TIA Executive Summary

City of Glendale — Regular Meeting (2026-01-22)

View PDF Item 3 Meeting page

Extracted text (via pymupdf) 5559 characters
Sarival Logistics 
Traffic Impact Analysis 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Prepared for: 
 
 
 
 
 
 
 
Project Number: 25.5783 
April 3, 2025 
 
Evergreen-Sarival & Peoria, LLC 
2390 E. Camelback Road, Suite 410 
Phoenix, AZ 85016 
 
 
 
Prepared by: 
 
 
Lōkahi, LLC 
10555 N. 114th Street, Suite 105 
Scottsdale, AZ 85259 
04/03/25
APPROVED
Rebecca Fastje
05/19/2025

SARIVAL LOGISTICS 
EVERGREEN-SARIVAL & PEORIA, LLC 
1 
1. INTRODUCTION AND EXECUTIVE SUMMARY 
1.1. 
PURPOSE OF REPORT AND STUDY OBJECTIVES 
Lōkahi, LLC (Lōkahi) was retained by Evergreen-Sarival & Peoria, LLC to complete a Traffic 
Impact Analysis (TIA) for the proposed Sarival Logistics development, located near the 
southwest corner of Sarival Avenue and Peoria Avenue. The site is located within Maricopa 
County unincorporated area and adjacent to City of Glendale city limits. The TIA will be 
prepared for submittal to the City of Glendale, the City of Surprise, the Maricopa County 
Department of Transportation (MCDOT), and the Arizona Department of Transportation 
(ADOT). 
 
The proposed Sarival Logistics development will be comprised of three (3) industrial 
buildings totaling 675,500 square feet. The opening year is anticipated in 2030. 
 
The objective of this Traffic Impact Analysis is to analyze the traffic related impacts of the 
proposed development to the adjacent roadway network. See Figure 1 for the vicinity map. 
 
This Traffic Impact Study includes: 
 
• Level of service analysis for the existing conditions weekday AM and PM peak 
hours 
• Trip generation for the proposed development 
• Level of service analysis for the opening year (2030) weekday AM and PM 
peak hours 
• Level of service analysis for 5 years after the opening year (2035) weekday AM 
and PM peak hours 
• Queue analysis 
 
The following are the study area intersections included in this study: 
 
1. Peoria Avenue and Loop 303 Southbound Ramp 
2. Peoria Avenue and Loop 303 Northbound Ramp 
3. Sarival Avenue and Peoria Avenue 
4. Sarival Avenue and Brown Street/Driveway A 
5. Sarival Avenue and Olive Avenue 
6. Sarival Avenue and Northern Parkway Westbound Ramp 
7. Sarival Avenue and Northern Parkway Eastbound Ramp 
8. Sarival Avenue and Driveway B 
9. Sarival Avenue and Driveway C

SARIVAL LOGISTICS 
EVERGREEN-SARIVAL & PEORIA, LLC 
2 
1.2. 
EXECUTIVE SUMMARY 
This report presents the analyses and results of a Traffic Impact Analysis prepared for the 
proposed Sarival Logistics development, located on the west side of Sarival Avenue 
approximately 1,300 feet south of Peoria Avenue. The site is located within Maricopa 
County unincorporated area and adjacent to City of Glendale city limits. The proposed 
development will be comprised of three (3) buildings totaling 675,000 square feet. The 
opening year is anticipated in 2030.  
 
1.2.1. EXISTING CAPACITY ANALYSIS 
The weekday AM and PM peak hour existing capacity analyses were completed for the study 
intersections as a baseline analysis of current operations. The existing LOS results are shown 
in Table 2 and Table 3. 
 
1.2.2. TRIP GENERATION 
The trip generation for the proposed development was calculated using the Institute of 
Transportation Engineers (ITE) publication Trip Generation, 11th Edition. The proposed Sarival 
Logistics is anticipated to generate a total of 2,277 weekday trips, with 230 trips occurring 
during the AM peak hour and 230 trips occurring during the PM peak hour. 
 
     
 
1.2.3. FUTURE CONDITIONS 
Future capacity analyses were completed with and without the buildout of the proposed 
Sarival Logistics development for the opening year and 5 years after the opening year. The 
year 2030 and 2035 background traffic volumes include a 3.50% annual growth rate based on 
Maricopa Associations of Governments (MAG) socioeconomic projections, as well as the 
traffic volumes generated by known surrounding developments.  
 
YEAR 2030 – OPENING YEAR 
The year 2030 build capacity analysis results in all movements operating at a LOS D or better, 
or at the same capacity as the year 2030 no build conditions. A comparison of the year 2030 
build and no build weekday AM and PM peak hour LOS and delay results are shown in Table 
5 and Table 6. 
 
 
 
Weekday
Total
Total
In
Out
Total
In
Out
Industrial Park
130
675.5 1000 Sq. 
Ft. GFA
2,277
230
186
44
230
51
179
PM Peak Hour
Land Use
ITE 
Code
Qty
Unit
AM Peak Hour

SARIVAL LOGISTICS 
EVERGREEN-SARIVAL & PEORIA, LLC 
3 
YEAR 2035 – 5 YEARS AFTER OPENING YEAR 
The year 2035 build capacity analysis results in all movements operating at a LOS D or better, 
or at the same capacity as the year 2035 no build conditions. A comparison of the year 2035 
build and no build weekday AM and PM peak hour LOS and delay results are shown in Table 
7 and Table 8. 
 
1.2.4. RECOMMENDATIONS 
The recommendations with the buildout of the proposed Sarival Logistics 
development include: 
 
Half-Street Improvements Adjacent to the Project 
• The developer will be responsible for the half street improvements adjacent 
to the project frontage along Sarival Avenue. 
 
Sarival Avenue and Driveway A (4)  
• Construct full access stop-controlled west leg of the existing Sarival Avenue 
and Brown Street intersection. 
• Construct a 150-foot southbound right-turn lane.  
 
Sarival Avenue and Driveway B (8)  
• Construct full access stop-controlled driveway with a 150-foot southbound 
right-turn lane.  
 
Sarival Avenue and Driveway C (9)  
• Construct full access stop-controlled driveway with a 150-foot southbound 
right-turn lane.