Certification of Adequate Schools

City of Glendale — Regular Meeting (2021-03-04)

View PDF Item 1 Meeting page

Extracted text (via pymupdf) 4710 characters
PL094 
Certification of Adequate School Facilities 
for 
Residential Rezoning – Glendale, Arizona 
Revised November 2001 
 
Glendale City Ordinance No. 2104 applies to applications for residential rezoning which will increase the 
projected number of students for any school district’s attendance area.  This includes applications for rezoning 
which change zoning classifications from non-residential to residential and rezonings which change residential 
zoning classifications to a higher density classification. 
 
To be completed by City Staff 
 
 
 
 
 
 
 
 
 
 
City Application Number:  SR 20-0017 
 
City Staff Contact: Christina LaVelle  
Telephone Number:  623-930-2553  
 
Property Address: 16231 N. 68th Lane, Glendale, AZ 85382 
 
Property Size: 4.78 Acres 
 
Existing Zoning: R1-4, Single Residence 
Proposed Zoning: R-3, Multiple Residence 
 
Existing Dwelling Unit Potential: 
Single Family: 52 
Multi-Family:   N/A 
 
Proposed # of Dwelling Units:  
Single Family: N/A 
Multi-Family:   69 
 
Net Increase in Dwelling Units from Existing Zoning: 17 units 
 
 
Affected School District(s): 
Peoria Unified School District 
 
Impacted School(s): 
 
 
Elementary:  
Paseo Verde Elementary School, Foothills Elementary School, Pioneer Elementary School 
 
Middle:  
N/A 
 
High School: Cactus High School 
 
Sent for Certification to:  
 KKontra@pusd11.net 
 
Referred Date:  
 8/26/2020 
 
Response Deadline:      9/8/2020 
 
 
 
If no response is received by this date, it will  
be deemed that there are adequate school 
facilities for the proposed rezoning. 
 
Response Date: 
__1/19/21_______________ 
 
 
Received January 19, 2021

PL094 
Certification of Adequate School Facilities 
for 
Residential Rezoning – Glendale, Arizona 
Revised November 2001 
 
To Be Completed By School Official (Choose One) 
 
1. __X_  The school district has adequate facilities to accommodate the projected number of new students 
within the school district attendance area that will be generated by this rezoning request. 
2. ___  The school district will have adequate school facilities by a planned capital improvement to be 
constructed within one (1) year and located within the school district’s attendance area affected by this 
residential rezoning request. 
3. ___  The school district has determined an existing or proposed charter school can provide adequate school 
facilities.   
4. ___   The applicant and the school district have entered into an agreement to provide, or help to provide, 
adequate school facilities in a timely manner within the school district’s attendance area affected by this 
residential rezoning request.  Details of this agreement are not required.   
5. ___   The school does not have adequate school facilities to accommodate projected growth attributable to 
the rezoning.   
 
If response number five (5) is selected, please provide specific details regarding the factors contributing to 
the lack of adequate facilities as related to the School Facilities Board Guidelines.  Indicate where facilities 
are not adequate.  Attach additional details as necessary.   
 
A. 
School Site  
 
 
 
 
 
_______________________________ 
B. 
Academic Classroom Space 
 
 
 
_______________________________ 
C. 
Classroom Fixtures and Equipment 
 
 
_______________________________ 
D. 
Libraries and Media Centers 
 
 
 
_______________________________ 
E. 
Auditoriums and Multipurpose Rooms 
 
 
_______________________________ 
F. 
Technology 
 
 
 
 
 
_______________________________ 
G. 
Transportation 
 
 
 
 
 
_______________________________ 
H. 
Science Facilities  
 
 
 
 
_______________________________ 
I. 
Arts Facilities 
 
 
 
 
 
_______________________________ 
J. 
Vocational Educational Education Facilities 
 
_______________________________ 
K. 
Physical Education-Comprehensive Health Program 
_______________________________ 
L. 
Other School Facility Areas and Equipment 
a. 
Compliance with Building Codes  
 
_______________________________ 
b. 
Building Systems  
 
 
 
_______________________________ 
c. 
Building Soundness 
 
 
 
_______________________________ 
d. 
Minimum Gross Square Footage  
 
_______________________________ 
e. 
Critical Health or Safety Issues 
 
 
_______________________________ 
 
School District:  Peoria Unified School District 
Representative Name (Please Print) __Michael Maas 
Representative Signature_____Michael Maas____ 
Title__Director Research, Planning Date_1/19/21 Application No. _________________ 
 
The completed Certification of Adequate School Facilities should be forwarded to: 
Christina LaVelle, Project Manager 
City of Glendale 
5850 West Glendale Avenue, Suite 212 
Glendale, Arizona 85301