7 D-BACK Q RPT END MARCH 31 2020.PDF
Extracted text (via ocr_local)
2280 characters
aa ML Y 19369 2001 2002 April 13, 2020 Clint Hickman, Chairman Maricopa County Board of Supervisors Maricopa County Supervisor, District 4 301 West Jefferson Street, 10" Floor Phoenix, AZ 85003 Dear Chairman Hickman: Pursuant to paragraph 13 of the Binding MOU between the Maricopa County Stadium District and AZPB Limited Partnership, attached is the quarterly Report of disbursements from the Reserve Account for the period ending March 31, 2020. Please contact me if you have any questions. Sincerely, Thomas M. Harris Executive Vice President, CFO TMH/spc Attachment ce: Ken Kendrick Bridget K. Harper, Maricopa County John Lewis, Maricopa County PHONE (602) 462 6000 Fax (602) 462 6600 ARIZONA DIAMONDBACKS + 401 EAST JEFFERSON STREET + PHOENIX, ARIZOHA 85004 [ dbacks.com lg losdbacks.com Date Various Various Various Various Amount $20,919.10 S$ 24,694.20 S$. 86,751.10 $272,073.15 $ 404,437.55 Chase Field Reserve Account Disbursements Type of Work * 1&2 January 1 - March 31, 2020 Description Server Replacement - The replaced EVS "IP Director" allows the in- house broadcast the save and move files between the EVS system and Adobe, allowing video content to edited. The old server was replaced with this newer model. Router Upgrade - This upgrade added extra power supply and backup capabilities for the in-house broadcast system. The router is the main component of the in-house broadcasting system that controls and distributes all audio and video signals in the system. Lower Concourse concrete repairs - These concrete repairs were necessary as seating brackets were eroding from the concrete risers. Repairs were completed in Sections 100-104, 131, atid 139-143, Extension of Backstop to provide greater fan safety and comfort. The total project cost will be closer to $370k once the final invoices are:processed for payment. * Type of Work is classified as follows 1 Repairs or replacements to existing HVAC and plumbing systems, together with electrical work to the extent needed for the proper operating of those or other systems at Chase Field Work to the roof of Chase Field and to secondary systems to the extent required for the operation of the roof Repairs or replacements to existing scoreboards or audio/video systems