GPA23-02 & ZON23-03
VAI Resort (Centerpoint PAD Amendment)
Planning Commission Hearing – October 24, 2024
Alex Lerma
Senior Planner
Request
2
1. Minor General Plan Amendment from POS to CCC.
2. Rezone to amend PAD.
Applicant: Adam Baugh, Withey Morris Baugh, PLC,
VAI Resorts LLC
3
CITY HALL
SUBJECT
PROPERTY
Located at the
Southeast
corner of the
Loop 101 and
Cardinals
Way
Vicinity Map
General Plan / Zoning
4
General Plan Proposal:
CCC
Zoning Proposal:
PAD Amendment
Aerial Photograph
5
Conceptual
Site Plan
6
7
Site Renderings
8
Site Renderings
9
Site Renderings
Proposed Amendments
10
Centerpoint
PAD
Vai Resort PAD Amendment
Max FAR
1.00 or less
1.00 or less
Min. Open Space %*
10%
10%
Min. Front Building
Setback (Cardinals
Way)
0-feet
120-feet
(SRP substation may be placed within
setback)
Min. Street Side
Building Setback
•
95th Avenue
0-feet
5-feet
•
Missouri Avenue
0-feet
230-feet
•
Loop 101 Freeway
0-feet
125-feet
Min. Interior Setback
Per Building
Code
Per Building Code
Proposed Amendments
11
Centerpoint
PAD
Vai Resort PAD Amendment
Distance Between
Structures
Building
separation shall
be per the
building code.
Building separation shall be per the
building code.
Max. Building
Height**
220 feet
(subject to FAA
Clearance)
220 feet (subject to FAA Clearance)
Min. Landscape
Setbacks
•
Cardinals Way
20-feet
0-feet
•
95th Avenue
20-feet
10-feet
•
Missouri Avenue
10-feet
8-feet
•
Loop 101 Freeway
0-feet
0-feet
Proposed Amendments
12
Centerpoint PAD
Vai Resort PAD Amendment
Max. Height for
Freeway Monument
Sign
55-feet
55-feet
Parking Space
Dimensions
Minimum 9’ x 18’
Minimum 9’ x 18’
Parking Ratio
1 space per 500 sf;
up to 15% total
parking spaces
reduction subject to
approval by the
planning
Administrator or
his/her designee
1 space per 450 sf***
13
Public Involvement
• Notice mailed June 1, 2023.
• Virtual neighborhood meeting held June 20, 2023.
• In-person neighborhood meeting held July 27, 2023.
• Advertised in The Arizona Republic on October 2, 2024.
• Hearing notices mailed on September 27, 2024.
• Property posted on-site October 4, 2024.
Findings & Analysis
14
• The project site plan demonstrates effective use of land,
circulation and site arrangement.
• Although no residential uses are proposed as part of the PAD
amendment, the Centerpoint PAD (ZON19-13) list of permitted
uses will continue to apply which include various housing types.
• The PAD’s main objective is to provide a development that offers
of mix of land uses focused on providing lodging and
entertainment.
Findings & Analysis
15
• The PAD amendment design guidelines will set the
foundation to ensure that the architectural and overall site
design of the project are of high-quality.
• Adequate utilities exist in the area. With onsite
development, the applicant will also be required to make the
proper off-site improvements.
• Proposal is consistent with General Plan goals & policies.
16
The Planning Commission should recommend approval of
GPA23-02, as written.
The Planning Commission should recommend approval of
ZON23-03, subject to the following stipulations:
1. Development shall be in substantial conformance with the
VAI Resort (Centerpoint PAD Amendment) narrative, final
date stamped October 4, 2024.
Recommendation
Continued:
17
2.
The resort is requesting to flush the artificial bathing lake filters directly
into the sewer system. During flushing, the flow rate will be four
thousand gallons per minute for one, five-minute backwash event per
day. To insure there is no conflict with flows, the owner will only flush
during agreed upon hours between 3am and 5am. To further reduce
any conflicts, the owner will contact the Glendale Water Services
Department control room at 623-930-4100 a minimum of twenty-four
hours in advance if flushing is expected to occur outside of the agreed
upon hours or frequency. It is understood that Glendale Water Services
continually monitors area sewer flows. If future sewer flows are
observed out of compliance, the owner shall provide a sewer flow
attenuation plan which could include a storage tank for metering flow to
sewer.
Continued:
18
3. Lighting which might exceed dark sky ordinance, proposed
to be located on atop of the MATTEL attraction and Aerobar,
shall require FAA review prior to issuance of a building
permit by the City.
Continued:
19
4. Auxiliary Right turn lanes will be provided in advance of the
following driveways:
a. All driveways on southbound 95th Avenue.
b. Garage entrance off Montebello.
c. Garage entrance off 91st Avenue.
d. If any of the turn lane improvements are located outside of
existing right-of-way, then additional right-of-way will be
required.
Continued:
20
5. The garage entrance off of 91st Avenue will be designed as a
“right in - right out” driveway. The design of the driveway will
include a pork chop median. The design shall be submitted to
the City for review and approval during the design phase of the
project.
6. All through lanes on northbound and southbound 95th Avenue
shall not lead into a “lane drop” condition in the area between
the Cardinal’s Way intersection and the development’s south
property line. The design of the lane drop taper shall be
reviewed and approved by the City.
Continued:
21
7. Southbound 95th Avenue in advance of Cardinals Way will be
modified to accommodate one right turn lane, two southbound
lanes and one left turn lane as is recommended in the Traffic
study.
8. The marked crosswalk along 95th Avenue shall be signalized
(HAWK). This is in accordance with the City’s crosswalk policy.
9. The queue length of all turn lanes studied in the Traffic Impact
Analysis (TIA) will be designed (where applicable) to meet the
projected turn traffic demand.
Continued:
22
10.The design of the transition area associated with the merge
lane, on southbound 95th Avenue south of Montebello, needs
to be updated to meet current America Association of State
Highway and Transportation Officials (AASHTO) design
standards.
11.A signing plan that includes the use of static, overhead lane
control signs, and overhead dynamic message signs will be
submitted to the City for review and approval. The developer
will be responsible for all costs associated with the design, and
the implementation of the plan.
Continued:
23
12.The developer shall develop a traffic control plan that outlines
the traffic requirements during major events at VAI. The plan
shall be reviewed and approved by the City’s Transportation
Department.
13.The roadway design associated with all the offsite
improvements shall meet all the America Association of State
Highway and Transportation Officials (AASHTO) and Manual on
Uniform Traffic Control Devices (MUTCD) requirements.
GPA23-02 & ZON23-03
VAI Resort (Centerpoint PAD Amendment)
Planning Commission Hearing – October 24, 2024
Alex Lerma
Senior Planner