September 2, 2020
S2019025
Page 1 of 2
Report to the Board of Supervisors
Prepared by the Maricopa County Planning and Development Department
Board Hearing Date:
September 2, 2020
Case #/Title:
S2019025 – Azure Canyon Parcel 2
Supervisor District:
4
Applicant/Owner:
HilgartWilson, LLC / Mattamy Arizona LLC
Request:
Final Plat of Parcel 2 which includes a replat of the Azure
Canyon Infrastructure Plat Parcel 2 which consists of 154
residential lots and 19 tracts in the R1-10 RUPD zoning district
Site Location:
Generally located at the northwest corner of 184th Ave.
alignment and Camelback Rd. in the Glendale area
Site Size:
Approximately 51.8 acres
County Island Status:
Yes (Glendale)
Additional
Comments:
Staff considers this replat to be in substantial conformance
with the approved Azure Canyon Preliminary Plat Extension
(S2019003). The applicant has routed a copy of the plat to all
the municipalities within three miles of the subject property
and to all intended utility providers. There were no objections
to the request raised by any of these agencies. The replat
meets all applicable subdivision regulations and zoning
regulations of the R-10 RUPD standards (Z2012097).
Recording fees will be furnished at the time of plat
recordation. All requirements of the Maricopa County
Department
of
Transportation,
the
Maricopa
County
Environmental Services Department, the Flood Control District
of Maricopa County, and the Drainage Review Division of the
Maricopa County Planning and Development Department
have been met.
Recommendation:
Approval
Presented by:
Rachel Applegate, Senior Planner
Reviewed by:
Darren Gerard, AICP, Planning Manager
Attachments:
Letter to the Board of Supervisors (1 page)
Reduction of Plat (7 pages)
Narrative Report Summary (8 pages)
September 2, 2020
S2019025
Page 2 of 2
ADWR Certificate (1 page)
Enclosure:
Sealed mylars (1 set)
l .§11
ENGINEER I PLAN I
SURVEY I MANAGE
July 9, 2020
Maricopa County Board of Supervisors
301 W. Jefferson, 10th Floor
Phoenix, AZ. 85003
RE:
Final Plat for Azure Canyon - Parcel 2
HILGARTWILSON Project No.: 1228.05
Dear Board,
This letter is to request the approval of the Parcel 2 Final Plat for Azure Canyon.
This parcel is being subdivided by:
Mattamy Homes
9200 E. Pima Parkway
Scottsdale, AZ 85258
The plat was prepared by:
HILGARTWILSON, LLC
RLS# 19344: Kirk J. Pangus
The project is within 3 miles of the City of Goodyear, the City of Buckeye, and the City of Glendale and the plat
has been provided to them.
Thank you,
Zach Hilgart, P.E.
Respectfully Submitted,
HILGARTWILSON, LLC
2141 East Highland Avenue, Suite 250 • Phoenix, Arizona 85016 • 602-490-0535
1
of
1
P: 602.490.0535 / F: 602.368.2436
www.hilgartwilson.com
2141 E. HIGHLAND AVE., STE. 250
PHOENIX, AZ 85016
FINAL PLAT
OF
"AZURE CANYON - PARCEL 2"
AN PLANNED RESIDENTIAL DEVELOPMENT
SUBJECT TO SINGLE FAMILY DESIGN REVIEW
MARICOPA COUNTY, ARIZONA
CASE NUMBER: S2019025
7/15/2020
P: 602.490.0535 / F: 602.368.2436
www.hilgartwilson.com
2141 E. HIGHLAND AVE., STE. 250
PHOENIX, AZ 85016
7/15/2020
P: 602.490.0535 / F: 602.368.2436
www.hilgartwilson.com
2141 E. HIGHLAND AVE., STE. 250
PHOENIX, AZ 85016
7/15/2020
P: 602.490.0535 / F: 602.368.2436
www.hilgartwilson.com
2141 E. HIGHLAND AVE., STE. 250
PHOENIX, AZ 85016
7/15/2020
P: 602.490.0535 / F: 602.368.2436
www.hilgartwilson.com
2141 E. HIGHLAND AVE., STE. 250
PHOENIX, AZ 85016
7/15/2020
P: 602.490.0535 / F: 602.368.2436
www.hilgartwilson.com
2141 E. HIGHLAND AVE., STE. 250
PHOENIX, AZ 85016
7/15/2020
P: 602.490.0535 / F: 602.368.2436
www.hilgartwilson.com
2141 E. HIGHLAND AVE., STE. 250
PHOENIX, AZ 85016
7/15/2020
p
AZURE CANYON
Preliminary Plat
Narrative
TABLE OF
CONTENTS
FINAL PLAT NARRATIVE
FOR
AZURE CANYON – PARCEL 2
NORTH OF CAMELBACK ROAD BETWEEN PERRYVILLE ROAD & CITRUS
ROAD
MARICOPA COUNTY, ARIZONA
CASE # S2019003
July 31, 2019
Prepared For:
Mattamy Homes
9200 East Pima Center
Parkway, Suite 160
Scottsdale, Arizona
85258
Prepared by:
HILGARTWILSON
2141 E. Highland
Avenue, Suite 250
Phoenix, AZ 85016
Phone: (602) 490-0535
1.0
PURPOSE OF REQUEST .............................................................................................................. 1
2.0 DESCRIPTION OF PROPOSAL ..................................................................................................... 1
3.0
RELATIONSHIP TO SURROUNDING PROPERTIES ....................................................................... 3
4.0
LOCATION AND ACCESSIBILITY .................................................................................................. 3
5.0 DEVELOPMENT SCHEDULE ........................................................................................................ 4
6.0 RETENTION ................................................................................................................................. 4
7.0
COMMUNITY FACILITIES AND SERVICES.................................................................................... 5
7.1
General Community Facilities ............................................................................................. 5
7.2
Schools ................................................................................................................................. 5
7.3
Police/Fire ............................................................................................................................ 5
8.0
COMMUNITY FACILITIES AND SERVICES.................................................................................... 6
9.0
CONFORMANCE TO COMPREHENSIVE PLAN AMENDMENT STIPULATIONS (CPA2012012) ..... 6
10.0
CONFORMANCE TO ZONING STIPULATIONS (Z2012097) ......................................................... 7
Figures
Figure 1 – Vicinity Map & City Limits
Figure 2 – Luke AFB Compatibility
Figure 3 – Surrounding Properties and Zoning Map
Figure 4 – Phasing Plan
Appendices
Appendix A – Figures
Appendix B – Zoning Stipulations (CPA2012012, Zoning Case Z2012097)
Page 1
1.0 PURPOSE OF REQUEST
Azure Canyon is a proposed single family residential subdivision located on approximately 135.6 net
acres. The Project was formerly known and entitled under the name of “Russell Ranch South”, and
may be referred to as such in this report. The Project area is generally situated north of Camelback
Road between Perryville Road to the west and 181st Avenue to the east in section 15, Township 2
North, Range 2 West. Refer to Figure 1, Vicinity Map for the Project Location.
The Project is located in unincorporated Maricopa County, and underwent a Comprehensive Plan
Amendment (CPA2012012) and rezoning in the County from R1-18 RUPD to R1-10 RUPD and R1-18
RUPD (Z2012097), approved by the Board of Supervisors on February 20, 2015. A Preliminary Plat
(S2012007) was approved on February 6, 2016 by the Planning and Zoning Commission with an
extension (S2018011) approved on April 16, 2018. Both of these are now expired. A new Preliminary
Plat for the project (S2019003) is currently under review and targeting inclusion on the August 15
Planning and Zoning Commission agenda.
The Project is located approximately 2.5 miles southwest of Luke Air Force Base, approximately three-
quarters of a mile beyond the 65 Ldn noise contours. The Property is within the Luke Air Force Base
Graduated Density and within the “vicinity of a military airport”. Refer to Figure 2, Luke AFB
Compatibility.
The site plan is depicted on Figure 4 – Phasing Plan.
2.0 DESCRIPTION OF PROPOSAL
This narrative is for Parcel 2 of Azure Canyon. Parcel 2 includes 154 and 19 tracts. It will re-plat Parcel
2, which was dedicated in the Azure Canyon Infrastructure Plat.
Parcel 2 is included within Azure Canyon RUPD (Case Z2012097). The RUPD table from the report is
included with this narrative:
Page 2
R1-10 RUPD DEVELOPMENT STANDARDS
Page 3
3.0
RELATIONSHIP TO SURROUNDING PROPERTIES
The Project lies within unincorporated Maricopa County. The adjacent properties to the west, north,
and east of the Project are also within unincorporated Maricopa County, while the property to the south
lies within the Goodyear city limits. The surrounding properties are in various stages of development.
Refer to Surrounding Properties and Zoning Map for specific locations and existing zoning of adjacent
properties.
West
The adjacent property to the west, across Perryville Road, is Zanjero Trails. It is currently under
development within unincorporated Maricopa County. From south to north, the zoning ranges from C-
2 RUPD, R-2 RUPD, and R1-6 RUPD, each with a PAD overlay.
North
The adjacent property to the north (western portion) is Savannah. It is fully developed within
unincorporated Maricopa County with a zoning district of R1-10. The adjacent property to the north
(eastern portion) is Russell Ranch South, Phase III which is under various stages of development and
is within unincorporated Maricopa County with a zoning district of R1-18 RUPD.
East
The adjacent property to the east consists of 3 land categories. The northern portion is Russell Ranch,
Phase I. It is developed large lot custom home property. It is within unincorporated Maricopa County
with a zoning district of R1-18 RUPD. The central portion is the EPCOR Russell Ranch Wastewater
Treatment Facility. The southern portion is privately owned property that is vacant and graded and
within unincorporated Maricopa County with a zoning district of RU–43.
South
The adjacent property to the south, across Camelback Road, is Sedella and is within the City of
Goodyear. It is currently under development and actively selling homes. The site is zoned Planned Area
Development (PAD) District.
4.0 LOCATION AND ACCESSIBILITY
The perimeter streets include Perryville Road, Camelback Road, and 181st Avenue.
Perryville Road
•
Existing 33-foot roadway easement
•
Half–street right-of-way (65’) adjacent to the Project perimeter to be dedicated at the
time of Final Plat
Camelback Road
•
Existing 45-foot roadway easement for most of Camelback Road and a 65-foot
roadway dedication (via previously recorded final plat) for a portion immediately west
of 181st Avenue
•
Half–street right-of-way (65’) adjacent to the Project perimeter, not previously
dedicated with Russell Ranch Phase IV Final Plat, to be dedicated at the time of Final
Plat
•
To be reviewed, approved, inspected and ultimately owned and maintained by the City
of Goodyear
Page 4
181st Avenue
•
Existing 30-foot roadway dedication
•
Half–street right-of-way adjacent to the Project perimeter was dedicated with Russell
Ranch Phase IV Final Plat
Internal Street Network
•
Public Local
•
Ultimate 50-foot right-of-way
•
Street right-of-way to be dedicated at time of Final Plat
•
Street improvements, including street lighting, to be constructed at time of
development
•
As part of this application, a waiver from Plate 10 of the Maricopa County Subdivision
regulations is requested for 183rd Avenue, which provides frontage for more than 15
lots.
Pedestrian Circulation
An internal trail system circulates throughout the community linking homes with the
various parks and the assortment of community amenities distributed throughout the
Project. The trails are stabilized decomposed granite and where appropriate, paved
surfaces.
5.0 DEVELOPMENT SCHEDULE
Development of the Project will commence upon review and approval of the construction plans and
final plats. The Project is anticipated to develop in four phases as shown in Figure 4 – Phasing Plan.
Phasing is subjected to change at the time of Final Plat based upon market conditions, industry factors,
and/or business considerations. The required infrastructure shall be in place with each phase of
development.
An Infrastructure Subdivision Plat has been submitted to dedicate the offsite roadways and the four
phases. The first phase will include a Model Home Complex (Parcel 1). The second and third phases
will include the balance of the R1-10 lots (Parcels 2 and 3), and the fourth phase will include the R1-
18 lots (Parcel 4).
6.0 RETENTION
Temporary retention basins are currently in place to mitigate the deficit in retention within Russell
Ranch Phases I-III as described in the development agreement between Maricopa County and the
property owner, MCR# 2011-0296740, recorded April 7, 2011. Survey of these temporary basins
show they contain 23.18 acre-feet of retention storage and are maintained as required. These
temporary retention basins will remain in place until they are replaced by new retention basins which
will be constructed concurrent with the first phase. These new basins will provide 15.62 acre-feet of
storage to mitigate the deficit plus the additional volume required for onsite storage in Parcels 3 and
4 fulfilling the requirements of the development agreement. The proposed drywells depicted in the
mass grading plans will be modified once installation and testing is complete on the initial drywell,
which will be installed under a separate permit. Additional dewatering measures are also being
Page 5
concurrently pursued with ADOT, to allow the basins to dewater via a permanent bleed-off system to
the Loop 303.
7.0 COMMUNITY FACILITIES AND SERVICES
7.1 General Community Facilities
The nearest public library is the Litchfield Park Branch Library located approximately
six miles east at 101 W Wigwam Boulevard, Litchfield Park, Arizona 85340.
The nearest public hospital is the West Valley Hospital located approximately seven
miles southeast at 13677 W McDowell Road, Goodyear, Arizona, 85395.
7.2 Schools
The Project will be served by the Litchfield Elementary School District for elementary
students’ grades K through 8. Per the Litchfield Elementary School District Boundaries
map, the elementary school students will initially attend the Scott L. Libby Elementary
School located at 18701 W Thomas Road, Litchfield Park, Arizona, 85340, which is
approximately 1 mile from the Community. Litchfield Elementary School District -
School #16 is currently under design within the Sedella master planned community,
18601 W Campbell, which is across Perryville Road from the Community. The
anticipated opening of the school is August 2019.
The Project will be served by the Agua Fria Union High School District for students in
grades 9 through 12. Per the Agua Fria Union High School District Attendance
Boundaries map, the high school students will attend Verrado High School located at
20050 W Indian School Road, Buckeye, Arizona 85396, which is approximately 1 mile
from the Project. Canyon View High School opened in August 2018 and is located in
the Zanjero Trails master planned community at the northwest corner of Perryville
Road and Bethany Home Road approximately 1.5 miles from the Project.
7.3 Police/Fire
It is anticipated the Project will be served by Rural/Metro Fire Department. The nearest
Rural/Metro Fire Department is located approximately five miles northeast at 16805
W Olive Avenue, Waddell, Arizona 85355. The next closest fire department is located
approximately six miles southeast at 105 W Desert Avenue, Litchfield Park, Arizona
85340.
The Project will be served by Maricopa County Sheriff Department. The nearest sheriff
department is located approximately eight miles southeast at 920 E Van Buren Street,
Avondale, Arizona 85323, generally northeast of Van Buren Street and Dysart Road.
Applicant met with representatives of Rural/Metro and will meet with the Sheriff’s
office to better understand the current demands and will work closely with both
Rural/Metro and Sheriff’s office to better insure future demands and appropriate
levels of service are met.
Page 6
8.0 COMMUNITY FACILITIES AND SERVICES
All necessary utilities to serve the Project are currently available or will be brought to the site during
development. Utilities and services for the Project will be provided by the following providers.
•
Water: EPCOR Water
•
Wastewater: Liberty Utilities (Parcels 1 and 2)
EPCOR Water (Parcels 3 and 4)
•
Electrical: APS
•
Telephone: Century Link
•
Cable: Cox
•
Natural Gas: Southwest Gas
9.0 CONFORMANCE TO COMPREHENSIVE PLAN AMENDMENT STIPULATIONS (CPA2012012)
a.
Development and use of the site shall comply with the Narrative Report entitled “Russell
Ranch South”, including all exhibits dated revised June 12, 2014, and stamped received
June 13, 2014, except as modified by the following conditions.
Response: This development of the Project complies with the Narrative Report entitled
“Russell Ranch South”, including all exhibits dated revised June 12, 2014, and stamped
received June 13, 2014.
b.
If the Board takes action to amend or revert/rescind subsequent zoning, this land
use plan shall be considered for amendment.
Response: The developer understands this stipulation.
c.
The total number of the residential units shall not exceed 333 dwelling units.
Response: The development of this site complies with this stipulation with 333 lots
included on the Preliminary Plat.
d.
Not less than 27 acres shall be developed as open space to include Neighborhood
Park, pocket parks and as internal trail system. At the time of each preliminary plat
submission, the developer shall include a description of the status, cumulative acreage
and proposed amenities.
Response: The development plan for the Project includes over the minimum 27 acres
open space required.
e.
The following Maricopa County Flood Control District (FCD) conditions shall apply:
1. A Floodplain Use Permit must be obtained from the Floodplain Management and
services Division of the Flood Control District.
STATE OF ARIZONA
DEPARTMENT OF WATER RESOURCES
CERTIFICATE OF ASSURED WATER SUPPLY
This is to certify that
Mattamy Arizona, LLC, an Arizona limited liability company, Owner,
has met the requirements of A.R.S. §§ 45-576 and A.A.C.R12-15-701 et. seq., and
By powers vested in the Director of the Arizona Department of Water Resources by the State
of Arizona, and subject to the conditions contained in A.A.C. R12-15-701 et seq.,
is issued this Certificate of Assured Water Supply for
Azure Canyon Parcels 1 & 2
Township 2 North, Range 2 West, Section 15
GSRB&M Maricopa County, PHOENIX AMA
The referenced subdivision consists of 180 lots as described in the preliminary plat on file with the
Department, and has an estimated water demand of 104.78 acre-feet per year. The subdivision
will be served groundwater by EPCOR - Agua Fria.
This Certificate is invalid as to any entity not named above.
This Certificate may be assigned pursuant to A.A.C. R12-15-705.
Certificate Number: 27-701080.0000