PARKWAY 303 WEST 
SWC Loop 303 & Peoria Avenue 
Glendale, Arizona 
 
ZON21-21 
 
Submitted July 7, 2021 
Resubmitted October 19, 2021

PROJECT TEAM 
 
 
Developer: 
Suburban Land Reserve 
51 South Main Street, Suite 301 
Salt Lake City, UT 84111 
(801) 321-8723 
 
Architect: 
Butler Design Group 
5017 E. Washington St, Suite 107 
Phoenix, AZ 85034 
(602) 957-1800 
 
Legal Representative: 
Withey Morris 
2525 E. Arizona Biltmore Cir.  
Ste A-212 
Phoenix, AZ 85016 
(602) 230-0600 
 
Civil Engineer: 
Hunter Engineering 
10450 N. 74th Street, Suite 200 
Scottsdale, AZ 85258                      
(480) 991-3985 
 
Traffic Engineer: 
Southwest Traffic Engineering, LLC 
Andrew Smigielski 
3838 N. Central Avenue, Suite 1810 
Phoenix, AZ  85012 
(602) 266-7983

1 
TABLE OF CONTENTS 
I. 
Introduction ........................................................................................................... 2 
II. 
General Plan Conformance .................................................................................. 2 
III. 
Planned Area Development Plan .......................................................................... 3 
1. 
Purpose and Overview............................................................................... 3 
2. 
Permitted Uses .......................................................................................... 3 
3. 
Site Plan .................................................................................................... 4 
4. 
Development Standards ............................................................................ 5 
5. 
PAD Deviations .......................................................................................... 5 
6. 
Performance Standards ............................................................................. 6 
7. 
Landscaping, Screening, Walls .................................................................. 7 
IV. 
Landscape Design ................................................................................................ 8 
V. 
Architectural Design ............................................................................................. 8 
VI. 
Circulation & Access ............................................................................................. 9 
1. 
Existing Conditions. ................................................................................... 9 
2. 
Proposed Improvements .......................................................................... 10 
VII. 
Grading and Drainage ........................................................................................ 10 
VIII. 
Infrastructure/Utilities .......................................................................................... 11 
IX. 
Signage .............................................................................................................. 11 
X. 
Phasing .............................................................................................................. 12 
XI. 
Summary ............................................................................................................ 12

2 
I.  Introduction 
Suburban Land Reserve, Inc. (“SLR”) plans to develop 262.6 gross acres located at 
the southeast corner of Cotton Lane and Peoria Avenue (the “Property”).  See 
Vicinity Map and Aerial Map attached at Tab 1.  The Property is currently within 
Maricopa County and will be annexed into Glendale.  The Property is zoned RU-43 
in Maricopa County.  See Zoning Map at Tab 2.   
 
Upon annexation, the Property’s initial zoning designation will be Agriculture (A-1). 
The City is initiating this rezoning from A-1 to Planned Area Development (“PAD”) to 
allow development of a new railroad served industrial park and commercial center 
called “Parkway 303 West” that will utilize existing and future railroad infrastructure 
and meet demand in the area for rail-served industrial uses.  
 
This property has frontage along the Loop 303, from Peoria Avenue to Olive 
Avenue. The Property is currently vacant land utilized for agricultural purposes. The 
Property is within the unincorporated area of Maricopa County, and falls within the 
City of Glendale’s municipal planning boundaries. The property is bounded by 
Cotton Lane and rural residential/agricultural uses to the west, Peoria Avenue and 
vacant farmland to the north, the Loop 303 Freeway and vacant farmland to the 
east, and Olive Avenue and a large plant nursery to the south. 
 
The Applicant seeks to develop the Property in accordance with the commercial and 
industrial zoning districts and modified development standards to create a superior 
level of expectation along this expanding transportation corridor.   
 
This Parkway 303 West PAD will allow commercial, industrial manufacturing, 
assembly, employment, distribution, warehousing and other related industrial uses.  
Rezoning the property to PAD will permit the development of industrial and 
commercial uses which are compatible with land use trends along the 303 corridor 
and comply with state statutes concerning territory in the vicinity of a military 
installation.  
 
Parkway 303 West PAD proposes approximately 3.4 million square feet of building 
facilities. The development plan, which is conceptually only and subject to change, 
presently shows seventeen (17) buildings ranging in size from 2,000 square feet to 
1.08 million square feet to accommodate a broad range of industrial tenants and 
commercial users. Twenty (20) acres in the southeast corner of the site is reserved 
for a future APS substation.  Commercial uses are also designated along Peoria 
Avenue.  Overall, the use is compatible with the 303 Freeway Corridor and the PAD 
regulations are tailored for the intended development. 
 
II.  General Plan Conformance 
Per the Glendale General Plan 2040, the Property has a land use designation of 
RMU (Regional Mixed Use). See General Plan Map at Tab 3. The RMU land use

3 
designation permits a cohesive, large‐scale, mixed‐use planned development 
fostering urban, multi‐modal opportunities. Per the General Plan, “RMU 
developments accommodate a variety of complementary uses, both physically and 
functionally integrated, including commercial, employment, residential, open space, 
and other supportive land uses.”  
 
In this instance, the proposed development includes commercial and 
industrial uses with arterial frontage and freeway access.  This precisely fits the 
definition and intent of the RMU and hence, the proposed mix use development is in 
conformance with the RMU designation.  
 
III.  Planned Area Development Plan  
 
1.  Purpose and Overview 
 
The intent of the Parkway 303 West is to allow commercial, manufacturing, 
assembly, employment, distribution, warehousing and other related industrial uses 
found in the C-2, C-3, M-1, M-2 and B-P zoning districts.  Related uses such as e-
commerce, office and commercial uses shall also be permitted with development 
standards that ensure appropriate flexibility to attract future employers and uses.  
The PAD will allow commercial, industrial and employment uses that are compatible 
with the 303 Freeway Corridor and are in conformance with the underlying zoning 
and uses along this freeway. 
 
Specific users have not been identified at this time. The plans, exhibits, and images 
presented herein are conceptual only and intending to convey the type, intensity, 
and quality of development expected at this location.  Once specific users are 
identified, a design review application (site plan, building architecture, landscaping, 
signage, grading, etc.) will be submitted for administrative review by Glendale staff. 
 
2.  Permitted Uses  
 
All uses permitted in the C-2, C-3, M-1, M-2 and B-P zoning districts.   
 
Other Permitted Uses 
• Uses Subject to Conditions: Per section 5.753, 5.773, 5.813, 5.843, 
and 5.863 of the Glendale Zoning Ordinance 
• Uses Subject to Conditional Use Permits: Per section 5.754, 5.774, 
5.814, 5.844 and 5.864 of the Glendale Zoning Ordinance 
• Accessory Uses: Per section 5.756, 5.776, 5.185, 5.845, and 5.865 of 
the Glendale Zoning Ordinance 
• Temporary Uses: Per section 3.920 of the Glendale Zoning Ordinance

4 
3. Site Plan 
 
To maximize and attract potential users, the conceptual plan helps illustrate how the 
property could be designed for multiple building arrangements.  This plan is 
conceptual and will be finalized at a later Design Review phase, but this general 
illustration ensures optimal flexibility while demonstrating potential development 
options.  See Conceptual Plan at Tab 4. 
 
The Plan proposes approximately 3.42 million square feet of warehouse and 
distribution facilities. The proposed development is conceptually shown with six (6) 
industrial buildings ranging in size from 176,000 square feet to 1.08 million square 
feet to accommodate a broad range of industrial tenants and users. Thirteen (13) 
acres of commercial uses are planned along Peoria Avenue.  The commercial area 
is conceptual only and will be subject to a future design review as the market and 
users refine a play layout.  Twenty (20) acres in the southeast corner of the site is 
reserved for a future APS substation.  
 
This plan option is conceptual and subject to change based on market demand.  A 
future design review application will establish the future site layout for each 
individual building layout. 
 
The development will be accessed via a series of private primary driveways that 
feed into an internal roadway network that circulates around the development: four 
(4) on Cotton Lane, two (2) on Peoria Avenue, and zero on Olive Avenue. 
Additionally, there are four (4) secondary driveways on Cotton Lane and four (4) 
secondary driveways on Peoria Avenue.  
 
The circulation design provides separation of cars and trucks where possible and 
transport trucks can access various points of the buildings.  Sufficient employee 
parking is provided along Cotton Lane, Peoria Avenue, and within close proximity of 
the other buildings within the site.   
 
4. Development Standards 
 
Commercial development standards shall comply with C-2 or C-3 zoning district 
development standards of the Glendale Zoning Ordinance. 
 
As reflected through Table A below, the industrial development standards for the 
Parkway 303 West are created to facilitate the development.  More specifically, the 
permitted heights and intensity will permit the development of a highly attractive and 
superior industrial development representative of the types of development along the 
303 Freeway Corridor. Should a conflict exist between any provision in this PAD and 
the Glendale Zoning Ordinance, the PAD shall apply.

5 
Table A: Comparative Development Standards Table 
 
 
M-1 
PAD Proposal 
Min. Lot Area 
6,000 
6,000 
Max. Lot Area 
N/A 
N/A 
Building Setbacks 
• Front 
• Rear 
• Side 
• Street Side 
 
• 25’ 
• 60’ 
• 60’ 
• 25’ 
 
• 25’ 
• 60’ 
• 60’ 
• 25’ 
Max. Building Height 
30’ 
85’ 
(Rooftop building 
appurtenances can 
exceed roof height up 
to 105’ maximum 
provided they are more 
than 20’ from the 
building’s roof edge.  
Roof mounted 
equipment shall be fully 
screened from the 
adjacent public street 
line of sight. Material 
silos or other similar 
building specific 
support, ground, or 
platform mounted 
elements may exceed 
roof height up to 120’ 
maximum.) 
Max. FAR 
.3 
.5  
(Mezzanine 
sf 
area 
excluded 
from 
FAR 
ratio) 
Parking 
• Warehouse/Distribution 
• Office 
• Commercial uses 
 
• 1/2000 sf 
• 1/300 sf 
• 1/250sf 
 
• 1/2000 sf 
• 1/300 sf 
• 1/250 sf 
 
(Mezzanine 
sf 
area 
excluded from parking 
calculations) 
 
PAD Deviation Justification  
 
a. Height: Building height needs to be flexible to meet future tenant needs.  
Typically, the norm for an anticipated industrial building in this market may 
suggest 40’ of clear height inside, resulting in a building height in the 50’ range.  
However, in this case, there is the potential for a unique distribution or

6 
manufacturing use that may include multiple levels of storage platforms or 
automated systems, resulting in the need for increased height.  Site 
appurtenances, such as material silos or other building specific support 
equipment, may be required to exceed the building height.  In such cases, 
location and treatment of such elements shall be considered and incorporated 
into the overall design solution. 
 
b. FAR: A distinction should be made between additional building floors and storage 
mezzanines.  Often, storage mezzanines or multi-level automated storage 
platforms are incorporated into the tall clear height of a large distribution facility.  
Mezzanines fall within a portion of the already defined volume and footprint of the 
building and do not impact the visual appearance or height of the exterior of the 
building, thus not impacting the perceived density addressed by FAR.  They are 
often limited in actual employee population and used for a different type of 
storage or processing that does not require the otherwise high bay volume of the 
space. 
 
5.  Performance Standards 
 
a. Uses or operations of products within this district shall be permitted unless 
such uses are or may become obnoxious or offensive by reason of the 
emission of odor, dust, smoke, noise, gas fumes, cinders, vibrations, glare, 
refuse, or air or water pollution.  
b. All uses permitted in this district shall be primarily conducted within a fully 
enclosed building unless otherwise permitted. Outside storage of materials 
and equipment related to the primary activity is permitted provided that the 
outside storage area is screened by a wall with the design and height to be 
approved by the Community Development Group.  
c. Explosive or hazardous processes require approval by Glendale Fire 
Department that all manufacturing, storage, and waste processes meet all 
safety and environmental standards as administered by the department.  
d. The development shall comply with the City of Glendale Outdoor Light Control 
Ordinance.  Lighting plans shall be submitted with each Design Review 
application illustrating that on-site lighting does not exceed one-foot candle at 
the property line.  On-sight lighting shall be dark sky compliant. 
e. No use shall be established, maintained, or conducted within the 
development which may cause the dissemination of smoke, gas, dust, odor, 
or any other atmospheric pollutant outside the building in which the use is 
conducted. 
f. No use shall result in noise perceptible beyond the boundaries of the 
immediate site of the use.

7 
g. No use shall result in the discharge of any waste materials to any water 
course, dry wells, storm sewers, or ditch. 
h. No use shall result in the dissemination of glare or vibration beyond 
immediate site of the use. 
i. No use shall create a physical hazard by reason of fire, explosions, or use of 
radioactive materials or any similar cause of property in the same or adjacent 
districts. 
6.  Landscape, Screening, Walls 
 
Landscape buffer and screen wall requirements shall comply with Section 7.200 of 
the Glendale Zoning Ordinance. The design, materials and colors for all walls, 
fences and screening devices visible from public view will be uniform in appearance.  
A wall enclosing the truck courts shall be provided to help screen the truck loading 
and maneuvering area. 
 
Screening is intended to be a positive element of the Site which complements the 
building’s architecture and blends with the perimeter landscaping. Screening used at 
the entrance to the properties should enhance the entry, complement the building’s 
architecture and shall not impair traffic safety by obscuring views.  
 
For a building that provides a secured visitor parking area adjacent to the building’s 
publicly accessible street frontage, chain link fencing should not typically be located 
along the street frontage adjacent to such building’s visitor parking area; provided, 
however, that when and where chain link fencing along the street frontage of a 
secured visitor parking area would be appropriate under the particular circumstances 
of a given development’s building design, ingress and egress, vehicular and 
pedestrian circulation, loading and unloading, operations, security and other 
pertinent circumstances, chain link fencing will be allowed if/as appropriate along all 
or a portion of the publicly accessible street frontage that is adjacent to such secured 
visitor parking area with final determination and approval of the chain link fencing 
being part of the design review application submittal.  
 
Long expanses of exposed wall surfaces should be architecturally designed and/or 
landscaped to prevent monotony. Further, decorative monuments, gates and/or 
fences in combination with landscaping should be used to provide continuity at the 
street where openings occur due to driveways or other breaks in the sidewalk or 
building wall.  
 
Loading and unloading of goods is an integral function of this industrial Site. Loading 
is traditionally associated with outdoor storage of goods and truck parking. Loading 
docks should be located where they can function efficiently without detracting from 
the aesthetics of the industrial structure. Loading docks and outdoor storage within 
100 feet of a residential district along the perimeter of the site shall be screened by

8 
an 8 feet (min.) high CMU wall, or a combination of landscape berm and wall or 
landscape berm and screened chain link fence with a total height of 8 feet (min.). 
 
IV.  Landscape Design 
 
Landscaping shall be designed to complement the building architecture overall 
design theme for the site.  All materials will comply with the City’s low water plant 
palette.  The street frontage landscaping will provide an attractive public edge to the 
property.  Perimeter site boundaries will define the parcel and provide a pleasing 
common boundary with adjacent sites.  Enhanced landscaping will further define 
potential building entries with canopy trees at City-required spacing to provide 
shading for the parking areas.  A variety of tree species, combined with a colorful 
combination of shrubs and groundcovers, will provide an overall landscape 
composition of appropriate scale to enhance the overall development and its visual 
impact on its surroundings.  More specific details regarding plantings, types, 
locations and quantities will be a part of the future design review application where 
they will address the actual size and building design.  
 
Onsite landscaping will occur concurrently with development of individual parcels. 
Offsite landscaping will be installed along individual parcel frontages as each 
individual parcel is developed. A Conceptual Lot Layout showing an example of how 
individual parcels may be developed is provided at Exhibit 4. 
 
V.  Architectural Design 
 
The design of large industrial facilities requires a specific response to anticipated 
tenant requirements combined with careful aesthetic consideration of dealing with 
such a large building mass.  Since the future tenant is unknown at this time, the 
design palette must remain flexible.  The building may take on the characteristics of 
a specific tenant, if that tenant is identified prior to development, or may be more 
‘generic’, designed to appeal to a broad range of potential tenants (particularly if 
development commences before a specific tenant is known).  Both examples can be 
found along the adjacent 303 Corridor. 
 
Scale is an important consideration when looking at the overall design.  Freeway 
scale addresses the higher speed, more distant views of the development from the 
adjacent Loop 303.  Elements should be larger and easier to appreciate from 
automobiles on the freeway.  Similarly, but to a lesser degree, the building will be set 
back considerably from Cotton Lane so the scale should be addressed accordingly.  
The level of detail increases adjacent to potential building entries where pedestrian 
scale elements should then be introduced. 
 
Color and pattern will be used to ‘break down the mass’ and develop visual interest 
that creates an overall pleasing aesthetic on all sides of the building.  The color 
palette may include a range from warm to cool neutrals that respect the surrounding 
desert hues and may include limited color accents to provide additional interest or

9 
address corporate imaging.  The primary building material will be painted, articulated 
concrete wall panels and may feature accent materials that provide additional 
texture or colors where areas of enhancement are appropriate.  Glass will be 
incorporated at anticipated office areas or to provide additional daylighting at 
workspaces.  Metal canopies will provide further shade, shadow, and accent at 
specific points of entry. 
 
Building parapets will be extended above the roof line to provide screening of roof 
top equipment from view at adjacent public right of ways along Cotton Lane and 
Loop 303.  Dock and outdoor storage areas will be screened with an 8’ masonry wall 
with detail and color to complement the building architecture.  A similar 3’ high wall 
will screen parking along the adjacent streets. Roof drains shall be internally piped 
unless specifically presented and approved as an enhancement used to further 
articulate the building façade. 
 
A representative architectural collage exhibit is included to convey a representative 
palette of design ideas.  Specific details regarding architecture, materials, colors, 
etc. will be a part of the future design review application. See Architectural Collage 
Exhibit attached at Tab 5.   
 
 
VI.  Circulation and Access 
 
The Property is well situated from a regional access perspective; it is visible from the 
303 Freeway and is easily accessible from the surrounding arterial street network. 
 
1. Existing Conditions 
 
Peoria Avenue is an east-west, two-way, two-lane roadway on the along the 
northern boundary of the Property that is jointly controlled by the City of Surprise and 
MCDOT. Olive Avenue is similarly an east-west, two-way, two-lane roadway 
bordering the south side of the Property, and is controlled by MCDOT. Cotton Lane 
is currently an unimproved two-way, two-lane roadway bounding the west side of the 
Property and is also controlled by MCDOT. 
 
To the east of the Property is the Loop 303 freeway. ADOT controls 50% of the right-
of-way to the east of the Property. Olive Avenue does not have any access to the 
303 Freeway.  There is also a BNSF rail line along the north side of the road that 
limits direct vehicular access to Olive Avenue.  Peoria Avenue has full access to the 
303 Freeway.  
 
The surrounding roadway half-streets will be improved along the frontage of the 
project in phases as needed to support each phase of the project.  The City of 
Surprise and MCDOT currently have a joint project to improve Peoria Avenue 
(TT0576 Peoria Avenue Citrus to Cotton to SR303). The developer will need to 
coordinate with all agencies and the MCDOT project for requirements on Peoria 
Avenue.

10 
 
2. Proposed Street Improvements 
 
As part of the proposed Parkway 303 West PAD, offsite improvements will occur 
along the adjoining streets. Cotton Lane will be widened from a two-lane roadway to 
a 5-lane roadway with curb, gutter, sidewalk, landscaping, and roadway lighting on 
the east side of the street. Five (5) proposed driveways along the east side of Cotton 
Lane will serve the project site.  
 
Peoria Avenue will be widened from a two-lane roadway to a five-lane roadway with 
curb, gutter, sidewalk, landscaping, and roadway lighting on the south side of the 
street. The developer will need to coordinate with MCDOT Project TT0576 Peoria 
Avenue Citrus to Cotton to SR303. Improvements on Peoria Avenue will be 
governed by that plan. Three (3) proposed driveways along the south side of Peoria 
Avenue will serve the project site.  
 
All driveway locations and spacing shall be approved by MCDOT. 
 
VII.  Grading and Drainage  
 
The grading and drainage for the site will be designed to retain the 100 year, 2-hour 
storm event in accordance with the City of Glendale drainage design guidelines.  
Storm drainage will be conveyed via internal drain or downspouts and overland flow 
across the parking lots and truck dock areas into either catch basins or curb 
openings which will outfall to a combination of surface and/or underground retention 
areas. The required storage volume will dissipate within 36 hours via a combination 
of natural percolation and drywells.  Any off-site drainage impacts to the site will be 
routed through the site in order to maintain its historical drainage pattern.  
 
Until the channel improvements proposed by the TT0576 project are in place, it is 
anticipated that significant offsite flows will overtop the intersection of Peoria Avenue 
and Cotton Lane and continue across the subject project as sheet flow. Please note 
that if this development occurs prior to the channel improvements on the north side 
of Peoria Avenue, interim measures will need to be provided. 
 
Drainage patterns and flows in this area are covered by the following reports: 
 
• Loop 303/White Tanks Area Drainage Master Plan Update Hydrologic 
Analysis (ADMPU). HDR Engineering, Inc. August 20, 2009. 
• Loop 303/White Tanks Area Drainage Master Plan Update: Phase I - Update 
the Existing Hydrology Model - Final Hydrology Report, Parson Brinckerhoff, 
July 2015. 
• Peoria Avenue Citrus Road to SR303 Scoping Assessment Initial Drainage 
Report. TY LIN International, July 14, 2021.

11 
VIII.  Infrastructure/Utilities 
 
1. Water 
Water will be provided to the site by EPCOR.  EPCOR has stated that they will 
allow domestic and fire protection water from their existing waterline located 
northwest Cotton and Peoria Avenue.  An off-site water main extension will be 
completed in accordance with EPCOR and city requirements.     
2. Sewer 
Sewer will be provided by EPCOR. EPCOR has stated that the residential 
development west of Cotton Lane is currently extending a sewer line from south 
of the Nursery to Olive Avenue and to the west side of Cotton Lane. It is 
anticipated that this project will connect to this proposed sewer main.     
3. Irrigation 
There are several existing Maricopa Water District (MWD) facilities on site, 
including an open irrigation ditch and underground irrigation pipe along Peoria 
Avenue and an open irrigation ditch along Cotton Lane. The developer will need 
to work with the MWD to relocate existing irrigation infrastructure as necessary. 
MWD also owns a narrow strip of land between Cotton Lane and the Property 
that will require an agreement between the parties to compete the necessary 
roadway improvements. 
4. Power 
There is a 100-foot utility easement with large APS transmission lines and towers 
running along the east side of the Property that will eventually feed into the future 
substation planned for the southeast corner of the Property. No vertical 
structures may be built within the utility easement in order for APS to maintain 
unobstructed access to the lines and towers. 
 
IX.  Signage 
 
This development will provide for functional and attractive signage that compliments 
the architecture of the overall SLR Logistics 303.  This PAD application sets forth the 
general location, quantity, and maximum height of monument signage for Parkway 
303 West.  Monument signs along the streets and the 303 freeway, as well as on-
site development identification signs will provide proper identification.  Directional 
signs may be located throughout the development to point users to their desired 
destination.  These signs will utilize the established color and materials palette that 
is applied to the building’s constructed on the Property.     
 
Two (2) 60’-tall freeway pylon signs are proposed along the 303 Freeway frontage of 
the Property.  Pylon signs will provide identity for the overall development and may 
include single-tenant panels, or multi-panel depending upon the future tenant user(s) 
of the Property.  Four (4) 20’-tall monument signs are proposed along Cotton Lane 
at various access drives.  Two (2) 10’-tall monument sigs are proposed along each

12 
street frontage for Olive and Peoria Avenues.  Monument signs will provide identity 
for the overall development and may include single-tenant panels, or multi-panel 
depending upon the future tenant user(s) of the Property.  
 
Once future tenants are identified, the applicant may consider a Comprehensive 
Sign Plan (CSP) to provide for attractive and consistent signage for tenants and 
users of Parkway 303 West.  The future CSP will contain guidelines with regard to 
color, materials, location of wall signage, allowable areas, illumination, and 
configuration of logo and copy presentations. Conceptually, proposed signage 
standards include: 
 
Sign Type 
Max Quantity 
Max Height 
Max Area 
Freeway 
Pylon Sign 
2 
60 feet 
627 SF 
Primary 
Monument 
Sign 
4 
20 feet 
200 SF 
Secondary 
Monument 
Sign 
2 
10 feet 
100 SF 
 
X.  Phasing 
 
The Property will develop in multiple phases as market conditions warrant.  The 
intent is to install infrastructure and improve the street frontage and access way 
adjacent to each industrial phase. It is anticipated that the initial phase will include at 
least one building, street frontage improvements, and retention basins. Plans for 
individual buildings/phases will be submitted to the City of Glendale to ensure proper 
and orderly development. Timing of the commercial development, and its associated 
offsite improvements along Peoria Avenue will occur as market conditions warrant 
and as user’s finalize future plans. 
 
XI. Summary 
 
The PAD and the proposed site plan will allow development of the Parkway 303 
West industrial and commercial center. The proposed development is an new retail 
shopping center and modern industrial park designed to meet soaring demand for 
high quality warehouse, distribution, and manufacturing facilities adjacent to Loop 
303. This project supports Glendale’s long-term goals for the region and will provide 
a robust, sustained contribution to the City’s economic growth. The development will 
complement the surrounding area and provide substantial benefits and employment 
opportunities to the City of Glendale.

13 
LIST OF EXHIBITS 
1. 
Aerial and Vicinity Map 
2. 
Zoning Map: Current vs. Proposed  
3.  
General Plan Map 
4. 
Conceptual Site Plan 
5. 
Architectural Collage Exhibit 
6.  
Legal Description

TAB 1

SWC Loop 303 & Peoria – Glendale, AZ
N
Aerial Map

TAB 2

TAB 3

SWC Loop 303 & Peoria Avenue – Glendale, AZ
N
General Plan Map

TAB 4

TAB 5

TAB 6

2
4
4
4
3
5
5
5
5
N COTTON LANE
: PEORIA A9E
5
5
: OLI9E A9E
6
7
5
5
5
1
6TATE RO8TE 303
H8NTER
EXHIBIT "B"
ZONING PARCEL
PAGE 3 OF 4
XB01

1
2
3
4
5
6
MONUMENT LEGEND:
7
HUNTER
XB01
EXHIBIT "B"
ZONING PARCEL
PAGE 4 OF 4