02. 03.CPA250009 Z250027 PZ Staff Report

Maricopa County — Planning & Zoning (2026-01-08)

View PDF Item 2 Meeting page

Extracted text (via pymupdf) 51331 characters
CPA250009 & Z250027 
Page 1 of 11 
 
 
Report to the Planning and Zoning Commission 
Prepared by the Maricopa County Planning and Development Department 
 
 
Case: 
CPA250009 & Z250027 – NEC 491st Ave & Thomas Rd.  
 
 
 
 
Hearing Date: 
January 8, 2026 
 
Supervisor District: 
5 
 
 
 
  
 
Applicant: 
Jason Morris, Withey Morris Baugh, PLC  
 
Owner: 
Grandilla (Arizona) Inc. / Foot Creek Corporation  
   
 
Requests:  
1)        General Comprehensive Plan Amendment (CPA) of the Maricopa County 
Vision 2030 Comprehensive Plan’s land use designation from Rural 
Development Area (RDA) to Utilities  
 
2) 
Zone change with overlay from Rural-43 to IND-2 IUPD  
 
 
Site Location: 
Generally located NEC of Thomas Rd & 491st Ave in the Harquahala Valley 
area. 
 
  
Site Size: 
Approximately 638 acres 
 
Density: 
N/A 
 
County Island:  
No 
 
 
County Plan: 
Rural Development Area (RDA)  
 
Municipal Plan: 
N/A 
 
Municipal Comments: 
None received to date  
 
Support/Opposition: 
None known 
 
Recommendation: 
1)  
Approve  
 
2)  
Approve with conditions

CPA250009 & Z250027 
Page 2 of 11 
Project Summary: 
 
1. 
The applicant, on behalf of the property owners, is requesting a CPA of the County’s Vision 2030 
Comprehensive Plan from RDA to Utilities  and a companion rezone from Rural-43 to IND-2 IUPD. 
This will permit development of solar power generation, battery energy storage systems (BESS) 
and other industrial uses.  
 
2. 
The site is located in Harquahala Valley at the northeast corner of Thomas Rd and 491st Ave.  It 
is currently vacant land utilized for agriculture. There are no proximate residential neighborhoods, 
but there is a vacant farmhouse property that has been excluded from this application at the 
northwestern corner of the site. Surrounding land uses are agricultural and except for a large gas-
powered APS power generating station located adjacent to the immediate  southwest. 
 
3. 
The CPA narrative asserts that the proposal meets the criteria: 
 
4. 
“Overall Improvement to the Comprehensive Plan  
The proposed amendment represents an overall improvement to the Maricopa County 
Comprehensive Plan by advancing multiple Vision 2030 goals. The land use designation change is 
compatible with the existing uses in the area surrounding the Property and supports development 
that aligns with the County’s long-term economic and infrastructure goals and policies. The 
Property’s proximity to substantial regional energy infrastructure, including power generation 
assets, creates a unique opportunity to collocate a high-tech, energy-intensive use where reliable 
power infrastructure already exists, thereby minimizing the need for costly or disruptive new utility 
extensions.  
Data centers are capital-intensive, low-trip-generating employers that diversify the County’s 
economic base, strengthen its position in the knowledge and technology sector, and provide 
durable tax revenue without straining County services or infrastructure. By placing this use in a 
sparsely populated rural area substantially separated from incompatible development, the 
amendment supports Vision 2030’s goals of promoting balanced and efficient land use patterns, 
encouraging development where infrastructure is available, and fostering economic growth that is 
compatible with the surrounding land uses and environmental context. In doing so, it benefits the 
broader region, not just the property owner, by catalyzing employment and infrastructure 
investment consistent with the Comprehensive Plan’s vision for sustainable, long-term prosperity. 
 
5. 
No Adverse Impact to Planning Area 
 
The proposed amendment will have no adverse impact on the planning area because it is located 
in a sparsely populated, rural setting with substantial separation from residential neighborhoods 
and other sensitive uses, thereby eliminating the potential for land use conflicts. The surrounding 
context is dominated by large-lot rural parcels, existing utility infrastructure, and natural gas and 
solar energy generation facilities, all of which are compatible with the low-traffic, low-emissions 
operational profile of a data center campus. The amendment and the proposed development it will 
accommodate will not require unplanned County expenditures for road, water, or sewer extensions, 
as all necessary improvements and on-site utility systems will be privately funded. Traffic 
generation will be minimal compared to other industrial uses of similar scale, preserving roadway 
capacity and avoiding degradation of planned transportation service levels. 
 
In short, the amendment is compatible with the existing land use patterns and will not burden public 
infrastructure or diminish the health, safety, or quality of life of current or future area residents. 
 
6. 
Consistency with Intent of Comprehensive Plan 
This proposal is fully consistent with the intent of the Maricopa County Comprehensive Plan, which 
seeks to promote balanced and efficient land use patterns, strengthen the County’s economic base,

CPA250009 & Z250027 
Page 3 of 11 
protect environmental resources, and ensure infrastructure investments are fiscally responsible. 
Vision 2030 emphasizes directing employment uses to locations where infrastructure already 
exists or can be efficiently extended. The property’s proximity to existing regional energy 
infrastructure provides reliable energy access without requiring costly new utility corridors. The 
proposed Heavy Industrial designation accommodates a use that is low in traffic generation, high 
in capital investment, and provides long-term operational stability, traits that align with the Plan’s 
goals for sustainable economic growth and fiscal strength. By situating a high-tech data center 
campus in a rural, infrastructure-adjacent location buffered from incompatible uses, the 
amendment supports the Comprehensive Plan’s overarching vision of fostering prosperity, 
protecting quality of life, and guiding development in a manner that benefits the broader region. 
 
 
7. 
. with Specific Goals and Policies: 
Economic Growth Goal: Have a diverse and balanced economy to promote long-term economic 
stability and economic resiliency. The proposed change in comprehensive plan land use 
designation and corresponding rezoning enables the development of a high-tech data center 
campus, which directly supports employment opportunities and capital investment in a targeted 
growth sector (information and data services). The scale of the development—over 600 acres and 
2.25 million square feet of potential building area—signals long-term employment potential and 
economic growth aligned with county planning for industrial and employment uses. Additionally, 
the project is located in a sparsely populated rural area and in proximity to significant regional 
energy infrastructure, reducing the risk of land use conflicts and minimizing impacts to sensitive 
residential areas. 
 
8. 
Land Use Policy: Use land use buffers and compatible land use strategies near existing and future 
high voltage electric utility line corridors. The subject site is in close proximity to several important 
utility infrastructure assets. Although the specific power source has not yet been confirmed, the 
presence of significant nearby energy infrastructure supports the feasibility of large-scale industrial 
development at this location. The proposed development represents an efficient and compatible 
use of land resources. 
 
9. 
Economic Growth Goal: Create and grow a diverse business climate. Data centers represent a vital 
component of the digital economy, providing infrastructure to support cloud services, AI 
processing, and global data management. This project would help diversify the local economy 
beyond traditional agriculture and energy uses and solidify Maricopa County’s role as a destination 
for emerging technology investment.” 
 
10. 
The rezoning request does not include a Plan of Development (POD) to set specific uses and 
design layouts at this time. However, the applicant’s narrative, speaks to a proposed data storage 
use intended to operate 24-hours per day.  Each building of the data center will house digital 
servers, switches, and telecommunications equipment. To maintain optimal conditions, systems 
such as generators, batteries, electrical distribution, and cooling systems are used to regulate 
heat and airflow throughout the building. The data center will employ technicians with specialized 
expertise who will monitor and maintain the data systems either on-site or remotely.  At this time 
the number of employees, type of screening, types of lighting, number of driveways, and amount 
of parking needed has not been finalized and will be determined in the Plan of Development stage.  
 
11. 
The IUPD proposes modified development standards from the base zoning district for flexibility 
in site design. An 80’ maximum building/structure height is requested (increased from 40’ in 
current ordinance and 60’ in updated ordinance effective January 9, 2026) to allow for modern 
data center design practices. Parking requirements are requested at a minimum 1 space per

CPA250009 & Z250027 
Page 4 of 11 
9,000 sq ft of building floor area (reduced from 1:900 in the current ordinance and 1:1,000 in the 
updated ordinance) as arguably  the use is employee extensive. Screening is requested to allow 
decorative metal fencing rather than a min. 6’ solid wall. Note that solid screen walls in practice 
are uncommon for large-acreage power generation facilities in remote locations, and often such 
site’s are surrounded by chain-link security fencing.  The proposal is to match industry 
standards and provide a congruent site design. IUPD will also limited the entitled uses of the 
IND-2 zoning district to uses available on septic until such time as sewer infrastructure is 
installed.  
   
[TABLE ON NEXT PAGE]

CPA250009 & Z250027 
Page 6 of 11 
Aerial photo of subject site

CPA250009 & Z250027 
Page 7 of 11 
Aerial image & surrounding environs

CPA250009 & Z250027 
Page 8 of 11 
Existing On-Site and Adjacent Zoning / Land Use: 
 
12. 
On-site: 
 
Rural-43 / Agricultural & vacant 
North: 
Rural-43 / Agricultural & vacant 
South: 
Rural-43 / Agricultural & vacant 
East: 
Rural-43 & IND-2/ Agricultural & vacant 
West: 
Rural-43 / Agricultural & vacant 
 
 
Zoning District map 
 
Utilities and Services: 
 
13. 
Water:  
 
Well (Harquahala Irrigation Authority) 
Wastewater: 
Septic 
School Districts: 
Buckeye Union High School District 
 
Arlington School District 
Fire: 
Harquahala Valley Fire District 
Police:  
MCSO

CPA250009 & Z250027 
Page 9 of 11 
Right-of-Way: 
 
14. 
The following table includes existing and proposed half-width right-of-way and the future 
classification based upon the Maricopa County Department of Transportation (MCDOT) Major 
Streets and Routes Plan.  It should be noted without a precise site plan nor a traffic study, right-
of-way preservation or right-of-way dedication cannot be determined at this time.  MCDOT is 
requesting that all perimeter section lines shall reserve a half-width right-of-way of 55’ and all 
perimeter mid-section lines shall reserve a half-width right-of-way of 40’. Moreover, any adjacent 
setback to these perimeter section and mid-section lines shall be added to the reserved half-width 
right-of-way.  
 
Street Name 
Half-width Existing R/W 
Half-width Proposed R/W 
Future Classification 
491st Ave 
30’ 
30’ 
Minor Collector  
 
Adopted Plan: 
 
13. 
Maricopa County Vision 2030 Comprehensive Plan (adopted 1/13/16): The plan designates this 
site as within the Rural Development Area (RDA) with a maximum density of one dwelling unit per 
gross acre, suitable for agricultural related uses and residential land uses.  
 
14. 
The same parcel confines were previously part of a comprehensive plan amendment under 
CPA2009009 which also changed the plan designation from RDA to Industrial for the Starwood 
Solar 1 Project. The case was conditioned on a 2-year timeframe due to concerns a zoning was 
not obtainable. (Note that CPA cases are no longer approved subject to conditions.) On December 
12, 2012 per CPA2021005 the CPA was rescinded and land use redesignated as its current RDA. 
 
Public Participation Summary: 
 
15. 
The applicant complied with the requirements of the citizen review process with the required 
posting of the site and notification by first class mail to interested parties and adjacent property 
owners within 300’ of the site. The applicant went further and notified all landowners within one-
mile. Signs were posted on the site, in accordance with applicable regulations. As of the writing 
of this report, neither applicant nor staff have received any support or opposition from the public. 
Staff spoke with two landowners in the vicinity who requested additional information but did not 
provide comments.  
 
Outstanding Concerns from Reviewing Agencies: 
 
16. 
N/A 
 
Staff Analysis: 
 
17. 
Staff is supportive of both the comprehensive plan amendment and the rezoning due to the 
changing nature of the area. History of the property and the surrounding area indicate industrial 
development specific to solar and other power-generation facilities and related uses are 
appropriate land use in the general vicinity due to remote location not proximate to any residential 
neighborhoods but with electric power distribution infrastructure. The adjacent gas-powered 
generation station creates an audible buzz in the air noted during site visits. The area is primarily 
agricultural in nature with a number of power-generation facilities, and a very sparse scattering 
of residences. The proposed 80’ maximum height allowance will make future structures visible 
from all vantage points.  However, the request for the site reflects a further expansion of the IND-

CPA250009 & Z250027 
Page 10 of 11 
2 zoning approved on nearby parcels and the higher intensity energy generating uses such as that 
of the neighboring power-generation station. There is no known opposition to the IND-2 IUPD 
zoning.  
 
Recommendation: 
 
18. 
Staff recommends the Commission adopt a motion to recommend that the Board of Supervisors 
approve CPA250009.  
 
19. 
Staff recommends the Commission adopt a motion recommending that the Board of Supervisors 
approve Z250027 subject to the following conditions ‘a’ – ‘j’: 
 
a. 
Development of the site shall be in substantial conformance with the Zoning Exhibit 
entitled “Z250027 Zoning Exhibit“, consisting of 1 full-size sheet, dated November 3, 
2025, except as modified by the following conditions. 
 
b. 
Development of the site shall be in substantial conformance with the Narrative Report 
entitled “NEC 491st Ave & Thomas Rd Rezone Project Narrative”, consisting of 10 pages, 
dated November, 2025, and stamped received December 11, 2025, except as modified 
by the following conditions. 
 
c. 
The following IND-2 IUPD standards shall apply: 
 
1. Maximum Height – 80’  
2. Minimum Parking - 1 space per 9000 sq ft  
3. Minimum Screening -  A 6’ metal security fence. Chain-link fencing with razor wire is 
prohibited 
4. Permitted uses - All uses permitted in the IND-2 Zoning District including Data 
Centers and accessory uses, electric substations and battery storage, and Power 
generation facilities for on-site utilization or sale to a utility or other off-site users. 
Until such time as the site is served by sewer, uses on the site shall only be those 
acceptable to the Maricopa County Environmental Services Department (MCESD) 
that can be accommodated by septic systems. A public water system shall be 
required prior to establishment of any non-residential use that requires potable 
water. 
 
 
d. 
The following engineering conditions: 
 
1. Without the submittal of a precise plan of development, no development approval is 
inferred by this review, including, but not limited to number of proposed building 
lots/units, drainage design, access and roadway alignments. These items will be 
addressed as development plans progress and are submitted to the County for further 
review and/or entitlement.  
 
2. A Traffic Study/Statement must be submitted with future entitlement (POD) 
application(s). See following link to MCDOT Traffic Impact Manual. (RDM 7.1.4) 
https://www.maricopa.gov/DocumentCenter/View/303  
 
3. Engineering review of re-zone cases is conceptual in nature. All development and 
engineering design shall be in conformance with Section 1205 of the Maricopa County

CPA250009 & Z250027 
Page 11 of 11 
Zoning Ordinance; Drainage Policies and Standards; Floodplain Regulations for 
Maricopa County; MCDOT Roadway Design Manual; and current engineering policies, 
standards and best practices at the time of application for construction. 
 
e. 
Unless waived or modified by the County, the applicant or developer shall implement the 
best practices and any recommendations by the Arizona Game and Fish Department 
(AZGFD). The Zoning Inspector and/or their designee shall review whether these best 
practices are being implemented in accordance with the letter following the issuance of 
relevant permits and periodically as needed through either the inspection process or 
communication with AZGFD. Should the Zoning Inspector and/or their designee decide 
that the owner or developer has not substantially undertaken these best practices in good 
faith, the owner or developer shall not receive final permits or certificate of occupancy 
until the best practices are implemented. 
 
f. 
Administrative approval of a plan of development will be required prior to approval and 
issuance of construction permits to develop and establish use of the site.  
 
g. 
Prior to issuance of a building permit, written confirmation will be required from the 
emergency fire protection jurisdiction having authority that the facility has been designed 
in accordance with their regulations and requirements, and that emergency fire protection 
service will be provided to the facility. Prior to issuance of the certificate of occupancy, 
local fire protection jurisdiction review and approval will be required. 
 
h. 
The developer must submit any project narrative to the Department of Defense Siting 
Clearinghouse for Energy, Installations, and Environmental for review at the following site: 
osd.dod-siting-clearinghouse@mail.mil prior to the submittal of any Plan of Development.  
 
i. 
The property owner/s and their successors waive claim for diminution in value if the 
County takes action to rescind approval due to noncompliance with conditions.  
 
j. 
The granting of this change in use of the property has been at the request of the applicant, 
with the consent of the landowner.  The granting of this approval allows the property to 
enjoy uses in excess of those permitted by the zoning existing on the date of application, 
subject to conditions.  In the event of the failure to comply with any condition, the property 
may be considered for revocation to the zoning that existed on the date of application.  It 
is, therefore, stipulated and agreed that either revocation due to the failure to comply with 
any conditions, does not reduce any rights that existed on the date of application to use, 
divide, sell or possess the property and that there would be no diminution in value of the 
property from the value it held on the date of application due to such revocation of the 
Zone Change.  The Zone Change enhances the value of the property above its value as of 
the date the Zone Change is granted and reverting to the prior zoning results in the same 
value of the property as if the Zone Change had never been granted. 
 
 
Presented by: 
Andrew Lorentzen, Planner 
Reviewed by: 
Rachel Applegate, Planning Supervisor 
 
Attachments: 
Comprehensive Plan Case Map (1 page) 
 
Zoning Case Map (1 page) 
 
Zoning Exhibit (1 page) 
 
Comprehensive Plan Change Narrative Report (16 pages) 
 
Zone Change Narrative Report (10 pages) 
 
Engineering Report (3 pages)   
 
MCESD comments (3 pages)

/
Maricopa County Planning & Development - Phoenix, AZ
5
Gross Acres: 637 approx.
Generated December 11, 2025 11:51 AM
CPA250009
Application Name:
Legal Description
NEC 491st Ave & Thomas Rd CPA
Applicant
Case Address
Stephanie Watney
3503 N 491ST AVE
Applicant Phone/Email
Parcel Primary:506-30-021A
6023464619
TONOPAH, AZ 85354
Map scale 1:13,073
Supervisor District No.
CPA to amend land use designation to Heavy Industrial. See narrative.

/
Maricopa County Planning & Development - Phoenix, AZ
5
Gross Acres: 641 approx.
Generated December 11, 2025 11:56 AM
Z250027
Application Name:
Legal Description
491st Ave & Thomas Rd Rezoning
Applicant
Case Address
Stephanie Watney
3503 N 491ST AVE
Applicant Phone/Email
Parcel Primary:506-30-021A
6023464619
TONOPAH, AZ 85354
Map scale 1:13,084
Supervisor District No.
I2 IUPD Rezoning (without a Plan of Development)

Development Team 
 
 
Legal Representative 
Withey Morris Baugh, PLC 
Jason Morris / Alex Hayes / Stephanie Watney, AICP 
2525 E. Arizona Biltmore Circle, Suite A-212 
Phoenix, AZ 85016 
hayes@wmbattorneys.com 
Civil Engineer 
Colliers Engineering & Design 
Darrell Wilson / Casey Whiteman 
2141 E. Highland Avenue  
Phoenix, AZ 850212

1 |  
 
TABLE OF CONTENTS 
 
A. INTRODUCTION ..............................................................................................2 
B. LOCATION AND SITE CONDITIONS ...........................................................2 
C. COMPREHENSIVE PLAN AND ZONING ......................................................2 
D. COMPREHENSIVE PLAN AMENDMENT PROPOSAL .................................3 
E. COMPREHENSIVE PLAN ANALYSIS .............................................................3 
F. CONCLUSION .................................................................................................5 
 
EXHIBITS 
 
1. Aerial Map 
2. Existing Comprehensive Plan Map 
3. Existing and Proposed Zoning Map 
4. Proposed Comprehensive Plan Map

2 |  
 
A. Introduction 
We are pleased to submit this comprehensive plan amendment application for the 
approximately 638-acre site located between Indian School Road to Thomas Road, and 
483rd Avenue to 491st Avenue in Unincorporated Maricopa County, otherwise commonly 
known as Maricopa County Assessor’s Parcel Numbers (APNs) 506-30-021A, 506-30-
024A (cumulatively, the “Property”) (See Tab 1, Aerial Map). The request is to change the 
Property’s Comprehensive Plan Land Use Designation from Rural Development Area to 
Heavy Industrial. Notably, this request does not include a ±2.12 acre residential portion 
of APN 506-30-021A (the “Out Parcel”); that parcel will remain a residential parcel. A 
companion application to rezone the Property from RU-43 to IND-2 IUPD has been filed 
under separate cover. 
 
B. Location and Site Conditions  
The Property is located in a predominantly undeveloped, rural area in western Maricopa 
County and the surrounding land uses are generally low-intensity, with large 
undeveloped tracts and rural residential parcels. However, to the east and beyond, there 
is an emerging industrial land use pattern with several properties rezoning to IND-2. To 
the north of the Property is vacant RU-43 land; to the east and southeast is vacant land 
and a solar farm zoned RU-43 and IND-2; to the south is vacant and farmed land zoned 
RU-43; to the southwest is the Harquahala Power Generation facility; and, to the west is 
vacant and farmed land zoned RU-43.  
Given the transition of the general area toward an industrial land use pattern, and the 
Property’s proximity to major transportation arteries, the Applicant proposes to develop 
the Property with industrial uses.  
C. Existing Comprehensive Plan and Zoning  
The Property has an existing Comprehensive Plan land use designation of Rural 
Development Area (See Tab 2, Existing Comprehensive Plan Map), which was approved 
by the Board of Supervisors in December 2012. Historically, the Property was designated as 
Industrial via Case No. CPA2009009 and was once envisioned as the site for a utility-scale 
solar electrical generating plant. However, the companion rezoning and Special Use Permit 
applications stalled during the Great Recession, when market conditions and financing 
constraints significantly reduced demand for large-scale energy projects. As a result, the 
County initiated a Comprehensive Plan reversion—an uncommon procedure by today’s 
practices—which restored the Property to its current Rural Development Area designation. 
 
The Property is zoned RU-43. See Tab 3, Existing and Proposed Zoning Map.  
 
 
[Left intentionally blank]

3 |  
 
D. Comprehensive Plan Amendment Proposal   
With the rise of the Internet of Things (IoT) and its increasingly integral role in the modern 
economy, data centers have evolved into critical infrastructure, ensuring reliable access to 
machine learning, data analytics, cloud computing and other essential services. In recent 
years, Arizona has established itself as an epicenter for this key economic sector. While the 
availability of reliable power and energy infrastructure has become a challenge for new 
development of data centers, the Property is ideally situated with proximity to energy 
options which present a unique opportunity for the Property, which is also proximate to key 
transportation arteries.  
 
Accordingly, this proposal is to amend the Property’s Comprehensive Plan land use 
designation from Rural Development Area to Heavy Industrial to accommodate data center 
uses. See Tab 4, Proposed Comprehensive Plan Map.  A companion application will be 
filed to rezone the Property from RU-43 to IND-2 with and IUPD. 
 
The proposed development is anticipated as a phased development, in which the 
sequencing would occur per market demand. The initial conceptual phase of development 
is anticipated to occur over the south portion of the Property. The conceptual site plan 
identifies nine (9) industrial buildings, each with a footprint of approximately 250,000 square 
feet, for a total building area of 2.25 million square feet. The conceptual site plan may be 
modified, however key strategic infrastructure will provide the backbone for development, 
including a dedicated switchyard (±26 acres), on-site septic facilities, and a water campus, 
which will enhance the site’s capacity for a variety of users. Retention areas are planned 
throughout the site to manage stormwater. Designated "Future Development (IND-2)" areas 
within the site plan provide flexibility to meet evolving industrial market needs, which may 
include colocation and innovative uses that support the primarily intended data center use. 
 
The proposed data center campus would create new, high wage employment opportunities 
and provide a new source of revenue for Maricopa County and the various taxing entities 
applicable to the Property. Additionally, as a low trip generating land use, the proposed data 
center is a compatible use within the existing area. While conceptual development plans are 
currently in the design phase, the proposed plans will be designed to provide a high quality 
and context appropriate development. 
 
E. Comprehensive Plan Analysis  
 
Overall Improvement to the Comprehensive Plan 
 
The proposed amendment represents an overall improvement to the Maricopa County 
Comprehensive Plan by advancing multiple Vision 2030 goals. The land use designation 
change is compatible with the existing uses in the area surrounding the Property and 
supports development that aligns with the County’s long-term economic and infrastructure 
goals and policies. The Property’s proximity to substantial regional energy infrastructure, 
including power generation assets, creates a unique opportunity to colocate a high-tech,

4 |  
 
energy-intensive use where reliable power infrastructure already exists, thereby minimizing 
the need for costly or disruptive new utility extensions.  
 
Data centers are capital-intensive, low-trip-generating employers that diversify the County’s 
economic base, strengthen its position in the knowledge and technology sector, and 
provide durable tax revenue without straining County services or infrastructure. By placing 
this use in a sparsely populated rural area substantially separated from incompatible 
development, the amendment supports Vision 2030’s goals of promoting balanced and 
efficient land use patterns, encouraging development where infrastructure is available, and 
fostering economic growth that is compatible with the surrounding land uses and 
environmental context. In doing so, it benefits the broader region, not just the property 
owner, by catalyzing employment and infrastructure investment consistent with the 
Comprehensive Plan’s vision for sustainable, long-term prosperity. 
 
No Adverse Impact to Planning Area  
 
The proposed amendment will have no adverse impact on the planning area because it is 
located in a sparsely populated, rural setting with substantial separation from residential 
neighborhoods and other sensitive uses, thereby eliminating the potential for land use 
conflicts. The surrounding context is dominated by large-lot rural parcels, existing utility 
infrastructure, and natural gas and solar energy generation facilities, all of which are 
compatible with the low-traffic, low-emissions operational profile of a data center campus. 
The amendment and the proposed development it will accommodate will not require 
unplanned County expenditures for road, water, or sewer extensions, as all necessary 
improvements and on-site utility systems will be privately funded. Traffic generation will be 
minimal compared to other industrial uses of similar scale, preserving roadway capacity and 
avoiding degradation of planned transportation service levels. 
 
In short, the amendment is compatible with the existing land use patterns and will not 
burden public infrastructure or diminish the health, safety, or quality of life of current or 
future area residents. 
 
Consistency with Intent of Comprehensive Plan  
 
This proposal is fully consistent with the intent of the Maricopa County Comprehensive Plan, 
which seeks to promote balanced and efficient land use patterns, strengthen the County’s 
economic base, protect environmental resources, and ensure infrastructure investments are 
fiscally responsible. Vision 2030 emphasizes directing employment uses to locations where 
infrastructure already exists or can be efficiently extended. The Property’s proximity to 
existing regional energy infrastructure provides reliable energy access without requiring 
costly new utility corridors. The proposed Heavy Industrial designation accommodates a use 
that is low in traffic generation, high in capital investment, and provides long-term 
operational stability, traits that align with the Plan’s goals for sustainable economic growth 
and fiscal strength. By situating a high-tech data center campus in a rural, infrastructure-
adjacent location buffered from incompatible uses, the amendment supports the 
Comprehensive Plan’s overarching vision of fostering prosperity, protecting quality of life, 
and guiding development in a manner that benefits the broader region.

5 |  
 
Consistency with Specific Goals and Policies  
 
1. Economic Growth Goal: Have a diverse and balanced economy to promote long-
term economic stability and economic resiliency.  
 
The proposed change in comprehensive plan land use designation and corresponding 
rezoning enables the development of a high-tech data center campus, which directly 
supports employment opportunities and capital investment in a targeted growth sector 
(information and data services). The scale of the development—over 600 acres and 2.25 
million square feet of potential building area—signals long-term employment potential and 
economic growth aligned with county planning for industrial and employment uses. 
Additionally, the project is located in a sparsely populated rural area and in proximity to 
significant regional energy infrastructure, reducing the risk of land use conflicts and 
minimizing impacts to sensitive residential areas. 
 
2. Land Use Policy: Use land use buffers and compatible land use strategies near 
existing and future high voltage electric utility line corridors.  
 
The subject site is in close proximity to several important utility infrastructure assets. 
Although the specific power source has not yet been confirmed, the presence of significant 
nearby energy infrastructure supports the feasibility of large-scale industrial development at 
this location. The proposed development represents an efficient and compatible use of land 
resources.  
 
3. Economic Growth Goal: Create and grow a diverse business climate.   
 
Data centers represent a vital component of the digital economy, providing infrastructure to 
support cloud services, AI processing, and global data management. This project would 
help diversify the local economy beyond traditional agriculture and energy uses and solidify 
Maricopa County’s role as a destination for emerging technology investment. 
 
 
F. Conclusion 
The requested comprehensive plan amendment and rezoning supports development that 
is consistent and compatible with both existing and planned development in this area. The 
Property is uniquely suited for the proposed use and would provide significant benefits to 
the County and the broader economic region.

https://www.wmbattorneys.com/
TAB 1

https://www.wmbattorneys.com/
TAB 2

https://www.wmbattorneys.com/
TAB 3

https://www.wmbattorneys.com/
TAB 4

Development Team 
 
 
Legal Representative 
Withey Morris Baugh, PLC 
Jason Morris / Alex Hayes / Stephanie Watney, AICP 
2525 E. Arizona Biltmore Circle, Suite A-212 
Phoenix, AZ 85016 
hayes@wmbattorneys.com 
Civil Engineer 
Colliers Engineering & Design 
Darrell Wilson / Casey Whiteman 
2141 E. Highland Avenue  
Phoenix, AZ 850212

1 |  
 
TABLE OF CONTENTS 
 
A. INTRODUCTION ..............................................................................................3 
B. LOCATION AND SITE CONDITIONS ...........................................................3 
C. COMPREHENSIVE PLAN AND ZONING ......................................................3 
D. REZONE PROPOSAL .......................................................................................3 
E. IUPD OVERLAY ................................................................................................3 
F. COMPREHENSIVE PLAN ANALYSIS .............................................................6 
G. ACCESSIBILITY AND CIRCULATION ............................................................6 
H. COMMUNITY FACILITIES AND SERVICES ...................................................7 
I. PUBLIC UTILITIES AND SERVICES ................................................................7 
J. CONCLUSION .................................................................................................7 
 
EXHIBITS 
 
1. Aerial Map 
2. Comprehensive Plan Map 
3. Existing and Proposed Zoning Map 
4. Conceptual Development Plan

2 |  
 
A. Introduction 
We are pleased to submit this rezoning application for the approximately 638-acre site 
located between Indian School Road to Thomas Road, and 483rd Avenue to 491st Avenue 
in Unincorporated Maricopa County, otherwise commonly known as Maricopa County 
Assessor’s Parcel Numbers (APNs) 506-30-021A, 506-30-024A (cumulatively, the “Property”) 
(See Tab 1, Aerial Map). The request is to rezone the Property from RU-43 to IND-2 IUPD. 
Notably, this request does not include a ±2.12 acre residential portion of APN 506-30-021A 
( the “Out Parcel”); that parcel will remain a residential parcel. 
 
B. Location and Site Conditions  
The Property is located in a predominantly undeveloped, rural area in western Maricopa 
County and the surrounding land uses are generally low-intensity, with large undeveloped 
tracts and rural residential parcels. However, to the east and beyond, there is an emerging 
industrial land use pattern with several properties rezoning to IND-2. To the north of the 
Property is vacant RU-43 land; to the east and southeast is vacant land and a solar farm zoned 
RU-43 and IND-2; to the south is vacant and farmed land zoned RU-43; to the southwest is 
the Harquahala Power Generation facility; and, to the west is vacant and farmed land zoned 
RU-43.  
 
Given the transition of the general area toward an industrial land use pattern, and the 
Property’s proximity to major transportation arteries, the Applicant proposes to develop the 
Property with industrial uses.  
C. Comprehensive Plan and Zoning  
The Property has a Comprehensive Plan land use designation of Rural Development Area. 
See Tab 2, Existing Comprehensive Plan Map, which was approved by the Board of 
Supervisors in December 2012. Historically, the Property was designated as Industrial via 
Case No. CPA2009009 and was once envisioned as the site for a utility-scale solar electrical 
generating plant. However, the companion rezoning and Special Use Permit applications 
stalled during the Great Recession, when market conditions and financing constraints 
significantly reduced demand for large-scale energy projects. As a result, the County 
initiated a Comprehensive Plan reversion—an uncommon procedure by today’s practices—
which restored the Property to its current Rural Development Area designation. 
 
The Property is zoned RU-43. See Tab 3, Zoning Map. As discussed below, a companion 
Minor Amendment to the County’s Comprehensive Plan Map has been submitted under 
separate cover to support this industrial rezoning. 
 
 
[Left intentionally blank]

3 |  
 
D. Rezone Proposal   
With the rise of the Internet of Things (IoT) and its increasingly integral role in the modern 
economy, data centers have evolved into critical infrastructure, ensuring reliable access to 
machine learning, data analytics, cloud computing and other essential services. In recent 
years, Arizona has established itself as an epicenter for this key economic sector. While the 
availability of reliable power and energy infrastructure has become a challenge for new 
development of data centers, the Property is ideally situated with proximity to energy 
options which present a unique opportunity for the Property, which is also proximate to key 
transportation arteries. 
 
Accordingly, this proposal is to rezone the Property from Rural-43 to Light Industrial (IND-2) 
with an Industrial Unit Plan of Development (IUPD) Overlay, which, pursuant to county staff 
direction, is the appropriate zoning to accommodate data center uses. A companion 
application will be filed to amend the Property’s Comprehensive Plan land use designation 
from Rural Development Area to Heavy Industrial, which supports IND-2 uses. 
 
The proposed development is anticipated as a phased development, in which the 
sequencing would occur per market demand. The initial conceptual phase of development 
is anticipated to occur over the south portion of the Property. The conceptual site plan 
identifies nine (9) industrial buildings, each with a footprint of approximately 250,000 square 
feet, for a total building area of 2.25 million square feet. The conceptual site plan may be 
modified, however key strategic infrastructure will provide the backbone for development, 
including a dedicated switchyard (±26 acres), on-site septic facilities, and a water campus, 
which will enhance the site’s capacity for a variety of users. Retention areas are planned 
throughout the site to manage stormwater. Designated "Future Development (IND-2)" areas 
within the site plan provide flexibility to meet evolving industrial market needs, which may 
include colocation and innovative uses that support the primarily intended data center use. 
 
The proposed data center campus would create new, high wage employment opportunities 
and provide a new source of revenue for Maricopa County and the various taxing entities 
applicable to the Property. Additionally, as a low trip generating land use, the proposed 
data center is a compatible use within the existing area. While conceptual development 
plans are currently in the design phase, the proposed plans will be designed to provide a 
high quality and context appropriate development. 
 
E. IUPD Overlay  
The purpose of the IUPD overlay is to allow variations in development standards for 
industrial projects that require special design techniques or flexibility. As described herein, 
the proposed rezone is intended to accommodate a data center campus that will support 
critical digital infrastructure functions. Data centers are a unique and evolving product type 
with certain design and operational needs that are not fully accommodated by the base IND-
2 development standards. Accordingly, this application proposes the following 
development standards for the IUPD overlay, which include variations to the maximum 
height and minimum parking requirements. Additionally, while it is understood that data

4 |  
 
centers are a permitted use in the IND-2 district, the ordinance does not specifically 
contemplate the use. This IUPD overlay clarifies that the permitted uses shall include all use 
permitted in the IND-2 district, as well as data centers and ancillary uses, including 
substations, battery storage, and electrical distribution facilities.  
 
Development Standards 
 
Development Standard 
Base Zoning District 
Regulations (IND-2) 
Proposed Zoning 
Regulations (IND-2 IUPD) 
Height (Primary Buildings) 
 
40' 
80' 
Front Yard 
 
 
Abutting a Major Street, Section 
Line Road, State or Federal 
Highway 
20' 
20' 
Abutting Collector Streets and 
midsection line roads 
15' 
15' 
Abutting local and interior 
streets of industrial subdivision 
10' 
10' 
Side Yard 
 
 
Adjacent rural or residential 
zoning district 
5' 
5' 
Rear Yard 
 
 
Abutting rural or residential 
zoning district 
25’ 
25’ 
Abutting commercial or 
industrial zoning district 
0’ 
0’ 
Lot Area (Min) 
6,000 sf 
6,000 SF 
Lot Width (Min) 
60' 
60' 
Lot Coverage 
60% 
60% 
Parking 
1 space / 600 sf of 
floor area 
1 space / 9,000 sf of floor area 
Screening requirement 
A solid masonry wall not 
less than six feet in height 
shall be required along 
and adjacent to any side 
or rear property line 
abutting any rural or 
residential zone 
boundary, or any alley 
abutting such zone 
boundary. Further, any 
access gates shall be 
constructed of view-
obscuring material to 
A metal security fence is 
permitted in lieu of a solid 
masonry wall. Chain link 
fencing with razor wire designs 
shall not be permitted.

5 |  
 
provide effective site 
screening. 
Permitted Uses 
All Uses Permitted in 
the IND-2 Zoning 
District 
All uses permitted in the 
IND-2 Zoning District. 
Data Centers and accessory 
uses, including electric 
substations and battery 
storage. 
Power generation facilities, 
including for on-site utilization 
or sale to a utility or other off-
site users. 
 
 
Height 
Additional building height optionality will allow for efficient utilization of land and ensures 
scalability to meet future demand. The ability to provide extra clear height will 
accommodate the unique operational and design requirements of the modern data center 
facility, which require large-volume interior spaces to house vertically stacked server racks, 
cooling infrastructure and other mechanical equipment, and fire suppression systems. Taller 
structures can also optimize airflow and reduce cooling loads.  The minimal residential 
development in the vicinity of the Property, as well as the presence of substantial power 
generation and transmission infrastructure, minimizes the potential for visual or land use 
conflicts.    
 
Parking  
The Applicant proposes a reduced parking ratio for the proposed data center campus 
based on the unique operational characteristics of data center facilities. While data center 
operations require staffing of skilled, high-wage employees, the number of full-time, on-site 
employees is less than that of traditional office or industrial uses. Additionally, data centers 
are not customer-facing and do not need to accommodate visitor traffic or parking. The 
proposed ratio is tailored to actual demand and will fully meet operational needs for both 
full-time employees and intermittent contractor and maintenance activity. This approach 
ensures functional adequacy and promotes efficient use of land resources by eliminating the 
requirement for an expanse of unused parking spaces.  
 
Screening 
Considering the scale, location, and operational characteristics of the Property and the 
proposed development, a 6’ tall masonry wall around the entire perimeter would be 
unnecessary and incompatible with the site context. The Property is located in a sparsely 
populated area with substantial distances between the proposed buildings and any existing 
residences. The conceptual plan incorporates generous setbacks and natural buffers which 
provide effective visual separation and reduce the need for an urban-style solid perimeter 
wall. A continuous masonry wall of this scale would create a significant visual barrier and

6 |  
 
disrupt the open, rural character of the area. The proposed alternative – security fencing 
combined with landscape screening in key areas – preserves the visual openness typical of 
the County’s rural planning area while still providing appropriate screening where 
necessary.  
F. Comprehensive Plan Analysis  
The proposed rezone is consistent with the goals and policies of the Maricopa County Vision 
2030 Comprehensive Plan, including the following: 
 
1. Economic Growth Goal: Have a diverse and balanced economy to promote long-
term economic stability and economic resiliency.  
 
The rezoning to IND-2 enables the development of a high-tech data center campus, which 
directly supports employment opportunities and capital investment in a targeted growth 
sector (information and data services). The scale of the development—over 600 acres and 
2.25 million square feet of potential building area—signals long-term employment potential 
and economic growth aligned with county planning for industrial and employment uses. 
Additionally, the project is located in a sparsely populated rural area and in proximity to 
significant regional energy infrastructure, reducing the risk of land use conflicts and 
minimizing impacts to sensitive residential areas. 
 
2. Land Use Policy: Use land use buffers and compatible land use strategies near 
existing and future high voltage electric utility line corridors.  
 
The subject site is in close proximity to an existing natural gas power generation facility, 
which is an important utility infrastructure asset. Although it’s not confirmed whether the 
data center would utilize that specific generation source, the presence of significant nearby 
energy infrastructure supports the feasibility of large-scale industrial development at this 
location. The proposed development represents an efficient and compatible use of land 
resources.  
 
3. Economic Growth Goal: Create and grow a diverse business climate.   
 
Data centers represent a vital component of the digital economy, providing infrastructure to 
support cloud services, AI processing, and global data management. This project would 
help diversify the local economy beyond traditional agriculture and energy uses and solidify 
Maricopa County’s role as a destination for emerging technology investment. 
 
 
G. Accessibility and Circulation  
At this stage, the site plan for the proposed development is purely conceptual and the 
internal circulation has not been designed. A future plan of development will provide 
additional details related to site access and circulation and such design will conform with 
County standards and be informed by a Traffic Impact Study.

7 |  
 
Pursuant to the conceptual site plan, primary access to the site will be from 491st Avenue, 
which connects to I-10 to the north via Salome Road. Secondary access is anticipated to be 
provided via Thomas Road. At the plan of development stage, right of way dedications are 
anticipated for Thomas Road, Indian School Road, 491st Avenue, and 483rd Avenue.  
 
H. Community Facilities and Services  
The Property is located in the Arlington Elementary School District and the Buckeye Union 
High School District. The proposed use is not residential and will not have an impact on local 
schools. However, the proposed use will generate substantial revenue that will benefit the 
school districts.  
 
The Property is located in a sparsely populated rural area predominantly used for agriculture 
and energy generation. There are no community facilities or amenities located in the 
immediate vicinity.  
 
 
I. Public Utilities and Services   
A list of anticipated utility and service providers will include: 
 
• 
Water -  There is no water service available within the area of this Project.  It is anticipated 
that a private water campus will be constructed as part of this Project with a production well, 
treatment and onsite storage that will meet the domestic water, process water and fire 
requirements.  All water facilities are anticipated to be privately owned and maintained.  A 
connection to a public water system is not currently contemplated.  More detailed water 
demand and facility information will be provided for the Project as the site planning and 
development process advances. 
 
The Property is located within the Harquahala Irrigation Authority (Nos. 60-201107.0001 and 
60-201108.0001), which provides water rights to the Property based on its historically 
irrigated acreage. Accordingly, the Property is permitted to withdraw approximately 1,920 
acre feet of water per year over a rolling ten-year period, or up to 3,840 acre feet in any given 
year. This equates to approximately 1,714,065 gallons per day and 3,428,131 gallons per 
day, respectively.  
 
Specific water demand will be identified during the plan of development phase, but water 
demand is not anticipated to exceed the existing rights for property. 
 
• 
Wastewater - This Project does not currently have wastewater facilities within the Project 
vicinity.  Domestic wastewater needs will be addressed through a conventional septic system 
to be constructed onsite.  If industrial wastewater is needed for this Project, an onsite 
treatment facility will be constructed.  More detailed wastewater production and facility 
information will be provided for the Project as the site planning and development process 
advances. 
• 
Fire Protection – Harquahala Valley Fire District 
• 
Public Safety – Maricopa County Sheriff’s Office (District 2) 
• 
Power – Arizona Public Service

8 |  
 
• 
Gas Services – Southwest Gas Corporation  
 
 
 
J. Conclusion 
The requested comprehensive plan amendment and rezoning supports development that 
is consistent and compatible with both existing and planned development in this area. The 
Property is uniquely suited for the proposed use and would provide significant benefits to 
the County and the broader economic region.