Z2023136 
Page 1 of 3 
 
 
 
 
Report to the Board of Supervisors 
Prepared by the Maricopa County Planning and Development Department 
 
Board Hearing Date: 
October 23, 2024 
 
Case #/Title:   
 
 
Z2023136 – Camping World  
 
Supervisor District: 
3 
 
Applicant/Owner:  
Wendy Riddell, Berry Riddell, LLC / FRHP 5 LLC 
 
Request: 
Zone change from Rural-43 to C-3 CUPD  
 
Site Location: 
Generally located east of the SEC of Black Canyon Hwy. & Circle 
Mountain Rd. in the Anthem area 
 
Site Size: 
Approximately 3.5 acres 
 
County Island Status: 
N/A 
Additional 
Comments: 
The requested C-3 CUPD zoning to allow the expansion of the 
Camping World RV center. The existing facility is located to the 
immediate west of the subject site on a parcel fronting the Black 
Canyon Hwy. and within the City of Phoenix. An IUPD overlay is 
requested and will require additional screening height and 
preservation and maintenance of a natural wash open space area. 
after the latter is the result of discussions with neighborhood 
stakeholders. There are no outstanding concerns from reviewing 
agencies.  There is no known opposition. 
 
 
Commission  
 
Recommendation: 
On 9/12/24, the Commission voted 8-0 to adopt a motion 
recommending the Board of Supervisors approve Z2023136 
subject to conditions ‘a’ – ‘h’:  
 
a. 
Development of the site shall be in substantial conformance with the Narrative Report 
entitled “Camping World”, consisting of 4 pages, dated June 24, 2024, except as modified 
by the following conditions. 
 
b. 
Development of the site shall be in substantial conformance with the Zoning Exhibit 
entitled “Camping World Zoning Exhibit” consisting of 1 full-size sheets, except as 
modified by the following conditions. 
 
c. 
Prior to approval of the initial final plat or precise plan of development approval, the 
applicant shall provide the Maricopa County Planning and Development Department with 
an executed pre-annexation service agreement with the City of Phoenix that identifies the

October 23, 2024 
Z2023136 
Page 2 of 3 
detail for when the proposed project will be annexed and the provision of water and sewer 
service, and requirements for maintenance of the wash noted in condition ‘e’.  In lieu of 
pre-annexation service agreement, the developer must provide a ‘will serve’ letter from the 
certificated water and sewer provider(s). 
 
d. 
The following C-3 CUPD standard shall apply: 
1. 
Minimum screening requirements: 8-foot CMU wall adjacent to residential uses 
whether or not separated by a street, alley, drainage way or open space.  
 
e. 
The wash in the southwest area of the parcel shall be maintained in accordance with City 
of Phoenix requirements.  
 
f. 
The following planning engineering conditions shall apply:   
1. 
Circle Mountain Road immediately west if the site is within the jurisdiction of the 
City of Phoenix. The applicant will be responsible for coordinating with the City to 
review any traffic impact, right-of-way dedication, permitting or roadway 
improvement requirements for this section of Circle Mountain Road.  
 
2. 
Engineering review of planning and/or zoning cases is for conceptual design only. 
All development and engineering design shall be in conformance with Section 
1205 of the Maricopa County Zoning Ordinance; Drainage Policies and Standards; 
Floodplain Regulations for Maricopa County; MCDOT Roadway Design Manual; 
and current engineering policies, standards and best practices at the time of 
application for construction. 
 
3. 
Based on the conceptual design nature of the information submitted, changes to 
the site layout and/or a reduction in the number of building lots may be 
necessitated by the final engineering design of the subdivision drainage 
infrastructure. 
 
4. 
Detailed Grading and Drainage (Infrastructure) Plans must be submitted with the 
application for Final Plat Approval and Building Permits. 
 
 
g. 
Noncompliance with any of the conditions assigned to the approval of this Zone Change 
by the Maricopa County Board of Supervisors may be grounds for revocation in 
accordance with the requirements and procedures as set forth in the Maricopa County 
Zoning Ordinance.  
 
h. 
The granting of this change in use of the property has been at the request of the applicant, 
with the consent of the landowner.  The granting of this approval allows the property to 
enjoy uses in excess of those permitted by the zoning existing on the date of application, 
subject to conditions.  In the event of the failure to comply with any condition, the property 
shall revert to the zoning that existed on the date of application.  It is, therefore, stipulated 
and agreed that either revocation due to the failure to comply with any conditions, does 
not reduce any rights that existed on the date of application to use, divide, sell or possess 
the property and that there would be no diminution in value of the property from the value 
it held on the date of application due to such revocation of the Zone Change.  The Zone 
Change enhances the value of the property above its value as of the date the Zone Change 
is granted and reverting to the prior zoning results in the same value of the property as if 
the Zone Change had never been granted.

October 23, 2024 
Z2023136 
Page 3 of 3 
 
 
 
Presented by: 
 
Andrew Lorentzen, Planner 
Reviewed by: 
 
Darren Gérard, AICP, Planning Manager   
 
Attachment: 
 
9/12/24 P&Z Packet (18 pages)  
 
 
Note: 
9/12/24 Draft P&Z Minutes are not available as of the writing of this report, but can be 
provided upon request later when available.

Z2023136 
Page 1 of 6 
 
 
Report to the Planning and Zoning Commission 
Prepared by the Maricopa County Planning and Development Department 
 
 
Case: 
Z2023136 – Camping World  
 
 
 
 
Hearing Date: 
September 12, 2024 
 
Supervisor District: 
3 
 
 
  
 
Applicant: 
Wendy Riddell, Berry Riddell, LLC  
 
Owner: 
FRHP 5 LLC 
   
Request: 
Zone change from Rural-43 to C-3 CUPD for RV storage and sales 
 
  
 
Site Location: 
Generally located east of the SEC of Black Canyon Hwy. & Circle Mountain 
Rd. in the Anthem area 
 
  
Site Size: 
Approximately 3.5 acres 
 
Density: 
N/A 
 
County Island:  
No 
 
 
County Plan: 
Daisy Mountain / New River Area Plan – Large lot residential (1-2 du/ac)  
 
Municipal Plan: 
City of Phoenix – Undesignated 
 
Municipal Comments: 
None received to date  
 
Support/Opposition: 
None known 
 
Recommendation: 
Approve with conditions

Z2023136 
Page 2 of 6 
Project Summary: 
 
1. 
The applicant is requesting a zone change from Rural-43 to C-3 CUPD for expansion of an existing 
‘Camping World’ RV sales facility on 3 parcels on approximately 3.5 acres of land in the North 
Phoenix / Anthem area. The parcels are currently undeveloped land fronting Circle Mountain Rd. 
to the north. Located west is the ‘Camping World’ location, a City of Phoenix C-2 parcel. To the 
south and east are Rural-43 residential parcels with additional City of Phoenix R-3 multifamily 
residential zoning to the north of Circle Mountain Rd.    
 
2. 
The applicant is seeking rezoning in preparation for annexation into the City of Phoenix to join the 
existing ‘Camping World’ development. The applicant is requesting C-3 which is greater than the 
C-2 City of Phoenix designation on the existing Camping World parcel, this is due to the difference 
in zoning designations between the County and the City, with outdoor storage being a C-3 
development standard in Maricopa County. A precise plan of development is not proposed at this 
time.  
 
3. 
A CUPD overlay is being requested to amend the screening requirement to require 8-foot walls 
adjacent to any residential boundary. This  requested change is from discussions the applicant 
had with neighbors during initial community outreach.  
 
Regulation 
C-3 Standard 
Proposed C-3 CUPD Standard 
Screening 
6-foot CMU Wall 
8-foot CMU wall adjacent to 
residential parcels 
 
2024 Aerial Image

Z2023136 
Page 3 of 6 
Current Zoning 
 
Proposed Zoning

Z2023136 
Page 4 of 6 
 
Existing On-Site and Adjacent Zoning / Land Use: 
 
4. 
On-site: 
 
Rural-43 / Vacant 
North: 
R-3 / Vacant (City of Phoenix)  
South: 
Rural-43 / Single family residential & vacant  
East: 
Rural-43 / Single family residential 
West: 
C-2 / Commercial RV sales and repair 
 
 
Utilities and Services: 
 
5. 
Water: 
 
City of Phoenix  
Wastewater: 
City of Phoenix  
Fire: 
Daisy Mountain Fire Dept.  
Police:  
Maricopa County Sherriff  
 
Right-of-Way: 
 
6. 
The following table includes existing and proposed half-width right-of-way and the future 
classification based upon the Maricopa County Department of Transportation (MCDOT) Major 
Streets and Routes Plan.   
 
Street Name 
Half-width Existing R/W 
Half-width 
Proposed R/W 
Future Classification 
Circle Mountain Rd. 
40’ 
40’ 
Major Collector 
 
Adopted Plan: 
 
7. 
Daisy Mountain / New River Area Plan (updated 11/20/19): The parcel is categorized as ‘large lot 
residential’ which the plan states is intended for single family rural land use to promote 
preservation of hillside and natural features.  
 
Public Participation Summary: 
 
8. 
The applicant has met all Maricopa County requirements for 300’ neighbor notification and 
signage in two places on the parcel. The applicant has provided a finalized public participation 
plan that indicates they have been in contact and working with a direct neighbor to identify 
potential issues that development may bring. To this date, staff has received no public comments 
or concerns regarding this application from surrounding neighbors or the public at large.  
 
Outstanding Concerns from Reviewing Agencies: 
 
9. 
N/A 
 
Staff Analysis: 
 
10. 
Staff supports the conceptual rezoning and future annexation for the expansion of the existing 
Camping World. As the current site has developed within the City utilizing city standards, it is 
deemed appropriate for the site expansion to develop utilizing the same standards.  
 
Recommendation:

Z2023136 
Page 5 of 6 
11. 
Staff recommends the Commission adopt a motion recommending that the Board of Supervisors 
approve Z2023136 subject to the following conditions ‘a’ – ‘h’: 
 
a. 
Development of the site shall be in substantial conformance with the Narrative Report 
entitled “Camping World”, consisting of 4 pages, dated June 24, 2024, except as modified 
by the following conditions. 
 
b. 
Development of the site shall be in substantial conformance with the Zoning Exhibit 
entitled “Camping World Zoning Exhibit” consisting of 1 full-size sheets, except as 
modified by the following conditions. 
 
c. 
Prior to approval of the initial final plat or precise plan of development approval, the 
applicant shall provide the Maricopa County Planning and Development Department with 
an executed pre-annexation service agreement with the City of Phoenix that identifies the 
detail for when the proposed project will be annexed and the provision of water and sewer 
service, and requirements for maintenance of the wash noted in condition ‘e’.  In lieu of 
pre-annexation service agreement, the developer must provide a ‘will serve’ letter from the 
certificated water and sewer provider(s). 
 
d. 
The following C-3 CUPD standard shall apply: 
1. 
Minimum screening requirements: 8-foot CMU wall adjacent to residential uses 
whether or not separated by a street, alley, drainage way or open space.  
 
e. 
The wash in the southwest area of the parcel shall be maintained in accordance with City 
of Phoenix requirements.  
 
f. 
The following planning engineering conditions shall apply:   
1. 
Circle Mountain Road immediately west if the site is within the jurisdiction of the 
City of Phoenix. The applicant will be responsible for coordinating with the City to 
review any traffic impact, right-of-way dedication, permitting or roadway 
improvement requirements for this section of Circle Mountain Road.  
 
2. 
Engineering review of planning and/or zoning cases is for conceptual design only. 
All development and engineering design shall be in conformance with Section 
1205 of the Maricopa County Zoning Ordinance; Drainage Policies and Standards; 
Floodplain Regulations for Maricopa County; MCDOT Roadway Design Manual; 
and current engineering policies, standards and best practices at the time of 
application for construction. 
 
3. 
Based on the conceptual design nature of the information submitted, changes to 
the site layout and/or a reduction in the number of building lots may be 
necessitated by the final engineering design of the subdivision drainage 
infrastructure. 
 
4. 
Detailed Grading and Drainage (Infrastructure) Plans must be submitted with the 
application for Final Plat Approval and Building Permits. 
 
g. 
Noncompliance with any of the conditions assigned to the approval of this Zone Change 
by the Maricopa County Board of Supervisors may be grounds for revocation in 
accordance with the requirements and procedures as set forth in the Maricopa County 
Zoning Ordinance.

Z2023136 
Page 6 of 6 
 
h. 
The granting of this change in use of the property has been at the request of the applicant, 
with the consent of the landowner.  The granting of this approval allows the property to 
enjoy uses in excess of those permitted by the zoning existing on the date of application, 
subject to conditions.  In the event of the failure to comply with any condition, the property 
shall revert to the zoning that existed on the date of application.  It is, therefore, stipulated 
and agreed that either revocation due to the failure to comply with any conditions, does 
not reduce any rights that existed on the date of application to use, divide, sell or possess 
the property and that there would be no diminution in value of the property from the value 
it held on the date of application due to such revocation of the Zone Change.  The Zone 
Change enhances the value of the property above its value as of the date the Zone Change 
is granted and reverting to the prior zoning results in the same value of the property as if 
the Zone Change had never been granted. 
 
 
 
Presented by: 
Andrew Lorentzen, Planner 
Reviewed by: 
Rachel Applegate, Planning Supervisor 
 
Attachments: 
Case Map (1 page) 
 
Narrative Report (4 pages) 
 
Zoning Exhibit (1 page) 
 
Engineering comments (5 pages) 
 
MCESD comments (1 pages)

/
Maricopa County Planning & Development - Phoenix, AZ
3
Gross Acres: 3 approx.
Generated August 22, 2024 12:51 PM
Z2023136
Application Name:
Legal Description
Camping World
Applicant
Case Address
Wendy Peterson
3971 W Circle Mountain RD
Applicant Phone/Email
Parcel Primary:202-22-015D
4805653017
wp@berryriddell.com
New River, AZ 85087-8919
Map scale 1:1,226
Supervisor District No.
Camping World EDR

Camping World 
Zone Change with Overlay Narrative 
Case Number: Z2023136 
 
1st Submittal: October 3, 2023 
2nd Submittal: January 23, 2024  
 
Prepared By: 
Berry Riddell LLC 
Wendy Riddell, Esq. 
Elyse DiMartino, Planner 
6750 E. Camelback Road, Suite 100 
Scottsdale, Arizona 85251

A. REQUEST 
The purpose of this request is for approval of a Zone Change with Overlay from RU-43 (Rural-43 
– One Acre Per Dwelling Unit) to C-3 CUPD (General Commercial, Commercial Unit Plan of 
Development) on approximately 3.41-acres located east of the southeast corner of West Circle 
Mountain Road and the Black Canyon Highway (the “Site”). The Site is comprised of three 
parcels, identified as Maricopa County Assessor’s Parcel Numbers 202-22-015D, 202-22-015E, 
and 202-22-015F. The approval of a Zone Change with Overlay will allow the expansion of the 
existing Camping World RV Storage and Sale facility.  
 
A CUPD is being requested to address the following development standards: 
Regulation 
Base Zoning District 
Regulations (C-3) 
Proposed Zoning District 
Regulations (C-3 CUPD) 
Maximum Height 
40’ 
40’  
Minimum Front Yard 
10’ 
10’ 
Minimum Side Yard 
None Required (unless 
adjacent to a rural or 
residential zoning district, 
then 10’) 
10’ 
Minimum Rear Yard 
None Required (unless 
adjacent to a rural or 
residential zoning district, 
then 25’) 
10’ 
Minimum Lot Area 
6,000 square feet 
6,000 square feet 
Minimum Lot Width 
60’ 
60’ 
Maximum Lot Coverage 
60% 
N/A

Minimum Parking Spaces 
1 per 250 square feet 
 N/A – no structures are 
proposed 
Screening 
6’ solid wall  
 8’ solid wall 
 
Please note that we are not requesting site plan approval as part of this Zone Change request. 
 
B. DESCRIPTION OF PROPOSAL 
The Property is currently undeveloped desert land. The proposed Zone Change with Overlay will 
allow the Site to develop as an expansion of the existing Camping World Recreational Vehicle 
Storage and Sale (“Camping World”) facility. The Site is intended to be used as new inventory 
storage for the existing Camping World site, located adjacent to the Site on the west. Camping 
World was founded in 1966 and today is the largest Recreational Vehicle (“RV”) retailer in the 
United States. It prides itself on providing customers with long-term value in RVs, associated 
products, and services. Camping World employs highly-trained and knowledgeable employees to 
assist customers in RV dealerships, services centers, customer support centers, and online.  
 
C. RELATIONSHIP TO SURROUNDING PROPERTIES 
The Site is undeveloped desert land zoned Rural-43 (“RU-43”), allowing for one dwelling unit per 
acre. To the east and south are single-family detached homes zoned RU-43. To the west and north 
of the Site is land within the jurisdiction of the City of Phoenix, zoned Intermediate Commercial 
(“C-2”). The property abutting the Site’s western boundary is also an RV storage facility and the 
property to the north is vacant, desert land. Finally, the Property is located within the Board of 
Supervisors District 3 (Bill Gates).  
 
D. LOCATION AND ACESSIBILITY 
As forementioned, the Site is located east of the southeast corner of West Circle Mountain Road 
and the Black Canyon Highway (the “I-17”) in the jurisdiction of Maricopa County. The subject 
Site is a gateway to some of Arizona’s most beautiful recreational areas, including Lake Pleasant, 
and New River Nature Preserve. Given the close proximity to outdoor recreational areas and the 
I-17, the Site is an ideal location for the proposed RV Storage facility. Finally, the intent is to 
provide one gated access point to the Site, off West Circle Mountain Road. 
 
E. COMMUNITY FACILITIES AND SERVICES 
Currently, educational needs are being served by the Deer Valley Unified school districts. As 
mentioned, the Site is also near a vast array of recreational activities.

F. PUBLIC UTILITIES AND SERVICES 
The Site’s use will be restricted until the City of Phoenix provides water service to the Site. The 
Site will be served by the Maricopa Water District for irrigation, Southwest Gas Corporation for 
gas service, and Arizona Public Service (“APS”) for electric power service. Century Link and 
Cox Communications will provide internet service to the Site. Police services are provided by 
Maricopa County Sheriff’s Office and fire services by Daisy Mountain Fire Department. 
 
G. CONCLUSION 
We respectfully request that the Zone Change with Overlay from RU-43 to C-3 CUPD be 
considered for approval. Given the proximity to outdoor recreational facilities and the I-17, the 
Site is an ideal location for an RV Storage facility.

APN’s: 202-22-015D, 202-22-015E, 202-22-015F
Z2023136 – Camping World – Zoning Exhibit

Doug Jones, P.E., CFM
Planning & Development
301 W. Jefferson St., Suite 170
Phoenix, Arizona 85003
Phone: (602) 372-0790
Fax: (602) 506-8762
www.maricopa.gov/planning
Email address:
Doug.Jones@maricopa.gov
 
Planning & Development
Engineering Plan Review
Date:  
February 13, 2024
Memo To:
Darren Gerard, AICP, Planning Manager, Department of Planning & 
Development
Attn:
Andrew Lorentzen, Planner, Planning & Development Services
cc:
Michael Norris P.E., Engineering Manager, Planning and Development
Bob Fedorka, PE, Engineering Supervisor, Planning & Development
From:
Doug Jones, PE, CFM, Plans Examiner Engineer, Planning & 
Development
Subject:  
Z2023136 – Camping World re-zone w/POD
APN(s):
202-22-015D, E & F
Engineering Review has reviewed the 2nd plan and report routed for review on 
01/26/2024, for the subject application and has the following objections: NOTE: No 
grading and drainage plans were submitted with this 2nd review, so review is still based 
on the 1st submittal plans with the updated drainage report.
DRAINAGE PLAN REVIEW 
1.
OFFSITE HYDROLOGY
a.
Updated Comment: Update report to identify all offsite flows impacting the 
site and how they are routed through the site to the historic outfall. Update: 
Offsite flows for the 100-year peak storm, not the 100-year, 2-hour storm 
must be used/routed through the site. Provide a Time of concentration 
calculation, then use that Tc to calculation the peak intensity/flowrate.
b.
Updated Comment: The site is impacted by significant offsite flow from 
the north. Provide an engineering (hydraulic & hydrologic) analysis of 
offsite flow and how it is routed through the site. Identified flow appears to 
be in the order of magnitude of 350 cfs. Provide at least preliminary analysis 
showing that proposed pipe through the site is sufficient, or provide 
alternate means of routing the balance of the offsite flow through the site. 
Update: See attached aerial with a rough outline of the drainage area 
contributing to this site. Note the area north and west of the site that 
connects with the wash through lot 015D.
c.
Previous comment still required: The site is impacted by sheet flow from 
the east. Provide a fence detail for the proposed wall. County standard is a 
turned block every other block. Wall must either adhere to this standard (if 
sufficient for expected flow), or provide engineering analysis showing that 
the proposed openings are sufficient to not adversely affect the adjacent 
properties.

Page 2 of 5
2.
ONSITE HYDROLOGY
a.
Updated Comment: The drainage report and plans must be sealed by a 
Civil Engineer registered in the state of Arizona (MCZO 1205.7.2). Update: 
Report was sealed, plans were not resubmitted.
3.
ONSITE RETENTION
a.
No comments on proposed retention volumes. Note: Prior to building permit 
issuance, for underground storage, applicant must provide certification of 
a minimum of a 75-year design life.
4.
RETENTION DISPOSAL
a.
Update drywell calculations to identify the expected number of drywells 
based on an assumed rate of 0.1 cfs and a maximum drain-down time of 
36-hours. - COMPLETE
5.
CROSS SECTIONS
a.
No comments.
6.
FINISHED FLOORS
a.
No proposed finished floors, no comments.
 
7.
TOPOGRAPHY
a.
Prior to submission of plans for building permits, certification of the 
topographic data will be required.
8.
FLOODPLAINS
a.
No Special Flood Hazard Areas.
 
9.
EROSION SETBACKS
a.
N/A
FLOOD CONTROL DISTRICT REVIEW
10. No SFHA, No FC comments.

Page 3 of 5
PND TRANSPORTATION PLAN REVIEW
11. Approval of the Traffic Study submitted with this application is attached. 
12. Ultimate half-width improvements along Circle Mountain Road are required. 
Refer to the current version of the Roadway Design Manual (Figure 5.10) for 
required ½ street improvement requirements.
13. Gated access(es) must provide an adequate turnaround area so that vehicles 
will not back onto public roads (WB-50 design vehicle).
14. Applicant to notify ADOT of proposed project through the Red Letter Process, 
RedLetter@azdot.gov, due to the proximity to the I-17.
PND TRANSPORTATION PLAN REVIEW R/W INFORMATION 
15. Circle Mountain Road (MCDOT Jurisdiction)
a.
Current Classification:Minor Collector
b.
Future Classification: Major Collector
c.
Existing R/W:
40 Feet (1/2 street)
d.
Ultimate R/W:
40 Feet (1/2 street)
STORM WATER QUALITY REVIEW/INFORMATION
16. The subject site is (not) located within the County’s Urbanized Area; and thus 
will not require a Storm Water Pollution Prevention Permit (SWPPP) from the 
County. This does NOT preclude the requirement to obtain a Notice of Intent 
to Discharge (NOID) from the State (ADEQ), as may be required.
The following stipulations will apply:
1.
Circle Mountain Road immediately west if the site is within the jurisdiction of 
the City of Phoenix. The applicant will be responsible for coordinating with the 
City to review any traffic impact, right-of-way dedication, permitting or roadway 
improvement requirements for this section of Circle Mountain Road. 
2.
Engineering review of planning and/or zoning cases is for conceptual design 
only. All development and engineering design shall be in conformance with 
Section 1205 of the Maricopa County Zoning Ordinance; Drainage Policies and 
Standards; Floodplain Regulations for Maricopa County; MCDOT Roadway 
Design Manual; and current engineering policies, standards and best practices 
at the time of application for construction.
3.
Based on the conceptual design nature of the information submitted, changes 
to the site layout and/or a reduction in the number of building lots may be 
necessitated by the final engineering design of the subdivision drainage 
infrastructure.
4.
Detailed Grading and Drainage (Infrastructure) Plans must be submitted with 
the application for Final Plat Approval and Building Permits 
Please contact me with any questions.

Page 4 of 5
DRAINAGE PLAN REVIEW REFERENCES:  
The Drainage Regulations are listed in Section 1205 of the MCZO:
https://www.maricopa.gov/documentcenter/view/272 
Maricopa County Drainage Policies and Standards Manual:
https://www.maricopa.gov/DocumentCenter/Home/View/2369 
For Additional Information See:
https://www.maricopa.gov/1635/Drainage-Review
FLOOD CONTROL DISTRICT OF MARICOPA COUNTY REFERENCES:  
Floodplain Regulations for Maricopa County:
https://www.maricopa.gov/DocumentCenter/View/630 
For Additional Information See:
https://www.maricopa.gov/3847/Flood-Control-District 
PND TRANSPORTATION REFERENCES:
Residential Driveway Guidelines
https://www.maricopa.gov/documentcenter/view/362 
Roadway Design Manual
http://www.mcdot.maricopa.gov/DocumentCenter/View/24883
Maricopa County Resolution for ROW Permits
https://www.maricopa.gov/documentcenter/view/364 
For Additional Information See:
https://www.maricopa.gov/156/MCDOT 
PND STORMWATER QUALITY (SWPPP) REFERENCES:
Storm Water Quality Management and Discharge Control Regulation
https://www.maricopa.gov/DocumentCenter/View/6577
Air Pollution Control Regulations Rule 310
https://www.maricopa.gov/DocumentCenter/View/5354 
For Additional Information See:
https://www.maricopa.gov/3980/Water-Sewage-Stormwater-Waste

Page 5 of 5
Abbreviations Key:
Drainage:
DD = 
Department Directive (See: http://www.maricopa.gov/1911/Department-
Directives)
MCZO =
Maricopa County Zoning Ordinance
DPSM = 
Maricopa County Drainage Policies and Standards
SSA = 
State Standard Attachment
DDMV1= Maricopa County Drainage Design Manual – Hydrology
DDMV2 = Maricopa County Drainage Design Manual – Hydraulics
Flood Control:
FRMC =
Floodplain Regulations for Maricopa County
PND Transportation:
RDM = 
MCDOT Roadway Design Manual
RDG = 
MCDOT Residential Design Guidelines
MSRP = 
MCDOT Major Streets and Routes Plan
PND Storm Water:
SWMDCR=
Maricopa County Storm Water Quality Management and Discharge 
Control Regulation
DDMV3= Maricopa County Drainage Design Manual – Erosion Control
APCR=
Maricopa County Air Pollution Control Regulations – Rule 310

Page | 1  
 
 
Subdivision 
Infrastructure  
& Planning Program 
301 W. Jefferson St. 
Phoenix, AZ 85003 
 
S u b d i vi s io n @ m a ri co p a .go v 
e s d .m a r i c o pa .g o v 
 
 
 
 
 
The Maricopa County Environmental Services Department (MCESD) has completed review 
for the  Zone Change with Overlay from RU-43 to C-3 CUPD to allow the Site to develop as a 
Camping World RV Storage and Sale facility planning case(s). Please note the following 
MCESD requirements for site development: 
Subdivision and Infrastructure –  
An Approval to Construct application is required and must be submitted to MCESD’s 
Subdivision & Infrastructure Program for water, reclaimed water and/or wastewater system 
infrastructure. 
 
A will serve letter issued by the Utility is required and must be submitted to MCESD’s 
Subdivision & Infrastructure Program if the site/development will be provided with water 
and/or reclaimed water by a Utility.  A capacity assurance letter issued by the Utility is 
required to MCESD’s Subdivision & Infrastructure Program if the site/development 
wastewater service is being provided by a Utility. 
 
For subdivision related questions, please contact the Subdivision and Infrastructure 
Program at (602) 506-1058 or email subdivision@maricopa.gov. 
Additional Notes –  
Environmental Services does not require these items for condition of approval of  Z2023136, however 
these items must be addressed with the development of the site. Environmental Services does not 
require additional review of this case. 
 
*It should be noted that this document does not approve the referenced project. Comments are provided 
for the benefit of the applicant for MCESD permit requirements and as an advisory to Maricopa County 
Planning and Development Department. Other Maricopa County agencies may have additional 
requirements. Final review and approval will be made through Planning and Development Department 
procedures. Applicant may need to submit separate applications to the Maricopa County Environmental 
Services Department for approval of proposed facilities regulated by the Department. Review of any such 
application will be based on current regulations at the time of application. 
 
Project Name:  Zone Change with Overlay 
from RU-43 to C-3 CUPD to allow the Site 
to develop as a Camping World RV 
Storage and Sale facility 
Primary Contact Name:  Wendy  
Peterson 
Planning Application Type: Zone Change 
APN(s):   202-22-015D 
Reviewer: Souren Naradikian, P.E. 
Email: Souren.Naradikian@maricopa.gov 
Phone: 602-372-2907 
Planner Name:  Andrew Lorentzen 
Planning Case #:  Z2023136 
Date: November 7, 2023 
 
Water and Waste Management Division