190035-CHANGE ORDER #2.PDF

Maricopa County — Formal (2020-08-19)

View PDF Item 73 Meeting page

Extracted text (via pymupdf) 24287 characters
Procurement Type:        Article 3           Article 5          Article 5 Term  
 Other (please specify)  
      
    New Delivery Order 
 
 
 
 
 
Project Manager: 
 
 
     TM or CO #:  
 
 
 
 
                 Phone #: 
 
 
Date:  
 
 
 
 
 
 
 
Project #: 
 
 
 
 
 
 
 
 
 
 
 
Vendor Name: 
 
 
 
 
 
 
Project Name: 
 
Contract #: 
 
 
 
 
 
 
Location Name: 
 
 
 
 
 
 
 
  
 
Delivery Order #:   
 
 
 
 
 
Amount:  
 
 
 
 
  
 
 
Funding Source:      MM        CIP      Annual Funds      User Funds     
  
 
FUND
DEPT 
UNIT 
ACTIVITY
APPR UNIT
OBJ/SUB 
LOCATION 
(Bldg #) 
PROGRAM 
PHASE 
AMOUNT 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
APPROVAL OR REVIEW REQUIRED
DATE
 
INITIAL
 
1. 
 
All information has been reviewed by Project Manager 
 
 
 
 
2. 
 
FMD Deputy Director Approval 
 
 
 
 
3. 
 
FMD Director Approval 
 
 
 
 
 
4. 
Additional Special or Requested Review (Specify) 
 
5. 
Budget Analyst Review  
 
 
 
6. 
FMD Procurement Review 
 
 
 
7. 
OPS Article 5 Change Order Processing (If Applicable) 
 
 
 
8. 
Delivery Order Processing 
 
 
 
9. 
Deliver Order Released (Sent to PM) 
 
 
 
 
 
Deliver Order Total to Date
$ 
 
DESCRIPTION OF PROJECT SCOPE OR CHANGE ORDER: 
(A total summary of all Task Modifications or Change Orders to date should be provided above, if space is limited insert below) 
 
 
 
 
Required Attachments: 1. Vendor Proposal with Supporting Documentation & Schedule 2. Task Mod/Change Order Signature Sheet (If Applicable)     
3. Vendor rate sheet from contract (PM to verify and initial rates on vendor proposal) 4. Budget Summary and Estimate Sheets 
 
*For Article 5 Change Orders please provide the signature authority matrix 
 
 
Maricopa County
Facilities Management Department
Rev 
01/2020
 
Delivery Order, Task Modification, & Change Order Routing Form
Article
 
 
 
 
 
  RW
BC
2
7/16/20
Brian Sheehan
6-0369
3310-18-0818
301 Restack
Dekker Perich Sabatini
190035
301 Admin
$47,399.64
19*9628
441
D470
4713
FACM
ADBR
9150-11
3310
ADBR
CAPBLD
$47,399.64
7/16/20
7/17/20
7/17/20
7/17/20
205,800+1,322,422+Current= $1,575,621.64
Three Add Services for electrical engineering services for upgrades to the building UPS system, floor plan
revisions to 2nd and 3rd floor Assessor's Department, 7th floor doors, additional 9th floor office and
workstations and for counter revisions at the 1st floor combined counter and 2nd floor Assessor's counter.
I
I
I

ARTICLE 5 CONTRACT MODIFICATION AUTHORITY
NON-CONSTRUCTION
CONSTRUCTION
Original Contract Fee
Modification Limit
 Original Contract
Value
Modification Limit
$                 1 - 1000
CAPA Ceiling
$                1- 1,000
CAPA Ceiling
0
0
$
10,000
$
6,000
$
10,000
$
6,000
0
0
$
100,000
$
40,000
$
100,000
$
40,000
0
0
$
200,000
$
60,000
$
200,000
$
60,000
$
205,800.00
$
60,870.00
0
$
300,000
$
75,000
$
300,000
$
75,000
0
0
$
400,000
$
85,000
$
400,000
$
90,000
0
0
$
500,000
$
90,000
$
500,000
$
107,500
0
0
$
750,000
$
93,750
$
1,000,000
$
200,000
0
0
$
1,000,000
$
97,500
$
2,000,000
$
245,000
0
0
$
1,500,000
$
100,000
$
3,000,000
$
250,000
Insert Original Contract
Value Here:
$205,800.00
Insert Original Contract
Value Here:
$0.00
0
Maximum
Cummulative Change
Order Authority for
FMD Director
$60,870.00
Maximum
Cummulative Change
Order Authority for
FMD Director
$0.00
INSTRUCTIONS
1.  Insert the ORIGINAL value of your contract into the RED box.
2.  The maximum CUMMULATIVE change order authority for the FMD Director will appear in the BLUE
3.  If your contract exceeds $3,000,000, the maximum cummulative change order authority for the FMD
4.  If your cummulative change orders exceed the amount in the BLUE box, but are less than $1 Million,
5.  If your cummulative change orders exceed $1 Million, then the change order must be signed by the
6.  Deductive change orders, changes to time only or changes to the terms of a contract only can be
7.  Any major changes to the scope of the project, as determined by FMD Management, require
8.  Print this page and attach to change order routing sheet.

June 4, 2020 
  
Brian Sheehan 
Capital Project Manager 
Maricopa County | Facilities Management Department 
401 W Jefferson St | Phoenix, Arizona | 85003 
BrianSheehan@ maricopa.gov 
 
Re: 
Maricopa County 301 Building Restack project located at 301 W. Jefferson St, 
Phoenix, AZ 85003 
 
Architectural & Engineering Services 
 
Additional Services #2 Proposal 
 
Dear Brian: 
 
Dekker/Perich/Sabatini is pleased to submit this proposal for additional professional design services for 
the above referenced project. The scope of the additional services is to address drawing changes 
requested by OET on May 13, 2020 detailed in the attached memo from Bridgers & Paxton. 
 
As we’ve submitted drawings for permit on Monday, March 13, 2020, so these additional services consist 
of reworking portions Construction Documents.  
 
The changes described above require electrical engineering services only. Architecture, mechanical, and 
structural engineering do not require any additional fees. 
 
We propose to provide the additional services described above for additional professional electrical 
engineering design services will be a lump sum fee as indicated below: 
 
Total cost of services -  
 
 
 
 
 
 
 
$   4,674.00 
 
This proposal amends our original contact which consists of our proposal letter dated April 23, 2019 and 
the Maricopa County/DPS Master Agreement dated January 9, 2019. 
 
Brian, thank you for the opportunity to submit this proposal. If you find it acceptable, please forward a 
signed copy back to us. As always, feel free to call if you have any questions about anything contained 
herein or require additional information.   
 
Best Regards, 
Dekker/Perich/Sabatini 
 
 
 
Adrienne Lewis, AIA 
Principal  
 
APPROVED:   
 
 
 
 
   
         
DATE:  
 
 
   
 
for Maricopa County

1839 S. Alma School Rd, Suite 300 
Mesa, AZ  85210 
main 602.996.6399 www.bpce.com
DATE:  June 2, 2020 
B&P PROJECT NO:  8040.00 
 
ADDITIONAL SERVICE REQUEST - 02 
 
PROJECT TITLE:  MCF 301 ADMINISTRATION BUILDING RESTACK 
CLIENT NAME/PROJECT MANAGER:  Brian Sheehan 
B&P PRINCIPAL-IN-CHARGE:  John Montaño, P.E. 
DESCRIPTION OF SERVICES:   
Technology Floor Plan updates per OET comments 
 
Following is our understanding of the Additional services: 
 
Additional services is being requested to address drawing changes per OET comments provide after the 
100% CD submittal.  
 
1. Some comments deviate from the OET standards guide we were provided at the beginning of the 
project. For example, OET is requesting all Wireless Access Points to utilize Category 6A cabling 
and not Category 6 as called out in the OET Standards guide. Change requires updates to plan  
General Notes, Keynote, Rack Elevation and Cabling Specification. 
 
2. There was a note on T401 advising mistakes to the Rack Elevation Detail, that detail was taken 
from the OET Standards Document and modified for this project. Coordination with OET will be 
required to determine the modification required for the rack elevation.  
 
3. On all floor plan sheets there are multiple questions/comments/suggestions on cable tray and 
conduit routing. For the most part those will require us to go back through the model and verify if 
cable tray can be moved or added as requested on the OET mark ups.  Will also need to coordinate 
with mechanical, plumbing and electrical to determine if modifications will affect their plans.   
 
4. Will need to update EZPATH devices. 
 
5. Will Review conduit comments and coordinate with OET for any potential conflicts. 
 
6. OET has commented that in the telecom rooms basket style cable tray is preferred and not the  
ladder style tray. We will update all the telecom room details, T501 Details and the specification. 
 
We propose a lump Sum fee proposal as indicated in the attached task breakout. 
 
If the above described services and fees meet with your approval, please return a signed copy of this 
form to our office so that we may proceed.  We will await your authorization prior to proceeding with any 
additional work associated with this proposal. 
 
 
AUTHORIZED SIGNATURE 
DATE

Electrical  Fee Summary
Add Services #2- OET changes
programming hours
programming fee
SD Hours
SD Fee
DD Hours
DD Fee
50% CD Hours
50% Cd Fee
100% CD Hours
100% CD Fee
CA Hours
CA Fee
Hourly Rate
Principal
$185
2.00
$370.00
PM
$160
Senior Engineer
$135
Project Engineer
$115
16.00
$1,840.00
Engineer
$98
Engineer Intern
$85
Senior Designer
$120
Project Designer
$88
28.00
$2,464.00
designer
$72
BIM services
$100
CADD Tech
$62
admin
$60
Estimate/CA
$110
Phase Totals
0.00
0
0.00
$0.00
0.00
$0.00
0.00
$0.00
46.00
$4,674.00
0.00
$0.00
Add Service #2 Electrical  Fee Total
$4,674.00
Security  Fee Summary
programming hours
programming fee
SD Hours
SD Fee
DD Hours
DD Fee
50% CD Hours
50% Cd Fee
100% CD Hours
100% CD Fee
CA Hours
CA Fee
Hourly Rate
Principal
$150
PE
$135
Designer/Drafter
$125
Clerical
$125
Phase Totals
0.00
0
0.00
0
0.00
0
0.00
0
0.00
0
0.00
0
Security  Fee Total
Estimator  Fee Summary
programming hours
programming fee
SD Hours
SD Fee
DD Hours
DD Fee
50% CD Hours
50% Cd Fee
100% CD Hours
100% CD Fee
CA Hours
CA Fee
Hourly Rate
Principal
$150
PE
$135
Estimator
$125
Designer/Drafter
$125
Clerical
$125
Phase Totals
0.00
0
0.00
0
0.00
0
0.00
0
0.00
0
0.00
0
Estimator  Fee Total

July 15, 2020 
  
Brian Sheehan 
Capital Project Manager 
Maricopa County | Facilities Management Department 
401 W Jefferson St | Phoenix, Arizona | 85003 
BrianSheehan@ maricopa.gov 
 
Re: 
Maricopa County 301 Building Restack project located at 301 W. Jefferson St, 
Phoenix, AZ 85003 
 
Architectural & Engineering Services 
 
Additional Services #3 Proposal_R1 
 
Dear Brian: 
 
Dekker/Perich/Sabatini is pleased to submit this proposal for additional professional design services for 
the above referenced project. The scope of the additional services consists of redesign of the County 
Assessor spaces on the second and third floors. Additionally, electrical and mechanical engineering 
incurred additional fees for modifications made to the 7th and 9th floors which are included in their fee. 
Please see enclosed letter from Bridgers & Paxton that references these modifications. 
 
As we’ve submitted drawings for permit on Monday, March 13, 2020, so these additional services consist 
of reworking portions Construction Documents.  
 
The changes described above require architecture, mechanical, and electrical engineering services only. 
The structural engineers do not require any additional fees. 
 
We propose to provide the additional services described above for additional professional architectural 
and MEP design services will be a lump sum fee as broken out below: 
 
Architectural Services - 
  
 
 
 
 
 
 
$   17,260.00 
Mechanical Services -   
 
 
 
 
 
 
 
$     3,553.64 
 
Electrical Services -   
 
 
 
 
 
 
 
$   12,738.00 
Total cost of services -  
 
 
 
 
 
 
 
$   33,551.64 
 
This proposal amends our original contact which consists of our proposal letter dated April 23, 2019 and 
the Maricopa County/DPS Master Agreement dated January 9, 2019. 
 
Brian, thank you for the opportunity to submit this proposal. If you find it acceptable, please forward a 
signed copy back to us. As always, feel free to call if you have any questions about anything contained 
herein or require additional information.   
 
Best Regards, 
Dekker/Perich/Sabatini 
 
 
 
Adrienne Lewis, AIA 
Principal  
 
 
 
APPROVED:   
 
 
 
 
   
         
DATE:  
 
 
   
 
for Maricopa County

1839 S. Alma School Rd, Suite 300 
Mesa, AZ  85210 
main 602.996.6399 www.bpce.com
DATE:  July 13, 2020 
B&P PROJECT NO:  8040.00 
 
ADDITIONAL SERVICE REQUEST – 04 REV 01 
 
PROJECT TITLE:  MCF 301 ADMINISTRATION BUILDING RESTACK 
CLIENT NAME/PROJECT MANAGER:  Brian Sheehan 
B&P PRINCIPAL-IN-CHARGE:  John Montaño, P.E. 
DESCRIPTION OF SERVICES:   
1st, 2nd , 7th and 9th Floor counters Modifications 
 
Additional services is being requested to address drawing changes as follows: 
A. 1st (Lobby 2086) and 2nd floor (waiting 1077/open office 1063) Counters Modifications as follows:  
1. Glazing will be added to separate cope:  Change our construction drawings for the modified 
counters that will add glazing for COVID considerations.   
2. Electrical Scope:  will evaluate if a new luminaire will be provided, however, glare may be an 
issue which will require removal of the counter downlights.  Electrical lighting plans will be 
updated, Update panel schedules, update load calculation. 
3. Mechanical Scope:  No Scope anticipated as ductwork for the spaces is dedicated to each space.  
4. Plumbing Scope:  No scope. 
5. Technology Scope:  No scope. 
 
B. 7th Floor add 2 doors to isolate the SW open office area  
1. Electrical Scope:  modify luminaire locations at new door locations. Devices to remain, add exit 
light at each location.    
2. Mechanical Scope: No scope.   
3. Plumbing Scope:  No scope. 
4. Technology Scope:  No scope. 
 
C. 9th Floor (Director 9037) will be slightly smaller with added room WFD (9087)  
1. Electrical Scope:  Change Lighting, receptacles, branch circuiting update panelboard schedules 
and loads.  
2. Mechanical Scope: change ductwork layout, update HVAC heat load calculations,  
3. Plumbing Scope: no scope 
4. Technology Scope:  change device layout and  
 
We propose a lump Sum fee proposal as indicated in the attached task breakout. 
 
If the above described services and fees meet with your approval, please return a signed copy of this 
form to our office so that we may proceed.  We will await your authorization prior to proceeding with any 
additional work associated with this proposal. 
 
 
AUTHORIZED SIGNATURE 
DATE

Maricopa County 301 Admin restack - Fee summary sheet
Dekker/Perich/Sabatini
Fee Summary Sheet
Proposal Date
7/15/2020
Architect  Fee Summary
Add Services #3- Assessor's 2nd and 3rd Floor Rework
programming hours
programming fee
SD Hours
SD Fee
DD Hours
DD Fee
50% CD Hours
50% Cd Fee
100% CD Hours
100% CD Fee
CA Hours
CA Fee
Hourly Rate
Principal III
$250
Principal II
$210
12.00
$2,520.00
Principal I
$170
Architect III
$150
Architect II
$120
Architect I
$100
Construction administrator
$110
Project Manager
$150
20.00
$3,000.00
Project Arcitect
$120
28.00
$3,360.00
Intern Architect II
$90
30.00
$2,700.00
Intern Architect I
$70
24.00
$1,680.00
Interior Designer III
$130
Interior Designer II
$100
40.00
$4,000.00
Interior Designer 
$80
Interior Design Intern II
$75
Interior Design Intern I
$65
Spec Writer
$125
Drafter
$70
Clerical
$65
0.00
0.00
Phase Totals
0.00
$0.00
0.00
$0.00
154.00
$17,260.00
0.00
$0.00
#REF!
#REF!
#REF!
#REF!
Architect  Fee Total
$17,260.00
Geotech  Fee Summary
programming hours
programming fee
SD Hours
SD Fee
DD Hours
DD Fee
50% CD Hours
50% Cd Fee
100% CD Hours
100% CD Fee
CA Hours
CA Fee
Hourly Rate
Principal
$150
PE
$135
Designer/Drafter
$125
Clerical
$60
Phase Totals
0.00
0
0.00
0
0.00
0
0.00
0
0.00
0
0.00
0
Geotech  Fee Total
Civil  Fee Summary
programming hours
programming fee
SD Hours
SD Fee
DD Hours
DD Fee
50% CD Hours
50% Cd Fee
100% CD Hours
100% CD Fee
CA Hours
CA Fee
Hourly Rate
Principal
$150
PE
$135
Designer/Drafter
$125
Clerical
$125
Phase Totals
0.00
0
0.00
0
0.00
0
0.00
0
0.00
0
0.00
0
Civil  Fee Total

Landscape  Fee Summary
programming hours
programming fee
SD Hours
SD Fee
DD Hours
DD Fee
50% CD Hours
50% Cd Fee
100% CD Hours
100% CD Fee
CA Hours
CA Fee
Hourly Rate
Principal
$150
PE
$135
Designer/Drafter
$125
Clerical
$125
Phase Totals
0.00
0
0.00
0
0.00
0
0.00
0
0.00
0
0.00
0
Landscape  Fee Total
Structural  Fee Summary
programming hours
programming fee
SD Hours
SD Fee
DD Hours
DD Fee
50% CD Hours
50% Cd Fee
100% CD Hours
100% CD Fee
CA Hours
CA Fee
Hourly Rate
Principal II
$210
Principal I
$170
Structural Engineer III
$150
Structural Engineer II
$120
Structural Engineer I
$100
Engineering Intern II
$90
Engineering Intern I
$70
Designer/Drafter
$90
Clerical
$65
Phase Totals
0.00
0
0.00
0
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
Structural   Fee Total
$0.00
#REF!
#REF!
#REF!
#REF!
Mechanical  Fee Summary
Add Services #3- Assessor's 2nd and 3rd Floor Rework, 9th & 7th Floor Changes
programming hours
programming fee
SD Hours
SD Fee
DD Hours
DD Fee
50% CD Hours
50% Cd Fee
100% CD Hours
100% CD Fee
CA Hours
CA Fee
Hourly Rate
Principal
$189
4.00
$755.40
PM
$131
Senior Engineer
$153
Project Engineer
$115
Engineer
$98
Engineer Intern
$85
Senior Designer
$109
16.00
$1,742.24
Project Designer
$88
12.00
$1,056.00
designer
$72
BIM services
$100
CADD Tech
$62
Estimate/CA
$110
Phase Totals
0.00
0
0.00
$0.00
0.00
$0.00
0.00
$0.00
32.00
$3,553.64
0.00
$0.00
Mechanical  Fee Total
$3,553.64

Electrical  Fee Summary
Add Services #3- Assessor's 2nd and 3rd Floor Rework, 9th & 7th Floor Changes
programming hours
programming fee
SD Hours
SD Fee
DD Hours
DD Fee
50% CD Hours
50% Cd Fee
100% CD Hours
100% CD Fee
CA Hours
CA Fee
Hourly Rate
Principal
$185
8.00
$1,480.00
PM
$160
Senior Engineer
$135
Project Engineer
$115
14.00
$1,610.00
Engineer
$98
Engineer Intern
$85
Senior Designer
$120
20.00
$2,400.00
Project Designer
$88
44.00
$3,872.00
designer
$72
40.00
$2,880.00
BIM services
$100
CADD Tech
$62
8.00
$496.00
admin
$60
Estimate/CA
$110
Phase Totals
0.00
0
0.00
$0.00
0.00
$0.00
0.00
$0.00
134.00
$12,738.00
0.00
$0.00
Electrical  Fee Total
$12,738.00
Security  Fee Summary
programming hours
programming fee
SD Hours
SD Fee
DD Hours
DD Fee
50% CD Hours
50% Cd Fee
100% CD Hours
100% CD Fee
CA Hours
CA Fee
Hourly Rate
Principal
$150
PE
$135
Designer/Drafter
$125
Clerical
$125
Phase Totals
0.00
0
0.00
0
0.00
0
0.00
0
0.00
0
0.00
0
Security  Fee Total
Estimator  Fee Summary
programming hours
programming fee
SD Hours
SD Fee
DD Hours
DD Fee
50% CD Hours
50% Cd Fee
100% CD Hours
100% CD Fee
CA Hours
CA Fee
Hourly Rate
Principal
$150
PE
$135
Estimator
$125
Designer/Drafter
$125
Clerical
$125
Phase Totals
0.00
0
0.00
0
0.00
0
0.00
0
0.00
0
0.00
0
Estimator  Fee Total

July 15, 2020 
  
Brian Sheehan 
Capital Project Manager 
Maricopa County | Facilities Management Department 
401 W Jefferson St | Phoenix, Arizona | 85003 
BrianSheehan@ maricopa.gov 
 
Re: 
Maricopa County 301 Building Restack project located at 301 W. Jefferson St, 
Phoenix, AZ 85003 
 
Architectural & Engineering Services 
 
Additional Services #4 Proposal_R1 
 
Dear Brian: 
 
Dekker/Perich/Sabatini is pleased to submit this proposal for additional professional design services for 
the above referenced project. The scope of the additional services consists revising the design of the 
one-stop-shop and Assessor’s counters to incorporate glass partition in response to COVID 19.       
 
As we’ve submitted drawings for permit on Monday, March 13, 2020, so these additional services consist 
of reworking portions Construction Documents.  
 
The changes described above require architecture, and electrical engineering services only. The 
mechanical and structural engineers do not require any additional fees. 
 
We propose to provide the additional services described above for additional professional architectural 
and electrical engineering design services will be a lump sum fee as broken out below: 
 
Architectural Services - 
  
 
 
 
 
 
 
$   7,160.00 
Electrical Services -   
 
 
 
 
 
 
 
$   2,014.00 
Total cost of services -  
 
 
 
 
 
 
 
$   9,174.00 
 
This proposal amends our original contact which consists of our proposal letter dated April 23, 2019 and 
the Maricopa County/DPS Master Agreement dated January 9, 2019. 
 
Brian, thank you for the opportunity to submit this proposal. If you find it acceptable, please forward a 
signed copy back to us. As always, feel free to call if you have any questions about anything contained 
herein or require additional information.   
 
Best Regards, 
Dekker/Perich/Sabatini 
 
 
 
Adrienne Lewis, AIA 
Principal  
 
 
 
 
APPROVED:   
 
 
 
 
   
         
DATE:  
 
 
   
 
for Maricopa County

1839 S. Alma School Rd, Suite 300 
Mesa, AZ  85210 
main 602.996.6399 www.bpce.com
DATE:  July 13, 2020 
B&P PROJECT NO:  8040.00 
 
ADDITIONAL SERVICE REQUEST – 04 REV 01 
 
PROJECT TITLE:  MCF 301 ADMINISTRATION BUILDING RESTACK 
CLIENT NAME/PROJECT MANAGER:  Brian Sheehan 
B&P PRINCIPAL-IN-CHARGE:  John Montaño, P.E. 
DESCRIPTION OF SERVICES:   
2nd Floor counters Modifications 
 
Additional services is being requested to address drawing changes to the 1st (Lobby 2086) and 2nd floor 
(waiting 1077/open office 1063) Counters Modifications as follows:  
 
1. Glazing will be added to separate cope:  Change our construction drawings for the modified 
counters that will add glazing for COVID considerations.   
 
2. Electrical Scope:  will evaluate if a new luminaire will be provided, however, glare may be an 
issue which will require removal of the counter downlights.  Electrical lighting plans will be 
updated, Update panel schedules, update load calculation. 
 
3. Mechanical Scope:  No Scope anticipated as ductwork for the spaces is dedicated to each space.  
 
4. Plumbing Scope:  No scope. 
 
5. Technology Scope:  No scope. 
 
We propose a lump Sum fee proposal as indicated in the attached task breakout. 
 
If the above described services and fees meet with your approval, please return a signed copy of this 
form to our office so that we may proceed.  We will await your authorization prior to proceeding with any 
additional work associated with this proposal. 
 
 
AUTHORIZED SIGNATURE 
DATE

Maricopa County 301 Admin restack - Fee summary sheet
Dekker/Perich/Sabatini
Fee Summary Sheet
Proposal Date
7/15/2020
Architect  Fee Summary
Add Services #2- Public Counter Revisions 1st & 2nd Floor
programming hours
programming fee
SD Hours
SD Fee
DD Hours
DD Fee
50% CD Hours
50% Cd Fee
100% CD Hours
100% CD Fee
CA Hours
CA Fee
Hourly Rate
Principal III
$250
Principal II
$210
2.00
$420.00
Principal I
$170
Architect III
$150
Architect II
$120
Architect I
$100
Construction administrator
$110
Project Manager
$150
6.00
$900.00
Project Arcitect
$120
12.00
$1,440.00
Intern Architect II
$90
20.00
$1,800.00
Intern Architect I
$70
Interior Designer III
$130
20.00
$2,600.00
Interior Designer II
$100
Interior Designer 
$80
Interior Design Intern II
$75
Interior Design Intern I
$65
Spec Writer
$125
Drafter
$70
Clerical
$65
0.00
0.00
Phase Totals
0.00
$0.00
0.00
$0.00
60.00
$7,160.00
0.00
$0.00
#REF!
#REF!
#REF!
#REF!
Architect Fee Total
$7,160.00
Geotech  Fee Summary
programming hours
programming fee
SD Hours
SD Fee
DD Hours
DD Fee
50% CD Hours
50% Cd Fee
100% CD Hours
100% CD Fee
CA Hours
CA Fee
Hourly Rate
Principal
$150
PE
$135
Designer/Drafter
$125
Clerical
$60
Phase Totals
0.00
0
0.00
0
0.00
0
0.00
0
0.00
0
0.00
0
Geotech  Fee Total
Civil  Fee Summary
programming hours
programming fee
SD Hours
SD Fee
DD Hours
DD Fee
50% CD Hours
50% Cd Fee
100% CD Hours
100% CD Fee
CA Hours
CA Fee
Hourly Rate
Principal
$150
PE
$135
Designer/Drafter
$125
Clerical
$125
Phase Totals
0.00
0
0.00
0
0.00
0
0.00
0
0.00
0
0.00
0
Civil  Fee Total

Electrical  Fee Summary
Add Services #2- Public Counter Revisions 1st & 2nd Floor
programming hours
programming fee
SD Hours
SD Fee
DD Hours
DD Fee
50% CD Hours
50% Cd Fee
100% CD Hours
100% CD Fee
CA Hours
CA Fee
Hourly Rate
Principal
$185
3.00
$555.00
PM
$160
Senior Engineer
$135
Project Engineer
$115
Engineer
$98
Engineer Intern
$85
Senior Designer
$120
Project Designer
$88
12.00
$1,056.00
designer
$72
BIM services
$100
CADD Tech
$62
6.50
$403.00
admin
$60
Estimate/CA
$110
Phase Totals
0.00
0
0.00
$0.00
0.00
$0.00
0.00
$0.00
21.50
$2,014.00
0.00
$0.00
Electrical  Fee Total
$2,014.00
Security  Fee Summary
programming hours
programming fee
SD Hours
SD Fee
DD Hours
DD Fee
50% CD Hours
50% Cd Fee
100% CD Hours
100% CD Fee
CA Hours
CA Fee
Hourly Rate
Principal
$150
PE
$135
Designer/Drafter
$125
Clerical
$125
Phase Totals
0.00
0
0.00
0
0.00
0
0.00
0
0.00
0
0.00
0
Security  Fee Total
Estimator  Fee Summary
programming hours
programming fee
SD Hours
SD Fee
DD Hours
DD Fee
50% CD Hours
50% Cd Fee
100% CD Hours
100% CD Fee
CA Hours
CA Fee
Hourly Rate
Principal
$150
PE
$135
Estimator
$125
Designer/Drafter
$125
Clerical
$125
Phase Totals
0.00
0
0.00
0
0.00
0
0.00
0
0.00
0
0.00
0
Estimator  Fee Total