PM - 97T58401 - 0      Page 1
U.S. ENVIRONMENTAL
PROTECTION AGENCY
Grant Agreement
GRANT NUMBER (FAIN):
97T58401
MODIFICATION NUMBER:
0
PROGRAM CODE:
PM
DATE OF AWARD
05/14/2026
TYPE OF ACTION:
New
MAILING DATE
05/19/2026
PAYMENT METHOD:
ASAP
ACH#
90179
RECIPIENT TYPE:
County
Send Payment Request to:
Contact EPA RTPFC at: rtpfc-grants@epa.gov
RECIPIENT:
MARICOPA COUNTY AIR QUALITY DEPARTMENT
301 W JEFFERSON ST STE 410
PHOENIX, AZ 85003-2157
EIN: 86-6000472
PAYEE:
MARICOPA COUNTY AIR QUALITY DEPARTMENT
301 W JEFFERSON ST STE 410
PHOENIX, AZ 85003-2157
PROJECT MANAGER
Eric Poole
401 W. Jefferson St
Phoenix, AZ 85003
Eric.Poole@maricopa.gov
Email:
602-506-6737
Phone:
EPA PROJECT OFFICER
Jean Samolis
75 Hawthorne Street, AIR-4-2
San Francisco, CA 94105
samolis.jean@epa.gov
Email:
415-972-3939
Phone:
EPA GRANT SPECIALIST
Karla CarrilloCastillo
Grants Branch, MSD-6
75 Hawthorne Street
San Francisco, CA 94105
carrillocastillo.karla@epa.gov
Email:
415-972-3372
Phone:
PROJECT TITLE AND DESCRIPTION
PM2.5 MONITORING NETWORK
See Attachment 1 for project description.
BUDGET PERIOD
04/01/2026 - 03/31/2027
PROJECT PERIOD
04/01/2026 - 03/31/2027
TOTAL BUDGET PERIOD COST
$ 94,730.00
TOTAL PROJECT PERIOD COST
$ 94,730.00
NOTICE OF AWARD
Based on your Application dated 04/10/2026 including all modifications and amendments, the United States acting by and through the US Environmental
Protection Agency (EPA) hereby awards $ 94,730.00. EPA agrees to cost-share 100.00% of all approved budget period costs incurred, up to and not
exceeding total federal funding of $ 94,730.00. Recipient's signature is not required on this agreement. The recipient demonstrates its commitment to carry out
this award by either: 1) drawing down funds within 21 days after the EPA award or amendment mailing date; or 2) not filing a notice of disagreement with the
award terms and conditions within 21 days after the EPA award or amendment mailing date. If the recipient disagrees with the terms and conditions specified
in this award, the authorized representative of the recipient must furnish a notice of disagreement to the EPA Award Official within 21 days after the EPA
award or amendment mailing date. In case of disagreement, and until the disagreement is resolved, the recipient should not draw down on the funds provided
by this award/amendment, and any costs incurred by the recipient are at its own risk. This agreement is subject to applicable EPA regulatory and statutory
provisions, all terms and conditions of this agreement and any attachments.
ISSUING OFFICE (GRANTS MANAGEMENT OFFICE)
ORGANIZATION / ADDRESS
U.S. EPA, Region 9, U.S. EPA, Region 9 Grants Branch, MSD-6
75 Hawthorne Street
San Francisco, CA 94105
AWARD APPROVAL OFFICE
ORGANIZATION / ADDRESS
U.S. EPA, Region 9, Air and Radiation Division, AIR-1
R9 - Region 9
75 Hawthorne Street
San Francisco , CA 94150
THE UNITED STATES OF AMERICA BY THE U.S. ENVIRONMENTAL PROTECTION AGENCY
Digital signature applied by EPA Award Official Morgan Capilla - Acting Grants Management Officer
DATE
05/14/2026

PM - 97T58401 - 0      Page 2
EPA Funding Information
FUNDS
FORMER AWARD
THIS ACTION
AMENDED TOTAL
EPA Amount This Action
$ 0
$ 94,730
$ 94,730
EPA In-Kind Amount
$ 0
$ 0
$ 0
Unexpended Prior Year Balance
$ 0
$ 0
$ 0
Other Federal Funds
$ 0
$ 0
$ 0
Recipient Contribution
$ 0
$ 0
$ 0
State Contribution
$ 0
$ 0
$ 0
Local Contribution
$ 0
$ 0
$ 0
Other Contribution
$ 0
$ 0
$ 0
Allowable Project Cost
$ 0
$ 94,730
$ 94,730
Assistance Program
66.034 - Surveys-Studies-Investigations-
Demonstrations and Special Purpose Activities
relating to the Clean Air Act
Statutory Authority
Clean Air Act: Sec. 103
Regulatory Authority
2 CFR 200, 2 CFR 1500 and 40 CFR 33
Fiscal
Site Name
Req No
FY
Approp.
Code
Budget
Organization
PRC
Object
Class
Site/Project
Cost
Organization
Obligation /
Deobligation
-
2609M6S007
26
E1
09M1
000A04XPM
4183
-
-
$ 94,730
$ 94,730

PM - 97T58401 - 0      Page 3
Budget Summary Page
Table A - Object Class Category
(Non-Construction)
Total Approved Allowable
Budget Period Cost
1. Personnel
$ 44,073
2. Fringe Benefits
$ 16,439
3. Travel
$ 6,000
4. Equipment
$ 0
5. Supplies
$ 2,730
6. Contractual
$ 0
7. Construction
$ 0
8. Other
$ 0
9. Total Direct Charges
$ 69,242
10. Indirect Costs: 0.00 % Base : see General T/C
$ 25,488
11. Total (Share: Recipient ______ % Federal ______ %)
0.00
100.00
$ 94,730
12. Total Approved Assistance Amount
$ 94,730
13. Program Income
$ 0
14. Total EPA Amount Awarded This Action
$ 94,730
15. Total EPA Amount Awarded To Date
$ 94,730

PM - 97T58401 - 0      Page 4
Attachment 1 - Project Description
This agreement provides funding to the Maricopa County Air Quality Department to assist with the
necessary development, establishment, and maintenance of adequate monitoring programs for the
prevention and control of air pollution or implementation of national primary and secondary air quality
standards. This grant is provided to conduct ambient air quality monitoring of fine particulate matter
(PM2.5). Specifically, the recipient will continue operating a PM2.5 air monitoring network and collect
quality assured data on ambient air concentrations of PM2.5. Data will be used for providing air pollution
data to the general public in a timely manner, developing and tracking implementation plans, assessing
regional haze, and assisting with health studies and other ambient aerosol research activities. The PM2.
5 monitoring network design addresses these objectives through a combination of siting and
instrumentation strategies.
This agreement provides full federal funding in the amount of $94,730. Preaward costs are approved
back to 4/1/2026. See terms and conditions. The Maricopa County Air Quality Department will collect
quality assured PM2.5 concentrations and submit results to the EPA's national air quality database.The
anticipated deliverables include quality assured ambient air monitoring data, annual asset management
reports, reporting on audits, and submitting annual air monitoring network plans. The anticipated short-
term outcome for this project is an increase in the knowledge regarding the character and extent of PM2.
5 in the ambient air. The long-term outcome, through the eventual development and execution of the
state’s implementation plan, is reduced PM2.5 concentrations and compliance with the PM2.5 NAAQS
as set forth in the Clean Air Act. Intended Beneficiaries: Direct beneficiaries of these activities are
Maricopa County residents who will have decreased risk of adverse health effects, including cancer and
neurological effects.
No subawards are included in this assistance agreement.

PM - 97T58401 - 0      Page 5
Administrative Conditions
General Terms and Conditions
The recipient agrees to comply with the current EPA general terms and conditions available at: https:
//www.epa.gov/grants/epa-general-terms-and-conditions-effective-october-1-2025-or-later
These terms and conditions are in addition to the assurances and certifications made as a part of the
award and the terms, conditions, or restrictions cited throughout the award.
The EPA repository for the general terms and conditions by year can be found at: https://www.epa.
gov/grants/grant-terms-and-conditions#general
A.  Federal Financial Reporting (FFR)
For awards with cumulative project and budget periods greater than 12 months, the recipient will submit
an annual FFR (SF 425) covering the period from "project/budget period start date" to September 30 of
each calendar year to the EPA Finance Center in Research Triangle Park, NC.  The annual FFR will be
submitted electronically to rtpfc-grants@epa.gov no later than December 30 of the same calendar
year. Find additional information at https://www.epa.gov/financial/grants.  (Per 2 CFR § 200.344(b), the
recipient must submit the Final FFR to rtpfc-grants@epa.gov within 120 days after the end of the project
period.)
B.  Procurement 
The recipient will ensure all procurement transactions will be conducted in a manner providing full and
open competition consistent with 2 CFR § 200.319. In accordance with 2 CFR § 200.324, the
recipient and subawardee(s) must perform a cost or price analysis in connection with applicable
procurement actions, including contract modifications. State and Tribal government entities must
follow procurement standards as outlined in 2 CFR § 200.317.

PM - 97T58401 - 0      Page 6
Programmatic Conditions
a.]  Performance Reporting and Final Performance Report  
Performance Reports - Content
In accordance with 2 CFR 200.328, the recipient agrees to inform EPA as soon as problems, delays, or
adverse conditions which will materially impair the ability to meet the outputs/outcomes specified in the
assistance agreement work plan are known.
Performance Reports - Frequency
The recipient agrees to submit quarterly reports electronically in the form of quality assured and certified
data entered timely into EPA's national Air Quality System (AQS) database.
b.]  Cybersecurity
(a) The recipient agrees that when collecting and managing environmental data under this assistance
agreement, it will protect the data by following all applicable State or Tribal law cybersecurity
requirements.
(b) (1) EPA must ensure that any connections between the recipient's network or information system and
EPA networks used by the recipient to transfer data under this agreement, are secure. For purposes of
this Section, a connection is defined as a dedicated persistent interface between an Agency IT system
and an external IT system for the purpose of transferring information. Transitory, user-controlled
connections such as website browsing are excluded from this definition.
If the recipient's connections as defined above do not go through the Environmental Information
Exchange Network or EPA's Central Data Exchange, the recipient agrees to contact the EPA Project
Officer (PO) no later than 90 days after the date of this award and work with the designated
Regional/Headquarters Information Security Officer to ensure that the connections meet EPA security
requirements, including entering into Interconnection Service Agreements as appropriate. This condition
does not apply to manual entry of data by the recipient into systems operated and used by EPA's
regulatory programs for the submission of reporting and/or compliance data.
(2) The recipient agrees that any subawards it makes under this agreement will require the subrecipient
to comply with the requirements in (b)(1) if the subrecipient's network or information system is connected
to EPA networks to transfer data to the Agency using systems other than the Environmental Information
Exchange Network or EPA's Central Data Exchange. The recipient will be in compliance with this
condition: by including this requirement in subaward agreements; and during subrecipient monitoring
deemed necessary by the recipient or subrecipient under 2 CFR 200.332(e), by inquiring whether the
subrecipient has contacted the EPA Project Officer. Nothing in this condition requires the recipient to
contact the EPA Project Officer on behalf of a subrecipient or to be involved in the negotiation of an
Interconnection Service Agreement between the subrecipient and EPA.
c.]  Competency of Organizations Generating Environmental Measurement Data
In accordance with Agency Policy Directive Number FEM-2012-02, Policy to Assure the Competency of
Organizations Generating Environmental Measurement Data under Agency-Funded Assistance

PM - 97T58401 - 0      Page 7
Agreements, the Recipient agrees, by entering into this agreement, that it has demonstrated competency
prior to award, or alternatively, where a pre-award demonstration of competency is not practicable,
Recipient agrees to demonstrate competency prior to carrying out any activities under the award
involving the generation or use of environmental data. Recipient shall maintain competency for the
duration of the project period of this agreement and this will be documented during the annual reporting
process.
d.]  Geospatial Data Standards
All geospatial data created must be consistent with Federal Geographic Data Committee (FGDC)
endorsed standards.  Information on these standards may be found at https://www.fgdc.gov/.
e.]  Quality Assurance
Authority: Quality Assurance applies to all assistance agreements involving environmental information as
defined in 2 C.F.R. § 1500.12 Quality Assurance.
1. Quality Management Plan (QMP)
a. Prior to beginning environmental information operations, the recipient must:
i. Submit a previously EPA-approved and current QMP,
ii. The EPA Quality Assurance Manager or designee (hereafter referred to as QAM) will notify the
recipient and EPA Project Officer (PO) in writing if the QMP is acceptable for this agreement.
b. The recipient must submit the QMP within 60 days after grant award, and/or no more than 90 days
after grant award.
c. The recipient must review their approved QMP at least annually. These documented reviews shall be
made available to the sponsoring EPA organization if requested. When necessary, the recipient shall
revise its QMP to incorporate minor changes and notify the EPA PO and QAM of the changes. If
significant changes have been made to the Quality Program that affect the performance of environmental
information operations, it may be necessary to re-submit the entire QMP for re-approval. In general, a
copy of any QMP revision(s) made during the year should be submitted to the EPA PO and QAM in
writing when such changes occur. Conditions requiring the revision and resubmittal of an approved QMP
can be found in section 6 of EPA's Quality Management Plan (QMP) Standard.  
2. Quality Assurance Project Plan (QAPP)
Prior to beginning environmental information operations, the recipient must:
i. Submit a previously EPA-approved QAPP proposed to ensure the collected, produced, evaluated, or
used environmental information is of known and documented quality for the intended use(s).
ii. The EPA Quality Assurance Manager or designee (hereafter referred to as QAM) will notify the
recipient and EPA Project Officer (PO) in writing if the previously EPA-approved QAPP is acceptable for
this agreement.

PM - 97T58401 - 0      Page 8
For Reference:
• Quality Management Plan (QMP) Standard and EPA's Quality Assurance Project Plan (QAPP)
Standard; contain quality specifications for EPA and non-EPA organizations and definitions applicable to
these terms and conditions.
• EPA QA/G-5: Guidance for Quality Assurance Project Plans.
• EPA's Quality Program website has a list of QA managers, and Specifications for EPA and Non-EPA
Organizations.
• The Office of Grants and Debarment Implementation of Quality Assurance Requirements for
Organizations Receiving EPA Financial Assistance.
f.]  Use of Logos
If the EPA logo is appearing along with logos from other participating entities on websites, outreach
materials, or reports, it must not be prominently displayed to imply that any of the recipient or
subrecipient's activities are being conducted by the EPA. Instead, the EPA logo should be accompanied
with a statement indicating that the Maricopa County Air Quality Department received financial support
from the EPA under an Assistance Agreement. More information is available at: https://www.epa.
gov/stylebook/using-epa-seal-and-logo#policy
__END OF DOCUMENT__