Agenda Item Id: 245065 
 
Item Title 
AMENDMENT TO COMPETITION IMPRACTICABLE WITH JACOBS ENGINEERING GROUP, INC FOR 
MCKELLIPS ROAD INFRASTRUCTURE AND ROADWAY IMPROVEMENTS 
 
C Number:  C-64-23-032-X-01 
 
Action Requested: 
 Approve the attached Competition Impracticable Form for consultant design services Contract 2021-
025, with Jacobs Engineering Group, Inc., in the amount of $110,348 for additional design and post-
design services for Phase 2 of the Maricopa County Department of Transportation’s TT0342 McKellips 
Road project.  The original Contract was previously approved by the Board as a Competition 
Impracticable procurement with a not-to-exceed amount of $243,525.  The revised total contract value 
will be for a sum not-to-exceed of three hundred fifty-three thousand eight hundred and seventy-three 
dollars ($353, 873).  Supervisory District No. 2  
 
Additional Information: 
 This project was split into two phases following an unsuccessful construction bid advertisement in 
January 2022. It was determined the best approach was to redesign the project and construct it in two 
separate phases placing the water/sewer infrastructure in one phase followed by the roadway paving in 
a second phase.   
 
A competition impracticable for Jacobs Engineering to split the design into two phases was approved on 
August 17, 2022 (Agenda Item C-64-23-032-X-00) and Phase 1 has now completed construction. This 
request is for unanticipated Phase 2 design updates such as adjusting the existing super-elevation of 
McKellips Road, addition of a sewer lateral, extension of paving limits to include the Alma School 
intersection, adding a right-turn lane, and incorporating Phase 1 as-built information into the design plus  
addressing items that were not completed in Phase 1. This also addresses additional funds for post-
design services for Phase 2. 
 
An Intergovernmental Agreement is in place with Salt River Pima Maricopa Indian Community for cost-
sharing and maintenance responsibilities for this project.   
 
 
PERFORMANCE INFORMATION: 
 
Program:  Transportation Improvement Program (TIP) 
 
Activity:  Roadway Construction

Performance Measure:  Deliver the TIP Budget. 
 
Anticipated Results:  Provide improved roadway network and safety improvements to the travelling 
public.  
 
  
FUNDING: (Expenditure Impact by FY’s)  
 
FY2025:  $70,000 
FY2026:  $40,348 
 
Item Notes: 
07/18/2024 01:42:01 PM  Dorene Stretar     Reviewed 
 
 
Is there a Financial Impact? 
No 
 
General Item Information 
Department: Transportation 
Contact Name: Sandra Dubose 
Meeting Date: 8/7/2024 9:30 AM - Formal