Traffic Impact Analysis Executive Summary
Extracted text (via pymupdf)
38457 characters
TRAFFIC IMPACT Transportation approves this TIA contingent on the following assumptions - School staffing numbers remain as stated in this submittal -Staggered student arrivals will occur as stated -School will not increase enrollment beyond 100 students Received 4/24/2025 Revised Traffic Impact Analysis 2 Sahuaro Glen Academy – 65th Avenue/Alice Avenue Table of Contents Executive Summary ____________________________________________________ 4 Project Description _____________________________________________________ 5 Study Methodology _____________________________________________________ 5 Existing Conditions _____________________________________________________ 8 Existing Traffic Data __________________________________________________ 10 Access _______________________________________________________________ 10 Trip Generation ______________________________________________________ 13 Trip Distribution & Assignment _________________________________________ 13 Existing Traffic Operations _____________________________________________ 16 Future Traffic Operations Without Project ________________________________ 17 Future Traffic Operations With Project___________________________________ 19 Turn Lane Analysis____________________________________________________ 21 Crash Analysis ________________________________________________________ 23 Conclusion ___________________________________________________________ 25 Table of Figures Figure 1 – Vicinity Map _________________________________________________ 6 Figure 2 – Site Plan _____________________________________________________ 7 Figure 3 – Existing Lane Configurations and Traffic Control __________________ 9 Figure 4 – Existing Weekday Peak Hour Traffic Volumes ____________________ 11 Figure 5 – Baseline Access Point and Intersection Configuration Assumptions __ 12 Figure 6 – Weekday Peak Hour Trip Distribution __________________________ 14 Figure 7 –Weekday Peak Hour Trip Assignment ___________________________ 15 Figure 8 – 2026 Weekday Peak Hour Traffic Volumes Without Project ________ 18 Figure 9 - 2026 Weekday Peak Hour Traffic Volumes With Project ___________ 20 Figure 10 – Proposed Lane Configurations and Traffic Control _______________ 26 Revised Traffic Impact Analysis 3 Sahuaro Glen Academy – 65th Avenue/Alice Avenue List of Tables Table 1 – Site Generated Trips __________________________________________ 13 Table 2 – Level of Service Criteria – Un-signalized Intersections ______________ 16 Table 3 – Existing Weekday Peak Hour Levels of Service ____________________ 17 Table 4 – 2026 Weekday Peak Hour Levels of Service Without Project _________ 19 Table 5 – 2026 Weekday Peak Hour Levels of Service With Project ___________ 21 Table 6 – MCDOT Left Turn Lane Warrant at Driveways ___________________ 22 Table 7 – MCDOT Right Turn Lane Warrant at Driveways __________________ 22 Table 8 – Left Turn Lane Warrant Evaluation at Driveways _________________ 23 Table 9 – Right Turn Lane Warrant Evaluation at Driveways ________________ 23 Table 10 – Crash Analysis at Alice Avenue/67th Avenue ______________________ 23 Table 11 – Crash Analysis at Alice Avenue/65th Avenue ______________________ 24 Appendix Traffic Counts Capacity Calculations Crash Analysis Comment Resolution Prepared By: Andrew Smigielski, PE, PTOE, PTP Shane Gutknecht, PE Revised Traffic Impact Analysis 4 Sahuaro Glen Academy – 65th Avenue/Alice Avenue SAHUARO GLEN ACADEMY 65TH AVENUE/ALICE AVENUE REVISED TRAFFIC IMPACT ANALYSIS Executive Summary The purpose of this traffic study is to evaluate the current and future transportation system within the project study area surrounding the site without and with the proposed. Existing Traffic Operations All of the study intersections currently operate at an adequate Level of Service (LOS) during the weekday AM and PM peak hours. Future Traffic Operations Without Project The study intersections are all expected to continue to operate at an adequate LOS in 2026 without traffic from the project during the weekday AM and PM peak hours. Future Traffic Operations With Project All of the study intersections are expected to continue to operate at an adequate LOS in 2026 without and with traffic from the project during the weekday AM and PM peak hours. Turn Lane Analysis Inbound turn lanes are not expected to be warranted at GSL East Driveway or GSL South Driveway. Crash Analysis Crash history for the existing study intersections was obtained from ADOT from 1 January 2019 to 31 December 2023. Thirty (30) crashes (six with injury) were reported at the intersection of Alice Avenue/67th Avenue within the five-year study period. Collisions involving left turns accounted for 50% of the total crashes, this is likely due to left turning vehicles misjudging the speed of oncoming traffic on 67th Avenue and accepting gaps in traffic too small to make the maneuver. Notably, a significant number (43%) of the vehicle incidents occurred in the year 2020. In the years 2023, 2022, 2021, and 2019 there were crashes per year at this intersection. The spike in crashes in 2020 may be attributed to irregular traffic patterns during the COVID-19 pandemic. Four (4) crashes were reported at the intersection of Alice Avenue/65th Avenue. No crashes were reported at the intersections of GSL East Driveway/Alice Avenue, GSL North Driveway/65th Avenue, GSL South Driveway/65th Avenue. Due to the limited number of crashes at the study intersections within the study period, there is no observable crash pattern for the area. Revised Traffic Impact Analysis 5 Sahuaro Glen Academy – 65th Avenue/Alice Avenue SAHUARO GLEN ACADEMY 65TH AVENUE/ALICE AVENUE REVISED TRAFFIC IMPACT ANALYSIS Project Description Bezos Academy is proposing a new Pre-School on the southwest corner of 65th Avenue/Alice Avenue in Glendale, Arizona. The vicinity of the project is shown in Figure 1. The site will be located as shown in Figure 2. The proposed development will be a 100 student Pre-School, served by five existing intersections. The purpose of this traffic impact analysis is to: • Evaluate the current and future operational characteristics of the adjacent roadway network surrounding the project site. • Estimate the traffic generation associated with the project and assign that traffic to the existing roadway system. • Analyze future traffic operations at five existing intersections. • Determine the need for auxiliary (left and right turn) lanes at the driveways that will serve the project site. • Perform a crash analysis to identify any specific crash trends within the study area. The author of this report is a registered Professional Engineer (Civil) in the State of Arizona having specific expertise and experience in the preparation of traffic impact analyses. Study Methodology In order to analyze and evaluate the potential traffic impacts of the proposed development, the following tasks were undertaken: • Field observation of the proposed site and surrounding area was conducted to evaluate the existing physical and operational characteristics of the adjacent roadway network. • Traffic volumes generated by the proposed site were estimated based site specific information provided by the operator of the site. • Calculated site traffic was distributed based on existing traffic patterns and assigned to the primary roadways within the project study limits. • Capacity analyses were performed for the existing conditions and future conditions without and with the project based on an opening year of 2026 a using methodology presented in the 2022 Highway Capacity Manual (HCM 7). • The need for auxiliary turn lanes at the study driveways were evaluated based on Maricopa County Department of Transportation (MCDOT) guidelines. • Crash records were obtained from the Arizona Department of Transportation (ADOT) database to identify any specific crash trends within the study area. Revised Traffic Impact Analysis 6 Sahuaro Glen Academy – 65th Avenue/Alice Avenue Figure 1 – Vicinity Map EXIT EXIT SAHUARO GLENN (6) ACADEMY PARKING, RESTRIPE PARKING SPACES 9'X18' EACH NORTH OUTDOOR PLAY AREA 3,750 SF SLUMP BLOCK FENCE PER DETAILS 2,3,4,& 5/G1.00 EXIT EXIT EXIT EXIT EXIT VAN ACCESS 1 2 3 4 5 6 7 8 (E) FH (E) FH G1.00 8 EXIT EXIT EXISTING TRANSFORMER 9 10 11 12 14 15 16 17 13 18 19 20 GATE G1.00 3 G1.00 5 EXISTING SITE FENCE STAFF PATIO UTILITY ENCLOSURE UTILITY ENCLOSURE W ALICE AVE N 65TH AVE (12) EXISTING PARKING -NO CHANGE PROPOSED 5' WIDE CONCRETE SIDEWALK, TYP CONCRETE SIDEWALK, TYP PROTECT EXISTING TREE PROTECT EXISTING TREES PROTECT EXISTING TREE POST AND PANEL SIGN, NIC G1.00 4 2 EXCAVATE 6" 145'-0" (E) FH EXISTING SITE GATE TO EXIT (TO REMAIN OPEN) PROTECT EXISTING TREES NSSP N N N N N G1.00 7 4'-0" EXISTING RIGHT - OF - WAY SHADE STRUCTURE 10'X10' SHADE STRUCTURE 10'X10' STORAGE SHED 120SFT , HT < 6' PER IFC APPENDIX D, D103.4 DEAD ENDS , DEAD-END FIRE APPARATUS ACCESS ROADS WITHIN 150 DO NOT REQUIRE A TURNAROUND FIRE APPARATUS ACCESS ROAD <150 FEET 125'-0" HOSE PULL DISTANCE 98'-8 1/2" PROPERTY LINE PROPERTY LINE HOSE PULL 268' DISTANCE BETWEEN TWO FIRE ACCESS POINTS <300' (150'+150' HOSE PULL LENGTHS) EXISTING SIDE WALK FLUSH WITH DRIVE. NO CURB COVERED PARKING TO BE MAINTAINED (1) BIKE RACK - COLOR TO MATCH EXISTING BUILDING ACCESSIBLE PATH TO PARKING: TEACHER WALKS KIDS ON CROSSWALK NORTH G1.00. 8 G1.00. 3 G1.00. 4 G1.00. 2 G1.00. 7 G1.02 3 G1.02 2 G1.02 5 PARENT/GUARDIAN DROP OFF AND PICK UP: SEE NARRATIVE FOR OPERATIONS. ASPHALT DRIVEWAY 28'-0" DROP OFF EXISTING SITE GATE TO ENTER (TO REMAIN OPEN) DRIVE AISLE CENTER LINE STRIPING 5'-0" PROPOSED DRIVE LINE STAFF ESCORTS STUDENTS TO CLASSROOM CAR EXITS CAR STOPS HERE AND KID GETS OUT HERE INTO TEACHER'S CARE PARKING FOR TEACHERS AND PARENTS PARKING FOR TEACHERS ONLY PROJECT ADDRESS: SAHUARO GLENN 6511 WEST ALICE AVENUE GLENDALE, AZ 85302 OWNER: DAY 1 ACADEMIES 3040 78TH AVENUE SOUTHEAST, SUITE 1042 MERCER ISLAND, WA 98040 CONTACT: WOLFGANG HORN, PHONE 925-922-2268 PROPERTY OWNER: GLENCROFT CENTER FOR MODERN AGING 8611 N 67TH AVE, GLENDALE, AZ 85302 GLENDALE, AZ 85302 CONTACT: JOHN THORNHAUER, PHONE 623-939-9475 ARCHITECT OF RECORD: BASSETTI ARCHITECTS 71 COLUMBIA ST., #501 SEATTLE, WA 98104 CONTACT: SUSAN CONWAY, 206-340-9500 TAX PARCEL NO: 143-19-001M; 143-19-003A; 143-19-001L LEGAL DESCRIPTION: 143-19-003A W 50F SE4 NW4 EX S 40F & EX RD P/D 15171-148 & EX ANY PT LY SLY OF FOL DESC LN COM W4 COR SEC 31 TH N 88D 32M E 1220.8F N 384F S 88D 9M W 543F TH N 1D 8M W 281.60F TO TPOB SD LN TH N 88D 51M E 549.87F TO TERM SD LN 143-19-001M SE4 NW4 SEC 31 DAF FR NW COR SE4 NW4 SD SEC E 50F TPOB TH E 65. 96F TH S 1320F M/L TH W 63.32F TH N 1320F TPOB EX S 40F & EX S 5X5 TRI IN SE COR & EX RD P/D 15171-148 & EX PT LY SLY OF FOL DESC LN COM W4 COR SEC 31 TH N 88D 32M E 1220.8F N 384F S 88D 9M W 543F N 1D 8M W 281.60F TO TPOB SD LN TH N 88D 51M E 549.87F TO TERM SD LN 143-19-001L N2 SW4 NW4 SEC 31 AKA N2 LOT 2 EX W 45F & EX N 30F & EX 10F X 10F TRI IN NW COR TH/OF & EX COM W4 COR SEC TH N ALG W LN SEC 935.08F TH N 88D 51M E 142.34F TH N 88D 37M E 384.19F TO TPOB TH CONT N 88D 37M E 142F TH S 1D 12M E 213.58F TH S 88D 51M W 142F TH N 1D 12M W 213.01F TO TPOB & EX P/D 15491-0629 JURISDICTION: CITY OF GLENDALE, AZ FIRE DISTRICT: GLENDALE FIRE DEPARTMENT SEWER DISTRICT: GLENDALE SEWER SERVICES DEPARTMENT WATER DISTRICT: GLENDALE WATER SERVICES DEPARTMENT CODES: 2018 IBC (International Building Code) 2018 IEBC (International Existing Building Code) 2018 IRC (International Residential Code) 2018 IMC (International Mechanical Code) 2018 IPC (International Plumbing Code) 2018 IECC (International Energy Code) 2018 IFGC (International Fuel Code) 2018 IFC (International Fire Code) 2017 NEC (National Electric Code) Americans With Disability Act Accessibility Guidelines Arizonans with Disabilities Act 2018 Americans with Disabilities Act Standards for Accessible Design 2018 IPMC (International Property Maintenance Code) City of Glendale Revised Sound Attenuation Standards Fair Housing Accessibility Guidelines PROPOSED USE: PRIVATE SCHOOL WITHOUT DORMITORIES ZONING: R-4, MULTIPLE RESIDENCE OCCUPANCY GROUP: E - EDUCATIONAL - PERMITED CONDITIONAL USE BUILDING AREA : 7,719 SF N 59 TH AVE N 67 TH AVE W OLIVE AVE W NORTHERN AVE 60 17 107 SITE LOCATION NEW RIVER NORTH N 65 TH AVE W ALICE AVE EXISTING ACCESSIBLE PATH CONCRETE SIDEWALK, TYP BROOM FINISH, TOOLED CONTROL JOINT EVERY 5'-0" (E) SEWER LINE (E) WATER LINE (E) FIRE HYDRANT (FH) (E) LUMINAR NO STANDING/STOPPING/PARKING SIGN PER CITY OF GLENDALE TRANSPORTATION REFER DETAIL #SS-109 R7-101, R7-101L OR R7-101R NSSP ACCESSIBLE PATH PROPERTY LINE FIRE APPARATUS ACCESS ROAD 4 GATE-B-2 323119 - STL PICKET FENCE 042000 - MASONRY SLUMP BLOCK FENCE G1.00 9 TYP 323119 - STL PICKET GATE CJ 8'-0" 7'-9" CJ CJ LEVEL 1 0" 4 GATE-B-1 6 G1.00 CJ G1.00 3 TYP SLUMP BLOCK MASONRY FENCE TO MATCH EXISTING SITE FENCE 8'-0" 7'-11 1/2" LEVEL 1 0" SECTION 033053 - MISCELLANEOUS CAST-IN-PLACE CONCRETE 3'-0" 323119 - FENCE POST MOUNTED ONE COURSE BELOW TOP OF WALL 323119 - STEEL PICKET FENCE 3'-4" EQUAL TO (8) COURSES SB-CMU 2'-8" EQUAL TO (4) COURSES SB-CMU 1'-4" CIP FOOTING 9 1/4" CAULKING AND BACKER-ROD 042000 - SLUMP WALL CONCRETE MASONRY UNITS CUT BLOCK AROUND FENCE POST, LEAVE 1/4" VOID SPACE AROUND POST 042000 #5 @ 32" OC VERT 042000 #5 @ 48" OC HORIZ 033053 #5 DOWELS @16" OC (ALT. HOOKS) #4 @ 48" OC TOP (3) #4 CONT BOT. EQ 8" MON EQ 042000 #5 @ TOP POST BASE PL, WELDED TO POST, 5X10X3/8 PL, (4) 3X1/2 WEDGE ANCHORS 072500 - CAULKING AND BACKER ROD 323119 - STL PICKET 4X4X1/4 POST GROUT FILLED CUT CMU TOP BLK 323119 - STL BASE PLATE ACCESS PARKING SYMBOL PER #SS-205,WHITE 10'-0" 5'-0" 5'-0" ACCESS PARKING SIGN REFER DETAIL #SS-105 #SS-131 FOR SIGN SQUARE POST SECTION 321723 - 4" WIDE PAVEMENT MARKINGS, 45DEG ANGLE 2' OC 4" WIDE WHITE PARKING STRIPE WHEEL STOP 20'-0" FLUSH CURB FROM PARKING TO SIDEWALK EXISTING TRANSFORMER TRENCH PER ELECTRICAL DRAWINGS CONCRETE PATH, CONTROL JOINT 5' TYP ELECTRICAL SERVICE LOCATION, SEE ELECTRICAL DRAWINGS EXISTING BUILDING CONTROL JOINT TYP G1.02 1 LEVEL 1 0" CJ CJ CJ 323119 - STEEL PICKET 042000 - SLUMP BLOCK WALL 2'-8" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 2'-6" CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ LEVEL 1 0" ACCESS PARKING SYMBOL PER #SS-205,WHITE 5'-0" 11'-0" 5'-0" SECTION 321723 - 4" WIDE PAVEMENT MARKINGS, 45DEG ANGLE 2' OC VAN ACCESSIBLE SIGN REFER DETAIL #SS-105 &SS-131 FOR SIGN SQUARE POST 4" WIDE WHITE PARKING STRIPE WHEEL STOP VAN SPACE FLUSH CURB FROM PARKING TO SIDEWALK 20'-0" 3'-10" 1'-6" a. Fire Department access and water supply requirements shall be in place prior to combustible materials being brought on site b. Pursuant to Chapter 32.5 of the Glendale City Code, all new and existing utilities within or contiguous to this site shall be placed underground. c. All utility boxes, vaults and backflow prevention devices shall be painted to match the building and screened from public view by a masonry wall or a round-topped wire mesh enclosure, painted to match the adjacent wall. d. Sight distance requirements of COG detail G-447 (Local Streets) or G-448 (Arterial and Collector Streets) are met for all driveways and streets. e. Streetlights installed by the developer may be required for construction plan approval. f. On-site lighting will be placed so as to direct the light away from adjacent residential uses and must not exceed one-foot candle at the property line. The height of the parking lot lights within 150’ of residential use to be 15’. High Pressure Sodium (HPS) lighting required adjacent to residence. g. On-site lighting shall meet outdoor Light Control Ordinance. h. Maximum noise level 55 decibels (normal speaking voice) at property line. i. Convenience uses shall be subject to a separate Citizen Participation and Conditional Use Permit Process. j. The property owner is responsible for maintaining landscaping in all public rights- of-way adjacent to the project. EXIT/ENTRANCE EXIT/ENTRANCE EXIT/ENTRANCE ENTRANCE ONLY EXIT ONLY EXIT ONLY 71 Columbia Street, Suite 500 Seattle, Washington 98104 T (206) 340 9500 ISSUE DATE: JOB NO: # DATE Jurisdiction Stamp Area ONE INCH AT FULL SIZE www.bassettiarch.com 4/21/2025 3:46:32 PM ARCHITECTURAL SITE PLAN 2314 GLENDALE - SAHUARO GLENN BEZOS ACADEMY APRIL 21, 2025 G1.00 SR24-0217 CUP 6511 WEST ALICE AVENUE GLENDALE, AZ 85302 STRUCTURAL ENGINEER Coughlin Porter Lundeen 801 Second Avenue Suite 900 Seattle, WA 98104 T (206) 343 0460 MECHANICAL ENGINEER Hargis Engineers, Inc. 1201 3rd Avenue, Suite 600 Seattle, WA 98101 T (206) 448 3376 ELECTRICAL ENGINEER Hargis Engineers, Inc. 1201 3rd Avenue, Suite 600 Seattle, WA 98101 T (206) 448 3376 1" = 30'-0" 1 SITE PLAN PROJECT DATA VICINITY MAP SITE PLAN LEGEND 0' 30' 15' 1/4" = 1'-0" 3 72" NORTH GATE 1/4" = 1'-0" 5 72" SOUTH GATE 1 1/2" = 1'-0" 6 SITE WALL SECTION (TYP) 1 1/2" = 1'-0" 9 SITE WALL CONTROL JOINT (CJ) - TYP 1" = 10'-0" 8 ADA PARKING 1/16" = 1'-0" 10 SIDEWALK REPAIR ACCESS PARKING SYMBOL 1/4" = 1'-0" 4 FENCE EAST ELEVATION 1/4" = 1'-0" 2 FENCE NORTH 1" = 10'-0" 7 ADA PARKING -VAN ACCESSIBLE 1 1 1 1 1 1 GENERAL SITE PLAN NOTES 2 REVISIONS 1 CUP RESPONSES 12/16/24 2 CUP RESPONSES 2/21/25 3 CUP RESPONSES 4/11/25 4 CUP RESPONSES 4/21/25 EXISTING PARKING EXITS / ENTRANCES 3 3 4 4 4 4 Revised Traffic Impact Analysis 8 Sahuaro Glen Academy – 65th Avenue/Alice Avenue Existing Conditions The proposed project involves the redevelopment of an existing building at the Glencroft Senior Living (GSL) facility on the southwest corner of 65th Avenue/Alice Avenue in Glendale, Arizona. 67th Avenue is a north/south aligned arterial roadway that provides two lanes in each direction of travel separated by a two-way center left turn lane. Curb, gutter, and sidewalk facilities are available on both sides of the roadway. The posted speed limit on 67th Avenue is 40 miles per hour (mph). Alice Avenue is an east/west aligned collector street and 65th Avenue is a north/south aligned collector street. Both roads provide a single lane in each direction of travel. Curb, gutter, and sidewalk facilities are present on both sides of the roadway. The posted speed limit is 25 mph. The intersection of Alice Avenue/67th Avenue is a three-leg unsignalized intersection. Westbound traffic approaching the intersection is STOP controlled. While pavement markings do not exist to delineate separate westbound left and westbound right turn lanes at the intersection, operationally it behaves in the same way. The east leg of the intersection is roughly 40 feet wide and when provided with that much pavement vehicles attempting to turn left and right tend to naturally separate into two queues. A separate westbound left and westbound right turn lane were modeled in analyses of this report. Northbound traffic is provided with a through lane and a shared through/right turn lane while southbound traffic makes use of a two-way center left turn lane and two through lanes. Alice Avenue/65th Avenue forms a four-leg ALL WAY STOP controlled intersection. All approaches to the intersection are provided with a shared left/through/right turn lane. The Glencroft Senior Living (GSL) community is accessed by multiple driveways on the south side of Alice Avenue and west side of 65th Avenue within the study area. This report will focus on three primary driveways that will facilitate access to the proposed project. The easternmost driveway on Alice Avenue, GSL East Driveway, is a full-access driveway located approximately 175 feet west of 65th Avenue. An exit only driveway (GSL North Driveway) and an entrance only driveway (GSL South Driveway) are located on the west side of 65th Avenue, approximately 325 feet and 650 feet south of Alice Avenue, respectively. Both GLS North Driveway and GSL South Driveway are gated. The study intersection locations, lane configurations, and intersection control are shown in Figure 3. Revised Traffic Impact Analysis 9 Sahuaro Glen Academy – 65th Avenue/Alice Avenue Figure 3 – Existing Lane Configurations and Traffic Control Revised Traffic Impact Analysis 10 Sahuaro Glen Academy – 65th Avenue/Alice Avenue Existing Traffic Data In order to form a basis for analysis of the project impacts, weekday AM and PM peak hour turning movement counts were conducted at the intersections of Alice Avenue/67th Avenue, Alice Avenue/65th Avenue, GSL East Driveway, GSL North Driveway, GSL South Driveway. The weekday turning movement counts were conducted from 7:00 AM to 9:00 AM and 4:00 PM to 6:00 PM. All traffic counts were collected in March 2024 while school was in session. The results of the traffic counts are shown in Figure 4. Complete traffic count data can be found in the Appendix. Access The proposed project does not include the construction of new access points. Instead, it will utilize GSL East Driveway as the primary entrance to the proposed project, with the GSL North Driveway and GSL South Driveway designated as the main child drop-off and pick-up accesses. GSL East Driveway will provide access to a parking area utilized by teachers, deliveries, and other non-student pick-up/drop-off traffic. Vehicles that enter at GSL East Driveway must also exit at GSL East Driveway as there will be no onsite connectivity to other driveways. Vehicles entering the site to drop-off or pick-up a student will do so via GSL South Driveway. From there, parents will take an immediate right turn, and continue northbound, where teachers, or other traffic monitors, will be waiting to help children unload and escort them to their classroom. Drivers will remain in their vehicles and then exit the site after their children have been unloaded. Exiting vehicles will continue north and exit via GSL North Driveway. GSL North Driveway will be exit only and GSL South Driveway will be enter only during the peak hours and child drop-off and pick-up times. Figure 5 shows the locations, geometry and spacing for the study intersections that will also serve as a baseline of analysis in 2026 with Sahuaro Glen Academy. Revised Traffic Impact Analysis 11 Sahuaro Glen Academy – 65th Avenue/Alice Avenue Figure 4 – Existing Weekday Peak Hour Traffic Volumes Revised Traffic Impact Analysis 12 Sahuaro Glen Academy – 65th Avenue/Alice Avenue Figure 5 – Baseline Access Point and Intersection Configuration Assumptions Revised Traffic Impact Analysis 13 Sahuaro Glen Academy – 65th Avenue/Alice Avenue Trip Generation Traffic volumes generated by the proposed site were estimated based site specific information provided by the operator of the site. The following data and assumptions were utilized: • 100 students will be dropped off during the weekday AM peak hour. All of the vehicles associated with drop-off also exit during the weekday AM peak hour. • 50 students will be picked up from aftercare during the weekday PM peak hour. All of the vehicles associated with aftercare pick-up also exit during the weekday PM peak hour. • A carpool factor of 0.85 was utilized to account for siblings and students that do not arrive in separate vehicles. • In order to provide a conservative analysis it was assumed that the school’s 16 staff members would all arrive during the weekday AM peak hour and would all exit during the weekday PM peak hour. However, it is expected that most or all staff members will arrive/depart before and after the open hours of the academy (i.e. outside of the weekday AM/PM peak hours). • 5 miscellaneous vehicles (vendors, maintenance, etc.) enter and exit during both the weekday AM and PM peak hours. The result is the expected weekday trip generation for the project as shown in Table 1. Table 1 – Site Generated Trips Trip Distribution & Assignment Trip distribution for the project was based on existing traffic volume patterns near the proposed site. Figure 6 shows the weekday trip distribution for the project as a percentage of net new primary trips. Figure 7 shows the assignment of the new site generated trips to the project intersections within the study area. Day Care Center (LUC 565) Average Daily, Inbound (vtpd) 392 Average Daily, Outbound (vtpd) 392 Total Daily 784 AM Peak Hour, Inbound (vtph) 106 AM Peak Hour, Outbound (vtph) 90 Total AM Peak 196 PM Peak Hour, Inbound (vtph) 48 PM Peak Hour, Outbound (vtph) 64 Total PM Peak 112 vtpd - vehicle trips per day, vtph - vehicle trips per hour Time Period Revised Traffic Impact Analysis 14 Sahuaro Glen Academy – 65th Avenue/Alice Avenue Figure 6 – Weekday Peak Hour Trip Distribution Revised Traffic Impact Analysis 15 Sahuaro Glen Academy – 65th Avenue/Alice Avenue Figure 7 –Weekday Peak Hour Trip Assignment Revised Traffic Impact Analysis 16 Sahuaro Glen Academy – 65th Avenue/Alice Avenue Existing Traffic Operations Analysis of current intersection operations was conducted for the weekday AM and PM peak hours using the nationally accepted methodology set forth in the Highway Capacity Manual, Transportation Research Board, 2022 (HCM 7). The computer software Synchro 12 was utilized to calculate the levels of service for individual movements and approaches. LOS is a qualitative measure of the traffic operations at an intersection or on a roadway segment. Level of service is ranked from LOS A, which signifies little or no congestion and is the highest rank, to LOS F, which signifies congestion and jam conditions. LOS D is typically considered adequate operation at signalized and un-signalized intersections in developed areas. At un-signalized intersections, level of service is predicted/calculated for those movements, which must either stop for or yield to oncoming traffic and is based on average control delay for the particular movement. Control delay is the portion of total delay attributed to traffic control measures such as stop signs and traffic signals. The criteria for level of service at un-signalized intersections are shown in Table 2. Table 2 – Level of Service Criteria – Un-signalized Intersections Level-of-Service Delay A < 10 seconds/vehicle B > 10 and < 15 seconds/vehicle C > 15 and < 25 seconds/vehicle D > 25 and < 35 seconds/vehicle E > 35 and < 50 seconds/vehicle F > 50 seconds/vehicle Table 3 shows the existing levels of service that were calculated for the study intersections. Complete capacity calculations are included in the Appendix. As shown in Table 3, all the study intersections currently operate at an adequate LOS during the weekday AM and PM peak hours. Revised Traffic Impact Analysis 17 Sahuaro Glen Academy – 65th Avenue/Alice Avenue Table 3 – Existing Weekday Peak Hour Levels of Service Future Traffic Operations Without Project In order to assess the impacts of the project on future traffic operations, traffic projections were made for the opening year of 2026. A review of Maricopa County historical traffic data in the vicinity of the project showed increasing and decreasing traffic volumes in the area. A 2% annual compounded traffic growth rate was used to estimate the future 2026 weekday peak hour traffic volumes without the project, as shown in Figure 8. As with the current volumes, levels of service were calculated for each of the intersections in the study area for 2026 without the project. Intersection levels of service for 2026 without the project are shown in Tables 4. Complete capacity calculations are included in the Appendix. As shown in Table 4, all the study intersections are expected to continue to operate at an adequate LOS in 2026 without traffic from the project during the weekday AM and PM peak hours. LOS Delay LOS Delay Unsignalized Intersections Alice Avenue/67th Avenue Westbound Left C 18.8 C 20.0 Westbound Right B 11.4 B 11.4 Southbound Left A 9.6 A 9.6 GSL East Driveway/Alice Avenue Westbound Left/Through A 0.0 A 0.0 Northbound Left/Right A 0.0 A 0.0 Alice Avenue/65th Avenue Eastbound Left/Through/Right A 8.0 A 7.9 Westbound Left/Through/Right A 7.6 A 7.7 Northbound Left/Through/Right A 7.6 A 7.6 Southbound Left/Through/Right A 7.7 A 7.8 GSL North Driveway/65th Avenue Eastbound Left/Right A 0.0 A 9.1 GSL South Driveway/65th Avenue Northbound Left/Through A 7.4 A 7.3 Delay - seconds per vehicle PM Peak Intersection AM Peak Revised Traffic Impact Analysis 18 Sahuaro Glen Academy – 65th Avenue/Alice Avenue Figure 8 – 2026 Weekday Peak Hour Traffic Volumes Without Project Revised Traffic Impact Analysis 19 Sahuaro Glen Academy – 65th Avenue/Alice Avenue Table 4 – 2026 Weekday Peak Hour Levels of Service Without Project Future Traffic Operations With Project In order to assess the impacts of the project on future traffic operations, levels of service were calculated for each project intersection in 2026 with the project. Weekday peak hour traffic volumes for 2026 without the project were combined with the estimated trips generated by the project to yield weekday peak hour traffic volumes with the project as shown in Figure 9. Weekday intersection levels of service for 2026 with the project were then calculated as shown in Table 5. Complete capacity calculations are included in the Appendix. As shown in Table 5, all the study intersections are expected to continue to operate at an acceptable LOS in 2026 without and with traffic from the project during the weekday AM and PM peak hours. LOS Delay LOS Delay Unsignalized Intersections Alice Avenue/67th Avenue Westbound Left C 19.2 C 20.3 Westbound Right B 11.6 B 11.5 Southbound Left A 9.7 A 9.7 GSL East Driveway/Alice Avenue Westbound Left/Through A 0.0 A 0.0 Northbound Left/Right A 0.0 A 0.0 Alice Avenue/65th Avenue Eastbound Left/Through/Right A 7.9 A 7.8 Westbound Left/Through/Right A 7.5 A 7.6 Northbound Left/Through/Right A 7.6 A 7.5 Southbound Left/Through/Right A 7.6 A 7.7 GSL North Driveway/65th Avenue Eastbound Left/Right A 0.0 A 9.1 GSL South Driveway/65th Avenue Northbound Left/Through A 7.3 A 7.3 Delay - seconds per vehicle Intersection AM Peak PM Peak Revised Traffic Impact Analysis 20 Sahuaro Glen Academy – 65th Avenue/Alice Avenue Figure 9 - 2026 Weekday Peak Hour Traffic Volumes With Project Revised Traffic Impact Analysis 21 Sahuaro Glen Academy – 65th Avenue/Alice Avenue Table 5 – 2026 Weekday Peak Hour Levels of Service With Project Turn Lane Analysis A key element of this analysis is to determine if left and right turn lanes are required at the driveways providing access to the proposed project site. The City of Glendale utilizes Maricopa County Department of Transportation turn lane warrant criteria. Turn lane warrant criteria from the MCDOT Roadway Design Manual updated March 2024 (MCDOT RDM) are shown in Tables 6 and 7. Tables 8 and 9 show the locations that were evaluated for left and right turn lanes based on MCDOT guidelines and traffic volumes in 2026 with the project. As shown in Table 8 and 9, inbound turn lanes at GSL East Driveway and GSL South Driveway are not warranted. LOS Delay LOS Delay LOS Delay LOS Delay Unsignalized Intersections Alice Avenue/67th Avenue Westbound Left C 19.2 C 20.3 C 20.3 C 21.0 Westbound Right B 11.6 B 11.5 B 11.7 B 11.6 Southbound Left A 9.7 A 9.7 A 9.8 A 9.8 GSL East Driveway/Alice Avenue Westbound Left/Through A 0.0 A 0.0 A 7.6 A 7.4 Northbound Left/Right A 0.0 A 0.0 A 9.2 A 9.0 Alice Avenue/65th Avenue Eastbound Left/Through/Right A 7.9 A 7.8 A 8.3 A 8.1 Westbound Left/Through/Right A 7.5 A 7.6 A 8.2 A 7.9 Northbound Left/Through/Right A 7.6 A 7.5 A 8.3 A 7.9 Southbound Left/Through/Right A 7.6 A 7.7 A 8.1 A 8.0 GSL North Driveway/65th Avenue Eastbound Left/Right A 0.0 A 9.1 B 10.3 A 9.5 GSL South Driveway/65th Avenue Northbound Left/Through A 7.3 A 7.3 A 7.7 A 7.5 Delay - seconds per vehicle Intersection AM Peak PM Peak AM Peak PM Peak 2025 Without Project 2025 With Project Revised Traffic Impact Analysis 22 Sahuaro Glen Academy – 65th Avenue/Alice Avenue Table 6 – MCDOT Left Turn Lane Warrant at Driveways Table 7 – MCDOT Right Turn Lane Warrant at Driveways Revised Traffic Impact Analysis 23 Sahuaro Glen Academy – 65th Avenue/Alice Avenue Table 8 – Left Turn Lane Warrant Evaluation at Driveways Table 9 – Right Turn Lane Warrant Evaluation at Driveways Crash Analysis Crash history for the existing study intersections was obtained from ADOT from 1 January 2019 to 31 December 2023. The results of the crash analysis at the intersections of Alice Avenue/67th Avenue, Alice Avenue/65th Avenue, GSL East Driveway, GSL North Driveway, GSL South Driveway are shown in Tables 10 and 11. A summary of the crash data can be found in the Appendix. Table 10 – Crash Analysis at Alice Avenue/67th Avenue AM 63 21 30 PM 74 4 30 AM 56 25 30 PM 45 13 30 vph - vehicles per hour, mph - miles per hour Direction Left Turn Treatment Warranted? Intersection Advancing Traffic Volume (vph) Minimum Left-Turn Volume Criteria (vph) Westbound 1 25 No GSL East Driveway/Alice Avenue Peak Hour Left-Turn Volume (vph) # of Through Lanes per Direction Posted Speed (mph) GSL South Driveway/65th Avenue Northbound 1 25 No AM 114 4 N/A* PM 91 1 N/A* AM 60 56 N/A* PM 65 30 N/A* vph - vehicles per hour, mph - miles per hour *Advancing through traffic volumes are not high enough to warrant a turn lane. Advancing Traffic Volume Right- Turn Volume Posted Speed (mph) Peak Hour Minimum Right-Turn Volume Right Turn Treatment Warranted? GSL East Driveway/Alice Avenue Eastbound 1 25 No Intersection Direction # of Through Lanes per GSL South Driveway/65th Avenue Southbound 1 25 No Angle Left Turn Rear-End Sideswipe Single Vehicle Head On Other 2019 1 2 0 1 0 0 0 0 0 4 2020 1 6 4 2 0 0 0 0 1 13 2021 1 2 0 0 0 0 0 0 1 3 2022 0 1 1 0 0 0 0 0 1 2 2023 1 4 1 1 1 0 0 0 3 8 5-Year Total 4 15 6 4 1 0 0 0 6 30 Year Crash Type Fatal Injury Crash Totals Revised Traffic Impact Analysis 24 Sahuaro Glen Academy – 65th Avenue/Alice Avenue Table 11 – Crash Analysis at Alice Avenue/65th Avenue As shown in Table 10, thirty (30) crashes (six with injury) were reported at the intersection of Alice Avenue/67th Avenue within the five-year study period. Collisions involving left turns accounted for 50% of the total crashes, this is likely due to left turning vehicles misjudging the speed of oncoming traffic on 67th Avenue and accepting gaps in traffic too small to make the maneuver. Notably, a significant number (43%) of the vehicle incidents occurred in the year 2020. In the years 2023, 2022, 2021, and 2019 there were crashes per year at this intersection. The spike in crashes in 2020 may be attributed to irregular traffic patterns during the COVID-19 pandemic. As shown in Table 11, four (4) crashes were reported at the intersection of Alice Avenue/65th Avenue. Crashes were not reported at the intersections of GSL East Driveway/Alice Avenue, GSL North Driveway/65th Avenue, GSL South Driveway/65th Avenue. Due to the limited number of crashes at the study intersections within the study period, there is no observable crash pattern for the area. It should be noted that this crash summary only includes crashes where a police officer was contacted and wrote a report, otherwise, there is no record of the incident. It is possible that other minor crashes occurred in the area where the Police Department was not contacted, and no official record of these crashes exists. Angle Left Turn Rear-End Sideswipe Single Vehicle Head On Other 2019 1 2 0 0 0 0 0 0 0 3 2020 0 1 0 0 0 0 0 0 0 1 2021 0 0 0 0 0 0 0 0 0 0 2022 0 0 0 0 0 0 0 0 0 0 2023 0 0 0 0 0 0 0 0 0 0 5-Year Total 1 3 0 0 0 0 0 0 0 4 Year Crash Type Fatal Injury Crash Totals Revised Traffic Impact Analysis 25 Sahuaro Glen Academy – 65th Avenue/Alice Avenue Conclusion When fully completed, the proposed Sahuaro Glen Academy is predicted to generate an additional 784 vehicle trips per day (vtpd) on weekdays to the adjacent street system from the new project site. Fifty percent of these new trips (392 vehicle trips) will be into the project and fifty percent will be out of the project. All the study intersections currently operate at an adequate LOS during the weekday AM and PM peak hours and are anticipated to continue operating at an adequate LOS during the weekday AM and PM peak hours in 2026 without and with the proposed project. Inbound turn lanes are not expected to be warranted at GSL East Driveway or GSL South Driveway. Thirty (30) crashes (six with injury) were reported at the intersection of Alice Avenue/67th Avenue within the five-year study period. Collisions involving left turns accounted for 50% of the total crashes, this is likely due to left turning vehicles misjudging the speed of oncoming traffic on 67th Avenue and accepting gaps in traffic too small to make the maneuver. Notably, a significant number (43%) of the vehicle incidents occurred in the year 2020. In the years 2023, 2022, 2021, and 2019 there were crashes per year at this intersection. The spike in crashes in 2020 may be attributed to irregular traffic patterns during the COVID-19 pandemic. Four (4) crashes were reported at the intersection of Alice Avenue/65th Avenue. No crashes were reported at the intersections of GSL East Driveway/Alice Avenue, GSL North Driveway/65th Avenue, GSL South Driveway/65th Avenue. Due to the limited number of crashes at the study intersections within the study period, there is no observable crash pattern for the area. Proposed lane configurations and traffic control are shown in Figure 10. P:\projects 2024\24021 - sahuaro glenn daycare (glendale)\traffic analysis\report\rev final\sga tia SEALED 240331.docx