Traffic Study - Executive Summary
Extracted text (via pymupdf)
12201 characters
EXECUTIVE SUMMARY Traffic Impact Study The Base Industrial Park - North Litchfield Road and Super Sabre Street Glendale, Arizona March 3, 2022 PREPARED FOR ViaWest Group 2390 East Camelback Road, Suite 305 Phoenix, AZ 85016 PREPARED BY INTELLIGENT TRANSPORTATION ● TRAFFIC ● TRANSPORTATION PLANNING ● TRAFFIC DATA COLLECTION EEXCUTIVE SUMMARY Traffic Impact Study The Base Industrial Park - North Litchfield Road and Super Sabre Street Glendale, Arizona March 3, 2022 PREPARED FOR ViaWest Group 2390 East Camelback Road, Suite 305 Phoenix, AZ 85016 PREPARED BY Phoenix, Arizona 85007 UCG Project Number: TR22003 Conducted by: Sarah Simpson PhD, PE President 1 I. EXECUTIVE SUMMARY United Civil Group (UCG) was retained by ViaWest Group to perform this Traffic Impact Study (TIS) for the planned The Base Industrial Park - North Development located south of Super Sabre Street and west of Litchfield Road in Glendale, Arizona. The site consists of approximately 84.6 acres of vacant land, Maricopa County Assessor’s parcels (501-58-001K, 501-58-002A, 501-58-003B, 501-58-004B, 501-58- 005D). The site will be developed as seven warehouse buildings totaling approximately 1,188,900 square feet. It is assumed that the warehouse buildings will be constructed in one phase and occupied by year 2024. Two site driveways are planned for this development. Both driveways are located on Litchfield Road and will access the employee parking areas and the truck yards. The two driveways for this site are planned as full movement driveways and will align with the existing streets of Stella Avenue and Claremont Street on the east side of Litchfield Road. Because the City of Glendale follows MCDOT traffic impact standards, this TIS has been performed in general conformance with the MCDOT Traffic Impact Study Manual dated May 2017, and per scoping information provided by City of Glendale Transportation Department, locally accepted standards, and industry practice. Per the MCDOT Traffic Impact Study Manual, this planned The Base Industrial Park - North Development is characterized as an Analysis Category I, small development which generates 100 or more peak hour trips but fewer than 499 peak hour trips. As such, the study horizon years for this development are opening year, 2024, plus 3 years after opening, 2027. The minimum study area is defined as all site access driveways and all signal-controlled intersections within ¼ mile and/or major street intersections without signal control and driveways within 500 feet. Within these parameters and based on discussions with the City of Glendale, the intersections of Litchfield Road/Glendale Road, Litchfield Road/Super Sabre Street, Litchfield Road/Stella Avenue, Litchfield Road/Claremont Street, Litchfield Road/Bethany Home Road and Litchfield Road/Missouri Avenue are included in the study area. 2 A. Study Objectives This study is intended to investigate the existing and future traffic conditions and identify any potential roadway improvements necessary to serve the proposed development. Major study objectives of this traffic report are as follows: • Analyze the existing study area intersections and site accessibility for the development. • Determine the site traffic volumes generated by the proposed development and their impacts on the surrounding study area and roadway network. • Where applicable, recommend safety, intersection and/or roadway improvements, sufficient to meet the needs of the development and adjacent roadway network due to the additional site generated traffic volumes. B. Conclusions and Recommendations The site consists of approximately 84.6 acres of vacant land, Maricopa County Assessor’s parcels (501-58-001K, 501-58-002A, 501-58-003B, 501-58-004B, 501-58- 005D). The site will be developed as seven warehouses with a total of approximately 1,188,900 square feet. It is assumed that the warehouses will be constructed and occupied by year 2024. Two site driveways are planned for this development. Both driveways will access the employee parking areas and the truck yards. The driveways for this site are planned as full movement driveways and align with the existing streets of Stella Avenue and Claremont Street on the east side of Litchfield Road. Access A is planned to be constructed as a full access and will align with the existing street, Stella Avenue, on the east side of Litchfield Road. Access B is planned to be constructed as a full access and will align with the existing street, Claremont Street on the east side of Litchfield Road. The forecasted trip generation was calculated based on values presented within the 11th Edition of the ITE Trip Generation Manual. On a weekday, after full build-out, the planned The Base Industrial Park - North Development will generate a total of 2,033 daily trips with 202 trips occurring in the morning peak hour and 214 trips occurring in the evening peak hour. Using the forecasted total traffic volumes for years 2024 and 2027, the study area intersections and the proposed site accesses are anticipated to operate at acceptable levels of service, LOS D or better, during the morning and evening peak hours. 3 Auxiliary lanes will be needed for the development. Right-turn deceleration lanes are warranted and recommenced on Litchfield Road at site accesses A and B. A two way left turn lane exists on Litchfield Road adjacent to the site. The two way left turn lane is sufficient to accommodate left turn traffic into accesses A and B. Proper intersection sight distance and sight triangles shall be provided and maintained at the site accesses and intersections of the proposed development to give drivers exiting the accesses a clear view of oncoming traffic. The landscape and hardscape within the sight triangles must not obstruct the driver’s view of the adjacent travel lanes. To ensure adequate sight distances and sight distance triangles, AASHTO’s A Policy on Geometric Design of Highways and Streets Section 9.5 should be followed as appropriate when designing the accesses and landscaping. Based on the findings of this TIA, the following recommendations apply: • Construct a right turn deceleration lane on Litchfield Road for southbound traffic at Access A. The right turn lane should provide 100 feet of storage with a 90-foot taper. • Construct a right turn deceleration lane on Litchfield Road for southbound traffic at Access B. The right turn lane should provide 150 feet of storage with a 120-foot taper. 36 XI. LIMITATIONS Our professional services have been performed using the degree of skill ordinarily exercised, under similar circumstances, by reputable transportation engineering firms practicing in this locality. No other warranty, expressed or implied, is made. The contents of this report are intended for the sole use of the addressee and his/her designees. In completing this report, data was obtained from a variety of sources (i.e., City, County, State and Federal sources); United Civil Group has assumed these sources to be reliable and accurate. Should deviations from this report be noted, this firm shall be contacted for review of the area of concern. A reasonable attempt was made to acquire recent traffic impact studies, traffic projections and/or data that may be helpful in more accurately projecting traffic volumes. United Civil Group is not responsible for incorporating data made available after this document has been finalized. This report is issued with the understanding that it is the responsibility of the owner to see that its provisions are carried out or brought to the attention of those concerned. If any changes of the proposed project are planned, the conclusions and recommendations contained in this report shall be reviewed and the report shall be modified or supplemented, as necessary. 37 X. SOURCES A Policy on Geometric Design of Highways and Streets, American Association of State Highway and Transportation Officials, 7th Edition, 2019. Engineering Design and Construction Standards, City of Glendale, 2015. Manual on Uniform Traffic Control Devices, Federal Highway Administration, MUTCD 2009. Highway Capacity Manual, HCM, Transportation Research Board. Roadway Design Manual, MCDOT, 2020. Traffic Impact Study Manual, MCDOT, 2017. Trip Generation, 10th Edition, Institute of Transportation Engineers, 2017. ArcGIS - 2021 not to scale Figure 1: Vicinity Map Industrial 82 Glendale Victory Base Permission for commercial use granted by Google Earth not to scale Litchfield Rd Glendale Ave Figure 2: Aerial View Super Sabre St Bethany Home Rd Missouri Ave Stella Ln Claremont St Industrial 82 Glendale Victory Base Figure 3: Site Plan not to scale ACCESS A ACCESS B 429(975) 2(9) 13(12) 31(30) 774(519) 17(20) Litchåeld Rd 4 416(966) 4(17) 9(6) 11(13) 768(486) 12(23) Litchåeld Rd 1 Figure 4: Existing Conditions - Year 2022 1 381(516) 127(265) 263(236) 200(192) 353(463) 117(195) Litchåeld Rd Glendale Ave 2 2 215(56) 355(648) 57(206) 71(326) 348(54) 432(450) Litchåeld Rd Super Sabre St STOP 3 3 4 Claremont St 5 7(4) 465(922) 20(45) 36(23) 2(0) 84(55) 0(4) 0(0) 3(16) 17(12) 729(536) 56(111) Litchåeld Rd Bethany Home Rd STOP STOP 5 6 Missouri Ave STOP 6 not to scale Stella Ln STOP 540(1018) 20(5) 11(7) 89(55) 779(678) 108(109) Litchåeld Rd LEGEND AM(PM) Peak Hour Traffic Volume XX(XX) 5 3 2 1 4 6 Litchfield Rd Glendale Ave Super Sabre St Bethany Home Rd Missouri Ave Stella Ln Claremont St SPEED 40 LIMIT SPEED 25 LIMIT SPEED 25 LIMIT SPEED 25 LIMIT SPEED 35 LIMIT LEGEND X% AM(PM) Peak Hour Traffic Volume Trip Distribution XX(XX) Figure 5: Site Generated Traffic and Trip Distribution 3 21(8) 41(16) 0(0) 0(0) 0(0) 0(0) 6(21) 0(0) 9(31) 32(12) 13(41) 0(0) 5 0(0) 27(92) 0(0) 0(0) 0(0) 0(0) 0(0) 0(0) 0(0) 0(0) 94(36) 0(0) Citrus Rd Bethany Home Rd not to scale 1 39(15) 0(0) 0(0) 23(9) 12(39) 7(23) Litchåeld Rd Glendale Ave Litchåeld Rd Stella Ln 4 41(16) 9(31) 0(0) 0(0) 0(0) 0(0) 13(41) 0(0) 18(61) 62(24) 32(12) 0(0) Litchåeld Rd Claremont St 6 Missouri Ave 27(92) 0(0) 0(0) 0(0) 94(36) 0(0) Litchåeld Rd 5 3 2 1 4 6 Litchfield Rd Glendale Ave Super Sabre St Bethany Home Rd Missouri Ave Stella Ln Claremont St 2 Super Sabre St 0(0) 62(24) 0(0) 0(0) 0(0) 0(0) 0(0) 0(0) 0(0) 0(0) 19(62) 0(0) Litchåeld Rd ACCESS A ACCESS B Industrial 82 Glendale 60% 25% 15% LEGEND AM(PM) Peak Hour Traffic Volume XX(XX) 483(1084) 2(9) 13(12) 31(30) 859(582) 17(20) Litchåeld Rd 4 468(1075) 4(17) 9(6) 11(13) 852(546) 12(23) Litchåeld Rd 5 3 2 1 4 6 Litchfield Rd Glendale Ave Super Sabre St Bethany Home Rd Missouri Ave Stella Ln Claremont St Figure 7: Background Traffic - Year 2027 1 424(584) 142(310) 299(264) 221(212) 401(516) 129(215) Litchåeld Rd Glendale Ave 2 Super Sabre St 3 Claremont St 5 7(4) 522(1026) 22(50) 40(25) 2(0) 93(61) 0(4) 0(0) 3(16) 17(12) 809(601) 62(123) Litchåeld Rd Bethany Home Rd 6 Missouri Ave not to scale Stella Ln 605(1132) 22(6) 12(8) 98(61) 864(758) 119(120) Litchåeld Rd 215(56) 392(715) 3(14) 11(5) 59(40) 9(8) 57(206) 20(68) 71(326) 348(54) 477(497) 4(9) Litchåeld Rd Industrial 82 Glendale Figure 9: Total Traffic - Year 2027 3 21(8) 509(1091) 4(17) 9(6) 0(0) 11(13) 6(21) 0(0) 9(31) 32(12) 865(587) 12(23) 5 7(4) 549(1118) 22(50) 40(25) 2(0) 93(61) 0(4) 0(0) 3(16) 17(12) 903(637) 62(123) Citrus Rd Bethany Home Rd not to scale 1 463(599) 142(310) 299(264) 244(221) 413(555) 136(238) Litchåeld Rd Glendale Ave Litchåeld Rd Stella Ln 4 41(16) 492(1115) 2(9) 13(12) 0(0) 31(30) 13(41) 0(0) 18(61) 62(24) 891(594) 17(20) Litchåeld Rd Claremont St 6 Missouri Ave 632(1224) 22(6) 12(8) 98(61) 958(794) 119(120) Litchåeld Rd 5 3 2 1 4 6 Litchfield Rd Glendale Ave Super Sabre St Bethany Home Rd Missouri Ave Stella Ln Claremont St LEGEND AM(PM) Peak Hour Traffic Volume XX(XX) 2 Super Sabre St 215(56) 454(739) 3(14) 11(5) 59(40) 9(8) 57(206) 20(68) 71(326) 348(54) 496(559) 4(9) Litchåeld Rd ACCESS A ACCESS B