July 22, 2020 
Z2020026 
Page 1 of 3 
Report to the Board of Supervisors 
Prepared by the Maricopa County Planning and Development Department 
 
 
 
Board Hearing Date: 
July 22, 2020 
 
Case #/Title:   
 
 
Z2020026 – T-Mobile PH60112A – Apache Auto  
 
Supervisor District: 
2 
 
Applicant/Owner:  
Declan Murphy, Coal Creek Consulting for TowerCom/ 
Fredrickson Living Trust 
 
Request: 
Special Use Permit (SUP) for a wireless communication facility 
in the C-3 zoning district 
 
Site Location: 
Generally located on the NEC of Sossaman Rd. and Main St. 
in the Mesa area 
 
Site Size: 
Approx. 600 sq. ft. (of an approx. 6.68 acre parcel) 
 
County Island Status: 
Yes (Mesa) 
Additional 
Comments: 
The proposed SUP is for an 80’ stealth monopole designed to 
resemble a broadleaf tree with related equipment. There 
would be a 600-square foot (30’ x 20’) leased area. Staff is 
recommending a 20 year timeframe for SUP entitlement.  
 
There are no outstanding concerns from reviewing agencies.  
The site is within the City of Mesa Municipal Planning Area, the 
City of Mesa was notified and as of the date of this report, 
staff have not received comments from the City concerning 
this request. All property owners within 300’ and interested 
parties of the site were notified; however, as of the date of 
this report no support or opposition has been received.  
 
Commission  
 
Recommendation: 
On 6/11/20, the Commission voted 6-0 to recommend 
approval of Z2020026 subject to conditions ‘a’ – ‘i’:  
 
 
a. 
Development of the site shall be in substantial conformance with the Site Plan 
entitled “PH60112A Apache Auto”, consisting of 8 full-size sheets, dated stamped 
received on April 20, 2020, except as modified by the following conditions. 
 
b. 
Development of the site shall be in substantial conformance with the Narrative 
Report entitled “PH60112A – Apache Auto”, consisting of 4 pages, stamped 
received May 11, 2020, except as modified by the following conditions.

July 22, 2020 
Z2020026 
Page 2 of 3 
 
c. 
The maximum height of the Wireless Communication Facility shall be limited to 80’.  
 
d. 
The following Engineering conditions shall apply: 
 
1. 
Utility extensions encroaching into the right-of-way of 7th Street, an open 
and declared County roadway, may require a Wireless Agreement with 
MCDOT for conduit, fiber optic lines and other work that will be within the 
County ROW. This agreement must be coordinated with Ms. Kelly Roy, 
MCDOT 
Utility 
Branch 
Coordination 
Manager, 
602-506-8603 
or 
Kelly.Roy@maricopa.gov. Evidence of said agreement must be provided 
prior to issuance of any building permits for this project. 
 
2. 
Engineering review of planning and/or zoning cases is for conceptual 
design only. All development and engineering design shall be in 
conformance with Section 1205 of the Maricopa County Zoning 
Ordinance; Drainage Policies and Standards; Floodplain Regulations for 
Maricopa County; MCDOT Roadway Design Manual; and current 
engineering policies, standards and best practices at the time of 
application for construction. 
 
e. 
A Minor Amendment shall be required to co-locate future carriers on the Wireless 
Communication Facility.  
 
f. 
The wireless communication tower shall retain the stealth properties as originally 
designed. Any damaged or missing branches shall be replaced within 60 days of 
such damage occurring.  
 
g. 
This Special Use Permit shall expire 20 years from the date of approval by the Board 
of Supervisors on July 22, 2040. All of the site improvements shall be removed within 
120 days of such termination or expiration.   
 
h. 
Noncompliance with any Maricopa County Regulation shall be grounds for 
initiating a revocation of this Special Use Permit as set forth in the Maricopa County 
Zoning Ordinance.  
 
i. 
The granting of this change in use of the property has been at the request of the 
applicant, with the consent of the landowner.  The granting of this approval allows 
the property to enjoy uses in excess of those permitted by the zoning existing on 
the date of application, subject to conditions.  In the event of the failure to comply 
with any condition, and at the time of expiration of the Special Use Permit, the 
property shall revert to the zoning that existed on the date of application.  It is, 
therefore, stipulated and agreed that either revocation due to the failure to 
comply with any conditions, or the expiration of the Special Use Permit, does not 
reduce any rights that existed on the date of application to use, divide, sell or 
possess the property and that there would be no diminution in value of the 
property from the value it held on the date of application due to such revocation 
or expiration of the Special Use Permit.  The Special Use Permit enhances the value 
of the property above its value as of the date the Special Use Permit is granted 
and reverting to the prior zoning results in the same value of the property as if the 
Special Use Permit had never been granted.

July 22, 2020 
Z2020026 
Page 3 of 3 
 
 
Presented by: 
 
Ray Banker, Planner 
Reviewed by: 
 
Darren Gérard, AICP, Planning Services Manager 
Attachment: 
 
6/11/20 P&Z Packet (23 pages)  
 
 
Note: 
6/11/20 Draft P&Z Minutes are not available as of the writing of this report, but can 
be provided upon request later when available.

Z2020026 
Page 1 of 7 
Report to the Planning and Zoning Commission 
Prepared by the Maricopa County Planning and Development Department 
 
 
 
Case: 
Z2020026 – T-Mobile PH60112A – Apache Auto  
 
 
Hearing Date: 
June 11, 2020 
 
Supervisor District: 
2 
  
 
Applicant: 
Declan Murphy, Coal Creek Consulting for TowerCom 
 
Owner: 
Fredrickson Living Trust 
   
Request: 
Special Use Permit (SUP) for a wireless communication facility in the 
C-3 zoning district 
 
  
 
Site Location: 
Generally located on the NEC of Sossaman Rd. and Main St. in the 
Mesa area 
 
  
Site Size: 
Approx. 600 sq. ft. (of an approx. 6.68 acre parcel) 
 
Density: 
N/A 
 
County Island:  
Yes (Mesa) 
 
 
County Plan: 
East Mesa Area Plan - Urban Residential/High (0-25 d.u./ac.) 
 
Municipal Plan: 
Mesa General Plan – Mixed Use Activity District (Character Area) 
 
Municipal Comments: 
City of Mesa has no comments (email received)  
 
Support/Opposition: 
None known 
 
Recommendation: 
Approve with conditions

Z2020026 
Page 2 of 7 
Project Summary: 
 
1. 
Coal Creek Consulting on behalf of TowerCom for T-Mobile has submitted a Special Use 
Permit (SUP) application for a wireless communication facility (WCF) in a county island 
surrounded by the City of Mesa. The C-3 zoned 6.68-acre subject parcel is known as the 
Apache Sands Service Center, which includes auto/RV service and repair, a gas station, 
and miscellaneous uses. It is located on the northeast corner of Main St. and Sossaman 
Rd. Access to the site for maintenance would be through a 12’ wide access easement 
from Main St.  
 
2020 Aerial Photograph 
 
 
2. 
The applicant will be leasing a 600-square foot (30’ x 20’) area at the east end of the 
property to house the WCF, which includes an 80’ stealth monopole designed to 
resemble a broadleaf tree. There would also be related equipment to be located within 
a minimum 6’ (h) solid wall. The WCF will include one sector of six panel antennas at the 
top of the pole.  The 80’ structure will be set back from the property boundaries at all four 
directions with the following measurements, 492’-3” from the west, 89’-10” from the east, 
200’-7” from the south, and 296’-5” from the north. The WCF would meet the setback 
requirements which state for commercial zoning under Article 1202.3.1.2.a: “The wireless 
communication facility, if exceeding the height requirements of the zoning district in 
which it is located, shall be set back from a property line that abuts land located in a 
Rural or Residential Zoning District one foot for every one foot in height of the wireless 
communication facility…” 
 
3. 
The applicant had previously applied for a Conditional Use Permit (CUP) under 
LU20190043 for the subject WCF. Through review of this CUP, it was found that the 
proposed antenna diameter (11’) would exceed the maximum 8’ allowed per MCZO 
Article 1202.3.1.1.h. which is the reason why an SUP is being requested. Although there is

Z2020026 
Page 3 of 7 
another WCF (55’ height monopalm) on the subject site, it is mentioned by the applicant 
in the narrative that this is not co-locatable. 
 
Zoning Map 
 
 
Portion of Proposed Site Plan

Z2020026 
Page 4 of 7 
Proposed Elevation Details 
 
 
Proposed Antenna Diameter Exhibit

Z2020026 
Page 5 of 7 
Existing On-Site and Adjacent Zoning / Land Use: 
 
4. 
On-site: 
 
C-3 / Apache Sands Service Center 
North: 
R1-10 / Single-family residential  
South: 
Arterial then LC (Mesa) / Main St. then commercial development 
East: 
Arterial then C-3 / 77th St. then vacant 
West: 
Arterial then LC (Mesa) / Commercial shopping center   
 
 
Utilities and Services: 
 
5. 
Water: 
 
City of Mesa 
Wastewater: 
City of Mesa 
School District: 
Mesa Unified 
Fire: 
Mesa Fire Department 
Police:  
Mesa Police Department 
 
Adopted Plans: 
 
6. 
East Mesa Area Plan: The property is designated as “Urban Residential/High” (0-25 
d.u./ac.). 
 
7. 
Mesa General Plan: The Property is designated for “Mixed Use Activity District” (Character 
Area). 
 
Public Participation Summary 
 
8. 
The applicant complied with the Maricopa County Citizen Review Process with the 
required posting of the property and notification by first class mail to adjacent property 
owners within 300’ of the subject parcel and interested parties. Furthermore, the initial 
submittal was routed to the City of Mesa who had no comment. As of the date of this 
report, staff has not received any letters of opposition. 
 
Outstanding Concerns from Reviewing Agencies: 
 
9. 
N/A 
 
Staff Analysis: 
 
10. 
Staff believes that the SUP is both reasonable and necessary for T-Mobile to provide 
expanded coverage in the area. The applicant mentions that this would fill a gap and 
deficiency in the T-Mobile coverage of the area. There would be significant separation 
between the proposed WCF and the adjacent properties. Especially, the closest residents 
would be at least 290’ away. Furthermore, as of the date of this report, neither the 
applicant nor staff has received opposition as a result of the applicant’s citizen 
participation outreach efforts.

Z2020026 
Page 6 of 7 
Recommendation: 
 
11. 
For the reasons outlined in this report, staff recommends the Commission motion for 
Approval of Z2020026, subject to conditions ‘a’ – ‘i’. 
 
a. 
Development of the site shall be in substantial conformance with the Site Plan 
entitled “PH60112A Apache Auto”, consisting of 8 full-size sheets, dated stamped 
received on April 20, 2020, except as modified by the following conditions. 
 
b. 
Development of the site shall be in substantial conformance with the Narrative 
Report entitled “PH60112A – Apache Auto”, consisting of 4 pages, stamped 
received May 11, 2020, except as modified by the following conditions. 
 
c. 
The maximum height of the Wireless Communication Facility shall be limited to 80’.  
 
d. 
The following Engineering conditions shall apply: 
 
1. 
Utility extensions encroaching into the right-of-way of 7th Street, an open 
and declared County roadway, may require a Wireless Agreement with 
MCDOT for conduit, fiber optic lines and other work that will be within the 
County ROW. This agreement must be coordinated with Ms. Kelly Roy, 
MCDOT 
Utility 
Branch 
Coordination 
Manager, 
602-506-8603 
or 
Kelly.Roy@maricopa.gov. Evidence of said agreement must be provided 
prior to issuance of any building permits for this project. 
 
2. 
Engineering review of planning and/or zoning cases is for conceptual 
design only. All development and engineering design shall be in 
conformance with Section 1205 of the Maricopa County Zoning 
Ordinance; Drainage Policies and Standards; Floodplain Regulations for 
Maricopa County; MCDOT Roadway Design Manual; and current 
engineering policies, standards and best practices at the time of 
application for construction. 
 
e. 
A Minor Amendment shall be required to co-locate future carriers on the Wireless 
Communication Facility.  
 
f. 
The wireless communication tower shall retain the stealth properties as originally 
designed. Any damaged or missing branches shall be replaced within 60 days of 
such damage occurring.  
 
g. 
This Special Use Permit shall expire 20 years from the date of approval by the Board 
of Supervisors on July 22, 2040. All of the site improvements shall be removed within 
120 days of such termination or expiration.   
 
h. 
Noncompliance with any Maricopa County Regulation shall be grounds for 
initiating a revocation of this Special Use Permit as set forth in the Maricopa County 
Zoning Ordinance.  
 
i. 
The granting of this change in use of the property has been at the request of the 
applicant, with the consent of the landowner.  The granting of this approval allows

Z2020026 
Page 7 of 7 
the property to enjoy uses in excess of those permitted by the zoning existing on 
the date of application, subject to conditions.  In the event of the failure to comply 
with any condition, and at the time of expiration of the Special Use Permit, the 
property shall revert to the zoning that existed on the date of application.  It is, 
therefore, stipulated and agreed that either revocation due to the failure to 
comply with any conditions, or the expiration of the Special Use Permit, does not 
reduce any rights that existed on the date of application to use, divide, sell or 
possess the property and that there would be no diminution in value of the 
property from the value it held on the date of application due to such revocation 
or expiration of the Special Use Permit.  The Special Use Permit enhances the value 
of the property above its value as of the date the Special Use Permit is granted 
and reverting to the prior zoning results in the same value of the property as if the 
Special Use Permit had never been granted. 
 
 
Presented by: 
Ray Banker, Planner 
Reviewed by: 
Matthew Holm, AICP, Planning Supervisor 
 
Attachments: 
Case Map (1 page) 
 
Site Plan (reduced 8.5”x11”, 8 pages) 
 
Narrative Report (4 pages) 
 
Engineering Comments (1 page) 
 
MCESD comments (1 page) 
 
City of Mesa Email (1 page)