Extracted text (via pymupdf)
30684 characters
Shops at 75th CUP23-15 Conditional Use Permit Pad A PROJECT NARRATIVE 3.716± Acres Requests: Conditional Use Permit Pad A & Pad B SWC of 75th Ave & Bethany Home Road Submittal Date: May 30, 2023 Revised Submittal August 2, 2023 Received [3 AUG 2023] PLANNING DIVISION DEVELOPMENT TEAM Owner NRM Group, LLC 2861 N. 52nd Ave Suite #5 Phoenix AZ 85035 Developer Diversified Partners, LLC Mr. Walt Brown Jr. 7500 E McDonald Dr. Scottsdale, AZ 85250 Architect MCG Architecture 60 East Rio Salado Parkway, Suite 900 Tempe, AZ 85281 Civil Engineer Optimus Civil Design Group LLC 4650 E. Cotton Center Blvd., Suite 200 Phoenix, Arizona 85040 Traffic Engineer Eric Maceyko EPS Group 1130 N Alma School Road, Suite 120 Mesa, AZ 85201 3 | P a g e I. Introduction Diversified Partners, LLC (the “Developer”) is requesting a Conditional Use Permit (“CUP”) for a convenience use (drive thru) on Pad A for a project known as the Shops at 75th. Simultaneous with this review, an additional CUP submittal for Pad B is also being processed in Glendale. An aerial map has been provided (see Exhibit 1 – Aerial Map) to show location and contextual reference. This will be a new commercial plaza with commercial uses (the “Project”). The site plan (see Exhibit 2 - Site Plan) details the layout of the overall commercial center; two (2) new ingress points will be constructed on 75th Avenue and one (1) ingress point will be constructed on Bethany Home Road. This site plan has been modified from the pre-app site plan to accommodate citizen input and staff input. Additionally, Developer has processed a comprehensive traffic impact analysis for the site which has been approved by the Glendale Transportation Principal Engineer Alan Heathcoat, P.E.. The ingress/egress and stacking for the drive thru’s has been studied in a comprehensive manner by city staff, city engineers and our traffic engineering firm EPS Group. The site plan has been modified and corrected to accommodate all of the suggestions put forth in the traffic impact analysis. The access on Bethany Home Road has been modified to the suggestions made by city staff in the pre-application process (taper is being moved west). Significant improvements are required along 75th Avenue. The entire half street, curb, gutter, sidewalk and landscaping will need to be constructed. Most of this construction will take place in the ROW to be dedicated to the City of Glendale. It is a significant amount of off-site work. The work will be a drastic improvement to the intersection with excellent pedestrian connectivity. In addition to the significant and cumbersome half street improvements, Developer will “underground and pipe” the SRP irrigation channels that currently exist on the Property. The undeveloped property is comprised of Maricopa County Assessor’s parcel number 102-07- 001C. The City of Glendale, in conjunction with the Arizona Cardinals & real estate developers, recently connected Cardinals Way to Bethany Home Road. The intent of this road connection is two-fold; first, alleviate stadium traffic from the Arizona Cardinals stadium and second, to bring employment opportunities and tax revenues to an area that was being underutilized. The recent completion of Cardinals way to Bethany Home Road (immediately adjacent on the north side of this property) has caused Bethany Home Road to become a vital, major arterial connector to the west portion of the City of Glendale. Increased traffic on Bethany Home Road to the entertainment districts to the west, along with the new residential communities to the west, makes this parcel highly suitable for commercial uses and aligns with the City of Glendale’s goals when it made the decision to connect Cardinal way to Bethany Home Road. This parcel recently went to City Council and was approved for zoning and general plan unanimously. During this very public discussion, the tenant (specifically Dutch Bros) was discussed in depth by council and staff. As you will see in our site plan, ample stacking has been provided that exceeds code. We have 31 car queuing shown on our site plan. In the worst case theoretical assessment (which is unlikely to occur in the real world) we have space for 3 extra cars in the queuing lane for Pad A. MCDOT requires 12 car stacking here, and we exceed that requirement by 19 cars. 4 | P a g e Per Section 3.904 of the Zoning Ordinance the following 5 findings are required for a CUP to be approved: 1.That the proposed use is consistent with the policies, objectives, and land use map of the Glendale General Plan and the purpose of the zone district in which the site is located; 2.That the proposed use will not be materially detrimental to the health, safety or general welfare of persons residing or working within the neighborhood of the proposed use, or have an adverse effect on the property, adjacent properties, the surrounding neighborhood or the city when consideration is given to the character and size of the use and hours of operation; 3.That the proposed site is adequate in size and shape to accommodate the intended use and that all requirements for the zone district, including but not limited to: setbacks, walls, landscaping and buffer yards are met; 4.That the proposed site has adequate access to public streets and highways to carry the type and quantity of traffic which may be generated by the subject use, and that on-site circulation is adequate to permit driveways, parking, and loading requirements in a manner which is safe and efficient; 5.That adequate conditions or stipulations have been incorporated into the approval of the conditional use permit to insure that any anticipated detrimental effects can be mitigated. We find that this CUP request is consistent with the goals and policies of the General Plan specifically as follows: • Land Use Element Goal LU-1, Policy LU-1.1: Development is guided by sound growth management; the City shall ensure that sufficient infrastructure is in place for desired land uses. There is adequate infrastructure surrounding the Site with 75rd Ave and Bethany Home Road both major thoroughfares, located adjacent to the Site. • Land Use Element Goal LU-2, Policy LU-2.4: There are transition and buffer areas between unrelated land uses; The City shall ensure that adequate buffers between residential and nonresidential uses are included, except in cases where the residential is a part of a mixed‐use development where it relates to the adjacent use. There are building setbacks and planned lush landscape buffer areas between the school field area to the west and the working farm to the South. • Land Use Element Goal LU-5, Policy LU-5.2: Glendale implements a cohesive land planning approach throughout the Municipal Planning Area; The City shall prioritize the proactive implementation of area and specific plans to provide enhanced guidance on the development of areas. There is adequate infrastructure surrounding the Site with 75th Avenue & Bethany Home Road, both major arterials, located adjacent to the Site. • Circulation Element (C) Policy C-5.3 The City shall promote and support timely and appropriate development adjacent to major transportation corridors. The Site sits at the southwest corner of 75th Avenue & Bethany Home Road. Bethany Home road was recently extended to connect to Cardinals Way (in 2020). It is a new transportation corridor that will provide superb connectivity to the entertainment and stadium districts to the west. Improvements to Bethany Home Road and 75th Avenue will be completed with this Project, therefore supporting the City’s policy of time and appropriate development adjacent to major transportation corridors. • Policy C-8.3 The City shall require new development to provide adequate connectivity to existing transportation networks. The Site lies on both 75th Avenue and Bethany Home Road (which transitions into Cardinals Way). Drivers can access the Agua Fria Freeway (Loop 101) to the 5 | P a g e West and Grand Avenue (US 60) to the East. Therefore, the proposed development will provide excellent connectivity to existing transportation networks. • Public Health and Safety Element (S) Policy S-2.7 The City shall require that new development provide adequate access for emergency vehicles, particularly firefighting equipment, and evacuation routes, as appropriate. The Site will have access points on both Bethany Home Road and 75th Avenue. Drive aisles through the site will be designed to accommodate the standards of the local fire department, emergency services, and Public Works vehicles. • Policy S-7.3 The City shall encourage crime prevention and defensible space through design principles (CPTED). All phases of development will include well-lit, highly visible parking and activity areas to ensure the safety of patrons and employees alike. The proposed lighting and landscaping of the site has been approved by city Staff through the DR process. • Environmental Planning Element (EP) Policy EP-9.3 The City should encourage developers to provide site design and landscaping elements that will reduce energy use and mitigate urban heat island effects. As a part of the development of the Project, site plans and landscape plans have been reviewed by the City of Glendale. The designers will ensure that the Site’s designs incorporate adequate elements in order to reduce energy use in buildings. • Neighborhood Preservation and Revitalization Element (NPR) Policy NPR-1.1 The City shall exemplify pride in neighborhood character and community appearance through landscape themes and property maintenance. As a part of the Site’s development, the developers have prepared detailed site plans, building plans, and landscaping plans approved by the City of Glendale’s. The designers will take into account the existing designs in the neighborhood in an effort to stay true to the neighborhood’s character. Furthermore, the Site will be well maintained by individual owners for the center. This new development promotes the public health and safety by providing a safe space for Glendale residents to dine and shop in as opposed to the current vacant land which could be a blight for citizens to look at and potentially dangerous to come onto due to the SRP irrigation laterals that are located on the property. • Fiscal Element (F) Policy F-4.1 The City shall encourage new development to provide assurances that adequate public safety standards will be met. The development on the Site will include new, modern buildings built to current building and fire codes adopted by the City of Glendale. Site design, access, and driveway standards will meet all current code requirements for emergency service access to the site. • Conservation, Rehabilitation and Redevelopment Element (CRR) Policy CRR-1.5 The City shall direct specific redevelopment efforts to areas of visual blight. The Site consists of a large vacant dirt lot. Several surface irrigation laterals and large mounds of dirt are on the site. Such visual blight will be improved by the proposed development. There will be fresh, new buildings, attractive landscaping and architectural diversity throughout the development. The changes will improve the site’s attractiveness to the community while providing useful services. • Policy CRR-2.1 The City shall encourage and support infill development to take advantage of existing infrastructure, community and educational facilities, and enhance existing neighborhoods. The proposed development of the Site is infill development that will take advantage of existing infrastructure and enhance existing neighborhoods. The development will enhance the area’s infrastructure by completing adjacent arterial roadway improvements and sidewalks that will be enjoyed by the greater community at large. • Goal CRR-3 Underutilized properties are redeveloped and reused. The Site is a great example of an underutilized property in need of development and service to surrounding neighborhoods. It is currently vacant and provides no benefit to the neighborhood or the City of 6 | P a g e Glendale. Development of the Property for commercial services will benefit the community because it will create jobs, provide entertainment, service and shopping options and complete public infrastructure. • Economic Development Element (ED) Policy ED-2.1 The City shall examine zoning and develop a strategy to encourage appropriate zoning for areas that would be well-suited for future development. The City has the opportunity now for the owners of this property to develop with both a land use designation (and zoning) to facilitate the development of a small shopping center that includes site and roadway infrastructure. • Bicycling and Pedestrian Element (BP) Policy BP-1.5 The City shall encourage business to provide facilities for customers and visitors, thereby encouraging bicycle use and making bicycling safe, convenient and enjoyable. The Project will be providing bicycle racks so that patrons and employees that choose to bike will have the convenience of securing them onsite. • Conservation of Resources Element (CON) Policy CON-1.3 The City shall encourage the use of native plans and inclusion of trees that can enhance shade and reduction of heat island effect in developed areas. The landscape plan will detail plant varieties found on the Arizona Department of Water Resources (ADWR) “Low Water Use / Drought Tolerant Plant Lists for the Phoenix Active Management Area (AMA). • Environmental Planning (EP) Policy EP-7.1 The City shall incorporate noise mitigation strategies into land use and development plans, such as… transitional buffers between high noise land uses and more noise sensitive uses. This CUP request, in conjunction with the recently approved DR has used landscaping and building setbacks to achieve noise mitigation. Through the list above, which details a strong consistency with the policies and objectives of the General Plan, we also find the Project furthers the public health, safety and general welfare of the citizens of Glendale (findings 1 & 2). The site and site plan, as recently approved through the DR process, is adequate in size and shape to accommodate the intended use and that all requirements for the zone district, including but not limited to: setbacks, walls, landscaping and buffer yards have been met (finding 3). The proposed site, as shown through the approved traffic impact analysis, has adequate access to public streets and highways to carry the type and quantity of traffic which may be generated by the subject use, and that on-site circulation is adequate to permit driveways, parking, and loading requirements in a manner which is safe and efficient (finding 4). Adequate conditions or stipulations have been incorporated into the approval of the conditional use permit (such as 31 car stacking vs the 12 required by MCDOT) to insure that any anticipated detrimental effects are being mitigated (finding 5). The Project will provide a solution to immediate public infrastructure needs (roadway/sidewalk improvements) while adequately buffering adjacent development and bringing needed goods and services to the surrounding community. 7 | P a g e Vision & Users The Property is currently vacant and contains several irrigation ditches along the east and north side of the property. The Property has been thoughtfully designed and will benefit the City of Glendale and residents in the surrounding neighborhoods. Further, the inclusion of service-related uses is important because, unlike retail uses which are quickly being replaced by online shopping, services will remain important to consumers. The development will have a substantial positive impact on the citizens of Glendale, especially with all of the new curb, gutter, sidewalks, streetlights and other parts of this project that will substantially improve this parcel of land. We have created a thoughtful high quality vision for this project. As you will see from the proposed elevations, the buildings are modern and of excellent quality. We (Diversified Partners) pride ourselves on creating high quality first class projects. As a recent example, we just completed a retail center at En Fuego (the NWC of 91st Avenue and Glendale Avenue), the Starbucks project, that is an excellent addition to Glendale. Pedestrian connectivity and ADA access is being provided from both 75th Avenue & Bethany Home Road. Potential customers in this underserved market will be able to easily navigate the center to utilize the various tenants that ultimately come to the property. We will be providing plush landscape buffer areas on all sides of the development, including tasteful parking screening walls on the arterials. All phases of development will include well-lit, highly visible parking and activity areas to ensure the safety of patrons and employees alike. Bike Racks will be installed for patrons and employees to utilize. The proposed lighting and landscaping of the site will be reviewed through the city to ensure compliance. It is the intent of the Developer to have mixed retail and convenience uses (generally the uses in the C-1 category). We envision several restaurants to service this underserved area. We envision a coffee user on the north end of the project followed by several retail users in a multi-tenant building. The entire centers final plans will be market driven by users that fall within the zoning category of the property. Historically this site has been vacant and used for farming and overflow parking. Surrounding Uses and Zoning are indicated in Table A. Table A Existing Land Use Existing Zoning North Bethany Home Road then Single-family residential R1-7 East 75th Avenue then Commercial – Walgreens 75th Avenue then Single Family Residential C-1 R1-6 South Commercial/Agricultural – Tolmachoff Farms R1-6 West Education - Elementary School R1-6 In 2022 and 2023 the site went through a rezone and minor general plan amendment. The rezoning and minor general plan amendment included 2 neighborhood meetings, 3 neighbor mailings along with a planning commission and council hearing. The General Plan Amendment and Rezoning were approved. The site plan has not deviated from the site plans shown during these processes. The proposed use is a drive thru coffee shop (DBA Dutch Bros). The typical hours of operation are 5:00 AM to 11:00 PM. Shifts of workers and number of employees are determined on a demand basis. The tenant anticipates this location to generate less volume than the nearby store on 83rd & Thunderbird. Per the approved traffic impact analysis this coffee shop is expected to generate 332 vehicle trips to the site daily. 8 | P a g e The site will be accessed via three new entrances (1 of 75th Avenue RI/RO and 1 on Bethany Home Road RI/RO and 1 on 75th full access). The site has been designed so that customers can easily navigate the center with internal circulation allowing any exit to be chosen by the customer (see site plan). As mentioned above, ample stacking has been provided that exceeds code. We have 31 car queuing shown on our site plan. In the worst case theoretical assessment (which is unlikely to occur in the real world) we have space for 3 extra cars in the queuing lane for Pad A. MCDOT requires 12 car stacking here, and we exceed that requirement by 19 cars. Conclusions & CUP Request Site Planning & Layout The Project will include right-of-way dedications on 75th Avenue and Bethany Home Road. Both of these half-streets will be improved with the development (75th will have major improvements completed with this project). There are several SRP irrigation channels on the east side and north side of the property that will be “piped and undergrounded” per SRP to create a visually appealing corner vs the vacant blight that exists today. The parcel is irregularly shaped and the north entrance to the project will be as far west as possible to mitigate potential conflicts with the intersection (per staff request). We anticipate 2 ingress/egress points on 75th Avenue. The Property’s site plan has been specifically designed to provide adequate buffering to adjacent uses, safe pedestrian and vehicular access, circulation and stacking. An 8 foot wall is provided on the West and South sides to buffer the uses from the adjacent parcels. Parking screen walls are being provided around the parking areas and drive thru aisles. These strategies will help make a synergistic project that fits well in the neighborhood. The Project will provide needed commercial services and convenience for nearby neighborhoods and businesses. For these beneficial reasons, the Applicant respectfully requests approval of a conditional use permit (convenience use / drive thru) for Pad A. Respectfully Submitted by ____________________________ Scott Hintze – Diversified Partners Project Manager 5 Diversified Partners May 30th, 2023 Project Manager Scott Hintze 7500 E McDonald Drive #100A Scottsdale, AZ 85250 Scott@dpcre.com 480-947-8800 Subject: Conditional Use Permit Request Convenience Use CUP23-15 Shops at 75 Pad A & CUP23-16 Shops at 75 Pad B Dear Neighbor: This letter is to inform you about our request to the City of Glendale for a conditional use permit to allow a drive thru to be constructed on Pads A & B at the Shops at 75th and invite you to the neighborhood meeting we are conducting via zoom on June 26th, 2023 at 6:00 PM (details below). The site plan (enclosed) is the same as discussed in the last neighborhood meeting and at Town Council. The property is located at the Southwest Corner of 75th Avenue & Bethany Home Road in the Yucca District (assessors parcel number 102-07-001C). It is our intent to develop the 3.71 acre parcel located on the southwest corner of 75th Avenue & Bethany Home Road. To the north of the site lies Bethany Home Road, a major arterial. To the east of the site lies 75th Avenue, a major arterial. Adjacent use to the west is Coyote Ridge Elementary School which no longer operates as an elementary school and to the east (across 75th Avenue) is CVS. The rear fence to two residential homes also lies to the east (across 75th Avenue). To the south currently lies Tolmachoff Farms and on the North (across Bethany Home Road) lies the Tesserra residential community. Our project will consist of 3-4 buildings with various commercial users. The site plan includes a coffee user for Pad A and a taco restaurant for Pad B. The project will provide ample rear and side setbacks with lush landscaping per Glendale code. In addition, the irrigation canals currently on the site will be undergrounded with new sidewalk, curb and gutter to make excellent pedestrian connectivity to Bethany Home Road and along 75th Avenue. Please join us for our neighborhood meeting on June 26th, 2023. Navigate to http://zoom.us or dial in at 1-720-707-2699 and enter the meeting ID below. Click Join at the top right hand of the screen and enter in the information below Meeting ID: 831 1708 1059 Passcode: 123325 Attached is the latest conceptual plan for review. Please email feedback to Scott Hintze scott@dpcre.com or call me at 602-549-4173 or via mail at the address above by June 25th, 2023. You may also contact Alex Lerma with the City of Glendale at (623) 930-2810. Sincerely, Scott Hintze Project Manager Encl: Conceptual Site Plan 2'-8" 20'-0" 5" x 5" STEEL POLE 2' DIA. CONCRETE BASE LED FIXTURE 6'-0" 6'-0" SPLIT FACE CMU COLOR TO MATCH: SW "WINCHESTER GRAY" 2 x 2 x 1 4" STEEL FRAME AROUND DOOR 22 GA TYPE B GALV. STEEL WELDED TO FRAME GATE HINGED ON 6" FILL HEIGHT BOLLARD SLIDING BOLT CANE BOLT 24" LONG @ INSIDE FACE OF FLANGE FRONT ELEVATION SIDE ELEVATION 2'-8" 20'-0" 5" x 5" STEEL POLE 2' DIA. CONCRETE BASE LED FIXTURE 13'-4" 3'-0" 6'-0" 4'-0" 8" 3'-0" 12'-0" INSIDE 4" CONCRETE 4" STEEL BOLLARD FILL WITH CONC., TYP. 4'-0" 10'-8" 3'-0" HOLES FOR CANE BOLTS IN OPEN AND CLOSED POSITION CANE BOLTS ARE TO BE SLEEVED AND AT LEAST 3" DEEP, AND BE KEPT CLEAN AT ALL TIMES 6" THICK REBAR REINFORCED CONC. 13'-4" WIDE x 12', OUT FROM FRONT OF ENCLOSURE 3% MAX. SLOPE GATES ARE TO BE WELDED TO THE BOLLARD IN FRONT OF THE STATION 8" SPILT FACE CMU WALL PAINTED TO MATCH BUILDINGS PRE-CAST CONC. CAP 12" SMOOTH FACE CMU WALL WITH PLASTER FINISH PAINTED TO MATCH BUILDINGS. OCCURS EVERY ±20'-0" 4'-0" MIN. SEE PLANS 4'-8" MIN. SEE PLANS 2'-0" STOP DO NOT ENTER PROPERTY LINE 30'-0" Driveway 20' S/B 40' 9 25'-0" 18'-6" 20'-0" Typ. 27'-0" 8' SITE WALL PAD 'D' RESTAURANT 2,800 sf PATIO 440 sf TOLMACHOFF FARMS (APN 102-07-002) (R1-6) 60' 26.6' 6 35' 12'-0" 12'-0" BETHANY HOME ROAD 8 55'-0" ROW 30'-0" Driveway 10'-0" Typ. 3 25'-0" 25'-0" STOP DO NOT ENTER DRIVE THRU DRIVE THRU 7 7 9 6 7 55'-0" ROW PROPERTY LINE 603.47' 18'-6" 20' S/B 12'-0" 12'-0" 10'-0" Typ. 20'-0" Typ. 70' 27' 70' 10'-0" 4 26.6' 26.6' 8 2 5'-0" 15' L/S 25'-0" 18'-6" 20'-0" Typ. 30'-0" 20'-0" Typ. STOP DO NOT ENTER DRIVE THRU DRIVE THRU DRIVE THRU DRIVE THRU DRIVE THRU 4 9 5 6 6 13'-4" Typ. 10'-8" Typ. (E) CURB AND GUTTER, TO REMAIN SIDEWALK MONUMENT SIGN PAD 'A' RESTAURANT 1,242 sf PATIO 405 sf 8' SITE WALL SIDEWALK SIDEWALK 4' SITE WALL PYLON SIGN RETAIL 'B1' 1,600 sf RETAIL 'B2' 1,600 sf RETAIL 'B3' 1,600 sf RESTAURANT 'B' 2,100 sf PAD 'C' RESTAURANT 1,890 sf PATIO 490 sf 25'-0" 18'-6" 20'-0" S/B 26'-0" L/S 26'-0" L/S PROPERTY LINE 53.48' GLENDALE ELEMENTARY SCHOOL DISTRICT (APN 102-07-001D) (R1-6) BUS STOP CVS PHARMACY (APN 144-21-006F) (C-1) SINGLE FAMILY RESIDENTIAL (R1-6) (E) F.H. CHAIN LINK FENCE 63'-2" 96'-11" 99'-5" 99'-0" 81'-0" N. 75TH AVE. CL CL SINGLE FAMILY RESIDENTIAL (R1-7) 30'-0" Driveway NEW CURB AND GUTTER NEW CURB AND GUTTER EDGE OF (E) PAVEMENT (E) F.H. (E) F.H. (E) F.H. NEW CURB AND GUTTER SIDEWALK 7 UTILITY ENCLCLOSURE (E) (E) (E) (E) (E) (E) (E) (E) F.H. F.H. CONCRETE DRAINAGE SWALE CHAIN LINK FENCE 8'-0" 8'-6" 10'-0" 4' SITE WALL 55'-0" 55'-0" STOP 1 55'-0" STOP BYPASS LANE 58'-11" PROPERTY LINE 548.13' 20'-0" S/B 4' SITE WALL PROPERTY LINE 218.40' 5'-0" STREET LIGHT TO BE RELOCATED VISIBILITY TRIANGLE, TYP. @ ALL DRIVEWAYS 109'-2" 30 MIN. SIDEWALK WIDTH IS 5 FEET, TYPICAL FOR ALL SIDEWALKS IN PUBLIC R/W 15' L/S 15' L/S 120' STORAGE 40' TAPER R=35' 95' STORAGE 43' TAPER NOTE: This information is conceptual in nature and is subject to adjustments pending further verification and Client, Tenant, and Governmental Agency approvals. No warranties or guaranties of any kind are given or implied by the Architect. DATE: MCG JOB #: REVISIONS DATE Glendale, AZ 85303 SWC 75th Ave and Bethany Home 75TH AVENUE AND BETHANY HOME ROAD 21.630.01 01/26/2023 MCG ARCHITECTURE 2023 ALL RIGHTS RESERVED C 0 SITE PLAN Scale : 1" = 40' 20' 40' 80' 102-07-001C C-1 PARCEL NUMBER (APN NO.): EXISTING ZONING: LEGAL DESCRIPTION: THE EAST 313.39 FEET AS MEASURED ALONG THE NORTH LINE OF THE NORTHEAST QUARTER OF SECTION 14, TOWNSHIP 2 NORTH, RANGE 1 EAST OF THE GILA AND SALT RIVER BASE AND MERIDIAN, MARICOPA COUNTY, ARIZONA. PROPOSED USE: RETAIL / RESTAURANTS BUILDINGS CONST. TYPE OCCUPANCY AREA PAD A: V-B B 1,242 S.F. PATIO A: N/A N/A 405 S.F. PAD B: V-B B,M 6,900 S.F. SITE COVERAGE: 9.14% LANDSCAPE COVERAGE: 28% PARKING REQUIRED: 13 SPACES 4 SPACES 21 SPACES 19 SPACES PAD - A (RESTAURANT) : 1 PER 100 PATIO - A : 1 PER 100 PAD - B (RESTAURANT): 1 PER 100 PAD - B (RETAIL): 1 PER 250 SITE DATA site BETHANY HOME ROAD 75TH AVENUE 67TH AVENUE 83RD AVENUE GLENDALE AVENUE CAMELBACK ROAD Vicinity Map TRASH ENCLOSURE ELEVATIONS SCALE: 1/4" = 1'-0" TYPICAL LIGHT STANDARD SCALE: 1/4" = 1'-0" BETHANY HOME ROAD 75TH AVENUE R1-6 (ELEMENTARY SCHOOL) C-1 R1-6 R1-6 R1-6 (AGRICULTURE) R1-6 R1-7 R1-6 (AGRICULTURE) Surrounding Uses site N PROJECT DATA PROPERTY OWNER: NRM INVESTORS, LLC 7500 E McDONALD DR. SUITE 100A SCOTTSDALE, AZ 85250 PHONE: (480) 947-8800 ARCHITECT: MCG ARCHITECTURE 60 E RIO SALADO PARKWAY, SUITE 900 TEMPE, AZ 85281 CONTACT: JORGE CALDERON PHONE: (602) 813-0779 LANDSCAPE ARCHITECT: T.J. McQUEEN AND ASSOCIATES INC. 10450 N 74TH STREET, SUITE 120 SCOTTSDALE, AZ 85258 CONTACT: TIM McQUEEN PHONE: (602) 265-0320 OWNER AGENT: DIVERSIFIED PARTNERS, LLC 7500 E McDONALD DR. SUITE 100A SCOTTSDALE, AZ 85250 CONTACT: SCOTT HINTZE PHONE: (480) 947-8800 CIVIL ENGINEER: OPTIMUS CIVIL DESIGN GROUP, LLC 4650 E. COTTON CENTER BLVD. SUITE 200 PHOENIX, AZ 85040 CONTACT: JEFF BEHRANA PHONE: (602) 393-5234 TRAFFIC ENGINEER: EPS GROUP, INC. 1130 N ALMA SCHOOL ROAD, SUITE 120 MESA, AZ 85201 CONTACT: ERIC MACEYKO PHONE: (480) 503-2250 a. FIRE DEPARTMENT ACCESS AND WATER SUPPLY REQUIREMENTS SHALL BE IN PLACE PRIOR TO COMBUSTIBLE MATERIALS BEING BROUGHT ON SITE. b. PURSUANT TO CHAPTER 32.5 OF THE GLENDALE CITY CODE, ALL NEW AND EXISTING UTILITIES WITHIN OR CONTIGUOUS TO THIS SITE SHALL BE PLACED UNDERGROUND. c. ALL UTILITY BOXES, VAULTS AND BACKFLOW PREVENTION DEVICES SHALL BE PAINTED TO MATCH THE BUILDING AND SCREENED FROM PUBLIC VIEW BY A MASONRY WALL OR A ROUND-TOPPED WIRE MESH ENCLOSURE, PAINTED TO MATCH THE ADJACENT WALL. d. SIGHT DISTANCE REQUIREMENTS OF COG DETAIL G-447 (LOCAL STREETS) OR G-448 (ARTERIAL AND COLLECTOR STREETS) ARE MET FOR ALL DRIVEWAYS AND STREETS. e. STREETLIGHTS INSTALLED BY THE DEVELOPER MAY BE REQUIRED FOR CONSTRUCTION APPROVAL. f. ON-SITE LIGHTING WILL BE PLACED SO AS TO DIRECT THE LIGHT AWAY FROM ADJACENT RESIDENTIAL USES AND MUST NOT EXCEED ONE-FOOT CANDLE AT THE PROPERTY LINE. THE HEIGHT OF THE PARKING LOT LIGHTS WITHIN 150' OF RESIDENTIAL USE TO BE 15'. HIGH PRESSURE SODIUM (HPS) LIGHTING REQUIRED ADJACENT TO RESIDENCE. g. ON-SITE LIGHTING SHALL MEET OUTDOOR LIGHTING CONTROL ORDINANCE. h. MAXIMUM NOISE LEVEL 55 DECIBELS (NORMAL SPEAKING VOICE) AT PROPERTY LINE. i. CONVENIENCE USES SHALL BE SUBJECT TO A SEPARATE CITIZEN PARTICIPATION AND CONDITIONAL USE PERMIT PROCESS. j. THE PROPERTY OWNER IS RESPONSIBLE FOR MAINTAINING LANDSCAPING IN ALL PUBLIC RIGHTS-OF-WAY ADJACENT TO THE PROJECT. GENERAL NOTES: SCALE: 1/4" = 1'-0" LEGEND ACCESSIBLE PATH LIGHT STANDARDS LANDSCAPED AREAS PARTIAL ISOMETRIC VIEW - 4' & 8' HIGH SCREEN WALL (PER COG DETAIL G-934) Received [3 AUG 2023] PLANNING DIVISION