PowerPoint Presentation
Extracted text (via pymupdf)
2168 characters
The Base CSP (Comprehensive Sign Program) Conditional Use Permit CUP25-04 Planning Commission Hearing – April 24, 2025 Amy Schwenner Planner Request 2 Planning Commission approval of The Base CSP (CUP25-04) with stipulations, as presented. Applicant: Julie Kulka Vicinity Map 3 CITY HALL SUBJECT PROPERTY Southwest corner of Litchfield Road and Super Saber Street Zoning Map 4 Aerial Map 5 Project Details 6 STANDARD ALLOWED PROPOSED MONUMENT SIGN Number of Monuments 8 1 Maximum Height 14 ft 20 ft Maximum Sign Area 110 sf 104 sf WALL SIGNS / TENANT ID Sign Area per Elevation 1.75 sf per 1 lf varies Maximum Sign Area per Building 500 sf for buildings >80,000 sf 2520 sf for ~310,000 sf Conceptual Signs 7 Proposed (20’ max) Allowed per UDC (14’ max) Conceptual Signs 8 Allowed: signs Totaling 500 sf Proposed: 8 signs Totaling 2,520 sf Conceptual Site Plan 9 Public Involvement 10 • Notices mailed March 7, 2025 • No neighborhood meeting required • Property posted March 28, 2025 • Hearing notices sent March 28, 2025 • Notice published in the Arizona Republic April 2, 2025 Findings & Analysis 11 • Consistent with General Plan • Not detrimental to health, safety, or general welfare; no adverse effects on the property, adjacent uses, nor surrounding neighborhood when consideration is given to the character and size of the use and hours of operation Findings & Analysis 12 • Adequate size and shape, zoning district requirements are met • Adequate access to public streets, safe and efficient on- site circulation • Stipulations to mitigate anticipated detrimental effects Recommendation 13 Staff recommends approval of CUP25-04 subject to the following stipulations: 1. Development shall be in substantial conformance with The Base CSP, date stamped February 28, 2025 and subject to sign permit approval by the Development Services Department. 2. Sign types not identified nor expressly prohibited within The Base CSP will be evaluated by the current City of Glendale sign standards. The Base CSP (Comprehensive Sign Program) Conditional Use Permit CUP25-04 Planning Commission Hearing – April 24, 2025 Amy Schwenner Planner