Extracted text (via pymupdf)
22447 characters
Capital Fund Program - Five-Year Action Plan Office of Public and Indian Housing U.S. Department of Housing and Urban Development Part I: Summary PHA Name : Locality (City/County & State) Original 5-Year Plan Revised 5-Year Plan (Revision No: ) City of Glendale Housing Authority X 2577-0274 02/28/2022 PHA Number: AZ003 Status: Approval Date: Approved By: Draft A. Development Number and Name Work Statement for Work Statement for Work Statement for Work Statement for Work Statement for 2026 2027 2028 2029 2030 Year 5 Year 4 Year 3 Year 2 Year 1 GLENDALE HOMES (AZ003000001) $504,000.00 $600,000.00 $596,500.00 $596,500.00 $596,500.00 Form HUD-50075.2(4/2008) Capital Fund Program - Five-Year Action Plan Office of Public and Indian Housing U.S. Department of Housing and Urban Development Part II: Supporting Pages - Physical Needs Work Statements (s) 1 2577-0274 02/28/2022 Work Statement for Year 2026 Development Number/Name Quantity Estimated Cost General Description of Major Work Categories Identifier GLENDALE HOMES (AZ003000001) $504,000.00 Appliances(Dwelling Unit-Interior (1480)-Appliances) $30,000.00 ID0000300 Replacement of Stoves, Refrigerators, Washers/Dryers and Dishwashers as needed in units at three properties Operations(Operations (1406)) $10,000.00 ID0000301 Cost unforeseen for operational Security Doors and Exterior Metal Doors (Dwelling Unit-Exterior (1480)-Exterior Doors) $15,000.00 ID0000302 Replace security and exterior doors at Glendale and Lamar Homes. HVAC(Dwelling Unit-Exterior (1480)-Other) $210,000.00 ID0000303 HVAC Unit replacements as needed for units over 10 years old Landscaping (Dwelling Unit-Site Work (1480)-Landscape) $20,000.00 ID0000304 Tree and Palm Tree annual trimming. Water Heaters(Dwelling Unit-Interior (1480)-Plumbing) $25,000.00 ID0000305 Replace water heaters in 12 units Form HUD-50075.2(4/2008) Capital Fund Program - Five-Year Action Plan Office of Public and Indian Housing U.S. Department of Housing and Urban Development Part II: Supporting Pages - Physical Needs Work Statements (s) 1 2577-0274 02/28/2022 Work Statement for Year 2026 Development Number/Name Quantity Estimated Cost General Description of Major Work Categories Identifier Garbage Disposals(Dwelling Unit-Interior (1480)-Plumbing) $4,000.00 ID0000306 Replace garbage disposals as needed in units Sewer Line Cleaning(Dwelling Unit-Site Work (1480)-Sewer Lines - Mains,Dwelling Unit-Site Work (1480)-Water Lines/Mains) $55,000.00 ID0000307 Annual occurrence to clean out underground pipes at Glendale, Lamar and Cholla Vista homes. Tile Flooring(Dwelling Unit-Interior (1480)-Flooring (non routine)) $10,000.00 ID0000308 Replace carpet with tile flooring in 2 to 3 units. Bathhroom and Kitchen Remodeling(Dwelling Unit-Interior (1480)-Bathroom Counters and Sinks,Dwelling Unit-Interior (1480)-Bathroom Flooring (non cyclical),Dwelling Unit-Interior (1480)- Commodes,Dwelling Unit-Interior (1480)-Kitchen Cabinets,Dwelling Unit-Interior (1480)-Kitchen Sinks and Faucets,Dwelling Unit-Interior (1480)-Plumbing,Dwelling Unit-Interior (1480)-Tubs and Showers) $45,000.00 ID0000309 Kitchen and bathroom remodels for 3 to 4 units. Management Improvements(Management Improvement (1408)-Staff Training) $3,000.00 ID0000310 Maintenace Training and certifications. Irrigation System(Dwelling Unit-Site Work (1480)-Other) $12,000.00 ID0000311 Irrigation system repairs at all sites Electrical Repairs(Dwelling Unit-Interior (1480)-Electrical) $8,000.00 ID0000312 Electric Panel Repairs as needed at all sites Form HUD-50075.2(4/2008) Capital Fund Program - Five-Year Action Plan Office of Public and Indian Housing U.S. Department of Housing and Urban Development Part II: Supporting Pages - Physical Needs Work Statements (s) 1 2577-0274 02/28/2022 Work Statement for Year 2026 Development Number/Name Quantity Estimated Cost General Description of Major Work Categories Identifier Lighting(Dwelling Unit-Exterior (1480)-Exterior Lighting,Dwelling Unit-Interior (1480)-Other) $22,000.00 ID0000313 Install or replace light fixtures at units Termite Repairs(Dwelling Unit-Exterior (1480)-Balconies-Porches-Railings-etc,Dwelling Unit- Exterior (1480)-Columns and Porches,Dwelling Unit-Interior (1480)-Other) $25,000.00 ID0000314 Termite damage repairs to frames and structures Locksmiting(Dwelling Unit-Exterior (1480)-Exterior Doors,Dwelling Unit-Interior (1480)-Other) $10,000.00 ID0000315 Repair, replace, and standardize to all door handles and locks Subtotal of Estimated Cost $504,000.00 Form HUD-50075.2(4/2008) Capital Fund Program - Five-Year Action Plan Office of Public and Indian Housing U.S. Department of Housing and Urban Development Part II: Supporting Pages - Physical Needs Work Statements (s) 2 2577-0274 02/28/2022 Work Statement for Year 2027 Development Number/Name Quantity Estimated Cost General Description of Major Work Categories Identifier GLENDALE HOMES (AZ003000001) $600,000.00 Appliances(Dwelling Unit-Interior (1480)-Appliances) $35,000.00 ID0000317 Replacement of stoves, refrigerators, dishwashers, washing machines and dryers as needed in units. Operations(Operations (1406)) $10,000.00 ID0000318 Costs unforeseen for operational Sewer Line Cleaning and Repairs(Dwelling Unit-Site Work (1480)-Storm Drainage,Dwelling Unit- Site Work (1480)-Water Lines/Mains) $45,000.00 ID0000319 Annual occurrence to clean out underground pipes at all sites Tile Flooring(Dwelling Unit-Interior (1480)-Flooring (non routine)) $10,000.00 ID0000320 Replace carpet with tile in 2 to 3 units. Bathroom and Kitchen Remodels(Dwelling Unit-Interior (1480)-Bathroom Counters and Sinks,Dwelling Unit-Interior (1480)-Bathroom Flooring (non cyclical),Dwelling Unit-Interior (1480)- Commodes,Dwelling Unit-Interior (1480)-Kitchen Cabinets,Dwelling Unit-Interior (1480)-Kitchen Sinks and Faucets,Dwelling Unit-Interior (1480)-Plumbing,Dwelling Unit-Interior (1480)-Tubs and Showers) $40,000.00 ID0000321 Bathroom and kitchen remodeling in 3 to 4 units Replacement of Garbage Disposals(Dwelling Unit-Interior (1480)-Plumbing) $5,000.00 ID0000322 Replace garbage disposals as needed at sites. Form HUD-50075.2(4/2008) Capital Fund Program - Five-Year Action Plan Office of Public and Indian Housing U.S. Department of Housing and Urban Development Part II: Supporting Pages - Physical Needs Work Statements (s) 2 2577-0274 02/28/2022 Work Statement for Year 2027 Development Number/Name Quantity Estimated Cost General Description of Major Work Categories Identifier Water Heaters(Dwelling Unit-Interior (1480)-Plumbing) $20,000.00 ID0000323 Replace water heaters in 12 units Cholla Vista Irrigation Modifications(Dwelling Unit-Site Work (1480)-Water Lines/Mains) $12,000.00 ID0000324 Plumbing modifications to put Cholla Vista irrigation on an independent existing meter. Electrical Panels(Dwelling Unit-Interior (1480)-Electrical) $5,000.00 ID0000325 Electrical Panel Repairs/Replacement at all sites as needed. HVAC(Dwelling Unit-Interior (1480)-Other) $35,000.00 ID0000326 Replace decaying flex ducts and registers at Glendale and Lamar Homes Termite Repairs(Dwelling Unit-Exterior (1480)-Balconies-Porches-Railings-etc,Dwelling Unit- Exterior (1480)-Columns and Porches,Dwelling Unit-Exterior (1480)-Decks and Patios,Dwelling Unit-Interior (1480)-Other) $25,000.00 ID0000327 Termite damage repairs to frames and structures at all sites Locksmithing(Dwelling Unit-Exterior (1480)-Exterior Doors,Dwelling Unit-Interior (1480)-Interior Doors) $5,000.00 ID0000328 Repair, replacement, & standardization to all door handles and locks. Sidewalks and Patios(Dwelling Unit-Exterior (1480)-Columns and Porches,Dwelling Unit-Exterior (1480)-Decks and Patios,Dwelling Unit-Site Work (1480)-Pedestrian paving) $65,000.00 ID0000329 Repair, replace or additions to sidewalks and patios as needed at all sites Form HUD-50075.2(4/2008) Capital Fund Program - Five-Year Action Plan Office of Public and Indian Housing U.S. Department of Housing and Urban Development Part II: Supporting Pages - Physical Needs Work Statements (s) 2 2577-0274 02/28/2022 Work Statement for Year 2027 Development Number/Name Quantity Estimated Cost General Description of Major Work Categories Identifier Exterior Paint at Lamar and Glendale Homes(Dwelling Unit-Exterior (1480)-Exterior Paint and Caulking,Dwelling Unit-Interior (1480)-Interior Painting (non routine)) $20,000.00 ID0000330 Paint back wood panels Roofing (Dwelling Unit-Exterior (1480)-Roofs,Dwelling Unit-Exterior (1480)-Siding) $228,000.00 ID0000331 New roofing and or repairs as needed at Lamar Homes and Glendale Homes Lighting(Dwelling Unit-Exterior (1480)-Exterior Lighting) $25,000.00 ID0000332 Install or replace light fixtures at units Landscaping and Tree Trimming(Non-Dwelling Site Work (1480)-Landscape) $15,000.00 ID0000333 Tree and Palm Tree trimming as needed at Lamar, Glendale Homes, and Cholla Vista. Subtotal of Estimated Cost $600,000.00 Form HUD-50075.2(4/2008) Capital Fund Program - Five-Year Action Plan Office of Public and Indian Housing U.S. Department of Housing and Urban Development Part II: Supporting Pages - Physical Needs Work Statements (s) 3 2577-0274 02/28/2022 Work Statement for Year 2028 Development Number/Name Quantity Estimated Cost General Description of Major Work Categories Identifier GLENDALE HOMES (AZ003000001) $596,500.00 Operations(Operations (1406)) $10,000.00 ID0000334 Cost unforeseen circumstances Appliances(Dwelling Unit-Interior (1480)-Appliances) $35,000.00 ID0000335 Replacement of stoves, refrigerators, washers, dryers, and dishwashers as needed in units Management Improvements(Management Improvement (1408)-Staff Training,Management Improvement (1408)-System Improvements) $5,000.00 ID0000336 Training for Public Housing staff on new regulations and maintenance enhancements Sewer Line Cleaning and Repairs(Dwelling Unit-Exterior (1480)-Other,Dwelling Unit-Site Work (1480)-Sewer Lines - Mains,Dwelling Unit-Site Work (1480)-Water Lines/Mains) $50,000.00 ID0000337 Clean out underground pipes at Glendale, Lamar, and Cholla Vista Homes. Tile Flooring (Non Routine)(Dwelling Unit-Interior (1480)-Flooring (non routine)) $20,000.00 ID0000338 Carpet Removal and installation of tile at 3 units Kitchen and Bathroom Remodels(Dwelling Unit-Interior (1480)-Bathroom Counters and Sinks,Dwelling Unit-Interior (1480)-Bathroom Flooring (non cyclical),Dwelling Unit-Interior (1480)- Kitchen Cabinets,Dwelling Unit-Interior (1480)-Kitchen Sinks and Faucets,Dwelling Unit-Interior (1480)-Tubs and Showers) $100,000.00 ID0000339 Kitchen and Bathroom remodels (3 to 4 units) Form HUD-50075.2(4/2008) Capital Fund Program - Five-Year Action Plan Office of Public and Indian Housing U.S. Department of Housing and Urban Development Part II: Supporting Pages - Physical Needs Work Statements (s) 3 2577-0274 02/28/2022 Work Statement for Year 2028 Development Number/Name Quantity Estimated Cost General Description of Major Work Categories Identifier Garbage Disposals Replaced(Dwelling Unit-Interior (1480)-Other) $5,000.00 ID0000340 Garbage disposals replaced as needed in units Water Heaters(Dwelling Unit-Interior (1480)-Plumbing) $20,000.00 ID0000341 Replace water heaters in 12 units Electrical Panels(Dwelling Unit-Interior (1480)-Electrical) $5,000.00 ID0000342 Electrical panel replacement/repairs as needed HVAC(Dwelling Unit-Exterior (1480)-Other) $150,000.00 ID0000343 Replacement of aged air conditioning units Termite Repairs(Dwelling Unit-Exterior (1480)-Balconies-Porches-Railings-etc,Dwelling Unit- Exterior (1480)-Columns and Porches,Dwelling Unit-Exterior (1480)-Decks and Patios,Dwelling Unit-Exterior (1480)-Other,Dwelling Unit-Interior (1480)-Other) $25,000.00 ID0000344 Termite damage repairs to frames and structures at all sites Locksmithing(Dwelling Unit-Exterior (1480)-Exterior Doors) $5,000.00 ID0000345 Repair, replacement, and standardization to all door handles and locks Interior Renovation (Dwelling Unit-Interior (1480)-Other) $40,000.00 ID0000346 Renovation to the stairs in the two story units at Cholla Vista Form HUD-50075.2(4/2008) Capital Fund Program - Five-Year Action Plan Office of Public and Indian Housing U.S. Department of Housing and Urban Development Part II: Supporting Pages - Physical Needs Work Statements (s) 3 2577-0274 02/28/2022 Work Statement for Year 2028 Development Number/Name Quantity Estimated Cost General Description of Major Work Categories Identifier Exterior Painting(Dwelling Unit-Interior (1480)-Other,Dwelling Unit-Exterior (1480)-Exterior Paint and Caulking) $25,000.00 ID0000347 Exterior painting at Cholla Vista Buildings Window Screens(Dwelling Unit-Exterior (1480)-Windows) $15,000.00 ID0000348 Window screens for Glendale Homes Lighting(Dwelling Unit-Interior (1480)-Electrical) $1,500.00 ID0000349 Install or replace light fixtures in units Roof Replacement(Dwelling Unit-Exterior (1480)-Roofs) $20,000.00 ID0000350 Annual roof maintenance on all properties Landscaping(Non-Dwelling Site Work (1480)-Landscape) $20,000.00 ID0000351 Annual tree trimming or removal at all properties Security Doors & Exterior Doors(Dwelling Unit-Exterior (1480)-Exterior Doors) $15,000.00 ID0000352 Replacement of security and metal exterior doors as needed at all properties Plumbing(Dwelling Unit-Site Work (1480)-Other,Dwelling Unit-Site Work (1480)-Sewer Lines - Mains) $15,000.00 ID0000353 Install new, repair and upgrade underground water valves Form HUD-50075.2(4/2008) Capital Fund Program - Five-Year Action Plan Office of Public and Indian Housing U.S. Department of Housing and Urban Development Part II: Supporting Pages - Physical Needs Work Statements (s) 3 2577-0274 02/28/2022 Work Statement for Year 2028 Development Number/Name Quantity Estimated Cost General Description of Major Work Categories Identifier Window Replacement(Dwelling Unit-Exterior (1480)-Windows) $15,000.00 ID0000354 New windows for units at Lamar Homes Subtotal of Estimated Cost $596,500.00 Form HUD-50075.2(4/2008) Capital Fund Program - Five-Year Action Plan Office of Public and Indian Housing U.S. Department of Housing and Urban Development Part II: Supporting Pages - Physical Needs Work Statements (s) 4 2577-0274 02/28/2022 Work Statement for Year 2029 Development Number/Name Quantity Estimated Cost General Description of Major Work Categories Identifier GLENDALE HOMES (AZ003000001) $596,500.00 Operational(Operations (1406)) $10,000.00 ID0000355 Cost unforseen for operations Landscaping(Dwelling Unit-Site Work (1480)-Landscape) $20,000.00 ID0000356 Annual Tree trimming and Landscaping at all sites HVAC Replacement(Dwelling Unit-Exterior (1480)-Other) $150,000.00 ID0000357 HVAC Unit replacement for a/c units over 10 years old. Painting Exterior(Non-Dwelling Site Work (1480)-Fence Painting) $25,000.00 ID0000358 Paint / touch up on pony walls and site walls at Lamar Homes. Appliances(Dwelling Unit-Interior (1480)-Appliances) $35,000.00 ID0000359 Replace appliances such as stoves, refrigerators, washers, dryers, and dishwashers as needed. Security Screens and Mechanical Doors(Dwelling Unit-Exterior (1480)-Exterior Doors) $15,000.00 ID0000360 Replace security screens and exterior metal doors at Lamar and Glendale Homes. Form HUD-50075.2(4/2008) Capital Fund Program - Five-Year Action Plan Office of Public and Indian Housing U.S. Department of Housing and Urban Development Part II: Supporting Pages - Physical Needs Work Statements (s) 4 2577-0274 02/28/2022 Work Statement for Year 2029 Development Number/Name Quantity Estimated Cost General Description of Major Work Categories Identifier Garbage Disposals(Dwelling Unit-Interior (1480)-Plumbing) $5,000.00 ID0000361 Garbage disposals replaced as needed at all sites. Water Heater Replacement(Dwelling Unit-Interior (1480)-Plumbing) $20,000.00 ID0000362 Replace water heaters in 12 units as needed at sites. Underground Pipe Cleanout(Dwelling Unit-Site Work (1480)-Sewer Lines - Mains,Dwelling Unit-Site Work (1480)-Water Lines/Mains) $50,000.00 ID0000363 Clean out underground pipes at Lamar, Glendale Homes and Cholla Vista. Roofing(Dwelling Unit-Exterior (1480)-Roofs) $40,000.00 ID0000364 Asphalt shingle roof maintenance/replacement on all four of Cholla Vista buildings. Carpet Removal / Tile Replacement(Dwelling Unit-Interior (1480)-Flooring (non routine)) $20,000.00 ID0000365 Final carpet removal and replace with ceramic tile in remaining units. Kitchen and Bathroom Remodels(Dwelling Unit-Interior (1480)-Bathroom Counters and Sinks,Dwelling Unit-Interior (1480)-Bathroom Flooring (non cyclical),Dwelling Unit-Interior (1480)- Commodes,Dwelling Unit-Interior (1480)-Flooring (non routine),Dwelling Unit-Interior (1480)- Kitchen Cabinets,Dwelling Unit-Interior (1480)-Kitchen Sinks and Faucets,Dwelling Unit-Interior (1480)-Plumbing,Dwelling Unit-Interior (1480)-Tubs and Showers) $100,000.00 ID0000366 Remodel two to three units with a new bathroom and kitchen update of cabinets, counters, shower installs and pedestals. Training and Certifications(Management Improvement (1408)-Staff Training,Management Improvement (1408)-System Improvements) $5,000.00 ID0000367 Maintenance and staff training to include certifications. Form HUD-50075.2(4/2008) Capital Fund Program - Five-Year Action Plan Office of Public and Indian Housing U.S. Department of Housing and Urban Development Part II: Supporting Pages - Physical Needs Work Statements (s) 4 2577-0274 02/28/2022 Work Statement for Year 2029 Development Number/Name Quantity Estimated Cost General Description of Major Work Categories Identifier Electrical Panels(Dwelling Unit-Interior (1480)-Electrical) $5,000.00 ID0000368 Electrical panel repair or replacement in units as needed. Locksmithing(Dwelling Unit-Interior (1480)-Interior Doors,Dwelling Unit-Interior (1480)-Other) $5,000.00 ID0000369 Repair, replace and core changes to all locks in the public housing units. Lighting(Dwelling Unit-Interior (1480)-Other) $1,500.00 ID0000370 Replace interior light fixtures as needed in units. Tankless Water Heaters(Dwelling Unit-Interior (1480)-Plumbing) $40,000.00 ID0000371 Replace the tankless water heaters at Cholla Vista. Window Screens(Dwelling Unit-Exterior (1480)-Windows) $15,000.00 ID0000372 New window screens for Cholla Window Replacement(Dwelling Unit-Exterior (1480)-Windows) $35,000.00 ID0000373 Phase II of windows for Lamar Homes. Subtotal of Estimated Cost $596,500.00 Form HUD-50075.2(4/2008) Capital Fund Program - Five-Year Action Plan Office of Public and Indian Housing U.S. Department of Housing and Urban Development Part II: Supporting Pages - Physical Needs Work Statements (s) 5 2577-0274 02/28/2022 Work Statement for Year 2030 Development Number/Name Quantity Estimated Cost General Description of Major Work Categories Identifier GLENDALE HOMES (AZ003000001) $596,500.00 Electric Panel Repairs(Dwelling Unit-Interior (1480)-Electrical) $5,000.00 ID0000374 Panel repair or replacements as needed at all sites. Locksmithing(Dwelling Unit-Interior (1480)-Interior Doors) $5,000.00 ID0000375 Repair and Replace Core changes to remaining locks in Public Housing units. Interior and Exterior Lighting(Dwelling Unit-Interior (1480)-Other) $1,500.00 ID0000376 Replace interior and exterior lighting at units as needed Roofing(Dwelling Unit-Exterior (1480)-Roofs) $40,000.00 ID0000377 Roof Maintenance or replacement of shingles at three sites New Security Window Screens(Dwelling Unit-Exterior (1480)-Windows) $15,000.00 ID0000378 New security window screens at sites as needed Garbage Disposals(Dwelling Unit-Interior (1480)-Plumbing) $5,000.00 ID0000379 Replace garbage disposals as needed at sites Form HUD-50075.2(4/2008) Capital Fund Program - Five-Year Action Plan Office of Public and Indian Housing U.S. Department of Housing and Urban Development Part II: Supporting Pages - Physical Needs Work Statements (s) 5 2577-0274 02/28/2022 Work Statement for Year 2030 Development Number/Name Quantity Estimated Cost General Description of Major Work Categories Identifier Replace Water Heaters(Dwelling Unit-Interior (1480)-Plumbing) $20,000.00 ID0000380 Replace water heaters in an additional 12 units Five Year Environmentals on Three Sites(Contract Administration (1480)-Other Fees and Costs) $15,000.00 ID0000381 Required five year environmental Update Maintenance Plan(Management Improvement (1408)-System Improvements) $2,500.00 ID0000382 Review and update the maintenance plan Kitchen and Bathroom Remodels(Dwelling Unit-Interior (1480)-Bathroom Counters and Sinks,Dwelling Unit-Interior (1480)-Bathroom Flooring (non cyclical),Dwelling Unit-Interior (1480)- Commodes,Dwelling Unit-Interior (1480)-Electrical,Dwelling Unit-Interior (1480)-Flooring (non routine),Dwelling Unit-Interior (1480)-Interior Painting (non routine),Dwelling Unit-Interior (1480)- Kitchen Cabinets,Dwelling Unit-Interior (1480)-Kitchen Sinks and Faucets,Dwelling Unit-Interior (1480)-Plumbing,Dwelling Unit-Interior (1480)-Tubs and Showers) $100,000.00 ID0000383 Update three units for a kitchen and bathroom remodel Exterior Cleanouts at the three sites(Dwelling Unit-Site Work (1480)-Sewer Lines - Mains,Dwelling Unit-Site Work (1480)-Storm Drainage,Dwelling Unit-Site Work (1480)-Water Lines/Mains) $50,000.00 ID0000384 Cleanout of underground pipes at three sites Phase III Window Replacement(Dwelling Unit-Exterior (1480)-Windows) $35,000.00 ID0000385 Phase III Window replacement at Lamar Carpet Removal(Dwelling Unit-Interior (1480)-Flooring (non routine)) $20,000.00 ID0000386 Replace carpet with tile at remaining units. Form HUD-50075.2(4/2008) Capital Fund Program - Five-Year Action Plan Office of Public and Indian Housing U.S. Department of Housing and Urban Development Part II: Supporting Pages - Physical Needs Work Statements (s) 5 2577-0274 02/28/2022 Work Statement for Year 2030 Development Number/Name Quantity Estimated Cost General Description of Major Work Categories Identifier Tree Trimming at all Sites(Dwelling Unit-Site Work (1480)-Landscape) $20,000.00 ID0000387 Trimming all trees not included in Landscaping contract Exterior Painting at Glendale Homes(Non-Dwelling Exterior (1480)-Paint and Caulking) $250,000.00 ID0000388 Exterior Painting at 36 buildings Exterior Fence Panel Replacement(Dwelling Unit-Site Work (1480)-Fencing) $12,500.00 ID0000389 Replace damaged fencing along Lamar property line. Subtotal of Estimated Cost $596,500.00 Form HUD-50075.2(4/2008)