VILLAGE 83  
 
Project Narrative 
 
Case No. SR 21-0190 
83rd Avenue North of Camelback Road 
5136 North 83rd Avenue 
 
 
 
 
 
 
 
 
 
Submitted December 2021 
 
Project Team: 
Property Owner: 
Dorothy Keith & Teresa Zaddack 
Applicant/Planning Consultant: 
Jon M. Froke Urban Planning, LLC.

2 
 
 
 
 
 
 
 
 
 
Village 83 | Project Narrative 
 
TABLE OF CONTENTS 
1. Introduction ......................................................................................... 3 
2. Project Description & Development Concept ............................................... 5 
3. Findings ............................................................................................... 10 
4. Conclusion ........................................................................................... 11 
 
 
LIST OF EXHIBITS 
5. Exhibit A: Vicinity Map / Aerial Photograph ................................................ 3 
6. Exhibit B: Existing General Plan Land Use Map ........................................... 4 
7. Exhibit C: Existing Zoning Map ................................................................ 5 
8. Exhibit D: Conceptual Site Plan ............................................................... 8

Village 83 | Project Narrative 
3 
1. Introduction 
Dorothy Keith (the "Property Owner"), requests consideration of a General Plan Amendment and 
Rezoning Application for the property located on 83rd Avenue, north of Camelback Road (the “Project 
Site”). The property has an existing General Plan designation of LDR 2.5, Low Density Residential, and 
zoning designation of SR-17, Suburban Residence.  The request is for a General Plan Amendment to 
HDR 20, High Density Residential and a rezoning to R-3, Multiple Residence.  
Exhibit A: Vicinity Map/Aerial Photography 
 
Surrounding Land Uses & Zoning 
The Project Site consists of a detached, single-family house, a modular home, and additional accessory 
structures for stabling horses and dogs. The site is surrounded by existing residential, planned 
residential, and commercial development. Details about the surrounding uses, general plan land use 
designations and zoning districts, are provided in Table 1 and the following exhibits. 
 
 
 
 
 
 
Camelback 
Village 
Project Site 
Commercial Shopping Center (Under Construction)

4 
 
 
 
 
 
 
 
 
 
Village 83 | Project Narrative 
Table 1 - Surrounding Property Information 
Direction 
Use 
General Plan Land Use 
Zoning 
Project Site 
Detached, Single-Family 
Residential 
LDR 2.5 
SR-17 
North 
Detached, Single-Family 
Residential 
LDR 2.5 
SR-17 
East 
Detached, Single-Family 
Residential 
LDR 1 
SR-17 
South 
Commercial 
GC 
PAD 
West 
Detached, Single-Family 
Residential 
MDR 5 
R1-8 & R1-10 
 
Exhibit B: General Plan Land Use Map
 
 
 
 
 
 
 
Project Site 
LDR 2.5 
LDR 1 
MDR 5 
GC 
LDR 2.5 
PC 
MDR 3.5 
OFC

Village 83 | Project Narrative 
5 
 
Exhibit C: Existing Zoning Map 
 
 
2. Project Description & Development Concept 
The Applicant proposes Village 83 as a multi-family residential development that is complementary to 
this changing area of Glendale. The project envisions redeveloping the property with attached 
townhomes. To achieve this end use, the Applicant is requesting a General Plan land use amendment 
to HDR 20 and a rezoning to R-3. The project request is outlined in Table 2. Once developed, the site 
will include ample private open space, communal open space, various amenities, parking, and 
landscaping. The project will adhere to the development standards provided in the R-3 zoning district.  
Table 2 – Land Use and Zoning Request 
Existing 
Proposed 
Land Use
LDR 2.5, Low Density Residential
HDR 20, High Density Residential
Zoning
SR-17, Suburban Residence
R-3, Multiple Residence
 
The Project Site is advantageously located near the Westgate Entertainment District. As such, this 
portion of Glendale is experiencing considerable growth and development. Camelback Village is a new 
residential subdivision that is currently under construction to the west. This subdivision has 53 lots that 
Project Site 
SR-17 
SR-17 
PAD 
G-O 
C-2 
R1-8 
R1-10  
R1-8

6 
 
 
 
 
 
 
 
 
 
Village 83 | Project Narrative 
have all been sold and are in various stages of development. Immediately south of the Project Site is a 
large commercial development that is also under construction and includes an EOS Fitness Center that 
recently opened. Commercial pads are planned adjacent to the south property line of Village 83. 
A conceptual site plan for Village 83 is provided as Exhibit D. The final site plan will be determined at 
the time of Design Review approval. 
Project Justification 
As Glendale has grown and matured as a city, the large lot zoning concept seen at the Project Site has 
become less and less common. There are only a few small pockets of Glendale where this type of 
development is still present. The previously mentioned Camelback Village and EOS Fitness Center 
underwent similar development applications in the recent past: 
 In January 2018, the Camelback Village site underwent a General Plan Amendment from LDR 
2.5 to MDR 5 and concurrent rezone from SR-17 to R1-8 and R1-10. 
 In April 2000, the EOS Fitness Center site was rezoned from A-1 and SR-17 to SC. The site 
underwent one more rezoning in October 2019 to PAD which has led to the site being 
developed. 
These are just two examples of previously large-lot development being reused for higher intensity 
uses.  
Development Standards 
As previously stated, Village 83 will meet the development standards for the R-3 zoning district. Ample 
setbacks, landscape buffers, and screening will be provided throughout the site.  
Screening 
Village 83 will incorporate appropriate screening methods. Decorative CMU block walls and/or 
landscaping will be used for parking lot screening. Trash and recycling dumpsters will be enclosed with 
decorative masonry and will include metal gates. All mechanical equipment will be screened from 
public view.  
On & Off-Site Improvements 
Water 
Water improvements will include the installation of water lines within the project site. The project 
will connect to the existing 12-inch water line in 83rd Avenue and/or the existing 8-inch waterline in 
the emergency access road immediately south of the project site. Project staff will work with the City 
to determine the best options for water access.  
There is a 1-inch water service and meter adjacent to the existing house, which will be abandoned if 
not utilized in the proposed redevelopment of the site.

Village 83 | Project Narrative 
7 
Sewer 
Sewer improvements will include the installation of sewer lines within the project site. The project 
will connect to the existing 21-inch sewer line in 83rd Avenue.  
Electrical 
There are overhead powerlines along the project site frontage of 83rd Avenue. These will be removed, 
and the utility lines will be placed underground.  
Roadway 
At the time of development, half-street improvements will be constructed for 83rd Avenue along the 
project site frontage. These improvements will include paving, curb, gutter, sidewalks, streetlights, 
and landscaping. All improvements will adhere to City of Glendale standards as provided in the 2015 
Engineering Design Standards & Details. 
Transportation, Circulation, & Parking 
Village 83 will be accessed via 83rd Avenue. Village 83 will provide a 5-foot dedication to complete 
the half-street improvements previously mentioned.  
There is an existing 30-foot access road immediately south of the project site. An emergency access 
gate will be constructed along this roadway to provide an additional access point for emergency 
responders. An easement will be secured to allow emergency access to the existing access road.  
Valley Metro bus transit service is available along 83rd Avenue, with stops at Georgia Avenue and at 
Camelback Road. The Glendale Dial-a-Ride service is also available to the site. 
Pedestrian Circulation 
Pedestrian and bicycle movement within the project site will be facilitated through a series of 
sidewalks and pathways. Designated pedestrian pathways and accommodation for bicycles will be 
provided through designated access points.   
Parking 
Parking will comply with the Zoning Ordinance. The project will self-park with on-site parking provided 
with each alternative plan. 
Grading & Drainage 
The site will be designed to provide on-site storm water retention facilities.

Entry Gate
Property Boundary
30' B.S.L
5' R.O.W.
Dedication
5'
Playground
8' CMU
Screen Wall
Emergency Access
Gate
Per COG
Detail No. G934
Per COG
Detail No. G934
8' CMU
Screen Wall
8' CMU
Screen Wall
8' CMU
Screen Wall
Existing Access Road
30' B.S.L
40'
B.S.L
30'
B.S.L
54'
54'
Entry
Monument
Entry
Monument
Stormwater
Retention
Basin
83rd Avenue
32'-6" Radius typ.
52'-6" Radius typ.
Stormwater
Retention
Basin
26'
typ.
28'
5'
typ.
Ball Court
8
10
1
3
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
70
69
68
67
66
65
64
63
62
61
60
59
58
57
56
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
35
36
37
38
39
40
50'
0'
100'
25'
Scale 1":50'
Village 83 | Conceptual Site Plan
December 2021
Project Data
Address
5136 N. 83rd Avenue
Parcel No.
102-11-001J
Case No.
SR21-0026
Property Size
5.03 Acres (Gross)
Parking Spaces
138 Assigned Parking Spaces
70 Units / 3 = 23 Guest Parking Spaces
161 Parking Spaces Required
161 Parking Spaces Provided including 2 ADA
Building Area Notes
Min. Open Space
30%
Open Space Area
56,200 sqft.
Open Space Provided
30%
Project Notes
All lighting will conform with the City's Outdoor Light Control
Ordinance.
All mechanical equipment will be screened from public
view.
Keith Properties
Prepared for:
Prepared by:
Vicinity Map
Camelback Road
83rd Avenue
Orange Drive
Project Site

Village 83 | Project Narrative 
9 
Architectural Character 
The architectural character of Village 83 will be finalized during design review, however potential 
architectural elements may include:  
 Smooth stucco exterior with accents 
 Stucco accents and window treatments 
 Screen Walls & Landscaped Buffers 
 Exterior light fixtures at front door entrances 
 Entry features at gates with integrated landscaping 
 Landscaping and trees to screen balcony/patio space 
 The following architectural renderings are an example of what the project may look like once 
developed. Final design will be determined at the time of Design Review.

10 
 
 
 
 
 
 
 
 
 
Village 83 | Project Narrative 
Lighting Plan 
A lighting plan will be designed in conjunction with the construction documents for the site.  
Landscape Plan 
A landscape plan will be designed in conjunction with the construction documents for the site. Entry 
features and landscape focal points will be part of the landscape design for the project. Landscaping 
will be used to shield any balconies and patios visible from the street and all landscaping in the 
project will adhere to the City’s Landscape Ordinance. Additionally, all landscaping will meet low 
water use list provided by the Arizona Department of Water Resources. 
Stormwater Prevention Plan 
A stormwater prevention plan will be designed in conjunction with the construction documents for 
the site.  
Signage 
All signage will meet Section 7.100 of the Zoning Ordinance.  Monument signage is depicted on the 
conceptual site plan and will be subject to a separate sign permit.  
3. Findings 
This application warrants approval based on the following findings: 
 The proposal will be compatible with existing residential and commercial development in the 
area.  
 There is a precedent in this area of Glendale for redeveloping lower intensity uses to higher 
intensities. 
 The proposal meets the City’s expectations regarding site planning, landscaping, building 
materials, and screening. 
 The completed project will provide a housing option that is unique to this area and of a higher 
density than the surrounding development. 
o This varied housing style may cater to demographics that single-family housing 
developments do not.  
 This proposed development will serve the policies of the General Plan: 
o Housing Element Policy HE-2.2 . The City shall foster a pleasing, comfortable blending 
of single family and multi‐family housing units through use of compatibility techniques.  
o Housing Element Policy HE-5.3. The City should develop safe, well built, attractive 
housing that adds variety to neighborhoods, thereby serving as a catalyst for the 
improvement of the surrounding neighborhoods.

Village 83 | Project Narrative 
11 
4. Conclusion 
The Applicant has proposed the redevelopment of an underutilized large lot single-family home 
along 83rd Avenue. This proposal provides an opportunity for additional multi-family homes that will 
complement the existing development pattern of the area. It will also provide for an additional 
housing type that is currently not available in the direct vicinity of the project site. The HDR 20 
General Plan Amendment and requested R-3 zoning is consistent with the goals of the adopted 
General Plan.