TT0561_CONT_COMPETITION-IMPRACTICABLE-FORM-01_APPROVED_20200929.PDF
Extracted text (via pymupdf)
16552 characters
Office of Procurement Services GOODS AND SERVICES COMPETITION IMPRACTICABLE FORM This form is to be used when a department believes an acquisition is considered Competition Impracticable and the acquisition dollar amount is above $5,000. The Chief Procurement Officer can approve purchases up to $100,000. Board of Supervisors approval is required if the acquisition is over $100,000. This form must be submitted for approval to: Office of Procurement Services | 160 S 4th Ave | Phoenix, AZ 85003. Fax number: 602.506.6766. The signed form must be retained in the purchasing file. Unless approved by the Board of Supervisors in a formal agenda item or the Chief Procurement Officer in a formal Contract a CI form is valid from July 1 thru June 30th of each Fiscal Year. DEPARTMENT NAME DEPARTMENT RX# PROPOSED CONTRACT VENDOR DESCRIPTION OF GOODS OR SERVICES REQUIRED: COMPETITION IMPRACTICABLE CATEGORY (Check applicable box, attach documentation or provide explanation below.) Maricopa County Procurement Code MC1-351 states: “Competition Impracticable” means an acquisition where, competition is impractical because of standardization, warranty, or other factors as approved by the Board of Supervisors. NOTE: The following are unlikely to be sufficient Competition Impracticable justifications: • Personal or department preference for a product or vendor • Department perception that the vendor is the best qualified (this should be determined through a competitive process) • Lack of department planning resulting in limited time to conduct a competitive procurement • Special incentive or deal offered (can be assessed in open and competitive solicitation) • Department convenience Maricopa County Department of Transportation / PC&I Division Grant specified (supporting documents attached) Mailing lists, subscriptions or media advertising Warranty voided if service provided by other contract vendor Other (Provide written explanation below) Other proprietary situation Brand compatibility available from only one source (no other distributors) Software license renewals, additions, or upgrades available from only one source Contact Name: Jay Guertin Fax: Phone: (480) 966-8295 Zip/Postal Code: 85281 City, State: Tempe, Arizona Address: 1230 W. Washington Street, Suite 405 Company: WSP, USA Inc NEED IDENTIFIED Date: Sep 2, 2020 REQUESTED DELIVERY Date: Oct 16, 2020 QUOTED PRICE: 795,906.91 The estimated cost of this Procurement is: ≤ $100k > $100k Is this a Technology Procurement? Yes No Construction administration services for the construction management and inspection of the TT0562 Olive Ave, Sarival Ave to Reems Rd, project that has been merged with the TT0561 Olive Ave, SR 303 to Sarival Ave, project due to funding reallocation that occurred in July, 2020 as a result of current fiscal impacts. Upon approval of this Competition Impractical, the construction administration services for TT0562 will be added by change order to WSP's Construction Administration Services contract for TT0561. Accounting String: SEARCH A search was conducted consisting of: (check all that apply) RESULTS Describe the search from above in detail: PRICE MC1-352-B states: The Using Agency requesting a Competition Impracticable Procurement shall provide written evidence to support a Competition Impracticable determination containing an explanation of why the proposed procurement process is advantageous to the County; and the scope, duration, and estimated total dollar value of the procurement. Price has been fairly and reasonably established by: Describe methodology and results (attach any written supporting data, e.g., survey or market analysis): The alternative would be to use a different consultant for the merged project. This would require the termination of the WSP contract and procurement of a construction administration services contract for the merged project through the competitive process. Use of a different construction administration consultant would be unacceptable because of unfamiliarity with the project including current construction coordination and mapping of utility relocation efforts, utility conflict history, resolution determinations, coordination with various utility entities and understanding of their immediate needs as it relates to the on going utility relocation. WSP has the history and detailed background on both projects necessary to perform the construction administration services for the additional work required due to the merging of project TT0562 into TT0561. WSP provided a scope and fee that is consistent with the approved contract rates of their current Contract 2018-056 and acceptable construction management practices for this type of work. Market research Other vendors contacted Public notice given, list Other no alternatives were identified no alternatives were deemed acceptable because (explain below): Comparison to previous comparable purchases from a different vendor Independent estimate Comparison to public sector contract pricing Discount off published catalog pricing Market survey Other, explain: THIS IS A COMPETITION IMPRACTICABLE PROCUREMENT BECAUSE (attach additional page if needed): Prior to merging TT0562 into TT0561, WSP was awarded the Construction Administration Services contract (2018-056) to perform construction management and inspection for TT0561 Olive Ave, SR 303 to Sarival Ave, which was planned to start construction in Fall 2020. The combined project is now planned to start construction in Fall 2021. WSP has the familiarity regarding the TT0562 project history including utility coordination status and design issues and has the insight to successfully complete the project. WSP is currently performing utility relocation inspection and monitoring on the utility relocation stage for TT0561. TT0562 utility relocation efforts are soon approaching due to the advancement of the design schedule to merge the TT0562 construction work into TT0561. It is in the best interest of MCDOT to utilize WSP for the merged project for consistency, efficiency and a net cost savings. By utilizing WSP, MCDOT anticipates a potential net cost savings of $95,000 in the pre-project/utility relocation stage and utilizing a different consultant at this stage of project development would be contrary to the best public interest. CERTIFICATIONS I certify: 1) I recognize that the Maricopa County Procurement Code requires the use of competitive solicitations unless exempted by law. I have reviewed the information and materials relevant to this procurement of goods and services, and am requesting approval of an exception to the competitive process for the reasons described; 2) the price to be paid to the proposed vendor is fair, reasonable, and provides the best value to Maricopa County; and 3) this request for an exception to the competitive solicitation process is not the result of inadequate advance planning or for purposes of securing the services of a preferred vendor. Department Head or Department Head Delegate Signature (Required) Office of Procurement Services Date Signature Printed Name Save Email Recommended to BOS for approval. Date Signature Printed Name The CPO can approve procurements up to $100,000. This request is over $100,000 and must be submitted as an agenda item to the Board of Supervisors for consideration. x 1 | P a g e Permitting, Construction and Inspections Division Permits Branch 2901 W. Durango Street Phoenix, AZ 85009 Phone: 602-506-8791 Fax: 602-506-4009 www.mcdot.maricopa.gov SCOPE OF WORK Construction Management Task TT0562 - Olive Ave Sarival to Reems Rd The tasks listed below are to supplement the basic tasks that are required of the CM Consultant Contract No. 2018-056. Also refer to the October 2015 Update of the MCDOT Construction Management Manual. Coordination and scheduling of these services with MCDOT staff, as outlined below and in Contract No. 2018-056. General Consultant is responsible for all aspects of this project and shall act on behalf of MCDOT. No federal funds are involved with this project, and, there are no IGA’s. Consultant shall represent MCDOT in coordination and communication with the Contractor, and other agencies as may be involved in the prosecution of this project. Consultant is to handle all problems/issues on the front-line, while keeping MCDOT informed. Unusual issues that require decisions by MCDOT should be referred to MCDOT with recommended solution. Keep MCDOT informed through email and telephone on a near daily basis. Copy MCDOT on important correspondence. MCDOT will attempt to attend weekly meetings and may make other occasional site visits. Reference WSP | MCDOT Contract 2018-056 (enclosed) for the Consultant’s Scope of Work as it applies to the additional construction management responsibilities associated with the construction activities of TT0562 except as modified below. The Consultant shall be given a set of 95% contract documents including, plans, special provisions, cross sections, environmental clearance and other documents deemed necessary to aid the Consultant in managing the project. The 100% and Sealed contract documents are anticipated to be delivered in the 1st quarter of 2021 and the Consultant shall be forwarded these submittal documents as they become available. September 16, 2020 Shawn Coleman Project Engineer Maricopa County DOT 2901 west Durango Phoenix, AZ 85009 RE: Olive Ave Sarival Ave to Reems MCDOT Project No. TT0592 Contract 2018-056 WSP Cost Proposal adding TT0562 to contract 2018-056 Dear Mr. Coleman updated cost proposal for Olive Ave Sarival Ave to Reems Rd, MCDOT Project No T0562, contract 2018-056. The increase to 2018-056 is $795,906.91 The update makes the estimate the addition of TT0562 will extend the construction time by 7 months. Please feel free to contact me at (480) 449-4615 if you have any questions or need additional information. Sincerely WSP Robert Winrow Project Manager C: file Attachments Digitally signed by Winrow, Robert (Winrow) DN: cn=Winrow, Robert (Winrow), ou=Active, email=BOB.WINROW@wsp.com Date: 2020.09.10 07:20:52 -07'00' Winrow, Robert (Winrow) Olive Avenue - SR 303L to Sarival Avenue WSP USA Inc. TT0561 Contract No. 2018-056 ESTIMATED DIRECT LABOR PERSON BILLING CLASSIFICATION HOURS RATE/HOUR TOTAL Senior Resident Engineer 320 81.95 $ 26,224 $ Resident Engineer / Materials Coordinator 1,170 48.08 $ 56,254 $ Chief Inspector /Project Supervisor 1,334 52.48 $ 70,008 $ Lead Inspector II 1,540 37.37 $ 57,550 $ Lead Inspector I - - $ - $ Inspector II - - $ - $ Inspector I - - $ - $ Field Office Manager 736 35.12 $ 25,848 $ 5,100 Hours Estimated Labor Cost 235,884 $ Overhead 115.90% 273,390 $ Subtotal 509,274 $ ESTIMATED DIRECT EXPENSES (Listed By Item At Estimated Actual Cost - NO MARKUP) Travel 31,510 $ Plotting $ Miscellaneous Expenses - $ Total Estimated Expenses 31,510.00 $ ESTIMATED OUTSIDE SERVICES AND CONSULTANTS Firm Cost ACS Services (DBE) 79,840.36 $ J2 Engineering (DBE) 25,939.23 $ HDR Construction Control Corporation 98,416.32 $ Total Estimated Outside Services DBE % 204,195.91 $ 13.29% PROFIT (Direct Labor +Overhead) 10% 50,927.00 $ TOTAL ESTIMATED FEE 795,906.91 $ CONTRACT TIME 400 Calendar Days (Figures Rounded To The Nearest $1) Consultant Firm Signature Date DERIVATION OF COST PROPOSAL SUMMARY 3/26/2013 Page 1 of 4 9/16/2020 Digitally signed by Guertin, Joseph (Guertin) DN: cn=Guertin, Joseph (Guertin), ou=Active, email=Jay.Guertin@wsp.com Date: 2020.09.16 15:08:46 -07'00' Guertin, Joseph (Guertin) Olive Avenue - SR 303L to Sarival Avenue WSP USA Inc. TT0561 Contract No. 2018-056 Scale No Shts Hours/ Sheet Senior Resident Engineer Resident Engineer / Materials Chief Inspector /Project Lead Inspector II Lead Inspector I Inspector II Inspector I Field Office Manager Total 81.95 $ 48.08 $ 52.48 $ 37.37 $ - $ - $ - $ 35.12 $ Pre-Project Constructability / Utility Oversight 30 60 224 40 354.0 During Construction 290 1110 1110 1540 696 4746.0 Post Construction # 320 1170 1334 1540 736 5100.0 TASK ESTIMATED STAFF HOURS - PHASE 3/26/2013 Page 2 of 4 CONSULTANT/SUBCONSULTANT NAME: WSP USA Inc. CONTRACT NO: 2018-056 Olive Avenue - SR 303L to Sarival Avenue 10/2/2019 MAN-HOURS PROJECT PERSONNEL SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN TOTALS Senior Resident Engineer 2 2 2 2 2 2 2 2 2 2 10 40 40 50 40 50 40 30 320 Resident Engineer / Materials Coordinator 2 2 2 2 2 2 2 2 2 2 40 160 160 180 160 170 160 120 1170 Chief Inspector /Project Supervisor 12 20 16 16 20 16 16 20 16 16 56 160 160 180 160 170 160 120 1334 Lead Inspector II 180 380 320 340 200 120 1540 Lead Inspector I 0 Inspector II 0 Inspector I 0 Field Office Manager 40 96 96 120 96 120 96 72 736 0 TOTAL 16 24 20 20 24 20 20 24 20 20 146 456 636 910 776 850 656 462 0 0 0 0 5100 CONSULTANT/SUBCONSULTANT SCHEDULED PROJECT MAN-HOURS 2020 2021 2022 ESTIMATED MAN-HOURS Olive Avenue - SR 303L to Sarival Avenue WSP USA Inc. TT0561 Contract No. 2018-056 Travel A. Local Mileage at 0.575 $ 54,800 miles Subtotal Travel 31,510.00 $ Plotting B. Exhibits at exhibits C. Plots at plots - $ D. Plan Submittals Half Size Bond Copies at Copies Full Size Bond Copies at Copies Subtotal Plotting - $ Miscellaneous Expenses C. Other - $ Subtotal Miscellaneous Expenses - $ ESTIMATED OUTSIDE SERVICES & CONSULTANTS ACS Services 79,840.36 $ J2 Engineering 25,939.23 $ HDR Construction Control Corporation 98,416.32 $ TOTAL ESTIMATED OUTSIDE SERVICES 204,195.91 $ TOTAL ESTIMATED EXPENSES 235,705.91 $ ESTIMATE OF DIRECT EXPENSES 3/26/2013 Page 4 of 4 No Optional Tasks (Inclusive of Consultant and Subconsultant[s] total proposed fee.) J2 Engineering & Environmental CONTRACT NO.: 2018-056 PROJECT NAME: TT0561 Olive SR303 to Sarival Modification to add TT0562 Olive Ave Sarival to Reems Classifications Man-hours Hourly Rates Labor Costs Sr. Resident Engineer $0.00 Resident Engineer $0.00 Project Supervisor $0.00 Lead Inspector II (Roadway & Traffic) $0.00 Lead Inspector II (Electrical) $0.00 Lead Inspector I (Material Coordinator) $0.00 Lead Inspector I (Environmental Compliance) 240 $41.88 $10,051.20 Inspector II $0.00 Inspector I $0.00 Project Administration $0.00 $10,051.20 ___134.61___% of Direct Labor $13,529.92 10% of Direct Labor + Overhead $2,358.11 $25,939.23 EXPENSE AMOUNT $0.00 $0.00 $0.00 Cost Proposal Summary (No Optional Tasks ) Maricopa County Department of Transportation DIRECT LABOR FEE PROPOSAL - TABLE A CONSULTANT COST PROPOSAL SUMMARY Page 1 of 3 DESCRIPTION Mileage Premium Over Time DIRECT AND OUTSIDE EXPENSES NAME OF SUBCONSULTANT TOTAL COST Total Subconsultant(s) $0.00 Consultant's Total Direct Labor $25,939.23 Consultant's Total Direct and Outside Expenses $0.00 Total: $25,939.23 Consultant's Totals of Direct Labor and Direct and Outside Expenses $25,939.23 TOTAL PROPOSED FEE $25,939.23 (Inclusive of Consultant and Subconsultant[s] total proposed f J2 Engineering & Environmental Firm Signature Project Landscape Architect Title 08/25/20 Date Cost Proposal Summary (No Optional Tasks) Maricopa County Department of Transportation SUBCONSULTANT(s) FEE PROPOSAL - TABLE A CONSULTANT COST PROPOSAL SUMMARY TASK Page 2 of 3