Extracted text (via pymupdf)
3398 characters
D.R. HORTON ENHANCED TRAFFIC IMPACT STATEMENT 6250 N 91ST AVENUE GLENDALE, ARIZONA Prepared for: D.R. Horton 1890 South Price Road Suite 200 Chandler, Arizona 85286 For Submittal to: City of Glendale CivTech Inc. 10605 North Hayden Road, Suite 140 Scottsdale, Arizona 85260 Office: 480-659-4250 Fax: 480-659-0566 info@civtech.com NOVEMBER 2025 CIVTECH PROJECT NO. 25-1040 Alan Heathcoat P.E. Principal Engineer Glendale Transportation 01/15/2026 2:11:48 PM APPROVED 6250 N 91st Avenue Redevelopment – Glendale, Arizona Enhanced Traffic Impact Statement 1 November 2025 EXECUTIVE SUMMARY D.R. Horton proposes the redevelopment of an existing church into a gated residential community located at 6250 North 91st Avenue. The Project includes the Parcels 102-04-003N and 102-04-003P, excluding Parcel 102-04-003Q which is located at the southwest corner of the overall property. The redevelopment is composed of 78 proposed single-family attached dwelling units (DU). Primary access to the site is provided by an existing traffic signal 6250 N 91st Avenue which is also a direct signalized access to the State Farm Stadium immediately to the west of the Project. CivTech, Inc. has been retained by D.R. Horton to perform the enhanced traffic impact statement for the proposed development. The purpose of this assessment is to address the traffic and transportation impacts of the proposed development on the surrounding streets and intersections. The following conclusions and recommendations have been documented in this study: GENERAL • The proposed development is anticipated to generate 512 weekday daily trips, 31 trips during the AM peak hour, and 37 trips during the PM peak hour. EXISTING • The results of the existing conditions analysis indicate that all study intersections operate with acceptable levels of service (LOS D or better). OPENING YEAR • The results of the Synchro analysis indicate that all study intersections operate with overall acceptable levels of service (LOS D or better). • The existing driveway will continue to be utilized by the Glendale Youth Sports Complex and the condominiums. The driveway is projected to operate at acceptable levels of service. • The developer acknowledges that coordination with the City will be required during events at the State Farm Stadium. The City has traffic management plans in place for mega events, which occur throughout the year, and limit access to the development during such events. o A right-in/right-out access will be maintained during mega events, per current City traffic management plans. Based on the trips generated by the site, the right-in/right- out access will operate sufficiently during event traffic control setup. o Should an emergency occur, gated access to 90th Avenue is being proposed. This gated access will remain closed except during an emergency, and will only be opened for emergency service access to the development. • A northbound right-turn lane at 91st Avenue and 6150North is not required by this project per the City of Glendale standards. However, it should be noted that the future land-use for the adjacent vacant property (Parcel 102-04-033Q) is undetermined at this time and no current proposals have been made to the City. It is therefore possible that a future proposed use on this adjacent property