Office of Procurement Services
GOODS AND SERVICES
COMPETITION IMPRACTICABLE FORM
This form is to be used when a department believes an acquisition is considered Competition Impracticable and the acquisition
dollar amount is above $10,000. The Chief Procurement Officer can approve purchases up to $100,000. Board of Supervisors
approval is required if the acquisition is over $100,000. This form must be submitted for approval to: Office of Procurement
Services | 301 W Jefferson Street Suite 700 | Phoenix, AZ 85003. Fax number: 602.506.6766. The signed form must be retained
in the purchasing file. Unless approved by the Board of Supervisors in a formal agenda item or the Chief Procurement Officer in
a formal Contract a CI form is valid from July 1 thru June 30th of each Fiscal Year.
DEPARTMENT NAME
DEPARTMENT RX#
PROPOSED CONTRACT VENDOR
NEED IDENTIFIED Date:
REQUESTED DELIVERY
Date:
QUOTED PRICE:
Accounting String:
Company:
Address:
City, State:
Zip/Postal Code:
Phone:
Fax:
Contact Name:
DESCRIPTION OF GOODS OR SERVICES REQUIRED:
The estimated cost of this Procurement is:
≤ $100k
> $100k
Is this a Technology Procurement?
Yes
No
COMPETITION IMPRACTICABLE CATEGORY (Check applicable box, attach documentation or provide explanation below.)
Maricopa County Procurement Code MC1-351 states: “Competition Impracticable” means an acquisition where, competition is
impractical because of standardization, warranty, or other factors as approved by the Board of Supervisors.
NOTE: The following are unlikely to be sufficient Competition Impracticable justifications:
• Personal or department preference for a product or vendor
• Department perception that the vendor is the best qualified (this should be determined through a competitive process)
• Lack of department planning resulting in limited time to conduct a competitive procurement
• Special incentive or deal offered (can be assessed in open and competitive solicitation)
• Department convenience
Grant specified (supporting documents attached)
Mailing lists, subscriptions or media advertising
Warranty voided if service provided by other contract vendor
Other (Provide written explanation below)
Software license renewals, additions, or upgrades available
from only one source
Brand compatibility available from only one source (no other
distributors)
Other proprietary situation
Transportation
Jacobs Engineering Group, Inc.
06/04/2024
101 North 1st Avenue, Suite 2600
602-253-1200
85003
Phoenix, AZ
Judah Cain
CI #2 for TIP Project TT0342 McKellips Road, Loop 101 to McKellips Road design services for
unanticipated Phase 2 design updates requested by MCDOT such as adjusting existing super-elevation of
McKellips Road, addition of a sewer lateral, extension of paving limits to include Alma School intersection,
adding a right-turn lane, and incorporating Phase 1 as-built information into the Phase 2 design and
addressing items that were not completed in Phase 1. Also, additional budget for post-design services for
Phase 2.
07/12/2024
$110,348
DocuSign Envelope ID: 306E260F-8CE3-4C22-B029-2BA167964A96
SEARCH
A search was conducted consisting of: (check all that apply)
Market research
Public notice given, list
Other vendors contacted
Other
RESULTS
no alternatives were identified
no alternatives were deemed acceptable
because (explain below):
Describe the search from above in detail:
PRICE
MC1-352-B states: The Using Agency requesting a Competition Impracticable Procurement shall provide written evidence
to support a Competition Impracticable determination containing an explanation of why the proposed procurement
process is advantageous to the County; and the scope, duration, and estimated total dollar value of the procurement.
Price has been fairly and reasonably established by:
Comparison to previous comparable purchases
from a different vendor
Independent estimate
Comparison to public sector contract pricing
Discount off published catalog pricing
Market survey
Other, explain:
Describe methodology and results (attach any written supporting data, e.g., survey or market analysis):
THIS IS A COMPETITION IMPRACTICABLE PROCUREMENT BECAUSE (attach additional page if needed):
Jacobs Engineering has been the project design consultant since May, 2017, and has developed the
design from 60-percent stage to Sealed. The project bid in January 2022, but no bids were accepted.
MCDOT determined that the project shall be separated into two phases for two separate bid
solicitations. Phase 1 for underground facilities has completed and Phase 2 design is now completing.
Jacobs Engineering has the familiarity regarding the project history including design decisions, utility
coordination issues, and SRP-MIC coordination expectations, to provide these services. It is in the
best interest of MCDOT to utilize Jacobs Engineering to complete the design and provide bidding
assistance and post-design services for consistency and efficiency. Utilizing a different design
consultant at this stage of McKellips Road design would be contrary to the public interest.
The alternative would be to use a different design consultant, which would be unacceptable
because of unfamiliarity with the project, including design issues, agency coordination, utility
issues and SRP-MIC coordination. Jacobs Engineering has the history and detailed project
knowledge to complete the Phase 2 design and provide bidding assistance and post-design
services.
Jacobs Engineering provided a scope and fee proposal which is consistent with similar
consultants contract rates and acceptable engineering fees for this type of work.
DocuSign Envelope ID: 306E260F-8CE3-4C22-B029-2BA167964A96
CERTIFICATIONS
I certify:
1) I recognize that the Maricopa County Procurement Code requires the use of competitive solicitations unless
exempted by law. I have reviewed the information and materials relevant to this procurement of goods and services,
and am requesting approval of an exception to the competitive process for the reasons described;
2) the price to be paid to the proposed vendor is fair, reasonable, and provides the best value to Maricopa County; and
3) this request for an exception to the competitive solicitation process is not the result of inadequate advance planning
or for purposes of securing the services of a preferred vendor.
Department Head or Department Head Delegate Signature (Required)
Printed Name
Signature
Date
Office of Procurement Services
The CPO can approve procurements up to $100,000. If this request is over $100,000 it must be submitted as
an agenda item to the Board of Supervisors for consideration.
Approved/Recommended for Approval
Printed Name
Signature
Date
Office of Enterprise Technology (If this procurement is classified as a technology procurement it must be
forwarded to OET for coordination and/or approval. If this procurement request is not approved by OET, the form will
be returned to the requestor.)
Approved. Recommended purchase is in line with Maricopa County's strategic technology plan or currently installed
equipment or service, and is considered to be a competition impracticable procurement.
Not Approved.
Reasoning:
Printed Name
Signature
Date
Save
Email
DocuSign Envelope ID: 306E260F-8CE3-4C22-B029-2BA167964A96
Jesse Gutierrez
6/26/2024
6/26/2024
Kevin Tyne
6/26/2024
1501 W. Fountainhead Pkwy
Suite 401
Tempe, AZ 85282
T +602 253 1200
www.jacobs.com
June 4, 2024
Attention: Ben Markert, PE
Maricopa County Department of Transportation
2901 W. Durango Street
Phoenix, AZ 85009
Reference:
Contract No. 2021-25
Project Name: McKellips Rd, Loop 101 to Alma School Road
Project No. TT0342
Modification
Dear Mr. Markert,
Please find enclosed JACOB’s Scope of Services and Cost Proposal for Modification 2 for the above referenced
project.
The cost for these services is $110,348. The derivation of the fee is attached. All salaries and rates are in line with
the contract.
Our Subconsultants on this contract are:
Huit-Zollars
J2 Engineering and Environmental Design
We trust you will find that our submittal is in order. If you should have questions or require additional information,
please contact me at (602) 650-4030 or email at judah.cain@jacobs.com.
Sincerely,
Judah Cain, PE
Project Manager
Enclosures
DocuSign Envelope ID: 306E260F-8CE3-4C22-B029-2BA167964A96
Scope of Services – Project
Specific
Final Design
PROJECT NAME: MCKELLIPS ROAD
Consultant:
JACOBS
Project No:
Contract No.:
TT0342
2021-025
Maricopa County
Department of Transportation
2901 W. Durango Street
Phoenix, AZ 85009
JUNE 2024
DocuSign Envelope ID: 306E260F-8CE3-4C22-B029-2BA167964A96
Scope of Services
Project Specific
Project No.: TT0342
Contract No.: 2021-025
Revised: June 2024
Page 2 of 6
Table of Contents
SCOPE OF SERVICES – PROJECT SPECIFIC .................................................................................. 3
Project Overview .................................................................................................................................... 3
Project Location .................................................................................................................................. 3
Project Background ............................................................................................................................ 3
Project Purpose ................................................................................................................................... 4
Length of Services .................................................................................................................................. 4
SECTION 100
PROJECT MANAGEMENT ..................................................................................... 4
100.2.2
Matrix of Deliverables ...................................................................................................... 4
100.4
Design Criteria .................................................................................................................. 4
SECTION 200
SUBMITTALS ............................................................................................................. 4
1200.6
Phase No. 2 Sealed PS&E Submittal ................................................................................ 4
SECTION 300
BIDDING PHASE ....................................................................................................... 5
1300.5
Phase No. 2 Technical Assistance ..................................................................................... 5
1300.6
Phase No. 2 Preparation of Addenda ................................................................................ 5
1300.7
Phase No. 2 Pre-Bid Conference ....................................................................................... 5
1300.8
Phase No. 2 Bid Opening .................................................................................................. 5
SECTION 400
POST DESIGN ............................................................................................................ 5
1400.6
Phase No. 2 Pre-Construction Conference ........................................................................ 5
1400.7
Phase No. 2 Request for Information (RFIs) .................................................................... 5
1400.8
Phase No. 2 Begin Construction ....................................................................................... 5
1400.9
Phase No. 2 End Construction .......................................................................................... 5
1400.10 Phase No. 2 Project Administration and Close-Out ................................................................. 5
DocuSign Envelope ID: 306E260F-8CE3-4C22-B029-2BA167964A96
Scope of Services
Project Specific
Project No.: TT0342
Contract No.: 2021-025
Revised: June 2024
Page 3 of 6
SCOPE OF SERVICES – PROJECT SPECIFIC
Project Overview
Project Location
McKellips Road between Loop 101 Price Freeway and Alma School Road is approximately 1.97 miles
in length located entirely within the Salt River Pima-Maricopa Indian Community (SRP-MIC).
McKellips Road is classified as a principal arterial roadway and is typically an un-curbed 2-lane
roadway with widening at major intersections within the limit of the project corridor.
Project Background
A Design Concept Report (DCR) was developed for this project in 2009. That DCR also included the
evaluation of bridges crossing the Salt River at McKellips Road, Dobson Road and Gilbert Road. The
recommended alternative for widening McKellips Road between Loop 101 and Alma School Road was
to widen the roadway symmetrically about the existing centerline.
Utilizing the recommended alignment from the DCR, a Scoping Study was completed in 2015 that
included a raised median, curb and gutter, sidewalk, irrigation improvements and a storm drain that
outlet to the Loop 101 channel.
A Safety Evaluation was performed for the corridor in 2016 which identified short-term and long-term
countermeasures for implementation.
In 2016, a Value Engineering (VE) Analysis was performed on the scoping design which identified cost
saving modifications to the scoping design and added improvements recommended in the Safety
Evaluation.
Some of the significant items from the VE Analysis included utilizing retention basins in lieu of an
underground storm drain pipe and salvaging the existing pavement rather than a complete reconstruction
of the roadway.
Jacobs completed a 60% Design that implemented the VE recommendations which included reusing the
existing pavement by widening rather than reconstructing the roadway, as recommended in the VE
Report. However, the proposed widening created complicated milling and overlay thickness along with
a differential in the median curb height that was undesirable to MCDOT.
After further collaboration with MCDOT, SRPMIC and key stakeholders, Jacobs completed a revised
60% design and then 95% and 100% Design Documents. The revised design developed some of the VE
recommendations that were agreeable to MCDOT as well as safety countermeasures and drainage
options. The Final Design includes revisions to the roadway profile that requires constructing a majority
of the existing pavement to simplify construction and provide the required pavement structure while
maintaining minimum roadway cross-slopes and grades. Right-turn lanes were added to the Saddleback
Communications site along with modifications to the landscaping, drainage, and irrigation.
In January 2022 the project advertised for construction. MCDOT rejected the one bid received and has
opted to repackage TT0342 into two projects. Phase No. 1 will construct underground facilities
including sewer lines, waterlines and storm drain. Phase No. 2 will construct the remaining
aboveground facilities.
Phase No. 1 construction was completed in March 2024. During the construction of Phase No. 1
MCDOT approved the inclusion of an additional right turn lane east of Longmore Road to provide
access to a future SRP-MIC water treatment plant. The design exception for the existing superelevation
on McKellips Road approaching Alma School Road was rejected. and the Phase No. 2 design was
revised to include a compliant superelevation rate. The Phase No. 2 project plans were also updated to
include temporary irrigation drainage for the construction of the box culvert.
DocuSign Envelope ID: 306E260F-8CE3-4C22-B029-2BA167964A96
Scope of Services
Project Specific
Project No.: TT0342
Contract No.: 2021-025
Revised: June 2024
Page 4 of 6
Project Purpose
This project is for preparing final PS&E for Phase No. 2 and for post design services for the
construction of Phase No. 2.
Length of Services
It is anticipated the length of service for this task will be 18 months to include production of sealed
documents and post design services for Phase No. 2.
SECTION 100 PROJECT MANAGEMENT
100.2.2 Matrix of Deliverables
In accordance with Contract No. 2015-030, WA#6, MicroStation V8i and InRoads will be used to
develop CADD deliverables and the Consultant will use MCDOT’s CADD Standards for MicroStation
V8i.
100.4 Design Criteria
In accordance with Contract No. 2015-030, WA#6, the project design will be in accordance with the
MCDOT 2018 Roadway Design Manual (RDM) and current Maricopa County Drainage Policy and
Standard Manual (DPSM) and the 60% Design Documents. MCDOT references and publications shall
control the work, and any necessary supplementation should be provided by appropriate AASHTO,
FHWA, Maricopa Association of Governments (MAG) and/or MCDOT references. All designs shall
conform to the latest ADA Accessibility Guidelines Title I and II.
SECTION 200 SUBMITTALS
The Consultant will make one (1) submittal for this project, at the Sealed stage. The Consultant will
provide this submittal in electronic format, including CADD files, to the MCDOT Project Manager for
distribution to the project team members and stakeholders.
The Project Manager will return all comments to the Consultant within 14 calendar days following the
submittal. With each resubmittal, the Consultant shall return any prior review check prints along with
prior review comments annotated with Consultant responses.
The Consultant shall submit quality assurance documentation demonstrating that the proposed QA/QC
procedures have been implemented. The Consultant shall be required to resubmit any scheduled
submittal deemed by MCDOT to be incomplete or lacking in sufficient detail.
Final sealed reports such as drainage reports, soils report and other prepared reports and data shall be
submitted electronically by the Consultant in addition to the specified number of hard copies. Each
report including cover with signed professional seal, text, photos, engineering and other drawings,
tables, maps, all appendices, and hand calculations shall be provided to MCDOT as one Acrobat Reader
(.PDF) formatted file on a compact disk, suitable for publishing on the MCDOT website. Cost estimates
and other data prepared on spreadsheets shall be submitted electronically (Microsoft Excel) by the
Consultant along with the specified number of hard copies.
1200.6 Phase No. 2 Sealed PS&E Submittal
The Consultant will prepare and submit sealed construction documents, specifications, and cost
estimates.
DocuSign Envelope ID: 306E260F-8CE3-4C22-B029-2BA167964A96
Scope of Services
Project Specific
Project No.: TT0342
Contract No.: 2021-025
Revised: June 2024
Page 5 of 6
SECTION 300 BIDDING PHASE
1300.5 Phase No. 2 Technical Assistance
The Consultant shall provide technical assistance and respond to design questions during the
advertisement period of the project.
1300.6 Phase No. 2 Preparation of Addenda
The Consultant shall prepare addenda that may be required to clarify or correct the plans or Special
Provisions.
1300.7 Phase No. 2 Pre-Bid Conference
The Consultant shall attend a pre-bid conference for all contractors interested in bidding on the project
and shall be prepared to answer contractor’s questions.
1300.8 Phase No. 2 Bid Opening
After bid opening, the Consultant shall assist MCDOT in analyzing bids when requested to do so.
SECTION 400 POST DESIGN
Post Design Services shall be provided as outlined herein.
1400.6 Phase No. 2 Pre-Construction Conference
The Consultant shall attend a pre-construction conference and shall be prepared to answer Contractor’s
questions.
1400.7 Phase No. 2 Request for Information (RFIs)
The Consultant shall review and respond to the Contractor’s request for information (RFI) or
clarification of design issues contained within the project plans and specifications. For estimating
purposes, it is assumed the Contractor will have 40 RFIs.
1400.8 Phase No. 2 Begin Construction
The Consultant shall attend weekly construction meetings and shall be prepared to answer the
Contractor’s questions. For estimating purposes, it is assumed there will be 52 construction meetings
that will be attended by the Consultant.
The Consultant shall attend on-site construction meetings as necessary and shall be prepared to answer
the Contractor’s questions. For estimating purposes, it is assumed there will be 3 on-site construction
meetings that will be attended by the Consultant.
The Consultant shall review and approve Contractor submittals and shop drawings associated with
products and procedures for construction of improvements specified in the project plans and
specifications. For estimating purposes, it is assumed the Contractor will have 20 submittals.
1400.9 Phase No. 2 End Construction
The Consultant shall attend a final walk-thru inspection of the project once the Contractor has obtained
substantial completion from MCDOT. The Consultant shall not be responsible for providing record
drawings.
1400.10 Phase No. 2 Project Administration and Close-Out
The Consultant shall finalize project documentation. A certificate of performance will be submitted to
MCDOT once all work is complete and final invoice submitted.
DocuSign Envelope ID: 306E260F-8CE3-4C22-B029-2BA167964A96
Scope of Services
Project Specific
Project No.: TT0342
Contract No.: 2021-025
Revised: June 2024
Page 6 of 6
END SCOPE OF SERVICES
DocuSign Envelope ID: 306E260F-8CE3-4C22-B029-2BA167964A96
McKellips Road, Loop 101 to Alma School Road
Engineering Firm JACOBS
PROJECT NO. TT0342
Contract No. 2021-25
ESTIMATED DIRECT LABOR
PERSON
BILLING
CLASSIFICATION
HOURS
RATE/HOUR
TOTAL
Project Manager/Senior Task Manager
57
81.04
$
4,619
$
Senior Project Engineer
193
87.02
$
16,795
$
Project Engineer
200
50.06
$
10,012
$
CADD Technician
104
36.00
$
3,744
$
Project Controls
2
49.86
$
100
$
Project Administration
11
36.03
$
396
$
567
Hours
Estimated Labor Cost
35,666
$
Overhead
99.41%
35,456
$
Subtotal
71,122
$
ESTIMATED DIRECT EXPENSES
(Listed By Item At Estimated Actual Cost - NO MARKUP)
Travel
45
$
Plotting
-
$
Miscellaneous Expenses
-
$
Total Estimated Expenses
45
$
ESTIMATED OUTSIDE SERVICES AND CONSULTANTS
Firm
Cost
Huitt-Zollars
32,069
$
J2 Engineering & Environmental
-
$
Total Estimated Outside Services
32,069
$
PROFIT (Direct Labor +Overhead)
10%
7,112.16
TOTAL ESTIMATED FEE
110,348
$
CONTRACT TIME
Calendar Days
(Figures Rounded To The Nearest $1)
Consultant Firm Signature
Date
DERIVATION OF COST PROPOSAL SUMMARY
6/4/2024
Page 1 of 1
DocuSign Envelope ID: 306E260F-8CE3-4C22-B029-2BA167964A96
McKellips Road, Loop 101 to Alma School Road
Engineering Firm JACOBS
PROJECT NO. TT0342
Contract No. 2021-25
Scale
No
Shts
Hours/
Sheet
Project
Manager/
Senior
Task
Manager
Senior
Project
Engineer
Project
Engineer
Traffic
Engineer
CADD
Technician
Electrical
Engineer
Project
Controls
Project
Administration
Total
TASK
ESTIMATED STAFF HOURS
SECTION 1200 SUBMITTALS
1200.6 Phase No. 2 Sealed PS&E Submittal
16
60
100
40
8
224.0
SECTION 1300 BIDDING PHASE
1300.5 Phase No. 2 Technical Assistance
2
2
4
8.0
1300.6 Phase No. 2 Preparation of Addenda (4 addendums)
2
2
4
4
12.0
1300.7 Phase No. 2 Pre-Bid Conference
1
1
2
4.0
1300.8 Phase No. 2 Bid Opening
1
1
2.0
SECTION 1400 POST DESIGN SERVICES
1400.6 Phase No. 2 Pre-Construction Conference
4
4.0
1400.7 Phase No. 2 Request for Information (40 RFIs)
10
50
60
40
160.0
1400.8 Phase No. 2 Begin Construction (52 virtual mtgs, 3 on-site visits, 20 shop dwgs)
16
75
30
20
141.0
1400.9 Phase No. 2 End Construction
2
2
4.0
1400.10 Phase No. 2 Project Administration and Close-Out
3
2
3
8.0
57
193
200
104
2
11
567.0
6/4/2024
Page 1 of 1
DocuSign Envelope ID: 306E260F-8CE3-4C22-B029-2BA167964A96
McKellips Road, Loop 101 to Alma School Road
Engineering Firm JACOBS
PROJECT NO. TT0342
Contract No. 2021-25
Travel
A. Local Mileage at
0.56
$
80
miles
Subtotal Travel
45
$
Plotting
B. Exhibits at
0.25
$
exhibits
-
$
C. Plots at
1.00
$
plots
-
$
D. Plan Submittals
Half Size Bond Copies at
0.10
$
Copies
Full Size Bond Copies at
1.00
$
Copies
Subtotal Plotting
-
$
Miscellaneous Expenses
C. Other
-
$
Subtotal Miscellaneous Expenses
-
$
ESTIMATED OUTSIDE SERVICES & CONSULTANTS
Huitt-Zollars
32,069
$
J2 Engineering & Environmental
-
$
TOTAL ESTIMATED OUTSIDE SERVICES
32,069
$
TOTAL ESTIMATED EXPENSES
32,114
$
ESTIMATE OF DIRECT EXPENSES
3/26/2013
Page 1 of 1
DocuSign Envelope ID: 306E260F-8CE3-4C22-B029-2BA167964A96
May 30, 2024
Mr. Judah Cain, P.E.
Jacobs Engineering Group, Inc.
101 N. First Ave., Suite 2600
Phoenix, Arizona 85003
Reference:
McKellips Road – Project No. TT0342; Contract 2021-025
Additional PS&E and Post Design Services Modification
Huitt-Zollars Proposal No. P313700.01.01 – Change Order
Dear Mr. Cain:
Huitt-Zollars, Inc. (HZI) (Subconsultant) appreciates the opportunity to provide this proposal for
professional engineering consulting services to Jacobs Engineering Group, Inc. (Client) on
additional PS&E and Post Design Services for the McKellips Road project; Salt River Pima -
Maricopa Indian Community (Project). This contract modification includes the additional services
performed outside the current contract. Our proposal is based upon the scope of services,
compensation, schedule, terms and conditions and attachments contained herein.
Specifically, we understand that we will provide the following:
I.
SCOPE OF SERVICES:
1 SECTION 200 OUT OF SCOPE ITEMS
1200.6 Phase No. 2 Sealed PS&E Submittal:
Prepare and submit sealed construction documents, specifications, and cost estimates.
2 SECTION 400 ADDITIONAL ITEMS
1400.7 Additional RFIs:
Review and respond to the additional Contractor’s Request for Information or clarification
of design issues within the project plans and specifications.
III.
COMPENSATION:
Since the level of effort for these scope elements are not easily defined, the fee for these services
has been established with an estimated budget and will be billed monthly on a Time and Materials
(T&M) basis using the attached Rate Sheets.
1 SECTION 200 OUT OF SCOPE ITEMS
1200.6 Phase No. 2 Sealed PS&E Submittal: ............................
(T&M)
Total for Section 200 Out of Scope Items: .................. $14,678
(T&M)
DocuSign Envelope ID: 306E260F-8CE3-4C22-B029-2BA167964A96
McKellips Road
Project No. TT0342; Contract 2021-025
Additional PS&E & Post Design Services
HZ R#313700.01.01
Page | 2
2 SECTION 400 ADDITIONAL ITEMS
1400.7 Additional RFIs: ..............................................................
(T&M)
Total for Section 400 Additional Items: ......................... $17,391
(T&M)
Total Estimated Budget
Our estimated budget for this contract modification is $32,069 See Attachment A.
III.
EXCLUDED SERVICES:
Excluded Scope Items include, but are not limited to the following:
1. NA
IV. CLIENT PROVIDED ITEMS:
Client shall provide Huitt-Zollars with the following:
1. Signed Contract
V. SCHEDULE:
Begin Work following receipt of your signed contract.
DocuSign Envelope ID: 306E260F-8CE3-4C22-B029-2BA167964A96
McKellips Road
Project No. TT0342; Contract 2021-025
Additional PS&E & Post Design Services
HZ R#313700.01.01
Page | 3
VI.
AUTHORIZATION:
Should this proposal meet with your approval and acceptance, please sign, and return to our
office by e-mail to dboth@huitt-zollars.com. We will schedule the above services as soon as we
receive your authorization. If you have any questions about any aspect of this proposal, please
do not hesitate to give us a call.
Sincerely,
HUITT-ZOLLARS, INC.
Doug Both
Project Manager
Paul Hoskin, P.E.
Vice President
Attachments:
A- Derivation of Cost
B- Derivation of Hours
C- Certified Rates
Accepted and Approved for
Jacobs Engineering Group, Inc.
(Signature)
(Name)
(Title)
(Date)
DocuSign Envelope ID: 306E260F-8CE3-4C22-B029-2BA167964A96
Attachment A
Derivation of Cost
DocuSign Envelope ID: 306E260F-8CE3-4C22-B029-2BA167964A96
DocuSign Envelope ID: 306E260F-8CE3-4C22-B029-2BA167964A96
Attachment B
Derivation of Hours
DocuSign Envelope ID: 306E260F-8CE3-4C22-B029-2BA167964A96
DocuSign Envelope ID: 306E260F-8CE3-4C22-B029-2BA167964A96