Agreement with Inter Technologies Corporation

City of Glendale — Regular Meeting (2026-03-24)

View PDF Item 18 Meeting page

Extracted text (via pymupdf) 57927 characters
1 
01/28/2025 
C      
AGREEMENT FOR 
TRAFFIC MANAGEMENT CENTER VIDEO SYSTEM UPGRADE 
City of Glendale Solicitation No. RFP 26-11 
This Agreement for Traffic Management Center Video System Upgrade ("Agreement") is effective and entered into 
between CITY OF GLENDALE, an Arizona municipal corporation ("City"), and Inter Technologies Corporation, a 
Virginia Corporation, authorized to do business in the State of Arizona, ("Contractor"), as of the _____ day of 
____________, 2026. 
RECITALS 
A. 
City intends to undertake a project for the benefit of the public and with public funds that is more fully set 
forth in Exhibit A, pursuant to Solicitation No. RFP 26-11 (the "Project"); 
B. 
City desires to retain the services of Contractor to perform those specific duties and produce the specific 
work as set forth in the Project attached hereto; and 
C. 
City and Contractor desire to memorialize their agreement with this document. 
AGREEMENT 
In consideration of the Recitals, which are confirmed as true and correct and incorporated by this reference, the 
mutual promises and covenants contained in this Agreement, and other good and valuable consideration, City and 
Contractor agree as follows: 
1. 
Key Personnel; Sub-contractors. 
1.1 
Services.  Contractor will provide all services necessary to assure the Project is completed timely and 
efficiently consistent with Project requirements, including, but not limited to, working in close 
interaction and interfacing with City and its designated employees, and working closely with others, 
including other contractors or consultants, retained by City. 
1.2 
Project Team. 
a. 
Project Manager. 
(1) 
Contractor will designate an employee as Project Manager with sufficient training, 
knowledge, and experience to complete the Project and handle all aspects of the 
Project (as determined by the City in its sole discretion); such that the work 
produced by Contractor is consistent with applicable standards as detailed in this 
Agreement; 
(2) 
The City must approve the designated Project Manager; and 
(3) 
To assure the Project schedule is met, Project Manager may be required to devote 
no less than a specific amount of time as set out in Exhibit A. 
b. 
Project Team. 
(1) 
The Project Manager and all other employees assigned to the project by Contractor 
will comprise the "Project Team." 
(2) 
Project Manager will have responsibility for and will supervise all other employees 
assigned to the Project by Contractor. 
c. 
Discharge, Reassign, Replacement. 
(1) 
Contractor acknowledges the Project Team is comprised of the same persons and 
roles for each as may have been identified in the response to the Project's 
solicitation.

2 
01/28/2025 
(2) 
Contractor will not discharge, reassign or replace or diminish the responsibilities of 
any of the employees assigned to the Project who have been approved by City 
without City's prior written consent unless that person leaves the employment of 
Contractor, in which event the substitute must first be approved in writing by City. 
(3) 
Contractor will change any of the members of the Project Team at the City's request 
if an employee's performance does not equal or exceed the level of competence that 
the City may reasonably expect of a person performing those duties or if the acts or 
omissions of that person are detrimental to the development of the Project. 
d. 
Sub-contractors. 
(1) 
Contractor may engage specific technical contractor (each a "Sub-contractor") to 
furnish certain service functions. 
(2) 
Contractor will remain fully responsible for Sub-contractor's services. 
(3) 
Sub-contractors must be approved by the City, unless the Sub-contractor was 
previously mentioned in the response to the solicitation. 
(4) 
Contractor shall certify by letter that contracts with Sub-contractors have been 
executed incorporating requirements and standards as set forth in this Agreement. 
2. 
Schedule.  The services will be undertaken in a manner that ensures the Project is completed timely and 
efficiently in accordance with the Project. 
3. 
Contractor’s Work. 
3.1 
Standard.  Contractor must perform services in accordance with the standards of due diligence, care, 
and quality prevailing among contractors having substantial experience with the successful furnishing 
of services for projects that are equivalent in size, scope, quality, and other criteria under the Project 
and identified in this Agreement. 
3.2 
Licensing.  Contractor warrants that: 
a. 
Contractor and Sub-contractors will hold all appropriate and required licenses, registrations 
and other approvals necessary for the lawful furnishing of services ("Approvals"); and 
b. 
Neither Contractor nor any Sub-contractor has been debarred or otherwise legally excluded 
from contracting with any federal, state, or local governmental entity ("Debarment"). 
(1) 
City is under no obligation to ascertain or confirm the existence or issuance of any 
Approvals or Debarments or to examine Contractor's contracting ability. 
(2) 
Contractor must notify City immediately if any Approvals or Debarment changes 
during the Agreement's duration and the failure of the Contractor to notify City as 
required will constitute a material default under the Agreement. 
3.3 
Compliance.  Services will be furnished in compliance with applicable federal, state, county and local 
statutes, rules, regulations, ordinances, building codes, life safety codes, and other standards and 
criteria designated by City. 
Contractor must not discriminate against any employee or applicant for employment on the basis of 
race, color, religion, sex, national origin, age, marital status, sexual orientation, gender identity or 
expression, genetic characteristics, familial status, U.S. military veteran status or any 
disability.  Contractor will require any Sub-contractor to be bound to the same requirements as stated 
within this section.  Contractor, and on behalf of any subcontractors, warrants compliance with this 
section.

3 
01/28/2025 
3.4 
Coordination; Interaction. 
a. 
For projects that the City believes requires the coordination of various professional services, 
Contractor will work in close consultation with City to proactively interact with any other 
professionals retained by City on the Project ("Coordinating Project Professionals"). 
b. 
Subject to any limitations expressly stated in the Project Budget, Contractor will meet to 
review the Project, Schedule, Project Budget, and in-progress work with Coordinating 
Project Professionals and City as often and for durations as City reasonably considers 
necessary in order to ensure the timely work delivery and Project completion. 
c. 
For projects not involving Coordinating Project Professionals, Contractor will proactively 
interact with any other contractors when directed by City to obtain or disseminate timely 
information for the proper execution of the Project. 
3.5 
Work Product. 
a. 
Ownership.  Upon receipt of payment for services furnished, Contractor grants to City, and 
will cause its Sub-contractors to grant to the City, the exclusive ownership of and all 
copyrights, if any, to evaluations, reports, drawings, specifications, project manuals, surveys, 
estimates, reviews, minutes, all "architectural work" as defined in the United States Copyright 
Act, 17 U.S.C § 101, et seq., and other intellectual work product as may be applicable ("Work 
Product"). 
(1) 
This grant is effective whether the Work Product is on paper (e.g., a "hard copy"), 
in electronic format, or in some other form. 
(2) 
Contractor warrants, and agrees to indemnify, hold harmless and defend City for, 
from and against any claim that any Work Product infringes on third-party 
proprietary interests. 
b. 
Delivery.  Contractor will deliver to City copies of the preliminary and completed Work 
Product promptly as they are prepared. 
c. 
City Use. 
(1) 
City may reuse the Work Product at its sole discretion. 
(2) 
In the event the Work Product is used for another project without further 
consultations with Contractor, the City agrees to indemnify and hold Contractor 
harmless from any claim arising out of the Work Product. 
(3) 
In such case, City shall also remove any seal and title block from the Work Product. 
4. 
Compensation for the Project. 
4.1 
Compensation.  Contractor's compensation for the Project, including those furnished by its Sub-
contractors will not exceed $600,000, as specifically detailed in Exhibit B (the "Compensation"). 
4.2 
Change in Scope of Project.  The Compensation may be equitably adjusted if the originally 
contemplated scope of services as outlined in the Project is significantly modified. 
a. 
Adjustments to the Compensation require a written amendment to this Agreement and may 
require City Council approval. 
b. 
Additional services which are outside the scope of the Project contained in this Agreement 
may not be performed by the Contractor without prior written authorization from the City. 
c. 
Notwithstanding the incorporation of the Exhibits to this Agreement by reference, should 
any conflict arise between the provisions of this Agreement and the provisions found in the 
Exhibits and accompanying attachments, the provisions of this Agreement shall take priority 
and govern the conduct of the parties.

4 
01/28/2025 
5. 
Billings and Payment. 
5.1 
Applications. 
a. 
Contractor will submit monthly invoices (each, a "Payment Application") to City's Project 
Manager and City will remit payments based upon the Payment Application as stated below. 
b. 
The period covered by each Payment Application will be one calendar month ending on the 
last day of the month or as specified in the solicitation. 
5.2 
Payment. 
a. 
After a full and complete Payment Application is received, City will process and remit 
payment within 30 days. 
b. 
Payment may be subject to or conditioned upon City's receipt of: 
(1) 
Completed work generated by Contractor and its Sub-contractors; and 
(2) 
Unconditional waivers and releases on final payment from Sub-contractors as City 
may reasonably request to assure the Project will be free of claims arising from 
required performances under this Agreement. 
5.3 
Review and Withholding.  City's Project Manager will timely review and certify Payment Applications. 
a. 
If the Payment Application is rejected, the Project Manager will issue a written listing of the 
items not approved for payment. 
b. 
City may withhold an amount sufficient to pay expenses that City reasonably expects to incur 
in correcting the deficiency or deficiencies rejected for payment. 
6. 
Termination. 
6.1 
For Convenience.  City may terminate this Agreement for convenience, without cause, by delivering 
a written termination notice stating the Effective Termination date, which may not be less than 30 
days following the date of delivery. 
a. 
Contractor will be equitably compensated for Goods or Services furnished prior to receipt 
of the termination notice and for reasonable costs incurred. 
b. 
Contractor will also be similarly compensated for any approved effort expended and 
approved costs incurred that are directly associated with project closeout and delivery of the 
required items to the City. 
6.2 
For Cause.  City may terminate this Agreement for cause if Contractor fails to cure any breach of this 
Agreement within seven days after receipt of written notice specifying the breach. 
a. 
Contractor will not be entitled to further payment until after City has determined its damages.  
If City's damages resulting from the breach, as determined by City, are less than the equitable 
amount due but not paid Contractor for Service and Repair furnished, City will pay the 
amount due to Contractor, less City's damages, in accordance with the provision of § 5. 
b. 
If City's direct damages exceed amounts otherwise due to Contractor, Contractor must pay 
the difference to City immediately upon demand; however, Contractor will not be subject to 
consequential damages of more than $2,000,000 or the amount of this Agreement, whichever 
is greater. 
7. 
Conflict.  Contractor acknowledges this Agreement is subject to A.R.S. § 38-511, which allows for 
cancellation of this Agreement in the event any person who is significantly involved in initiating, negotiating, 
securing, drafting, or creating the Agreement on City's behalf is also an employee, agent, or consultant of any 
other party to this Agreement. 
8. 
Insurance. 
8.1 
Requirements.  Contractor must obtain and maintain the following insurance ("Required Insurance"):

5 
01/28/2025 
a. 
Contractor and Sub-contractors.  Contractor, and each Sub-contractor performing work or 
providing materials related to this Agreement must procure and maintain the insurance 
coverages described below (collectively referred to herein as the "Contractor's Policies"), 
until each Party's obligations under this Agreement are completed. 
b. 
General Liability. 
(1) 
Contractor must at all times relevant hereto carry a commercial general liability 
policy with a combined single limit of at least $2,000,000 per occurrence and 
$4,000,000 annual aggregate for each property damage and contractual property 
damage. 
(2) 
Sub-contactors must at all times relevant hereto carry a general commercial liability 
policy with a combined single limit of at least $2,000,000 per occurrence. 
(3) 
This commercial general liability insurance must include independent contractors' 
liability, contractual liability, broad form property coverage, XCU hazards if 
requested by the City, and a separation of insurance provision. 
(4) 
These limits may be met through a combination of primary and excess liability 
coverage. 
c. 
Auto.  A business auto policy providing a liability limit of at least $2,000,000 per accident for 
Contractor and $2,000,000 per accident for Sub-contractors and covering owned, non-
owned and hired automobiles. 
d. 
Workers' Compensation and Employer's Liability.  A workers' compensation and employer's 
liability policy providing at least the minimum benefits required by Arizona law. 
e. 
Notice of Changes.  Contractor's Policies must provide for not less than 30 days' advance 
written notice to City Representative of: 
(1) 
Cancellation or termination of Contractor or Sub-contractor's Policies; 
(2) 
Reduction of the coverage limits of any of Contractor or and Sub-contractor's 
Policies; and 
(3) 
Any other material modification of Contractor or Sub-contractor's Policies related 
to this Agreement. 
f. 
Certificates of Insurance. 
(1) 
Within 10 business days after the execution of the Agreement, Contractor must 
deliver to City Representative certificates of insurance for each of Contractor and 
Sub-contractor's Policies, which will confirm the existence or issuance of Contractor 
and Sub-contractor's Policies in accordance with the provisions of this section, and 
copies of the endorsements of Contractor and Sub-contractor's Policies in 
accordance with the provisions of this section. 
(2) 
City is and will be under no obligation either to ascertain or confirm the existence 
or issuance of Contractor and Sub-contractor's Policies, or to examine Contractor 
and Sub-contractor’s Policies, or to inform Contractor or Sub-contractor in the 
event that any coverage does not comply with the requirements of this section. 
(3) 
Contractor's failure to secure and maintain Contractor Policies and to assure Sub-
contractor policies as required will constitute a material default under the 
Agreement. 
g. 
Other Contractors or Vendors. 
(1) 
Other contractors or vendors that may be contracted with in connection with the 
Project must procure and maintain insurance coverage as is appropriate to their 
particular contract.

6 
01/28/2025 
(2) 
This insurance coverage must comply with the requirements set forth above for 
Contractor's Policies (e.g., the requirements pertaining to endorsements to name the 
parties as additional insured parties and certificates of insurance). 
h. 
Policies.  Except with respect to workers' compensation and employer's liability coverages, 
City must be named and properly endorsed as additional insureds on all liability policies 
required by this section. 
(1) 
The coverage extended to additional insureds must be primary and must not 
contribute with any insurance or self insurance policies or programs maintained by 
the additional insureds. 
(2) 
All insurance policies obtained pursuant to this section must be with companies 
legally authorized to do business in the State of Arizona and reasonably acceptable 
to all parties. 
8.2 
Sub-contractors. 
a. 
Contractor must also cause its Sub-contractors to obtain and maintain the Required 
Insurance. 
b. 
City may consider waiving these insurance requirements for a specific Sub-contractor if City 
is satisfied the amounts required are not commercially available to the Sub-contractor and 
the insurance the Sub-contractor does have is appropriate for the Sub-contractor's work 
under this Agreement. 
c. 
Contractor and Sub-contractors must provide to the City proof of the Required Insurance 
whenever requested. 
8.3 
Indemnification. 
a. 
To the fullest extent permitted by law, Contractor must defend, indemnify, and hold 
harmless City and its elected officials, officers, employees and agents (each, an "Indemnified 
Party," collectively, the "Indemnified Parties"), for, from, and against any and all claims, 
demands, actions, damages, judgments, settlements, personal injury (including sickness, 
disease, death, and bodily harm), property damage (including loss of use), infringement, 
governmental action and all other losses and expenses, including attorneys' fees and litigation 
expenses (each, a "Demand or Expense"; collectively, "Demands or Expenses") asserted by 
a third-party (i.e. a person or entity other than City or Contractor) and that arises out of or 
results from the breach of this Agreement by the Contractor or the Contractor’s negligent 
actions, errors or omissions (including any Sub-contractor or other person or firm employed 
by Contractor), whether sustained before or after completion of the Project. 
b. 
This indemnity and hold harmless provision applies even if a Demand or Expense is in part 
due to the Indemnified Party's negligence or breach of a responsibility under this Agreement, 
but in that event, Contractor shall be liable only to the extent the Demand or Expense results 
from the negligence or breach of a responsibility of Contractor or of any person or entity 
for whom Contractor is responsible. 
c. 
Contractor is not required to indemnify any Indemnified Parties for, from, or against any 
Demand or Expense resulting from the Indemnified Party's sole negligence or other fault 
solely attributable to the Indemnified Party. 
9. 
E-verify, Records and Audits. To the extent applicable under A.R.S. § 41-4401, the Contractor warrants 
their compliance and that of its subcontractors with all federal immigration laws and regulations that relate to 
their employees and compliance with the E-verify requirements under A.R.S. § 23-214(A). The Contractor or 
subcontractor’s breach of this warranty shall be deemed a material breach of the Agreement and may result 
in the termination of the Agreement by the City under the terms of this Agreement. The City retains the legal 
right to randomly inspect the papers and records of the other party to ensure that the other party is complying 
with the above-mentioned warranty. The Contractor and subcontractor warrant to keep their respective

7 
01/28/2025 
papers and records open for random inspection during normal business hours by the other party. The parties 
shall cooperate with the City’s random inspections, including granting the inspecting party entry rights onto 
their respective properties to perform the random inspections and waiving their respective rights to keep such 
papers and records confidential. 
10.  
No Boycott of Israel.  To the extent A.R.S § 35-393 through § 35-393.03 are applicable, the parties hereby 
certify that they are not currently engaged in, and agree for the duration of the Agreement to not engage in, a 
boycott of goods or services from Israel, as that term is defined in A.R.S § 35-393. 
11. 
Uyghur Forced Labor Prevention Act (UFLPA). Contractor certifies that it does not currently, and during 
the term of this Agreement, will not use: 
a.  
the forced labor of ethnic Uyghurs in the People’s Republic of China;  
b. 
any goods or services produced by the forced labor of ethnic Uyghurs in the People’s 
Republic of China; and  
c. 
any contractors, subcontractors or suppliers that use the forced labor or any goods or 
services produced by the forced labor of ethnic Uyghurs in the People’s Republic of China. 
12. 
Attestation of PCI Compliance.  When applicable, the Contractor will provide the City annually with a 
Payment Card Industry Data Security Standard (PCI DSS) attestation of compliance certificate signed by an 
officer of Contractor with oversight responsibility. 
13. 
Notices. 
13.1 
A notice, request or other communication that is required or permitted under this Agreement (each 
a "Notice") will be effective only if: 
a. 
The Notice is in writing; and 
b. 
Delivered in person or by overnight courier service (delivery charges prepaid), certified or 
registered mail (return receipt requested); and 
c. 
Notice will be deemed to have been delivered to the person to whom it is addressed as of 
the date of receipt, if: 
(1) 
Received on a business day, or before 5:00 p.m., at the address for Notices identified 
for the Party in this Agreement by U.S. Mail, hand delivery, or overnight courier 
service on or before 5:00 p.m.; or 
(2) 
As of the next business day after receipt, if received after 5:00 p.m. 
d. 
The burden of proof of the place and time of delivery is upon the Party giving the Notice; 
and 
e. 
Digitalized signatures and copies of signatures will have the same effect as original signatures. 
13.2 
Representatives. 
a. 
Contractor.  Contractor's representative (the "Contractor's Representative") authorized to 
act on Contractor's behalf with respect to the Project, and his or her address for Notice 
delivery is: 
Inter Technologies Corporation 
c/o  Jeff Rose 
2430 W. Mission Ln., Suite 1 
Phoenix, AZ 85021 
 
b. 
City.  City's representative ("City's Representative") authorized to act on City's behalf, and 
his or her address for Notice delivery is:

8 
01/28/2025 
City of Glendale 
c/o  Shoalynn Gilliland 
5970 W. Brown Street 
Glendale, Arizona 85302 
(623) 930-2863 
 
With required copy to: 
 
City Manager 
 
 
 
City Attorney 
City of Glendale  
 
 
City of Glendale 
5850 West Glendale Avenue 
 
5850 West Glendale Avenue 
Glendale, Arizona 85301  
             Glendale, Arizona 85301 
c. 
Concurrent Notices. 
(1) 
All notices to City's representative must be given concurrently to City Manager and 
City Attorney. 
(2) 
A notice will not be deemed to have been received by City's representative until the 
time that it has also been received by City Manager and City Attorney. 
(3) 
City may appoint one or more designees for the purpose of receiving notice by 
delivery of a written notice to Contractor identifying the designee(s) and their 
respective addresses for notices. 
d. 
Changes.  Contractor or City may change its representative or information on Notice, by 
giving Notice of the change in accordance with this section at least ten days prior to the 
change. 
14. 
Financing Assignment.  City may assign this Agreement to any City-affiliated entity, including a non-profit 
corporation or other entity whose primary purpose is to own or manage the Project. 
15. 
Entire Agreement; Survival; Counterparts; Signatures. 
15.1 
Integration.  This Agreement contains, except as stated below, the entire agreement between City 
and Contractor and supersedes all prior conversations and negotiations between the parties regarding 
the Project or this Agreement. 
a. 
Neither Party has made any representations, warranties or agreements as to any matters 
concerning the Agreement's subject matter. 
b. 
Representations, statements, conditions, or warranties not contained in this Agreement will 
not be binding on the parties. 
c. 
The solicitation, any addendums and the response submitted by the Contractor are 
incorporated into this Agreement as if attached hereto.  Any Contractor response modifies 
the original solicitation as stated.  Inconsistencies between the solicitation, any addendums 
and the response or any excerpts attached as Exhibit A and this Agreement will be resolved 
by the terms and conditions stated in this Agreement. 
15.2 
Interpretation. 
a. 
The parties fairly negotiated the Agreement's provisions to the extent they believed necessary 
and with the legal representation they deemed appropriate. 
b. 
The parties are of equal bargaining position and this Agreement must be construed equally 
between the parties without consideration of which of the parties may have drafted this 
Agreement. 
c. 
The Agreement will be interpreted in accordance with the laws of the State of Arizona.

9 
01/28/2025 
15.3 
Survival.  Except as specifically provided otherwise in this Agreement, each warranty, representation, 
indemnification and hold harmless provision, insurance requirement, and every other right, remedy 
and responsibility of a Party, will survive completion of the Project, or the earlier termination of this 
Agreement. 
15.4 
Amendment.  No amendment to this Agreement will be binding unless in writing and executed by 
the parties.  Any amendment may be subject to City Council approval.  Electronic signature blocks 
do not constitute execution. 
15.5 
Remedies.  All rights and remedies provided in this Agreement are cumulative and the exercise of 
any one or more right or remedy will not affect any other rights or remedies under this Agreement 
or applicable law. 
15.6 
Severability.  If any provision of this Agreement is voided or found unenforceable, that determination 
will not affect the validity of the other provisions, and the voided or unenforceable provision will be 
deemed reformed to conform to applicable law. 
15.7 
Counterparts.  This Agreement may be executed in counterparts, and all counterparts will together 
comprise one instrument. 
16. 
Term.   
 
16.1  
Extensions. The term of this Agreement commences upon the effective date and continues for a one 
(1)-year initial period.  The City may, at its option and with the approval of the Contractor, extend 
the term of this Agreement an additional four (4) years, on an annual basis.  Contractor will be notified 
in writing by the City of its intent to extend the Agreement period at least thirty (30) calendar days 
prior to the expiration of the original or any extension period.  Price adjustments will only be reviewed 
prior to the extension period and any such price adjustment will be a determining factor for any 
renewal.  There are no automatic extensions or renewals of this Agreement. 
 
16.2 
Extension for Procurement Process. Upon the expiration of the Term of this Agreement, including 
 
the initial term and any renewals, at the City’s sole discretion, this Agreement may be extended on a 
 
month-to-month basis for a maximum of six (6) months to allow for the City to complete its 
 
procurement process to select a vendor to provide the services/materials similar to those provided 
 
under this Agreement.  The City will notify the Contractor in writing of its intent to extend the 
 
Agreement at least thirty (30) calendar days prior to the expiration of the Term.  Any extension 
 
provided under this subsection will continue under the same terms and conditions as in effect 
 
immediately prior to the expiration of the then-current term.  
17. 
Dispute Resolution.  Any controversy or claim arising out of or relating to this contract, or the breach 
thereof, shall be settled by arbitration administered according to the American Arbitration Association’s 
Commercial Arbitration Rules, and judgment on the award rendered by the arbitrator may be entered in any 
court having jurisdiction thereof. 
18. 
Cooperative Use of Contract.  This agreement may be extended for use by other governmental agencies 
and political subdivisions of the State.  Any such usage by other entities must be in accord with the ordinances, 
charter, rules and regulations of the respective entity and the approval of the Contractor and City.  For a list 
of SAVE members, click on the following link: http://www.mesaaz.gov/business/purchasing/save 
19. 
Exhibits.  The following exhibits, with reference to the term in which they are first referenced, are 
incorporated by this reference. 
Exhibit A 
Project 
Exhibit B 
Compensation 
 
(Signatures appear on the following page.)

EXHIBIT A 
TRAFFIC MANAGEMENT CENTER VIDEO SYSTEM UPGRADE 
PROJECT 
 
The TMC Control Room shall utilize a dedicated network-enabled video management system and direct-view LED 
video wall. System operators must control the video management system via a network-based graphical user 
interface capable of being accessed via an application installed on operator station PCs or by remote desktop 
connection directly to the video wall management system processor.  
The system must support up to 256 unique video wall preset scenarios that TMC staff can easily configure and 
recall. The processor must allow up to 48 encoded H.264 or H.265 1080P video streams to be shown on the video 
wall at one time as TMC will typically use the wall to view roughly 36-48 video streams at once.  
Add-alternate upgrade pricing must be provided to allow up to 72 streams to be shown on the video wall at once. 
Surveillance camera streams are available in H.264 format which the new video management system must accept 
natively without transcoding. Baseband inputs must be ingested to the video management system and a secondary 
Crestron AV control system to operate the existing control system must be replaced as part of this scope of work, 
along with the video wall itself and certain ancillary components. Additional requirements for this upgrade are 
provided later in this document. Refer to Appendix A for a functional diagram of the new video management 
system.  
Refer to Appendix B for a bill of materials with performance specifications. Any deviation to the materials in 
Appendix B proposed by the design/build contractor must be preapproved in writing by the City of Glendale prior 
to submitting a bid.  
Performance Requirements: 
Providing a complete and functioning turn-key audiovisual system. Furnish all labor, equipment, materials, supplies, 
cabling/wiring, final connections, configuration, calibration, and testing. Perform all operations necessary to 
complete the installation. The Contractor must work with a specialty LED mounting structure fabricator to engineer 
and develop a frame arrangement that supports the new video wall. The existing framed opening will need to be 
expanded, new support points installed, and cladding provided above and below the video wall to create a seamless 
finished appearance. The mounting structure fabricator must have documented experience with similar projects. The 
Contractor must calibrate the LED wall after installation to validate that the system is functioning correctly and the 
pixel cards are color-matched within the manufacturer's tolerance. 
Electrical Requirements 
The Contractor must verify the current electrical panels and circuiting to ensure sufficient power is available for the 
new equipment. Contractor must verify that the existing conditions comply with local code. The Contractor must 
provide additional power as required at the video wall, the rack, and the new UPS to accommodate the 
requirements. Based on existing mechanical system performance, no additional cooling capacity is anticipated. 
Display Technology and Configuration 
The Contractor is responsible for providing and installing a video wall that must be comprised of direct view LED 
(dvLED) display cabinets with a pixel pitch of 1.5 mm. A uniform cabinet size must be used for the video wall. The 
power consumption of the video wall per unit area must be less than 600 W/m². The video wall must provide high-
quality images and signal/power redundancy. The recommended size for the DVLED display cabinets making up 
the video wall is 608 mm x 342 mm. The Contractor may select a different cabinet size that meets the dimensional 
requirements of the video wall assembly. The arc length of the available wall opening is 290”, with an overall arc 
radius of 23°, and the new video wall must be constructed to fit within this horizontal space. At this cabinet size, the 
quantity of dvLED cabinets required is 72, or six rows of twelve cabinets. The overall video wall dimensions are 
approximately 6’-8” high by 23’ wide. The completed video wall top edge shall be 4” below the finished ceiling, and 
all gaps between the finished video wall and the building construction (floor, ceiling, walls) shall be filled in with 
cladding/fascia panels. Figure 2 conveys a 3D visual of the new LED video wall. Figure 3 represents the new 
viewing range for a TMC staff member sitting at the TMC Control Room desk. Contractor shall field verify existing

12 
01/28/2025 
conditions, including arc length and radius, as part of the design/build process. The new dvLED video wall must fill 
the available wall opening’s arc length without gaps and provide additional height over the existing LCD video wall. 
The contractor shall be responsible for hiring the necessary trades to expand the opening around the new video 
wall’s additional height through selective demolition and reconstruction. This must include framing, drywall, and 
painting. The contractor shall also modify the ceiling grid and replace ceiling tiles as necessary to neatly trim out the 
opening. New ceiling tiles must match the existing. 
Video Wall Size and Mounting 
The new LED video wall must fit into an expanded opening in the TMC’s curved front wall. The existing drywall 
above the center of the video wall must be demolished to accommodate the new screen size. The existing opening is 
approximately 98” H x 281” W, but the Contractor is responsible for providing field verification of these 
measurements and determining the required size of the new opening. The Contractor must provide new floor-to-
ceiling structural supports designed and stamped by a structural engineer licensed to practice in the state of Arizona. 
The posts must be set back to allow for 6” of depth from the post front to the display front to allow flexibility in the 
display mounting. Provide upright supports between every vertical row of dvLED cabinets for a total of 13 
supports, 9or as needed to provide structural support for the designed video wall. Provide the necessary cladding 
and trim around the video wall to create a seamless integration between the new dvLED cabinets and existing side 
walls and ceiling. New cladding panels must be provided to fill the space between the floor and the video wall. 
Figure 4 demonstrates the vertical structural supports required between each row of dvLED cabinets and shows 
how they are mounted to the floor and ceiling. This figure also conveys how the wall opening is curved. The video 
wall must be equipped with either rack-mounted or on-board power supplies, which must be arranged in a 
redundant configuration. The redundancy must ensure that the operation can continue even if a controller or power 
supply fails. 
Content Processing and Management 
The video wall must support the simultaneous viewing of up to 48 camera streams. These streams originate from 
the existing Genetec VMS and must be ingested as H.264 streams into the new video wall management system. The 
Contractor must upgrade the facility’s video wall management system to incorporate the required functionality as 
described in the TMC requirements document and perform all tasks related to configuration and integration. Non-
IP audio and video sources, such as HDMI inputs from workstation computers and television receivers, must be 
ingested into the video wall management system via encoders. Jupiter Catalyst XL hardware with Jupiter Canvas 
software is the video wall management system acceptable to Glendale Transportation Systems Management (TSM). 
The new video wall management system must ingest and encode all sources, then route, format, and position any 
encoded input in any location on the video wall, as well as live video on workstations linked to the system. The 
conference roll will use the KVM to access and control the video wall remotely.  
The Contractor must upgrade the Crestron control processor wall touch panel to the latest models and implement 
control integration with the video management system, the dvLED wall controllers, TV tuner sources, and the DSP 
audio amplifier. The controller must control the changing of TV tuner channels, turning the system on or off, and 
recalling up to eight different video wall layouts via the video management system. The TSM staff must have the 
ability to view up to three TV channels simultaneously. The Contractor must provide new TV tuners to allow for 
this functionality. All control system programming must be new and supplied by the Contractor. All existing 
workstations must remain and keep the functionality of controlling the content shown on the video wall, including 
the existing workstation in the adjacent offices. Only one workstation at a time will be permitted to be out of 
service, and this must be coordinated with the City. 
In the TSM Equipment Room, the existing (3) 4-post Ortronics MM20 racks will remain. The Contractor must 
utilize Rack #1 that currently houses the AV equipment for the new video wall processor and all other associated 
equipment to perform the required functionality. 
Audio 
The Contractor must replace the existing two ceiling speakers that allow audio playback from the video management 
system output in the TSM Control Room. Headend equipment required for the audio system must be located at the 
AV rack in the TMC Equipment Room. The existing audio amplifier must be replaced with a 320 W, 2-channel 
amplifier featuring DSP that is fully controllable via the

13 
01/28/2025 
Crestron System. The speakers must be professional in-ceiling loudspeakers with a tile bridge and integrated back 
can. 
User Stations and Workstations CPUs 
The existing user stations at the TMC Control Room table must remain and be utilized in the new video wall design. 
Beneath the table is a floor box providing a local HDMI input that must remain. User stations must manage the 
inputs displayed on the video wall via Canvas software and are linked via KVM extension back to a rack-mounted 
workstation CPU in the TSM Equipment Room. The Raritan Dominion KVM system is designed to remain. User 
stations in the Supervisor Office and workstations connected to the KVM switch and rackmount workstation CPUs 
also exist and must remain in use. All existing workstation CPUs must be provided with Canvas video wall 
management system software by the Contractor in coordination with the City’s IT support team. DisplayPort 
and/or DVI-I video outputs from workstation CPUs and other rackmount application servers must be split to allow 
complete resolution outputs to be sent to KVM computer interface modules (CIMs) and the video management 
system. Video interfaces must be provided by the Contractor as required for signal compatibility with new 
equipment. 
UPS Replacement 
The existing 8kVA floor-standing UPS must be replaced. The new UPS must be upsized to serve not only the 
network equipment in the rack but also the video rack as well. The replacement UPS must be 15kVA minimum with 
online doubleconversion architecture, hard-wired power line input connection, and output connections to match 
existing power distribution units. Minimum UPS run time at full load must be 10 minutes. The new UPS must 
include a network management card and software to allow for the graceful automated shutdown of attached 
computing equipment. 
Spare Equipment Requirements 
The Contractor must be responsible for spare parts and equipment. Required spares include the following: 
 Six (6) additional complete dvLED cabinets matching those provided as part of the video wall, including 
matching batch-sorted LED pixel cards 
 One (1) additional dvLED video wall controller and send box 
 One (1) critical spares kit for the Jupiter Catalyst XL Video Wall Management System 
Administrative Requirements 
The Contractor is responsible for all building permits from the City of Glendale’s Building Safety Department, along 
with facilitating all required inspections and approvals during the course of construction. It is the Contractor’s 
responsibility to: 
 Procure and pay for all necessary permits, licenses, inspections, and observe any requirements stipulated therein 
 Comply with all applicable federal, state, and local labor laws, regulations, as well as any applicable local union and 
trade regulations 
 Provide evidence of insurance for the full value of equipment and materials located on site. Insurance will cover 
all losses prior to full City acceptance. Maintain additional liability insurance to protect the supplier and/or City 
against damage claims for personal injury or death that may occur during the installation of this work. 
 All equipment and materials are to be fully insured against loss or damage from vandalism, theft, fire, etc. 
 A certificate of insurance for Workman’s Compensation and Liability for all personnel is to be provided to the 
City and be kept on file. 
 Keep insurance in full force up until acceptance of the system by the City or until the City relieves the Contractor 
in writing of this responsibility, whichever is earlier.  
The Contractor must also coordinate all downtime/outages with the TMC and provide sufficient notice for when 
the outages will begin. The Contractor is responsible for the demolition of the existing space, including removing 
the DVR, the existing LCD cabinets, and the existing mount frames. This equipment, along with the rack-mounted

14 
01/28/2025 
equipment, such as the existing video wall management servers, video interfaces, control system, and other 
associated obsolete equipment that is being replaced, must be returned to the City.  
The Contractor must provide clean-up after demolition, throughout construction, and at the end of the project. The 
existing drywall above the video wall must be demolished, and the clock removed, to accommodate the additional 
height of the new video wall. The Contractor must provide feature licensing for the new video wall management 
system from the system manufacturer and any required third-party software vendors for the TMC staff to enable 
and use the video wall functionality as desired. 
The Contractor must provide all design drawings and submittals to the City as PDF files for the City’s review and 
confirm receipt of document files with the City. Allow at least four (4) weeks for the City to review each submittal 
package. No portion of the work is to commence until the City has approved the prefabrication submittals in 
writing. All documents submitted for approval must include the project name, the contractor's name and contact 
information, the date submitted, and a list of transmitted documents.

EXHIBIT B 
TRAFFIC MANAGEMENT CENTER VIDEO SYSTEM UPGRADE 
COMPENSATION 
 
METHOD AND AMOUNT OF COMPENSATION 
Per Section 4 of this agreement. 
NOT-TO-EXCEED AMOUNT 
The total amount of compensation paid to Contractor for full completion of all work required by the Project during 
the entire term of the Project must not exceed $600,000. 
DETAILED PROJECT COMPENSATION 
Please see Exhibit B.

City of Glendale 
Solicitation Number: RFP 26-11/42600010 
TRAFFIC MANAGEMENT CENTER VIDEO SYSTEM 
UPGRADE 
PRICING WORKBOOK 
CITY OF GLENDALE 
Procurement Department 
5970 West Brown Street, 
Suite 210 
Glendale, Arizona 85302 
 
PRICING WORKBOOK     
Contractor must complete the Pricing Schedule below. Any items not clearly listed on Contractor’s 
submitted price proposal will be considered included in Contractor’s price at no additional cost to the 
City. All pricing should contemplate compliance with the performance requirements as specified in the 
Scope of Work.​​
​
​
​
  
 
1.​
INSTRUCTIONS: 
a.​
The cost proposal must be submitted separately from the rest of the written proposal.  
b.​
Cost proposals shall be quoted as an all-inclusive fixed fee for services. 
c.​
All inclusive – covers all direct and indirect necessary expenses including but not 
limited to: travel, telephone, copying, and other out-of-pocket expenses. 
d.​
Not to Exceed – The actual fees shall not exceed the amount specified in fee proposal. 
 
2.​
PRICE SCHEDULE 
 
AUDIO VISUAL SYSTEM 
Line 
Number 
Quantity Description 
Make 
Model 
Cost 
Extended 
Cost 
1 
2 
Switch 
Cisco 
3750G-WS-S 
EXISTING 
EXISTING 
2 
2 
Switch 
Cisco 
2960X-48TD-L 
EXISTING 
EXISTING 
3 
7 
Workstation 1U 
Dell 
Precision 3930 
EXISTING 
EXISTING 
4 
1 
Router/Firewall Appliance 
Palo Alto 
PA-520 
EXISTING 
EXISTING 
5 
6 
Data Cabling Patch Panels 
 
 
EXISTING 
EXISTING 
6 
1 
Storage Server 
Dell 
Power Edge R330 
EXISTING 
EXISTING 
7 
1 
Server/Workstation 
Dell 
Power Edge R310 
EXISTING 
EXISTING 
8 
3 
Server 1U 
Dell 
Power Edge R320 
EXISTING 
EXISTING 
9 
1 
8-Way Splitter 
Blonder-Tongue 
CRSP-8 
EXISTING 
EXISTING 
10 
6 
Workstation 2U 
Dell 
Precision R7310 
EXISTING 
EXISTING 
11 
3 
4-Post Rack 
Ortronics 
MM20 
EXISTING 
EXISTING 
12 
1 
AV System Controller with Rack Mounts 
Crestron 
CP4N 
$1,690.15 
$1,690.15 
13 
1 
AV System Touchpanel 
Crestron 
TSW-1070 
$1,991.96 
$1,991.96

City of Glendale 
Solicitation Number: RFP 26-11/42600010 
TRAFFIC MANAGEMENT CENTER VIDEO SYSTEM 
UPGRADE 
PRICING WORKBOOK 
CITY OF GLENDALE 
Procurement Department 
5970 West Brown Street, 
Suite 210 
Glendale, Arizona 85302 
 
14 
2 
Audio Loudspeakers 
Biamp 
Desono CM60DTD 
$116.34 
$232.68 
15 
1 
DSP Audio Amplifier with Rack Mounts 
Extron 
NETPA U 2002 SB 
$1,976.00 
$1,976.00 
16 
3 
TV Tuner with Rack Mounts 
Comtempary 
Research 
5114.001 
$839.50 
$2,518.50 
17 
1 
Video Management System Processor CPU 
Chassis with Rack Mounts 
Jupiter 
Catalyst XL CPU 
$100,112.87 
$100,112.87 
18 
1 
Video Management System Processor Express 
Chassis with Rack Mounts 
Jupiter 
Catalyst XL Express 
Included 
Included 
19 
1 
Video Management System Quad HDMI/DP 
Output Card 
Jupiter 
3-540-338-00 
Included 
Included 
20 
6 
Video Management System Decoder Card 
Jupiter 
3-540-304-02 
Included 
Included 
21 
5 
Video Management System Encoder with Rack 
Mounts 
Jupiter 
StreamPoint 4K Quad $4,829.00 
$24,145.00 
22 
1 
Video Management System Software - Named 
Client License 
Jupiter 
Canvas Named Client 
License 
$2,195.00 
$2,195.00 
23 
4 
Video Management System Software - 
Floating Client License 
Jupiter 
Canvas Floating 
Client License 
$4,390.00 
$17,560.00 
24 
1 
Video Management System Software - Server 
License 
Jupiter 
Canvas Server 
License 
$8,780.00 
$8,780.00 
25 
2 
Direct-View LED Video Wall Controller and 
Send Box 
Media Resources Performance Spec 
$24,137.32 
$24,137.32 
26 
1 
Direct-View LED Video Wall, curved, 1.5mm 
pixel pitch, 12 W x 6 H 
Media Resources Performance Spec 
$124,356.63 
$124,356.63 
27 
1 
Custom Video Wall Mounting Frame with 
Cladding and PE Stamp 
Media Resources Performance Spec 
$32,658.31 
$32,658.31 
28 
7 
Workstation VGA to HDMI Converter/Interface Media Resources Performance Spec 
Included 
Included 
29 
A/R 
Cabling, connectors, interfaces, and 
miscellaneous 
Media Resources As Required 
$3,000.00 
$3,000.00 
30 
A/R 
Other system operating/software/feature 
licenses 
Media Resources As Required 
Included 
Included 
31 
1 
 
Jupiter 
Training-CAN 
$3,018.75 
$3,018.75

City of Glendale 
Solicitation Number: RFP 26-11/42600010 
TRAFFIC MANAGEMENT CENTER VIDEO SYSTEM 
UPGRADE 
PRICING WORKBOOK 
CITY OF GLENDALE 
Procurement Department 
5970 West Brown Street, 
Suite 210 
Glendale, Arizona 85302 
 
32 
1 
 
Jupiter 
Commissioning-FC 
$3,018.75 
$3,018.75 
33 
1 
 
Jupiter 
Commissioning-CAN 
$3,018.75 
$3,018.75 
 
 
 
 
 
Total AV 
Equipment 
$354,410.67 
 
 
AV Contractor Labor 
 
 
 
 
31 
1 
System Engineering & Project Management 
 
 
$5,700.00 
$5,700.00 
32 
1 
Contractor Shop Assembly 
 
 
$3,800.00 
$3,800.00 
33 
1 
On-site installation 
 
 
$25,977.08 
$25,977.08 
34 
1 
General & Adminstrative 
 
 
$2,080.00 
$2,080.00 
35 
1 
System Programming 
 
 
$8,400.00 
$8,400.00 
 
Total AV Labor 
$45,957.08 
 
 
Total AV 
System 
$400,367.75 
 
 
 
AUDIO VISUAL SPARES 
 
Line 
Number 
Quantity Description 
Make 
Model 
Cost 
Extended 
Cost 
1 
1 
Video Management System Critical Spares Kit 
Jupiter 
3-CXL-001-00 
Included 
Included 
2 
6 
Direct-View LED Video Wall additional fully populated 
and matched cabinet 
Media 
Resources 
Peformance 
Spec 
Included 
Included 
3 
1 
Direct-View LED Video Wall Controller and Send Box 
Media 
Resources 
Performance 
Spec 
Included 
Included 
4 
 
 
 
 
 
 
5 
 
 
 
 
 
 
6

City of Glendale 
Solicitation Number: RFP 26-11/42600010 
TRAFFIC MANAGEMENT CENTER VIDEO SYSTEM 
UPGRADE 
PRICING WORKBOOK 
CITY OF GLENDALE 
Procurement Department 
5970 West Brown Street, 
Suite 210 
Glendale, Arizona 85302 
 
7 
 
 
 
 
 
 
8 
 
 
 
 
 
 
9 
 
 
 
 
 
 
10 
 
 
 
 
 
 
11 
 
 
 
 
 
 
12 
 
 
 
 
 
 
13 
 
 
 
 
 
 
14 
 
 
 
 
 
 
15 
 
 
 
 
 
 
16 
 
 
 
 
 
 
17 
 
 
 
 
 
 
 
 
 
 
 
Total AV 
Spares 
$ - 
 
 
 
Total 
$ - 
 
MECHANICAL, ELECTRICAL, PLUMBING (MEP) 
Line Number Quantity Description 
Make Model 
Cost 
Extended 
Cost 
1 
1 
15kVA Online Double Conversion UPS 
APC 
SURT15KRMXLT $23,889.07 
$23,889.07 
2 
 
UPS Battery Module 
 
 
 
 
3 
1 
UPS Network Management Card 
APC 
AP9640 
$459.58 
$459.58 
4 
1 
UPS Software 
 
 
Included 
Included 
5 
1 
Electrical Wire & Cable 
 
 
$2,200.00 
$2,200.00 
6 
1 
Electrical Conduit, Boxes, and Faceplates 
 
 
$1,685.00 
$1,685.00 
7 
1 
Electrical Devices 
 
 
$852.00 
$852.00

City of Glendale 
Solicitation Number: RFP 26-11/42600010 
TRAFFIC MANAGEMENT CENTER VIDEO SYSTEM 
UPGRADE 
PRICING WORKBOOK 
CITY OF GLENDALE 
Procurement Department 
5970 West Brown Street, 
Suite 210 
Glendale, Arizona 85302 
 
8 
 
 
 
 
$ 
$ 
9 
 
 
 
 
$ 
$ 
10 
 
 
 
 
$ 
$ 
11 
 
 
 
 
$ 
$ 
12 
 
 
 
 
$ 
$ 
13 
 
 
 
 
$ 
$ 
14 
 
 
 
 
$ 
$ 
15 
 
 
 
 
$ 
$ 
16 
 
 
 
 
$ 
$ 
17 
 
 
 
 
$ 
$ 
18 
 
 
 
 
$ 
$ 
19 
 
 
 
 
$ 
$ 
20 
 
 
 
 
$ 
$ 
 
 
 
 
 
Total MEP Equipment $29,085.65 
 
 
MEP Contractor Labor 
 
 
 
 
21 
1 
System Engineering & Project Management  
 
$987.50 
$987.50 
22 
1 
On-site installation 
 
 
$3,583.50 
$3,583.50 
23 
1 
General & Administrative 
 
 
$1,282.00 
$1,282.00 
24 
1 
System Startup and Commissioning 
 
 
$410.00 
$410.00 
 
Total MEP Labor 
$6,263.00 
 
 
 
Total 
$35,348.65 
 
 
 
GENERAL CONSTRUCTION

City of Glendale 
Solicitation Number: RFP 26-11/42600010 
TRAFFIC MANAGEMENT CENTER VIDEO SYSTEM 
UPGRADE 
PRICING WORKBOOK 
CITY OF GLENDALE 
Procurement Department 
5970 West Brown Street, 
Suite 210 
Glendale, Arizona 85302 
 
Line Number Quantity Description 
Manufacturer Part Number/Series Cost 
Extended 
Cost 
1 
1 
Framing 
 
 
$10,184.00 
$10,184.00 
2 
1 
Drywall 
 
 
$7,457.51 
$7,457.51 
3 
1 
Paint 
 
 
$4,993.63 
$4,993.63 
7 
1 
Ceiling Grid and Tiles 
 
 
$4,318.66 
$4,318.66 
8 
 
 
 
 
$ 
$ 
9 
 
 
 
 
$ 
$ 
10 
 
 
 
 
$ 
$ 
11 
 
 
 
 
$ 
$ 
12 
 
 
 
 
$ 
$ 
13 
 
 
 
 
$ 
$ 
14 
 
 
 
 
$ 
$ 
15 
 
 
 
 
$ 
$ 
16 
 
 
 
 
$ 
$ 
17 
 
 
 
 
$ 
$ 
18 
 
 
 
 
$ 
$ 
19 
 
 
 
 
$ 
$ 
20 
 
 
 
 
$ 
$ 
 
 
 
 
 
Total GC Equipment 
$26,953.80 
 
 
General Contractor Labor  
 
 
 
21 
1 
Project Management 
 
 
$8,185.16 
$8,185.16 
22 
1 
On-site installation 
 
 
$12,687.29 
$12,687.29 
23 
1 
General & Administrative  
 
$3,576.75 
$3,576.75 
 
Total GC Labor 
$24,449.20

City of Glendale 
Solicitation Number: RFP 26-11/42600010 
TRAFFIC MANAGEMENT CENTER VIDEO SYSTEM 
UPGRADE 
PRICING WORKBOOK 
CITY OF GLENDALE 
Procurement Department 
5970 West Brown Street, 
Suite 210 
Glendale, Arizona 85302 
 
 
 
Total 
$51,403.00 
Total for Base Bid 
$487,119.40 
Sales Tax 
$35,228.04 
Grand Total Base Bid $522,347.44 
 
 
 
ALTERNATIVES 
Line 
Number 
Quantity Description 
Make 
Model 
Cost 
Extended 
Cost 
1 
1 
Base Bid 
Inter 
Technologies 
N/A 
$487,119.40 
$522,347.44 
2 
3 
Video Management System Decoder Card - 8x HD60 
video streams 
Jupiter 
3-540-304-
02 
$10,181.00 
$30,543.00 
3 
 
Sales Tax for line 2 
 
 
$2,809.96 
$2,809.96 
4 
 
 
 
 
$ 
$ 
5 
 
 
 
 
$ 
$ 
8 
 
 
 
 
$ 
$ 
9 
 
 
 
 
$ 
$ 
10 
 
 
 
 
$ 
$ 
11 
 
 
 
 
$ 
$ 
12 
 
 
 
 
$ 
$ 
13 
 
 
 
 
$ 
$ 
14 
 
 
 
 
$ 
$ 
15 
 
 
 
 
$ 
$ 
16 
 
 
 
 
$ 
$ 
17 
 
 
 
 
$ 
$

City of Glendale 
Solicitation Number: RFP 26-11/42600010 
TRAFFIC MANAGEMENT CENTER VIDEO SYSTEM 
UPGRADE 
PRICING WORKBOOK 
CITY OF GLENDALE 
Procurement Department 
5970 West Brown Street, 
Suite 210 
Glendale, Arizona 85302 
 
18 
 
 
 
 
$ 
$ 
19 
 
 
 
 
$ 
$ 
20 
 
 
 
 
$ 
$ 
 
 
 
 
 
Total AV 
Equipment 
$555,700.40 
 
 
AV Contractor Labor 
 
 
 
 
21 
1 
System Engineering & Project Management 
 
 
$1,000.00 
$1,000.00 
22 
1 
Contractor Shop Assembly 
 
 
included 
included 
23 
1 
On-site installation 
 
 
included 
included 
24 
1 
General & Administrative 
 
 
$2,000.00 
$1,000.00 
25 
1 
System Programming 
 
 
$4,500.00 
$4,500.00 
 
Total AV Labor 
$6,500.00 
 
 
Total AV 
Alternates 
$562,200.40 
 
 
 
WARRANTY 
Base Bid 
Line 
Number 
Quantity Description 
Make 
Model 
Cost 
Extended Cost 
1 
1 
Video Management System Hardware Warranty 
- Year 1 included at N/C 
Jupiter JUP-CARE-FC 
Included with Purchase 
Included with 
Purchase 
2 
1 
Video Management System Hardware Warranty 
- Year 2 included at N/C 
Jupiter JUP-CARE-FC 
Included with Purchase 
Included with 
Purchase 
3 
1 
Video Management System Hardware Warranty 
- Extend to Year 3 
Jupiter JUP-CARE-FC 
$12,212.76 
$12,212.76 
4 
1 
Video Management System Hardware Warranty 
- Extend to Year 4 
Jupiter JUP-CARE-FC 
$12,212.76 
$12,212.76

City of Glendale 
Solicitation Number: RFP 26-11/42600010 
TRAFFIC MANAGEMENT CENTER VIDEO SYSTEM 
UPGRADE 
PRICING WORKBOOK 
CITY OF GLENDALE 
Procurement Department 
5970 West Brown Street, 
Suite 210 
Glendale, Arizona 85302 
 
5 
1 
Video Management System Hardware Warranty 
- Extend to Year 5 
Jupiter JUP-CARE-FC 
$12,212.76 
$12,212.76 
6 
1 
Video Management System Software Support - 
Year 1 included at N/C 
Jupiter 
JUP-CARE-CA
NVAS 
Included with Purchase 
Included with 
Purchase 
7 
1 
Video Management System Software Support - 
Extend to Year 2 
Jupiter 
JUP-CARE-CA
NVAS 
$5,460.00 
$5,460.00 
8 
1 
Video Management System Software Support - 
Extend to Year 3 
Jupiter 
JUP-CARE-CA
NVAS 
$5,460.00 
$5,460.00 
9 
1 
Video Management System Software Support - 
Extend to Year 4 
Jupiter 
JUP-CARE-CA
NVAS 
$5,460.00 
$5,460.00 
10 
1 
Video Management System Software Support - 
Extend to Year 5 
Jupiter 
JUP-CARE-CA
NVAS 
$5,460.00 
$5,460.00 
Alternate 
1 
1 
Video Management System Hardware Warranty 
- Year 1 included at N/C 
Jupiter JUP-CARE-FC 
Included with Purchase 
Included with 
Purchase 
2 
1 
Video Management System Hardware Warranty 
- Year 2 included at N/C 
Jupiter JUP-CARE-FC 
Included with Purchase 
Included with 
Purchase 
3 
1 
Video Management System Hardware Warranty 
- Extend to Year 3 
Jupiter JUP-CARE-FC 
$15,653.40 
$15,653.40 
4 
1 
Video Management System Hardware Warranty 
- Extend to Year 4 
Jupiter JUP-CARE-FC 
$15,653.40 
$15,653.40 
5 
1 
Video Management System Hardware Warranty 
- Extend to Year 5 
Jupiter JUP-CARE-FC 
$15,653.40 
$15,653.40 
6 
1 
Video Management System Software Support - 
Year 1 included at N/C 
Jupiter 
JUP-CARE-CA
NVAS 
Included with Purchase 
Included with 
Purchase 
7 
1 
Video Management System Software Support - 
Extend to Year 2 
Jupiter 
JUP-CARE-CA
NVAS 
$5,460.00 
$5,460.00 
8 
1 
Video Management System Software Support - 
Extend to Year 3 
Jupiter 
JUP-CARE-CA
NVAS 
$5,460.00 
$5,460.00 
9 
1 
Video Management System Software Support - 
Extend to Year 4 
Jupiter 
JUP-CARE-CA
NVAS 
$5,460.00 
$5,460.00 
10 
1 
Video Management System Software Support - 
Extend to Year 5 
Jupiter 
JUP-CARE-CA
NVAS 
$5,460.00 
$5,460.00

City of Glendale 
Solicitation Number: RFP 26-11/42600010 
TRAFFIC MANAGEMENT CENTER VIDEO SYSTEM 
UPGRADE 
PRICING WORKBOOK 
CITY OF GLENDALE 
Procurement Department 
5970 West Brown Street, 
Suite 210 
Glendale, Arizona 85302 
 
12 
 
 
 
 
 
 
 
 
 
 
 
Total AV Warranty (48) 
for 5 years 
$58,478.28 
 
 
 
 
 
Total AV Warranty (72) 
for 5 years 
$68,800.20 
 
 
 
Total 
$ - 
 
 
 
3.​
DISCOUNT/PAYMENT TERMS: The City standard is 2% 20 days 
 
Comply:​
YES         NO   X    
 
If your answer is NO, please state terms offered: (Enter discount rate if payment in 20 days) % 
 
0% Net 30 
​
 
4.​
PAYMENT Contractor shall provide monthly statements of itemized services.  Payment will be 
reviewed and approved by the Contract Administrator or designee. The itemized statement 
shall not exceed the proposal fee in this Section.    
 
5.​
TAX AMOUNT Do not include any use tax or federal tax in your proposal.

City of Glendale 
Solicitation Number: RFP 26-11/42600010 
TRAFFIC MANAGEMENT CENTER VIDEO SYSTEM 
UPGRADE 
PRICING WORKBOOK 
CITY OF GLENDALE 
Procurement Department 
5970 West Brown Street, 
Suite 210 
Glendale, Arizona 85302 
 
 
 
 
 
OFFEROR NAME:  Inter Technologies Corporation