Extracted text (via pymupdf)
1335 characters
NOTES 1. EXISTING & PROPOSED CONTOURS PROVIDED AT 5 & 25 FOOT INTERVALS. 2. ALL PROPERTY BOUNDARIES ARE APPROXIMATE. 3. BACKGROUND AERIAL IMAGERY SOURCE: BING \\HALEYALDRICH\SHARE\CF\PROJECTS\134597\CAD\FIGURES\01-18-23\134597_FIGURE-2_65-FT.DWG BBENNEHOFF FIG_2 (2) 5/14/2024 11:53 AM Sheet: Printed: Saved by: FIGURE 2 M.R. TANNER MINING GLENDALE PROPERTY GLENDALE, ARIZONA CONCEPTUAL PLAN OF DEVELOPMENT SCALE: AS SHOWN MAY 2024 0 500 1000 SCALE IN FEET PIT AREA = 86.98 ACRES M.R. TANNER PARCELS AGUA FRIA FLOODWAY DRAFT GLENDALE PARCELS AGUA FRIA FLOODPLAIN 60 FT LANDSCAPE OFFSET LEGEND FLOODWAY FLOODPLAIN GLENDALE PROPERTY BOUNDARY PROPERTY BOUNDARY PHASE 1 PHASE 2 EGRESS AND INGRESS ROADWAY 60' MINING/LANDSCAPE BUFFER LINE 501-55-010B 501-55-007D STATE TRUST LAND 102-59-008D 102-59-241D 501-55-004E 501-55-004G 501-55-004F 501-55-002A 501-55-003B 501-99-001J 501-99-001K 501-55-011C 501-55-012C 60 FT LANDSCAPE OFFSET INLET STRUCTURE TO SPAN FLOODWAY AND TIE INTO EXISTING FLOOD CONTROL STRUCTURE TO THE WEST AND CITY OF GLENDALE PROPERTY TO THE EAST. NO MINING TO OCCUR ON CITY OF GLENDALE PROPERTY. PIT DEPTH = 65' 2:1 2:1 2:1 10:1 2:1 5:1 100 FT TAIL CUT MITIGATED BY EXISTING DROP STRUCTURE WESTERN PIT CREST WILL ABUT EXISTING ARMORED BERM 60 FT LANDSCAPE OFFSET 2:1 EGRESS & INGRESS ROAD N. EL MIRAGE RD ENTRY POINT