FY2027-2036 10-Year Capital Improvement Plan March 3, 2026 Agenda 2 • Capital Improvement Plan (CIP) Overview • Capital Improvement Plan Projects • Council Discussion Budget Calendar 3 Item Date Workshop #1 – Budget Overview / Revenues / Five-Year Financial Forecasts January 27, 2026 Workshop #2 – FY27-36 Capital Improvement Plan March 3, 2026 Workshop #3 – (All Day) FY27 Operating Budget Department Presentations March 30, 2026 Workshop #4 – FY27 Total Tentative Budget (Operating, CIP, Debt, Contingency) April 14, 2026 Voting Meeting – Tentative Budget Adoption May 12, 2026 Voting Meeting – Final Budget Adoption / Property Tax Levy June 9, 2026 Voting Meeting – Property Tax Adoption June 23, 2026 Capital Improvement Plan 4 What is a Capital Improvement Plan (CIP)? 5 • 10-Year “roadmap” for creating, maintaining and paying for current and future capital needs • CIP Projects are: • Cost $50,000 or more • Useful life of 5+ years • Examples of CIP Projects: • Fire and Police Stations • City Buildings (Libraries, Court Facilities, Office Buildings) • Parks, Recreation Centers, Libraries • Water and Wastewater Treatment Plants • Streets, Bridges, Traffic Signals • Flood Control (Storm Drains, Retention Basins) • Major Equipment Purchases (Fire Trucks, Street Sweepers, etc.) Life Cycle of a CIP Project 6 Study Design Construction Furniture, Fixtures and Equipment (Vertical Construction) Project Completion Life Cycle of a Vertical Construction Project Life Cycle of a CIP Project 7 Life Cycle of a Horizontal Construction Project Study Design Construction Project Completion Examples of CIP Projects 8 Examples of CIP Projects 9 Examples of CIP Projects 10 Examples of CIP Projects 11 Why Do We Do Capital Planning? 12 • Strategic Planning • Fiscal Management • Community Improvement • Transparency and Accountability • Risk Management • Leveraging Funding Why Do We Do Capital Planning? 13 • City Council Financial Policy on Capital Asset and Debt Management A. Improve existing assets B. Replace existing assets as needed C. Construct new assets • Government Finance Officers Association (GFOA) Best Practice CIP Process 14 Staff Develops 5-year Financial Forecasts Departments work with Engineering on Project Scope/Timelines Projects are Submitted to Budget and Finance Budget and Finance Evaluates Funding Sources for Projects Proposed CIP Presented to Council Budget and Finance Evaluates Funding Sources for Projects Council Adopts 10-Year CIP (Year 1 Appropriated) How is the CIP Funded? 15 • Year 1 (FY27) is appropriated as part of the budget • Funding Sources: • Cash (Fund Balance + Revenue) • Bonds (Debt) • General Obligation Bond funded projects in Library, Government Facilities, and Parks require additional voter authorization • Grants • Carryover What is Carryover? 16 • Carryover is funding that is “carried over” from one fiscal to the next • Carryover occurs when a project takes more than one budget year • Budget and Finance works with Departments during budget development to estimate carryover from current fiscal year (FY26) to upcoming fiscal year (FY27) • If a project has carryover, the carryover funds remain in the same project/funding source • Carryover is adjusted after the fiscal year is closed, when all prior fiscal year expenses have been recorded. Project Slides (Presentation Only) 17 CIP Funding Sources 18 • Development Impact Fees • One-time charges to developers for new development • Can only be used for new or expanded infrastructure • General Obligation Bonds • Debt issuance must be authorized by Voters • Streets, Public Safety, Parks, Government Facilities, Open Space/Trails, Libraries, and Flood Control • Parks, Government Facilities, Libraries and Flood Control require additional voter authorization via special bond election • Debt service paid by Secondary Property Tax CIP Funding Sources 19 • Grants • Federal or state grant funding • Often require a match contribution to the project • Pay-As-You-Go • Cash funded projects CIP Funding Sources 20 • Special Revenue Funds • Transportation Sales Tax • Half cent sales tax • Improve service for all modes of transportation • Highway User Revenue Funds • Restricted Special Revenue Fund • Right of Way acquisition, construction, reconstruction, maintenance, and repair • Enterprise Funds • Water/Sewer • Funding can come from G. O. Bonds, revenue bonds, revenue obligations or cash financing • Debt service paid from future water/sewer fee revenue • Landfill – paid by Landfill user fees • Solid Waste – paid by Solid Waste user fees CIP Funding Sources 21 Pay-As-You-Go Funds • 1080 – General Government Capital Projects (General Fund) • 2110 – Arts Commission General Obligation Bonds • 4010 – 4013: Streets Construction • 4040 – 4043: Public Safety Construction • 4050 & 4053: Parks Construction • 4060 – 4063: Government Facilities • 4080 & 4081: Cultural Facility • 4090 – 4093: Open Space/Trail Construction • 4100 – 4103: Library Construction • 4110 – 4113: Flood Control Construction CIP Funding Sources 22 Development Impact Fees (DIF) • 4173 – Fire (2019 DIF) • 4223 – Police (2014 DIF) • 4284 – Libraries (2019 DIF) • 4383 – Parks & Rec (2019 DIF) • 4410 – Streets Zone 1 East (2014 DIF) • 4420 – Streets Zone 2 West (2014 DIF) • 4431 – Streets East (2019 DIF) • 4434 – Streets West (2023 DIF) • 6065 – Water (2014 DIF) • 6071 – Water (2019 DIF) • 6101 – Sewer (2019 DIF) CIP Funding Sources 23 Special Revenue Funds • 2050 – HURF Operating (Pavement Management) • 4020 – HURF Capital • 2070 – TST Operating (Pavement Management) • 4030 – Transportation Sales Tax Capital • 2071 – Transportation Streets in Lieu Fund (SILF) • 2200 – GRPSTC Revenue CIP Funding Sources Enterprise User Fees • 6020 – Water • 6030 – Sewer • 6031 – Stormwater • 6110 – Landfill • 6120 – Solid Waste Grants • 2060 – Transportation Grants • 2160 – Other Grants • 2190 – Airport Capital Grants • 4610 – ARPA Capital Projects 24 FY2026 10-Year Adopted CIP By Project Type 25 Water $736.8M Streets $481.2M Public Safety $323.0M Wastewater $297.1M Facility Maintenance $169.0M Parks $136.8M Solid Waste $57.6M Drainage $56.1M Airports $52.8M Landfill $42.1M Library $36.7M Parking Lots $21.8M Tranist $11.1M Arts $1.0M Total FY26-35 CIP $2.3B FY2027 10-Year Proposed CIP By Project Type 26 Water $851.8M Streets $672.9M Public Safety $373.9M Wastewater $289.1M Parks $186.5M Facility Maintenance $122.6M Solid Waste $67.8M Drainage $58.4M Airport $52.7M Library $52.1M Landfill $49.5M Parking Lots $21.0M Transit $10.6M Arts $1.0M Total FY27-36 CIP $2.8B 10-Year Proposed CIP by Funding Source 27 Enterprise Funds $1,271.2M Bond Funds $646.1M Special Revenue Funds $433.7M Grants $159.1M Pay-As-You-Go $219.7M DIF $80.0M Total FY27-36 CIP $2.8B One-Year Proposed Capital Improvement Plan 28 Streets $93.4M Water $79.3M Public Safety $71.6M Wastewater $38.3M Drainage $34.1M Parks $31.4M Facility Maintenance $28.9M Parking Lots $16.5M Airport $10.1M Solid Waste $8.3M Library $7.8M Landfill $7.6M Transits $5.7M Arts $1.0M Total FY27-28 CIP $430M Funded by Water Enterprise Fees (99%) and Water DIF (1%) Capital Improvement Plan Priorities: • Provide water supply from multiple sources • Maintain a resilient and secure infrastructure • Meet all Federal and State regulations Major Projects for first five years: • Rehab water lines, booster stations and reservoirs • Rehab water treatment plants • Add new groundwater wells and rehab existing • Water Meter Replacement with AMI 29 FY27-36 Water CIP Overview Water Funding 30 Water Projects 31 PROJECT PROJECT NAME EST CARRYOVER FY27 FY28 FY29 FY30 FY31 FY32-36 TOTAL CIPWA19018 WATER RIGHTS & OTHER SUPPLY SOURCES 40,103 700,000 3,650,000 1,025,000 1,025,000 1,025,000 875,000 $8,340,103 CIPWA19020 SCADA IMPROVEMENTS 1,408,932 1,300,000 1,400,000 1,300,000 1,300,000 1,500,000 8,500,000 $16,708,932 CIPWA19021 STORAGE & RECOVERY WELLS REHAB 585,375 500,000 460,000 420,000 420,000 520,000 1,750,000 $4,655,375 CIPWA19022 GROUNDWATER WELLS & INTERCONNECTS 6,736,806 11,200,000 11,000,000 5,900,000 7,750,000 6,000,000 10,000,000 $58,586,806 CIPWA21022 OASIS WTP IMPROVEMENTS 676,924 500,000 500,000 3,500,000 6,000,000 3,500,000 20,650,000 $35,326,924 CIPWA21023 PYRAMID PEAK WTP IMPROVEMENT 892,790 4,950,000 2,540,000 2,500,000 2,500,000 3,000,000 30,000,000 $46,382,790 CIPWA21024 CHOLLA WTP IMPROVEMENTS 225,077 8,000,000 7,000,000 7,000,000 3,000,000 5,000,000 40,000,000 $70,225,077 CIPWA23008 WATER METER DATA COLLECTION SYSTEM 5,724,921 6,000,000 10,000,000 10,000,000 0 0 0 $31,724,921 CIPWA23009 FACILITIES REHAB – WATER 15,656 400,000 400,000 400,000 400,000 400,000 2,000,000 $4,015,656 CIPWA23011 WATER DEVELOPMENT INFRASTRUCTURE 150,000 150,000 150,000 250,000 250,000 150,000 0 $1,100,000 Water Projects 32 PROJECT PROJECT NAME EST CARRYOVER FY27 FY28 FY29 FY30 FY31 FY32-36 TOTAL CIPWA26001 BARTLETT LAKE ADDITIONAL SPACE 90,000 500,000 500,000 4,000,000 4,000,000 0 0 $9,090,000 CIPWA26002 ADVANCED WATER PURIFICATION FACILIT 384,048 1,200,000 760,000 15,400,000 19,800,000 75,500,000 288,800,000 $401,844,048 CIPWA60017 WATER & WASTEWATER SYSTEMS MODELING 57,464 250,000 250,000 200,000 200,000 200,000 750,000 $1,907,464 CIPWA60018 LABORATORY EQUIPMENT REPLACEMENT 70,000 150,000 150,000 500,000 150,000 200,000 1,000,000 $2,220,000 CIPWA60019 VEHICLE REPLACEMENT PROGRAM 1,844,812 2,000,000 1,500,000 1,500,000 1,500,000 2,000,000 8,000,000 $18,344,812 CIPWA61001 WATER VALVE REPLACEMENT PRGM 62,405 1,500,000 1,500,000 1,500,000 1,500,000 1,720,000 8,000,000 $15,782,405 CIPWA61013 WATER LINE REHABILITATION PROGRAM 3,536,428 6,000,000 5,500,000 6,000,000 6,000,000 7,000,000 50,000,000 $84,036,428 CIPWA61023 WATER SYSTEM SECURITY 101,070 300,000 150,000 150,000 150,000 200,000 500,000 $1,551,070 CIPWA61045 THUNDERBIRD RESERV & DIST SYS IMPRV 450,000 6,000,000 3,500,000 0 0 0 0 $9,950,000 CIPWA61047 METER VAULT REPLACEMENT PROGRAM 21,457 500,000 515,000 500,000 500,000 500,000 1,500,000 $4,036,457 Water Projects 33 Funded by Sewer Enterprise Fees (99%) and Sewer DIF (1%) Capital Improvement Plan Priorities: • Maintain a resilient and secure infrastructure • Meet all Federal and State regulations Major Projects for first five years: • Rehab sewer lines, manholes and lift stations • 91st Avenue Wastewater Treatment Plant • Rehabilitate West Area Water Reclamation Facility • Arrowhead Water Reclamation Facility Improvements 34 FY27-36 Wastewater CIP Overview Wastewater Funding 35 Wastewater Projects 36 PROJECT PROJECT NAME EST CARRYOVER FY27 FY28 FY29 FY30 FY31 FY32-36 TOTAL CIPWW19088 ARROWHEAD SEWER LINES 277,230 100,000 3,000,000 0 0 1,000,000 4,000,000 $8,377,230 CIPWW21026 WEST AREA WRF IMPROV PH 2 3,498,473 1,000,000 3,600,000 4,800,000 4,800,000 4,800,000 15,600,000 $38,098,473 CIPWW21027 ARROWHEAD WRF IMPROVEMENTS 598,496 3,450,000 2,950,000 1,500,000 1,500,000 3,000,000 11,400,000 $24,398,496 CIPWW22076 SEWER LINE REHAB PROGRAM 2,248,824 3,754,000 3,450,000 8,550,000 6,049,000 7,000,000 35,000,000 $66,051,824 CIPWW22077 LIFT STATION & FORCE MAIN REHAB 823,582 2,225,000 3,450,000 2,425,000 1,500,000 1,500,000 2,500,000 $14,423,582 CIPWW22090 VISION 2 DEVELOPMENT PROJECT 11,244 0 0 0 0 0 0 $11,244 CIPWW23010 FACILITIES REHAB – SEWER 106,048 100,000 100,000 100,000 100,000 100,000 500,000 $1,106,048 CIPWW23012 SEWER DEVELOPMENT INFRASTRUCTURE 656,060 700,000 700,000 700,000 700,000 700,000 0 $4,156,060 CIPWW63003 99TH AVE INTERCEPTOR LINE 3,746,593 4,000,000 100,000 1,300,000 300,000 1,800,000 5,000,000 $16,246,593 CIPWW63010 91ST AVENUE WWTP IMPROVEMENTS 3,335,445 5,500,000 7,000,000 8,000,000 11,000,000 12,600,000 50,000,000 $97,435,445 Wastewater Projects 37 38 FY27-36 Transit CIP Overview • Funded by Transportation Sales Tax (69%) and Transportation Grants (31%) • Projects include: – North Glendale Park & Ride Project – Bus Stop Enhancements – Transit Bus Fleet Replacement Transit Funding 39 Transit Projects 40 FY27-36 Streets CIP Overview 41 • Funding Sources: • Transportation Sales Tax (44%) • HURF (10%) • Streets G. O. Bonds (16%) • Development Impact Fees (8%) • Transportation Grants (21%) • General Fund (1%) FY27-36 Streets CIP Overview 42 • Projects Include: • 59th Ave from Camelback to Loop 101 • Pavement Management • 67th Ave from Beardsley to Pinnacle Peak • 83rd Ave, Glendale Ave to Northern Ave Streets Funding 43 Streets Funding 44 Streets Projects 45 PROJECT PROJECT NAME EST CARRYOVER FY27 FY28 FY29 FY30 FY31 FY32-36 TOTAL CIPST19006 PAVEMENT MANAGEMENT 778,909 19,733,891 20,619,151 20,764,430 22,118,939 20,467,218 132,568,825 $237,051,362 CIPST19010 BALLPARK BOULEVARD 13,546 0 0 0 0 0 0 $13,546 CIPST19048 CAPITAL BRIDGE REPAIR PROGRAM 58,136 371,598 390,177 409,685 430,171 451,678 2,620,601 $4,732,046 CIPST20012 FLASHING YELLOW ARROWS 0 100,000 100,000 0 0 0 0 $200,000 CIPST20013 VEHICLE REPLACEMENT 1,183,090 607,246 631,535 656,796 683,069 710,391 4,001,617 $8,473,744 CIPST20022 BIKE PROJECTS (LOCAL MATCH) 0 148,994 151,973 155,013 158,113 161,275 856,070 $1,631,438 CIPST21001 TELECOM CONDUITS 261,860 209,600 209,600 209,600 209,600 209,600 1,048,000 $2,357,860 CIPST21015 CENTRAL CORE SIDEWALK GAPS 148,196 0 0 0 0 0 0 $148,196 CIPST21051 ST RECON 75THGLENDALE TO NORTHERN 2,768,814 268,455 0 0 0 0 0 $3,037,269 CIPST21052 ST RECON 83RDGLENDALE TO NORTHERN 4,470,099 450,000 5,970,915 0 0 0 0 $10,891,014 Streets Projects 46 PROJECT PROJECT NAME EST CARRYOVER FY27 FY28 FY29 FY30 FY31 FY32-36 TOTAL CIPST22043 ST RECON 67TH GREENWAY TO BELL 268,456 0 0 0 0 0 0 $268,456 CIPST22062 PAVEMENT CUT REPAIR 113,346 115,612 117,924 120,283 122,689 125,142 664,270 $1,379,266 CIPST22063 TRANSPORTATION NETWORK IMPROVEMENTS 0 0 500,000 500,000 500,000 500,000 0 $2,000,000 CIPST22064 TRANSPORTATION SAFETY PROGRAM 675,444 1,051,725 467,900 477,258 486,803 496,539 2,635,689 $6,291,358 CIPST22065 SCALLOP STREET PROGRAM 7,281,656 0 0 0 0 0 0 $7,281,656 CIPST22068 59TH AND NORTHERN INTERSECT IMPROV. 1,328,850 0 0 0 0 0 0 $1,328,850 CIPST22120 95TH AVE / MONTEBELLO INTERSECTION 184,164 0 0 0 0 0 0 $184,164 CIPST23017 NORTHERN PARKWAY CABLE BARRIER 2 0 14,324 143,988 0 0 0 0 $158,312 CIPST23018 TMC UPGRADE 680,341 0 0 2,013,999 0 0 0 $2,694,340 CIPST23019 MARYLAND ACTIVE TRANSPORTATION IMPR 235,282 0 0 0 0 0 0 $235,282 Streets Projects 47 PROJECT PROJECT NAME EST CARRYOVER FY27 FY28 FY29 FY30 FY31 FY32-36 TOTAL CIPST23020 MISSOURI ACTIVE TRANSPORTATION IMPR 125,312 0 0 0 0 0 0 $125,312 CIPST23048 SARIVAL AVE/GLENDALE AVE SIGNAL 416,360 0 0 0 0 0 0 $416,360 CIPST23049 INFILL STREETLIGHTS PHASE II 995,426 513,569 0 0 0 0 0 $1,508,995 CIPST23051 TRAFFIC SIGNAL INTERCONNECT 0 101,000 153,831 101,000 228,677 101,000 228,677 $914,185 CIPST23052 SPEED FEEDBACK SIGNS SCHOOL ZONES 24,614 0 0 0 0 0 0 $24,614 CIPST23053 INFILL SIDEWALK 170,144 171,916 175,355 178,862 182,438 186,087 987,774 $2,052,576 CIPST23054 GUARDRAIL UPDATE 93,463 114,611 116,902 119,241 121,626 124,059 884,409 $1,574,311 CIPST23071 83RD AVE CARDINALS WAY INTERSECTION 144,825 0 0 0 0 0 0 $144,825 CIPST24016 59TH AVETHUNDERBIRD INTERSECTION 0 309,072 0 0 0 0 0 $309,072 CIPST24017 67TH AVEGREENWAY INTERSECTION 695,740 675,000 0 0 0 0 0 $1,370,740 Streets Projects 48 PROJECT PROJECT NAME EST CARRYOVER FY27 FY28 FY29 FY30 FY31 FY32-36 TOTAL CIPST24018 67TH AVEPEORIA INTERSECTION IMPRV 14,775 200,000 0 0 0 0 0 $214,775 CIPST24024 99TH AVE: GLENDALE AVE TO NORTHERN 0 0 0 200,000 1,153,040 0 0 $1,353,040 CIPST24025 BALLPARK BLVD: BHR TO MARYLAND AVE 0 0 0 0 468,180 2,706,080 0 $3,174,260 CIPST24029 NORTHERN: REEMSLITCHFIELD WIDENING 0 0 0 690,050 2,111,555 0 0 $2,801,605 CIPST24030 NORTHERN: SARIVALALSUP WIDENING 0 0 0 0 0 0 2,696,000 $2,696,000 CIPST24031 REEMSHATCHER TRAFFIC SIGNAL 0 0 165,612 579,697 0 0 0 $745,309 CIPST24032 SARIVAL: GLENDALE TO NORTHERN ROADW 0 0 0 828,060 2,584,543 0 0 $3,412,603 CIPST24033 SARIVALOLIVE TRAFFIC SIGNAL 0 0 0 129,684 500,000 0 0 $629,684 CIPST24034 SARIVALPEORIA INTERSECTION IMPRV 0 0 0 49,321 250,000 0 0 $299,321 CIPST24035 RIGHT OF WAY LANDSCAPE PLAN 885,930 370,144 381,248 392,686 404,466 0 0 $2,434,474 Streets Projects 49 PROJECT PROJECT NAME EST CARRYOVER FY27 FY28 FY29 FY30 FY31 FY32-36 TOTAL CIPST24037 TRANSPORTATION PLAN 14,402 444,326 0 0 0 0 1,104,080 $1,562,808 CIPST24043 GLENDALE SAFE STREETS FOR ALL ACTION PLAN 30,042 0 0 0 0 0 0 $30,042 CIPST24060 51ST AVE OLIVE AVE TO CACTUS ROAD 555,000 3,765,813 0 0 0 0 0 $4,320,813 CIPST24064 ROW XERISCAPE LANDSCAPE PROGRAM 200,000 0 0 0 0 0 0 $200,000 CIPST24068 67TH AVE BEARDSLEY TO PINNACLE PK 320,360 500,000 10,713,869 0 0 0 0 $11,534,229 CIPST25012 GLENDALE AVE RADAR DET & ADAPT CONT 0 397,192 0 0 0 0 0 $397,192 CIPST25013 ADVANCE DETECTION & STOP BAR INSTAL 0 513,746 0 0 0 0 0 $513,746 CIPST25037 ST RECON 59TH AVE & BEARDSLEY AREA 85,200 0 0 0 0 0 0 $85,200 CIPST25039 ST RECON 59TH AVE & CACTUS AREA 60,946 0 0 0 0 0 0 $60,946 CIPST25040 RECON ST, 51ST AVE & PEORIA AV AREA 64,670 0 0 0 0 0 0 $64,670 Streets Projects 50 PROJECT PROJECT NAME EST CARRYOVER FY27 FY28 FY29 FY30 FY31 FY32-36 TOTAL CIPST25042 ST RECON 71ST AVE & BEARDSLEY AREA 0 6,693,728 0 0 0 0 0 $6,693,728 CIPST25043 ST RECON 63RD AVE & BEARDSLEY AREA 0 3,298,687 0 0 0 0 0 $3,298,687 CIPST25044 RECON 55TH AVE, CACTUS TO CHOLLA ST 0 585,954 0 0 0 0 0 $585,954 CIPST25045 ST RECON, 51ST AVE & NORTHERN AREA 0 1,537,875 0 0 0 0 0 $1,537,875 CIPST25046 ST RECON, 51ST AVE & GLENDALE AREA 0 2,807,025 0 0 0 0 0 $2,807,025 CIPST25047 ST RECON, 83RD AVE & MARYLAND AREA 0 738,686 0 0 0 0 0 $738,686 CIPST25048 RECON GLENN DR, 88TH LN TO 87TH DR 0 264,084 0 0 0 0 0 $264,084 CIPST25049 MOUNTAIN VIEW RD, 43RD TO 59TH 0 118,333 2,204,250 0 0 0 0 $2,322,583 CIPST25050 ST RECON, 75TH AVE & NORTHERN AREA 0 0 6,636,112 0 0 0 0 $6,636,112 CIPST25051 RECON ROSE LN, GRAND CANAL TO 99TH 0 0 311,011 0 0 0 0 $311,011 Streets Projects 51 PROJECT PROJECT NAME EST CARRYOVER FY27 FY28 FY29 FY30 FY31 FY32-36 TOTAL CIPST25052 ST RECON, 75TH AVE & DENARO DR AREA 0 0 209,846 0 0 0 0 $209,846 CIPST25053 46TH AVE, McLENNAN TO OCOTILLO 0 0 0 106,400 0 0 0 $106,400 CIPST25054 ST RECON, 59TH AVE & BETHANY AREA 0 0 0 6,692,271 0 0 0 $6,692,271 CIPST25055 ST RECON, 69TH AVE & GREENWAY AREA 0 0 0 4,040,248 0 0 0 $4,040,248 CIPST25056 ST RECON, 47TH AVE & NORTHERN AREA 0 0 0 0 3,381,193 0 0 $3,381,193 CIPST25057 ROSE LN, CULDESAC TO 49TH AVE 0 0 0 0 125,528 0 0 $125,528 CIPST25058 ST RECON, 71ST AVE & NORTHERN AREA 0 0 0 0 2,430,441 0 0 $2,430,441 CIPST25059 ST RECON, 79TH AVE & BETHANY AREA 0 0 0 602,916 602,916 0 0 $1,205,832 CIPST25060 ST RECON, 75TH AVE & GLENDALE AREA 0 0 0 0 0 851,543 0 $851,543 CIPST25061 UNION HILLS, 51ST AVE TO 59TH AVE 0 0 0 0 250,000 4,716,000 0 $4,966,000 Streets Projects 52 PROJECT PROJECT NAME EST CARRYOVER FY27 FY28 FY29 FY30 FY31 FY32-36 TOTAL CIPST25062 59TH, DEER VALLEY TO PINNACLE PEAK 0 0 0 0 125,000 2,096,000 0 $2,221,000 CIPST25063 RECON BELL RD, 67TH AVE TO 75TH AVE 0 0 0 0 0 259,771 4,935,650 $5,195,421 CIPST25064 ST RECON, 55TH AVE & BELL RD AREA 0 0 0 0 0 0 2,576,344 $2,576,344 CIPST25065 ST RECON, 79TH AVE & GLENDALE AREA 0 0 0 0 0 0 4,318,081 $4,318,081 CIPST25066 NEW RIVER, GLENDALE TO CULDESAC 0 0 0 0 0 0 466,995 $466,995 CIPST25067 ST RECON, OLIVE AVE & 51ST AVE AREA 0 0 0 0 0 0 4,318,185 $4,318,185 CIPST25069 ACTIVE TRANSPORTATION PLAN 0 999,990 0 0 0 0 0 $999,990 CIPST25070 ST RECON BETHANY HM 43RD TO 51ST 250,000 0 0 4,965,160 0 0 0 $5,215,160 CIPST25072 ST RECON GREENWAY 59TH TO 51ST 0 0 0 200,000 4,716,000 0 0 $4,916,000 CIPST25073 ST RECON CAMELBACK 59TH TO 83RD 1,675,087 0 5,533,500 0 0 0 0 $7,208,587 Streets Projects 53 PROJECT PROJECT NAME EST CARRYOVER FY27 FY28 FY29 FY30 FY31 FY32-36 TOTAL CIPST25075 ST RECON 75THDEER VLLY TO BEARDSLY 2,988,450 1,376,220 0 0 0 0 0 $4,364,670 CIPST25080 DOWNTOWN PEDESTRIAN LIGHT SYSTEM 226,635 0 0 0 0 0 0 $226,635 CIPST26014 UPGRADE TO OUTDATED SIGNAL 0 1,100,000 0 100,000 1,000,000 100,000 1,000,000 $3,300,000 CIPST26015 CLIMATE ACTION PLAN 350,000 0 0 0 0 0 0 $350,000 CIPST26018 LITCHFIELDMISSOURI TO NORTHERN 573,000 969,600 5,283,900 0 0 0 0 $6,826,500 CIPST26019 GLENDALEEL MIRAGE TO LITCHFIELD 582,000 136,350 3,786,000 0 0 0 0 $4,504,350 CIPST26020 67TH, DEER VALLEY TO PINNACLE PEAK 336,000 424,200 3,052,500 0 0 0 0 $3,812,700 CIPST26021 59TH AVE GLENDALE TO OLIVE 500,000 0 6,288,000 0 0 0 0 $6,788,000 CIPST27004 127TH AVE GLENDALE AVE TRAFFIC SIGNAL 0 0 1,083,176 0 0 0 0 1,083,176 CIPST27011 67TH AVE/ GLENDALE AVE INTERSECTION IMP 0 50,000 256,738 0 0 0 0 306,738 Streets Projects 54 55 FY27-36 Solid Waste CIP Overview • Funding Source: 100% Enterprise – User Fee Revenues • Focus On Programmed Vehicle Replacements • Follow industry standard replacement cycles Solid Waste Funding 56 Solid Waste Projects 57 58 FY27-36 Public Safety CIP Overview • Funded by Public Safety G. O. Bonds (67%), General Fund (18%), Special Revenue Funds (11%), Fire DIF (2%) and Police DIF (2%) • Projects Include – Police Crime Laboratory – GRPSTC CIP Program (Master Plan) – Fire Station 1510 – Near Airport – Fire Apparatus Replacement – Main Public Safety Building Renovation Public Safety Funding 59 Public Safety Projects 60 Public Safety Projects 61 Public Safety Projects 62 FY26-35 Public Safety Projects 63 64 FY27-36 Parks CIP Overview • Funded by Parks G. O. Bonds (84%), Open Space/Trail G. O. Bonds (15%), Grants(1%) • Projects include: – Sahuaro Ranch Park Master Plan Buildout – Thunderbird Conservation Park Improvements – Rose Lane Pool Replacement Parks & Recreation Funding 65 Parks & Recreation Projects 66 Parks & Recreation Projects 67 Parks & Recreation Projects 68 Parks & Recreation Projects 69 Parks & Recreation Projects 70 Parks & Recreation Projects 71 PROJECT PROJECT NAME EST CARRYOVER FY27 FY28 FY29 FY30 FY31 FY32-36 TOTAL CIPPK27019 ORANGEWOOD PARK IMPROVEMENTS 0 0 0 0 0 0 730,000 $730,000 CIPPK27023 TRIANGLE PARK IMPROVEMENTS 0 0 0 0 0 0 50,000 $50,000 CIPPK27024 BONSALL PARK SOUTH IMPROVEMENTS 0 0 0 0 0 0 1,575,000 $1,575,000 CIPPK27025 MEMMINGEN PARK IMPROVEMENTS 0 0 0 0 0 0 903,000 $903,000 CIPPK27026 PASEO NEIGHBORHOOD PARK IMPROVEMENTS 0 0 0 0 0 0 352,000 $352,000 CIPPK27027 ORANGEWOOD VISTA PARK IMPROVEMENTS 0 0 0 0 0 0 500,000 $500,000 CIPPK27028 TIERRA BUENA PARK IMPROVEMENTS 0 0 0 0 0 853,300 0 $853,300 CIPPK27029 BICENTENNIAL PARK IMPROVEMENTS 0 0 0 0 0 0 525,000 $525,000 CIPPK27030 MARYLAND LAKES PARK IMPROVEMENTS 0 0 0 0 0 0 532,000 $532,000 CIPPK27031 ROVEY PARK IMPROVEMENTS 0 0 0 0 0 0 55,000 $55,000 Parks & Recreation Projects 72 PROJECT PROJECT NAME EST CARRYOVER FY27 FY28 FY29 FY30 FY31 FY32-36 TOTAL CIPPK27032 MANISTEE RANCH PROPERTY IMPROVEMENT 0 0 0 0 0 0 50,000 $50,000 CIPPK27033 GLENDALE ADULT CENTER 0 0 0 0 2,000,000 0 0 $2,000,000 CIPPK27034 ADULT CENTER PARKING IMPROVEMENTS 0 0 0 365,000 0 0 0 $365,000 CIPPK27035 BRIDLE PATH IMPROVEMENTS 0 0 0 0 0 0 100,000 $100,000 CIPPK27036 GLEN LAKES PARK IMPROVEMENTS 0 0 0 0 0 0 300,000 $300,000 CIPPK27037 MORCOMB PARK IMPROVEMENTS 0 0 0 0 0 0 250,000 $250,000 CIPPK27038 FOOTHILLS SPORTS COMPLEX 0 0 0 0 0 0 1,500,000 $1,500,000 CIPPK27039 ROSE LANE POOL REPLACEMENT 0 0 0 10,000,000 0 0 0 $10,000,000 CIPPK27040 BRIAN ANDERSON FIELD IMPROVEMENTS 0 0 0 0 0 0 200,000 $200,000 CIPPK27041 OASIS PARK IMPROVEMENTS 0 0 0 450,000 0 0 0 $450,000 Parks & Recreation Projects 73 74 FY27-36 Parking Lots CIP Overview • Funded by General Fund (100%) • Focused on: – Existing parking lots/garage repairs Parking Lots Funding 75 Parking Lots Projects 76 77 FY27-36 Library CIP Overview • Funded by Library G. O. Bonds (100%) • Projects include: – Main Library Renovation – Velma Teague Redevelopment – Foothills Library Renovation Library Funding 78 Library Projects 79 80 FY27-36 Landfill CIP Overview • Funding Source: 100% Enterprise – User Fee Revenues • Focus On Programmed Vehicle Replacements • Follow industry standard replacement cycles • North Cell Landfill Project • North Cell Phased Construction • Landfill Gas Extraction System • Stormwater Controls Landfill Funding 81 Landfill Projects 82 PROJECT PROJECT NAME EST CARRYOVER FY27 FY28 FY29 FY30 FY31 FY32-36 TOTAL CIPLF19019 LANDFILL COMPACTOR REPLACEMENT 990,639 900,000 945,000 0 0 0 3,885,000 $6,720,639 CIPLF19024 BULLDOZER REPLACEMENTS AND REBUILDS 71,187 0 170,000 1,775,500 1,500,000 0 521,000 $4,037,687 CIPLF19025 NORTH CELL LINER 50,000 0 0 3,742,440 0 0 3,647,000 $7,439,440 CIPLF19091 LANDFILL SCRAPER REPLACEMENT 0 0 0 1,305,060 0 0 0 $1,305,060 CIPLF21030 CLOSED LANDFILLS 694,300 600,000 119,500 115,000 115,000 115,000 575,000 $2,333,800 CIPLF22005 BUILDING IMPROVEMENTS 243,540 250,000 0 0 0 0 0 $493,540 CIPLF22006 SITE PAVING AND MARKINGS 193,812 0 0 0 0 628,800 0 $822,612 CIPLF78505 LF NORTH CELL PHASED CONSTRUCTION 5,000 0 5,828,700 0 0 0 6,256,650 $12,090,350 CIPLF78506 LANDFILL 4x4 REPLACEMENT TRUCKS 47,227 430,000 0 0 0 0 0 $477,227 CIPLF78514 SOLID WASTE INSPECTION TRUCKS 10,000 0 0 224,065 0 439,190 0 $673,255 Landfill Projects 83 84 FY27-36 Facility Maintenance CIP Overview • Primarily Funded with General Fund (53%), Enterprise Funds (19%), G. O. Bonds (15%), Transportation Sales Tax (13%) • Focus on: – Improving existing assets through programmatic replacements • Follow industry standard replacement cycles – Replacing existing assets as needed – Camelback Ranch Improvements – Field Operations Campus Facilities Funding 85 Facility Maintenance Projects 86 PROJECT PROJECT NAME EST CARRYOVER FY27 FY28 FY29 FY30 FY31 FY32-36 TOTAL CIPFC19016 GLENDALE OPS CAMPUSFIELD STAFF BLD 2,604,397 4,520,370 20,436,000 7,755,200 0 0 0 $35,315,967 CIPFC19038 CITY HALL BUILDING REMODEL 1,432,449 0 0 0 0 0 0 $1,432,449 CIPFC19061 ELECTRICAL SYSTEM RENEWAL 127,995 140,000 500,000 370,000 370,000 370,000 1,850,000 $3,727,995 CIPFC19062 ELEVATOR SYSTEM RENEWAL 81,569 400,000 200,000 380,000 525,000 500,000 2,500,000 $4,586,569 CIPFC19063 FIRE PROTECTION RENEWAL 146,524 70,000 200,000 200,000 200,000 200,000 1,000,000 $2,016,524 CIPFC19064 SECURITY CAMERA IMPROVEMENTS 55,254 0 0 0 0 0 0 $55,254 CIPFC19065 PLUMBING SYSTEM RENEWAL 0 250,000 100,000 100,000 100,000 100,000 500,000 $1,150,000 CIPFC19068 ROOFING SYSTEM RENEWAL 0 320,000 500,000 500,000 300,000 300,000 1,500,000 $3,420,000 CIPFC19071 HVAC REPAIR/REPLACEMENTS 0 440,000 1,000,000 1,000,000 700,000 500,000 1,500,000 $5,140,000 CIPFC22086 CITY HALL PARKING GARAGE 208,071 0 0 0 0 0 0 $208,071 Facility Maintenance Projects 87 PROJECT PROJECT NAME EST CARRYOVER FY27 FY28 FY29 FY30 FY31 FY32-36 TOTAL CIPFC23041 GLENDALE OPS CAMPUS RENOVATION 0 0 0 0 1,505,200 15,000,000 0 $16,505,200 CIPFC23043 COUNCIL CHAMBERS 303,341 0 0 0 0 0 0 $303,341 CIPFC23070 EXTERIOR BUILDING ENHANCEMENTS 55,935 20,000 100,000 100,000 100,000 100,000 500,000 $975,935 CIPFC24045 SPRING CITY DEMOLITION 2,323,736 0 0 0 0 0 0 $2,323,736 CIPFC24046 ADA PROGRAM 29,733 50,000 0 0 0 0 0 $79,733 CIPFC24047 INTERIOR REFRESH PROGRAM 709,187 665,000 750,000 750,000 750,000 750,000 3,750,000 $8,124,187 CIPFC24048 RETRO COMMISSIONING PROGRAM 50,500 730,000 500,000 500,000 500,000 500,000 2,500,000 $5,280,500 CIPFC24049 CEMETERY IMPROVEMENTS 600,769 0 150,000 700,000 0 0 0 $1,450,769 CIPFC24051 PERFORMANCE BASED CONTRACTS 333,701 0 0 0 0 0 0 $333,701 CIPFC25001 GATES AND DOORS RENEWAL PROGRAM 500,000 600,000 300,000 300,000 300,000 300,000 1,500,000 $3,800,000 Facility Maintenance Projects 88 89 FY27-36 Drainage CIP Overview • Funded by Flood Control G. O. Bonds (47%), Grants (48%), Stormwater Fee (4%), and General Fund (1%) • Projects Include: – Bethany Home Rd, 43rd Ave to 51st Ave • Work in coordination with internal and external partners – Maricopa County Flood Control District (MCFlood) – Maximizing matching funds – Arterial Reconstruction Program (Transportation) Drainage Funding 90 Drainage Projects 91 92 FY27-36 Airport CIP Overview • Funded by Airport Grant Funds (85%) and Transportation Sales Tax (15%) • Projects include: • Enviro Clearance Parallel Taxiway B • South Apron Reconstruction Phase 3 • Construct East Side Apron - Capacity • Runway Lighting & Signage Rehab Airport Funding 93 Airport Projects 94 PROJECT PROJECT NAME EST CARRYOVER FY27 FY28 FY29 FY30 FY31 FY32-36 TOTAL CIPAP19075 NEW RIVER CHANNELIZATION 0 0 0 238,225 900,000 450,000 4,500,000 $6,088,225 CIPAP21007 AIRPORT MASTER PLAN STUDY 0 382,120 0 0 0 0 0 $382,120 CIPAP21009 AIRPORT SECURITY FENCING 0 225,000 2,025,000 0 0 0 0 $2,250,000 CIPAP21010 SOUTHWEST APRON CAPACITY (DESIGN) 0 0 0 0 450,000 2,970,000 5,589,000 $9,009,000 CIPAP21012 AIRSIDE PAVEMENT MAINTENANCE 32,821 231,939 243,537 255,713 268,499 281,923 1,635,698 $2,950,130 CIPAP24009 SOUTH APRON RECONSTRUCT PHASE 3 365,458 7,642,400 0 0 0 0 0 $8,007,858 CIPAP25004 ENVIRO CLEARANCE PARALLEL TAXIWAY B 0 573,180 5,063,090 0 0 4,012,260 0 $9,648,530 CIPAP25008 RUNWAY LIGHTING & SIGNAGE REHABILIT 9,509 0 3,600,000 0 0 0 0 $3,609,509 CIPAP26011 CONSTRUCT EAST SIDE APRON CAPACITY 0 0 477,650 0 3,343,550 1,910,600 0 $5,731,800 CIPAP26012 SELFFUEL STATION SITE SURVEY 32,822 0 0 0 0 0 0 $32,822 Airport Projects 95 96 FY27-36 Arts CIP Overview • Funded by Arts Fund (100%) – 1% of Construction Completed in Current Fiscal Year on Eligible Projects • Projects include: – Municipal Arts Program – Arts Master Plan Art Funding 97 Art Projects 98 99 Questions? Operating Binder Review 100 • New FTE Requests • Supplementals Recommended for Approval • Supplementals Not Recommend for Approval • Operating Budget Summary by Department • Operating Budget Summary by Fund • Department Specific Tabs • Operating Budget Workshop March 30, 2026 Budget Calendar 101 Item Date Workshop #1 – Budget Overview / Revenues / Five-Year Financial Forecasts January 27, 2026 Workshop #2 – FY27-36 Capital Improvement Plan March 3, 2026 Workshop #3 – (All Day) FY27 Operating Budget Department Presentations March 30, 2026 Workshop #4 – FY27 Total Tentative Budget (Operating, CIP, Debt, Contingency) April 14, 2026 Voting Meeting – Tentative Budget Adoption May 12, 2026 Voting Meeting – Final Budget Adoption / Property Tax Levy June 9, 2026 Voting Meeting – Property Tax Adoption June 23, 2026