Compilation of All Public Comments (4_27_2026) 
1 
Date 
Name 
Organization 
(if applicable) 
Source 
Comment 
2/24/2026 Daniel 
Dempsey 
Email 
For definition, the energy or water required seems like a better metric for determining a data center than ft2. Or maybe a combination of metrics. Something like 
>50,000ft2 or >20MW electric service or >X ccf of water. We also want to be careful of the language “with the same controlling ownership interest” since that is so
easy to play games with. What if different parts have different controlling ownership? Does control require ownership? What if they hide control through NDAs?
That’s actually a good additional disclosure requirement: who has an ownership or controlling interest in the layers of shell companies? Also, I don’t know what M&C
goals are but here’s a recent example of other munis attempting to kill infrastructure they don’t like using large setbacks. I think something similar was done for
dispensaries. https://www.themesatribune.com/news/utilities-rap-mesa-s-ok-of-battery-facility-setbacks/article_3cb04d1f-6620-4793-b923-96f9510372dc.html
2/24/2026 Carissa Sipp 
and Dan 
Hunt 
Email 
We attended the disappointing zoning meeting last Thursday.  We have reviewed the advisory committee notes, the board for advisory and the 'proposed' zone 
requirements.  Quite honestly we feel like deja-vu.  This process, the panel and the proposed recommendations are out of step with everything that it should be and 
the 'experts' from the data centers perspective are widely out of touch salesmen not bases in the reality of the technology, power use or algorithms. We honestly 
don't know where start - so much needs to be corrected, fix and set up to protect Tucson.  When pressed about what the committee would do with our feedback, 
the panel would not commit to hearing us or even truly listening.  Why then have these meetings?  The Y/N is a joke and the fact the recommendations were 
released just before the meeting- come on. The fact Tucson thinks 400ft may be 'ok enough' for a 50000 sq ft data center is just the start of what is so wrong with 
these recommendations.  This alone shows so much is not well thought out or even understood by the zoning committee and how they are unwilling to even really 
try to do the right thing. Basic breakdown of just power needs for a  rack in a data center (est with only 10 servers): 10 AI servers x 2.2kW (assume Gen12A) 5 HS 
Switches x 750W 1 KVM + swtich x100W 3 PDU x 6W Firewall 720W 2x Memory (1PB, min need) x 3160W Therefore one rack is maybe 231kW and assuming a 10000 
st ft facility - this could be as many as 5000 servers.  So, you are running 115MW easy just from the computing equipment easy.  Then the 30deg delta from bottom 
to top server with the ambient need for 25C for the 'uP' means you have the cooling in the lab blowing (possibly) at 50F IN THE DESERT. We believe you as leaders 
need to address this immediately and discuss this fiasco again with the town manager. 
2/23/2026 Daniel 
Dempsey 
Breakout Room Feedback 
We need disclosures on what infrastructure is required by the utilities to service the data center, who is paying for it, and how they are paying for it. It turned out 
that a lot of the public presentation by Project Blue was false. They were not paying the whole cost. Ratepayers were paying the cost and so long as Project Blue paid 
rates, it was paying the whole cost. The problem lies in when Project Blue does not use enough resources to cover the cost of developing those resources. That 
becomes a subsidy. Or, if it abandons the project at year ten when the infrastructure takes 30 years to pay off through rates. The $40m in security was but a fraction 
of the $1b in new generation and transmission infrastructure needed. These sorts of deceptions are hard to see without disclosures. And none of it is proprietary. 
2/23/2026 Natalie 
Shepp 
Breakout Room Feedback 
The energy demands of data centers are not compatible with the City or County Climate Action Plans because new energy generation will be needed, likely with 
some new natural gas which is not conducive to net zero by 2050 goals. In addition, a large number of generators needed for back-up will likely contribute to ozone 
and particulate matter air quality impacts. Research at ASU shows that temperatures near data centers can be 3-5 degrees hotter. Therefore, hyper scale data 
centers are inappropriate for the City of Tucson.  
2/25/2026 
Email 
Hello and good morning I attended Monday night's virtual meeting, and during my breakout group I feel what I said was misrepresented based on a another 
community member who spoke after me. What I was addressing is not, under any circumstance, related to the no-evidence-based, anti-renewable-energy conspiracy 
known as "turbine sickness." This was a misinformed person who implied that my information on the effects of infrasound measured around data centers is an 
equivalent to a debunked conspiracy theory. I was not discussing "vibrations" or radiation. There was also a woman who is in the industry with many good points 
that she addressed about "regulating" data centers, but we must acknowledge the financial insentive this person has to the continued expansion of data centers. I 
think as a whole the city pushback has failed to address that we have awareness that data centers are necessary, and the purpose of AI tools in some capacity in 
general. The mass expansion for generative AI is not equivalent to cloud centers used for social platforms and streaming services. Even AI technology that benefits 
the world through science, math, and medicine does not need to be to this scale. Especially not the desert. 2 miles from a residential area is not enough distance, and 
too close under any circumstance. When I discussed infrasound these tones are notable near large data centers as well as oil and natural gas pipelines. Not cell 
towers or wind turbines. The main things I wanted to discuss were outside of scope, which I will be bringing up at future public hearings. Those being a) the AI bubble 
b) costs passed to consumers for electricity is undeniable and universal. If you are curious about some infrasound information I have attached a few video essays as
studies are limited. I know how that sounds, but I ask for these not to be disregarded as being without merit without giving them all a watch. They are well
researched, tested clearly, and with plenty of easily verifiable information. I have also included a video of them hacking flock cameras which is also important for
council to be aware of. I know that is not zoning either, but please pass this information to relevant parties if possible once you have determined legitimacy from
your perspective of their research and testing capabilities.Infrasound:-https://youtu.be/zy_ctHNLan8?si=qalHIYboQA8iWS76-https://youtu.be/UTvr8L5v8u8?si=SIvII-
_8xg7TfnO2-https://youtu.be/_bP80DEAbuo?si=qA9UueFeQ8jEb0QtMass Surveillance:-https://youtu.be/uB0gr7Fh6lY?si=xnLzq3IeAOyROEf6
Attachment F

Feedback Received on Large Scale Datacenters (3_12_2026) 
2 
2/24/2026 Vivek 
Bharathan 
Email 
I’m wondering if you can send us info about the data centers currently operating in Tucson and their energy and water use? 
2/19/2026 
Survey 2.19 Q1 
What are some comparable examples? How big in sq ft are current Tucson data centers? 
2/19/2026 
Survey 2.19 Q1 
Appears due deligencr has been done 
2/19/2026 
Survey 2.19 Q1 
I reject the assumption that a data center is inevitable here in Tucson. 
2/19/2026 
Survey 2.19 Q1 
Size threshold should be lower than 50,000 sq. ft. 
2/19/2026 
Survey 2.19 Q1 
I understand all the processes put in place, but I do not think there should be any data centers ever. 
2/19/2026 
Survey 2.19 Q1 
Zoning have to address changes of new technology. 
2/19/2026 
Survey 2.19 Q1 
More restrictions of the zoning review process. Run them like planned parenthood, hallway size requirements, bathrooms, ceiling height 
2/19/2026 
Survey 2.19 Q1 
Technology changes, it should be based more on power consumption and environmental impact. Review process with no public health input or participation on TAC 
is bad 
2/19/2026 
Survey 2.19 Q1 
Where are the current data centers in Tucson?  How big is the biggest? 
2/19/2026 
Survey 2.19 Q1 
Comment: too small a notice radius due to AQI and data center should be greater than 10000 NOT 50000 
2/19/2026 
Survey 2.19 Q1 
You need to include energy usage as well the size requirement. Community should b all of Tucson 
2/19/2026 
Survey 2.19 Q1 
Review process: notice bubble should be broadened- 10 miles at least. Those notified should include all residents and business including renters, not just owners. 
The definition should be broader and include land use by multiple owners and users not just one interest. The last sentence should read "or" not "and" processing 
2/19/2026 
Survey 2.19 Q1 
I appreciate the definition, however I would like the definition should cover more the active requests and processing. As well as some of the requirements for data. 
And expected data requests. 
I like the review process. The one issue would have been a clearer understanding of the I2 zone and impact on human, wildlife, and general ecological impact. And a 
research plan to examine and communicate it. That said, I like the definition. 
2/19/2026 
Survey 2.19 Q1 
The zoning and review process should include a public vote by those effected by associated power and water price increases. 
2/19/2026 
Survey 2.19 Q1 
Data centers are incompatible with climate and environmental sustainability, including land use, water use, and energy use. There is no way to manufacture water 
out of thin air nor is there any way to mitigate excessive and unsustainable water use. There is no way to offset carbon from such an intensive use. 
2/19/2026 
Survey 2.19 Q1 
Please protect us from data centers 
2/19/2026 
Survey 2.19 Q1 
Glad you are asking residents and property owners for their feedback. 
2/19/2026 
Survey 2.19 Q1 
Your lack of direct QA casts in doubt your commitment to communal consultation. 
2/19/2026 
Survey 2.19 Q1 
Moratorium on all hyper-scale Data Centers! 
2/19/2026 Emma 
Nichols 
Survey 2.19 Q1 
Bigger Notification Zone (5 miles) 
2/19/2026 
Survey 2.19 Q1 
definition should remove the term "remote" - due to the outsized impact on a community, notices and meetings arent enough, the project should require a vote 
from the residents (look what happened with project blue) 
2/19/2026 Admir 
Quraishy 
Survey 2.19 Q1 
when it comes to data centers, it should cover data-usage, memory, processing, and traffic management. Regading zoning review, I'd like to have seen more 
discussions on ecological impact, and how those would be measured. The definition should cover ecological, and human/ property disruption  
2/19/2026 Diane 
Marzonie 
Survey 2.19 Q1 
2 miles is not enough spare 
2/19/2026 Hanna Egan 
Survey 2.19 Q1 
more restrictions, 5x5 dimension max, only wind/solar energy 
2/19/2026 William 
Wilkening 
Survey 2.19 Q1 
Definition should include power & water (total cooling and power generation method) numbers (you may not do anything differnt but at least you would make 
developer to document numbers to get around state limits)

Feedback Received on Large Scale Datacenters (3_12_2026) 
3 
2/19/2026 
Survey 2.19 Q1 
this is nothing but manufactured consent we made it clear how tucson feels about data centers a poject blue. You're trying to educate us . we know. where is the size 
maximum? Proposal- No data center zoning?  
2/19/2026 
Carol Price 
Survey 2.19 Q1 
Is there a referendum process if the public disagrees w/ the mayor + council decision? want to make sure a data center doesnt sneak in parts by building it in smaller 
sections that dont meeting the efinition therefore sneak in under the wire; the notification area seems woefully small. what is the usual way council agendas ae 
shared? Do we have to work hard to hear about agenda items or are they widely disseminated? 
2/19/2026 
Survey 2.19 Q1 
power matters, not just size/ 1.5 oz 2 miles is not sufficently large of a notification area 
2/19/2026 
Survey 2.19 Q1 
The definition should have a lower threshold- much lower; the process should have more public review + engagemetn (including this info session); The proposed 
notification area for neighborhood meetings + public hearing is way too small. Same for associations. Theres no info about how/when neighbors + the public would 
be informed 
2/19/2026 
Survey 2.19 Q1 
glad you are having neighborhood meetings and public meetings 
2/19/2026 Saul Ramirez 
Survey 2.19 Q1 
please have meetings like this in Spanish too. A large population of Tucson, residents are spanish speking residents 
2/19/2026 
TF Johnson 
Survey 2.19 Q1 
Dont lie, this is about Project Blude, and if if it wasnt prepartion implies construction, we say no. If you wanna bitch about NMBYS, bitch about whoevers preventing 
hihg-speed rail. when the bubble pops this will fuck us. the process is way too fast 
2/19/2026 
85719 
Survey 2.19 Q1 
contigous site & ownership questions; a good stat (expanded notice good but the limit for PHs is NOT ADDRESSED); 1) Seems like the provisions for "contigous" site & 
Controlling ownership will allow companies to make work arounds to avoid regulation 2) Currently our high paid mayor 7 council limit public hearings to 1 hour that 
is totally inadequate for issues as impactful as water & energy guzzling industries it is insulting to their consituents to limt the time for public hearings. 
2/19/2026 
Survey 2.19 Q1 
notice and add 3 more meetings; incurese notice to the whole city bc data centers are gong to use water from all of the watershed I do like is not right to build 
2/19/2026 Dominik 
Soto 
Survey 2.19 Q1 
I believe that as much of the surrounding area should be notified and should have a chance to understand how they may be affected; The Public should have the final 
say. and if the public follows our best interest. Data Center will not be built. Definition notes: I agree with exausted definitions to limit explotiation. 
2/19/2026 Jessica 
Ramirez 
Survey 2.19 Q1 
Will the people have an ability to actually speak? Will our voices be heard? If the public does not want this, will that be considered? Is there a possibility these 
centers arent built?  
2/19/2026 
Survey 2.19 Q1 
Any Guarantee decision-maker listen to the public? What are sensitive areas? How will noise & scale & other impacts be defined? Tucson's values are no data 
centers, that should be the core of all regs. Community impact evaluted in "proposed zones" How does neighborhood meeting influence process? Can they say no? 
Will neighborhood meetings be accessible? 
2/19/2026 
Survey 2.19 Q1 
A proposed data center should be put up for a vote. Power & water users effected by associated price increases & outages should be allowed a say on whether the 
data center is allowed.  
2/19/2026 Adrian 
Fernandez 
Survey 2.19 Q1 
2, 40,000 sq ft centers or smaller would no be under these regulations? Can you give examples of current data centers in our city, county, state? ( was addressed by 
speaker) 
2/19/2026 
Survey 2.19 Q1 
there may be much larger data centers wiht associated infrastructure support facilities and "gigafactories" That may be adjacent to the data center. maybe need a 
"meage" data center designation. For anything over say 1,000,000 sf in total buildings(s) footprint.  
2/19/2026 
Survey 2.19 Q1 
the tac was flowed from the beginning. why are TEP and others who will profit off data cents included? Having feedback only in writing is not democratic and 
transparent. People want to hear others comments and questions. Appreciate the language to prevent segmentation. 
2/19/2026 
Survey 2.19 Q1 
Its not the size that counts its the energy it consumes. we want this to be more prohibitive. 
2/19/2026 
Survey 2.19 Q1 
50k is enormous, it should be 1/2 or a 1/4 that size 
2/19/2026 
Survey 2.19 Q1 
yes except size threshold should be 50K sq ft- maybe 35 sq ft 
2/23/2026 William Craig 
2_23 Registration 
Comments 
What role does a Data Center hold in a desert community where water is a major issue and energy is already being priced beyond the reasonable access of this poor 
community?  to keep it running are minimal 
2/23/2026 William Craig 
2_23 Registration 
Comments 
After it has been built the number of jobs needed to keep it running are minimal 
2/23/2026 Carissa Sipp 
2_23 Registration 
Comments 
NG is not a ‘green’ energy. There is no reason to not demand backup via solar and battery storage.

Feedback Received on Large Scale Datacenters (3_12_2026) 
4 
2/23/2026 Carissa Sipp 
2_23 Registration 
Comments 
there should be demand for solar infrastructure on the roof I have more comments 
2/23/2026 Carissa Sipp 
2_23 Registration 
Comments 
corrections to the note in from the committee 
2/23/2026 Stella smith 
2_23 Registration 
Comments 
I am interested in all areas not only one area of concern re data centers. 
2/23/2026 Coral 
2_23 Registration 
Comments 
Arizona may have the very short end of the stick for CAP water, especially Tucson. ANY extra water demands are especially important to consider as we seek water 
solutions to keep up with the existing people, homes and businesses. Not NIMBY, just cautious! 
2/23/2026 
Priscilla 
Watts 
2_23 Registration 
Comments 
Limited energy useage and rate increase to residence 
2/23/2026 
Charles  
Spann 
2_23 Registration 
Comments 
Why is still on the table the citizens have already said no way to this p 
2/23/2026 
Mark 
Roxburgh 
2_23 Registration 
Comments 
Are they going to supply there own energy and not make our electricity prices skyrocket?? 
2/23/2026 lee stanfield 
2_23 Registration 
Comments 
We cannot afford to allow data centers access to any of our water, either directly OR INDIRECTLY via TEP!!!. We are already in the midst of an unprecedented 
drought that is predicted to continue to worsen for decades! 
2/23/2026 Hollis Toal 
2_23 Registration 
Comments 
There is probably no way a large data center can operate in Tucson without depriving the surrounding community of absolutely critical water and energy 
requirements, and raising utility rates for everyone. 
2/23/2026 Jeff Lynch 
2_23 Registration 
Comments 
I find all of you in contempt of not responding to the negative views of the public that have already been voiced on this subject.  My feeling is that all of you should 
be recalled!  This matter isn't rocket science! 
2/23/2026 
Carol 
Huggins 
2_23 Registration 
Comments 
What safeguards are there regarding energy costs and water usage? 
2/23/2026 Megan Lucin 
2_23 Registration 
Comments 
Thank you for the opportunity to be a part of this conversation. 
2/23/2026 Amber Hall 
2_23 Registration 
Comments 
Why are you building a data center in the desert when the future of our water and energy resources is already so uncertain? This is a cruel and unnecessary use of 
those resources and you know it.  
2/23/2026 
Laura 
Anderson 
2_23 Registration 
Comments 
I’d like no data centers in Tucson, but if that ship has sailed, we need to make sure we don’t end up like the other cities without reliable running water. Don’t let Pima 
County become the new Newton County, GA!! https://youtu.be/DGjj7wDYaiI 
2/23/2026 
Kathleen 
Wilber 
2_23 Registration 
Comments 
Why should our quiet beautiful area be sacrificed to increase profits for the top four data center investors: Amazon Web Services, Microsoft Azure, Meta Platforms 
and Google Services. There will be environmental damage, noise pollution, increased traffic. 
2/23/2026 
Sheila  
McBride 
2_23 Registration 
Comments 
Plan to not pass on extraordinary Energy demand on to residents and businesses. Plan to refuse data centers in the desert. Plans to prevent contamination of 
environment if coolant is proposed instead of water. 
2/23/2026 Nic Adams 
2_23 Registration 
Comments 
Against Data Center. Not enough jobs, too much strain on local ecology. We literally don't have the water to sustain this nor do citizens want to carry the burden of 
increased utilities to give IT companies tax breaks. NO. Absolutely NO.  
2/23/2026 Adena Bank 
2_23 Registration 
Comments 
Having data centers in this area is absolutely insane. Our water is in peril. We have no business doing anything to risk any more water and energy uses. Say absolutely 
no to this. 
2/23/2026 
Christopher 
Kloeppinger-
Todd 
2_23 Registration 
Comments 
Based on historical data, what major realistic, proven long-term benefits can a large-scale data center provide outside of short-term contracts for large construction 
outfits and low-pay facility jobs, that could justify the risk and expense to the region

Feedback Received on Large Scale Datacenters (3_12_2026) 
5 
2/23/2026 
kristin 
eberhardt 
2_23 Registration 
Comments 
Convince me this won't affect Tucson's infrastructure - water, electricity, etc. 
2/23/2026 john divjak 
2_23 Registration 
Comments 
What will this Data Center benefit the people of this area, in ways that will make this a better place to live?  A large percentage of citizens moved to this area for 
retirement, pollution free air, and a peaceful, noise-free environment. 
2/19/2026 Dan Hunt 
2_19 Registration 
Comments 
Statements in the meetings are misguided.  Working tangential to data centers world wide there should be adoption from China and the EU for better data center 
zoning and environmental impact.  There is no note on construction our requirements on energy efficiency (PDU) or e-waste.  Energy loading (specifically to AI) 
should be of note and TEP should not be at the table but community experts. 
2/19/2026 Carissa Sipp 
2_19 Registration 
Comments 
Many statements in the meeting notes from the ‘experts’ on the ‘committee’ seem to be misguided and there is a misunderstanding in AI/ML and the 
HW/infrastructure as well as power loading, jobs provided.  Natural gas is not a green generator.  There is new battery technology in EVs in China that has thermal 
stability- these are cheaper (Na+ battery technology).  There are papers from MIT and this battery technology is production ready.  These zoning requirements should 
require this technology and there is no reason to not contain or stop generators from running with a proper establishment of backup - true renewable.  The team 
making decision should look to China’s build out requirements (truly pushing for energy efficiency and environmental protection).  The EU is also releasing standards 
and policies the team should review- to be released Q1 2026.  The efficiency of any power to these centers in such heat is ridiculous.  The thermals of the GPUs, 
TPUs, ASICs and CPUs (varies by customers) creates a tremendous burden on power and water.   There is no reason to have a data center in Tucson of hyper scale 
capacity and there should be a 1 yr moratorium on anything until voters can decide on regulations.  A panel of corporation reps and a few community members who 
may not understand systems we need to constrain is not adequate. 
2/19/2026 
Lanie 
Herrera Lally 
2_19 Registration 
Comments 
I am worried about water usage while we are in a water shortage in the desert. 
2/19/2026 Donald Ries 
2_19 Registration 
Comments 
I have questions:  Are these large facilities being required to generate a significant portion or all of the electricity they use?  Where will the water they use come 
from?  How will their water use affect our ground water and CAP water? 
2/19/2026 April 
2_19 Registration 
Comments 
There should be an area of interest for just banning large scale data centers outright, you'd probably get a lot of signups 
2/19/2026 Jon Ralston 
2_19 Registration 
Comments 
The Colorado River is in decline and there is no agreement among states that use the Colorado River.  NASA satellites show Arizona aquifers are in decline.  Why are 
we wasting water on cooling and power generation for data centers? 
2/19/2026 
Reed 
Spurling 
2_19 Registration 
Comments 
I am worried that this public input process is intended to manufacture consent for something that many in Tucson do not want at all. For example, my primary area 
of interest here—banning large data centers in the city—is not listed on this form. Banning large data centers entirely through zoning might be necessary to 
adequately protect our water and our electric grid given the circumstances, but this deserves more discussion. 
2/19/2026 
2_19 Registration 
Comments 
Though I am unhappy with being siloed, I selected "Energy and Water Use" because I want to see enforceable limits on how much water and energy data centers in 
Tucson are allowed to use. Please take a look at this year's Colorado River snowpack data [https://graphs.water-data.com/ucsnowpack/], then decide for yourself 
whether you think our city will need to use more water or less water over time. We cannot support large data centers without sacrificing other more useful things. 
2/19/2026 
2_19 Registration 
Comments 
Please continue to listen to as many Tucsonans as possible and continue to reform your processes so that the field is no longer tilted in favor of wealthy developers. I 
am paying attention to Mayor and Council and City Management's entanglements with corporations and I am ready to call them out as necessary. 
2/19/2026 
Betsy 
Wilkening 
2_19 Registration 
Comments 
Will the public have time to speak? Why was No Desert Data Center Coalition not provided a place for speaking? 
2/19/2026 
Kathryn 
Anderson 
2_19 Registration 
Comments 
Yes, I have questions.  No accommodations 
2/19/2026 
Leonna 
Sierra 
2_19 Registration 
Comments 
Will there be a ASL interpreter? 
2/19/2026 Reyes 
2_19 Registration 
Comments 
Data centers have no place in a Desert during a water crisis. Why are we exploiting our finite resources for limited monetary gain. We will not be able to afford 
desalination/decontaminated water costs when we run out of fresh water. 
2/19/2026 Hanna Egan 
2_19 Registration 
Comments 
No water for data centers

Feedback Received on Large Scale Datacenters (3_12_2026) 
6 
2/23/2026 
Julia 
Guglielmo, 
SW Decision 
Resources 
2_23  Zoom Poll 
Need more information about what setbacks are standard and comparisons with existing plans and projects 
2/23/2026 lee stanfield 
2_23  Zoom Poll 
We need to do everything possible to stop all big data centers from locating here. 
2/23/2026 Vivek 
2_23  Zoom Poll 
Setbacks don’t matter. We need a minimum distance a data center can be from zoned residential. Like 20 miles 
2/23/2026 Kya 
2_23  Zoom Poll 
On the proposed setback? Increase the distance. 
2/23/2026 
Nicole 
Hagedorn 
2_23  Zoom Poll 
This is far too small of a setback for both residential and commercial buildings given the pollutants given off by data centers and corresponding health concerns. 
2/23/2026 Stella smith 
2_23  Zoom Poll 
We are being sold out to consider having data centers at all. We DO NOT have the wter resources that most comunities have and should NOT be selling out those 
resources to DATA Centers that can go ANYWHERE ELSE in the US. 
2/23/2026 Beth Lehr 
2_23  Zoom Poll 
These proposed centers would be HUGE. There needs to be a distance measured more than hundreds of meters. 
2/23/2026 
Miriam 
Robles 
2_23  Zoom Poll 
we dont want data centers 
2/23/2026 
Heather 
Pruzan 
2_23  Zoom Poll 
Not set back far enough 
2/23/2026 
Daniel 
Dempsey 
2_23  Zoom Poll 
I think Chandler or Mesa just implemented a 1,000ft setback for new battery systems. 
2/23/2026 Susan Tiss 
2_23  Zoom Poll 
Residential setbacks should be 800 to 1000 feet or more.  But really we just shouldn’t have them in any residential area at all. 
2/23/2026 Bev Paul 
2_23  Zoom Poll 
What if they are not allowed within 25 miles away w/private wells 
2/23/2026 
Megan 
Martin 
2_23  Zoom Poll 
We can't even be considering putting something like this near schools or homes. It's shown these centers do damage to public health. Look up what is happening in 
Virginia (data center ally) we cannot do this, it is no where near approptiate. 
2/23/2026 
Eric 
Klingberg 
2_23  Zoom Poll 
Noise pollution from data centers have been shown to reach 2.5 miles+ away. This seems WAY too close. 
2/23/2026 
Megan 
Milton 
2_23  Zoom Poll 
The citizens of Tucson do not want any data centers. 
2/23/2026 
Priscilla 
Watts 
2_23  Zoom Poll 
what about lights, signage, etc? 
2/23/2026 Erin Harris 
2_23  Zoom Poll 
What is the setback from industrial zoning or uses? 
2/23/2026 
Patricia 
Piasecki 
2_23  Zoom Poll 
i think it should be at least a mile 
2/23/2026 
Wil 
Schuiteman, 
AIA 
2_23  Zoom Poll 
400-ft is NOT FAR ENOUGH!!!!!!!!!!!
2/23/2026 Jon Ralston 
2_23  Zoom Poll 
Ban hyperscale data centers 
2/23/2026 Vivek 
2_23  Zoom Poll 
The definition needs to be based on energy use not area 
2/23/2026 Kya 
2_23  Zoom Poll 
There needs to be more focus on energy use 
2/23/2026 
S. 
Vandergriff 
2_23  Zoom Poll 
how was the sq feet of 50,000 determined? 
2/23/2026 Stella smith 
2_23  Zoom Poll 
the moe public review the better. one public meeting is not enough. should have 3 or 4 
2/23/2026 
Paul 
Stapleton-
2_23  Zoom Poll 
Here is the question that I posted in my registration links: "Will we define and commit to requiring a Community Benefits Agreement, with succession clauses and 
enforcement mechanisms with all development entities? Thank you for this public meeting opportunity."

Feedback Received on Large Scale Datacenters (3_12_2026) 
7 
Smith, 
Arizona CD6 
2/23/2026 Raye Winch 
2_23  Zoom Poll 
I do not see anything here that looks at the amount of water and electricity used and takes into context how that would impact city residents (both human and 
beyond human) 
2/23/2026 
Miriam 
Robles 
2_23  Zoom Poll 
We don't want data centers 
2/23/2026 
Heather 
Pruzan 
2_23  Zoom Poll 
More notice to all neighbors not just hoa 
2/23/2026 
Daniel 
Dempsey 
2_23  Zoom Poll 
“Same controlling ownership” could be manipulated, no? 
2/23/2026 Susan Tiss 
2_23  Zoom Poll 
Large scale is 10,000 square ft or more 
2/23/2026 
Kathleen 
Dreier 
2_23  Zoom Poll 
Just look at the questions in chat to see 
2/23/2026 Carissa Sipp 
2_23  Zoom Poll 
The largest size shows a misunderstanding from both the advisory council and the town on AI, data center architecture.  This is ridiculous 
2/23/2026 Dan Hunt 
2_23  Zoom Poll 
Definition is way too large. Should be 5000 sq ft 
2/23/2026 
Reed 
Spurling 
2_23  Zoom Poll 
The notification area should be 20 miles in radius 
2/23/2026 
Megan 
Martin 
2_23  Zoom Poll 
The questions surrounding water and energy are not being answered clearly enough to feel confident in zoning proposal. Not to mention the consistency of not 
listening to the public. There should not be a data center here. 
2/23/2026 
Eric 
Klingberg 
2_23  Zoom Poll 
Noise pollution from data centers can extend beyond two miles. I recommend sending mail further than that radius. 
2/23/2026 Erin Harris 
2_23  Zoom Poll 
If a data center proposal is located in I-2 and meets ALL regulatory requirements re: zoning, setbacks, water use, electricity, everything... why is it still discretionary? 
2/23/2026 
Victoria 
Sammons 
2_23  Zoom Poll 
There is so much damage being done by these centers in other states and no one is looking into the long term impacts. What are you doing to prevent data centers 
from taking on a "we will fix it later" mentality?  
2/23/2026 Rachel Cook 
2_23  Zoom Poll 
My family and I do not feel satisfied that a defining the data center in this way will protect us from environmental/health issues as a result of their building them in 
our area 
2/23/2026 
Patricia 
Piasecki 
2_23  Zoom Poll 
there should be greater distance of notification 
2/23/2026 
Wil 
Schuiteman, 
AIA 
2_23  Zoom Poll 
Notice should be a 1 mile radius 
2/23/2026 Jon Ralston 
2_23  Zoom Poll 
Ban hyperscale data centers 
2/23/2026 lee stanfield 
2_23  Zoom Poll 
No one has yet answeredmy question about TEP’s water usage directly from the aquifer? 
2/23/2026 April 
2_23  Zoom Poll 
You are not taking into account current customers and how they will be affected, i.e., rates, current action plans, and health outcomes. 
2/23/2026 
S. 
Vandergriff 
2_23  Zoom Poll 
How would violations of the regulations be addressed/handled? 
2/23/2026 
Nicole 
Hagedorn 
2_23  Zoom Poll 
WE DO NOT WANT DATA CENTERS AT ALL IN TUCSON. WE WANT THE CITY TO BACK UP RESIDENTS AND REJECT ALL PROPOSALS. THE PROPOSED REGULATIONS 
SHOULD REFLECT THAT. 
2/23/2026 Stella smith 
2_23  Zoom Poll 
should be more restrictive. why do we need to have ANY data centers??? Evidently mayor and council made their own personal decisions about this without 
sufficient public input on whether toallow these things AT ALL 
2/23/2026 Raye Winch 
2_23  Zoom Poll 
I believe both should take into account the impact that the amount of water and energy use would have on human and beyond human life. Not just to evaluate how 
much conservation is incorporated into the plans, but how will this energy and water use affect life and the long term viability of life in the region

Feedback Received on Large Scale Datacenters (3_12_2026) 
8 
2/23/2026 Mark Estes 
2_23  Zoom Poll 
Please include the resolutions offered by Beal Infrastructure to the town of Marana so that Tucson residents can be informed about how Beal Infrastructure intends 
of easing the communities concerns 
2/23/2026 
Miriam 
Robles 
2_23  Zoom Poll 
Absolutely Not, we need detail how the power will be generated, who will pay for that infraestructure, we need renewable energy. 
2/23/2026 
2_23  Zoom Poll 
In terms of water usage, none, not one drop of our valuable water. 
2/23/2026 
Daniel 
Dempsey 
2_23  Zoom Poll 
Need more disclosure around what new infrastructure is required. Who is paying for it. How they are paying for it. 
2/23/2026 Susan Tiss 
2_23  Zoom Poll 
We should not have large-scale and hyper-scale data centers here.  They don’t fit in this environment.  We don’t have the resources to support them and also 
support the population.  Why won’t you listen to us when we tell you we don’t want this?  
2/23/2026 
Kathleen 
Dreier 
2_23  Zoom Poll 
Review chat comments 
2/23/2026 Bev Paul 
2_23  Zoom Poll 
NO data centers. Period. 
2/23/2026 
Megan 
Martin 
2_23  Zoom Poll 
A data center here just does not make sense. We don't have the water resources, period. We also can't get clear answers about how this will effect energy use AND 
water use with TEP. This isn't going to just do nothing, it's a large center that requires tons of resources and we cannot provide it.  
2/23/2026 
Megan 
Milton 
2_23  Zoom Poll 
No resources for data centers. We do not want it. 
2/23/2026 Rachel Cook 
2_23  Zoom Poll 
they are wholly insufficient and should have been set before the beale data center was even proposed!!!!!! 
2/23/2026 
Wil 
Schuiteman, 
AIA 
2_23  Zoom Poll 
More data needs to be collected, analyzed first. 
2/23/2026 Jon Ralston 
2_23  Zoom Poll 
No water for hyperscale data centers directly or indirectly (i.e. via TEP) 
2/23/2026 
Julia 
Guglielmo, 
SW Decision 
Resources 
2_23  Zoom Poll 
Need more info about amount of noise centers are expected to make, as well as other anticipated impacts 
2/23/2026 Vivek 
2_23  Zoom Poll 
https://www.youtube.com/watch?v=_bP80DEAbuo please watch this!!! 
2/23/2026 Kya 
2_23  Zoom Poll 
What is the maximum allowable level being considered? What about high pitched sounds and vibrations? 
2/23/2026 
S. 
Vandergriff 
2_23  Zoom Poll 
How will offences be enforced?  How will any of this be enforced? 
2/23/2026 Stella smith 
2_23  Zoom Poll 
The City has SO MANY environmental regulations currently that they don't enforce because they don't hire people to check or to enforce ocmplaints.  The 
enforcement regulations here may be passed but totally mean absolutely noTHInG. TO CITIZENS. 
2/23/2026 
Natalie 
Shepp 
2_23  Zoom Poll 
There should be limits on the number of generators 
2/23/2026 Julie Dittmer 
2_23  Zoom Poll 
Would the City consider requiring a developer-funded public health impact assessment for large-scale data centers, similar to required traffic or acoustic studies, to 
evaluate heat, air quality from generators, noise-related health impacts, and emergency service impacts? 
2/23/2026 Raye Winch 
2_23  Zoom Poll 
Can you share more context on noise, such as a public health analysis of noise impact and an environmental impact on noise on wildlife? I don't think I have enough 
information from this presentation to make a determination 
2/23/2026 Beth Lehr 
2_23  Zoom Poll 
The noise level isn't specified. 
2/23/2026 
Divinity 
Caldwell 
2_23  Zoom Poll 
Not specific enough, not adequate protections l. Still to vague, how would users define an emergency? Stricter language should be used 
2/23/2026 
Miriam 
Robles 
2_23  Zoom Poll 
Bloom Energy is the latest battery backups, causes zero noise.

Feedback Received on Large Scale Datacenters (3_12_2026) 
9 
2/23/2026 
Andi 
Faulkner-
Harrison 
2_23  Zoom Poll 
does not address infrasound 
2/23/2026 
Daniel 
Dempsey 
2_23  Zoom Poll 
What are setbacks on generators? 
2/23/2026 Susan Tiss 
2_23  Zoom Poll 
These regulations don’t go far enough, don’t call out actual standards for level and type of noise, and they do include no info about what the penalties would be. 
2/23/2026 
Reed 
Spurling 
2_23  Zoom Poll 
Require all applicants to supply 1) noise modeling assumptions, 2) an expected decibel contour plot, referenced to a specific sound pressure, 3) an expected 
frequency spectrum, and 4) an expected heat map of frequency vs power 
2/23/2026 
Sarah 
Rotenberger 
2_23  Zoom Poll 
what constitutes allowed emergency use? how is “emergency” defined and by whom? 
2/23/2026 
Megan 
Martin 
2_23  Zoom Poll 
https://youtu.be/t-8TDOFqkQA?si=o6QPXcNNjvDm90Dh 
2/23/2026 
Megan 
Milton 
2_23  Zoom Poll 
There is no information regarding the level of noise that we're talking about? 
2/23/2026 
Victoria 
Sammons 
2_23  Zoom Poll 
This is not adequate or appropriate for the areas. How will this be enforced? Which 400ft away neighborhood are you willing to watch get destroyed? I can have one 
drone ruin a whole hiking experience and those are not very loud. 
2/23/2026 Rachel Cook 
2_23  Zoom Poll 
are current data from large and hyper scale data centers around the country being included in the research for this regulation? does topography specific to the 
desert affect this compared to other areas where data centers are located? 
2/23/2026 
Wil 
Schuiteman, 
AIA 
2_23  Zoom Poll 
Require ALL Data Ctrs. to have roof-mtd. PV systems to store energy rather than using any type of fossil fuels. 
2/23/2026 Jon Ralston 
2_23  Zoom Poll 
Ban hyperscale data centers 
2/23/2026 April 
2_23  Zoom Poll 
You’re allowing acres of impervious pavement that run-off 
2/23/2026 Kya 
2_23  Zoom Poll 
20ft is so little. 
2/23/2026 
Nicole 
Hagedorn 
2_23  Zoom Poll 
As someone mentioned in the comments, heat generated from data centers is not being taken into account here. 
2/23/2026 Stella smith 
2_23  Zoom Poll 
nOT RESTRICITEVE ENOUGH. no GUARANTEE OF ANY ENFORCEMENT EVEN IF ESTABLISHED.  THE CITY IS VERY POOR ON KEEPING MANY OF ITS PRIOR 
COMMITMENTS RE ENFORCEMENT 
2/23/2026 Julie Dittmer 
2_23  Zoom Poll 
I need time to analyze each standard and look at other standards to compare - is there a way to have meeting materials and then give feedback? 
2/23/2026 Raye Winch 
2_23  Zoom Poll 
I believe any landscaping and buffering standards must include a thorough analysis on potential health impacts and should include a required public health analysis 
2/23/2026 Beth Lehr 
2_23  Zoom Poll 
20 feet of landscaping does not take the place of an acre worth of an ecosystem. 
2/23/2026 Susan Tiss 
2_23  Zoom Poll 
No data centers of these sizes are appropriate and no amount of landscaping will make them appropriate. 
2/23/2026 
Reed 
Spurling 
2_23  Zoom Poll 
Require continuous tree cover over 100% of each lot, seriously 
2/23/2026 
Sarah 
Rotenberger 
2_23  Zoom Poll 
would like to see required landscaping as a percent of total land usage 
2/23/2026 
Eric 
Klingberg 
2_23  Zoom Poll 
I like the inclusion of rain capturing, but a 50,000+ acre huge building with 20ft around it in landscaping seems disproportionate. 
2/23/2026 
Megan 
Milton 
2_23  Zoom Poll 
Slapping native plant landscaping on this public safety and health hazard is a joke. Why not plant some palm trees while we're at it? 
2/23/2026 
Victoria 
Sammons 
2_23  Zoom Poll 
I don't even know how to process this comment as it is just so terrible for the environment and trying to make these regulations is like paving over the Desert 
Museum for more parking lot.

Feedback Received on Large Scale Datacenters (3_12_2026) 
10 
2/23/2026 
Wil 
Schuiteman, 
AIA 
2_23  Zoom Poll 
Data Ctrs. need to be held at a higher standard than ANY Commercial project.  20-ft buffer is a joke!  Stormwater use should be set @ 80%. 
2/23/2026 Jon Ralston 
2_23  Zoom Poll 
Ban hyperscale data centers 
2/19/2026 
Survey 2.19 Q2 
We should not have data centers in a place that can barely support what it already has there. 
2/19/2026 
Survey 2.19 Q2 
What is your stance on co-locations and Power Coupling? 
2/19/2026 
Survey 2.19 Q2 
Both open and protects - good job 
2/19/2026 
Survey 2.19 Q2 
A little concern data centers will find a way to not report real water usage 
2/19/2026 
Survey 2.19 Q2 
Make the rules as restrictive as possible 
2/19/2026 
Survey 2.19 Q2 
The premise of this meeting that we want data centers and that they are acceptable/inevitable in our community is infuriating to me. 
2/19/2026 
Survey 2.19 Q2 
As to both, demonstrated access should be not just time of application, but e.g. for 20-50 years minimum 
2/19/2026 
Survey 2.19 Q2 
Must have ability to shut off water of violation of limits. Fines are not enough. 
2/19/2026 
Survey 2.19 Q2 
On water, is the "no potable water" requirement only applicable to data centers that don't meet the threshold of large water user? 
2/19/2026 
Survey 2.19 Q2 
What's to stop them from changing their intended energy use mix later? These regulations are weak 
2/19/2026 
Survey 2.19 Q2 
We aren’t even asking the right questions to get honest estimates on resource use. Even if we were, data centers aren’t honest in their answers. Don’t let data 
centers poison water with chemicals like PFAS. Tucson has already poisoned our communities water in the past and we can’t even address current issues with PFAS. 
Tucson Water doesn’t even know what pipes have lead in them. There needs to be punishment and accountability for violated agreements as well, they can’t project 
usage and then overdraw later  
2/19/2026 
Survey 2.19 Q2 
Where do I start.  Water is used in energy thus there should be a plus in the regulation.  Monitoring should be part of this as well.  Need to add more comments but 
will provide be via email 
2/19/2026 
Survey 2.19 Q2 
Even with regulations, we don’t have the means or resources to let them be expendable for such a long period of time. 
2/19/2026 
Survey 2.19 Q2 
No large data centers. 
Period. 
2/19/2026 
Survey 2.19 Q2 
There is no accountability in here. As we have seen with Beale they will say anything to get what they want. They told ACC that nuclear is renewable. There is no big 
picture or accountability about the amount of water needed to produce energy. You should define renewables and make them provide energy locally through 100% 
renewable. Don’t let them get by with just credits 
2/19/2026 
Survey 2.19 Q2 
Don't use water that the desert doesn't even have 
2/19/2026 
Survey 2.19 Q2 
don’t steal water from a desert, a literal desert!! 
2/19/2026 
Survey 2.19 Q2 
It seems to be a good start.  I’m not sure what other standards might be needed 
2/19/2026 Emma 
Nichols 
Survey 2.19 Q2 
they need to reuse water, use rain water, ground water, they will not use drinkable water. Solar power should be considered. no using our power grid 
2/19/2026 
Survey 2.19 Q2 
Energy: should require protections for utility rate payers should require a percentage of energy from renewable sources & limit fossil fuels. should address nuclear 
(small scale) EMFs on-site and offsite should be addressed why no solar requirements? Water: need commtment to reduce use parallelll to reduced avalability 
2/19/2026 Adamir 
Quraishy 
Survey 2.19 Q2 
Mainly Id like to see more regarding tucson offset cost, i.e. how to ensure a decrease in water prices and an effort to ensure that there is a limitation of impact on the 
average Tucson resident water cost. How will that responsiblity be borne by the data center 
2/19/2026 hanna egan 
Survey 2.19 Q2 
no river ground water, no clean water, no generators no batteries no gas 
2/19/2026 william 
wilkening 
Survey 2.19 Q2 
does large quanity use ordinance apply to private well user? how to hold developer to what they say they are going to use; again need to consider water use of 
power generator ; need to sue state to change to local control  
2/19/2026 
Survey 2.19 Q2 
do you have any idea how much waver they use 
2/19/2026 
carol price 
Survey 2.19 Q2 
the requirement of adequate water supply is the main sticking point. In Arizona there is no such thing it will simply get less and less adequate as time goes on. Not 
sure how the large water user ordinacne can allow such high water usage w/o endangering the rest of the community

Feedback Received on Large Scale Datacenters (3_12_2026) 
11 
2/19/2026 lynn price 
Survey 2.19 Q2 
"proposed" and "adequate" are subjective and not enforceable 
2/19/2026 
Survey 2.19 Q2 
ENFORCE this or it is meaningless 
2/19/2026 Dravea 
Survey 2.19 Q2 
for data centers would not have access to potable water to cool off equipment energy use for them solar (aka no use of our power grid) 
2/19/2026 
Survey 2.19 Q2 
what does applicant certifying access to adequate water supply "even mean when our city is located in a region experiencing extreme drought rising temperature 
and CAP limitation as the Colorado river dries up? where will the huge amounts of water that these centers will use actually come from? Our watershed and or other 
communities! Access to energy supply our shared grid and or energy generation that will use our water and pollute our environment (especially if not required to be 
100% renewable without credits)  
2/19/2026 
Survey 2.19 Q2 
afraid data centers will be violating water usage limits and just pay fines to get away with using more water. 
2/19/2026 
TF Johnson 
Survey 2.19 Q2 
If you want them to use energy have them use 100% rewnewable they gotta work for it. if you cant regulate energy mix they should income the water use on the sitc 
does not match up with the level of water scarcity and has too many loopholes  
2/19/2026 
85719 
Survey 2.19 Q2 
1) require solar or all rooftop of data center bed 2) Nothing pricing of energy and water use= as residential uses we are charged on a sliding scale where by more use
equals higher prices large scale users must pay more or a scale that is comparable to residential users w/ regard to amount used. 3) huge scale users should absorb
all cost associated w/ their impact on electrical and water infrastructure imposters needed for their use.
2/19/2026 
Survey 2.19 Q2 
I think they should be able to prove they can access an extra 75% I do like the prohibiting use of potable water 
2/19/2026 Dominik 
Soto 
Survey 2.19 Q2 
Even with restrictions and regulations we do not have the resources to sustain a long running data center. We do not get our water back! 
2/19/2026 Jessica 
Ramirez 
Survey 2.19 Q2 
7,480,000 gallons (or more) monthly average. we dont have the resources to consider this. what are the consequences to regulation being violated? Big tech 
companies can easily pay off fines so fines dont stop them.  
2/19/2026 
Survey 2.19 Q2 
How will businesses be accountable to their conservation plans? Who defines respectufl water use? How are adequate enrgy & water supplies defined? Impact to 
citizens considered? 
2/19/2026 
Survey 2.19 Q2 
energy: generator use is problematic 
2/19/2026 Adrian 
Fernandez 
Survey 2.19 Q2 
The energy used and generated should be a public utility. If these centers are only going to grow (I mean they will want to build data centers in 5, 10, 20 years) what 
are is the cush? waiting and seeing how (the good and bad) of how other projects play out may be wise 
2/19/2026 
Survey 2.19 Q2 
If you cant regulate energy use, source are cast the City should ban large scale data centers. 
2/19/2026 
Survey 2.19 Q2 
Why cant demad mix from providers? Not one drop for data 
2/19/2026 
Survey 2.19 Q2 
you want to require they show access to power/water but not the impact it would have on the resource or if the use would affect anyone else ie power goes up 
water deplited. Require nuterz or better resource usage is solar reclaimed water/ use  
2/19/2026 
Survey 2.19 Q2 
should rquire demonstreated access to energy not only @ time application but for determined period of time, e.g ensuit. ditto re water but for much longer period 
e.g 50 years
2/19/2026 
Survey 2.19 Q3 
Not nearly enough for generator air pollution, noise, and heat produced 
2/19/2026 
Survey 2.19 Q3 
No data centers in Tucson 
2/19/2026 
Survey 2.19 Q3 
That’s not nearly enough. That is laughable and complete buffoonery. No data centers. 
2/19/2026 
Survey 2.19 Q3 
To be honest, I wasnt listening. I was thinking of my QA questions 
2/19/2026 
Survey 2.19 Q3 
Not large enough to address noise and other impacts. 
2/19/2026 
Survey 2.19 Q3 
Will send email with feedback 
2/19/2026 
Survey 2.19 Q3 
Good distance 
2/19/2026 
Survey 2.19 Q3 
Make the setback the length of the property 
2/19/2026 
Survey 2.19 Q3 
Not sure how long 200 or 400 feet is. 
2/19/2026 
Survey 2.19 Q3 
Setbacks footage should be larger. 
2/19/2026 
Survey 2.19 Q3 
Need more info on noxious range 
2/19/2026 
Survey 2.19 Q3 
These large scale data centers shouldn't exist. If they do, the setbacks are not enough. Make the setbacks big enough to make sure the can't get built

Feedback Received on Large Scale Datacenters (3_12_2026) 
12 
2/19/2026 
Survey 2.19 Q3 
Ngl, this section was not clearly displayed. So I am unsure what was being communicated. 
2/19/2026 
Survey 2.19 Q3 
Need to take into account the infrastructure like parking and any extra generators 
2/19/2026 
Survey 2.19 Q3 
Details of noise generation and dampening from generators is unclear. 
2/19/2026 Emma 
Nichols 
Survey 2.19 Q3 
increase setback 
2/19/2026 
Survey 2.19 Q3 
no use of our power grid. please look into cleaner or greener power alternatives. 
2/19/2026 
Survey 2.19 Q3 
these need huge setbacks - 400 ft & 200 ft are woefully inadequate 
2/19/2026 
Survey 2.19 Q3 
Noise: who pays for testing to verify levels are being maintained? How often is testing done? hwat hapens if levels are exceeded? 
2/19/2026 
Survey 2.19 Q3 
Generators: Priority should be to use large- format battery (energy) storage such as vanadium flow batteries, etc paired with solar wind 
2/19/2026 Aamir 
Quraisz 
Survey 2.19 Q3 
straight up dont know what is going on 
2/19/2026 
Survey 2.19 Q3 
I'd like to see more requirements into reducing noise research. I.e. a tax related to funding. Data center and similar noise reduction requirements 
2/19/2026 Diane 
Marzonie 
Survey 2.19 Q3 
400 ft is not enough. They should pick a space thats farther away from homes and businesses 
2/19/2026 
Survey 2.19 Q3 
who chooses the members at the independent noise study. Variety of folks outside of the government/state/ adj employees 
2/19/2026 Hanna Egan 
Survey 2.19 Q3 
More standards more rules we dont want this the whole project should be set back 
2/19/2026 
Survey 2.19 Q3 
too loud youre letting them ruin our lives 
2/19/2026 William 
wilkening 
Survey 2.19 Q3 
what about auxilary structures: parking, back up generation, fuel storage; pollution numbers at property line? 
2/19/2026 
Survey 2.19 Q3 
Need to have correct D6 levles for creiteria 
2/19/2026 
Carol Price 
Survey 2.19 Q3 
Every design standard related to data center zoning should be the strictest & the highest standards to provide the most protection to our community our 
environment and our people over giving concessions to the corporations 
2/19/2026 
Survey 2.19 Q3 
Again, the highest standards should be in place to protect humans + wildlife + the environment - low frequency noise can be very problematic 
2/19/2026 Lynn Price 
Survey 2.19 Q3 
too small 
2/19/2026 
Survey 2.19 Q3 
I dont personally know enough about decibles but looks convincing 
2/19/2026 
Survey 2.19 Q3 
make the steback the length of each property, seriously 
2/19/2026 
Survey 2.19 Q3 
you need a much better understanding of low-frequency noise generation 
2/19/2026 
Survey 2.19 Q3 
ban all fossil fuel generators- we are in a climate crisis 
2/19/2026 Dravea 
Survey 2.19 Q3 
600 ft for residential 400ft for office/commercial 
2/19/2026 
Survey 2.19 Q3 
no use of the powergrid unless absolutely necessary 
2/19/2026 
Survey 2.19 Q3 
The setbacks arent nearly enough- these centers dont belong anywhere in Tucson. I-2 zones are mostly on the southside + will impact the health of our communities 
because of the noise + pollution 
2/19/2026 
Survey 2.19 Q3 
who's conducting the noise study? Do decibel limits at the property line refer to dba or abc? These centers produce a flat hum or low-frequency noise thats more 
often felt than heard over a wider area with signficant health impacts. 
2/19/2026 
Survey 2.19 Q3 
The generators will use diesel gas - this will harm neighborhs and our climate. There should be no data centers using fosil fuels esp in the desert 
2/19/2026 
Survey 2.19 Q3 
200 and 400 ft setback do not seem enough 
2/19/2026 
Survey 2.19 Q3 
If parking area is smaller that means not enough people would get employed. noise travel different quiet times which would make noises at data centers more 
detectable 
2/19/2026 TF Johnson 
Survey 2.19 Q3 
I dont trust like that 
2/19/2026 
Survey 2.19 Q3 
natural gas generators are what makes it so bad in other locales. Thorium reactors or nothing, I can think of several engineers willing to agree.

Feedback Received on Large Scale Datacenters (3_12_2026) 
13 
2/19/2026 
85719 
Survey 2.19 Q3 
really depends on location & nearby zoning & build out 1) I live nearby a wash--> noise from outdoor events travels the wash and impacts residents adversely it is 
affected by air temperature and other factors--> consult w/ sound engineers as well City & County noise ordinances are not adequate today w/o data centers in the 
mix. 2) what about wording that deals w/ code violations= penalties; timing of court cases; ability to halt business if pattern of violations
2/19/2026 
Survey 2.19 Q3 
currently noise violations are pretty much ignored by the City & County. Just measuring decibles is not sufficient - ambient noise from traffic and other everyday 
sounds is totally different from noise from things like amplified music or generators or heat pumps etc. We are told essentially to pump up w/ adverse noise because 
it is not a health issue. 
2/19/2026 
Survey 2.19 Q3 
it should be bigger perhaps + 70% back from property line 
2/19/2026 
Survey 2.19 Q3 
I want noise limit to be 0 D at property line I'm not joking 
2/19/2026 
Survey 2.19 Q3 
I want only battery! If they run out they should have planned better 
2/19/2026 Dominik 
Soto 
Survey 2.19 Q3 
The pollution will still be there just farther away. It is still going to affect our community 
2/19/2026 
Survey 2.19 Q3 
The noise pollution is a good concern but our concerns lie where the resources are being used. the ones being used to create the noise 
2/19/2026 Jessica 
Ramirez 
Survey 2.19 Q3 
Do these setbacks protect us from air pollution? 400 feet is not nearly enough .1 mile =5280  400 feet=.0076 miles only about a minute or two of distance at a normal 
walking pace. unnacceptable 
2/19/2026 
Survey 2.19 Q3 
who conducts independent noise study? How are measurements of proposals done? What if proposal isnt accurate? What is an emergency ? How does a data center 
have an emergency?  
2/19/2026 
Survey 2.19 Q3 
My concern is that set back may not be adequate to dampen noise produced by generators 
2/19/2026 
Survey 2.19 Q3 
generator proposal for natural gas & no load switching seem acceptable 
2/19/2026 Adrian 
Fernandez 
Survey 2.19 Q3 
once again no need to be first learn from others 
2/19/2026 
Survey 2.19 Q3 
more perfect union, a journalist project has done various interview and research on above questions. 
2/19/2026 
Survey 2.19 Q3 
would need to be updated if a higher level or larger 1M sf center were to be allowed. 
2/19/2026 
Survey 2.19 Q3 
How much heat will large scale data center generate? Set back should be the length of the property 
2/19/2026 
Survey 2.19 Q3 
"natural" aka fracked gas is not clean. Renewable energy and battery backup only. 
2/19/2026 
Survey 2.19 Q3 
Need more info about how far from nearest residence >10 miles 
2/19/2026 
Survey 2.19 Q3 
Define emergency/ no diesel/ cant determine noise regs w/o knowing min. distance from residences 
2/19/2026 
Survey 2.19 Q3 
still to loud no teeth to proposal 
2/19/2026 
Survey 2.19 Q3 
I doubt the setbacks (400 ft) are sufficient to amilirate noise/glare radiant heat etc. 
2/19/2026 
Survey 2.19 Q3 
I lack enough info to understand how noise studies could be done meaningful prior to construction + occupancy/use 
2/19/2026 
Survey 2.19 Q4 
Not One Drop for Data! 
2/19/2026 
Survey 2.19 Q4 
Habitat destruction cannot be overstated. 
2/19/2026 
Survey 2.19 Q4 
This is laughable 
2/19/2026 
Survey 2.19 Q4 
Will email 
2/19/2026 
Survey 2.19 Q4 
No amount of buffering is going to mitigate the impact on contaminated water supplies and heat spillover 
2/19/2026 
Survey 2.19 Q4 
Is landscaping and setback requirements redundant? 
2/19/2026 
Survey 2.19 Q4 
In the words of Dr Evil, “how about No!” to the idea of data centers in Tucson. 
2/19/2026 
Survey 2.19 Q4 
Parking lots must have solar coverings and designed to void heat island effect. 
2/19/2026 
Survey 2.19 Q4 
No 
2/19/2026 
Survey 2.19 Q4 
The desert should be left alone. No data centers. If these regulations exist they should be more strict. Low Parking maximums. MAXimums. Native plants. But yeah... 
These large scale dcs shouldn't exist and we should prohibit hem altogether through land use code

Feedback Received on Large Scale Datacenters (3_12_2026) 
14 
2/19/2026 Emma 
Nichols 
Survey 2.19 Q4 
make sure the plants and landscapping is local and non invasive 
2/19/2026 Diane 
Marzonie 
Survey 2.19 Q4 
1/2 the distance of the setback? 
2/19/2026 Hanna Egan 
Survey 2.19 Q4 
no native land (which is all land) 
2/19/2026 
Survey 2.19 Q4 
lol 
2/19/2026 Carol Price 
Survey 2.19 Q4 
better not let them plant anything that needs irrigation 
2/19/2026 
Survey 2.19 Q4 
make requirements more strict 
2/19/2026 Draea 
Survey 2.19 Q4 
make sure here plants are invasive, and are native 
2/19/2026 
Survey 2.19 Q4 
these standards are putting lipstck on a pig; the presentation made clear that theres litle parking because these centers dont have much staffiing- the opposite of 
what we were told by the city and developers of proejct blue last summer. So you all lied. were being presented regulations for a giant warehouse of servers, not for 
jobs but for what?  
2/19/2026 
Survey 2.19 Q4 
dont trust these standards 
2/19/2026 TF Johnson 
Survey 2.19 Q4 
They should no be allowed in any ERZs they ignor potential damage from other sources like the gas generators 
2/19/2026 85719 
Survey 2.19 Q4 
sounds walls plus enhanced native landscaping should be increased or at least an option to impose depending or adjacent built environment & zoning 
2/19/2026 
Survey 2.19 Q4 
with my increase setback there should be live ISO plants I would like lots of parking for all the jobs 
2/19/2026 Dominik 
Soto 
Survey 2.19 Q4 
appropriate sure but its hard to advocate for an establishment that doesnt have the peoples best interest in mind, polluting hurting the people and our land, without 
even doing the least, which is creating more jobs for people to be unhappy at 
2/19/2026 Jessica 
Ramirez 
Survey 2.19 Q4 
not much parking = not many workers= not many jobs. these centers will drain us of resources and will not give back to the community . Feels like a lose lose 
2/19/2026 
Survey 2.19 Q4 
Landscaping is greenwashing. Dont destroy the larel #larelback 
2/19/2026 
Survey 2.19 Q4 
were about to lose 300 acres of beautiful desert to project blue, come on 
2/19/2026 
Survey 2.19 Q4 
feels like it needs more 
2/19/2026 
Survey 2.19 Q5 
What are the parameters that constitute an "emergency"? 
2/19/2026 
Survey 2.19 Q5 
Get rid of data centers. As if a company is gonna adhere to any regulations. 
2/19/2026 
Survey 2.19 Q5 
Ban all fossil fuel generators 
2/19/2026 
Survey 2.19 Q5 
100s of MWs of diesel power is not acceptable in any application 
2/19/2026 
Survey 2.19 Q5 
NOT ONE DROP FOR DATA!!! 
2/19/2026 
Survey 2.19 Q5 
neighboring communities in phoenix have been forced to sleep in their basements due to noise pollution. 
2/19/2026 
Survey 2.19 Q5 
Noise: no way or method to monitor stated 
Generator: so bad- will email  
2/19/2026 
Survey 2.19 Q5 
How can noise study be meaningful prior to construction? 
2/19/2026 
Survey 2.19 Q5 
Don't believe this covered low frequency beyond an audible range,/effects on wildlife 
2/19/2026 
Survey 2.19 Q5 
The setting up of a check box process to provide cya criteria for the city to allow data centers is not acceptable. 
2/19/2026 
Survey 2.19 Q5 
No large data centers at all. 
No generators ever.  
If they do exist, all regulations should be more strict on noise and generator use should be more limited 
2/19/2026 
Survey 2.19 Q5 
On generators: the affirmative answer is only for natural gas generators or no load switching proposals. 
2/19/2026 
Survey 2.19 Q5 
Any amount of noise is harmful to health. Generators are noisy, and create lots of emissions that are hazardous to health. 
2/19/2026 
Survey 2.19 Q5 
Noise pollution is definitely a concern but it’s about the resources that are used to produce the noise. This case is a waste of resources.

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
15 
 
2/19/2026 
Survey 2.19 Q5 
My main issue is I'd like to have a requirement of revenue/profit to be funded into research grants to support public funding into R&D into generator muting. 
2/19/2026 
 
Survey 2.19 Q5 
In general there is a lack of proof how a large scale data center would benefit Tucson, Pima County, or really any community. I dont know anyone who wants these 
here where we are already vulnerable to drought & heat. Bottom line is we dont want these here  
2/19/2026 Admir 
Quarishy  
Survey 2.19 Q5 
I would like to see discussion regarding hiring practices. To support local hiring requirements  
2/19/2026 Diane 
Marzonie  
Survey 2.19 Q5 
any data centers at all!  
2/19/2026 
Survey 2.19 Q5 
Oregon required utilities to create new building classes/ reate structures for data centers so the costs arent shared by households businesses Data Centers doent 
bring jobs they bring pollution + aide fascism. Arizona doesnt have water to spare for data centers. Limit ground water + river water use. Batteries + Generatros 
contribute to climate change. Solar energy should be utilized. Noise will affect quality of life  
2/19/2026 William 
Wilkening  
Survey 2.19 Q5 
rezoning for next use of facility; accountability for energy mix by developers + energy mix, water replacement projects; disposal process for data center equipment.  
2/19/2026 
Carol Price 
Survey 2.19 Q5 
E-waste andling is an issue; abandoned projects+ buildings is a possiblity + a big potential problem; the process should always be transparent open to the public no 
NDAs; the process should depend upon public imput- preferably a public vote on referendum, every time. we cant trust elected officials to protect us from corporate 
greed as weve learned recently, sadly; would it just be simpler cleaner and less expresive to simply write an ordinence prohibiting data centers in Tucson period?  
2/19/2026 
Lynn Price 
 
Survey 2.19 Q5 
Electronic waste disposal? Data Center will need nw regulations: so much larger amount of E-waste; Those standards need to be developed. what are state & federal 
regs currently?  
2/19/2026 
Survey 2.19 Q5 
NOT ONE DROP FOR DATA!!! 
2/19/2026 
 
Survey 2.19 Q5 
This Process wasn't designed to maximize community participation and engagement. The proposal should have been shared in advance. It would have been informed 
by a technical advisory committee that included a wider set of experts not just mostly including indigenous tribes, southwest southside, southeast tucson residents 
who will be impacted; standards regulations and processes are not neutral. you're designing them what will enable these projects or will stop them. No hyperscale 
data centers in the desert or anywhere  
2/19/2026 
Survey 2.19 Q5 
having this codes for large scale data centers supports having these data centers. standards should be set higher to avoid centers to be build here in tucson. we need 
higher standards 200-400 ft standards are no enough 
2/19/2026 
TF Johnson 
 
Survey 2.19 Q5 
The lack of a Q&A section until we griped + the mainpulation of presented infor shows bad faith. Tell the Mayor and Council to fuck off I Know yall are pleasant 
bureacrats way over your heads but you got to have a spine. No data centers  
2/19/2026 
85719 
Survey 2.19 Q5 
1) large scale users must have their water & energy use priced on a sliding scale & cost them based on their use exceeding what is "acceptable" why should residents 
considere if industry does not 2) currently large scale data centers are needed for AI and cryptocurrency they do not serve the community nor are they needed for 
internet well phones or other every day uses seems like these large scale data centers are a billionares wet dream 
2/19/2026 
Survey 2.19 Q5 
I think we should just outlaw large data centers or have limits that make it impractical  
2/19/2026 
Dominik 
Soto 
Survey 2.19 Q5 
reserach and TAC imput being only 13 people who have an unknown bias? that couldve been a team of public citizens, there shouldve been more community 
outreach since the start. Schools are an untapped goldmaine full of community members that are in the field everyday Talking to young adults tracking them down if 
you have to Plan a city of tucson outreach day at high schools because a lot of the you just doesnt know better 
2/19/2026 Jessica 
Ramirez  
Survey 2.19 Q5 
We dont want regulations. we dont want these data centers  
2/19/2026 
Survey 2.19 Q5 
a large data center involves costs associated with power adn water. the purpose of these data centers is obstensibly to replace human workers through automation. 
Is there an upside to Tucsonans to allow a data center?  
2/19/2026 
Adrian 
Fernandez  
Survey 2.19 Q5 
what are the pros and cons to data centers? what are the pros and cons to the working class of AI? may be able to grow revenue and community support by having 
limts on AI uses. I would rather live ina city where the goal is to help people grow not just AI or corporate interest. What is going on with all the solar energy we 
generate what= how is it used who profits from it?  
2/19/2026 
Survey 2.19 Q5 
great start! thanks for the opportunity to comment!  
2/19/2026 
Survey 2.19 Q5 
Its absurd that TEP was on the TAC when their owners, for tis, told investors they plan to make money off building 1.5-2 billion dollars for additional generation for 
data centers. where is consultation of native nations? would all data centers be limited to the southside under these regulations?

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
16 
 
2/19/2026 
Survey 2.19 Q5 
come back with a draft like you were directed to write an ordinance prohibiting large scale data centers from our city of Tucson  
2/19/2026 
 
Survey 2.19 Q5 
I was told there was going to be Free hot dogs! can we address current business water/power waste small and large? can we adress city building/school water 
conservation?  
2/19/2026 
Survey 2.19 Q5 
Thank you for the presentation it is unfortanate zoning cannot address water+ power usage which of course are the most significant/ large-scale concerns  
2/23/2026 
Poster - Anthing we 
missed? 
Sticker - Big tech gets a paycheck We get the electric bill No data center, Graphic representation of various desert species being impacted by technology and data 
center 
2/23/2026 
Poster - Anthing we 
missed? 
No large hyperscale data centers. Attract low resource usage water/energy companies that create local jobs (permanet) 
2/23/2026 
Poster - Anthing we 
missed? 
Sticker - Protect our desert, Graphic representation of desert with various species and sign with red cross over data center 
2/23/2026 
Poster - Anthing we 
missed? 
Sticker - Bird saying "NO" , graphic representaion of bird yelling no 
2/23/2026 
Poster - Anthing we 
missed? 
Water & energy guzzling data centers do not belong in our drying desert. These centers have no practical use for ordinary citizens. 
2/23/2026 
Poster - Anthing we 
missed? 
Yes, we don't want any large scale data centers under any circumstances. This is a farce. 
2/23/2026 
Poster - Anthing we 
missed? 
PROPOSED REVIEW PROCESS: Notice bubble shoule be larger - 10 miles. Notive should go to renters & businesses as well. 
2/23/2026 
Poster - Anthing we 
missed? 
50,000 sf is to big...size should be brought down to largest exisiting Tucson data center square footage. 
2/23/2026 
Poster - Anthing we 
missed? 
What's to keep the applicant from changing the energy mix after their zoning is approved? or water use 
2/23/2026 
Poster - Anthing we 
missed? 
The setbacks aren't big enough! They should be tripled or quadrupled at least. 
2/23/2026 
Poster - Anthing we 
missed? 
Who will be responsible for cleaning up the data center e-waster & building 
2/23/2026 
Poster - Anthing we 
missed? 
NO large data centers 
2/23/2026 
Poster - Anthing we 
missed? 
As water use for power generation cannot be addressed via zoning code, how will this key concern be addressed? 
2/23/2026 
Poster - Definition & 
Process 
Moratorium on hyperscale data centers 
2/23/2026 
Poster - Definition & 
Process 
Have a large public notification zone 
2/23/2026 
Poster - Definition & 
Process 
Tucson already has a long history of big organizations poluting our land, I'm not ready for the health complications or the upscale in our electricity bill, especially 
when the notified area is so small! 
2/23/2026 
Poster - Definition & 
Process 
Moratorium on all hypre-scale data centers! 
2/23/2026 
Poster - Definition & 
Process 
E-waste disposal standards? Codes? Legal?

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
17 
 
2/23/2026 
Poster - Definition & 
Process 
No data centers! 
2/23/2026 
Poster - Definition & 
Process 
The definition + process: NO HYPERSCALE DATA CENTERS! Moratorium now. 
2/23/2026 
Poster - Definition & 
Process 
Unreadable scale data centers should be: No, you don't get to build one. 
2/23/2026 
Poster - Definition & 
Process 
Sticker - Not one drop for data, Graphical representation of rain over various desert related items 
2/23/2026 
Poster - Definition & 
Process 
Leave South Tucson alone! 
2/23/2026 
Poster - Definition & 
Process 
The highway already cut through South Tucson/Mexican American communities. 
2/23/2026 
Poster - Definition & 
Process 
What hazards would we be exposed to in southern Tucson. 
2/23/2026 
Poster - Definition & 
Process 
Problem w/your definition at written "The same controlling ownershup interest" -> or multiple ownership interests. "Storage, processing, and distribution" -> OR 
distribution 
2/23/2026 
Poster - Definition & 
Process 
These are all in the Southside or along waterways. That is environmental racism of ecological dustruction. ICE comes to mind. 
2/23/2026 
Poster - Definition & 
Process 
Way too small of a notification area 
2/23/2026 
Poster - Definition & 
Process 
Sticker - No data center in our desert, graphical representation of rattlesnake wrapped around drop of water 
2/23/2026 
Poster - Definition & 
Process 
We're already in a desert. We don't have enough water as is. 
2/23/2026 
Poster - Energy & Water 
Use 
E-waste! toxic, no longer can be exported from U.S. 
2/23/2026 
Poster - Energy & Water 
Use 
With AZ taking a hit on future CAP water there should be NO water guzzling industries whatsoever allowed to build in the desert. Data centers should absorb all costs 
assoc w. increased 
2/23/2026 
Poster - Energy & Water 
Use 
NO 
2/23/2026 
Poster - Energy & Water 
Use 
100% renewable energy only locally not credits + not nuclear like Beale said 
2/23/2026 
Poster - Energy & Water 
Use 
Adequate water supply - What's the defintion of that? Seems that there is no such thing unless the aquifer is recharging 
2/23/2026 
Poster - Energy & Water 
Use 
Sticker - Public Power, A brighter future for Tucson Graphic representation of tortoise with solar panel on back 
2/23/2026 
Poster - Energy & Water 
Use 
Zero water or energy use allowed for largescale data centers 
2/23/2026 
Poster - Energy & Water 
Use 
Water used to generate energy with fossil fuels MUST be considered throughout the CO River watershed

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
18 
 
2/23/2026 
Poster - Energy & Water 
Use 
Make sure TEP energy use is getting checked! (Public power!) 
2/23/2026 
Poster - Energy & Water 
Use 
No energy or water for data centers 
2/23/2026 
Poster - Energy & Water 
Use 
Sticker - Big tech gets a paycheck We get the electric bill No data center, Graphic representation of various desert species being impacted by technology and data 
center 
2/23/2026 
Poster - Energy & Water 
Use 
We already do not have "adequate water supply" 
2/23/2026 
Poster - Energy & Water 
Use 
Full moratorium on all hyperscale data centers 
2/23/2026 
Poster - Energy & Water 
Use 
Need protections around energy bills. No fossil fuel power. Better definition of adequate. 
2/23/2026 
Poster - Energy & Water 
Use 
Sticker - Not one drop for data, Graphical representation of rain over various desert related items 
2/23/2026 
Poster - Energy & Water 
Use 
Where will these centers get water form? The future of our water is uncertain, esp w/ what's happening with the Colorado River! Water should be for life, not data 
centers! These centers use way too much water. 
2/23/2026 
Poster - Energy & Water 
Use 
We don't have enough water for ourselves, let alone a data center. :( 
2/23/2026 
Poster - Energy & Water 
Use 
Will residents have to pay higher water & energy bills? 
2/23/2026 
Poster - Energy & Water 
Use 
Energy projections should be for summer months, not a winter day 
2/23/2026 
Poster - Energy & Water 
Use 
Sticker - Water for the people Not for Billionaires, No data CenterS 
2/23/2026 
Poster - Noise 
Set to sound uses allowed within the public library & no louder 
2/23/2026 
Poster - Noise 
We dont want data centers! 
2/23/2026 
Poster - Noise 
What similar sound levels from other uses? 
2/23/2026 
Poster - Noise 
On site generation if not renewable needs to be last resort. Limit generation = limit noise 
2/23/2026 
Poster - Noise 
Data centers out of South Tucson! 
2/23/2026 
Poster - Noise 
The highway already has alot of noise pollution 
2/23/2026 
Poster - Noise 
Will the noise study include only audible sounds? 
2/23/2026 
Poster - Open Space 
Landscaping should require tree canopy coverage of the entire parcel at tree maturity. 
2/23/2026 
Poster - Open Space 
Moratorium on all hypre-scale data centers! 
2/23/2026 
Poster - Open Space 
What happens to 10 year old data centers? Require owners of data centers to dispose safely 
2/23/2026 
Poster - Open Space 
E-waste from data centers! Disposal? 
2/23/2026 
Poster - Open Space 
NO Desert Data Centers 
2/23/2026 
Poster - Open Space 
Landscape borders need to be extensive & sound walls may be required depending on location. Better to require them to build underground 
2/23/2026 
Poster - Open Space 
Define large-scale data centers as ≥1000 sq. ft. 
2/23/2026 
Poster - Open Space 
Our lands can barely support what we currently have on them. We don't need to add more to habitat destruction =(

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
19 
 
2/23/2026 
Poster - Open Space 
Don't get fooled when they say this will bring new jobs to Tucson. This will raise all our utility bills and harm our water. 
2/23/2026 
Poster - Open Space 
Your community engagement processese need revision, reform + transformation so they enable actual community public opinion. 
2/23/2026 
Poster - Open Space 
Permenant ban on ALL DATA centers 
2/23/2026 
Poster - Open Space 
This community engagement didn't engage the community! Come up w/ + reform the process. 
2/23/2026 
Poster - Setbacks 
[Protect our Desert photo] 
2/23/2026 
Poster - Setbacks 
Setbacks half the size of the parcel from each perimeter of the parcel 
2/23/2026 
Poster - Setbacks 
Need to update noise ordinance to address noise issues related to Data Centers. Current code is not adequate to address what other towns w/ Data Centers are 
experiencing. 
2/23/2026 
Poster - Setbacks 
Err on the side of the strictest + highest standards possible 
2/23/2026 
Poster - Setbacks 
A setback of 400 feet is not usually enough for a hyperscale data center in a residential zone - they generate noise + pollution that's bad for public health! No Data 
Centers in Tucson = anywhere! Look at what happened in other communities 
2/23/2026 
Poster - Setbacks 
1-2 is mostly on the Southside + SW or SE - then will impact our families' health (noise + pollution!) 
3/4/2026 
Survey 3.4 Q1  
Need lots more information 
3/4/2026 
Survey 3.4 Q1  
If approved, then big expansion, is  a new applcation, hearing, etc required? 
3/4/2026 
Survey 3.4 Q1  
Is there an additional level of fact-checking when the applicant requests or answers your questions to make sure they are being truthful and transparent? 
3/4/2026 
 
 
Survey 3.4 Q1  
At which point during the review process is the environmental aspect taken into consideration? (light pollution, water availability, impact, neighboring town impact, 
etc)  
3/4/2026 
Survey 3.4 Q1  
feels too big  
3/4/2026 
Survey 3.4 Q1  
I-2 zoning makes sense. Please consider the lands under the DMAFB Departure Corridor where any land use for dense population is prevented-no homes, 
apartments, dense employment uses. Also suggest that 50,000 sf is considered to be a medium data center. Suggest 100K sf 
3/4/2026 
Survey 3.4 Q1  
At first, I was thinking that since the city does have within itz zoning laws the ability to reject buildings for purpose I thought you could just not approve data centers 
based on that but I appreciate the effort to have the review porcess dictate whether the business can meet the criteria to not impact the water and electric needs of 
the community so I support this proposal.  
3/4/2026 
 
 
Survey 3.4 Q1  
What Kinds of accessory uses likely go along with a data center, and do the accessory structures related to a data center need some considerations? for example 
onsite water treatment for water recycling vs putting it into the main system what are the impacts to wastewater infrastructure? Is there a process for expanding the 
data center on an established site? If an established site wants to add additional data processing, is that also a mayor and council approval? Do they repeat all these 
steps and submit the same materials (energy declaration etc)? Is there a maximum amount of sf allowed other than via lot coverage?  
3/4/2026 
Survey 3.4 Q2 
We are running out of water. For existing HUMANS living here. Too many unknowns. 
3/4/2026 
Survey 3.4 Q2 
Unclear if or what penalties for not following plan?? I didn’t see any requirements for using rainwater harvesting, white or “green” roofs, non potable water for 
appropriate uses, etc 
3/4/2026 
Survey 3.4 Q2 
Again double-checking to make sure that the applicants answers are truthful and transparent. How are you going to do that? 
3/4/2026 
Survey 3.4 Q2 
Showing that they can provide the resources doesn't mean that they are appropriate methods. Using other counties to provide power isn't ethical. 
3/4/2026 
Survey 3.4 Q2 
Need analysis of how usage affects tep capacity and pricing for others long term 
3/4/2026 
Survey 3.4 Q2 
Sourcing of energy needs to be broader as new energy sources are developed - example - Small Nuclear 
3/4/2026 
Survey 3.4 Q2 
If energy is sufficient or can be generated, but costs will increase due to transmission or other infrastructure needs, applicant should cover those expenses to prevent 
cost increase to existing customers. Water should default to closed loop. If using once through or open loop (even with recycled water) we should seek to condense 
and recapture through passive systems and reuse or put into surrounding plant areas proposed at borders. Wastewater is also a concern- must show we can properly 
process blowdown given scale and potential impact to our grey water systems. Any expenses to enhance water processing should be borne by company. 
3/4/2026 
Survey 3.4 Q2 
I'm not sure exactly how businesses would meet the standards but they are exactly what is needed. What I wasn't clear on is what happens to a business when it 
violates those standards? It should result in something painful to the business or they could just pay the fine and continue making water/electricity an issue for 
residence.

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
20 
 
3/4/2026 
Survey 3.4 Q2 
Thank you for covering gaps not covered by the LWUO. What goes into the energy declaration? How can we ensure the declaration is clear and thorough enough to 
hold them accountable? What does enforcement of energy demand/sources look like? 
3/4/2026 
Survey 3.4 Q3 
Increase setbacks. This should not negatively impact residential areas. 
3/4/2026 
Survey 3.4 Q3 
IF the centers are required to stay within industrial zones, then the setbacks are OK. 
3/4/2026 
Survey 3.4 Q3 
Setbacks should be 1000’ or more from residential areas. 
3/4/2026 
Survey 3.4 Q3 
400 ft is .075 miles -- that seems very close given the noise and air pollution. I live precisely 10x that distance (just measured it) from a heavy industrial user. I can 
hear and smell it even at that distance, and there are many people who are even closer than I am. Physical issues, such as vibrations, are also important to consider: 
my house sometimes shakes due to industrial activity. Given this, a minimum quarter-mile setback from urban residential and office/commercial would be more 
appropriate. However, I would like to know what the setbacks are for other heavy industrial uses to compare. They are probably all quite low. 
3/4/2026 
Survey 3.4 Q3 
Good on load shifting; good on batteries first; weak on allowing TEP to draw power from batteries if needed; weak on allowing any natural gas, especially if the install 
noisy RICE generators, etc 
3/4/2026 
Survey 3.4 Q3 
na 
3/4/2026 
Survey 3.4 Q3 
Require independent noise studies and clear limits for all sites, including those not in purely industrial zones. 
3/4/2026 
Survey 3.4 Q3 
There are many famous cases of commercial sites noise bouncing and landing somewhere far away. Are there provisions to address situations like this not forseen? 
Generators if environmentally equivalent to tep or other providers emissions should absolutely be allowed for load shedding especially if the city needs the relief. I 
would agree with them having additional noise restrictions. But we don't want large commercial sites killing us like happened in texas. 
3/4/2026 
Survey 3.4 Q3 
Generators need to be tested periodically to ensure reliability. Battery storage adds expense and is seldom useful for any medium or long term outage - good for 
short only. Both Batteries and generators plus forcing Tier IV level becomes potentially deal breakers due to cost impact. 
3/4/2026 
Survey 3.4 Q3 
Should clarify minimal battery backup time, such as ability to be on battery at least 15 min (possibly up to 30) 
3/4/2026 
Survey 3.4 Q3 
Not sure  
3/4/2026 
Survey 3.4 Q4 
Require permeable paving for parking lots; good to require 50% rainwater ; 
3/4/2026 
Survey 3.4 Q4 
Na 
3/4/2026 
Survey 3.4 Q4 
Agree on parking. Landscaping is an esthetic issue. Why different than any large warehouse? 
3/4/2026 
Survey 3.4 Q4 
Expect significant heat and evaporation from these centers; propose trees with large canopies. I also expect fencing will be established so presume that would have 
to be within the interior of the landscaping. Given that and concerns for security I’d propose an additional 10’ beyond the 20’ for landscaping and enough underbrush 
to encourage rabbits, mice, coyotes, javelina and other urban animals to forage in the area. 
3/4/2026 
 
 
Survey 3.4 Q4 
desert landscaping, while beautiful, is sparse vegetation compared to other environments. Is a 20 ft buffer of prickly pear going to be effective? Is that 20 ft distance 
based on best practices that were established where denser forest-type vegetation is in place? If so, we should consider a larger buffer or other rules about the 
density of the vegetation. 
3/4/2026 
Survey 3.4 Q5 
Is it possible to build in likely additional staff costs for enforcement if needed into the permit, especially given City finances!! 
3/4/2026 
Survey 3.4 Q5 
Triple your efforts to lessen impact on our environment, utilities and resources. 
3/4/2026 
Survey 3.4 Q5 
This is a joke. 
3/4/2026 
Survey 3.4 Q5 
What are the teeth of enforcement besides. Hand waving and strongly worded letters. Penalties need to make sure transgressions are not financially worth it. 
3/4/2026 
Survey 3.4 Q5 
Thanks for doing this. Please develop a Code Amendment that is followed in practicality, not emotional, non-factual, loudest voice wins approach. 
3/4/2026 
Survey 3.4 Q5 
If Tucson adopts such rigorous standards, we will be prepared to adequately vet large data centers. This was a good presentation, thank you. 
3/4/2026 
Survey 3.4 Q5 
Thank you! 
3/5/2026 
Barbara 
Richard  
  
3_5_RegistrationComments 
I have mobility issues but assume the venue will be ADA Compliant. If not I will not be able to attend.  
3/5/2026 
Annika 
Reimers 
  
3_5_RegistrationComments Is the City of Tucson prepared to listen to its citizens and make the ethical decision for our community and environment to prohibit large-scale data centers? Or do 
they prefer to sell-out to corporations at the expense of all?

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
21 
 
3/5/2026 
James M 
Nelson  
I’m known as 
the man behind 
the RealPage 
lawsuit  
3_5_RegistrationComments 
I have an important comment about what hasn’t been asked about the data centers  
3/5/2026 
Deanne F. 
Citizen for 
questions... 
3_5_RegistrationComments 
Must you live in that particular county/community to be heard? 
3/5/2026 
Elena Ortiz 
  
3_5_RegistrationComments What are approaches the City can use through the updated code to restrict hyper scale data center development so that these facilities are not developed within city 
limits?  
3/5/2026 
Eliseo 
  
3_5_RegistrationComments 
Make sure to have an extra microphone or two for audience Q&A. I'd be happy to volunteer as a runner to get microphones to the people in the audience.  
3/5/2026 
Lynn Price 
  
3_5_RegistrationComments 
What are guidelines for electronic waste from data centers?  
3/4/2026 
Linda Jenson 
3_4_RegistrationComments 
Am mostly interested in learning more to form an informed opinion at this point. This seems like an important topic moving forward, so I want first hand experience. 
3/4/2026 
guy smith 
none 
3_4_RegistrationComments 
Where would the water and electricity come from? 
3/4/2026 
Kimberly 
Madison 
Barrio San 
Antonio 
Neighborhood 
Association  
3_4_RegistrationComments 
I sincerely hope we’re continuing to keep the interests of our Tucson ecosystem and its citizens, both human and nonhuman, in this decision-making process. 
3/4/2026 
Noah 
Gariepy 
United Way of 
Tucson and 
Southern 
Arizona 
3_4_RegistrationComments 
I would like to know how we can specifically tax the data centers to uplift the Prosperity Initiative work in the community 
3/4/2026 
Carrie 
Newman 
3_4_RegistrationComments 
How would the building and functioning of data centers impact the availability and cost of energy and water for Tucson residents? 
3/4/2026 
Lisa Maher 
Garden District 
Neighborhood 
Assn Board 
3_4_RegistrationComments 
I wish I could have checked more than one area of interest in your drop-down.  VERY concerned about water and energy consumption. 
3/4/2026 
Suzie Garrett 
community 
member 
3_4_RegistrationComments What else can this land/space be used for?was that ever considered and discussed? Is housing development being postponed because of the water and electricity 
that would be used by a data center? What % of the cost will DMAFB pay for ? Whose the new NDA?  
3/4/2026 
Margo Itule 
No Desert Data 
Center 
3_4_RegistrationComments We need a revised, stronger Large Quantity Water User Ordinance that protects our precious groundwater, creeks, rivers, wetlands, rainwater, and recycled water. 
All applicants should have intentional review with opportunity for public input.  
3/4/2026 
Florence  
Johnson  
Public Safety 
Task Force 
3_4_RegistrationComments Data Centers require excessive power and water that increases infrastructure needed, unaffordably raising residential users' rates, and enabling suveillance 
technologiesand AI analysis that violates residents' Constitutional rights 
3/4/2026 
Norma Itule 
Citizen 
3_4_RegistrationComments 
Data centers are dangerous to the health of our community on all levels.  
3/4/2026 
Dan 
Stormont 
Commission on 
Climate, 
Energy, and 
Sustainability 
3_4_RegistrationComments 
I was involved with the working group that proposed the code changes. I'm curious to see how the proposed changes go over with the public. Looking forward to the 
meeting!

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
22 
 
3/4/2026 
Mary 
Slachter 
Live here 
3_4_RegistrationComments 
I want all of the above addressed 
3/4/2026 
Elizabeth 
Thompson 
Private citizen 
3_4_RegistrationComments I want to hear how we can put in local regulations to prevent data centers bringing low quality, short term jobs to the area in exchange for using up our scarce water 
resources and straining our power grid. 
3/4/2026 
Carmen 
Vega-Cruz 
Retired - live in 
LD17 
3_4_RegistrationComments Would appreciate as much detail as possible on regulations being established to cover natural resource usage and landscape effect, electricity, noise, air pollution 
and traffic flow considerations. Thank you.  
3/4/2026 
Johanna 
Martinez 
Concerned 
Citizen 
3_4_RegistrationComments I stand in firm opposition to allowing large scale data centers in Tucson. We live in a desert water is not a resource we have to spare and no amount of economic 
consent of justifies gambling with the future of this community. Reject data centers!!! 
3/4/2026 
Roger 
Johnson 
Retired 
concerned 
citizen 
3_4_RegistrationComments 
Water, electrical power, noise. Why Tucson?  
3/4/2026 
Pamela 
Tankersley 
home owner 
and resident of 
pima county & 
Tucson 
3_4_RegistrationComments 
How will our water & energy be protected so that residents & future generations of Pima county won't get stuck paying for this. 
3/4/2026 
MaryLynn  
StOres 
Citizen of 
Tucson 
3_4_RegistrationComments 
Why not build in land that gets more rain? 
3/4/2026 
Nancy 
Fahringer 
Private 
homeowner 
3_4_RegistrationComments 
I vote for more stringent noise, water, and setback requirements for data centers. 
3/4/2026 
Patricia Stoll 
Public 
3_4_RegistrationComments 
How will centers be powered and regulated to protect our water supply? What methods will be usd toutilize green energy in their power plans? 
3/4/2026 
Greg Veitch 
University of 
Arizona faculty, 
architectural 
designer, 
Tucson resident 
and property 
owner 
3_4_RegistrationComments 
Net benefit to Tucson community: jobs #, aesthetic/cultural/urban benefit, energy and water use relative to other employment and commercial options, tax 
incentives to data center developers and operators, site locations relative to other urban uses? 
3/4/2026 
Miguel Ortiz 
None 
3_4_RegistrationComments 
We don't want Data Centers! 
3/4/2026 
Scott Barker 
Tucson Lifestyle 
Magazine 
3_4_RegistrationComments 
Just interested in gathering information for a story.  
3/4/2026 
Tereasa 
Moffett 
none 
3_4_RegistrationComments Water isn't renewable, it's a luxury. Rural areas rely on wells, slowly taken over by companies. Datacenter construction wastes water for dust abatement, stealing 
water from residents. Const. should be outlawed bc environment can't sustain it AND ppl. 
3/4/2026 
Pati  Norman  Self 
3_4_RegistrationComments 
I would like to listen to this meeting. 
3/5/2026 
Poster - Noise 
way to prohibit on site generators like the methane turbines used in xAI in Memphis which ruins air quality 
3/5/2026 
Poster - Noise 
Prohibit all diesel/XIG generators please 
3/5/2026 
Poster - Noise 
Define emergency and non-emergency 
3/5/2026 
Poster - Noise 
NO MORE DATA CENTERS AT ALL PLEASE. Full moratorium or prohibition. 
3/5/2026 
Poster - Noise 
BAN ALL DATA CENTERS! They have NO value to us. We don't have the resources.

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
23 
 
3/5/2026 
Poster - Noise 
Data centers generate large decibles of noise that can cause chronic issues in humans and wildlife. We already have constant noise- we don't need more noise 
pollutants 
3/5/2026 
Poster - Open Space 
Artificial coverage traps heat, need natural vegatative coverage 
3/5/2026 
Poster - Open Space 
Enforced solar on parking spots 
3/5/2026 
Poster - Open Space 
Require use of native plants, focus on food/pollinator plants for wildlife enjoyment 
3/5/2026 
Poster - Open Space 
BAN ALL DATA CENTERS! They have NO value to us. We don't have the resources. 
3/5/2026 
Poster - Open Space 
Could use this land to preserve the environment and wildlife that is here instead of making room for a data center? 
3/5/2026 
Poster - Setbacks 
NO DATA CENTERS PLEASE 
3/5/2026 
Poster - Setbacks 
Proposed zoning is too close to Tribal lands. 
3/5/2026 
Poster - Anything missed 
Range of effect of low low frequency non audible 
3/5/2026 
Poster - Anything missed 
Tucson does not need data centers, we need water, renewable energy, and a future for this city, Data centers are modern day mass polluntants that are detrimental 
to the communities they inhabit 
3/5/2026 
Poster - Anything missed 
BAN ALL DATA CENTERS! THEY HAVE NO VALUE to us. We DON'T HAVE THE RESOURCES! 
3/5/2026 
Poster - Anything missed 
NO HYPERSCALE DATA CENTERS LISTEN TO TUCSON RESIDENTS! We DON'T want these AT ALL - these centers will harm our communities and environment 
3/5/2026 
Poster - Anything missed 
Sticker - Bird saying "NO" , graphic representaion of bird yelling no 
3/5/2026 
Poster - Definition & 
Process 
Where is the 50,000 square ft. guidance coming from? What factors are going into that decision? 
3/5/2026 
Poster - Definition & 
Process 
RE: I-2 Zones = marginalized communities = ENVIRONMENTAL RACISM 
3/5/2026 
Poster - Definition & 
Process 
Need more open discussion not filtered through one way feedback Townhall! 
3/5/2026 
Poster - Definition & 
Process 
<- THIS is environmental racism! (Making it easier to build these in I-2 zones) 
3/5/2026 
Poster - Definition & 
Process 
If it's easier to build these centers in I-2 zones, the impacts will be on South+Southeast Tucson especially. Large-scale data centers have effects on health, through 
low-frequency noise, cooling systems, e-waste, etc. 
3/5/2026 
Poster - Definition & 
Process 
The proposed locations of data centers disproprotimately negatively affect the health of the people who live near these facilities. It feels like environmental racism 
when you consider the demographic populations of I-2 zones 
3/5/2026 
Poster - Definition & 
Process 
Definition should be based off energy demand. 
3/5/2026 
Poster - Definition & 
Process 
BAN ALL DATA CENTERS! THEY HAVE NO VALUE to us. We DON'T HAVE THE RESOURCES! 
3/5/2026 
Poster - Definition & 
Process 
Citizens need to be added to the TAC ASAP including No Desert Data Center 
3/5/2026 
Poster - Definition & 
Process 
The I-2 locations where these things can get built cure too disproportionately nearby marginalized communities

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
24 
 
3/5/2026 
Poster - Definition & 
Process 
If size based, the size should be over 39,000 sft. (Not 50,000 sqft) 
3/5/2026 
Poster - Energy & Water 
Use 
Complinace & meaningful enforcement 
3/5/2026 
Poster - Energy & Water 
Use 
Water for power generation 
3/5/2026 
Poster - Energy & Water 
Use 
Sticker - Public Power, A brighter future for Tucson Graphic representation of tortoise with solar panel on back 
3/5/2026 
Poster - Energy & Water 
Use 
I grew upnhere if younthink we have opare water - We do not. 
3/5/2026 
Poster - Energy & Water 
Use 
We are entering a water shortage crisis - we don't have water to spare on data centers 
3/5/2026 
Poster - Energy & Water 
Use 
Renewable practicality 
3/5/2026 
Poster - Energy & Water 
Use 
Why is TEP on the TAC? They told their investors they plan to profit off of data centers! Public Power NOW! 
3/5/2026 
Poster - Energy & Water 
Use 
How do we prohibit data centers, point blank. 
3/5/2026 
Poster - Energy & Water 
Use 
Water limit must be enforced by shutoff threshold. Fines are not adequete deterant for billion dollar corporations 
3/5/2026 
Poster - Energy & Water 
Use 
We as humans can relate to needing water for life to sustain life itself That comes before any machine 
3/5/2026 
Poster - Energy & Water 
Use 
They use too much energy & water, we don't want them here. No data centers. 
3/5/2026 
Poster - Energy & Water 
Use 
The notification scale to the public about data centers should absolutely seek wider range if transparency is a priority 
3/5/2026 
Poster - Energy & Water 
Use 
Work w/ pima county + other nearby cities to implement cities to implement similar regulations. What's to stop a data center from building right outside city limits? 
3/5/2026 
Poster - Energy & Water 
Use 
We should focus on renewable energy 
3/5/2026 
Poster - Energy & Water 
Use 
BAN ALL DATA CENTERS! THEY HAVE NO VALUE to us. We DON'T HAVE THE RESOURCES! 
3/5/2026 
Poster - Energy & Water 
Use 
There is no "adequate water supply" avaiable for these centers! The energy isn't avaliable - especially if 100% renewable with no offsets/credits + no nuclear! Who 
will cut them off if they violate? Need stronger regularations! 
3/5/2026 
Poster - Energy & Water 
Use 
TEP shouldn't be TAC - they will profit from working with developers of these centers and don't care about renewable energy or develop customers with a stable 
grid! 
3/5/2026 
Hernan 
In person survey written Q1 I want to learn how you "define" the proposed large-scale data cente and how you proposed to re-zone before I can comment on theis. May consider imposing an 
upper limit to the size of the building  
3/5/2026 
In person survey written Q1 1) the FAQ #1 does no answer its won question of whether we can prohbiti data centers outright! 2) when will it be determined when enhancement fo 400ft-> 2mi 
will be done?

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
25 
 
3/5/2026 
Ary 
In person survey written Q1 definition should include smaller sq sootage. Can grandfatehr existing data centers. Also definition of large water use should be drastically reduced. Notification 
should be larger scale, rather than 2 miles should 10 miles. The entire city should be allowed input since we all share water and energy burden. renters should also be 
included  
3/5/2026 
In person survey written Q1 Needs max and minimum size in the definition. Notification should be regional and include all residents not just property owners. The entire county should be altered 
months in advance this is a regional concern no merely a 2 mile radius concern  
3/5/2026 
In person survey written Q1 a gross floor area of 50,000 sq ft is too big for a definition to regulate these in away that leads community voices saying no- the servers are getting powerful in less 
space! Define by energy use! Or make the threshold the median of current centers. The presenter said there are no communities near I-2 zones- thats not true! The 
notification area is too small for data center- it should be at least 
3/5/2026 
In person survey written Q1 
The public notice should be extended to tenents. The notice zone should be larger. Upper limit on large-scale definition   
3/5/2026 
Larry Lemon  
In person survey written Q1 
wee need a data center like we need a hole in our head! 
3/5/2026 
In person survey written Q1 could the square footage be limited so larger project are no proposed? Clear definition of where current sq footage come; include renter's non property owners in 
the notice potentially expand the notification zone to include more impacted  
3/5/2026 
 
In person survey written Q1 
where the water coming from? 
3/5/2026 
In person survey written Q1 Aside from dimensions and that it stores data, the definition is not ____ clear of the type of data and what its used for, this should be expanded upon. The review 
process could additionally be ___ longer or be given a large scale for public consideration as that is who will be affected 
3/5/2026 
In person survey written Q1 what loopholes may exist? Say allowing multiple entities to inhabit the same building? 50,000 sq ft is still too big. Communities should ask for a data center. Not wait 
to be notified if they're going to be thrown under the bus  
3/5/2026 
 
In person survey written Q1 they are too large. Our community cannt absorb a LSDC anywhere near 50,000 sq ft; The PA zones have very sparse population and will have limited turn out. Who 
will protect the sonoran desert. Residents need to be notified not just absentee landlords; A sonoran desert protection zone needs to be established. The proposed 
allowed zones would be destrcutive and detrimental to the sonoran desert  
3/5/2026 
Kay 
In person survey written Q1 If we don’t allow data centers in Tucson then we don’t need definitions for data centers. The proposed zoning for these centers also disproportionaly affects south 
tucson its residents. The range needs to be larger gov alert, renters need to be informed and a max site needs to be added  
3/5/2026 
Roma Lanor 
 
In person survey written Q1 
why are we even considering any data center? Size is not a good way to regulate look at water usage and elctricity usage. Ban all data centers 
3/5/2026 
Hernan 
 
In person survey written Q2 by law tucson water must stop water mining our aquifers. My understanding is that blending CAP water is not meeting present & future demands for H2O. How can 
you support such monstrocity? Can they guarentee 1000 years of sustainable use as you should demand from all developments  
3/5/2026 
In person survey written Q2 what happens later if an applicant has misrepresenteed its estimated water and energy usage? Will the penalities actuallly contribute to remediating any damage or 
will the damage be irrevocable? Steep is vauge  
3/5/2026 
Ary 
In person survey written Q2 water use & energy use threshold should be significantly reduced. 7.5 million gallons of water per month is an outrageously high number. It should be below a 
million, and re-evaluated every 3-5 years based on environmental changes since we know under depletion continues to increase. there should be provisions 
requrired used for renewable energy. fines should increase exponentially once exceeded and a clause to shut off water/energy pull license w/ continued violations  
3/5/2026 
In person survey written Q2 finace are not enforciable crazy to think that’s going to competl compliance. Include energy usage in the definition of large scale; need lots and lots of publicity to be 
sure everyone is educated on the issue and have time to organize  
3/5/2026 
In person survey written Q2 Energy mix should be 100% renewable w/ no credits; nuclear=no!; Demonstrate access means what? Are there lmits on the amount of energy they dislose as 
proposed use? There should be. This is totally inequitable hasn’t consulted tribes at all willimpact their water access. Larger quantity water user ordinance isnt 
enough recycled water is still water should be 100% offsets of total which should be lower! The penalties arent steep enough- it shouldnt take years + mega 
corporations can pay! Cut them off as soon as they stop complying!

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
26 
 
3/5/2026 
In person survey written Q2 
should be regulation on % renewable water standards should be stricter, non-potable water more stringent penalties  
3/5/2026 
Larry Lemon  
In person survey written Q2 
in a desert, a city I've lived in since 1953 and had water conservation preached to me all that time, we don’t need this! 
3/5/2026 
 
In person survey written Q2 energy use should come from renewable sources, fossible fuels are not sustainable for our future. Proposed data centers should not exceed the entire city is usage. 
Water is not a resource that we can be willing to give up to billion dollar companies water is life, we cant lose it or we lose our way of life  
3/5/2026 
In person survey written Q2 
where the water coming from? 
3/5/2026 
In person survey written Q2 
TEP bought natural gas to provide data center energy. Don not give credit loopholes also don’t give water until these buildings are 100% efficent or way more 
3/5/2026 
 
In person survey written Q2 The use of reclaimed water is a good start if any usage is necessary. If anything it should only use water that could not be otherwise put towarrds the city or the land. 
The current usage of several households worth is not sustainable, renewable energy sources are what should be strived for.  
3/5/2026 
 
In person survey written Q2 no business that uses millions of gallons of water monthly should be located anywhere in Arizona. Large businesses should be responsible for their own energy 
infrastructure. No data center in Tucson! 
3/5/2026 
In person survey written Q2 for waters do you distinguish between using water by returning it through the sewer system and using water by heating it into vapor and shooting it into the 
atmosphere? Energy- should be related to qty of people working for the facility  
3/5/2026 
 
In person survey written Q2 Applicant must create their own energy supply without creating new emissions net zero!; Fines do not solve the problem of water waste; only resident of tucson 
understand how precious each drop of water is. Water for life, not technology. We have no need for data center, we do hav a need to drink water, bathe, grow 
plants! There is no subsitute; There is no guarentee we will get water each year for the living.  
3/5/2026 
Kay 
In person survey written Q2 TEP is already fear mongering and water is becoming a scarcity. Humans, wild life, and our environment need water ore than data centers, we also need to move 
towards more nvironmentally sustainable power, TEP and data centers would set that back we the peopl of tucson need to own TEP 
3/5/2026 
Roma Lanor 
In person survey written Q2 
Tucson doesn’t have enough water for any data centers. TEP doesn’t have the infrastructure for any data center. Ban all data centers  
3/5/2026 
Hernan 
 
In person survey written Q3 
tell me what you proposed to do and I'll tell you whether or not I agre with you setback standards  
3/5/2026 
In person survey written Q3 
400 ft does not seem adequate  
3/5/2026 
In person survey written Q3 
the setback should be out of the state  
3/5/2026 
In person survey written Q3 the setbacks are too small- the noise and pollution will impact nearby residents especially in the southside where I-2 zones are located and have an easier approval 
process  
3/5/2026 
 
In person survey written Q3 
residential setback should be 1/2 mile at least what does right-sized mean? 
3/5/2026 
In person survey written Q3 
the setbacks need to be greater, especially for residential and noise sensitive areas  
3/5/2026 
In person survey written Q3 
where the water coming from  
3/5/2026 
 
In person survey written Q3 
still a lot to learn a lot to review

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
27 
 
3/5/2026 
In person survey written Q3 
rebewable energy sources must be a requirement  
3/5/2026 
In person survey written Q3 
way too close a constant hum/buzz is unnatural and unhealthy. Protect your citzens! Require sound deadening/reduction from inside facility  
3/5/2026 
 
In person survey written Q3 
who decides the arbitary setback? You can hear the droned of the 10 freeway all the way to bear canyon at night 
3/5/2026 
Kay 
In person survey written Q3 If the data centers already have to be back 200-400 feet could we use that land for enviornmental preservation or (if its abandoned urban land) update that land to 
directly benefit the community (parks, shelters, anythign that builds/protects community/land) not golf courses  
3/5/2026 
Roma Lanor 
In person survey written Q3 
400 ft and 200 ft is not enough sound vibration travels much further than that. 24/7 sound and vibration will ause health issues ban all data centers 
3/5/2026 
Hernan 
 
In person survey written Q4 
no matter what you do there is no way you can generate no noise around your facility  
3/5/2026 
 
In person survey written Q4 
how will avoidance of load shifting be enforced 
3/5/2026 
Ary 
In person survey written Q4 there should be time limits. While 50 dbs seems low, should be reduced after 8pm-6am. Fines should be significantly increased as these data centers to account for 
the fact that billinares own these companies. Again a clause to cut off water/energy + pull contract for continued violations.  
3/5/2026 
In person survey written Q4 
no data center noise. No data center. Full stop 
3/5/2026 
 
In person survey written Q4 noise limts "at the property line" is wholley inadequate when these centers produce a 24/7 low hum that travels far (as reported in other communities). Generator 
use- who will enforce (actually have capacity to enforce) when these companies violate the code?? 
3/5/2026 
In person survey written Q4 
constant noise at 55-65 decibles is harmful and disruptive. Who is monitoring load shifting? Who can stop them from breaking regulations and how? 
3/5/2026 
In person survey written Q4 
I feel like presentation breezed through this unsure about it but having a noise study is needed  
3/5/2026 
In person survey written Q4 
Where is the water coming from? 
3/5/2026 
 
In person survey written Q4 
we need to make sure there is ways to stop on site generation solely to save money (not because its necessary ie outages)  
3/5/2026 
In person survey written Q4 
These are issues that need to be full proof in their handling and monitoring but can only be tested through transprings that would not happen. 
3/5/2026 
In person survey written Q4 
much much more research need be done before any people should be used as guinea pigs for these constant noise  
3/5/2026 
 
In person survey written Q4 
These applicants do not care about our community or humanity for that matter. They want to mine our data, especially our childrens data to no benefit to society. 
3/5/2026 
Kay 
In person survey written Q4 we should work to become leaders in sustainable quiet power such as solar power (we are a city where we have ample sunlight) or even energy produced through 
kinetic/walking/moving this is the future technology we should invest in, not data centers) 
3/5/2026 
Roma Lanor 
In person survey written Q4 
ban all data centers no amount of noise is acceptable  
3/5/2026 
Hernan 
In person survey written Q5 
I'm sure you'll be able to build a "plastic paradiso" around this building so as to hide this monstrocity.

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
28 
 
3/5/2026 
In person survey written Q5 
putting lipstick on a pig doesn’t change the pig  
3/5/2026 
In person survey written Q5 you cant dress up these massive b__ structures with landscaping! Even on-site water harvesting is still using water that could use for projects that people actually 
want and need in this community!  
3/5/2026 
 
In person survey written Q5 
if this is something zoning can help then it should  
3/5/2026 
In person survey written Q5 
This is horrible + harms the planet. That’s it. 
3/5/2026 
In person survey written Q5 we should be working with the given environment not against it, construction of a large scale warehouse strips the land and the community of what could otherwise 
be a space for them, we already have data centers we don’t necessistate more or large one with a pretty lawn  
3/5/2026 
 
In person survey written Q5 
These centers will pave over acres of beautiful desert if we let them build. Why is this worth it? A small landscaping buffer is no consolation.  
3/5/2026 
 
In person survey written Q5 
need to be larger borders. Environmental compatability must harvest 100% of water demands  
3/5/2026 
Kay 
In person survey written Q5 we should consider preserving what little natural land we have left not giving it up to data centers we have so many abandoned buildings in our city already- data 
centers only have a life span of about 10 years (unless the costly serves are replaced) Do we want buidling that massive to join out list of abandoned land that nature 
struggles to reclaim  
3/5/2026 
Roma Lanor 
 
In person survey written Q5 
no parking needed. No jobs. Ban all data centers! 
3/5/2026 
Hernan 
In person survey written Q6 
I thought we made it clear to the mayor & city council: we do not want a data center in Pima County  
3/5/2026 
 
In person survey written Q6 we need the strictest restrictions and regulations. We need to do everything we can to prhibit building of data centers we don’t have enough water for this. For 
future community meetings, I think 20 + minutes at the beginning would be better moved to the end to give everyone who wants to speak a chance people made 
excellent points about enforcement and monitoring  
3/5/2026 
Ary 
In person survey written Q6 
the entire framing is problematic you should be  
3/5/2026 
In person survey written Q6 no data center in the desert. Full stop the standard and proposed standrads neeed to be "no data center larger then the six that exist in the city limits currently and 
no loopholes that would allow 2 or more smaller facilities side by side etc.  
3/5/2026 
In person survey written Q6 Why didn’t the technical advisory committee recruit from a wider range of experts in our community? Why was it so stacked with people who think these are good 
for business development" with little/no concern for the impact on our water energy air quiet biodiversity and especially our health + futures here?! Why wasnt 
there a citizens advisory committee? How will you integrate community feedback + be accountable to what you say you'll do with this? A productive proposal to 
regulate large-scale data centers means listening to Tucsonans who said no (overwhelmingly) to project blue + designing a code that effectively stops these from 
being built here at all! We dont need or want these! these centers are being built to profit from the survalliance of people- immigrants, health care centers, 
educators, workplaces  
3/5/2026 
In person survey written Q6 
prohibit data centers require a vote of the public  
3/5/2026 
 
In person survey written Q6 
no data centers please! Data centers should not impose on people! The city has the power to be different  
3/5/2026 
In person survey written Q6 
we don’t want data centers! This is the Desert!

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
29 
 
3/5/2026 
In person survey written Q6 
why are people who directly benefit ($$) from lesser regulation on the advisory committee (TEP USAF, data ceneter) why were they asked before citizens? 
3/5/2026 
In person survey written Q6 
no data center in Tucson. No data center in tucson…... 
3/5/2026 
 
In person survey written Q6 consider nature. These regulations should aim to enhance the wonderful natural aspects of Tucson and our place within it. We must be good stewards of the land. 
This is simply slightly minimized exploitation. How above no exploiting the earth 
3/5/2026 
Kay 
In person survey written Q6 we shouldn’t be spedning time trying to find a way to let this city have large data centers we should not and cannot have data centers here. We need to prohibit data 
centers (transparancy requires company honesty- how many mass corporations have lied or left out key data in the past)  
3/5/2026 
Roma Lanor 
In person survey written Q6 why are these being considered losing our resource for what? Add noise heat vibration, energy use, and water use. We don’t have the resoruces to support this kind 
of industry. The companies are going to violate the policies. Ban all data center in tucson pima county & arizona  
2/19/2026 
Online Survey Q1 
Define Large-Scale Data Centers 
How large are average data centers currently in Tucson in square footage? What is their comparative energy intake? Who do these current data centers service, and 
if they service the public how many do each service? Can this information be combined into a pamphlet with an illustration so people can see how much a proposed 
“large” data center would be in comparison? 
 
Eligible Locations and Review Process 
I don’t think City of Tucson should allow co-location of data centers with existing power plants being used to meet electricity demand from existing customers. 
Replacing this existing generation with other sources of generation could increase emissions and costs for other customers. I think we should consider creating a new 
zone separate from I-2 for large-scale data centers. 
I would like more citizen visibility and widespread advertising when it comes to a large data center. Billboards, three-month long newspaper ads, regular reminders 
on all major local television networks, social media, pamphlet handouts with informed persons who can take questions, and roadside signs. 
It’s important to first establish “why should I care?” If a zoning amendment is made, will that mean we the people do not get to decide on the establishment of a 
data center? How much  power do we the people have now and how much will we have after the amendment? 
 
I’d like to increase the enhanced public notice mileage area (which you proposed as half a mile for property owners and 2 miles for HOAs) to 1 mile and 4 miles 
respectively. 
2/20/2026 Colleen 
Online Survey Q1 
I am concerned about the placement of the Data Center.  The impact the large scale data center will have on our current water supply and energy supply.   
2/20/2026 Joyce T. 
Smith 
Online Survey Q1 
⛔❌⛔NO DATA CENTERS IN TUCSON  
OR PIMA COUNTY, AZ. PERIOD⚫ 
2/22/2026 Liam 
Donovan 
Online Survey Q1 
The definition is fine but large scale data centers per this definition should be entirely banned. They use up our electricity, land, and water while providing no benefit 
to rhe community or the world 
2/23/2026 
Online Survey Q1 
Please rewrite the regulation definitions to make it impossible to build large-scale data centers here. We do not want them here, they add no benefit to our 
community and they will only cause us harm.  
2/23/2026 Fiona 
Online Survey Q1 
I just think they shouldn’t be a thing so if I picked the wrong answer know that I don’t stand with data centers 
2/23/2026 
Moxy Smith 
 
Online Survey Q1 
I believe we need to halt data center construction in Tucson.  data centers take more than they give- just the worst kind of "growth".  It is antithetical to any kind of 
sustainability goals to ballon city power demands for projects that provide products unnecessary for human survival and happiness.   
2/23/2026 
Online Survey Q1 
Large-Scale data centers are massive and complex entities, with substantial impacts not just at the locations themselves, but within the infrastructure they require. 
The process needs to regulate and create extreme clarity on sound, power generation, backup power facilities, heat generation and overall environmental impacts.  
2/23/2026 
Online Survey Q1 
We are already in a scarce water situation. Places in texas and Georgia are already suffering greatly from these centers. Locals are struggling to get enough waters 
through their pipes due to the centers. Are we seriously considering letting huge data centers suck our water dry and kill the desert in the process? The Tucson 
community is strong and has and will be here forever, data centers do not need to be a part of our environment

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
30 
 
2/23/2026 
Sharyn 
Marie  
Online Survey Q1 
Tucson City Council should be responsive to constituent feedback & be using city resources to  ban data centers within our community vs creating ways to fast track 
future approvals based size.  Size of a data center is second to HOW MUCH WATER & ENERGY WILL A DATA CENTER CONSUME, HOW MUCH AIR-WATER-NOISE 
POLLUTION WILL IT EMIT.   
 
The city has already spoken loud and clear —TUCSON DOES NOT WANT DATA CENTERS   
2/23/2026 
Luke Felix-
Rose 
Online Survey Q1 
In my capacity as a student, as a community organizer with Climate Action Campaign, and as Vice President of the West University Neighborhood Association, I stand 
firmly against the proposal of such extractive development. Not just in my backyard, but in any yard, it is heinous, unnecessary, and provides a product that will soon 
crash and leave our community decimated in the aftermath. Please stop this nonsense. 
2/23/2026 
Online Survey Q1 
For any data center to be built in an area such as the desert which has extremely minimal groundwater and has to borrow the rest of it from out of state, is a horrible 
outcome for any long-term sustainability. Other ways of supplying power, such as using electricity, also requires water usage. Not to mention, the additional heat it 
brings to an area already over-temperature year after year. Any allowance of facilities like this is a major blow to the American Southwest. 
2/23/2026 mary-gray 
mahoney 
Online Survey Q1 
We should not be allowing for ANY data centers in the desert, so we do not need to have zoning for them. 
2/23/2026 
Kielly Lewis 
Online Survey Q1 
Absolutely NO DATA CENTERS. We have said resoundingly and loudly as a community that we do not want these no matter what size they are. We cannot afford to 
deplete the little water we currently have and we are months to years away from losing our rights to the Colorado river water. Put a permanent ban on the agenda 
and follow the lead of so many other communities across our country to protect themselves against this extractive, harmful and FAILING industry.  
2/23/2026 
Online Survey Q1 
NO to large scale data centers! NO to small scale data centers! NO to imperial backed data centers!!! NO to data centers on NATIVE NATIONS’ LAND!!! 
2/23/2026 Rae Lynn 
Reffruschinni 
Online Survey Q1 
We should prohibit all data centers from being built in the Tucson area. WE HAVE NO WATER! Our CAP amount is being cut. We are in a drought. We can not sustain 
any more growth. The business opportunities are small and short lived. In addition, the light, noise, air and water pollution is bad for everyone. 
2/23/2026 Daniel 
Rodriguez 
 
Online Survey Q1 
We want NO data centers at all. There is no need to have data centers in a desert that lacks water. I don't care how many "solutions" are given we font want more 
large warehouses filled with computers that will bring no permanent jobs, fill expand our carbon footprint and contribute to acoustic and overall pollution  
2/23/2026 
Nicole  
Online Survey Q1 
Large scale data centers are wrong for our community. I ask that staff be redirected to these regulations to make them prohibitive of data center construction in 
Tucson and Pima County at large. The Tucson community has shown up to say that data centers are not only an unpopular but extremely unwanted resource within 
our community. The UN recently declared that we are entering an era of global water bankruptcy. Large scale data centers subtract from our water table in an 
environment that will become even more volatile in an world of growing water scarcity. Protect our environment and protect the needs of our community. Listen to 
us, please.  
2/23/2026 
Sarah 
Osborne  
Online Survey Q1 
The people of Tucson and Pima County have voiced concerns over the negative environmental and economic impact that a data center would have, and yet this issue 
is still being pushed through. Please listen to your constituents and stop all proceedings that would involve data centers being built in Tucson, Pima County or Arizona 
in general.  
2/23/2026 BEV PAUL 
Online Survey Q1 
VERY concerned about the TRUTH of any info regarding any data center.  
2/23/2026 
Coral  
Online Survey Q1 
We the customers of TEP and Tucson Water will end up paying for the data centers. Already raising/wanting to raise our rates dramatically- and deal in CAP looks bad 
for Tucson. Putting the cart before the horse. While you are trying to be proactive, it could only end up meaning covering your "sss" when "the people" are upset - 
look at issues around country with mines - pollution, bankruptcy etc. Data centers the "new" mines. 
2/23/2026 Carol Plotkin 
Online Survey Q1 
Redirect staff to write regulations so they make it impossible to build large scale data centers here.  
2/23/2026 Emily Stulz 
Online Survey Q1 
We do not need any data centers here in Tucson and I ask that we rewrite this to make it very clear they are not allowed. 
2/23/2026 
Jon Ralston 
Online Survey Q1 
I understand the staff has been directed by the City Council and City Manager to go through this process, but I can't express how frustrating it is to have to continue 
to fight this as well as the City Council and City Manager with malice of forethought continuing to force this issue.   
2/23/2026 
Megan 
Online Survey Q1 
A large reason for the "need" for these data centers all across the country has to do with the mass surveillance state we are seeing grow today. Not only would a data 
center here take away necessary resources from us it would also allow for that state to grow. Data centers are not an inevitability and we cannot have one anywhere 
near here. 
2/23/2026 
Nicole R 
Online Survey Q1 
No data centers in Tucson. We already have so much art and technology in the city, so much beautiful wildlife and nature. These things make our city a great place to 
visit and live, and data centers will ruin all that with zero in exchange.  
2/23/2026 D 
Online Survey Q1 
No data centers in Tucson!! No AI surveillance!! No more funding genocides!!

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
31 
 
2/23/2026 
Online Survey Q1 
No. The regulations need to be so restrictive that Tucson is removed from the radar of these predatory corporations. 
2/23/2026 
 
Online Survey Q1 
NO large-scale data center is appropriate, so the proposed zoning review process is inadequate as it falls short of simply prohibiting these data centers. It doesn’t 
matter if data center corporations have to jump through a couple additional hoops; there will be objectively grave consequences on our local community and 
environment if these centers are constructed that far outweigh any perceived gains. 
2/23/2026 
Darcy Nagle-
O’Brien 
Online Survey Q1 
The city of Tucson and Pima County are located in a desert. We live under constant threat of inadequate water to sustain our modern lifestyle. Potential major 
restrictions of CO River/Cap water are on the horizon. AI technology is speculative and NOT necessary. It undermines many job sectors and many of its applications 
are useless. For these reasons, it makes no sense to build data centers in Pima County.  NONE. The companies that will profit from these data centers are notoriously 
unethical and profit-driven. To date, they have not provided any assurances/terms of accountability for the promises they make to recycle the vast amounts of water 
and electricity that would be required to run these massive computer banks.  
The jobs provided by the data centers are extremely limited and mostly consist of construction contracts to bulbs the data centers.  
It is imperative to understand that data centers are neither inevitable nor necessary. This idea is being pushed by those who stand to gain massive short-term profits. 
this is a speculative industry, pushing us to accept it and a cost that is too large. Furthermore, constructing them in a fragile desert environment is tantamount to 
erasing our way of life.  
2/23/2026 Gillian 
Online Survey Q1 
The review process needs to seriously consider how dangerous, energy hungry, expensive, and unnecessary data centers are when defining them  
2/24/2026 
Online Survey Q1 
We live in the desert. Why in THE WORLD would you put a data processing center anywhere, let alone in THE MIDDLE OF THE DESERT. We do NOT have enough 
water to spare. Adding another processing center on this earth is going to cut the amount of drinking water left in HALF IF NOT more. Please use your brains like we 
are. Please don’t help kill the planet faster.  
2/24/2026 
Bekka 
Online Survey Q1 
Change the scale to include facilities 25,000 square feet and above. Require the use of clean, renewable energy for 100% of operations. This is 2026 and we're 
headed into water bankruptcy. Tucson faces increasing threat of fire. Every new regulation we pass needs to be more strict than the last. Tucson is on borrowed 
time. Make them plant 100,000 trees. You can really make them do anything if they want this facility badly enough. And if they don't want it, so much the better for 
us, the residents of Tucson. 
2/24/2026 John 
LaValley  
 
Online Survey Q1 
No Desert Data Center!!! Tucsonans have already made it loud and clear! We don't want any data centers in or around our beautiful city. It's bad for the 
environment, bad for our health, and drains water that's already in short supply. Listen to us! No Data Centers!!! 
2/24/2026 
Online Survey Q1 
No data centers they hurt the communities and resources there will be no value added to the area just damage  
2/24/2026 Elizabeth F 
Online Survey Q1 
The people say No! No large-scale data centers in our desert.  
2/24/2026 
Online Survey Q1 
You've already heard a clear NO from the citizens of Tucson.  Not sure why you're continuing this process anyway.   (I know, developer pressure.) 
2/24/2026 
Online Survey Q1 
NO DATA CENTERS IN TUCSON OR PIMA COUNTY. 
2/25/2026 
Zion 
Alderette  
Online Survey Q1 
I do not feel having large scale data centers in our community is going to benefit Tucson residents in a meaningful manner. The various contradictions outweigh the 
benefits. Tucson residents pride ourselves in being innovative and forward thinking. The cost for water, electricity, the environmental hazards that having a large 
scale data center causes more harm to a population. Tucson has seen other larger communities agree to large data centers and seen the impacts it negatively had 
within those communities.. yes we want increased employment opportunities, we want corporations to want to move here to our beautiful community. However, 
We do not want corporations that will permanently harm our citizens. 
2/26/2026 Landon S. 
Online Survey Q1 
I feel that there needs to be a requirement for more community feedback or community involvement in the planning process.   The definition seems fine.   
3/4/2026 
Ellen 
Online Survey Q1 
Need lots more information. 
3/4/2026 
Bruce Plenk 
Online Survey Q1 
If approved, then big expansion, is a new application, hearing, etc required?? 
3/4/2026 
TL Cross 
Online Survey Q1 
Is there  an additional level of fact-checking when the applicant requests or answers your questions to make sure they are being truthful and transparent? 
3/4/2026 
Online Survey Q1 
At which point during the review process is the environmental aspect taken into consideration? (light pollution, water availability, impact, neighboring town impact, 
etc). 
3/4/2026 
Online Survey Q1 
Feels to big 
3/4/2026 
John Moffatt 
Online Survey Q1 
I-2 zoning makes sense.  Please consider the lands under the DMAFB Departure Corridor where any land use for dense population is prevented - no homes, 
apartments, dense employment uses.  Also suggest that 50,000 sf is considered to be a medium data center.  Suggest 100K sf.

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
32 
 
3/4/2026 
Online Survey Q1 
At first I was thinking that since the city does have within it's zoning laws the ability to reject buildings for "purpose" I thought you could just not approve data 
centers based on that but I appreciate the effort to have the review process dictate whether the business can meet the criteria to not impact the water and electric 
needs of the community so I support this proposal. 
3/4/2026 
Online Survey Q1 
What kinds of accessory uses likely go along with a data center, and do the accessory structures related to a data center need some considerations? for example 
onsite water treatment for water recycling vs putting it into the main system? what are the impacts to wastewater infrastructure? 
 
Is there a process for expanding the data center on an established site? If an established site wants to add additional data processing, is that also a mayor and council 
approval? Do they repeat all of these steps and submit the same materials (energy declaration, etc) 
 
is there a maximum amount of sf allowed, other than via lot coverage?  
3/5/2026 
Heather 
Kaylor-
Mayhew 
Online Survey Q1 
Why does this keep coming up? The city council voted no in August and yet, here we are again.  
3/5/2026 
Online Survey Q1 
We should not have any large-scale data centers in Tucson. 
3/5/2026 
Christian 
Garcia 
Online Survey Q1 
These data centers will set back our city, I’m glad we are taking action. 
3/5/2026 
Online Survey Q1 
I believe these data centers need more supervison. 
3/5/2026 
Stephanie 
Perry 
Online Survey Q1 
I'm fully against the idea of having data centers in Arizona. The reason why I'm against it is because A/C cooling for houses that require electricity is already at an 
extreme high especially during the summer for the common folk. The average person already spends around 400 dollars possibly more during the summer just to 
avoid getting heat stroke. If the data centers were to get put in place it would take up way more electrical resources for average people causing their bills to go up. 
The data centers wouldn't be beneficial for the average people and it would just cause more pollution. According to Lincoln Institute of Land Policy AI in 2023 
consumes enough energy to power 100,000 houses along with consuming 5 million gallons of water every day. Having these data centers in Tucson would be awful in 
the long run for normal people. 
3/5/2026 
Online Survey Q1 
A project as massive and complex as a data center campus obviously relies on a wide range of safety codes and standards, including the National Electrical Code, 
NFPA 101, Life Safety Code, NFPA 855, Standard for the Installation of Stationary Energy Storage Systems, and dozens of others. While there is no single standard 
that focuses exclusively on data centers, NFPA 75, Standard for the Fire Protection of Information Technology Equipment, comes the closest. The standard applies to 
information-technology equipment and the various places in a building where it is found, which is basically everywhere in a data center. 
However the city of Tucson only adopted the IFC code for 2024 and not any of the NFPA standards or guidelines that apply. Because the NFPA standards fall a few 
years behind, language in our ordinances stating that the latest versions be applied to these new projects and would be in the best interest of our citizens, our 
community and our brave fire fighters. Please consider adding NFPA adherence to these types of facilities with proposed adoptions. 
3/5/2026 
Megan 
Online Survey Q1 
Why are we hosting meetings about regulations on data centers when we already told you WE DONT WANT A DATA CENTER HERE. This is dystopian. Data centers are 
not inevitable and you have the ability to stop it. Wake up.  
3/5/2026 
Leo 
Online Survey Q1 
We dont need data center to monitor or tucsonans and use digital records against them. 
3/5/2026 
Online Survey Q1 
I feel like mayor and council are still not listening 
3/5/2026 
Derrick 
Espadas 
Online Survey Q1 
Mimics the language and talking points of data center developers and voids the voice of citizens 
3/5/2026 
Online Survey Q1 
Large scale data centers should be defined by how much energy they use.  
 
I appreciate the public input process, that no project is guaranteed approval and is not by-right, and that there is no allowance for segmentation. 
 
The locations where data center could be located are textbook environmental racism. All the locations are on the Southside, closest to communities that have 
already been harmed by industrial development. Renters should be notified too. 
3/5/2026 
Reyes 
Online Survey Q1 
To much unilateral presentation.  Need a townhall

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
33 
 
3/5/2026 
Online Survey Q1 
No larger than the current one of roughly 34000 square feet. Better yet no more data centers at all in Tucson  
3/5/2026 
 
Online Survey Q1 
Given miniaturization and growth of computational density, size is the wrong metric to use for regulation. A MW rating (e.g. 50 MW) would be more applicable. 
 
Distance is also an issue. These facilities generate low frequency noise which in the Sonoran desert travels miles, so distance is very different than A weighted noise 
generators. See the research submitted for more references and details. 
 
Notification should be expanded to 10 miles because of the propagation distances of low frequency noise in the Sonoran Data. 
3/5/2026 
Online Survey Q1 
You need to explain why such an entity would be of help to the citizens of Tucson. What about renters? 
3/5/2026 
Nathan  
Online Survey Q1 
I dislike the 50,000 Sq ft minimum requirement, i think it should be lowered, and I believe there should be a maximum limit defined as well.  
 
 
Every citizen deserves a notification, regardless of whether they own property, or not.  
3/5/2026 
Laurel Shane 
Online Survey Q1 
Need to notify neighbors farther than 1/2 mile. Notifications should go to the property, not the landlord.  
3/5/2026 
 
Online Survey Q1 
Definition should be more broad and inclusive, based on energy use or if it must be by square feet then smaller than 50K. Should not be same controlling ownership 
interest, should allow for multiple interests. Should Include more "and" language, less "or" language. 
The review process should be more inclusive of renters and other residents and businesses, individuals including students and workers, and the notice area should be 
expanded to 10 miles or more. There should be multiple required public meetings, at least 3. Also, the developer should be required to gain a supermajority of 
signatures of approval from all residents within a 20 mile radius in order to develop a large data center 
3/5/2026 
Online Survey Q1 
These regulations do not grow nearly far enough. No data centers. Stop it.  
3/5/2026 
Online Survey Q1 
Please do NOT allow data centers here. We do not want AI and we want to protect our fragile ecosystem above all. 
3/5/2026 
Online Survey Q1 
Define large data center as 50,000 contiguous or non-contiguous in the same city.  
 
Review process doesn’t allow time for public verbal comments.  
3/5/2026 
C Sipp 
Online Survey Q1 
Data center means a facility consisting of one or more buildings (whether constructed 
simultaneously or in separate phases) used primarily for the storage, management, 
processing, and transmission of digital data, which houses computer or network equipment, 
systems, servers, appliances, and other associated components related to digital data  
storage and operations. Data center includes commercial cryptocurrency mining operations 
and processing. 
Small-scale data center means a data center that has an electrical design capacity of 20 MW 
or less, and that uses less than 50 gallons per minute of water or less on an annualized 
basis. For the purposes of determining compliance with power and water usage thresholds 
in this ordinance, all data center buildings that are part of a phased or multi-building campus 
shall be evaluated in the aggregate, regardless of whether such buildings are constructed 
simultaneously or in separate phases. 
Large-scale data center and above means a data center that has an electrical design capacity greater than 20 MW or that uses more than 50 gallons per minute of 
water on an annualized basis. 
For the purposes of determining compliance with power and water usage thresholds in this 
ordinance, all data center buildings that are part of a phased or multi-building campus shall 
be evaluated in the aggregate, regardless of whether such buildings are constructed 
simultaneously or in separate phases. 
 
Purpose. The purpose of Large-Scale Data Center District is

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
34 
 
to provide a clear, comprehensive, and predictable regulatory framework for the siting and 
operation of large-scale data centers within Tucson. Large-scale data  
centers are characterized by substantial long-term demands on public infrastructure, 
including electrical power, water supply, transportation systems, and emergency services, 
as well as potential impacts on surrounding land uses and environmental resources. This 
district is intended to ensure that such facilities are evaluated, located, and developed in a 
manner consistent with the Comprehensive Plan (TBD); that their infrastructure and operational 
impacts are appropriately reviewed and mitigated; and that the City can fulfill its longterm fiscal, infrastructure, and community responsibilities associated with 
hosting 
generational infrastructure facilities. 
(b) Principal permitted use. 
(1) Large-scale Data Centers. 
(c) Accessory Uses. 
(1) Battery energy storage systems (BESS). 
(2) Solar arrays and other similar on-site renewable power generation systems. 
(3) On-site standby or backup power generation. 
(4) Electrical substations, switchyards, or power distribution equipment. 
(5) District energy or microgrid infrastructure. 
(6) Water treatment and recycling facilities. 
(7) Office, maintenance, and employee support facilities incidental to the data center. 
(d) Major site plan required. A major site plan shall be submitted and reviewed prior to the 
approval of a large-scale data center. A large-scale data center shall require rezoning to 
the zoning district, unless already located within such zoning district. 
(e) Additional information. 
(1) The following information shall be submitted on the major site plan, or in narrative 
form, supplied by the applicant with any application for rezoning to the zoning 
district: 
a. Legal description of all properties leased and/or owned, that are identified to be 
part of the project area; 
b. A description of the project including development timeline, location of buildings, 
parking, approximate number of employees; 
c. Water Study. A water study shall be submitted demonstrating that sufficient 
water resources are available to support the proposed use as described in 
See water comments 
d. Economic Development Agreement. The applicant shall enter into an Economic 
Development Agreement (“EDA”) with the city 
 
I have more but for some reason this format does not allow all the recommendations.  That is not good or ideal. 
3/5/2026 
Karen 
MacDonald 
Online Survey Q1 
Why allow exceptions for a large-scale data center at all (in a PAD or PCD)?   
3/6/2026 
Online Survey Q1 
We live in a desert, we should not have one of these. 
3/6/2026 
Toni Gosinski 
Online Survey Q1 
Need to make sure water can't be taken.  Drought and a lack of CAP water will create dangerous conditions in arizona in the next 50 years.  I know the large scale 
water ordinance is a guard rail let's just make sure we don't have too many small data centers that add up to the functional equivalent to a large one.  Need a upper 
limit on total water usage across all data centers using Tucson water. 
3/6/2026 
Lynn Price 
Online Survey Q1 
Looking at the TAC report: I wonder how current codes are working for existing data centers.

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
35 
 
3/7/2026 
Online Survey Q1 
The review processes and definitions of large-scale data centers are nowhere near strict enough to protect the residents in Tucson. To put it bluntly: unless these 
companies seeking to build facilities in our desert--which will bring more costs than benefits (people will get sick and die from the pollution that data centers bring)--
have revolutionary water treatment and reclamation methods, then they should not be allowed to build here at all. We are a desert with already scarce water supply 
and simply cannot afford a data center being built here. 
3/8/2026 
Online Survey Q1 
I like that property owners within a half mile and neighborhood associations within 2 miles are included in the review process. I would like to see property owners 
within 2 miles notified because that is the distance the low hum can travel that far; this also seems more appropriate when a data center is being proposed for a PAD 
rather than I-2.   
3/11/2026 
Online Survey Q1 
I want the mayor and council to more overtly declare that Tucson will NOT host data centers. They are a self-replicating blight on the land and they will only draw 
more. Oppose them entirely please.  
3/11/2026 
Online Survey Q1 
The need is growing.  We can no longer hide the need.  People are afraid of change.  Managed correctly and it will be fine.  
3/11/2026 
Anthony 
Young 
Online Survey Q1 
Placing a data center in a location without sufficient water resources is irresponsible. I can see no community benefit nor justification for doing so given the shortage 
of water in southern Arizona. In fact, continuing to move forward with this project over the objection of community members is a flagrant disregard of the wishes of 
the public and suggests corruption given this appears to be driven by certain business interests. Sad to see government leaders forcing a data center on the public. 
3/11/2026 
Online Survey Q1 
I feel that the biggest factor to be considered in the review process should be the opinion of the homeowners and neighborhood associations. If the majority of them 
vote no, then we should not allow the data center to be built.  
3/11/2026 
Online Survey Q1 
No water/ power data centers in Pima County  
3/11/2026 Kerry Hales 
Online Survey Q1 
TEP and GOP want to overturn public input  
3/11/2026 
Online Survey Q1 
In definition on website should read used for instead of use for 
3/11/2026 
Online Survey Q1 
Throughout this entire saga, Tucson citizens have repeatedly rejected building a data center in southern Arizona. The fact that we’re still fighting speaks to a failure 
on the part of local government and corporate commission. Once again, we reject any plans, current or future, to build data centers in Pima County.  
3/11/2026 Novaray 
Online Survey Q1 
Not excited about massive power or water usage but glad to see a practical plan to move forward 
3/11/2026 
Annette 
Robertson 
Online Survey Q1 
Resident opinion should take priority - nothing happens if we are not living here or paying taxes. I moved away from Goodyear because the enormous desire to fill 
our empty spaces with buildings that bring NO value to the residents. We do not need to be the dumping ground for projects rejected in other more "beautiful" 
places. PLUS, we are in the Sonoran Desert - no place for an industry that pulls from our extremely valuable and diminishing resource of water. You lose all credibility 
when encouraging water conservation and then consider allowing data centers. It is laughable and totally incongruent with our desert, Tucson, and Pima County 
values. Thank you!  
3/11/2026 
Online Survey Q1 
there is no way this is not going to cause more cost to the citizens of Tucson. It benefits the company and the company Board of directors and the CEO of the 
company pushing this program. Let alone a host of other issues that will be something that the Tucson citizens will have to face and will not be able to reverse.

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
36 
 
3/11/2026 
Stephanie 
Duncan 
Online Survey Q1 
Applicants must define how they will process their electronic waste when components of their systems fail or become obsolete and need replaced. Their waste 
cannot go into public landfills. 
 
Smaller buildings can be hubbed together, and equipment can get smaller, so there needs to be smaller threshold than a 50,000 square foot facility-size.  
 
The definition of Data Center cannot be left open so that data-centers can be allowed to lease data services to third parties. Data centers frequently lease their "data 
services" and an "on-site" property owner could be a shell for an international company. All data centers, regardless of who is using the services, need to be strictly 
controlled and limited.   
 
Property buyers cannot be trusted to provide their own reports for proving adequate water supply. This is the desert, and there is not enough water for life.  
 
Notifications need to be sent to anyone living within a 10 mile radius of a proposed center. Noise and air pollution travel further than 2 miles. 
 
Energy providers (owned by Canada) must charge a higher electric rate to data-centers. Individual customers cannot be expected to pay to increase TEP's capacity 
and improve their electric grids because big data wants to give them money.  
 
Part D, second bullet point is incomplete in regard to limiting sound when in proximity to _______? 
 
"Enhanced" landscaping needs require that there be native plants and big pollinator gardens.  
 
Aesthetics won't save water and stop wasted electricity. We don't need AI. The desert ecosystem does not need data centers. 
3/11/2026 
Online Survey Q1 
I am concerned regarding the massive water usage required for such a project anywhere in AZ. We are in a severe drought and have been for decades. This wont 
help the matter. As far as the massive energy usage, let the tech billionaires pay and provide for that themselves. They’ll be making money off this. Let it be their 
investment for doing business with Tucson. Im sick of these guys literally getting away with murder with their unregulated destructive ideas; social media in 
particular along with AI.  
3/11/2026 
Online Survey Q1 
***LARGE AND HYPER-SCALE DATA CENTERS ARE NOT INEVITABLE!*** 
 ***Tucsonans do not need or want ANY large-scale data centers*** 
 
3)Definition: 
-I agree that a clear definition is necessary to create restrictions.  
-IF City of Tucson is still considering allowing the building of large-scale data centers DESPITE DISAPROVAL of Constituents as well as endless negative energy, water, 
environmental and human implications, should there be an upper limitation that would ALWAYS be declined? Example: Large and hyper-scale defined as 50,000-
100,000sq ft. The City of Tucson will reject any proposal >100,000sq ft. Without a clear report of rejecting over the upper limit, I feel that there will be opportunity 
for manipulation of the language that could result in attempts at even larger facilities 
 
4)-Review Process: 
-Required neighborhood meeting invites should be expanded to include ALL humans living and working in the defined area. Specifically, renters (not just property 
owners), all schools and daycares (individual locations and district/administration level), as well as health clinics/doctor’s offices/hospitals (individual locations and 
administration level). It is imperative to notify individual humans and locations as these are the humans effected, out of town property owners will not have the 
same buy in. 
-The Notification Radius should be larger than the proposed increase. If the intent is to build a huge, hot, loud, water sucking, undesirable and unnecessary shelter 
for computers in an area that has limited resources, and is already subjected to environmental racism, the people that will be affected should know. All humans that 
LIVE and WORK within 2miles should be notified of neighborhood meetings. There should be several neighborhood meetings at varying times with enhanced

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
37 
 
accessibility. 
 
3/11/2026 
Online Survey Q1 
Needs more transparency 
3/11/2026 
Online Survey Q1 
Data centers are required to maintain our global competitiveness.  
3/11/2026 
Online Survey Q1 
Alternate cooling method  
3/11/2026 
Online Survey Q1 
The public should have input on proposed large scale data projects. No NDA’s should ever occur and should be outlawed. The taxpayer is the biggest stakeholder and 
should be notified immediately.  
3/12/2026 optional 
Online Survey Q1 
Not enough unbiased review. MONEY ALWAYS talks. 
3/12/2026 Gretl 
Krooksmer 
Online Survey Q1 
Data centers suck up water and natural resources while providing zero benefits to the communities in which they are placed. They provide no jobs in their 50,000 sq 
feet buildings. They are a blight. Please do not allow big tech to steal more of the desert's beauty 
3/12/2026 
Online Survey Q1 
Why are we allowing energy hungry companies utilize our resources? Why are residents not protected from skyrocketing utility bills? 
3/12/2026 
Online Survey Q1 
I think it's ridiculous to have an AI plant here- let alone ANYWHERE! It's terrible for the climate and it's sucking the creativity and life out of people. BOOOO AI  
3/12/2026 Divinity 
Caldwell 
Online Survey Q1 
The parameters shared during this meeting are not strict enough to prevent exploitative and extractive companies from trying to weasel in a hyperscale data center 
that would use a lot of resources  
3/12/2026 
Online Survey Q1 
I firmly believe that we need to add CoT taxing to the data centers.  The funding from said taxes should then be used to further cover the costs of the Thrive Zones 
and the Prosperity Initiative. 
3/12/2026 
Lisa Stee  
Online Survey Q1 
Let them come. I don’t believe a data center is wildly different from any other proposed industry and I don’t think we need yet another set of codes and a new 
permitting process to deal with them. Complicating our business codes yet again only drives up the cost of doing business in Tucson and that is a serious long term 
problem.

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
38 
 
2/19/2026 
Online Survey Q2 
Energy Consumption and Sourcing  
What will be the conditions for utilities to serve data center customers? Can there be minimum revenue obligations, as well as prepayments, and required letters of 
credit for those costs? 
 
Is there a way for regulators to hold utilities accountable for developing new electricity supplies required by data centers, perhaps basing accountability on firm 
commitments with financial backing from data center customers? 
 
Utilities should also utilize rate-setting processes to track transmission costs caused by specific customers. Data center customers (and other large loads) must be 
required to pay the costs of direct transmission connection. Utility companies should recognize these costs in retail-cost-of-service studies so that costs can be 
allocated appropriately. 
 
Water Use and Sourcing   
I need more information. If large water users use more than 10,000 ccf, what do the current largest water users use? Can we get an example list? Can we get a 
comparison to a single Walmart? (Or something simple that can help people mentally measure how big this thing is) Can we get a comparison with the average 
neighborhood and a single household? 
2/20/2026 Colleen 
Online Survey Q2 
I hear a lot about our water scarcity.  How will this data center that uses a lot of water to cool the data center impact our current water supply?  Tucson is growing 
with more people moving in.  The south west has always had a problem with water.  How is this going to impact our water supply going forward into the future? 
2/20/2026 
Joyce T. 
Smith 
Online Survey Q2 
⛔❌⛔NO DATA CENTERS IN TUCSON  
OR PIMA COUNTY, AZ. PERIOD⚫ 
2/22/2026 
Liam 
Donovan 
Online Survey Q2 
We should not be giving any electricity or water to these data centers whatsoever 
2/23/2026 Fiona 
Online Survey Q2 
I kinda don’t know what these fully mean and I don’t stand with data centers they may leave 
2/23/2026 Moxy Smith 
Online Survey Q2 
no amount of water or power should be allocated to data centers.   
2/23/2026 
Online Survey Q2 
Power generation and how it is handled need to be addressed on a regional basis, not just on a facility-by-facility or project-by-project basis but needs to be holistic. 
Methods, power generation and what happens to the area water with increased generation capabilities in place given the water restrictions in place and coming 
from the Colorado River.  
2/23/2026 
Online Survey Q2 
No data centers. Not a drop of water 
2/23/2026 
Sharyn 
Marie  
Online Survey Q2 
Do your job & be responsive to the community - not the corporations.  
2/23/2026 
Luke Felix-
Rose 
Online Survey Q2 
As a TEP ratepayer, I will be put one step closer to homelessness, a status that is criminalized by the City of Tucson. Projects like Hyperscale Data Centers will 
certainly increase the infrastructure needed by TEP, thus increasing my rates, lowering my quality of life, and making me less financially stable. If you push this 
through I will take it as a hostile stance against me personally.  
2/23/2026 
Online Survey Q2 
For any data center to be built in an area such as the desert which has extremely minimal groundwater and has to borrow the rest of it from out of state, is a horrible 
outcome for any long-term sustainability. Other ways of supplying power, such as using electricity, also requires water usage. Not to mention, the additional heat it 
brings to an area already over-temperature year after year. Any allowance of facilities like this is a major blow to the American Southwest. 
2/23/2026 
mary-gray 
mahoney 
Online Survey Q2 
The only appropriate answer is NO DATA CENTERS. 
2/23/2026 Kielly Lewis 
Online Survey Q2 
TEP is already out of control and we need a public option for our energy sources. It has been proven we can do this. In addition adding anything to the agenda or 
considering future projects that will deplete our water resources is foolish and dangerous to the area.  
2/23/2026 
Rae Lynn 
Reffruschinni 
Online Survey Q2 
We should prohibit all data centers from being built in the Tucson area. WE HAVE NO WATER! Our CAP amount is being cut. We are in a drought. We can not sustain 
any more growth. The business opportunities are small and short lived. In addition, the light, noise, air and water pollution is bad for everyone.

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
39 
 
2/23/2026 
Daniel 
Rodriguez 
Online Survey Q2 
The appropriate standards are zero energy and zero water provided to these datacenters. As seen across the country, the neighboring communities end up with 
higher energy bills, subsidizing the data center for companies that just want to keep dividing us for their profit. This is not something that will benefit the community 
hence it should not be allowed within it 
2/23/2026 Nicole  
Online Survey Q2 
Data centers are water negative. Any proposed compliance with large quantity water ordinances does not negate this fact. No data centers in Tucson or Pima county. 
2/23/2026 
Sarah 
Osborne  
Online Survey Q2 
There is so much evidence to support that data centers cause significant negative impacts on water sources and energy rates in the areas they are operating.  
2/23/2026 Coral  
Online Survey Q2 
What You ask and they agree too is not necessarily what will happen in practice. Where are the fines and other legal repercussions . 
2/23/2026 Carol Plotkin 
Online Survey Q2 
Redirect staff to write regulations so they make it impossible to build large scale data centers here.  
2/23/2026 
Online Survey Q2 
Demonstrating an "adequate water supply" is likely impossible in reality given the state of the Colorado River. Please strengthen this requirement. Recycled water 
should not be considered less valuable or separate from potable water—we have One Water. 
2/23/2026 Emily Stulz 
Online Survey Q2 
We have minimal water already and don’t need to be using it for data centers. 
2/23/2026 Jon Ralston 
Online Survey Q2 
Ban hyper scale data centers 
2/23/2026 Megan 
Online Survey Q2 
We haven't gotten any real transparency to our questions about data and water usage. The boards stance seems to be that it won't make any impact on us but 
looking around the country we see that is not true. Also we do not have the resources to provide a data center. 
2/23/2026 D 
Online Survey Q2 
We live in a desert!! We CANNOT provide water for data centers! 
2/23/2026 
Online Survey Q2 
The standard seems to consider whether the user has assured access to water and power, but does not appear to consider additional costs to the utility (and thus 
other users) to provide that water and power. 
2/23/2026 
Online Survey Q2 
Needs to consider the Colorado River levels. We are a desert. The years are getting warmer. We do not have the surplus of resources or the desire to just these 
community-destroying entities. 
2/23/2026 
Online Survey Q2 
NO large-scale data center is appropriate, and the proposed energy/water use and sourcing standards are inadequate. They are incredibly vague and provide no real 
guidelines. What does “access to adequate energy/water supply” even mean? It seems like this is purposefully left vague so that the data center corporations 
themselves can potentially decide what it means when submitting their application. Again, however, this falls short of simply prohibiting these data centers, which is 
the only correct and ethical decision the City of Tucson can make. 
2/23/2026 
Darcy Nagle-
O’Brien 
Online Survey Q2 
We do not have the necessary water and the energy required would be prohibitively expensive as well as detrimental to the environment.  
2/23/2026 Gillian 
Online Survey Q2 
These need to be incredibly strict, we are living in a water deficit, it is not understandable to give resources to an unwanted data center 
2/23/2026 
Online Survey Q2 
Tucson doesn’t need harsher conditions 
2/24/2026 
Online Survey Q2 
Please use your brains when deciding to NOT add a data center in the middle of the desert  
2/24/2026 Bekka 
Online Survey Q2 
Restricting the use of potable water is a good start, but how does that get enforced? Regulatory agencies have been disbanded left and right over the past year. We 
don't know what the future holds. The best thing we can do is to restrict water use. Tucson does not have the water for data centers. 
 
Make them use clean, renewable energy for 100% of their operations. We don't want to breathe more smoke from TEP burning more oil, and we don't want our 
electricity costs rising either.  
2/24/2026 
Daisy 
Flowers  
Online Survey Q2 
Large scale data centers should not be allowed to be built here in Tucson at any capacity. We will not allow what has happened to other cities happen to ours. The 
environmental impact is irreversible and it is always at the expense of us civilians, both environmentally and economically when the energy cost is passed down to 
our bills.  
2/24/2026 Elizabeth F 
Online Survey Q2 
Large-scale data centers are so extractive and devastating for the climate. Allocating resources to developing data centers is especially harmful to the nearby 
Indigenous communities that are already facing resource insecurity. 
2/24/2026 
Online Survey Q2 
Too lax, not enough oversight. Inappropriate to have energy-guzzing and water-guzzing enterprises in the desert. 
2/26/2026 Landon S. 
Online Survey Q2 
I feel that there needs to be something built in for water amount tier payment increase requirements and a required amount of renewable energy infrastructure as a 
percentage of energy use 
3/4/2026 
Ellen 
Online Survey Q2 
We are running out of water. For existing HUMANS living here. Too many unknowns.

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
40 
 
3/4/2026 
Bruce Plenk 
Online Survey Q2 
Unclear if or what penalties for not following plan?? I didn’t see any requirements for using rainwater harvesting, white or “green” roofs, non potable water for 
appropriate uses, etc 
3/4/2026 
TL Cross 
Online Survey Q2 
Again double-checking to make sure that the applicants answers are truthful and transparent.  
How are you going to do that? 
3/4/2026 
Online Survey Q2 
Showing that they can provide the resources doesn't mean that they are appropriate methods. Using other counties to provide power isn't ethical. 
3/4/2026 
Online Survey Q2 
Need analysis of how usage affects tep capacity and pricing for others long term 
3/4/2026 
John Moffatt 
Online Survey Q2 
Sourcing of energy needs to be broader as new energy sources are developed - example - Small Nuclear 
3/4/2026 
Online Survey Q2 
If energy is sufficient or can be generated, but costs will increase due to transmission or other infrastructure needs, applicant should cover those expenses to prevent 
cost increase to existing customers. 
 
Water should default to closed loop. If using once through or open loop (even with recycled water) we should seek to condense and recapture through passive 
systems and reuse or put into surrounding plant areas proposed at borders. Wastewater is also a concern- must show we can properly process blowdown given scale 
and potential impact to our grey water systems. Any expenses to enhance water processing should be borne by company. 
3/4/2026 
Online Survey Q2 
I'm not sure exactly how businesses would meet the standards but they are exactly what is needed.  What I wasn't clear on is what happens to a business when it 
violates those standards?  It should result in something painful to the business or they could just pay the fine and continue making water/electricity an issue for 
residence. 
3/4/2026 
Online Survey Q2 
Thank you for covering gaps not covered by the LWUO. 
 
What goes into the energy declaration? How can we ensure the declaration is clear and thorough enough to hold them accountable? What does enforcement of 
energy demand/sources look like? 
3/5/2026 
Heather 
Kaylor-
Mayhew 
Online Survey Q2 
Study after study shows the detriment data centers cause to the environment and communities they are built in. Please do your research and vote no on text ring 
and continuing this discussion on data centers in Southern Arizona.  
3/5/2026 
Online Survey Q2 
We should not be paying for billionaires who don't want to pay for their own data centers. 
3/5/2026 
Online Survey Q2 
This can be extremely dangerous in the future, for all we know we can suddenly run out of water or electricity and energy, now what? Not only that, the demands go 
up, and so will the price and taxes. Nobody will want to live in a situation like this. 
3/5/2026 
Online Survey Q2 
In other states the consumer ended up getting their electric rates increased. Mega users should pay and offset the costs, adopt a no water usage policy for data 
centers. They can use lubricants 
3/5/2026 
Megan 
Online Survey Q2 
Stop this garbage and fight against the data center, which you have the capacity to do by being in control of land use 
3/5/2026 
Leo 
Online Survey Q2 
Our water are for tucsonans use only 
3/5/2026 
Online Survey Q2 
I feel like mayor and council didn’t listen to us the first time: Tucson cannot support large scale data centers 
3/5/2026 
Derrick 
Espadas 
Online Survey Q2 
No means no. Why do outside corporations get to violate us 
3/5/2026 
Online Survey Q2 
Energy should be 100% renewable. And get rid of TEP. Public power for Tucson!  
3/5/2026 
Reyes 
Online Survey Q2 
Must be threshold where if they do not remain within use electricity or water is shutoff,  not just fined! 
3/5/2026 
Online Survey Q2 
There needs to be a much better cross agency approach to power supply, generation and delivery. These have massive impacts on resources and resident cost, which 
MUST be transparent. Bouncing who owns what between agencies is irresponsible and the government side MUST work together to regulate these rather than 
leaving residents to try to sort this out or hold the bag when no one pays attention. 
 
The issue in water is with respect to power generation, which is substantial and poorly regulated. Clarity on the SPECIFICS of where and how the energy is created 
and delivered and how much is thermal power based to drive water conservation. Water use directly in the facilities dwarfs power generation needs. 
  
3/5/2026 
Online Survey Q2 
There should be REQUIREMENTS that companies use renewable energy and recycled water.

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
41 
 
3/5/2026 
Nathan  
Online Survey Q2 
We don't have any water to spare, and our community cannot afford the hikes to our electric bill. Not one drop, don't build this. 
3/5/2026 
Laurel Shane 
Online Survey Q2 
This may be outside zoning abilities, but can you require a minimum percentage of renewable energy? 
3/5/2026 
Online Survey Q2 
We do not want these here they should be prohibited. 
They should do more than "disclose" a "proposed"  energy amount or mix. The accountability mechanisms are not strong enough there appears to be nothing to hold 
the developer to their original disclosure at time of mayor and council decision.  
Penalties are not strong or high enough for the Large Water User Ordinance. 
 
We don't want these things here. We do not want large scale data centers in Tucson or anywhere.  
3/5/2026 
Online Survey Q2 
These regulations are far too weak.  
3/5/2026 
Online Survey Q2 
No water or electricity for AI- we NEED those resources for the residents! 
3/5/2026 
Online Survey Q2 
Very weak in energy standards and sourcing. All it says is applicant is required to “discuss” renewables? Require them to USE renewables. Only renewables.  
3/5/2026 
C Sipp 
Online Survey Q2 
Water Use Agreement. The applicant shall submit a water use agreement to 
govern ongoing coordination between the applicant and the County regarding 
water use during operation of the facility as described in Section 107-151 § (n)(2) 
below. 
Water Supply and Sustainability Review. Approval for large-scale data center projects 
shall be conditioned on the applicant demonstrating there is sufficient reliable water 
supply to meet all projected water demands without undue adverse impacts on existing 
users, aquifers, or watersheds. To demonstrate this, the applicant must comply with the 
following requirements: 
(1) As part of any application for rezoning, special use permit, or other discretionary 
land use approval for a data center, the applicant shall submit a Water Study. The 
purpose of this plan is to demonstrate, at a planning-level, that sufficient water 
resources are available to support the proposed use without causing undue adverse 
impacts to existing water users, groundwater resources, or surface water systems. 
The plan shall describe the proposed water source(s), anticipated ranges of water 
demand, assumptions regarding cooling technologies, efficiency measures, system 
reliability considerations, and general contingency approaches for water supply 
interruptions or emergencies. The plan shall be prepared by a qualified professional 
and shall contain sufficient information to allow the City reviewing bodies, and 
the public to understand and evaluate the potential water impacts of the proposed 
use. 
(2) Prior to issuance of any building permit for a data center, the applicant shall enter 
into a Water Use Agreement with City. The purpose of the Water Use 
Agreement is to govern ongoing coordination between the applicant and the City 
regarding water use during operation of the facility. The agreement shall address, at 
a minimum, water use monitoring, reporting frequency, data sharing protocols, and 
verification of compliance with applicable permits and approvals. The agreement 
may also include provisions addressing response procedures during periods of 
water supply constraint, drought, emergency conditions, or other circumstances in 
which water use reductions or operational adjustments may be necessary to protect 
public health, safety, or existing water users. The Water Use Agreement may include 
additional terms related to adaptive management, mitigation measures, and 
enforcement as determined appropriate by the City and Applicant. The Water Use

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
42 
 
Agreement shall also require the Applicant to demonstrate coordination with the 
Environmental quality regarding applicable water use  
permits, interference mitigation procedures, monitoring obligations, and compliance 
procedures. 
(3) The applicant shall prove the use of water source immediately for all phases of the construction and understand the tier system by Tucson Water and incur heavy 
use rates for any CAP and/or groundwater use.  Basically, zero water use day 1 to day 10000000000000000. 
3/5/2026 
Karen 
MacDonald 
Online Survey Q2 
Energy usage must take into account the impact of a large data center's use of energy on community residents.  Will a data center's energy usage strain the energy 
grid?  Will residents' energy rates increase?  Also, renewable energy sources should be a priority. 
For water use, we live in a desert in the midst of a 30-year drought.  There is no adequate water supply for a large data center, period. 
3/6/2026 
Online Survey Q2 
As they aim to reconfigure the water dividends from the Colorado River in a way that could wipe Arizona from the map from its general water use, it is EVIL to 
consider the allowance of a large scale data center to be built here. Anyone involved in the invitation to Project Blue’s remnants or peers to construct such a 
monstrous and destructive entity in Tucson’s limits does not have an Arizonan’s best interests at heart and is failing as a public servant. NO DATA CENTERS! 
3/6/2026 
Toni Gosinski 
Online Survey Q2 
Generator usage needs to be tested to make sure it doesn't cause air quality issues during heat emergencies.  In the future if it is 115 degrees and a power outage 
happens running generators of any kind could cause air quality issues.  Can air quality tests be done when generators run? 
3/6/2026 
Lynn Price 
Online Survey Q2 
According to the purpose of city panners, codes don't regulate energy and water use. It is up to the other regulatory powers of the city. How well is that working for 
existing data centers.  
3/7/2026 
Online Survey Q2 
I cannot reiterate enough how inappropriate the mere consideration of a data center being built in a desert is. They should not be allowed to build here at all. The 
"closed loop" systems are advertised to be more effective than they are in reality. Once our drinking water is polluted, it will not be clean. Even if the facility is careful 
about how much water they use (and even if they use "air-cooling", which is also highly burdensome on the community both health-wise and financially), it will 
pollute our groundwater permanently by leaking chemicals just by being there at all. Do not let any data center, large or small, be built in a desert period. 
3/8/2026 
Online Survey Q2 
When an applicant discusses the energy source, are the obligated to stick to that mix for any set time? Can the energy mix be altered?  
I like that potable water cannot be used for cooling.  
Is groundwater pumping part of an "adequate source"?  
3/11/2026 
Online Survey Q2 
See prior  
3/11/2026 
Anthony 
Young 
Online Survey Q2 
Arizona is on the verge of having its water allotment reduced by the Federal Government. TEP is seeking currently a rate increase, and the public can expect TEP will 
request additional increases particularly after this project is built. 
3/11/2026 
Online Survey Q2 
My concern is that we need a way to "police" the water and energy use. Impose hefty fines if they go over their limits, or shut them down entirely.  
3/11/2026 Kerry Hales 
Online Survey Q2 
These data centers are notorios for lying.   
3/11/2026 
Online Survey Q2 
the proposed standards will likely only stand until all final contracts are approved and "new information" demands revisitation 
3/11/2026 
Online Survey Q2 
Should be signed off on by an independent entity, not just the developer's or their client's claims. Also, has the city paid for the high-powered legal advice necessary 
to outwit these powerful companies? They're getting the best, specialized legal advice. We need the same. This is not an area for in-house counsel or the usual 
suspects of outside vendors. 
3/11/2026 
Online Survey Q2 
Data centers notoriously do not keep energy or water conservation promises.  
3/11/2026 
Annette 
Robertson 
Online Survey Q2 
Science should lead all discussions. Crops should be low water needs crops.  Not sure if gourd farmers are still supplemented, but our farming should be water smart 
choices and related to food supply - keeping as much local as possible. Manufacturing plants pulling from our aqueducts should not be allowed free reign to our 
water supply. I appreciate the efforts AZ is making and realize we are caught in a timeline that is fast approaching for a resolution.  
3/11/2026 
Online Survey Q2 
how can anyone be positive of how sources of water sources of energy are going to be replaced and how much is going to be utilized and so forth you have to be 
kidding if you know the answers to that for the future of Tucson.

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
43 
 
3/11/2026 
Stephanie 
Duncan 
Online Survey Q2 
Applicants must define how they will process their electronic waste when components of their systems fail or become obsolete and need replaced. Their waste 
cannot go into public landfills. 
 
Property buyers cannot be trusted to provide their own reports for proving adequate water supply. This is the desert, and there is not enough water for life.  
 
Notifications need to be sent to anyone living within a 10 mile radius of a proposed center. Noise and air pollution travel further than 2 miles. 
 
Energy providers (owned by Canada) must charge a higher electric rate to data-centers. Individual customers cannot be expected to pay to increase TEP's capacity 
and improve their electric grids because big data wants to give them money.  
3/11/2026 
Daniela 
Mendez 
Online Survey Q2 
I do not think a desert city is the appropriate location for a large scale data center, regardless of the resources usage.  
3/11/2026 
Online Survey Q2 
See previous comment.  
3/11/2026 
Online Survey Q2 
***LARGE AND HYPER-SCALE DATA CENTERS ARE NOT INEVITABLE!*** 
 ***Tucsonans do not need or want ANY large-scale data centers*** 
 
 
6) Energy use and sourcing standards: 
“Applicants must demonstrate access to adequate and secure energy supply at time of application” 
If these organizations have enough money to build a large-scale data center, then they have enough money to build a solar grid or other alternative renewable 
energy source to supply their own energy. There should be a restriction on their ability to access the current power grid. **Maybe there should even be a contractual 
requirement that these corporations build a renewable energy source that has enough to give back to the community instead of solely exploiting the people and land 
for the benefit of billionaire investors?** 
 
7) Water use and sourcing standards: 
I appreciate that Water conservation is being reviewed as part of Data Center evaluation. I am concerned that the descriptions of restrictions do not go far enough.  
Under the Large Quantity Water Users Ordinance info listed in the FAQs. “This plan must demonstrate that at least 30% of proposed water use will come from 
reclaimed sources.” During the meetings it was described that this Ordinance is reserved mostly for golf course or parks. I would like to point out that as useful that 
an Ordinance like this is, large-scale data centers are NOT golf courses or parks. Golf courses and parks are usable locations where community members come 
together and enjoy their time and space. This use may change the land, but they do not decimate the land and environment in the same way that a large-scale data 
center does. IF the City of Tucson continues to consider the building of large and hyper-scale data centers, the Large Quantity Water Users Ordinance can be a 
starting point, However, A SHELTER FOR COMPUTERS DOES NOT DESERVE THE SAME WATER RIGHTS AS A LIVING USEFUL SPACE, LIKE A GOLF COURSE OR PARK. 
Aside from some kitchen/bathroom use at the facility, the need for potable water should be close to zero. Maybe this type of facility should have its own Ordinance 
rather than being grandfathered into something designed for community spaces?  
3/11/2026 
Online Survey Q2 
City must first address water issues for the general public 
3/11/2026 
Online Survey Q2 
Renewable requirements as long as reasonable are ok 
3/11/2026 
Online Survey Q2 
No eco friendly be a city inside a city fighting each other for water and energy and the land keeps dieing  
3/11/2026 
DeeAnn 
Saber 
Online Survey Q2 
We already do not have enough water resources in Tucson nor Arizona. They need to build these massive energy suckers somewhere else that has lots of water.  
3/11/2026 
Online Survey Q2 
How could mayor R. Romero be concerned about Lake Mead but fail to be concerned about water usage for data centers? That’s absurd. 
3/12/2026 optional 
Online Survey Q2 
NO water and electrical power use is the ONLY choice. 
3/12/2026 
Gretl 
Krooksmer 
Online Survey Q2 
We need a desalination plant in Ajo to assure water for our community

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
44 
 
3/12/2026 
Online Survey Q2 
The original proposal was to use a substantial amount of electricity and water. How do we guarantee that the resources are available? The large data center push it 
short-sided. 
3/12/2026 
Online Survey Q2 
water and energy should be provided to the community members of Tucson, NOT AI GENERATORS  
3/12/2026 
Divinity 
Caldwell 
Online Survey Q2 
Not strict enough  
3/12/2026 
Online Survey Q2 
I think we should outright decline all water use for data centers due to being in a desert with minimal water as it is.  Water is not a right, it's a human essential and 
should be treated as such.  Water for residents takes precedence over a data center. 
3/12/2026 Lisa Stee  
Online Survey Q2 
See earlier comment. Project Blue came in with an interesting water source (reducing leakage in city water pipes). They were clearly willing to work with the city. 
Tucson equally clearly was not willing to work with them. I wonder if there would have been room to talk about electricity sourcing and think the city should have 
had that conversation particularly in light of the frustration with TEP. That is an opportunity missed and now probably an elimination of any future opportunities.  
2/19/2026 
Online Survey Q3 
Setbacks from Residential and Other Non-Industrial Uses  
Regarding setbacks, I would like the public to know what the current zoning laws for setbacks are for our power plants. That needs to be factored into consideration 
so the people living around the plants can give their opinion if they would have appreciated a few hundred more feet. Ideally, I would love at least 1 mile from 
residential and commercial zones. Half a mile is tolerable. 
 
I think it would be great to implement a sort of jury standard. I’m a tax accountant and what I learned in school is that if a judge looks at a defendant’s case, 
recognizes that the loopholes they’re trying to jump through is to evade tax, he can call BS and shut it down. “If it walks like a duck, it’s a duck” kind of thing. You 
already have something like that with the thing you made so people cant make tons of mini data centers under the same ownership control to fall under the 50,000 
sq ft rule. 
2/20/2026 Colleen 
Online Survey Q3 
I suppose this question really depends on where these data centers are planned to be placed?  Are they going to be located in commercial locations?   
2/20/2026 
Joyce T. 
Smith 
Online Survey Q3 
⛔❌⛔NO DATA CENTERS IN TUCSON  
OR PIMA COUNTY, AZ. PERIOD⚫ 
2/23/2026 Fiona 
Online Survey Q3 
I feel like no DATA CENTERS 
2/23/2026 Moxy Smith 
Online Survey Q3 
no data centers.    
2/23/2026 
Sharyn 
Marie  
Online Survey Q3 
How many times & how many ways do you need to be told the same thing - NO DATA CENTERS 
2/23/2026 
Luke Felix-
Rose 
Online Survey Q3 
They are not enough. It's that plain. 
2/23/2026 
Online Survey Q3 
For any data center to be built in an area such as the desert which has extremely minimal groundwater and has to borrow the rest of it from out of state, is a horrible 
outcome for any long-term sustainability. Other ways of supplying power, such as using electricity, also requires water usage. Not to mention, the additional heat it 
brings to an area already over-temperature year after year. Any allowance of facilities like this is a major blow to the American Southwest. 
2/23/2026 Kielly Lewis 
Online Survey Q3 
Just don’t, do not consider letting any ai data center of any size any where near here.  
2/23/2026 
Rae Lynn 
Reffruschinni 
Online Survey Q3 
No data center should be built near any humans. 
2/23/2026 
Daniel 
Rodriguez 
Online Survey Q3 
No data centers at all are the only appropriate standard. Just vote no or we will remember come election time 
2/23/2026 Nicole  
Online Survey Q3 
No data centers in Tucson or Pima County. Respect your constituents, respect the environment, we dont need them here.  
2/23/2026 Coral  
Online Survey Q3 
Too close to schools. Tucson Southside always treated as the dumping grounds for anything the rest if county doesn't want: airport, Air Base, munitions plant, landfill 
etc. 
2/23/2026 Carol Plotkin 
Online Survey Q3 
Redirect staff to write regulations so they make it impossible to build large scale data centers here. They ARE NOT INEVITABLE. We don’t need or want them. Save 
our city for our children and grandchildren.  
2/23/2026 
Online Survey Q3 
Require a setback of all buildings by 1/2 the width of the parcel on all sides measured by the widest dimension

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
45 
 
2/23/2026 Jon Ralston 
Online Survey Q3 
Ban hyperscale data centers 
2/23/2026 Megan 
Online Survey Q3 
Having data centers near homes and schools is deadly. We don't know the long term effects but health issues in other areas of the country that have data centers 
shows this is not a healthy plan. 400 feet is nothing and not even close to acceptable. 
2/23/2026 
Online Survey Q3 
They should not be allowed within walkable distance of any residences, offices/businesses, or nature hubs. Data centers are known to lower the quality of life in the 
communities that they unfortunately exist within. 
2/23/2026 
Online Survey Q3 
NO large-scale data center is appropriate, and the proposed setback standards are absolutely  inadequate! They don’t even include all residential zones (SH and RH 
excluded). This fact displays gross negligence of the City’s responsibility to protect ALL its citizens. But again, the only solution to truly protect everyone is to prohibit 
these data centers altogether. 
2/24/2026 Bekka 
Online Survey Q3 
They need to be way farther than half a mile set back. Why do they need to be so close to our city? We live here and love the desert that surrounds our homes. Not 
only do they make a lot of noise, but they ruin the view, displace wildlife, and remove access to nature for our communities when they have over our natural 
environment.  
2/24/2026 
Daisy 
Flowers  
Online Survey Q3 
Large Scale Data Centers shall not be permitted AT ALL within Tucson or it's neighboring cities and counties. 
2/24/2026 
Online Survey Q3 
Not rigorous or strict enough.  
3/4/2026 
TL Cross 
Online Survey Q3 
Increase setbacks.  This should not negatively impact residential areas. 
3/4/2026 
Online Survey Q3 
IF the centers are required to stay within industrial zones, then the setbacks are OK. 
3/4/2026 
Online Survey Q3 
Setbacks should be 1000’ or more from residential areas. 
3/4/2026 
Online Survey Q3 
400 ft is .075 miles -- that seems very close given the noise and air pollution. I live precisely 10x that distance (just measured it) from a heavy industrial user. I can 
hear and smell it even at that distance, and there are many people who are even closer than I am. Physical issues, such as vibrations, are also important to consider: 
my house sometimes shakes due to industrial activity. Given this, a minimum quarter-mile setback from urban residential and office/commercial would be more 
appropriate. However, I would like to know what the setbacks are for other heavy industrial uses to compare. They are probably all quite low. 
3/5/2026 
Online Survey Q3 
Go build data centers in space or underground, stop destroying our natural landscapes with these ugly-ass data centers 
3/5/2026 
Christian 
Garcia 
Online Survey Q3 
The setback standards need to be looked over, they are not far enough  
3/5/2026 
Megan 
Online Survey Q3 
No data centers here! ARE YOU LISTENING?! 
3/5/2026 
Online Survey Q3 
A 400 foot setback is laughable. Talk to folks in Virginia. Probably you need a mile at least 
3/5/2026 
Derrick 
Espadas 
Online Survey Q3 
Where are the data points that these ordinances provide a positive outcome 
3/5/2026 
Online Survey Q3 
No data centers within 2 miles of an environmental justice community 
3/5/2026 
Reyes 
Online Survey Q3 
400 feet is not far enough.   
3/5/2026 
Online Survey Q3 
In all honesty it is useless relative to the noise and pollution output of these facilities. The sound travels MILES and through structures so unless you place the facility 
in a vacuum where it is on the property is largely irrelevant. 
3/5/2026 
Online Survey Q3 
400 feet is nothing; what a joke 
3/5/2026 
Nathan  
Online Survey Q3 
Try 1 hundred million trillion feet away from anyone and anything.  
3/5/2026 
Laurel Shane 
Online Survey Q3 
Is this setback far enough to mitigate heat/noise/unsightliness impacts? Why are offices closer? Do people at work not feel the impact? Working all day next to a 
noisy data center would drive me insane 
3/5/2026 
Online Survey Q3 
Setbacks should be more stringent and larger. The existing city code makes a lot of land uses actually unbuildable due to the ridiculous setback standards. Why not 
use this same tactic to make data centers unbuildabe in effect? I'm specifically thinking about how things like homeless shelters or rehabs are so restricted in code, 
it's basically impossible to build them. The city knows quite well how to prohibit land uses when they want to. Do it here for data centers, which nobody wants, 
instead of actually useful things (shelters) like you normally do. 
3/5/2026 
Online Survey Q3 
A 400-foot setback is not nearly enough from a residential zone. It should be setback of 1 mile instead

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
46 
 
3/5/2026 
C Sipp 
Online Survey Q3 
Minimum of 1000ft from the edge of the property to the first wall of any side with all sides at least >1000ft inside the boundary and proposed alerting all residents 
within a 5mile radius before any sell of land is approved.  No data center within 10miles from boundary to a school.  
3/6/2026 
Toni Gosinski 
Online Survey Q3 
400 feet is too close to a school.  1,300 feed is needed to prevent bad harmonics.  Can you require 1,300 feet distance between data centers and schools to protect 
children? 
3/6/2026 
Pamela 
Harig 
Online Survey Q3 
As I have read, across the country where these large-scale centers are in use, the noise pollution is a huge concern. 400 feet is not enough of a setback. It shouldn’t 
be within a mile of residences or schools.  Air pollution is another huge concern where large data centers are already operating. The generators produce a lot. And in 
our hot summers, which are only going to get hotter, emergencies will happen, and they will run, contributing to the heat! The desert is not the right place for a data 
center. 
3/7/2026 
Online Survey Q3 
Again, this proposal seems far too lenient. Four-hundred feet is a rather short distance for what is the noise equivalent of a constant police siren constantly blaring 
from the data center's cooling systems. They should not be within a mile of residential areas, urban or rural. And this isn't even accounting of the months/years of 
construction noises prior to the facilities being built. 
3/11/2026 
Online Survey Q3 
See prior  
3/11/2026 
Anthony 
Young 
Online Survey Q3 
Evidence is mounting concerning the sound emanating from data centers and the negative environment impact on humans and wildlife.   
3/11/2026 
Online Survey Q3 
400ft is not nearly far enough. It will still be an eyesore, disrupting the natural views that Tucson is so well-known for. It should be at least 1000ft.  
3/11/2026 
Online Survey Q3 
Again - get the best legal advice $ can buy. They are. 
3/11/2026 
Annette 
Robertson 
Online Survey Q3 
I do not approve of Data Centers here, so no set back would be appropriate - still pulling from our water supply, using our electric grid.  
3/11/2026 
Stephanie 
Duncan 
Online Survey Q3 
Setbacks need to be larger.  
 
Part D, second bullet point is incomplete in regard to limiting sound when in proximity to _______? 
 
"Enhanced" landscaping needs require that there be native plants and big pollinator gardens.  
3/11/2026 
Daniela 
Mendez 
Online Survey Q3 
The proposed setbacks should be larger to accommodate for a neighboring community.  
3/11/2026 
Online Survey Q3 
I dont know what they are.  
3/11/2026 
Online Survey Q3 
-Setbacks should be greater than the proposed 400 feet from residential areas.  
Is it possible to increase these setbacks to 1000 feet from residential and 500 feet from commercial? 
3/11/2026 
Online Survey Q3 
Rethinking is always a good thing time to consider dehydration and over hydrating    droughts and fluids no matter how the water is used on a massive scale that 
causes these two things and super storms tornados hurricanes cool water going into warm water not good change to natural eco system setbacks can be forward 
thinking for generations of people to exist than be destroyed  
3/11/2026 
Online Survey Q3 
Setback standards should be increased. 
3/12/2026 optional 
Online Survey Q3 
NO data center is the real answer. 
2/19/2026 
Online Survey Q4 
Noise & Generator Regulations  
It would be nice to have an established department where residents can complain or give feedback on noise levels. If a large amount give complaints, a new noise 
study has to be done. 
 
Please define “emergency situation”. War, command from federal government, request of a % of Tucsonans, “because Microsoft says so”, just give some guidelines 
on what that means.

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
47 
 
2/20/2026 Colleen 
Online Survey Q4 
I have not seen any type of plan showing where these proposed data centers are to be located.  So the discussion of noise is hard to answer.  If the development is 
located near communities I would prefer the developments are located a little further away from residential zones and placed into commercial zones that are 
designed for large scale commercial buildings and equipment. 
2/20/2026 
Joyce T. 
Smith 
Online Survey Q4 
⛔❌⛔NO DATA CENTERS IN TUCSON  
OR PIMA COUNTY, AZ. PERIOD⚫ 
2/22/2026 
Liam 
Donovan 
Online Survey Q4 
The main problem is that none of these centers should be built! 
2/23/2026 Fiona 
Online Survey Q4 
No data centers no matter what stop taking the water we already take without asking 
2/23/2026 Moxy Smith 
Online Survey Q4 
data centers produce physicially harmful noise pollution - and generators produce physical pollution.  no data centers.  we don't need them.   
2/23/2026 
Online Survey Q4 
These are massive topics and need to be thought through thoroughly. Noise should include A, C & G weighting as well as tonal penalties for frequencies generated by 
these facilities, specifically in the 31Hz, 63Hz, and 125Hz ranges, to avoid critical annoyance issues.  
 
Back-up power, clear definitions of when and how they can be used, testing requirements, technologies and environmental impacts need to be understood clearly, 
especially at large scale.   
2/23/2026 
Online Survey Q4 
I don’t want to hear it, I don’t want to see it, I don’t want to feel it. No data centers  
2/23/2026 
Sharyn 
Marie  
Online Survey Q4 
Tucson does need data centers 
2/23/2026 
Luke Felix-
Rose 
Online Survey Q4 
Noise pollution does not only affect the people living in the area, which seems to be the metric you are solely concerned with. It affects the local wildlife immensely, 
the human aspect you are playing down is amplified tenfold on the other living creatures around any proposed data center. This forces migration, disrupts 
ecosystems, and can be cataclysmic in its effects.  
2/23/2026 
Online Survey Q4 
There is no need to add this additional pollution to our communities and devaluing of people's private property 
2/23/2026 
mary-gray 
mahoney 
Online Survey Q4 
NO DATA CENTERS AT ALL 
2/23/2026 Kielly Lewis 
Online Survey Q4 
Again. These people are liars and do not care about any regulations the city puts forth. They will break every ordinance and standard and just pay the fines because 
they don’t care about our community or environment.  
2/23/2026 
Rae Lynn 
Reffruschinni 
Online Survey Q4 
Zero noise should be allowed. Generators cause pollution. No generators. 
2/23/2026 
Daniel 
Rodriguez 
Online Survey Q4 
As mentioned before. None of this is enough. We as a community do not want these 
2/23/2026 Nicole  
Online Survey Q4 
No data centers in Tucson or Pima County, reconsider these regulations to be prohibitive 
2/23/2026 Coral  
Online Survey Q4 
 Boise pollution very damaging to all of us, but especially children. Davis Monthan air traffic brings instruxtion to a halt. SE Tucson will get built out with homes. 
Consider data centers in states with true water supplies and lots of open space! Many need the $ 
2/23/2026 Carol Plotkin 
Online Survey Q4 
Redirect staff to write regulations so they make it impossible to build large scale data centers here. Save our city from them. They are not inevitable.  
2/23/2026 Jon Ralston 
Online Survey Q4 
Ban hyperscale data centers 
2/23/2026 Megan 
Online Survey Q4 
The generators are only to be used in "emergency situations" but who is defining the state of emergency? Again we see across the country the misuse of these tools 
and how it impacts the environment. We do not want and cannot have a data center here! 
2/23/2026 
Online Survey Q4 
The details of the noise being regulated is not well defined. Generators should not be allowed. Data centers do not provide a life-sustaining service. They can endure 
any power outages as most Tucson businesses and residents also do. 
2/23/2026 
Online Survey Q4 
NO large-scale data center is appropriate, so the proposed noise and generator use regulations are inadequate. PROHIBIT THESE DATA CENTERS. 
2/23/2026 
Darcy Nagle-
O’Brien 
Online Survey Q4 
None of the proposed regulations are adequate.  Data centers are not sustainable, they are not affordable, they don’t produce good jobs, they don’t enhance our 
community.  No amount of regulation can change these facts.  
There are many ways we can grow our community, our economy and increase the quality of life in Pima County. Data centers are not the way. The only benefactors

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
48 
 
are the corporations who come from 
outside our community and make huge profits at the expense of our water, cost of living and quality of life.  
2/24/2026 Bekka 
Online Survey Q4 
Double it and give it to the next person 
2/24/2026 
Daisy 
Flowers  
Online Survey Q4 
Large Scale Data Centers shall not be permitted AT ALL within Tucson or it's neighboring cities and counties. 
2/24/2026 Elizabeth F 
Online Survey Q4 
Any noise or generator use is too much. Because the people don’t want this data center. We do not NEED this data center. We need clean water and preserved wild-
lands.  
2/24/2026 
Online Survey Q4 
Noise pollution can be heard for up to 2 miles. 
2/24/2026 
Online Survey Q4 
Not strict enough. 
3/4/2026 
Bruce Plenk 
Online Survey Q4 
Good on load shifting; good on batteries first; weak on allowing TEP to draw power from batteries if needed; weak on allowing any natural gas, especially if the install 
noisy RICE generators, etc 
3/4/2026 
TL Cross 
Online Survey Q4 
Na 
3/4/2026 
Online Survey Q4 
Require independent noise studies and clear limits for all sites, including those not in purely industrial zones. 
3/4/2026 
Online Survey Q4 
There are many famous cases of commercial sites noise bouncing and landing somewhere far away. Are there provisions to address situations like this not forseen? 
 
Generators if environmentally equivalent to tep or other providers emissions should absolutely be allowed for load shedding especially if the city needs the relief. I 
would agree with them having additional noise restrictions. But we don't want large commercial sites killing us like happened in texas. 
3/4/2026 
John Moffatt 
Online Survey Q4 
Generators need to be tested periodically to ensure reliability.  Battery storage adds expense and is seldom useful for any medium or long term outage - good for 
short only.  Both Batteries and generators plus forcing Tier IV level becomes potentially deal breakers due to cost impact. 
3/4/2026 
Online Survey Q4 
Should clarify minimal battery backup time, such as ability to be on battery at least 15 min (possibly up to 30) 
3/4/2026 
Online Survey Q4 
Not sure 
3/5/2026 
Online Survey Q4 
Generators fall under county regulations 
3/5/2026 
Megan 
Online Survey Q4 
You guys are wasting so much time on this project when instead you could be looking into zoning areas and creating homes for people who don’t have them instead 
of building a data center for the ruling class billionaires  
3/5/2026 
Leo 
Online Survey Q4 
Generator gives off pollutants and nosey  
3/5/2026 
Online Survey Q4 
Did Beale ever send you the noise data they said they would? No? Do you seriously think big data center companies can be trusted? 
3/5/2026 
Derrick 
Espadas 
Online Survey Q4 
Diesel generation is used in other areas and the fines are easily paid by the offenders 
3/5/2026 
Online Survey Q4 
All forms of generation should be renewable. Fracked gas is not clean.  
 
Appreciate no load shifting. 
3/5/2026 
Reyes 
Online Survey Q4 
Need more information on no. Audible low frequency sound, and certain Gen brain,  (Methane,  coal) should be prohibited.   
3/5/2026 
Online Survey Q4 
You fundamentally missed the sound these facility generate. Sound should be composed of C and G Weighted scales as well as octave band limits and tonal penalties 
for day and nights as well as sensitive noise areas like schools, cemeteries, etc. this noise travels miles and has significant health impacts based on significant WHO 
research. 
3/5/2026 
Online Survey Q4 
Too limited for noise. What about duration of noise? 
3/5/2026 
Nathan  
Online Survey Q4 
I don't think we should be setting standards for neverending noise in our community. We should not have nonstop noise centers. Period.  
3/5/2026 
Laurel Shane 
Online Survey Q4 
50 db all day long would be very annoying. Maybe drop that number down.  
3/5/2026 
Online Survey Q4 
It doesn't address the length of time the noise lasts. There shouldn't be noise allowed round the clock. There is no accountability for the generator use, who will 
report or notice of the data center doesn't do it's load shift properly?

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
49 
 
3/5/2026 
Online Survey Q4 
No generators whatsoever. They should be required to use solar with battery storage if they need redundant power.  
3/5/2026 
C Sipp 
Online Survey Q4 
Noise Analysis. No operating data center equipment shall produce decibel levels 
exceeding any of the following limitations, with the exception of initial construction and 
routine maintenance. Adequate setbacks and effective sound mitigating equipment shall 
be used to comply with these limitations: 
(1) The average hourly noise level shall not exceed fifty-five (55) dBA or sixty-five (65) 
dBC as measured from the outer wall of any occupied structure within residentially 
zoned property adjacent to the proposed development. For property adjacent to the 
proposed development that is not residentially zoned, the average hourly noise level 
shall not exceed sixty-five (55) dBA or seventy-five (65) dBC as measured from the 
outer wall of any occupied structure. The average decibel limit is specific to source 
of the sound and does not count against cumulative ambient decibel levels as 
established in a baseline acoustic evaluation. 
(2) Equipment testing, maintenance activities, and construction activities that generate 
elevated noise, including generator testing, shall be limited to the hours of 8:00 a.m. 
to 6:00 p.m., Monday through Friday, unless otherwise approved by the Zoning 
Administrator. County approval for excessive noise generation shall not be 
unreasonably withheld. 
(3) A pre- and post-construction noise evaluation shall be completed by a certified 
professional by the Institute of Noise Control Engineering (INCE), or a licensed 
Professional Engineer (PE) to verify compliance with the County’s standards. The 
post-construction nose evaluation shall be completed after completion of all planned 
data center buildings at the end of construction (as defined in section 107-151(l)(5). 
(4) Commencing on the fifth anniversary of the end of construction, as defined 
hereafter, and continuing every five years thereafter, for so long as the data center 
operates, a noise evaluation shall be completed at the operators expense by a 
certified professional by the Institute of Noise Control Engineering (INCE), or a 
licensed professional engineer (PE) to verify compliance with the city standards (tbd). Completion of all data center buildings, or end of 
construction, means the date on which all of the following have occurred: completion 
of construction of the data center or, in the case of a phased or multi-building 
campus, all buildings of the multi-building data center campus, and issuance of a 
certificate of occupancy for all related buildings; and the data center operator has 
communicated, in writing, to the Zoning Administrator that it has completed the data 
center campus; provided, that, if all construction has stopped on the property for 
more than six (6) consecutive calendar months, other than due to delays by the  
County in processing related permits or approvals, then “end of construction” as 
used herein shall be deemed to have occurred as of the last day of such calendar 
month. This six-month time frame may be extended by the Zoning Administrator. 
(5)vibration accumulation should be limited to that of 'normal' standards (ie: recorded prior to the construction and maintained within 10% after 
(6) A description of a backup power plan describing the fuel source and expected 
usage of any standby, backup, or temporary power generation systems. The plan 
shall identify the anticipated number and size of generators or other power units, 
anticipated testing frequency and duration, anticipated noise and emission 
control measures, and anticipated fuel storage or delivery methods. The plan 
shall demonstrate the data center will comply with all applicable local, state and

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
50 
 
federal permitting requirements.  ONLY fixed generators allowed on site for power.  All storage of fuels and pipelines monitored for leaks and safety hazards with 
reports and independent inspectors paid and the center's cost with the city witnessing the review. 
(7) BESS, Solar and wind can be used. SMRs need nuclear review and proper wasted maintenance (NRC) paid for by the datacenter. 
3/6/2026 
Toni Gosinski 
Online Survey Q4 
I'm not sure if the noise mitigation is enough.  Might have to still do the 1,3000 set back plus the noise regulations.  I still have concerns about air pollution during 
heat emergencies. 
3/6/2026 
Pamela 
Harig 
Online Survey Q4 
See my previous comment. 
3/7/2026 
Online Survey Q4 
While the principle of using barriers both natural (like trees) and constructed (like thick walls) does seem practical in theory, it still is far too lenient for large 
companies who will have it in their best interest to short-cut any regulations to build faster and claim more land for their data centers. 
3/8/2026 
Online Survey Q4 
I like the details to track sound and mitigate the impacts  
3/11/2026 
Online Survey Q4 
See prior  
3/11/2026 
Online Survey Q4 
I am concerned how we will prevent electricity premiums from increasing. Surely if a data center is eating up a large portion of the energy produced, TEP will 
increase their prices. It is basic supply/demand.  
3/11/2026 
Online Survey Q4 
These things pollute the air and generate noise pollution. The noise doesn't stop, so it can be like living with tinnitus. Also, where's the independent study confirming 
what we must assume are their BS claims. 
3/11/2026 
Online Survey Q4 
No data center ever! 
3/11/2026 
Annette 
Robertson 
Online Survey Q4 
Part of why I moved from Goodyear was the data centers and the other was the increasing lack of attention to the health of residents related to noise pollution. It is 
an irritant that is not highly recognized until you experience it. I am a mental health professional and advocate for clients, and oppressed/forgotten populations, and 
provide training and technical assistance to several states related to services for those with serious mental illness - and they often are living in places which do not 
allow a peaceful nights rest. How can they, or you and I recover, when we cannot get a peaceful nights sleep? https://magazine.hms.harvard.edu/articles/noise-and-
health https://coeh.ucdavis.edu/research/how-noise-pollution-quietly-affects-your-health  
3/11/2026 
Online Survey Q4 
Tucson will fit the bill in any action or source needed for this data center to operate for companies or a company that is wanting or needing this type of massive 
program. 
3/11/2026 
Stephanie 
Duncan 
Online Survey Q4 
Applicants must define how they will process their electronic waste when components of their systems fail or become obsolete and need replaced. Their waste 
cannot go into public landfills. 
 
Notifications need to be sent to anyone living within a 10 mile radius of a proposed center. Noise and air pollution travel further than 2 miles. 
 
Part D, second bullet point is incomplete in regard to limiting sound when in proximity to _______? 
3/11/2026 
Online Survey Q4 
Noise and Generator Use regulations: 
-I have reservations about who and how these regulations will be monitored and reprimanded if violated. I do not believe fines will be a deterrent.  
3/11/2026 
Online Survey Q4 
Better cooling method  rethink generator only needed in emergency or not at all  
3/11/2026 
Online Survey Q4 
Generators should emit no noise. 
3/12/2026 optional 
Online Survey Q4 
no noise and no generator. 
3/12/2026 
Online Survey Q4 
No to all of it!!! KEEP AI OUT OF ARIZONA 
2/19/2026 
Online Survey Q5 
I want special care for the safe relocation of saguaros. Too many illegally knocked down things in my childhood. Prevention can be demanded now. There needs to be 
assurance that the saguaros continue to live for at least 1 year. No throwing saguaros in any bad dirt and calling it a day. 
2/20/2026 Colleen 
Online Survey Q5 
I did not see either option.  However, more desert vegetation is preferred.

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
51 
 
2/20/2026 
Joyce T. 
Smith 
Online Survey Q5 
F "LANDSCAPING STANDARDS"  
F DEMANDING AN ANSWER. NOT OK❗ 
⛔❌⛔NO DATA CENTERS IN TUCSON  
OR PIMA COUNTY, AZ. PERIOD⚫ 
2/23/2026 Fiona 
Online Survey Q5 
No data centers we keep our land you go back 
2/23/2026 Moxy Smith 
Online Survey Q5 
no amount of trees or landscaping is going to offset the issues caused by data centers. 
2/23/2026 
Online Survey Q5 
I couldn’t care less about their landscaping, they shouldn’t be building here 
2/23/2026 
Sharyn 
Marie  
Online Survey Q5 
Landscaping standards for a data center is like wrapping cancer cells in silk —still cancerous.   
 
Landscaping would not be needed if the center was not built.  
2/23/2026 
Luke Felix-
Rose 
Online Survey Q5 
I'm assuming "Option 2" is no. I am holistically against the proposals, and you seem to be deeming it "Inevitable". While we cannot defy the inevitable, we can define 
the inevitable, and I assure you that broligarch AI Tech is not what will win, it is the people and community and environment of Tucson. 
2/23/2026 
mary-gray 
mahoney 
Online Survey Q5 
NO DATA CENTERS! 
2/23/2026 Kielly Lewis 
Online Survey Q5 
This has to be a joke. Of all the standards we are going to hold ai data centers to we’re going to have them look pretty while they destroy neighborhoods, the 
environment, poison our water supplies and spew cancer causing chemicals into the air?  
2/23/2026 
Online Survey Q5 
Option 1 or Option 2? My answer is NO 
2/23/2026 
Rae Lynn 
Reffruschinni 
Online Survey Q5 
If no data centers are built, this will not be needed. 
2/23/2026 
Daniel 
Rodriguez 
Online Survey Q5 
Completely irrelevant. No landscaping will matter. WE JUST SO NO WANT THE DATA CENTERS HERE 
2/23/2026 Nicole  
Online Survey Q5 
No desert data centers 
2/23/2026 Carol Plotkin 
Online Survey Q5 
There are no options that are appropriate. I am sure of that. Redirect staff to write regulations so they make it impossible to build large scale data centers here. Save 
our city from them. They are not inevitable.  
2/23/2026 Jon Ralston 
Online Survey Q5 
 Ban hyper scale data centers 
2/23/2026 D 
Online Survey Q5 
The desert should remain intact!! The people of Tucson DO NOT want data centers here! 
2/23/2026 
Online Survey Q5 
No, a mere 20ft of desert flora does not even begin to counter the destruction from creating or sustaining a large data center. 
2/23/2026 
Online Survey Q5 
First of all — nice attention to detail leaving the response options as “Option 1” and “Option 2”…. But again, NO large-scale data center is appropriate, and the 
proposed landscaping standards are inadequate. This one especially feels like slapping a band-aide on what would be a gaping wound (only 20ft, really?). JUST 
PROHIBIT THE DATA CENTERS. 
2/23/2026 
Darcy Nagle-
O’Brien 
Online Survey Q5 
As stated before these proposed standards are completely inadequate at addressing the real issue. The citizens of Tucson and greater Pima County have spoken 
loudly. A very strong majority of our citizens are 100% opposed to data centers.  
2/23/2026 
Online Survey Q5 
No 
2/24/2026 
Online Survey Q5 
WHY IS THERE NOT A YES OR NO ANSWER. YOU GUYS ARE SETTING US UP TO FAIL. NO NO NO NONE OF THIS IS APPROPRIATE  
2/24/2026 Bekka 
Online Survey Q5 
Landscaping is better than concrete but worse than leaving the sonoran desert alone. If they're going to build anything, they should have to at least be required to 
install wildlife corridors with instruction from indigenous experts. 
2/24/2026 
Daisy 
Flowers  
Online Survey Q5 
Large Scale Data Centers shall not be permitted AT ALL within Tucson or it's neighboring cities and counties. 
2/25/2026 
Zion 
Alderette  
Online Survey Q5 
None of these options are acceptable. 
2/26/2026 Landon S. 
Online Survey Q5 
I read thought the document link and I didn't see these options

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
52 
 
3/4/2026 
Bruce Plenk 
Online Survey Q5 
Require permeable paving for parking lots; good to require 50% rainwater  
;   
3/4/2026 
TL Cross 
Online Survey Q5 
Na 
3/4/2026 
John Moffatt 
Online Survey Q5 
Agree on parking.  Landscaping is an esthetic issue.  Why different than any large warehouse? 
3/4/2026 
Online Survey Q5 
Expect significant heat and evaporation from these centers; propose trees with large canopies. I also expect fencing will be established so presume that would have 
to be within the interior of the landscaping. Given that and concerns for security I’d propose an additional 10’ beyond the 20’ for landscaping and enough underbrush 
to encourage rabbits, mice, coyotes, javelina and other urban animals to forage in the area. 
3/4/2026 
Online Survey Q5 
desert landscaping, while beautiful, is sparse vegetation compared to other environments. Is a 20 ft buffer of prickly pear going to be effective? Is that 20 ft distance 
based on best practices that were established where denser forest-type vegetation is in place? If so, we should consider a larger buffer or other rules about the 
density of the vegetation.  
3/5/2026 
Megan 
Online Survey Q5 
WE DONT HAVE THE WATER IN THE DESERT. WE DONT WANT TO PAY EXTRA FOR OUR ELECTRIC BILLS BC OF A DATA CENTER WE DO NOT WANT! 
3/5/2026 
Leo 
Online Survey Q5 
We don't want data center  
3/5/2026 
Online Survey Q5 
Lol 
3/5/2026 
Online Survey Q5 
Don’t allow development of the desert.  
3/5/2026 
Reyes 
Online Survey Q5 
Why is natural vegetation not planned for shade covering for parking, or at the very least solar.  
3/5/2026 
Online Survey Q5 
Not really all that important to me. 
3/5/2026 
Online Survey Q5 
Because it’s just a silly data point. 
3/5/2026 
Nathan  
Online Survey Q5 
You're complicit in killing the desert. 
3/5/2026 
Laurel Shane 
Online Survey Q5 
Require native plants with an emphasis on pollinator plants and food plants 
3/5/2026 
Online Survey Q5 
A data center is not better than an undisturbed desert. The landscaping should require 90% of the parcel to have water retention basins with native flora. 
3/5/2026 
C Sipp 
Online Survey Q5 
drainage system, limited parking, heat abatement for the surrounding area are all lacking here in 'landscaping' 
3/5/2026 
Karen 
MacDonald 
Online Survey Q5 
Landscaping must use native, low-water use plants and trees and follow the City's Water Harvesting Guidance Manual. 
3/7/2026 
Online Survey Q5 
It's reasonable to address the "anticipated low parking needs" for a supposed data center. Especially since they don't employ many people to be on-site or bring 
many jobs to our community at all besides a handful of engineers who could easily just work from home. 
But also, it doesn't really address the construction phase, which is another annoyance on the community as well. 
3/8/2026 
Online Survey Q5 
Screening goes a long way.  
3/11/2026 
Online Survey Q5 
See prior  
3/11/2026 
Online Survey Q5 
We need to ensure as little impact to the natural environment as possible. I feel the restrictions should be much more strict. Once again, hefty fines for those not in 
compliance.  
3/11/2026 
Online Survey Q5 
We do not want a data center to drain resources and mar the natural beauty of the desert. Again, they do not keep promises and cannot be trusted.  
3/11/2026 
Annette 
Robertson 
Online Survey Q5 
I oppose Data Centers 
3/11/2026 
Stephanie 
Duncan 
Online Survey Q5 
 
"Enhanced" landscaping needs require that there be native plants and big pollinator gardens.  
 
Aesthetics won't save water and stop wasted electricity. We don't need AI. The desert ecosystem does not need data centers. 
3/11/2026 
Daniela 
Mendez 
Online Survey Q5 
I like the idea of a small parking lot.

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
53 
 
3/11/2026 
Online Survey Q5 
 
14) Landscaping Standards: 
-Although I absolutely do not agree with the idea of building a large or hyper-scale data center in the desert, I would like to commend City of Tucson for their 
increased efforts over the years in improved landscaping and reducing heat island effect around town. I know that a lot of work has gone into these types of plans 
and projects, and I appreciate that this environmental protection exists! 
It is these types of environmental protections programs and plans that I want to see from my Tucson City Council. I know there are people on City Council that care 
about this precious desert we live in, that is why they are here to fight for it! I know that many, (maybe all?) Tucson City Council members would prefer to NOT see 
large-scale data centers come to fruition. Can we please continue this process to create definitions and codes, but rather than define how a data center can exist, use 
these to help protect us against large-scale data centers?  
3/11/2026 
Online Survey Q5 
Concrete not landscape no water return to ground even naturally go underground landscape remains same or even better boost natural plants animals bugs natural 
desert eco system amenities  
3/11/2026 
Online Survey Q5 
What does landscape matter if you’re depleting resources? 
3/12/2026 
Online Survey Q5 
No amount of landscaping will offset the energy and carbon use of a large-scale data center. 
3/12/2026 Lisa Stee  
Online Survey Q5 
Time to get out of the weeds and eliminate regulations.  
2/19/2026 
Online Survey Q6 
Design and Aesthetic Standards  
Can we require them to commission local artists for the creation and upkeep of a mural? If it’s going to be taking up so much space, might as well stimulate the 
economy and make it not an eyesore. 
 
Please also see this resource for guidelines and studies: 
https://www.ucs.org/resources/data-center-power-play?read-online-content=1 
2/20/2026 
Joyce T. 
Smith 
Online Survey Q6 
⛔❌⛔NO DATA CENTERS IN TUCSON  
OR PIMA COUNTY, AZ. PERIOD⚫ 
2/22/2026 
Liam 
Donovan 
Online Survey Q6 
Why are you guys so obsessed with helping large corporations build data centers that nobody wants?? 
2/23/2026 Fiona 
Online Survey Q6 
No data centers and please listen to us we are fighting  
2/23/2026 Moxy Smith 
Online Survey Q6 
no data centers.  take a stand.   
2/23/2026 
Sharyn 
Marie  
Online Survey Q6 
NO DATA CENTERS IN TUCSON 
2/23/2026 
Luke Felix-
Rose 
Online Survey Q6 
This is one strike in a long list of failures I have witnessed since arriving in Tucson. From Prop 414, Project Blue, RTA Next, the criminalization of houseless folx, and 
the attempts to reverse positive steps in public transport... honestly Mayor Romero seems little better to me than a Republican. I feel a hostile energy emanating 
from the City of Tucson with every passing month, and it is exhausting. Thankfully, the love and support of my community here sustains me, and I know the 
communities I am in are in agreement with the sentiments I've shared here today. 
2/23/2026 
mary-gray 
mahoney 
Online Survey Q6 
DO NOT LET DATA CENTERS WIN 
2/23/2026 Kielly Lewis 
Online Survey Q6 
NO DATA CENTERS OF ANY SIZE IN THE DESERT 
2/23/2026 
Rae Lynn 
Reffruschinni 
Online Survey Q6 
No data centers around or in Tucson! We do not need AI. We do not need the cloud. We can not afford the loss of water. 
2/23/2026 
Sarah 
Osborne  
Online Survey Q6 
A data center of any size would create negative impacts throughout our community. Even if the center is not "defined" as large scale the building or creation of a 
data center would cause public backlash and a loss of respect for the integrity of City of Tucson and Pima County officials. The people have spoken and we do not 
want a data center in our desert.  
2/23/2026 BEV PAUL 
Online Survey Q6 
I think they should be located many miles from city limits. They could drill their own wells & use solar power for electricty.  
2/23/2026 Carol Plotkin 
Online Survey Q6 
Redirect staff to write regulations so they make it impossible to build large scale data centers here. Save our city from them. They are not inevitable. We need you to 
do the right thing and not support these data centers in any way.

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
54 
 
2/23/2026 Jon Ralston 
Online Survey Q6 
Ban hyper scale data centers 
2/23/2026 Megan 
Online Survey Q6 
These meetings should be less about the way we can change ordinances to accommodate a data center and more around how we can stop a data center from being 
built here at all. We do not have the resources and the public has already clearly stated we do not want it. Step up and represent the people you're supposed to 
represent.  
2/23/2026 Nicole R 
Online Survey Q6 
I live on the SE side of town and was so glad when the proposed data center on Houghton was shot down. I want to make sure that all of Tucson is protected from 
the many problems data centers cause 
2/23/2026 D 
Online Survey Q6 
NO DATA CENTERS IN TUCSON 
2/23/2026 
Online Survey Q6 
What could the city do if the data center ignored the regulations once it was operational? Fines? Could they shut the building down? The city does not have a good 
track record of enforcing regulations or having the funds to enforce regulations. 
The health risks and environmental impacts need to also be studied and considered. 
2/23/2026 
Online Survey Q6 
NO large-scale data center is appropriate. Regardless of the flaws with all the proposed regulations, any proposal will be inadequate as long as it falls short of simply 
prohibiting these data centers. It doesn’t matter if data center corporations have to jump through a couple additional hoops; there will be objectively grave 
consequences on our local community and environment if these centers are constructed that far outweigh any perceived gains. 
2/23/2026 
Darcy Nagle-
O’Brien 
Online Survey Q6 
AI is a speculative industry, not an inevitable one. We stand to lose far too much by allowing data centers to be constructed in our arid, drought-ridden beautiful 
desert home.  
2/23/2026 Gillian 
Online Survey Q6 
Kill ANY data centers proposal, Tucson is not an energy desert for large data centers, it is a community and people will be hurt by any progress of a data center 
approval  
2/24/2026 Bekka 
Online Survey Q6 
The best data center would be no data center. Tucson doesn't want any data centers. If your goal is to make sure that if a data center gets built, that Tucson is the 
least amount impacted negatively, please require much more from developers. You make the rules. You could make them do a lot more. You can require them to 
build a solar power plant to power their operations. You can limit their water use to be no more than residential use would be. It doesn't need to be reasonable for 
their operations. This is about Tucson and the watershed and the wildlife and the community. Let's have rules that would make it so that they have to contribute to 
making Tucson an ever better place for everyone if they want to come here! 
2/24/2026 
Daisy 
Flowers  
Online Survey Q6 
Large Scale Data Centers shall not be permitted AT ALL within Tucson or it's neighboring cities and counties. 
2/24/2026 Elizabeth F 
Online Survey Q6 
No desert data center!! 
2/24/2026 
Online Survey Q6 
No means no. 
2/24/2026 
Online Survey Q6 
This community overwhelmingly decries data centers. We don't want them.  
 
The only legislation that is appropriate is legislation that prevents corporations from coming to Tucson/Pima county and using vast amounts of water and electricity. 
 
Data centers are a blight on our environment and do nothing to promote jobs or public social welfare. 
 
NO DATA CENTERS. LEGISLATE TO BLOCK THEM ENTIRELY. 
2/25/2026 
Zion 
Alderette  
Online Survey Q6 
Do not consider this proposal that causes harm to the community we have built together. 
2/26/2026 Landon S. 
Online Survey Q6 
How do I find the landscaping options.  Please think about 30 years into the future when we find ways to improve upon the industrial use of our desert where we 
have many limited resources.   
3/4/2026 
Bruce Plenk 
Online Survey Q6 
Is it possible to build in likely additional staff costs for enforcement if needed into the permit, especially given City finances!!  
3/4/2026 
TL Cross 
Online Survey Q6 
Triple your efforts to lessen impact on our environment, utilities and resources. 
3/4/2026 
Online Survey Q6 
This is a joke. 
3/4/2026 
Online Survey Q6 
What are the teeth of enforcement besides. Hand waving and strongly worded letters. Penalties need to make sure transgressions are not financially worth it. 
3/4/2026 
John Moffatt 
Online Survey Q6 
Thanks for doing this.  Please develop a Code Amendment that is followed in practicality, not emotional, non-factual, loudest voice wins approach.

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
55 
 
3/4/2026 
Online Survey Q6 
If Tucson adopts such rigorous standards, we will be prepared to adequately vet large data centers. This was a good presentation, thank you. 
3/4/2026 
Online Survey Q6 
Thank you! 
3/5/2026 
Online Survey Q6 
Tell Jeffrey and Elon that they are not welcome in Tucson 
3/5/2026 
Online Survey Q6 
Please consider language already developed in California, and consider the chemicals, and stored fuel package, and the danger of lithium batteries, when adding to 
the IFC 2024 adoption amendments, ask our state and local fire departments for help to protect life and property. Consider fire response. Use NFPA to guide you. 
3/5/2026 
Megan 
Online Survey Q6 
This needs to stop. We don’t enjoy these meetings and I’m sure you don’t either. Stand for something good instead of just going through the motions. A data center 
is a death sentence for our city, state, country. Stop it now.  
3/5/2026 
Online Survey Q6 
So tired of this shit 
3/5/2026 
Derrick 
Espadas 
Online Survey Q6 
Did not appreciate the city officials silencing the public 
3/5/2026 
Online Survey Q6 
Large scale data centers should be defined by how many megawatts of energy they will use and if the City is serious about protecting ratepayers from data center bill 
spikes we need a public power utility.  
3/5/2026 
Reyes 
Online Survey Q6 
This process is too unilateral too presentation and not community feedback and questions with live response.  
3/5/2026 
Online Survey Q6 
We do not want any large scale data centers in our desert. 
3/5/2026 
Online Survey Q6 
A moratorium should be put in place and significantly more work needs to be done here. There are substantive gaps and holes here which will compromise residents 
health and well being. 
3/5/2026 
Online Survey Q6 
Very disappointing. The panel was all white people. Didn’t really answer questions. Feels very much like a done deal. 
3/5/2026 
Nathan  
Online Survey Q6 
I hope the pay is worth it, cowards. 
3/5/2026 
Laurel Shane 
Online Survey Q6 
What’s stopping data centers from building just outside city limits? Is Pima County working on regulations? Do OV, Vail, Marana care?  
3/5/2026 
Online Survey Q6 
We don't want any of these. No data centers 
3/5/2026 
Online Survey Q6 
Our community does not want nor need these data centers. The city and county already ran behind our back before. Don’t do it again.  
3/5/2026 
Online Survey Q6 
NO AI!!!!!

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
56 
 
3/5/2026 
C Sipp 
Online Survey Q6 
This form did not allow for all the entry 'space' I needed or want to provide feedback.  This zoning requirement lacks teeth, definition and overall analysis to keep any 
data center in check.  There is limited to no real balance and the understanding of what so many electronics pose from fire hazard, chemical waste, heat production 
and both grid and water consumption.  there are counties outside of AZ doing so much better and you should seek their input (Georgia, Iowa). 
 
 
The following information shall be submitted prior to issuance of the first building 
permit for the data center: 
a. Planned location of underground or overhead electric lines, grid interconnection 
points, project entrances, staging areas, and access roads required during 
construction and post construction; 
b. Waste Management Plan. A Waste Management Plan detailing how construction 
waste will be handled during the construction period. The plan shall include: 
i. Estimated volumes and types of materials to be generated. 
ii. Identification of materials proposed for recycling, salvage, or reuse. 
iii. Designated recycling and disposals facilities. 
iv. Procedures for on-site material separation and storage. 
v. Documentation requirements demonstrating final disposal or diversion; 
 
. Written verification from their proposed power provider that the applicant has 
calculated the maximum planned electrical consumption of the proposed use and 
has verified the utility supply and related electrical infrastructure is sufficient to 
accommodate the applicant’s proposed use; 
d. Lighting Plan. A lighting plan shall be submitted providing details of the light 
spread and intensity diagrams, fixture specifications and mounting height details. 
Any lighting used for outdoor illumination on the property shall be full-cutoff 
fixtures so that light does not shine upward nor adversely impact adjoining 
property. 
e. A description of a backup power plan describing the fuel source and expected 
usage of any standby, backup, or temporary power generation systems. The plan 
shall identify the anticipated number and size of generators or other power units, 
anticipated testing frequency and duration, anticipated noise and emission 
control measures, and anticipated fuel storage or delivery methods. The plan 
shall demonstrate the data center will comply with all applicable local, state and 
federal permitting requirements. 
 
there should be regulation for AQI PM2.5, PM10, TVOCs, Ozone levels such that in a case these rise >5ppm or reach unheathly levels (AQI, federal levels) near or 
around the data center - all operations should cease for the day, week or extended time until the air is safe.  Monitoring is by the town/city with equipment 
approved by the town/city but purchased at the expense of the datacenter. 
 
Fire hazards of electrical equipment and chemicals that are used both in electronics and to fight fires need to be understood, hazmat plan for handling and all local 
water and water out of plant monitored for contamination with any contamination pulling all licenses and issuing financial penalties to the data center owner to 
clean up (mitigation and clean up plan should be developed with fine tiers) 
3/5/2026 
Karen 
MacDonald 
Online Survey Q6 
Regulations for large-scale data centers must be as stringent as possible.   
In the end, to my mind, data centers have no place in this beautiful, fragile desert.

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
57 
 
3/6/2026 
Toni Gosinski 
Online Survey Q6 
Make sure we are protecting schools.  Keep air quality high near schools.  Keep noise and bad harmonious away from schools.  Need to make sure Tucson doesn't get 
too many small data centers that create the functional equivalent of a large data center. 
3/6/2026 
Lynn Price 
Online Survey Q6 
Thank you to the planners who presented. The TAC minutes were helpful. How are current data centers, e.g. the 38,000 sq. ft. size, disposing of their electronic 
waste? lynnmpricept@gmail.com 
3/6/2026 
Pamela 
Harig 
Online Survey Q6 
Why can’t they be banned? If not outright, then make the burden to comply with regulations so onerous that no one will want to try. Data centers poison the water, 
air and land. They use electricity that rate payers will have to pay a lot more for in order to build capacity. Rolling blackouts could become the norm. Cities and towns 
around the country are rejecting them. We should, too. 
3/7/2026 
Online Survey Q6 
It's imperative to make these regulations as strict and rigid as possible. We cannot afford any large-scale data centers to be built here. Even if they were to bring 
supposed "economic benefits" they would be completely irrelevant in the face of a mass public health crisis that a data center would bring here to Tucson. 
 
Unless a company also happens to have a revolutionary water treatment and reclamation processes that could somehow reverse toxic chemical pollution in 
groundwater, or some means of being so self-sufficient that they don't even need to account for cooling methods and making private electrical power deals with 
companies like TEP, then they cannot build here. Make the regulations so steep that they will not want to build here. 
 
The people of Tucson should come first. 
3/8/2026 
Online Survey Q6 
Thank you for your time and thoughtful attention to this  
3/11/2026 
Online Survey Q6 
I do not like the idea of data centers in Tucson. We have already seen the problems they have caused, hence why we never continued with Project Blue. We seriously 
need to make these restrictions strict and actually enforce them.  
3/11/2026 
Online Survey Q6 
I don’t want  
3/11/2026 Kerry Hales 
Online Survey Q6 
I oppose data centers  
3/11/2026 
Online Survey Q6 
The 400+ jobs created does not justify the long term detrimental effects of implanting a data center close to populated areas.  Energy and water guarantees cannot 
be met long term, but only long enough to solidify contracts and achieve voter approvals.   
3/11/2026 
Online Survey Q6 
You are dealing with bad faith actors who know every possible way to screw the city over. Top legal talent knows how they will do this and can advise the city how to 
prevent it. Please cough up the $ to pay for this. 
3/11/2026 
Online Survey Q6 
No data center ever! 
3/11/2026 
Annette 
Robertson 
Online Survey Q6 
Thank you for asking for community feedback.  
3/11/2026 
Daniela 
Mendez 
Online Survey Q6 
Thank you for being proactive and creating regulations for this fast growing industry. Please be wise when it comes to privacy, climate, and wildlife if such project is 
proposed.  
3/11/2026 
Online Survey Q6 
*S-cuk Son-Inhabited for Millennia-Established 1775* 
Even if large-scale data centers are somehow inevitable in our future world, they really just DO NOT make any sense in the desert, they are too hot, demand too 
much energy and demand too much water. I am a second-generation Tucsonan in my 40s with two daughters I would like to raise here; I am witness to hotter 
summers, shorter winters, far less and inconsistent rain, I know the heat and drought have changed us and I see it getting worse. I am also witness to the lengths 
Tucson has gone to for respecting heritage, celebrating our communities and traditions, protecting wildlife, preventing worsening heat and honoring our desert 
existence! This is the Tucson I love and respect, please do not let data centers be the downfall of this mindset.  
We do not want large-scale data centers in Tucson or anywhere in the desert! 
El desierto es mi madre.  
Thank You. 
3/11/2026 
Online Survey Q6 
Make eco friendly new prosess of cooling instraments less water more innovation of cooling recycle clean energy no moving parts cheaper maintenance making 100 
percent less noise many possibilities only one fact eco friendly must be to surrounding inhabitants both prosper possible jobs  
3/11/2026 
DeeAnn 
Saber 
Online Survey Q6 
I already said it - no to data centers all together.

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
58 
 
3/11/2026 
Online Survey Q6 
Stop contributing to global climate change you’re making the earth hotter! 
3/12/2026 
Gretl 
Krooksmer 
Online Survey Q6 
Please send these tech bros back to the basements in which they belong  
3/5/2026 
Patricia 
Bauerle 
Email 
Attached is a copy of my March 2, 2026 letter emialed to Tucson City Council and a copy of my March 3, 2026 statement for the "call to the audience" for the Tucson 
City Council meeting that evening urging Tucson City Council to ban all data centers within and intersecting Tucson's jurisdiction. 
Statement of “Call to the Audience” urging ban of data centers 
From: Patricia Bauerle, a resident of Tucson, Arizona 
Date: March 3, 2026                                                          
 
Please ban any and all Data Centers within and intersecting with your jurisdiction, whether referred to as a “Data Center” or not for the following reasons: 
 
 
• Data Centers consume massive amounts of electricity, water, and fossil fuels and pollute the air and water and increase noise pollution.    
 
• Data Centers are a major threat to our environment and climate and exacerbate climate problems.  
 
• Data Centers increase the costs for community members, including working families and other residents, such as seniors and persons with disabilities. 
  
• Although one or more Data Centers may promise to offer a benefit of more reclaimed water in the future, there is no guarantee of such, and Pima County cannot 
afford to take any risk pertaining to our limited water.  Even if Pima County has been using less water than allocated, situations could change at any time, including 
the amount of water allotted and/or available to Pima County. 
 
• Proposed Data Centers have been shrouded in secrecy , which raises so many suspicions that if more were known by the public, there would likely be much more 
public outcry against such. Also, secrecy often shrouds wrongdoing. 
 
• Democrats have urged “investigation of commerce secretary for boosting AI Data Centers that may enrich his entire family.”  
 
• What are the other potential conflicts of interest, financial and/or otherwise, do proponents of the Data Centers have? 
                                                                      
• Data Centers may be subject to a potential AI bubble, from which they may likely be economic fallout and problems.  
 
• Data Centers have  grossly overestimated the potential benefits and grossly underestimated the potential risks and/or harms.  
 
• Data Centers, including any Data Center for cloud computing or cloud backup, are often developed for the purpose of Artificial Intelligence, and there are so many 
problems and concerns with AI, such as its lack of conscience, lack of empathy, ability to implement cyberattacks for which defenses aren’t ready, and accelerating at 
dangerous speeds. 
 
• AI Safety experts have departed from AI firms with dire warnings about catastrophic safety risks. 
 
• “[T]hermal drone footage shows Musk’s AI power plant flouting clean air regulations.”  
 
• AI tends to exacerbate human biases. 
 
• AI seems to “undermine medical education” and “medical doctors may never learn vital skills”.

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
59 
 
• Construction, Development, and/or hosting of Data Centers risk potential expensive lawsuits. 
 
• Other locales within the USA have made significant progress towards banning data centers in their jurisdictions. , , , ,        
  
For more information, please refer to my letters and emails dated July 27, 2025, December 14, 2025, and March 2, 2026, each with citations. 
 
Please ban data centers!!! 
 
Thank you for your attention to these matters. 
 
Unfortunately, I cannot attend any of the currently scheduled public hearings pertaining to data centers. 
I depend upon City of Tucson transit public transportation, and i experience too many technical difficulties for trying to participate in a virtual meeting. 
 
Thank you for your attention to these matters.

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
60 
 
2/23/2026 Aamir Nasir 
Quraishy 
Email 
I thank you again for leading the efforts on these hearings, and looking for feedback on structure. 
One point we discussed was how to communicate intent and structure in a way that would be most beneficial for expectations and boundaries that support meeting 
conduct and provide avenues for constructive feedback. 
________________________________________ 
Thank you for facilitating the recent meeting. I would like to offer constructive feedback regarding the structure and communication of the session. 
Several attendees expressed frustration about the format, particularly the perception that feedback was being requested but only accepted in written form during 
portions of the meeting. While I understand the need to manage time and maintain clarity when presenting technical or zoning-related information, it may be helpful 
to make the structure more explicit in advance to avoid misunderstandings. 
I recommend the following adjustments for future sessions: 
1) Clear Division Between Informational and Public Comment Phases 
The meeting agenda should explicitly state that the initial portion is strictly informational. During this phase: 
• Comments would be accepted only in written form. 
• The purpose would be to present zoning definitions, policy language, and technical clarifications. 
• City staff would respond to written questions as appropriate. 
This framing helps set expectations and ensures that time is used efficiently for structured information delivery. 
2) Scheduled Open Discussion Segment 
Following the informational portion, a clearly designated public comment period should be scheduled, with microphones available and equal opportunity for 
speakers. Making this second phase explicit in the agenda would ensure participants understand that vocal input is not being excluded, but sequenced. 
3) Communication and Accessibility Enhancements 
To further improve transparency and reduce confusion: 
• Consider posting meeting slides and policy drafts in advance. 
• Create a mailing list or text alert system specifically for data center hearings. 
• Offer optional seating outside the primary meeting space for individuals who prefer to wait until the public-comment phase begins, with text notifications 5–10 
minutes before speaking begins. 
These steps would help align expectations, reduce frustration, and ensure broader participation while preserving order and time management. 
The overall goal should be clarity of structure. When participants understand the purpose of each segment of the meeting, tensions tend to decrease and 
engagement becomes more productive.

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
61 
 
2/25/2026 Julie Dittmer 
Email 
My name is Julie Dittmer and I attended the 2/23/26 UDC information session. Carver Struve asked me to submit my questions from the breakout session in writing, 
and shared your contact information to discuss them further. 
 
I’m Chair of RADCAP (Responsible AI Data Center Advisory Panel). The questions below are based on our framework areas II (Public Health & Community Impact) and 
IV (Public Finance & Constitutional Protections). I’ve attached our evaluation framework for reference. 
 
1) Public health impacts   
Public health as a zoning-relevant compatibility concern (proximity to homes/businesses, and whether any form of developer-funded public health impact 
assessment could be part of review/conditions). 
 
My understanding is that this hasn’t been fully addressed yet (as of 2/23/26). Carver noted that suggestions, additional research, or precedents would be welcomed. 
Is that correct? 
 
2) Applicant track record / compliance history   
In discretionary review, what applicant disclosure (if any) is required regarding prior compliance issues, enforcement actions, or settlement agreements in other 
jurisdictions? If the City can’t directly penalize based on history, could disclosure still inform conditions of approval (e.g., monitoring, reporting, performance 
assurance/bonding where feasible)? 
 
Carver noted this is a question that would need to be run by an attorney. 
 
If it would be helpful, I’m also happy to schedule a call with you to discuss more. 
 
Thank you again for your time and for running a thoughtful public process. 
 
 
RADCAP Panel Evaluation Framework 
 
The Responsible AI Data Center Advisory Panel evaluates proposed data center developments across five core domains. This framework reflects the panel's shared 
priorities and serves as a baseline for assessing the public, infrastructural, legal, and technological implications of 
large-scale AI infrastructure projects. 
I. Resource Limits & Infrastructure Capacity 
 
The panel assesses whether proposed developments operate within sustainable and verifiable resource constraints. 
• Hard caps on water usage rather than fee-based mitigation mechanisms, recognizing that financial penalties alone may not deter high-capital operators 
• Disclosure of projected energy demand, infrastructure sourcing, and load profiles 
• Independent verification of grid capacity impacts, including cumulative effects on municipal and regional systems 
• Requirement for detailed infrastructure plans demonstrating long-term viability without disproportionate burden on public systems 
• Phased growth and cumulative-use re-trigger provisions 
• Anti-aggregation safeguards for related entities operating at shared sites 
• Phase-specific disclosure of water sourcing (potable, reclaimed, alternative) 
 
II. Public Health & Community Impact 
 
The panel evaluates the direct and indirect effects of data center operations on community health and household stability. 
• Ongoing health impact assessments for high-resource industrial users, consistent with municipal due diligence frameworks

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
62 
 
• Developer-funded municipal capacity to conduct public health monitoring and longitudinal impact analysis 
• Protections against household "energy insecurity" and other community-level risks arising from industrial demand on critical infrastructure 
• Integration of public health findings into permitting, enforcement, and ongoing oversight processes 
 
III. AI System Transparency & Governance 
  
The panel examines the governance and risk profile of AI systems deployed within data center environments, recognizing their potential impact on public 
infrastructure and safety. 
• Disclosure of AI training capacity, compute scale, and operational scope relevant to infrastructure and resource impacts 
• Risk-appropriate transparency regarding model architecture, system deployment practices, and security controls, subject to reasonable protections for proprietary 
intellectual property 
• Mandatory reporting of critical safety incidents affecting infrastructure, public systems, or users 
• Whistleblower protections for employees and contractors involved in AI system development and operations 
 
IV. Public Finance & Constitutional Protections 
 
The panel evaluates the legal and economic structure of public-private agreements associated with data center development. 
• Evaluation of tax incentives, subsidies, and development agreements under the Arizona Gift Clause and related constitutional standards 
• Assessment of economic proportionality between public cost and private benefit 
• Enforceable public-interest conditions in development agreements, including clawback provisions, performance benchmarks, and transparency requirements 
• Clear allocation of financial risk between developers and public entities 
 
V. Data Governance, Security & Public Accountability 
 
The panel assesses governance standards for data handling and operational security in large-scale AI infrastructure. 
• Standards for sensitive data handling, retention, and third-party access 
• Baseline cybersecurity and AI system security controls, with independent assessment or auditability where appropriate 
• Clear breach and incident notification requirements, including remediation timelines and public disclosure thresholds 
• Defined oversight and enforcement mechanisms, including accountability pathways for developers, operators, and public authorities 
• Requirement that public-facing commitments be time-bound and enforceable at the same stage as private benefit realization

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
63 
 
2/23/2026 Aamir Nasir 
Quraishy 
Email 
Firstly, realized I kept forgetting the h in your name. My bad. 
My next concern I'd like for the record is regarding long-term resiliancy and sustainability that if the "AI-bubble" bursts. Tucson is not left "holding the bag" 
________________________________________ 
I’d like to raise a long-term sustainability concern that I believe should be explicitly addressed in the City’s data center policy framework. 
There is an ongoing public concern that we may currently be in an “AI bubble,” and that rapid buildout could outpace long-term demand. If that happens, Tucson 
could be left with large-scale facilities that require continued upkeep, utility commitments, and land-use constraints—even if the original business model becomes 
nonviable. For that reason, I believe the City should require explicit long-term sustainability and transition planning as a condition of approval. 
I recommend the policy incorporate the following requirements: 
1) Maintenance, Resiliency, and Pivot Planning 
Data center approvals should include a clearly defined budget and plan for: 
• ongoing maintenance and upkeep, 
• resiliency (operational continuity, safety, and secure shutdown capabilities), and 
• flexibility to pivot if the primary business model (e.g., AI training) declines. 
If a facility is proposed primarily for AI workloads, the agreement should require a documented pivot pathway—including identified alternative uses, transition 
timelines, and a dedicated contingency budget—so the site can be repurposed rather than abandoned or left in partial decay. 
2) Performance Audits and Enforceable Off-Ramps 
The City should require an end-of-contract and noncompliance procedure that is explicit, enforceable, and transparent. This could include: 
• periodic audits (e.g., every 2–3 years) of key commitments and performance parameters, 
• public reporting (in a digestible form) so residents can evaluate compliance, 
• a structured escalation pathway: notice → corrective action plan → probation → termination, and 
• a clearly defined termination and transition plan that protects the City and the community. 
Put simply: the City should not rely on goodwill alone. The agreement should contain a functional off-ramp if commitments are not met, and it should ensure the site 
does not become a stranded asset with unresolved obligations. 
3) Decommissioning and Site Reuse Planning 
There should be required planning (and ideally bonding/financial assurance) for: 
• decommissioning, 
• equipment removal and safe disposal/recycling, 
• remediation if needed, and 
• site reuse or re-tenanting. 
This is about ensuring that Tucson is not left with expensive, decaying infrastructure that cannot be retrofitted or transitioned into productive use. 
4) Research Partnership for Sustainability and Scalability 
Finally, I recommend that the policy require or incentivize support for ongoing research partnerships with the University of Arizona (and relevant local academic and 
national research institutions) focused on: 
• data center sustainability practices, 
• ecological impact monitoring, 
• failure detection and risk modeling, 
• scalable operations, and 
• strategies for rapid repurposing or transition during market downturns. 
The goal is to ensure that economic and land-use decisions remain safe, adaptive, and congruent with long-term community well-being—even if market conditions 
shift sharply.

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
64 
 
2/23/2026 Aamir Nasir 
Quraishy 
Email 
My next suggestion is on ensuring the datacenters support local business/entrepreneurship support. 
________________________________________ 
In addition to workforce development, I believe the City should consider mechanisms that ensure meaningful local technological and economic reinvestment, rather 
than allowing the benefits of large-scale data infrastructure to flow primarily to out-of-state corporate headquarters. 
To that end, I recommend exploring the following concepts: 
1. Local Technology and Business Support Commission 
The City could establish or designate a commission tasked with ensuring that data center operations meaningfully support local businesses, startups, and technical 
professionals. This body could monitor compliance with local investment commitments and recommend strategies for strengthening Tucson’s emerging technology 
ecosystem. 
2. Preferential Access or Cost Structures for Local Use 
Where legally and contractually feasible, agreements could encourage reduced-cost data processing or infrastructure access for Tucson-based businesses, startups, 
and residents. This could include cloud credits, compute grants, or subsidized infrastructure programs designed to stimulate local entrepreneurship and digital 
innovation. 
3. Local Priority for AI and Compute Resources 
If facilities are engaged in large-scale AI training or high-performance computing, the City could negotiate provisions encouraging priority pathways or reserved 
allocations that support Tucson-based AI startups, web development firms, or technology entrepreneurs. This would help ensure that local innovators are not priced 
out of infrastructure physically located within their own community. 
4. Research Partnerships for Public Benefit 
The policy could include structured partnerships with the University of Arizona and other regional research institutions, prioritizing projects that advance medical 
research, public health, environmental science, or other socially beneficial domains. Allocating compute resources or grant funding toward research with 
demonstrable public impact would align infrastructure growth with community well-being. 
The overarching goal would be to ensure that Tucson retains a degree of technological sovereignty and economic participation in the value generated by 
infrastructure hosted within its jurisdiction. This is not about restricting corporate operation, but about designing agreements that ensure shared prosperity and 
long-term local resilience. 
________________________________________

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
65 
 
2/23/2026 Aamir Nasir 
Quraishy 
Email 
It's Aamir again, here is my second suggestion on supporting workforce stability in Tucson. 
________________________________________ 
Thank you for the opportunity to provide feedback on the second policy area. In addition to ecological and infrastructure considerations, I believe it is important that 
the City of Tucson incorporate hiring and workforce development language that ensures meaningful reinvestment into local talent and the regional economy. 
Specifically, I recommend consideration of the following elements: 
1. Local Hiring Commitments 
The policy could include a defined percentage target or quota for hiring Arizona residents, particularly those from the Tucson metro area. Ensuring that a substantial 
portion of jobs are filled by locally grown talent strengthens community buy-in and ensures that economic benefits remain within the region. 
2. Inclusive Workforce Access 
The city may wish to encourage or require that a portion of roles be accessible to individuals without formal educational credentials (e.g., not requiring a high school 
diploma), including pathways for GED holders or high school dropouts. Many data center operations include roles in facilities management, physical infrastructure, 
logistics, and support that can provide stable employment and upward mobility when paired with structured training programs. 
3. Spanish-Language Accessibility 
Given Tucson’s strong Hispanic and bilingual population, it would be forward-thinking to support the creation of Spanish-accessible roles where English fluency is not 
strictly required, particularly in operational or technical-support environments where language flexibility is feasible. This would meaningfully expand access to 
opportunity within the local community. 
4. Education and Workforce Development Investment 
The policy could require participating companies to allocate funding or partnership support toward institutions such as Pima Community College and local secondary 
education programs. This may include curriculum development, certification pipelines, technical training programs in data center management, and internship-to-
hire pathways. As the industry evolves, aligning local educational infrastructure with emerging workforce demands ensures long-term sustainability. 
Above all, I believe the policy should aim not only to safeguard ecological impact, but also to ensure that employment pathways, job safety, and workforce resilience 
evolve alongside rapidly changing technological paradigms. A comprehensive framework would allow Tucson to benefit both environmentally and economically from 
this industry’s growth. 
________________________________________ 
2/23/2026 Aamir Nasir 
Quraishy 
 
Email 
This is Aamir, we spoke for a bit at the hearing last week about my views of considerations regarding data center policy. 
------------------- 
One concern I have, particularly from the perspective of someone with experience in data management, is that the definition does not appear to sufficiently account 
for the types of data being processed. Not all data centers operate in the same way, and the nature of the workloads they support can differ significantly. 
For example, AI training workloads, AI inference (real-time request handling), general cloud storage, video streaming, and online gaming each involve distinct data 
flows, storage architectures, latency requirements, and network request patterns. These differences affect infrastructure design, resource allocation, energy usage, 
cooling demands, and overall system behavior. 
I believe the definition would benefit from incorporating distinctions between these different levels and categories of data management. A more comprehensive 
framework that acknowledges variations such as AI training, AI inference, and high-throughput streaming or gaming workloads would result in a more accurate and 
research-informed definition of what a data center is and how it operates. 
Thank you again for your work on this, and I hope this perspective is helpful as the definition is refined. 
--------------------- 
I will be sending several emails that cover different suggestions regarding considerations for Tucson Data Center Policy.

Feedback Received on Large Scale Datacenters (3_12_2026) 
 
 
 
66 
 
2/19/2026 Noelia 
Yucupicio  
Email 
Nice talking to you tonight. I wanted to share resources that may help you in making guidelines:  
 
https://www.ucs.org/resources/data-center-power-play?read-online-content=1 
 
UCS really condenses a lot of good information and gives good sources for studies/research. I like them a lot and I think it could be useful for your work.  
 
I'd love to discuss with you the public education and and awareness of this topic (the zoning definition expansion regarding data centers) because I think that was a 
major mark missed tonight with the crowd. 
 
It’s important to first establish “why should I (a random Tucsonan) care?” If a zoning amendment is made, will that mean we the people do not get to decide on the 
establishment of a data center? How much power do we the people have now and how much will we have after the amendment? What is something bad that might 
happen if this amendment is not made, can a data center be snuck in? Does our mayor intend on doing the same as the Marana town council and disregard our 
concerns? How can we know our Mayor and City of Tucson has our best interests at heart? Once there are clear consequences and assurances, I think it will make 
people see this as an important thing to define/consider and not just something they want to chase away with anger. 
 
I would like more citizen visibility and widespread advertising when it comes to a large data center. Billboards, three-month long newspaper ads, regular reminders 
on all major local television networks, social media, pamphlet handouts with informed persons who can take questions, and roadside signs. Do you think City of 
Tucson would be interested in setting aside a role/team and a budget for this? 
2/6/2026 
Lori Rickard  
Email 
I hope your day is going well.  I received an email about the upcoming public meetings about the data center.  I wish you much success.   
  
I was wondering if having the server rooms walls and floor covered in Himalayan Salt Bricks if that would help displace the heat along with the traditional cooling 
methods?  Then when a section needs to be replaced one can do it a brick at a time.   
  
Himalayan Salt Bricks 
Link - https://saltbricks.us/products/salt-bricks?variant=46207641026790

00:01:33
Colleen Whitaker, SW Decision Resources:
https://docs.google.com/document/d/1LxMJ-EvqPcYlQbAL84b3fAH5G9C_q6D2YMVX9P8ACts/edit
?usp=sharing
 
 
00:06:01
Carver Struve, City of Tucson PDSD:
https://forms.office.com/pages/responsepage.aspx?id=7Fke0gjC60Oq8c8G2aGW4DGeZj0tRXRP
jmeLR-c215NUMVNZV1NQSlUyT1FMTDYzNUoxVEVLWDJTOS4u&route=shorturl
 
 
00:07:46
Colleen Whitaker, SW Decision Resources:
Any PDSD folks have 
a short link for that full survey?
 
 
00:38:41
Ian Wan, City of Tucson PDSD:
Participant Agenda: 
https://drive.google.com/file/d/1Dy-EEo6HBp0UWAinXSrDPYYK7JKat5Ke/view?usp=sharing
 
 
00:44:06
lee stanfield:
When specifically will you be addressing the other 
topics such as water use, electrical use, pollution, etc.?
 
 
00:45:51
Ian Wan, City of Tucson PDSD:
The presentation will address the 
topics with time for discussion after in the breakout rooms
 
 
00:46:32
Ian Wan, City of Tucson PDSD:
Participant Agenda: 
https://drive.google.com/file/d/1Dy-EEo6HBp0UWAinXSrDPYYK7JKat5Ke/view?usp=sharing
 
 
00:52:07
lee stanfield:
I believe we should require any data center proposed
to locate here, to be completely self-sufficient via its own solar generated power 
for all its electrical needs (including all cooling systems), and zero water use for
cooling. It should not be allowed to transfer its use of water onto TEP or any other
IOU by using Air conditioning powered by electricity from TEP or any other IOU.
 
 
00:52:58
Rachel Cook:
Will the proposed code be able to be applied to 
existing data centers and those that have been approved but have not yet been built 
(eg Project Blue) or would these only be subject to the old code?
 
 
00:52:59
Monika Browatzki:
Reacted to "I believe we should ..." with 
🌵
 
 
👍
00:54:07
lee stanfield:
Reacted to "Will the proposed co..." with 
 
 
00:54:31
Cesar Acosta, City of Tucson PDSD:
Replying to "Will the 
proposed co..."
whatever proposed amendments we make to the UDC would apply to new builds in City 
Limits, so not the existing smaller data centers and not project blue which is 
outside COT city limits
 
 
00:55:06
Reed Spurling:
How is the city identifying and addressing gaps 
between these draft zoning rules and the large water users ordinance etc? I ask 
because Project Blue slipped through previously unidentified regulatory gaps.
 
 
00:55:15
lee stanfield:
Replying to "Will the proposed co..."
😢
 
 
👍
00:55:26
Rachel Cook:
Reacted to "How is the city id..." with 
 
 
00:56:23
Ian Wan, City of Tucson PDSD:
Participant Agenda: 
https://drive.google.com/file/d/1Dy-EEo6HBp0UWAinXSrDPYYK7JKat5Ke/view?usp=sharing
 
 
00:57:13
Jon Ralston:
What is the time for the meeting on March 18th?
 
 
00:57:35
Dan Bursuck, City of Tucson, PDSD:
Replying to "What is the 
time for..."
Hi Jon - our Planning Commission meetings start at 6pm.
 
 
00:57:54
Rachel Cook:
was part of the function of the NDA signed by mayor 
& council to keep "community meetings" such as the one we are having now from 
happening before project blue was pushed through?
Large Scale Data Centers Code Amendment 2/23/2026 Virtual Meeting Chat

👍
00:58:00
Jon Ralston:
Reacted to "Hi Jon - our Plannin..." with 
 
 
00:58:15
Mark Estes:
I have attended meetings on this subject in both 
Marana and in Tucson, Beal Infrastructure has outlined how it plans to use 
sustainable, renewable energy. They have also addressed potable and reclaimed water 
usage. Outlining how they plan to use a closed cooling system that doesn't rely on 
our aqua fur. Furthermore, Beal Infrastructure has already addressed any noise and 
environmental impact concerns. I'm confused as to why the city of Tucson hasn't 
implemented the same regulations and oversight as Marana has mandated for Beal 
Infrastructure.
 
 
➕
00:58:23
Susan Tiss:
Reacted to "was part of the func…" with 
 
 
➕
00:59:04
April:
Reacted to "was part of the fu..." with 
 
 
00:59:08
Jon Ralston:
Replying to "What is the time for..."
🙂
Thank you Dan! 
 
 
00:59:17
Dan Bursuck, City of Tucson, PDSD:
Reacted to "Thank you Dan! 
🙂
👍
" with 
 
 
01:00:57
lee stanfield:
Do any of these new ordinances apply to TEP, since 
they get their water directly from our aquifer without going through Tucson Water?
 
 
👍
01:01:20
Rachel Cook:
Reacted to "Do any of these ne..." with 
 
 
👍
01:02:07
Jon Ralston:
Reacted to "Do any of these new ..." with 
 
 
01:02:12
Vivek:
Reacted to "Do any of these new ..." with ‼
 
 
01:02:45
Mark Estes:
Beal Infrastructure has already indicated that the 
only potable water usage would be only for things like drinking fountains, bathrooms
and or staff uses. Which would have minimal impact on the water table.
 
 
01:02:56
Vivek:
How will CAP changes affect these processes?
 
 
01:03:07
Rachel Cook:
Will "paper water" or water credits fall under 
'large quantity water users' in this ordinance?
 
 
01:03:35
Julie Dittmer:
Just to make sure I understand correctly - the 
zoning ordinance can’t regulate utilities directly, but it can require applicants to
demonstrate infrastructure capacity and compliance with other ordinances. Is that 
accurate? 
Thank you for hosting this session to educate the public.
 
 
01:03:43
Susan Tiss:
How do these plans change now that we have the news 
about planned reductions in Colorado River water for AZ ?  Those reductions could 
change the equation for water in Tucson
 
 
❤
01:03:54
Renee:
Reacted to "How do these plans c…" with 
 
 
❤
01:03:57
Miriam Robles:
Reacted to "How do these plans c..." with 
 
 
❤
01:03:59
Rachel Cook:
Reacted to "How do these plans..." with 
 
 
01:04:44
Kathleen Dreier:
Reacted to "How do these plans c..." with 
👍
 
 
01:05:10
Sarah Rotenberger:
Replying to "Do any of these new ..."
Bumping this question
 
 
01:05:11
Vivek:
Replying to "Beal Infrastructure ..."
Beale Infrastructure wants 286 MW for phase 1 of Project Blue and up to 1.5 GW for 
Marana, which has YUUUUGE water implications since our energy utilities rely so much
on fracked gas. Fracking takes millions of gallons from someone else’s community, 
and then more water to heat into steam at the actual power plants. It’s not about

the water consumed on site. We have to be stewards for everyone’s water. Is this a 
country or not? Is this a world or not?
 
 
01:05:16
Renee:
So you won’t recalculate these given our much lower CAP 
amounts?
 
 
01:05:25
April:
Will aquifer injection wells be allowed in the Tucson Basin 
that carry Data Center discharge
 
 
❤
01:05:54
Miriam Robles:
Reacted to "Beale Infrastructure..." with 
 
 
💯
01:05:56
Susan Tiss:
Reacted to "So you won’t recalcu…" with 
 
 
👍
01:06:13
Rachel Cook:
Reacted to "So you won’t reca..." with 
 
 
01:06:23
Julie Dittmer:
Reacted to "Do any of these new …" with ‼
 
 
01:06:31
lee stanfield:
Replying to "Beal Infrastructure ..."
That’s because they will instead, transfer their water usage from direct to indirect
via going with air conditioning that will require TEP to use massively more water to
cool its generators in order to provide the data center with power for AC
 
 
❤
01:06:35
Divinity Caldwell:
Reacted to "So you won’t recalcu…" with 
 
 
01:06:48
Carissa Sipp:
What is net water zero in the terms of the 
agreement?
 
 
👍
01:07:32
Miriam Robles:
Reacted to "What is net water ze..." with 
 
 
01:07:41
ct tracy:
how is 'emergency' defined with regard to generator 
use?
 
 
❤
01:07:51
Vivek:
Reacted to "how is 'emergency' d..." with 
 
 
01:07:53
Miriam Robles:
data centers are known for worsening water 
contamination crisis, alleging that the facility's operations are exacerbating 
nitrate levels in the local water supply, which are linked to cancer and 
miscarriages
 
 
👍
01:08:03
Rachel Cook:
Reacted to "data centers are k..." with 
 
 
01:08:04
Renee:
Sorry, this water information is very unclear.
 
 
👍
01:08:13
Rachel Cook:
Reacted to "how is 'emergency'..." with 
 
 
01:08:16
Dan Bursuck, City of Tucson, PDSD:
Replying to "how is 
'emergency' d..."
Hi CT - we will discuss this a little further in the presentation.
 
 
👍
01:08:19
Miriam Robles:
Reacted to "Sorry, this water in..." with 
 
 
❤
01:08:40
Susan Tiss:
Reacted to "how is 'emergency' d…" with 
 
 
👍
01:08:43
Susan Tiss:
Reacted to "Sorry, this water in…" with 
 
 
💯
01:08:45
Susan Tiss:
Reacted to "Sorry, this water in…" with 
 
 
💯
01:08:51
Megan Martin:
Reacted to "Sorry, this water in..." with 
 
 
👍
01:08:56
Rachel Cook:
Reacted to "Sorry, this water ..." with 
 
 
👍
01:09:04
Susan Tiss:
Reacted to "data centers are kno…" with 
 
 
👍
01:09:11
Kya:
Reacted to Sorry, this water in... with "
"
 
 
01:09:16
Dan Bursuck, City of Tucson, PDSD:
Replying to "How is the city
iden..."
Hi Reed - we will discuss this a bit when we get to the review process, and required
disclosures for energy and water.
 
 
💯
01:09:43
lee stanfield:
Reacted to "So you won’t recalcu..." with 
 
 
01:09:46
Carissa Sipp:
Who decided these were experts in data center?  Most
have no architecture experience and mostly cloud
 
 
💯
01:09:52
Vivek:
Reacted to "Sorry, this water in..." with

01:10:17
Dan Bursuck, City of Tucson, PDSD:
Replying to "Just to make 
sure I ..."
Hi Julie. Yes, there are limitations on what we can regulate, but will go into some 
detail on what we are proposing to require related to infrastructure capacity.
 
 
👍
01:10:19
lee stanfield:
Reacted to "What is net water ze..." with 
 
 
01:10:23
Carissa Sipp:
Who is ‘we’?
 
 
01:10:24
Mark Estes:
Replying to "Beal Infrastructure ..." 
 I have extensive experience working on data centers and that is NOT how they plan 
on using our potable water. They've made extensive concessions to the community's 
concerns pertaining to water. Everything from reclaimed water ( the same as what 
municipal golf courses use) to closed cooling systems (much like the radiator in 
your car) which would NOT use potable water.
 
 
01:10:24
Rachel Cook:
who are the members specifically and what are their 
credentials and interest in the health and safety of Tucsonans?
 
 
👍
01:10:41
Miriam Robles:
Reacted to "Who decided these we..." with 
 
 
01:10:43
April:
Replying to "Sorry, this water ..."
How can we find details on the water plan that covers the aquifer protection under 
current law
 
 
👍
01:10:58
Rachel Cook:
Reacted to "I have extensive e..." with 
 
 
💯
01:11:05
Divinity Caldwell:
Reacted to "Sorry, this water in…" with 
 
 
❤
01:11:07
Susan Tiss:
Reacted to "Beale Infrastructure…" with 
 
 
👍
01:11:21
Rachel Cook:
Reacted to "Beale Infrastructu..." with 
 
 
👍
01:11:24
Rachel Cook:
Reacted to "That’s because th..." with 
 
 
👍
01:11:26
lee stanfield:
Reacted to "Sorry, this water in..." with 
 
 
👍
01:11:31
Susan Tiss:
Reacted to "That’s because they …" with 
 
 
01:12:05
April:
Do you have water experts besides stakeholders on your TAC 
and/or the City Water department as you have no experience with data centers as 
customers?
 
 
💯
01:12:10
Jon Ralston:
Reacted to "Sorry, this water in..." with 
 
 
01:12:12
Cesar Acosta, City of Tucson PDSD:
Replying to "who are the 
members ..."
Hey Rachel TAC members can be seen along with their area of expertise here 
https://www.tucsonaz.gov/Departments/Planning-Development-Services/Planning-Initiati
ves/Data-Centers-Unified-Development-Code-Amendment
 
 
👍
01:12:20
Rachel Cook:
Reacted to "Hey Rachel TAC mem..." with 
 
 
👍
01:12:21
Miriam Robles:
Reacted to "who are the members ..." with 
 
 
❤
01:12:29
Miriam Robles:
Reacted to "Do you have water ex..." with 
 
 
01:13:31
Dan Bursuck, City of Tucson, PDSD:
Replying to "Sorry, this 
water in..."
Hi April - there was a Mayor and Council study session on the Large Quantity Water 
Users Ordinance last week. The materials and the presentation should be helpful.
 
 
01:13:33
lee stanfield:
I do not think my question  re whether TEP’s water 
usage (which comes directly from our aquifer and does NOT go through Tucson Water) 
was adequately answered at all.
 
 
01:14:18
Cesar Acosta, City of Tucson PDSD:
Replying to "Do you have

water ex..."
members of the Citizen Water Advisory Committee and Watershed Management Group were 
part of the TAC were hoping more perspectives will give us feedback now
 
 
01:14:30
Daniel Dempsey: My biggest concerns—outside of the environmental—are
stranded cost and cross-subsidy risk (externalized costs from the datacenter to 
ratepayers). I think we can address them through disclosure requirements. The first 
draft doesn’t mention these issues at all.
 
 
01:14:35
Mark Estes:
Why hasn't the city of Tucson adopted the same 
regulations and zoning issues as the town of Marana?
 
 
❤
01:14:39
April:
Reacted to "Who decided these ..." with 
 
 
01:14:40
Kathleen Dreier:
Reacted to "Sorry, this water in..." with 
👍
 
 
01:14:56
Tahnee Robertson, SDR:
All questions in chat for now please
 
 
01:14:58
Carissa Sipp:
You missed local people in architecture
 
 
01:15:11
Carissa Sipp:
AI and ICs
 
 
01:16:02
Rachel Cook:
why did this not occur prior to the vote on project 
blue?
 
 
💯
01:16:36
Kathleen Dreier:
Reacted to "AI and ICs" with 
 
 
❤
01:16:47
Reed Spurling:
Reacted to "why did this not occ..." with 
 
 
01:17:00
Kathleen Dreier:
Reacted to "why did this not occ..." with 
🤔
 
 
01:17:09
Tahnee Robertson, SDR:
You should be able to move the poll on your 
screen if it is blocking the screen behind
 
 
01:17:27
lee stanfield:
I tried to get my question in the chat answered, but
it was not adequately answered, so I have raised my hand.
 
 
01:17:32
Miriam Robles:
We don't want any kind of Data Centers, big or small
 
 
01:17:41
Coral:
If you dont have much say over water and energy who does?? 
Seems like THE big question/issue!
 
 
💯
01:17:43
Jon Ralston:
Reacted to "If you dont have muc..." with 
 
 
01:17:46
Mark Estes:
How is Tucson more unique than Marana in respect to 
Hyper Data Centers?
 
 
💯
01:18:00
Susan Tiss:
Reacted to "We don't want any ki…" with 
 
 
❤
01:18:02
Susan Tiss:
Reacted to "We don't want any ki…" with 
 
 
👍
01:18:04
Rachel Cook:
Reacted to "We don't want any ..." with 
 
 
❤
01:18:05
lee stanfield:
Reacted to "why did this not occ..." with 
 
 
💯
01:18:09
Megan Martin:
Reacted to "We don't want any ki..." with 
 
 
01:18:13
Rachel Cook:
if this code change will apply to all large scale 
water users why are we specifically discussing definitions only for large-scale data
centers?
 
 
01:18:19
April:
Why are you only looking at outdated Phoenix codes and not 
real-time issues happening in other parts of the country/world that have raised 
customer electricity rates, damaged aquifers, and degraded air quality. Our air 
quality is an F according to the American Lung Association
 
 
01:18:21
Reed Spurling:
Replying to "Beal Infrastructure ..."
Mark, I think we are talking about two slightly different issues. TEP uses lots 
(billions of gallons) of water to generate power, whether or not potable water is 
used locally. Electricity itself costs water, and data centers use a lot of 
electricity, therefore a lot of water.

👍
01:18:41
Miriam Robles:
Reacted to "How is Tucson more u..." with 
 
 
💯
01:18:41
Vivek:
Reacted to "Mark, I think we are..." with 
 
 
01:18:47
Carissa Sipp:
So this could draw 500MW or more and anything under 
- you truly think you have regulations
 
 
01:18:49
Colleen Whitaker, SW Decision Resources:
Replying to "I tried
to get my qu..."
Lee we will have more time for questions and feedback in the breakout rooms. Please 
feel free raise your unanswered questions again there.
 
 
💯
01:19:04
Jon Ralston:
Reacted to "Mark, I think we are..." with 
 
 
❤
01:19:06
Susan Tiss:
Reacted to "Why are you only loo…" with 
 
 
💯
01:19:09
Susan Tiss:
Reacted to "Why are you only loo…" with 
 
 
➕
01:19:11
Susan Tiss:
Reacted to "Why are you only loo…" with 
 
 
💯
01:19:18
Vivek:
Reacted to "Why are you only loo..." with 
 
 
💯
01:19:28
Rachel Cook:
Reacted to "Why are you only l..." with 
 
 
👍
01:19:29
Susan Tiss:
Reacted to "How is Tucson more u…" with 
 
 
👍
01:19:36
Megan Milton:
Reacted to "We don't want any ..." with 
 
 
💯
01:19:55
Megan Milton:
Reacted to "Why are you only l..." with 
 
 
01:20:02
Vivek:
Weird, why aren’t there any suitable locations in the 
Foothills?
 
 
01:20:04
April:
Setbacks won't help PM2.5 or nitric oxide particulate that 
travels hundreds of miles from data centers and affects all life in the area.
 
 
👍
01:20:08
Rachel Cook:
Reacted to "Weird, why aren’t..." with 
 
 
01:20:09
Renee:
Why are PAD, PCD, not shown on the map? This is the loophole
that is historically used to bypass zoning codes.
 
 
❤
01:20:14
Susan Tiss:
Reacted to "Weird, why aren’t th…" with 
 
 
😂
01:20:17
Susan Tiss:
Reacted to "Weird, why aren’t th…" with 
 
 
01:20:22
Kathleen Dreier:
Reacted to "Weird, why aren’t th..." with 
💯
 
 
👍
01:20:23
Nicole Hagedorn:
Reacted to "Setbacks won't hel..." with 
 
 
💯
01:20:25
Megan Milton:
Reacted to "Weird, why aren’t..." with 
 
 
❤
01:20:26
Reed Spurling:
Reacted to "Weird, why aren’t th..." with 
 
 
👍
01:20:29
Susan Tiss:
Reacted to "Setbacks won't help …" with 
 
 
👍
01:20:31
Miriam Robles:
Reacted to "Setbacks won't help ..." with 
 
 
01:20:35
Kathleen Dreier:
Reacted to "Setbacks won't help ..." with 
👍
 
 
👍
01:20:38
Rachel Cook:
Reacted to "Setbacks won't hel..." with 
 
 
01:20:44
Mark Estes:
Replying to "Beal Infrastructure ..." 
 Again, I am a Union Electrician with over 2 decades of experience in the industry 
that includes working at TEP, Solar Fields and Data centers. Furthermore, I have 
attended meetings on this issue in both Marana and Tucson.
 
 
01:20:44
Kathleen Dreier:
Reacted to "Why are PAD, etc, no..." with 
💯
 
 
01:20:52
Nicholas Martell, City of Tucson:
Replying to "if this code 
chang..."
Thank you for the question. One of the reasons Mayor and Council has directed staff 
to look at new zoning regulations for data centers is related to how quickly the 
technology and definitions have changed as opposed to other land uses. Other large

users, like Golf Courses have not seen the same technological changes.
 
 
💯
01:21:13
Nicole Hagedorn:
Reacted to "Why are you only l..." with 
 
 
01:21:19
Carissa Sipp:
But only if >50000?
 
 
👍
01:21:32
Kya:
Reacted to Weird, why aren’t th... with "
"
 
 
💯
01:21:40
Divinity Caldwell:
Reacted to "Beale Infrastructure…" with 
 
 
❤
01:21:48
Divinity Caldwell:
Reacted to "That’s because they …" with 
 
 
01:22:00
Rachel Cook:
and yet feedback was requested from the public, 
council voted no after the fact and project blue will still be building... how are 
we to trust that public opinion will be taken into account????
 
 
01:22:07
Julie Dittmer:
What policy objective is the City seeking to achieve
through establishing this ordinance now. Regulatory clarity, anticipation of 
applications, or economic positioning?
 
 
💯
01:22:17
Megan Martin:
Reacted to "and yet feedback was..." with 
 
 
👍
01:22:19
Megan Milton:
Reacted to "and yet feedback w..." with 
 
 
01:22:19
April:
Sorry, are you saying you will allow data centers within 1/2
mile of schools, businesses, and houses??
 
 
💯
01:22:35
Susan Tiss:
Reacted to "and yet feedback was…" with 
 
 
01:22:35
Kathleen Dreier:
Reacted to "and yet feedback was..." with 
👍
 
 
➕
01:22:39
Susan Tiss:
Reacted to "and yet feedback was…" with 
 
 
01:22:52
Miriam Robles:
Council meeting in Marana was packed, yet council 
members ignored our voices, we don't want Big Tech just easily checking boxes, we 
need to block Data Centers in the first place.
 
 
➕
01:22:53
Susan Tiss:
Reacted to "Sorry, are you sayin…" with 
 
 
01:22:57
Vivek:
Replying to "Beal Infrastructure ..."
I’m not questioning any of that, and I respect your experience! But TEP’s energy mix
is on their website: 50% fracked gas. The technology doesn’t exist to spin up 
renewables as quickly as they need to meet 1.5 GW of demand over a few years, right?
https://www.tep.com/our-energy-mix/
 
 
01:23:05
April:
These standards you are proposing are proven to be deadly to
citizens
 
 
01:23:06
lee stanfield:
Data centers should only be allowed to be in areas 
where they can have sufficient land to use solar panels to be totally 
self-sufficient with regard to their total electricity needs including all 
air-conditioning needs. They should not be allowed to dump their water usage onto 
TEP by using AC cooling and thus requiring TEP to have to use huge amounts of water 
to cool their generators in order to supply the data centers with enough electricity
to air condition them.
 
 
➕
01:23:08
Susan Tiss:
Reacted to "Council meeting in M…" with 
 
 
❤
01:23:14
Miriam Robles:
Reacted to "Council meeting in M..." with 
 
 
👍
01:23:15
Nicole Hagedorn:
Reacted to "and yet feedback w..." with 
 
 
👆
01:23:29
Carissa Sipp:
Reacted to "Data centers should …" with 
 
 
👍
01:23:31
Nicole Hagedorn:
Reacted to "Council meeting in..." with 
 
 
👍
01:23:32
Rachel Cook:
Reacted to "I’m not questioni..." with 
 
 
💯
01:23:32
Susan Tiss:
Reacted to "Data centers should …" with 
 
 
💯
01:23:33
Jon Ralston:
Reacted to "Data centers should ..." with 
 
 
💯
01:23:37
Nicole Hagedorn:
Reacted to "These standards yo..." with 
 
 
💯
01:23:44
Susan Tiss:
Reacted to "These standards you …" with 
 
 
👆
01:23:45
Nicole Hagedorn:
Reacted to "Data centers shoul..." with

💯
01:23:46
Nicole Hagedorn:
Reacted to "Data centers shoul..." with 
 
 
👆
01:23:47
Megan Martin:
Reacted to "Data centers should ..." with 
 
 
💯
01:23:53
Rachel Cook:
Reacted to "Data centers shoul..." with 
 
 
👍
01:24:00
Miriam Robles:
Reacted to "These standards you ..." with 
 
 
01:24:04
John Kmiec:
Replying to "I do not think my qu..."
TEP has their own water rights that they are regulated against by the state of 
Arizona.
 
 
01:24:04
Coral:
Doesn't the south side of Tucson already have bigger 
impacts: noise from TIA and Davis Monthan, who keep trying to get F35s here; Hughes 
aircraft toxic ponds; PFAs from firefighting foam etc.in wells/water; more poverty 
and less activism there to protest or prevent negative impacts.
 
 
01:24:05
Carissa Sipp:
Was any feedback from last week’s meeting taken into
account?
 
 
👍
01:24:12
Miriam Robles:
Reacted to "Was any feedback fro..." with 
 
 
❤
01:24:18
Miriam Robles:
Reacted to "Doesn't the south si..." with 
 
 
❤
01:24:20
Rachel Cook:
Reacted to "Doesn't the south ..." with 
 
 
💯
01:25:10
Megan Milton:
Reacted to "Doesn't the south ..." with 
 
 
01:25:11
Tahnee Robertson, SDR:
A reminder that City staff will respond to 
questions through a FAQ that will be posted.
 
 
01:25:31
Susan Tiss:
Even Google defines “large-scale” data centers as 
anything over 10,000 sq feet.  Not 50,000.  50,000 is hyperscale
 
 
01:25:32
Raye Winch:
Can we have more context? Like how much energy and 
water a data center that size might use?
 
 
01:25:41
Dan Bursuck, City of Tucson, PDSD:
Replying to "Was any 
feedback fro..."
Hi Carissa - this is the same presentation as Thursday. We are planning four 
meetings that will help to guide potential revisions as we move forwad.
 
 
➕
01:25:46
Susan Tiss:
Reacted to "Was any feedback fro…" with 
 
 
01:26:00
Vivek:
What if we defined large-scale data centers not by area but 
by energy consumption?
 
 
01:26:01
Rachel Cook:
no
 
 
01:26:09
Renee:
One neighborhood meeting is NOT enough
 
 
❤
01:26:10
Daniel Dempsey: Reacted to "What if we defined l..." with 
 
 
❤
01:26:15
Miriam Robles:
Reacted to "One neighborhood mee..." with 
 
 
👍
01:26:24
Miriam Robles:
Reacted to "no" with 
 
 
❤
01:26:29
Susan Tiss:
Reacted to "What if we defined l…" with 
 
 
01:26:32
lee stanfield:
Where is the poll?
 
 
01:26:39
Kathleen Dreier:
Reacted to "Even Google defines ..." with 
👍
 
 
01:26:48
Dan Hunt:
Lost the poll screen
 
 
01:26:51
April:
Replying to "Was any feedback f..."
So is Carissa's question a no then?
 
 
01:27:02
Daniel Dempsey: Replying to "What if we defined l..."
Exactly. It’s the resource consumption that is the problem. AI data centers use far 
more resources than normal cloud data centers.
 
 
01:27:05
lee stanfield:
It is not showing up on screen!

01:27:13
Kathleen Dreier:
Please show us the results on the screen.
 
 
01:27:22
Vivek:
Reacted to "Sorry, are you sayin..." with ‼
 
 
01:27:25
lee stanfield:
Your poll is not showing up on the screen!!!
 
 
👍
01:27:31
Miriam Robles:
Reacted to "Please show us the r..." with 
 
 
01:27:36
Coral:
Where us poll? On phone...
 
 
01:27:39
Kathleen Dreier:
Thank you. See it now.
 
 
01:27:40
ct tracy:
i never saw the poll
 
 
❤
01:27:43
April:
Reacted to "One neighborhood m..." with 
 
 
💯
01:27:46
Vivek:
Reacted to "Doesn't the south si..." with 
 
 
01:27:47
Megan Milton:
I didn't get a chance to finish.
 
 
❤
01:27:49
Raye Winch:
Reacted to What if we defined l... with "
"
 
 
💯
01:28:10
April:
Reacted to "Doesn't the south ..." with 
 
 
01:28:27
Colleen Whitaker, SW Decision Resources:
https://forms.office.com/pages/responsepage.aspx?id=7Fke0gjC60Oq8c8G2aGW4DGeZj0tRXRP
jmeLR-c215NUMVNZV1NQSlUyT1FMTDYzNUoxVEVLWDJTOS4u&route=shorturl
 
 
01:28:58
Susan Tiss:
Power consumption…. Anything over 100 mw is “large.”
 
 
💯
01:29:05
April:
Reacted to "Power consumption..." with 
 
 
01:29:08
Colleen Whitaker, SW Decision Resources:
That is a link you 
can use to answer the same questions as are being posed in the Zoom polls. And it 
will remain open so you can take your time.
 
 
01:29:14
Kathleen Dreier:
Reacted to "Power consumption…. ..." with 
👍
 
 
➕
01:29:18
Susan Tiss:
Reacted to "Can we have more con…" with 
 
 
01:29:24
Miriam Robles:
Replying to "Power consumption…. ..."
They need to build Clean energy infrastructure first
 
 
❤
01:29:30
lee stanfield:
Reacted to "What if we defined l..." with 
 
 
01:29:36
Kathleen Dreier:
Reacted to "They need to build C..." with 
👍
 
 
👍
01:29:44
lee stanfield:
Reacted to "Was any feedback fro..." with 
 
 
01:29:56
Beth Lehr:
Sorry...my phone kicked me off. Can you drop the 
link one more time, please?
 
 
01:30:01
Daniel Dempsey: Disclosure is a big tool.
 
 
01:30:10
Ian Wan, City of Tucson PDSD:
https://forms.office.com/pages/responsepage.aspx?id=7Fke0gjC60Oq8c8G2aGW4DGeZj0tRXRP
jmeLR-c215NUMVNZV1NQSlUyT1FMTDYzNUoxVEVLWDJTOS4u&route=shorturl
 
 
01:30:12
Colleen Whitaker, SW Decision Resources:
Survey link: 
https://forms.office.com/pages/responsepage.aspx?id=7Fke0gjC60Oq8c8G2aGW4DGeZj0tRXRP
jmeLR-c215NUMVNZV1NQSlUyT1FMTDYzNUoxVEVLWDJTOS4u&route=shorturl
 
 
👍
01:30:25
Beth Lehr:
Reacted to https://forms.office... with "
"
 
 
💯
01:30:34
lee stanfield:
Reacted to "Power consumption…. ..." with 
 
 
01:30:39
Stella smith:
Yes, we do not want any data centers.
 
 
01:30:40
Daniel Dempsey: Disclosure has to include who is paying for the new 
infrastructure required and how it is being paid for.
 
 
👍
01:30:41
lee stanfield:
Reacted to "They need to build C..." with 
 
 
❤
01:30:46
Miriam Robles:
Reacted to "Disclosure has to in..." with 
 
 
❤
01:30:52
Miriam Robles:
Reacted to "Yes, we do not want ..." with 
 
 
👍
01:30:55
S. Vandergriff: Reacted to "Disclosure has to ..." with 
 
 
❤
01:30:56
Rachel Cook:
Reacted to "Yes, we do not wan..." with 
 
 
❤
01:30:57
Rachel Cook:
Reacted to "Disclosure has to ..." with

01:31:06
April:
Are you working with climateXchange or any other policy 
group that understands transmission challenges? If not, why? Because as you said, 
the grid is complicated and trying to make policy blindfolded is not wise.
 
 
❤
01:31:11
lee stanfield:
Reacted to "Yes, we do not want ..." with 
 
 
01:31:20
Rebecca Craft:
It just isn't clear yet whether data centers can 
operate in an environmentally unimpactful and sustainable way, anywhere in the 
country (or planet).  I'd like to see Tucson refuse all such development until we 
are more certain that it can be operated in a minimally damaging way.  So far data 
centers  seem to be operating in ways that have seriously negative impact on the 
people who live near them.
 
 
💯
01:31:24
Susan Tiss:
Reacted to "Disclosure has to in…" with 
 
 
01:31:26
Stella smith:
One publich meeting is absurd should be at least 4 
or 5 unless you intend to just NOT TAKE PUBLIC INPUT SERIOUSLY
 
 
❤
01:31:27
lee stanfield:
Reacted to "Disclosure has to in..." with 
 
 
01:31:32
Miriam Robles:
Replying to "Disclosure has to in..."
It has to commit to 100% renewable energy
 
 
💯
01:31:37
Vivek:
Reacted to "It just isn't clear ..." with 
 
 
💯
01:31:39
Susan Tiss:
Reacted to "It just isn't clear …" with 
 
 
01:31:39
Daniel Dempsey: There’s a major difference between a user financing 
the infrastructure and it being recovered through rates. If recovered through rates,
it needs to have security and long-term contracts.
 
 
➕
01:31:41
Susan Tiss:
Reacted to "It just isn't clear …" with 
 
 
👍
01:31:55
Megan Milton:
Reacted to "Disclosure has to ..." with 
 
 
❤
01:32:06
Miriam Robles:
Reacted to "It just isn't clear ..." with 
 
 
❤
01:32:22
Miriam Robles:
Reacted to "One publich meeting ..." with 
 
 
01:32:24
Kathleen Dreier:
Reacted to "Disclosure has to in..." with 
👍
 
 
❤
01:32:27
Miriam Robles:
Reacted to "There’s a major diff..." with 
 
 
01:32:30
Kathleen Dreier:
Reacted to "It has to commit to ..." with 
💯
 
 
01:32:31
Rachel Cook:
how do recent changes to the EPA and federal 
government's stance on climate change and interest in regulation affect this and the
enforcement of current and future code?
 
 
01:32:31
Stella smith:
why do we have to have ANY data centers. This is 
very unclear but apparently a decision that has already been made by City Council 
without adequate public input.
 
 
01:32:33
Vivek:
Reminder that Tucson Water WANTED to supply Project Blue 
until mayor and council said no
 
 
01:32:35
April:
What are your mechanisms for "off-setting" water use?
 
 
👍
01:32:38
Rachel Cook:
Reacted to "why do we have to ..." with 
 
 
01:32:41
Kathleen Dreier:
Reacted to "why do we have to ha..." with 
💯
 
 
👍
01:32:43
Rachel Cook:
Reacted to "Reminder that Tucs..." with 
 
 
❤
01:32:43
Julie Dittmer:
Reacted to "It just isn't clear …" with 
 
 
❤
01:32:43
Miriam Robles:
Reacted to "why do we have to ha..." with 
 
 
01:32:48
Kathleen Dreier:
Reacted to "Reminder that Tucson..." with 
💯
 
 
💯
01:32:49
Vivek:
Reacted to "why do we have to ha..." with 
 
 
💯
01:32:54
Vladimir:
Reacted to why do we have to ha... with "
"

👍
01:32:55
Julie Dittmer:
Reacted to "Disclosure has to in…" with 
 
 
01:33:05
Daniel Dempsey: TEP admitted before the ACC that Beale was not 
covering the cost of new generation and it was only a ten year contract. And that 
new generation has a life of 25+ years. So we get stuck with the bill under most 
scenarios. And the security amounts were nowhere near sufficient.
 
 
💯
01:33:18
Vivek:
Reacted to "TEP admitted before ..." with 
 
 
💯
01:33:20
Rachel Cook:
Reacted to "TEP admitted befor..." with 
 
 
01:33:20
Carissa Sipp:
I feel like these are just words and there is no 
system to check
 
 
👍
01:33:27
Rachel Cook:
Reacted to "I feel like these ..." with 
 
 
01:33:39
Andi Faulkner-Harrison: Every data center has gone over initial 
energy disclosure. Every community has had their electricity bill increase. How can 
you say it will be different here if there is no evidence to prove otherwise?
 
 
01:33:54
Vivek:
Can you please review slides while the poll is up?
 
 
01:34:08
Jon Ralston:
the comment section bogs down with everyone trying 
to answer the poll at the same time
 
 
01:34:09
Tahnee Robertson, SDR:
Reacted to "Can you please revie..." with 
ҿ
 
 
01:34:11
Kathleen Dreier:
Reacted to "Every data center ha..." with 
💯
 
 
Ӏ
01:34:25
Vivek:
Reacted to "the comment section ..." with 
 
 
01:34:26
Kathleen Dreier:
Replying to "Can you please revie..."
Yes, please!
 
 
01:34:50
Colleen Whitaker, SW Decision Resources:
Replying to "the 
comment section ..."
If anyone is having issues with the Zoom poll, please use this link. It has all the 
same questions: 
https://forms.office.com/pages/responsepage.aspx?id=7Fke0gjC60Oq8c8G2aGW4DGeZj0tRXRP
jmeLR-c215NUMVNZV1NQSlUyT1FMTDYzNUoxVEVLWDJTOS4u&route=shorturl
 
 
01:34:55
Vivek:
Paper water is water stolen from somewhere else
 
 
01:35:00
Colleen Whitaker, SW Decision Resources:
Replying to "the 
comment section ..."
And it will remain open after the meeting.
 
 
👍
01:35:08
Rachel Cook:
Reacted to "Paper water is wat..." with 
 
 
➕
01:35:10
Susan Tiss:
Reacted to "how do recent change…" with 
 
 
💯
01:35:12
Divinity Caldwell:
Reacted to "Paper water is water…" with 
 
 
💯
01:35:19
Susan Tiss:
Reacted to "why do we have to ha…" with 
 
 
💯
01:35:23
Susan Tiss:
Reacted to "Reminder that Tucson…" with 
 
 
👍
01:35:27
Miriam Robles:
Reacted to "I feel like these ar..." with 
 
 
💯
01:35:31
Nicole Hagedorn:
Reacted to "Reminder that Tucs..." with 
 
 
01:35:34
Carissa Sipp:
Replying to "TEP admitted before …"
By ACC and AZ law the are compensated- I think the term is base rate- this allows 
them to seek rate increases for these things and Fortis dropped the infrastructure 
for Beale in its investment disclosure this year touting it as a good thing and more
revenue.
 
 
💯
01:35:35
Nicole Hagedorn:
Reacted to "why do we have to ..." with 
 
 
💯
01:35:36
Susan Tiss:
Reacted to "TEP admitted before …" with

❤
01:35:37
Miriam Robles:
Reacted to "Every data center ha..." with 
 
 
➕
01:35:40
Susan Tiss:
Reacted to "TEP admitted before …" with 
 
 
❤
01:35:49
Miriam Robles:
Reacted to "Paper water is water..." with 
 
 
01:35:55
Megan Milton:
Have any of these plans been reassessed after the 
United Nations declared that we are in a state of global water bankruptcy ( 
https://news.un.org/en/story/2026/01/1166800 )? If so, how?
 
 
01:35:57
Carissa Sipp:
I have no poll
 
 
💯
01:36:22
Susan Tiss:
Reacted to "Every data center ha…" with 
 
 
❤
01:36:23
Susan Tiss:
Reacted to "Every data center ha…" with 
 
 
01:36:25
Colleen Whitaker, SW Decision Resources:
Replying to "I have 
no poll"
Please use this link Carissa: 
https://forms.office.com/pages/responsepage.aspx?id=7Fke0gjC60Oq8c8G2aGW4DGeZj0tRXRP
jmeLR-c215NUMVNZV1NQSlUyT1FMTDYzNUoxVEVLWDJTOS4u&route=shorturl
 
 
💯
01:36:33
Susan Tiss:
Reacted to "Paper water is water…" with 
 
 
01:36:48
lee stanfield:
But Tucson Water is NOT where TEP gets its water 
from….. TEP has its own wells and does NOT go through Tucson Water. So WOULD TEP’S 
WATER USE be be regulated by the new water standards???
 
 
01:36:50
Colleen Whitaker, SW Decision Resources:
Replying to "I have 
no poll"
It has the same questions as the zoom poll and will remain open after the meeting.
 
 
➕
01:36:57
Susan Tiss:
Reacted to "Have any of these pl…" with 
 
 
💯
01:36:59
Susan Tiss:
Reacted to "Have any of these pl…" with 
 
 
➕
01:37:23
Susan Tiss:
Reacted to "But Tucson Water is …" with 
 
 
❤
01:37:25
Miriam Robles:
Reacted to "But Tucson Water is ..." with 
 
 
💯
01:37:28
Susan Tiss:
Reacted to "But Tucson Water is …" with 
 
 
01:37:36
Rachel Cook:
Who deetermined the setback distances?
 
 
👍
01:37:46
Miriam Robles:
Reacted to "Who deetermined the ..." with 
 
 
01:38:12
Vivek:
Is there a minimum distance a data center must be from the 
nearest zoned residential?
 
 
01:38:13
Daniel Dempsey: Replying to "TEP admitted before ..."
Yeah, TEP adds the cost to the base rate. It then hopes Beale pays enough to cover 
it in its bills. If Beale fails to do so, it’s a cross-subsidy. We can address this 
through disclosures. Most of this information was redacted in TEP’s agreement with 
Beale. Then TEP admitted Beale wasn’t covering the cost.
M&C special exception needs to have this information to make a good decision.
 
 
💯
01:38:15
Megan Milton:
Reacted to "why do we have to ..." with 
 
 
01:38:15
Rachel Cook:
Contractor weighing in on the setbacks--this is 
incredibly low considering the noise, etc\
 
 
💯
01:38:20
Megan Milton:
Reacted to "Reminder that Tucs..." with 
 
 
01:38:24
Mark Estes:
If Hyper Data Centers are to have an impact on Pima 
County, why then isn't the city of Tucson including the proposed zoning and 
regulation issues addressed by Marana in these meetings? Why isn't the City of 
Tucson breaking down the concerns that Marana residents have expressed and offering 
those proposed resolutions offered by Beal Infrastructure so that the community of 
Tucson can be more informed?

01:38:27
Miriam Robles:
Other communities are having health issues due to 
similar setbacks
 
 
01:38:37
Dan Hunt:
Would you want this behemoth in YOUR backyard?
 
 
❤
01:38:47
Miriam Robles:
Reacted to "Would you want this ..." with 
 
 
01:39:15
lee stanfield:
TEP’s water usage is crucial because if a data 
center uses Air Conditioning, it just transfers its direct water usage to an 
indirect usage via massively increasing TEP’s water usage to generate the HUGE 
additional power needed for the data center’s air conditioning.
 
 
01:39:21
Victoria Sammons:
Do you consider data centers a public health
threat?
 
 
01:39:36
Kathleen Dreier:
The whole country has already shown us what 
happenes as it relates to data center development: It leads to extraction where the 
common person gets the fallout.
 
 
❤
01:40:06
Miriam Robles:
Reacted to "TEP’s water usage is..." with 
 
 
❤
01:40:14
Miriam Robles:
Reacted to "Do you consider data..." with 
 
 
01:40:14
Dan Bursuck, City of Tucson, PDSD:
Reacted to "Contractor 
👍
weighing ..." with 
 
 
01:40:21
Dan Hunt:
If you are truly looking for public feedback: it’s 
not zoning regulations we need, it’s a moratorium on all data centers.
 
 
❤
01:40:21
Miriam Robles:
Reacted to "The whole country ha..." with 
 
 
01:40:22
April:
Replying to "Contractor weighin..."
Yes, there are incidents of Havana type syndrome this close to data centers. Have 
you studied that?
 
 
❤
01:40:32
Miriam Robles:
Reacted to "If you are truly loo..." with 
 
 
❤
01:40:34
Susan Tiss:
Reacted to "Do you consider data…" with 
 
 
❤
01:40:35
Eric Klingberg: Reacted to "If you are truly loo..." with 
 
 
01:40:36
Kathleen Dreier:
Reacted to "If you are truly loo..." with 
💯
 
 
❤
01:40:41
Miriam Robles:
Reacted to "Yes, there are incid..." with 
 
 
💯
01:40:41
April:
Reacted to "Contractor weighin..." with 
 
 
❤
01:40:41
Susan Tiss:
Reacted to "The whole country ha…" with 
 
 
❤
01:40:45
Miriam Robles:
Reacted to "Contractor weighing ..." with 
 
 
01:40:47
Rachel Cook:
what is the maximum building heights in  this 
example?
 
 
❤
01:40:48
Susan Tiss:
Reacted to "If you are truly loo…" with 
 
 
💯
01:40:49
Susan Tiss:
Reacted to "If you are truly loo…" with 
 
 
👍
01:40:51
Dan Hunt:
Reacted to "Contractor weighing …" with 
 
 
➕
01:40:51
Susan Tiss:
Reacted to "If you are truly loo…" with 
 
 
❤
01:40:52
Rachel Cook:
Reacted to "If you are truly l..." with 
 
 
💯
01:40:54
Rachel Cook:
Reacted to "If you are truly l..." with 
 
 
👍
01:40:54
S. Vandergriff: Reacted to "If you are truly l..." with 
 
 
👍
01:40:57
Megan Milton:
Reacted to "If you are truly l..." with 
 
 
➕
01:40:58
Rachel Cook:
Reacted to "If you are truly l..." with 
 
 
👍
01:40:59
Rachel Cook:
Reacted to "If you are truly l..." with 
 
 
01:41:06
Carissa Sipp:
When will our feedback be rolled into the work?
 
 
👍
01:41:13
Rachel Cook:
Reacted to "When will our feed..." with 
 
 
👍
01:41:16
Eric Klingberg: Reacted to "Contractor weighing ..." with 
 
 
👍
01:41:22
Megan Milton:
Reacted to "When will our feed..." with 
 
 
01:41:23
Vivek:
Is there a minimum distance a data center must be from the

nearest zoned residential?
 
 
👍
01:41:24
Nicole Hagedorn:
Reacted to "When will our feed..." with 
 
 
01:41:24
April:
Replying to "Contractor weighin..."
This setback proposal is deadly and unrealistic according to studies from Cal Tech 
and others.
 
 
01:41:35
Susan Tiss:
No data centers in residential areas.  Period.  No 
“setback” is enough.
 
 
❤
01:41:42
Miriam Robles:
Reacted to "No data centers in r..." with 
 
 
💯
01:41:43
Divinity Caldwell:
Reacted to "Contractor weighing …" with 
 
 
01:41:52
Kya:
#3 on the poll for this one is a duplicate from the previous
poll. #2 doesn't make sense
 
 
01:41:55
Dan Bursuck, City of Tucson, PDSD:
Replying to "Is there a 
minimum d..."
As of now it is at 400 feet from residential.
 
 
💯
01:42:01
April:
Reacted to "If you are truly l..." with 
 
 
❤
01:42:03
Divinity Caldwell:
Reacted to "No data centers in r…" with 
 
 
❤
01:42:04
Rachel Cook:
Reacted to "No data centers in..." with 
 
 
❤
01:42:08
Nicole Hagedorn:
Reacted to "No data centers in..." with 
 
 
01:42:25
Jon Ralston:
I’ve got a joke for everyone.  A horse walks into a 
bar.  The bar tender says, “why the long face?”  The horse says, “because I’m a 
citizen of Tucson and I had thought we had defeated hyper scale data centers in our 
community, but the City of Tucson continues to push them.”  I realize that joke is 
kind of sad, but then again so is this process. (whomp, whomp)
 
 
👎
01:42:26
Megan Martin:
Reacted to "As of now it is at 4..." with 
 
 
01:42:34
Reed Spurling:
Replying to "If Hyper Data Center..."
Agreed, but Beale Infrastructure has lied to us multiple times about their projects’
requirements, so I think it would be difficult to apply their proposed “solutions” 
with much confidence.
 
 
01:42:36
Kathleen Dreier:
Reacted to "No data centers in r..." with 
❤
 
 
😂
01:42:42
Susan Tiss:
Reacted to "I’ve got a joke for …" with 
 
 
😂
01:42:45
Megan Martin:
Reacted to "I’ve got a joke for ..." with 
 
 
❤
01:42:46
Susan Tiss:
Reacted to "I’ve got a joke for …" with 
 
 
👏
01:42:47
Rachel Cook:
Reacted to "I’ve got a joke f..." with 
 
 
❤
01:42:52
Divinity Caldwell:
Reacted to "I’ve got a joke for …" with 
 
 
01:42:55
Tahnee Robertson, SDR:
Replying to "#3 on the poll for t..."
We’ll fix that, thanks for noting
 
 
❤
01:42:55
Rachel Cook:
Reacted to "I’ve got a joke f..." with 
 
 
01:42:58
April:
What decible of noise are you talking about, your slide does
not say.
 
 
01:43:02
Dan Bursuck, City of Tucson, PDSD:
Replying to "When will our 
feedba..."
Once we get through these public meetings, we will summaraize and post all the 
comments and provide revisions. Most likely that will be prior to the Planning 
Commission Study Session.

01:43:08
Carissa Sipp:
Are we building hills in Tucson desert?
 
 
➕
01:43:14
Susan Tiss:
Reacted to "What decible of nois…" with 
 
 
01:43:17
Kathleen Dreier:
Reacted to "Agreed, but Beale In..." with 
💯
 
 
👍
01:43:18
Susan Tiss:
Reacted to "When will our feedba…" with 
 
 
👍
01:43:20
Stella smith:
Reacted to "Paper water is water..." with 
 
 
👏
01:43:21
April:
Reacted to "I’ve got a joke f..." with 
 
 
❤
01:43:26
S. Vandergriff: Reacted to "No data centers in..." with 
 
 
01:43:45
Andi Faulkner-Harrison: Has anyone on council done their research on
infrasound by data centers (it's bad btw)
 
 
01:43:45
Rachel Cook:
except for project blue that has already been 
"passed" without consent from the public and without an amended code........
 
 
01:43:51
Mark Estes:
The server systems in data centers are set on a 
vibration dampening floor that mitigates any noise Produced by Data Centers. Marana 
has already set the standards for this and many other issues.
 
 
01:43:56
Carissa Sipp:
What is the exact equipment you are using do 
measurement?  What and who will do this?  And where?  With generators on/off?
 
 
❤
01:44:03
Miriam Robles:
Reacted to "The server systems i..." with 
 
 
01:44:05
April:
"getting at that noise" won't be mitigated by a wall. Sorry.
 
 
01:44:10
Susan Tiss:
Without specifics about the type of noise, this is 
not helpful info.
 
 
➕
01:44:27
Susan Tiss:
Reacted to "What is the exact eq…" with 
 
 
💯
01:44:56
Vivek:
Reacted to "Without specifics ab..." with 
 
 
💯
01:45:02
Megan Milton:
Reacted to "Without specifics ..." with 
 
 
01:45:06
Carissa Sipp:
Times of required maintenance should not be 9-6 for 
air quality issues
 
 
01:45:22
Stella smith:
Replying to "I have no poll"
The City DOES NOT enforce the noise level restrictions that we have now. There is 
certainly NO reason to be lieve they will enforce whatever noise regulations that 
they set up here. The City sets some of these regulations that sound good but then 
allocate NO staff to be concerned about enfor
 
 
01:45:27
Mark Estes:
The generators are only used for emergency 
situations and for emergency testing situations
 
 
01:45:28
April:
The generator segment is not clear. And saying that natural 
gas is cleaner is greenwashing and not helpful
 
 
01:45:51
Carissa Sipp:
I understand noise but this misses the generator 
issue and checkout is monthly maintenance with regards to impact on air quality
 
 
💯
01:45:55
Dan Hunt:
Reacted to "Without specifics ab…" with 
 
 
01:45:59
Vivek:
Replying to "Without specifics ab..."
https://www.youtube.com/watch?v=_bP80DEAbuo must watch about noise, data centers, 
and public health
 
 
01:46:23
Carissa Sipp:
Replying to "The generators are o…"
No- they receive maintenance monthly
 
 
01:46:34
Carissa Sipp:
They aren’t just ‘emergency’
 
 
👍
01:46:36
Miriam Robles:
Reacted to "https://www.youtube...." with 
 
 
01:46:38
April:
Particulate from LNG stays in the atmosphere decades longer 
than diesal or coal - which does not make it a good comparison. Solar or wind is 
"cleaner"

01:47:03
Megan Martin:
https://youtu.be/t-8TDOFqkQA?si=pMleg-oD0MJZol46
 
 
💯
01:47:18
Divinity Caldwell:
Reacted to "Without specifics ab…" with 
 
 
01:47:39
ct tracy:
maintenance needs to be defined or general ops is 
maintenance
 
 
01:47:41
Susan Tiss:
Other data centers around the country are using 
generators far more than they said they would.  There are also no penalties 
mentioned here for non-compliance.  This is wholly unacceptable.
 
 
💯
01:47:57
Divinity Caldwell:
Reacted to "Other data centers a…" with 
 
 
➕
01:47:58
Susan Tiss:
Reacted to "The generator segmen…" with 
 
 
💯
01:47:59
Megan Martin:
Reacted to "Other data centers a..." with 
 
 
💯
01:48:01
Nicole Hagedorn:
Reacted to "Other data centers..." with 
 
 
💯
01:48:01
Jon Ralston:
Reacted to "Other data centers a..." with 
 
 
💯
01:48:05
April:
Reacted to "Other data centers..." with 
 
 
01:48:23
Stella smith:
Replying to "I have no poll"
aLL THE REGULATIONS are not RESTRICTIVE ENOUGH.
 
 
💯
01:48:26
Megan Milton:
Reacted to "Other data centers..." with 
 
 
👍
01:48:30
Miriam Robles:
Reacted to "aLL THE REGULATIONS ..." with 
 
 
👍
01:48:34
Miriam Robles:
Reacted to "The City DOES NOT en..." with 
 
 
👍
01:48:51
Rachel Cook:
Reacted to "Other data centers..." with 
 
 
01:48:59
Stella smith:
Replying to "I have no poll"
none OF HE regulations will have any guarantee of nforcement
 
 
👍
01:49:20
S. Vandergriff: Reacted to "I feel like these ..." with 
 
 
01:49:24
ct tracy:
adding native veg to the border of a clear-cut acre 
is surreal
 
 
01:49:33
Carissa Sipp:
Where is heat generated from the data center 
considered here?
 
 
01:49:36
April:
What about stormwater runoff - any regulations there or does
disaters soak into the soil and make it's way to the aquifer? What about fire 
protection requirements? Fire departments say they don't have resources to put out 
data center fires b/c of the heat and toxicity.
 
 
01:49:46
Miriam Robles:
Define: Low water usage
 
 
💯
01:49:46
Divinity Caldwell:
Reacted to "Where is heat genera…" with 
 
 
💯
01:49:49
Megan Milton:
Reacted to "Where is heat gene..." with 
 
 
👍
01:50:03
Nicole Hagedorn:
Reacted to "What about stormwa..." with 
 
 
💯
01:50:03
Divinity Caldwell:
Reacted to "What about stormwate…" with 
 
 
💯
01:50:06
Nicole Hagedorn:
Reacted to "Where is heat gene..." with 
 
 
01:50:08
Eric Klingberg: Replying to "The generators are o..."
What would stop them from having an "emergency" every summer?
 
 
01:50:21
Stella smith:
Replying to "I have no poll"
HOW MANY EMPLOYEES WILL BE GUARANTEED TO MANAGE ENFORCEMENT?
 
 
01:51:10
Carissa Sipp:
Replying to "The generators are o…"
They will have daily emergencies and then more maintenance
 
 
01:51:11
Mark Estes:
Parking, setback and environmental issues would be 
the equivalent or better as that of the Amazon building on Kolb and Irvington.
 
 
01:51:40
ct tracy:
which is pretty depressing
 
 
01:51:41
Dan Hunt:
I worry that this public feedback is just a “check

the box” exercise that will get permanently archived into the circular filing 
cabinet.
 
 
☝
01:51:46
Megan Martin:
Reacted to "What would stop them..." with 
 
 
💯
01:51:51
Divinity Caldwell:
Reacted to "I worry that this pu…" with 
 
 
☝
01:51:53
Megan Martin:
Reacted to "They will have daily..." with 
 
 
💯
01:52:01
Megan Martin:
Reacted to "which is pretty depr..." with 
 
 
💯
01:52:02
Nicole Hagedorn:
Reacted to "I worry that this ..." with 
 
 
💯
01:52:10
Nicole Hagedorn:
Reacted to "which is pretty de..." with 
 
 
01:52:17
Carissa Sipp:
I am NO, NO and my links don’t work to add to the %
 
 
01:52:22
Mark Estes:
Replying to "The generators are o..." 
 Your assessment is incorrect CS.
 
 
💯
01:52:26
April:
Reacted to "adding native veg ..." with 
 
 
01:52:33
Susan Tiss:
Replying to "The generators are o…"
In other parts of the country and in other countries generators are used far too 
much and are causing pollution and soil/water contamination.  We have absolutely no 
reason the believe that it would be any different here.
 
 
💯
01:52:46
Jon Ralston:
Reacted to "What would stop them..." with 
 
 
💯
01:52:51
Susan Tiss:
Reacted to "which is pretty depr…" with 
 
 
01:52:53
Carissa Sipp:
No Mark- they are  my assessment is correct
 
 
💯
01:53:02
Susan Tiss:
Reacted to "I worry that this pu…" with 
 
 
➕
01:53:04
Susan Tiss:
Reacted to "I worry that this pu…" with 
 
 
01:53:12
Carissa Sipp:
I work in this field
 
 
01:53:14
Kathleen Dreier:
Reacted to "https://www.youtube...." with 
👍
 
 
💯
01:53:16
Susan Tiss:
Reacted to "No Mark- they are  m…" with 
 
 
01:53:16
Daniel Dempsey: Replying to "I worry that this pu..."
While it is, M&C special exception process means M&C will always be involved.
 
 
❤
01:53:21
Susan Tiss:
Reacted to "No Mark- they are  m…" with 
 
 
💯
01:53:26
April:
Reacted to "I worry that this ..." with 
 
 
01:53:55
Mark Estes:
Replying to "The generators are o..." 
 That's not correct ST.
 
 
😂
01:54:05
Carissa Sipp:
Reacted to "The generators are o…" with 
 
 
01:54:13
Colleen Whitaker, SW Decision Resources:
Survey link: 
https://forms.office.com/pages/responsepage.aspx?id=7Fke0gjC60Oq8c8G2aGW4DGeZj0tRXRP
jmeLR-c215NUMVNZV1NQSlUyT1FMTDYzNUoxVEVLWDJTOS4u&route=shorturl
 
 
01:54:23
Colleen Whitaker, SW Decision Resources:
we can share again 
in breakouts too.
 
 
01:54:41
Carissa Sipp:
You are not an expert.  You need to stay in the 
correct lane and read more
 
 
01:54:55
Vivek:
Breakout comments aren’t being written down so we should put
them where? Sorry missed that
 
 
01:55:00
April:
The problem is there is NOT enough technical information, 
nor the data to back it up that data centers are viable in this environment
 
 
01:55:12
Susan Tiss:
Replying to "The generators are o…"
It is correct, you can go read the citizen experiences and testimonials
 
 
02:25:42
Vivek:
Thanks Carver and Ina!!
 
 
02:26:06
Vivek:
If anyone wants to debrief with the No Desert Data Center

Coalition after the virtual meeting is done, everyone is welcome:
https://us02web.zoom.us/j/83418134176
Meeting ID: 834 1813 4176
 
 
02:26:10
Ina Ronquillo, City of Tucson:
Reacted to "Thanks Carver and In..."
👍
with 
 
 
02:26:52
Jon Ralston:
Not going to be able to debrief I have to go drink 
heavily.
 
 
💯
02:26:59
Megan Milton:
Reacted to "Not going to be ab..." with 
 
 
02:27:05
Kathleen Dreier:
Reacted to "If anyone wants to d..." with 
💯
 
 
❤
02:27:10
Megan Milton:
Reacted to "If anyone wants to..." with 
 
 
02:27:13
Vivek:
Replying to "Not going to be able..."
I’ll be having a beer but respect!
 
 
02:27:16
Andi Faulkner-Harrison: Reacted to Not going to be able... with 
💯
"
"
 
 
❤
02:27:25
Reed Spurling:
Reacted to "If anyone wants to d..." with 
 
 
🥃
02:27:27
Vivek:
Reacted to "Not going to be able..." with 
 
 
02:27:44
Colleen Whitaker, SW Decision Resources:
City of Tucson 
webpage on this amendment process: 
https://www.tucsonaz.gov/Departments/Planning-Development-Services/Planning-Initiati
ves/Data-Centers-Unified-Development-Code-Amendment
 
 
02:28:38
Julie Dittmer:
Thank you for hosting and keeping us so apprised of 
the processes!
 
 
02:28:45
Colleen Whitaker, SW Decision Resources:
Replying to "City of
Tucson webpa..."
And linked on that page is a document that summarizes the proposed regulations that 
were shared tonight: 
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/planning-initi
atives/data-centers/draft-data-centers-udc-amendment-outline-2.19.26.pdf
 
 
02:28:52
Kathleen Dreier:
Reacted to "Thank you for hostin..." with 
💯
 
 
💯
02:29:16
Reed Spurling:
Reacted to "Thank you for hostin..." with 
 
 
02:29:22
Heather Pruzan: Thank you
 
 
02:29:26
Colleen Whitaker, SW Decision Resources:
Replying to "City of
Tucson webpa..."
And finally, the survey link should you want to respond later or share with friends:
https://forms.office.com/pages/responsepage.aspx?id=7Fke0gjC60Oq8c8G2aGW4DGeZj0tRXRP
jmeLR-c215NUMVNZV1NQSlUyT1FMTDYzNUoxVEVLWDJTOS4u&route=shorturl
 
 
❤
02:29:27
Susan Tiss:
Reacted to "If anyone wants to d…" with

00:16:22
Colleen Whitaker:
Participant Agenda
 
 
00:23:54
Colleen Whitaker, SW Decision Resources:
Breakout notes
 
 
00:31:44
Cesar Acosta:
hey yall can I be a host too?
 
 
00:32:51
Colleen Whitaker, SW Decision Resources:
Full online survey
 
 
00:32:57
Colleen Whitaker, SW Decision Resources:
Breakout Room Survey
 
 
00:33:25
Amanda Smith:
Tahnee can you unmute me?
 
 
00:33:51
Colleen Whitaker, SW Decision Resources:
Breakout notes
 
 
00:34:16
Colleen Whitaker, SW Decision Resources:
Community Meetings -
DETAILED Agendas (in-person and virtual).docx
 
 
00:35:16
Roxanne Johnston, City of Tucson PDSD:
Same. I'll be happy to take 
notes. I will say the agenda won't let me open it - permissions issue
 
 
00:42:41
Tahnee Robertson, SW Decision Resources:
Can you share your 
cell, Roxanne
 
 
00:43:04
Tahnee Robertson, SW Decision Resources:
That way you can be 
in touch with me if needed (I’ll be out of the rooms, and can also move participants
if needeD)
 
 
00:43:09
Roxanne Johnston, City of Tucson PDSD:
07
 
 
00:43:52
Cesar Acosta City of Tucson PDSD:
Community Feedback: Proposed
Code Amendment for the Regulation of Large-Scale Data Centers
 
 
00:44:38
Roxanne Johnston, City of Tucson PDSD:
432-213-4507
 
 
00:45:23
Colleen Whitaker, SW Decision Resources:
Elizabeth, here are 
the breakout notes: Breakout Notes
 
 
00:50:46
Amanda Smith, City of Tucson PDSD:
6088430244
 
 
00:53:21
Ian Wan, City of Tucson - PDSD: Agenda 
(https://drive.google.com/file/d/1dFZqbIahLjoJBhkZlXHC4A0L2Bq6CJKT/view?usp=sharing)
 
 
00:56:11
Ian Wan, City of Tucson - PDSD: Agenda 
(https://drive.google.com/file/d/1dFZqbIahLjoJBhkZlXHC4A0L2Bq6CJKT/view?usp=sharing)
 
 
00:57:32
Ian Wan, City of Tucson - PDSD: Agenda 
(https://drive.google.com/file/d/1dFZqbIahLjoJBhkZlXHC4A0L2Bq6CJKT/view?usp=sharing)
 
 
00:59:55
Ian Wan, City of Tucson - PDSD: Agenda 
(https://drive.google.com/file/d/1dFZqbIahLjoJBhkZlXHC4A0L2Bq6CJKT/view?usp=sharing)
 
 
01:03:25
Ian Wan, City of Tucson - PDSD: Agenda 
(https://drive.google.com/file/d/1dFZqbIahLjoJBhkZlXHC4A0L2Bq6CJKT/view?usp=sharing)
 
 
01:03:29
Cesar Acosta City of Tucson PDSD:
(https://forms.office.com/g/dcwqZxHkfC)
 
 
01:04:07
Cesar Acosta City of Tucson PDSD:
^this is our Survey for 
questions throughout our presentation I'll be dropping it in the chat a few times 
throughout
 
 
👍
01:04:24
Dan Stormont:
Reacted to "^this is our Survey ..." with 
 
 
01:06:30
Ian Wan, City of Tucson - PDSD: Agenda 
(https://drive.google.com/file/d/1dFZqbIahLjoJBhkZlXHC4A0L2Bq6CJKT/view?usp=sharing)
 
 
01:09:12
Cesar Acosta City of Tucson PDSD:
https://tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/data-centers/data-
centers-faq_030426.pdf
 
 
01:19:17
Colleen Whitaker, SW Decision Resources:
^ The above document
is the FAQ to-date
 
 
01:20:22
Stella smith:
What time tomorrow is the Rincon meeting?
 
 
01:20:31
Colleen Whitaker, SW Decision Resources:
6-8pm
 
 
01:20:42
Cesar Acosta City of Tucson PDSD:
Replying to "What time 
tomorrow i..."
Large Scale Data Centers Code Amendment 3/4/2026 Virtual Meeting Chat

Hey Mae! it'll be from 6-8pm
 
 
01:21:02
Cesar Acosta City of Tucson PDSD:
For folks who have just 
joined/ joined recently here is today's agenda 
(https://drive.google.com/file/d/1dFZqbIahLjoJBhkZlXHC4A0L2Bq6CJKT/view?usp=sharing)
 
 
01:21:31
Stella smith:
Replying to "What time tomorrow i..."
in the auditorium i assume?
 
 
01:21:47
Cesar Acosta City of Tucson PDSD:
Replying to "What time 
tomorrow i..."
yes maam!
 
 
01:23:01
Jason Makansi:
He mentioned 8 something for the average water user 
- what was this figure?
 
 
01:23:19
Tereasa Moffett:
By all accounts a data center would use way 
beyond 7.5M gallons a month.
 
 
01:23:23
Dan Stormont:
Replying to "He mentioned 8 somet..."
8 ccf monthly
 
 
01:23:48
Dan Bursuck, City of Tucson, PDSD:
Reacted to "By all accounts 
👍
a da..." with 
 
 
01:23:55
Dan Bursuck, City of Tucson, PDSD:
Reacted to "8 ccf monthly" 
👍
with 
 
 
01:24:20
Tereasa Moffett:
It can use that within less than a week
 
 
01:25:42
Dan Stormont:
Replying to "By all accounts a da..."
That really depends on a lot of factors in the design of the data center. You also 
have to look at Scope 1 use (on-site) vs Scope 2 usage (off-site). And whether the 
water is consumed or used and recycled. It's complicated...
 
 
01:26:08
Tereasa Moffett:
Replying to "By all accounts a da..."
True, but it's not recycled forever.
 
 
01:26:58
Dan Stormont:
Replying to "By all accounts a da..."
🙂
That's why consumption is the most important metric. 
 
 
👍
01:27:31
Lisa Maher:
Reacted to "That's why consumpti..." with 
 
 
01:27:53
Jason Makansi:
Replying to "He mentioned 8 somet…"
Thx
 
 
👍
01:28:25
Dan Stormont:
Reacted to "Thx" with 
 
 
01:28:45
Cesar Acosta City of Tucson PDSD:
Survey link 
(https://forms.office.com/g/dcwqZxHkfC)
 
 
01:28:54
Stella smith:
Replying to "What time tomorrow i..."
                             Interesting that TAC did not have a lighting 
consideration
 
 
01:29:06
Tereasa Moffett:
Reacted to "                    ..." with 
👍
 
 
01:29:32
Dan Stormont:
Replying to "What time tomorrow i..."
We have looked at that as part of the zoning review.

01:29:44
Stella smith:
Replying to "What time tomorrow i..."
super
 
 
01:30:36
Stella smith:
Replying to "What time tomorrow i..."
Mae Smiith, ssmith@arizona.edu
 
 
01:31:05
Colleen Whitaker, SW Decision Resources:
Survey
 
 
01:38:31
Ian Wan, City of Tucson - PDSD: Agenda 
(https://drive.google.com/file/d/1dFZqbIahLjoJBhkZlXHC4A0L2Bq6CJKT/view?usp=sharing)
 
 
01:38:40
Ian Wan, City of Tucson - PDSD: FAQ - 
https://tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/data-centers/data-
centers-faq_030426.pdf
 
 
01:39:29
Cesar Acosta City of Tucson PDSD:
Survey link 
(https://forms.office.com/g/dcwqZxHkfC)
 
 
01:44:57
Monika Browatzki:
We need the same transparency for the public
showing the water use, as that is our key issue in this location.
 
 
01:45:26
Tereasa Moffett:
was that supposed to cover electricity?
 
 
01:46:19
Tereasa Moffett:
Thank you
 
 
01:46:19
Bruce Plenk:
How do you avoid the failure of the “100 year water 
supply” law here??
 
 
01:46:56
Lisa Maher:
On the water slide, was there a prohibition for 
non-potable use in the largest centers?
 
 
01:48:31
Cesar Acosta City of Tucson PDSD:
Survey link 
(https://forms.office.com/g/dcwqZxHkfC)
 
 
01:49:01
Monika Browatzki:
When answering the survey please provide the
link to the slides so we can reference while we are answering.
 
 
01:51:26
Dan Bursuck, City of Tucson, PDSD:
Reacted to "When answering 
👍
the s..." with 
 
 
01:52:27
Colleen Whitaker, SW Decision Resources:
Replying to "When 
answering the s..."
Link to slides: 
https://drive.google.com/file/d/1Shicwy_VIYlZIqYz687Cv9yiiSYogZt1/view?usp=sharing
 
 
01:52:37
Cesar Acosta City of Tucson PDSD:
Survey link 
(https://forms.office.com/g/dcwqZxHkfC)
 
 
01:52:51
Colleen Whitaker, SW Decision Resources:
Replying to "When 
answering the s..."
Remember you can fill out the survey after the meeting as well, if you want more 
time to think!
 
 
01:53:01
Monika Browatzki:
Replying to "When answering the s…"
Thank you
 
 
01:57:15
Jason Makansi:
The Generator maintenance restrictions to 9-5 M-F 
are likely too limiting.
 
 
01:57:22
Dan Bursuck, City of Tucson, PDSD:
Reacted to "The Generator 
👍
mainte..." with 
 
 
01:57:29
Bruce Plenk:
What are option s 1 and 2??
 
 
01:57:34
Monika Browatzki:
Is it possible to see a list of all surveys 
total?
 
 
01:57:43
Tereasa Moffett:
I'm sorry, I can't get over the comment

"They don't need a lot of parking" bc there aren't many workers except maintenance. 
There goes the sales pitch for new jobs haha
 
 
01:58:44
Dan Bursuck, City of Tucson, PDSD:
Hi Monika - it is just one 
survey with all of the questions.
 
 
👌
01:58:54
Monika Browatzki:
Reacted to "Hi Monika - it is ju…" with 
 
 
01:58:59
Jason Makansi:
Replying to "The Generator mainte…"
What I mean is not allowing emergency generator maintenance on weekends probably 
isn't fair. I can explain sometime...
 
 
01:59:44
Nicholas Martell, City of Tucson PDSD:
Reacted to "What I mean is 
👍
not a..." with 
 
 
01:59:47
Amanda Smith, City of Tucson PDSD:
Replying to "What are option
s 1 ..."
I think it's supposed to be "yes" "no" or "unsure"
 
 
02:00:02
Colleen Whitaker, SW Decision Resources:
PDSD Data Centers 
Webpage
 
 
02:00:18
Cesar Acosta City of Tucson PDSD:
FAQ 
https://tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/data-centers/data-
centers-faq_030426.pdf
 
 
02:00:47
Deirdre Demers: Is light pollution addressed anywhere?
 
 
👍
02:00:58
Bruce Plenk:
Reacted to "Is light pollution a..." with 
 
 
02:01:15
Dan Bursuck, City of Tucson, PDSD:
Replying to "I'm sorry, I 
can't g..."
Hi Tereasa - I think it is also related to requiring too many parking spots than 
needed, which could lead to more pavement than needed. Considering they are going to
be setback significantly and have other standards, the impact of no parking 
requirements is pretty minimal.
 
 
02:01:23
Carmen Vega-Cruz:
Sorry, didn't get ... is there a link for 
this presentation that I may share with neighbors?
 
 
02:01:30
Bruce Plenk:
Are they required to comply with Dark Skies 
ordinance??
 
 
02:01:31
Colleen Whitaker, SW Decision Resources:
Replying to "Is 
light pollution a..."
We are moving into Q&A shortly, and this can be addressed by staff.
 
 
02:02:04
Ian Wan, City of Tucson - PDSD: Yee, they would have to comply with 
the Outdoor Lighting Code
 
 
02:02:09
Dan Bursuck, City of Tucson, PDSD:
here is a link to the 
presentation:  
https://drive.google.com/file/d/1Shicwy_VIYlZIqYz687Cv9yiiSYogZt1/view?usp=sharing
 
 
02:02:16
Ian Wan, City of Tucson - PDSD: **Yes
 
 
02:02:18
Monika Browatzki:
Great meeting, thank you!
 
 
02:02:27
Colleen Whitaker, SW Decision Resources:
Replying to "Sorry, 
didn't get ....."
Presentation slides: 
https://drive.google.com/file/d/1Shicwy_VIYlZIqYz687Cv9yiiSYogZt1/view?usp=sharing
 
 
02:02:49
TL Cross:
Sorry, I have another meeting.  I did complete the 
survey.  Thank you.

02:03:04
Amanda Smith, City of Tucson PDSD:
Replying to "Sorry, I have 
anothe..."
Thank you for attending!
 
 
02:03:07
Carmen Vega-Cruz:
Replying to "Sorry, didn't get ....."
Thanks so much!
 
 
02:24:05
Roxanne Johnston, City of Tucson PDSD:
Where do we store the notes?
 
 
02:28:10
Colleen Whitaker, SW Decision Resources:
All information is 
on the PDSD website: PDSD Data Centers Webpage
 
 
02:28:27
Mark Holden:
Thanks COT & SW
 
 
02:29:45
Cesar Acosta City of Tucson PDSD:
survey link if you want it 
john  (https://forms.office.com/g/dcwqZxHkfC)

Planning and Development Services Department
Planning and Development Services Code Enforcement Division
Tucson Development Center Online (TDC)
From: Thayer Kuehne <tkuehne567@gmail.com>
Sent: Wednesday, April 22, 2026 10:24 AM
To: PDSDInquiries <PDSDInquiries@tucsonaz.gov>
Subject: Earth day action - Oppose Project Blue
You don't often get email from tkuehne567@gmail.com. Learn why this is important
Good morning,
I am writing today to voice my opposition to the project blue data center that is set to be
established on the outskirts of Tucson near the Pima County Fairgrounds. 
If allowed to continue development it will cause irreparable harm to the environment
and surrounding communities. 
Here in the desert we are already struggling with water shortages and frequent droughts.
A data center here in the southwest will only exasperated the current issues and lead to
even further water shortages. Taking away from farmers, ranchers and the expanding
housing developments in that area. 
Not to mention then the electricity needed to run the data centers, time and time again
we've seen the ramifications of these data centers on the communities. It's not the big
companies that foot the bill for the power drawn from our shared grid it's been the
locals, the community that have seen rising energy bills. In a time where more folks are
struggling to pay their bills or put food on their tables the last thing we need is another
economic and environmental stressor.
I implore you to contact who you can and use the power of your seat to help put a stop to

this data center. 
Thank you, 
Thayer Kuehne

You don't often get email from dlho2468@proton.me. Learn why this is important
From:
Carver Struve
To:
"dlho2468"
Subject:
RE: Data Center
Date:
Monday, April 27, 2026 8:10:00 AM
Hello, thank you for your feedback. Your comments will be passed on to both the Planning
Commission and Mayor and Council.
 
 
 
From: dlho2468 <dlho2468@proton.me> 
Sent: Friday, April 24, 2026 8:57 AM
To: Carver Struve <Carver.Struve@tucsonaz.gov>
Subject: Data Center
 
I am home bound, twice wounded Vietnam vet living with cancer and cannot attend council
meetings so you are going to hear my unequivocal opposition to data centers anywhere in the
Tucson area here and now.
 
Have you people lost your minds for even considering approving a data center here? Are you
going to pay my increased electricity bill or is Amazon going to pay for it?  Perhaps you will
personally.  What about my water bill and the massive increase approving data centers here will
cause.
 
With the current shortage of water, an extended drought actually, and given the outrageous
amounts of water Amazon, who I despise for political reasons, will be using I think you people
have to be taking bribes from that behemoth. I am a Democrat and I do not ever miss voting in
elections. Check my voting record. If the council approves this boondoggle I will vote against
every single one of them in the next election and will vote for other Democrats instead. 
 
I only receive $1345 in SS and another $106 in a VA pension.  Without HUD-VASH and Section 8,
I would be in the street..  Approval of this albatross could very well put me right into the streets.  
 
Feel free to copy this email and send it to the city council.
 
Very Sincerely,
 
Dennis L Hoban
1111 W. Saint Marys Rd, #205
Tucson, AZ  85745.
520-910-7955
 
 
 
Sent with Proton Mail secure email.