CITY OF GLENDALE, ARIZONA Glendale CONTRACT CHANGE ORDER A R I Z O tJ A Project Number: 212259 Change Order No: 1 Project Name: Bus Pullout Located at 75th Avenue and Union Hills Drive Description of Change: Changes to the scope of work, as directed by City staff, included: irrigation line relocation, isolation gate valve installation, catch basin design modifications, APS streetlight relocation fees, off-duty police officer charges, and various quantity adjustments due to conditions found in the field. Full details for these items are shown in the attached exhibits. Contractor will furnish labor, equipment, materials, and all services required to make additions, deletions, and changes, including changes to quantities and/or prices as outlined in attachment. Total amount of change order #1: COMPLETION DATE: Contract completion date prior to change order: Change in contract time due to this change order: New contract completion date: Contract amount prior to this change order: 03/04/26 0 03/04/26 New increase (decrease), due to this change order: $249,828.00 $116,281.11 $366,109.11 New contract amount including this change order: For Valuable Consideration, it is mutually agreed that the matter detailed above shall be done and payment made as shown herein on a Supplemental Agreement Change Order in accordance with the terms of the contract. For work being performed as a Supplemental Agreement Force Account Request, final payment shall be made as stipulated in the Standard Specifications and its supplements upon completion of said work. APPROVALS: Project Eng/Manager City of Glendale 5850 W. Glendale Ave. Glendale, AZ 85301 • By:ɅɆɇndez Date: / / 5- /-to? • T i ',a City of Glendale: By: Patrick Banger, City Manager Date: ------------ City of Glendale: By: Julie I<. Bower, City Clerk Date: ____ _ _ _ _ _ _ _ Contractor: Visus Engineering Construction, Inc. 1831 N. Rochester Mesa, AZ 85205 By: __________ _ Date: City of Glendale: By: Michael D. Bailey, City Attorney Date: ------ ------ 212259 Bus Pullout at 75th Avenue & Union Hills Drive ITEM AMOUNT 1 46,017.98 $ 2 31,199.03 $ 3 9,871.43 $ 4 3,352.67 $ 5 25,840.00 $ 116,281.11 $ APS de-energization\re-energization fee Miscellaneous bid item overruns Total Change Order 1 PROJECT NUMBER: PROJECT NAME: DESCRIPTION Landscape & Irrigation Relocation Catch Basin Modifications Off Duty Officer\Traffic Control Summary of changes/additions on Bus Pullout on 75th Avenue and Union Hills 1. Allowances for off duty police officers required by our adopted traffic control ordinance. This would have been included in an allowance for off-duty officers that was not in this contract. Visus provided an accounting of time and duration, and I verified their accounting matched the dates worked for required duration per the ordinance (6a-6p M-F). Two holidays occurred during that duration causing the regular rate of $95/hr to increase to $142.50 per hour. The total of all officer charges including markup was $46,017.98. 2. Relocate existing 4" Irrigation main line, install 2- 4" Isolation gate valves, Remove & replace. This was required to keep HOA and golf course downstream with water for the duration of time it took to relocate their utilities. This would have been included in an allowance for landscaping that was not in this contract. No line item for this existed and it was done via time and material change order totaling $31,199.03. 3. Re-design delays, re-grade site to new design, modify catch basin to new design. There were a few field-found discrepancies that Visus and Kimley Horn were able to collaborate and solve during the project. An existing manhole vault conflicted with a new catch basin, and modifications were necessary to get the bus bay to work in that location totaling $9,871.43 4. APS fee to de-energize and re-energize streetlight #5563 for relocation. This was not included in the bid tab total $3,352.67 5. Project over unders: There were quantity adjustments based on the required solutions to field-found conditions. 1. Shallow utilities behind proposed bus bay required extension of retaining wall. 2. Narrowing the bus bay and realigning sidewalk to match. 3. Creating a modified reinforced curb over the conflicting manhole elevation. These created overruns of bid items 6 (+2), 7 (+117), 11 (+157), & 14 (+95). These were offset by under runs in line items 8 (-18), and 25 (-2). The total net for the over/unders was $25,840.00 1831 N Rochester DATE: November 26, 2025 Mesa, AZ 85205 INVOICE # Pay App 1 Office: 480-833-8268 Visus Project # 25-07 City of Glendale P #: 212259 Visus GJE Acct # Visus Payment Acct: Bill To: City of Glendale Payment Terms: DUE UPON RECEIPT Project Name: City Wide Bus Pullouts Police Officer Pay App 1 thru 11/26/2025 Description Unit Quantity Unit Cost Total Cost Week of 10/13 thru 10/24/2025 HR 109 95.00 $ 10,331.25 $ Day of 10/13/2025 (Holiday) HR 12 142.50 $ 1,710.00 $ Week of 10/27 thru 10/31/2025 HR 56.8 95.00 $ 5,391.25 $ Week of 11/3 thru 11/7/2025 HR 60.75 95.00 $ 5,771.25 $ Week of 11/10 thru 11/14/2025 HR 49 95.00 $ 4,655.00 $ Day of 11/11/2025 Holiday) HR 12 142.50 $ 1,745.63 $ Week of 11/17/ thru 11/21/2025 HR 61.25 95.00 $ 5,818.75 $ Week of 11/24 thru 11/26/2025 HR 36.5 95.00 $ 3,467.50 $ Subtotal 38,890.63 $ 10% OHP 3,889.06 $ COG Tax @ 5.98% 2,558.23 $ Subtotal 45,337.91 $ Bond @ 1.5% 680.07 $ TOTAL 46,017.98 $ Make all checks payable to Visus Engineering Construction, Inc. If you have any questions concerning this invoice, contact Robert Smith at 480-833-8268. Notes: THANK YOU FOR YOUR BUSINESS! City Wide Bus Pullouts 11/26/2025 Project #212259 Change Order #2 Description: APS fee to de-energise and re-energise street light #5563 for relocation Item Quantity Unit Unit Price Total Subcontractor APS Inv #AR0110001241 1 LS $2,833.40 $2,833.40 Subtotal $2,833.40 10% OHP (Subcontrctor) $2,833.40 $283.34 Subtotal $3,116.74 Tax @ 5.98 $186.38 $3,303.12 Bond @ 1.5% $49.55 TOTAL $3,352.67 Notes: 0 Days Time Extension Approval By Date City Wide Bus Pullouts 11/26/2025 Project #212259 Change Order #3 Description: Re-design delays, re-grade site to new design, modify catch basin to new design. Item Quantity Unit Unit Price Total Equipment Pickup 10 HR $20.00 $200.00 Mini Excavator 5 HR $50.00 $250.00 210 Skip Loader 3 HR $55.00 $165.00 Subtotal $615.00 Labor Operator 14 HR $65.00 $910.00 Laborer 8 HR $50.00 $400.00 Foreman 10 HR $70.00 $700.00 Subtotal $2,010.00 Miscellaneous 1/2 Sack ABC Slurry 1 LS $798.50 $798.50 Traffic Control 8 DAYS $235.00 $1,880.00 Subtotal $2,678.50 Subcontractor Modify Catch Basin Incl Frame & Grate 1 LS $3,100.00 $3,100.00 Subtotal $3,100.00 Subtotal All Items $8,403.50 10% OHP (Equipment) $615.00 $61.50 10% OHP ( Subcontractor) $3,100.00 $310.00 15% OHP (Miscellaneous) $2,678.50 $401.78 Subtotal $9,176.78 Tax @ 5.98 $548.77 $9,725.55 Bond @ 1.5% $145.88 TOTAL $9,871.43 Notes: 6 Days Time Extension Approval By Date City Wide Bus Pullouts 11/26/2025 Project #212259 Change Order #1 Description: Relocate existing 4" Irrigation main line, Install 2- 4" Isolation gate valves, Remove & replace Control valves and wiring, irrigation laterals and sprikler heads, Compact trench, Sand and level disturbed area Install sod, dispose of all removed material, Cleanup. Item Quantity Unit Unit Price Total Equipment Pickup 71 HR $20.00 $1,420.00 Mini Excavator 11 HR $50.00 $550.00 210 Skip Loader 11 HR $55.00 $605.00 Trencher 5 HR $40.00 $200.00 Subtotal $2,775.00 Labor Operator 135 HR $65.00 $8,775.00 Laborer 71 HR $50.00 $3,550.00 Foreman 71 HR $70.00 $4,970.00 Subtotal $17,295.00 Miscellaneous Miscellaneous Pipe, Fittings, Material 1 LS $7,527.00 $7,527.00 Subtotal $7,527.00 Subtotal All Items $27,597.00 10% OHP (Equipment) $2,775.00 $277.50 15% OHP (Miscellaneous) $7,527.00 $1,129.05 Subtotal $29,003.55 Tax @ 5.98 $1,734.41 $30,737.96 Bond @ 1.5% $461.07 TOTAL $31,199.03 Notes: 6 Days Time Extension Approval By Date City Wide Bus Pullouts 11/26/2025 Project #212259 Change Order #4 Description: Final quantity overruns and underruns of items. Item Quantity Unit Unit Price Total Overruns 6 Curb & Gutter MAG 220-1 Type A 2 LF $60.00 $120.00 7 Concrete Sidewalk Mag 230 117 SF $20.00 $2,340.00 11 Modified Single Curb Reinforced 157 LF $175.00 $27,475.00 14 Remove Conc. S/W, D/W, Slabs 95 SF $9.00 $855.00 Subtotal $30,790.00 Underruns 8 Bus Pullout, 8" PCCP COG Det G-407 18 SY $175.00 $3,150.00 25 15" RGRCP, Class 3 2 LF $900.00 $1,800.00 Subtotal $4,950.00 TOTAL (Overruns) $25,840.00