StoneHaven – Phase 2A
Pre-Plat
Narrative
Southeast Corner of 91st Avenue and Montebello Avenue
Glendale, Arizona
Vicinity Map:
December 19, 2019
Prepared for:
Pulte Group
16767 N Perimeter Dr.,Suite 100
Scottsdale AZ 85260
Prepared by:
HILGARTWILSON
2141 E. Highland Avenue, Suite 250
Phoenix, Arizona 85016
Telephone: 602.490.0535
Contact: David W. George, P.E.
Glendale Number
Date Submitted
Date Approved
StoneHaven Pre-Plat Narrative
Page 2
StoneHaven
Phase 2A
Narrative Report Table of Contents
Narrative:
Page Number
I.
Project Description
3
II.
Public Utilities and Services
4
1. Water Facilities
1.1 Existing Water Conditions
4
1.2 Proposed Water
4
2. Wastewater Facilities
2.1 Existing Wastewater Conditions
4
2.2 Proposed Wastewater
5
3. Dry Utilities
5
III.
Drainage
1. Offsite
6
2. Onsite
6
IV.
Open Space and Trails
1. Open Space
7
2. Trails
7
StoneHaven Pre-Plat Narrative
Page 3
I.
Project Description
StoneHaven is an approximately 395-acre property located in Glendale,
Arizona at the northeast corner of 91st Avenue and Camelback Road. The
property is a portion of Section 15 of Township 2 North, Range 1 East.
StoneHaven consists of four phases (1, 2A, 2B & 3) with Phase 1 having
recorded final plats and map of dedications for Cardinals Way, Montebello
Avenue and 87th Avenue north of Montebello. Grading activities for Phase 1
and Cardinals Way are currently underway. The property is owned by John F
Long and Pulte Group is the developer. A Planned Area Development (PAD)
application for StoneHaven was approved by the City of Glendale on June 27,
2017.
StoneHaven is located within the City of Glendale planning area and is situated
at the eastern edge of the City’s Sports and Entertainment District and has
been used for agricultural production for nearly a century. The surrounding
land uses include single-family residential, educational (high school and
elementary sites), public parks, commercial sites, agricultural, and the State
Farm Stadium (located to the northwest). Primary ingress and egress points will
include 87th Avenue at Cardinals Way, Montebello Avenue at 91st Avenue, and
Camelback Road at 87th Avenue. Additional gated access to the eastern
portion of the Project is provided from 83rd Avenue south of Cardinals Way.
The StoneHaven Phase 2A (Project) as presented in this narrative will consist
of one single-family residential parcel (Parcel 12) of approximately 21.85 acres.
Parcel 12 is currently zoned SHD-4.5 PAD and will provide 112 lots. Access to
Parcel 12 will be provided from 89th Avenue south of Montebello Avenue. The
typical lot size will be 45 ft wide by 110 ft deep and the minimum lot area is
4,500 square feet. However, the minimum lot area maybe reduced up to 28 SF
at roadway intersections, knuckles and cul-da-sac returns due to chamfering at
the corner of the lot.
The Project will provide approximately 3.61 acres of open space area and will
provide public roadways and public water and sewer services.
StoneHaven Pre-Plat Narrative
Page 4
II.
Public Utilities and Services
1.
Water Facilities
1.1 Existing Water Conditions
StoneHaven is located entirely within the City of Glendale Water Service
Area. Existing water infrastructure immediately adjacent to the
StoneHaven includes existing 12-inch water mains in Missouri Avenue
(west of 87th Avenue), 83rd Avenue, 87th Avenue, 91st Avenue, and
Camelback Road (east of 87th Avenue) and an 8-inch water main in
Camelback Road (west of 87th Avenue). Additional area water facilities
include a 6-inch water main along eastside of 83rd Avenue from Bethany
Home Road to Missouri Avenue and a 24-inch water main along the south
side of the Grand Canal Linear Park from 87th Avenue to 83rd Avenue.
1.2 Proposed Water
The Project’s 112 single-family residential units will be served by an
internal network of looped 8-inch waterlines which will connect to 12-inch
waterlines that are being installed with Phase 1 improvements, specifically
in Montebello Avenue and 89th Avenue. The 12-inch waterlines within
StoneHaven Phase 1 will make two connections to the existing 12-inch
water main in 91st Avenue and one connection to the existing 12-inch
water main in 83rd Avenue.
2.
Wastewater Facilities
2.1 Existing Wastewater Conditions
StoneHaven is located entirely within the City of Glendale Wastewater
Service Area. Existing wastewater infrastructure immediately adjacent to
StoneHaven includes a 24-inch sewer main along 91st Avenue, a 48-inch
sewer main along Camelback Road, a 10-inch sewer main along 87th
Avenue, and a 21-inch sewer main along 83rd Avenue.
The existing sewer mains within 91st Avenue, 87th Avenue, and 83rd
Avenue all convey wastewater flows south toward Camelback Road where
an existing 48-inch sewer main conveys wastewater flows westward to
91st Avenue and intersects with an existing 24-inch sewer main from the
north. Wastewater flow continues westerly in Camelback Road as a 48-
inch sewer main to a diversion structure which directs 5.8 MGD to the
City’s 98th Avenue pump station and 8.9 MGD is directed to the 91st
Avenue Wastewater Treatment Plant.
StoneHaven Pre-Plat Narrative
Page 5
2.2 Proposed Wastewater
The Project’s 112 lots will be served by an internal network of gravity
sewer mains primarily consisting of 8-inch sewer lines. The gravity sewer
mains will drain to a sanitary sewer lift station to be located on the
eastside of 91st Avenue, north of the existing SRP well site. This lift
station will be completed with Phase 1 improvements. The gravity sewer
system and lift station facilities will be owned and operated by the City of
Glendale. The lift station has been designed to accommodate the
StoneHaven 1,362 single-family lots and will discharge to a 12-inch gravity
pipe which discharges to the existing 24-inch pipe in 91st Avenue.
3.
Dry Utilities
Dry utility services for the StoneHaven development will include phone
service by CenturyLink, natural gas service by Southwest Gas, cable
service by Cox Communications and electric service by SRP.
Existing overhead electric lines adjacent to the site include a 12 KV line on
the east side of 91st Avenue, which will be undergrounded, a 69 KV line on
the north side of Camelback Road, which will remain in place (except as
needed to accommodate the 87th Avenue intersection), and 69 KV line on
the north side of Cardinals Way, which will remain in place.
StoneHaven Pre-Plat Narrative
Page 6
III.
Drainage
1. Offsite
The StoneHaven site and surrounding area generally slopes in a
southwesterly direction. Historically, offsite drainage approached the
Project as sheet flow, generated from the watershed areas east and north
of the Project. Today, the Grand Canal Linear Park located along the
Cardinals Way alignment and established residential subdivisions located
east of the StoneHaven obstruct flows and prevent them from reaching the
site. Parcel 12 grading was included with the StoneHaven Phase 1
grading plan. Also included was the grading of Montebello Avenue which
is adjacent to the Project to the north, and 87th Avenue which is adjacent
to the Project on the east side. As a result, the Project is not impacted by
significant offsite flows.
2.
Onsite
The proposed onsite stormwater management concept for StoneHaven
residential and open space parcels consists of grading the lots to drain
from the backyard to the streets, and the streets to drain toward a series
of surface retention basins (located within the open space tracts). Street
conveyance shall occur as either surface flow within the right-of-way or in
a system of underground storm drains.
The stormwater retention basins will have sufficient capacity to retain
runoff from the 100-year 2-hour storm event. In some situations a
retention basin may not provide the required storage volume. In these
instances the excess stormwater will be conveyed to the next downstream
retention basin which will be sized to account for this volume transfer.
This downstream conveyance will be accomplished through structures
such as culverts, weirs, conveyance channels, and spillways or
combinations of these structures. Appropriate erosion protection will be
placed in locations as needed to protect the stormwater management
facilities. The StoneHaven project will provide within the project
boundaries, the stormwater storage volume necessary to satisfy City of
Glendale requirements.
The 100-year post development runoff for locations where flows exit the
StoneHaven project will not exceed the pre-developed runoff conditions
and the ultimate site outfall points will be at southwestern corner of the
property with outfalls on 91st Avenue and Camelback Road. All finished
floor elevations will be set a minimum of 12 inches above the high
adjacent 100-year water surface elevation and 14 inches above the
emergency overflow elevation of any adjacent retention basin. Drainage
design will be conducted in accordance with all applicable City of Glendale
and Maricopa County Drainage standards and regulations.
StoneHaven Pre-Plat Narrative
Page 7
IV. Open Space and Trails
1. Open space
The Project will provide approximately 3.61 acres of open space and will
be served by the 9.6 acre Parcel 14 community park being completed with
Phase 1.
2. Trails
StoneHaven will provide a comprehensive trail and pedestrian circulation
system, providing non-motorized access throughout the community. A
primary pedestrian path, six-feet in width, will be provided through the
major linear open space corridor within the center of the community,
providing additional connections to each development parcel and the
major amenities within StoneHaven.