Attachment K - Comparison of Data Center Regulations(PDF, 101KB)
Extracted text (via pymupdf)
2339 characters
Comparison of Data Center Regulations Regulatory Area Chandler Marana Phoenix Mesa Definition Broad definition; networked systems, telecom, data storage/processing Broad; servers, utilities, digital data management Includes only primary-use facilities; small owner-only uses excluded Very broad; includes advanced operations (AI, blockchain, crypto, modeling) Where Allowed Principal use only in PAD; accessory with limits Principal via Specific Plan; accessory in LI/HI Only select zones with Special Permit Principal via PAD Overlay; accessory allowed under conditions Community Input Neighborhood notice + meetings required Neighborhood notice required Noise mitigation required near residential; no formal meetings PAD review includes input; not explicitly required Noise Requirements Baseline + post-construction + annual monitoring; mitigation; liaison Baseline + post-construction + annual monitoring; max levels by use Noise study within 300 ft of residential; mitigation required; max 5% increase General operational compliance; enforcement tied to occupancy Site & Building Design Setbacks, screened equipment, landscaping, architectural treatments Setbacks, screening, underground utilities, landscape buffers, building mass/height limits Setbacks (150 ft mechanical), landscape buffers, façade treatments, streetscape, shaded paths Setbacks, PAD standards, landscape buffers, massing/façade treatments; flexible via PAD Backup Power / Generators Restricted hours, notice, sound mitigation Diesel Tier IV, emergency use, limited hours Screened/setback; must meet noise limits Covered under operational/PAD review Utilities / Water Considered during PAD review Must demonstrate adequate electricity/water; potable water prohibited for cooling “Will-serve” letter; water source documentation Reviewed during PAD/special approval Parking & Transportation Not specified in code amendment Not specified in code amendment Minimum distance from transit; streetscape/shaded paths Minimum parking ratios defined Enforcement Conditional on PAD + ongoing noise monitoring Compliance tied to Specific Plan; annual monitoring Certificate of occupancy conditional on noise compliance Civil penalties; escalating fines for repeat violations; habitual offenders may face criminal charges Attachment K