--7-"Arr-E,72.4 7L TZ 
JOB ORDER CONTRACTOR (JOC) CONTRACT 
MARICOPA COUNTY, ARIZONA 
HVAC Job Order Contractor 
Office of Procurement Services 
Serial # 200019-JOC 
Contract # 200019-JOC 
C-70- 
Project # N/A 
Facilities Management Department, Maricopa County Arizona

Division 0 - Bidding & Contract Requirements 
Section 	
Description 	
Number of Pages 
00005 	
Table of Contents 
	
1 
00500 	
Construction Contract 
	
4 
00610 	
Payment Bond and Performance Bond 
	
3 
00700 	
General Conditions Table of Contents 
	
6 
00700 	
General Conditions to the Construction Contract 	
 43 
Exhibit A — Definitions to the General Conditions 
	
3 
Exhibit B — Alternate Dispute Resolution 
	
5 
Exhibit C — Legal Worker Certification  
	
1 
Exhibit D — Request for Proposal for Task Order 
	
1 
Exhibit E — Performance Bond and Payment Bond Forms 
	
2 
Exhibit F — SBE Reporting Document 
	
1 
Exhibit G — Request for Qualifications dated 10/31/19 	
 
Exhibit H — Statement of Qualifications dated 10/31/19 	
 
Exhibit I — Certificate of Insurance for Job Order Contract 
	
2 
Exhibit J — General Requirements for the Job Order Contracts 	
 
All of the exhibits above are incorporated by reference as though fully set forth herein whether or not 
physically attached to this contract. 
NOTE: All references to "JOC" in this document are understood to mean the HVAC JOC. 
END OF SECTION 
2

SECTION 00500 
JOB ORDER CONTRACT 
A. 	
EFFECTIVE DATE:  
This CONTRACT is entered into by and between the Owner and the Job Order Contractor as 
Contract No. FMD-N/A, and shall be effective as of 3/26/2020. 
B. 
OWNER:  
MARICOPA COUNTY 
do Facilities Management Department 
401 West Jefferson Street 
Phoenix, Arizona 85003 
C. 
JOB ORDER CONTRACTOR:  
Interstate Mechanical Corporation 
1841 E. Washington Street 
Phoenix, Arizona 85034 
Robert M. Karber-Principal 
Office: (602) 257-1319; Fax: (602) 254-2945; E-Mail: bob.karber@imcor-az.com.  
D. 
RECITALS:  
The scope of work and specifications for a broad range of services will be identified in individual 
Task Orders which will be issued by the Owner from time to time. See EXHIBIT D hereto. 
NOW THEREFORE, intending to be legally bound and for valuable consideration, the receipt and 
sufficiency of which are acknowledged, the Owner and Job Order Contractor agree as follows: 
E. 
AGREEMENT:  
Article I. 	
THE CONTRACT 
The Task Order and other Contract Documents explained in Section 7.1 below and the 
definitions which are contained Section 00700, Exhibit A, govern this Job Order Contract. 
Article II. THE WORK 
2.1 	
The Job Order Contractor shall execute the entire Work described by each Task Order, 
including work which is reasonably inferable and necessary to produce the results intended by 
the Contract and the Task Order. 
Article III. CONTRACT TIME 
3.1 	
The Job Order Contractor shall have access to the area of the Work effective from the date of 
the Notice to Proceed for the assigned Task and shall achieve Substantial Completion and Final 
Completion of the Work no later than the performance period specified in each Task Order 
issued. The length of this Contract for services will be for a period of three (3) years with two 
one-year options to extend the contract, but in no event will this Contract's Term continue 
longer than five (5) years from the date of the Contract. The term of this Contract shall not be 
extended. All Work issued hereunder must be completed in full by the final expiration date of 
this Contract. Extensions to this Contract for years 4 and 5 may only be made by an amendment 
signed by both parties. A permission to complete a Task Order that extends into Year 4 or 
Year 5 does not extend the Contract in its entirety for the additional year. 
3.2 	
The Job Order Contractor shall achieve Substantial Completion of the Work (as defined in 
Section 00700, Article 9.8 herein, and evidenced by a Certificate of Substantial Completion) 
not later than as specified in each Task Order. 
1.1 
3

3.3 	
The Job Order Contractor shall achieve (as defined in Section 00700, Article 9.9 herein, and 
evidenced by a Certificate of Final Completion) no later than as specified in each Task Order. 
Article IV. CONTRACT SUM 
4.1 	
The Owner shall pay the Job Order Contractor in current funds for the Job Order Contractor's 
performance of individual Task Orders in an aggregate amount not to exceed Three Million 
Dollars ($3,000,000.00) in total, (over a 3 year period) and not to exceed One Million Dollars 
($1,000,000.00) per Fiscal Year, which Fiscal Year shall be designated by the Owner as 
beginning on July 1st and ending on June 30th of the next calendar year. The single maximum 
value of a task issued shall not exceed $1,000,000.00. The Owner does not guarantee a 
minimum Contract Sum under this Contract, and Job Order Contractor, in accepting this 
Contract, does not expect a minimum Contract Sum. Payments will be made in accordance 
with the sum negotiated for each specific Task Order. 
Maricopa County, at its sole discretion, may require the Job Order Contractor to purchase from 
a specified or designated County supplier (i.e. Home Depot) any and/or all available materials 
applied or installed by the Job Order Contractor or its subcontractors for a Task Order. The 
materials purchased by the Job Order Contractor(s), or its subcontractor(s), shall be purchased 
by the Job Order Contractor(s), or its subcontractor's, using their own funds and/or credit. Any 
discounts offered to the JOC by the County's material supplier shall be passed through to the 
County without markup. The County is not a party to these transactions and any issue/disputes 
shall be resolved without the involvement of the County. 
4.2 	
FEE AND OVERHEAD CALCULATIONS FOR CONSTRUCTION COSTS UP TO $250,000.00 
Overhead must be all inclusive and include all "costs of doing business". The County will not 
pay for items such as, but not limited to warranty, project closeout, home office expense, 
vehicles, vehicle maintenance, fuel, mileage, personal safety equipment, safety personnel, 
unless safety personnel is specifically required for the Work being performed and approved by 
the Owner. The Job Order Contractor agrees the overhead shall be no more than 8% and the 
fee shall be capped at 5%. 
4.3 	
FEE AND OVERHEAD CALCULATIONS FOR CONSTRUCTION OVER $250,000.00 
Overhead must be all inclusive and include all "costs of doing business". The County will not 
pay for items such as, but not limited to warranty, project closeout, home office expense, 
vehicles, vehicle maintenance, fuel, mileage, personal safety equipment, safety personnel, 
unless safety personnel is specifically required for the Work being performed and approved by 
the Owner. Overhead cost and percentages in addition to Job Order Contractor fee(s) shall be 
negotiated between the Job Order Contractor and the County for any projects exceeding 
$250,000.00. 
Article V. 	
PROGRESS PAYMENTS 
5.1 	
Progress payments will be made in accordance with Article 9 of the General Conditions to the 
Job Order Contract. 
Article VI. 
FINAL PAYMENT 
6.1 	
Final Payment will be made in accordance with Article 9 of the General Conditions to the Job 
Order Contract. 
Article VII. 
CONTRACT DOCUMENTS 
7.1 	
The Contract consists of the following documents incorporated herein by this reference: 
7.1.1 The Job Order Contract — Section 00500. 
7.1.2 The General Conditions to the Job Order Contract — Section 00700. 
7.1.3 Permits, Task Modifications, Change Directives, amendments or modifications to the 
Contract. 
4

7.1.4 Any and all documents issued during the procurement process for this Contract. 
7.1.5 Task Order documents including, but not limited to, Task Orders, associated plans and 
specifications. 
7.1.6 Any addenda to any issued Task Orders or other Contract documents. 
7.1.7 Exhibits to Section 00700: 
Exhibit A — Definitions to the General Conditions 
Exhibit B — Alternate Dispute Resolution 
Exhibit C — Legal Worker Certification 
Exhibit D — Request for Proposal for Task Order 
Exhibit E — Performance Bond and Payment Bond Forms 
Exhibit F — SBE Reporting Document 
Exhibit G — Request for Qualifications dated 10/31/19_ 
Exhibit H — Statement of Qualifications dated 10/31/19 
Exhibit I — Certificate of Insurance for Job Order Contract. 
Exhibit J — General Requirements for the Job Order Contracts 
All of the exhibits listed above are incorporated by reference as though fully set forth, 
whether or not they are physically attached to this Contract. 
7.1.8 All amendments to this Contract shall be in writing and approved/signed by both parties. 
Maricopa County Office of Procurement Services shall be responsible for approving all 
amendments for Maricopa County. 
7.1.9 UNIFORM ADMINISTRATIVE REQUIREMENTS: 
When applicable and by entering into this Contract the Contractor agrees to comply with 
all applicable provisions of Title 2, Subtitle A, Chapter II, PART 200—UNIFORM 
ADMINISTRATIVE REQUIREMENTS, COST PRINCIPLES, AND AUDIT 
REQUIREMENTS FOR FEDERAL AWARDS contained in Title 2 C.F.R. § 200 et seq. 
5

February 10, 2020 
Date 
Robert M. Karber 
Printed Name 
Principal 
Title 
Net 30 from date of invoice 
86-0448232 
Federal Tax Identification Number 
R00073195 / R0007316 
License Number 
90924 
IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the day and date first 
above written, in counterparts, each of which shall, without proof or accounting for the other counterparts, 
be deemed an original contract. 
Vendor Terms 	
NIGP Commodity Code (Advantage) 
COUNTY OF MARICOPA, ARIZONA 
RECOMMENDED BY: 	
ACCEPTED AND APPROVED: 
Department Head 	
Date 	Chairman, Board of Supervisors 	
Date 
LEGAL REVIEW 
Approved as to form and within the powers and 
authority granted under the laws of the State of 
Arizona to Maricopa County. 
ATTEST: 
Clerk of the Board 
Date 
By: 
Deputy County Attorney 
Date: 	
 
6

Facilities Management Department 	
1/30/20 
MARICOPA COUNTY, ARIZONA 
200019-JOC 
HVAC JOB ORDER CONTRACT 
SERIAL # 200019-JOC 
CONTRACT NO. 200019-10C 
COMPANY NAME: INTERSTATE MECHANICAL CORPORATION - IMCOR 
Please fill out the following rate chart with the hourly rates that match the staff classification 
description. Rates shall be provided  EXCLUSIVE of Overhead and Profit. Please utilize these staff 
classifications and do not add or modify any classifications. 
STAFF CLASSIFICATION 	
BILLING HOURLY RATE 
Project Manager 	
$84.00 
General Foreman 	
$77.32 
Journeyman 	
$71.68 
Apprentice 	
$63.71 
Laborer 	
$55.71 
Markups for quoted work is limited to the following overhead and profit percentages: 
Overhead —8% 
Profit — 5%

Maricopa County Office of Procurement Services 
320 W. Lincoln Street 
Phoenix AZ 85003 
1 
AUTHORIZED REPRESENTATIVE 
..--- 	
7 	® 
AccPRE) 	
CERTIFICATE OF LIABILITY INSURANCE 
L...------ 
DATE IMM/DD/YYYY) 
2/13/2020 
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS 
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES 
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED 
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. 
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. 
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on 
this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). 
PRODUCER 
INSURICA / Minard-Ames Insurance Services LLC 
4646 E. Van Buren St., #200 
Phoenix AZ 85008 
CONTACT 
NAME: 	
Certificates 
PHONE 	
FAX 
(A/C. No, E at) : 602-273-1625 	
IA/C, No): 602-273-0212 
E-MAIL 
ADDRESS: certs@INSURICA.com 
INSURER(S) AFFORDING COVERAGE 
NAIC # 
INSURER A: Old Republic Insurance Company 
24147 
INSURED 	
INTEMECO2C 
Interstate Mechanical Corporation aka IMCOR 
1841 E. Washington St. 
Phoenix AZ 85034 
INSURER B: Great American Insurance Company 
16691 
INSURER C: Hanover Insurance Company 
22292 
INSURER D: 
INSURER E: 
INSURER F: 
COVERAGES 	
CERTIFICATE NUMBER: 1361217319 	
REVISION NUMBER: 
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD 
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT 1MTH RESPECT TO WHICH THIS 
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, 
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. 
INSR 
LTR 
TYPE OF INSURANCE 
ADDL 
INSD 
SUBR 
WVD 
POLICY NUMBER 
POLICY EFF 
(MM/DD/YYYY) 
POLICY EXP 
(MMIDD/YYYY) 
LIMITS 
A 
X 
COMMERCIAL GENERAL LIABILITY 
Y 
Y 
MVVZY30712119 
4/1/2019 
4/1/2020 
EACH OCCURRENCE 
$ 1,000,000 
DAMAGE TO RENTED 
PREMISES (Ea occurrence) 
$ 100,000 
CLAIMS-MADE 
X 
OCCUR 
MED EXP (Any one person) 
$ 5,000 
PERSONAL & ADV INJURY 
$ 1,000,000 
GENERAL AGGREGATE 
$ 2,000,000 
GE  'L AGGREGATE 
  POLICY 
OTHER: 
X  
LIMITAPPLIES 
INT- 
PER: 
LOC 
PRODUCTS - COMP/OP AGG 
$ 2,000,000 
$ 
A 
AU 
X 
OMOBILE LIABILITY 
ANY AUTO 
OVVNED 
	
 AUTOS ONLY 
HIRED 
	
 AUTOS ONLY 
 SCHEDULED 
AUTOS 
NON-OWNED 
AUTOS ONLY 
Y 
Y 
MWTB30712219 
4/1/2019 
4/1/2020 
COMBINED SINGLE LIMIT 
(Ea accident) 
$ 1,000,000 
BODILY INJURY (Per person) 
BODILY INJURY (Per accident) 
PROPERTY DAMAGE 
(Per accident) 
$ 
$ 
B _ 
X 
UMBRELLA LIAB 
EXCESS LIAB 
X  OCCUR 
CLAIMS-MADE 
Y 
TUE405724615 
4/1/2019 
4/1/2020 
EACH OCCURRENCE 
$ 7,000,000 	
, 
AGGREGATE 
$ 7,000,000 
$ 
DED 
RETENTION $ 
A 
WORKERS COMPENSATION 
AND EMPLOYERS' LIABILITY 
ANYPROPRIETOR/PARTNER/EXECUTIVE 
OFFICER/MEMBER EXCLUDED? 
(Mandatory in NH) 
If yes, describe under 
DESCRIPTION OF OPERATIONS below 
Y / N  
. 
" 
N/A  
Y 
MWC30712019 
4/1/2019 
4/1/2020 
X 
PER 
STATUTE 
OTH-
ER 
E.L. EACH ACCIDENT 
$ 1,000,000 
EL. DISEASE - EA EMPLOYEE $ 1,000,000 
EL. DISEASE - POLICY LIMIT 
$ 1,000,000 
C 
*Installation Floater 
Stored Materials 
Ded: $1,000 
RH4A58215004 
4/1/2019 
411/2020 
One Loc/Per Disaster 
Temp Loc/Transit 
Stored Materials 
$2,200,000 
$1,000,000 
$500,000 
DESCRIPTION OF OPERATIONS / LOCATIONS /VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) 
*Includes Earthquake/Flood: Sub Limit/Ded: $1,000,000/$25,000. 	
Certificate Holder is defined as additional insured with respects to the general, auto and 
excess liability if required or agreed to in a written contract subject to all provisions and limitations of the policy. General, Auto and Excess liability coverage is 
primary and non-contributory. A Waiver of subrogation in favor of Certificate Holder applies to the general and auto liability and employers liability/workers 
compensation if required or agreed to in a written contract subject to all provisions and limitation of the policy. Per attached forms: CG2010 07/04; CG2037 
07/04; PCA035 4/06; TAU10042 11/16; CG2001 04/13; TAU9999 11/97; CG2404 05/09; PCA044 4/06; WC000313; CG2503 05/09. 
RE: Work performed under Contract No. 200019-JOC, HVAC. Additional Insured: The County, its agents, representatives, officers, directors, officials, and 
employees. Waiver of subrogation applies in favor of the additional insured. 
CERTIFICATE HOLDER 	
CANCELLATION 
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE 
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN 
ACCORDANCE WITH THE POLICY PROVISIONS. 
© 1988-2015 ACORD CORPORATION. All rights reserved. 
ACORD 25 (2016103) 	
The ACORD name and logo are registered marks of ACORD

Policy No: mwzy307121 
COMMERCIAL GENERAL LIABILITY 
CG 20 10 07 04 
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. 
ADDITIONAL INSURED OWNERS, LESSEES OR 
CONTRACTORS - SCHEDULED PERSON OR 
ORGANIZATION 
This endorsement modifies insurance provided under the following: 
COMMERCIAL GENERAL LIABILITY COVERAGE PART 
SCHEDULE 
Name Of Additional Insured Person(s) 
Or Organization(s): 
Location(s) Of Covered Operations 
All persons or organizations as required by written contract or agreement 
The locations as specified in the wrtften contracts or 
agreements 
Information required to complete this Schedule, if not shown above, will be shown in the Declarations. 
A. Section II — Who Is An Insured is amended to 	
B. With respect to the insurance afforded to these 
include as an additional insured the person(s) or 	
additional insureds, the following additional exclu- 
organization(s) shown in the Schedule, but only 	
sions apply: 
with respect to liability for "bodily injury", "property 	
This insurance does not apply to "bodily injury or 
damage" or "personal and advertising injury" 	
"property damage" occurring after: 
caused, in whole or in part, by: 	
1. All work, including materials, parts or equip- 
1. Your acts or omissions; or 	
ment furnished in connection with such work, 
2. The acts or omissions of those acting on your 	 on the project (other than service, maintenance 
behalf; 	
or repairs) to be performed by or on behalf of 
in the performance of your ongoing operations for 	 the additional insured(s) at the location of the 
the additional insured(s) at the location(s) desig- 	 covered operations has been completed; or 
nated above.  
2. That portion of "your work" out of which the 
injury or damage arises has been put to its in-
tended use by any person or organization other 
than another contractor or subcontractor en-
gaged in performing operations for a principal 
as a part of the same project, 
CG 20 10 07 04 	
ISO Properties, Inc., 2004 	
Page 1 of 1

Policy No: . MWZY30712119 
COMMERCIAL GENERAL LIABILITY 
CG 20 37 07 04 
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. 
ADDITIONAL INSURED - OWNERS, LESSEES OR 
CONTRACTORS - COMPLETED OPERATIONS 
This endorsement modifies insurance provided under the following: 
COMMERCIAL GENERAL LIABILITY COVERAGE PART 
SCHEDULE 
Name Of Additional Insured Person(s) 
Or Organization(s): 
Location And Description Of Completed Operations 
All persons or organizations as required by written contract or 
agreement 
The locations as specified In the written contracts or agreements 
Information required to complete this Schedule, if not shown above, will be shown in the Declarations. 
Section II — Who Is An Insured is amended to 
include as an additional insured the person(s) or 
organization(s) shown in the Schedule, but only with 
respect to liability for "bodily injury" or "property 
damage" caused, in whole or in part, by "your work" 
at the location designated and described in the 
schedule of this endorsement performed for that 
additional insured and included in the "products-
completed operations hazard". 
CG 20 37 07 04 	
© ISO Properties, Inc., 2004 	
Page 1 of 1

Policy No: MWTB30712219 
IL 10 (12106) OLD REPUBLIC 1NSUFtANCE COMPANY 
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. 
ADDITIONAL INSURED 
This endorsement modifies insurance provided under the following: 
BUSINESS AUTO COVERAGE FORM 
SCHEDULE 
Designated Person(s) or Organization(s): 
All persons or organizations where required by written contract. 
WHO IS AN INSURED (SECTION II) is amended to include the person(s) or organization(s) shown in the 
above Schedule, but only with respect to "accidents" arising out of work being performed for such 
person(s) or organization(s). 
As respects any person(s) or organization(s) shown in the above Schedule with whom you have agreed 
in a written contract to provide primary insurance coverage, this coverage will be primary and any 
insurance maintained by such person(s) or organization(s) will apply on an excess basis. 
PCA 035 04 06

larater;tent of Qualifications for 
Job Orier Contractor 
..SERI#200019-JOC 
CT #200019-JOC 
Due 	
e: Thursday, October 31, 2019 
0 PM MST 
1311.u:1111-ifJ1.fri._d 
Complete pre-construction, 
design, construction and 
system maintenance service 
for all facets of new retrofit,. 
tenant improvement., 
mechanical upgrades and 
service projects throughout 
Arizona and the Southwest. 
HVAC . Sheet Metal. Plumbing. Process Piping 
General Commercial Contracting 
interstate mechanical corporation 
1841 East Washington Street . Phoenix, AZ 85034 
602-257-1319 . 800-628-0211.. Fax 602-271-0674 
www.imcor:az.corri 
tit.6 Sougumst sista? 1.971 With 	
COPttliterda4 iff4644triel4 CthiC, & medical,preject3- 
General Contracting B-01 R00094734 • AC & Refrigeration L-39 R00073195 • Sheet Metal L-45 1l00073196 • Plumbing L-37 R00084435 • Process Piping L-04 R00084436 
it

October 31, 2019 
Maricopa County 
Office of Procurement Services 
160S. 4th Avenue 
Phoenix AZ 85003 
• 
1 	
gik 
Interstate mechanicol corporation 
602-257-1319 
Fax 602-254-2945 
iIitc 	
010!:'•10n 
602-257-1319 
Fax 602-256-5916 
602-253-0430 
Fax 602-256-5915 
Reference: 	
Request for Qualifications — HVAC Job Order Contractor Solicitation 200019-JOC 
Interstate Mechanical Corporation (IMCOR) is pleased to submit its Statement of Qualifications and Proposal to perform Job 
Order Contracting Services for Maricopa County pursuant to Solicitation 200019-JOC. IMCOR offers a proven team of 
construction professionals with significant JOC experience dedicated to superior competency and customer service. Our team 
is available and eager to extend our exceptional JOC services to the City. As you may know, IMCOR is one of the leading 
mechanical contractors in Arizona, with more than 300 employees. IMCOR is regularly recognized as an industry leader in 
our market, recently ranked as the fifth largest mechanical contractor by the Arizona Journal. If selected to perform HCAC job 
order contracting for the County, IMCOR is uniquely qualified to exceed the County's expectations: 
• 
Dedicated JOC Team — IMCOR's Facility Services Division is dedicated to providing exceptional Job Order 
Contracting services. The team is available around the clock to serve our customers by providing quick response 
times, with qualified subcontractors, accurate estimates, trained professionals and quality construction, all of which 
are essential to the delivery of successful JOC projects. 
• 
JOC Experience — In 2018 alone, IMCOR delivered more than $10 million in projects and services to public sector 
owners. These job orders ranged in size and complexity from routine and emergency repairs and preventative 
maintenance, to specialty mechanical projects pertaining to HVAC, Plumbing/Piping, and Energy Management 
systems. As a full-service provider across multiple disciplines, IMCOR is uniquely capable of assisting customers 
with all their mechanical needs. Many of our JOC orders were completed for repeat customers, confirming our quality 
of work and commitment to customer satisfaction. 
• 
Customer Service — We are dedicated to earning the trust of our customers by providing the highest quality service 
to our customers. In order to do so, IMCOR encourages open and honest communications with all of our customers, 
with the goal of being available at all times. We truly believe that a project's success can be objectively measured 
when it is delivered on time and on budget, to the customer's satisfaction. 
We often tell our customers that partnering with IMCOR eliminates the logistical complexity of engaging multiple mechanical 
contractors for diverse systems and drives value through expertise, efficiency and superior quality at every stage of a building's 
life cycle. We would welcome the opportunity to continue our long-standing relationship with the County. Should you need 
any other information or if you have any questions, please feel free to contact me at (602) 257-1319. 
Sincerely, 
INTERSTATENECHANICAL CORPORATION 
O 1 • I 
William P. Mason, President 
CC: 	
Bob Karber, Principal 
Dave Dickens, Service Division Manager 
Billy Teston, Facilities Division Manager 
Corporate Office 1841 East Washington Street . Phoenix, AZ 85034 602.257.1319 . 800-628-0211 Fax 602.271.0674 . www.imcor-oz.com  
licensed I iVAC General Sheet Metal Plumbing Process Pining General Commemat Contractor General Recidennal Contractor 
Arizona C-39 H00073196 CR-45 R00073196 C-37 R000134435 . C-4 000064436 13-1 1R00094734 8- R0009530/ Calitorme 550841 C-4 C-20 C-36 . 8-46

HVAC Job Order Contractor 
Solicitation No. 200019-10C 
Statement of Qualifications 
October 31, 2019 
TABLE OF CONTENTS 
Section:  
1 	Prior Experience 
2 	Project Team 
3 	Team Approach Capability 
4 	Arizona Business and Location of Arizona Office 
5 	Attachments 
• unapt

) (-70Ail 
hit  
Statement of Qualifications 
HVAC Job Order Contractor Solicitation No. 20001940C 
October 31, 2019 	
Page 1 
1 Prior Experience 
1) Prior Experience 
Provide a project description for five similar projects for which your firm was a JOC for a period of at least three 
consecutive year(s) for design phase services, construction phase services, and either maintenance services 
postconstruction or maintenance services in conjunction with construction. If you have not had JOC project 
delivery method experience on similar projects, but if your firm has done similar projects and you believe that your 
firm has experience on those projects which is comparable to the JOC project delivery method, provide a project 
synopsis for each such project and also include an explanation of why you believe the experience is comparable to 
the JOC project delivery method. To communicate prior experience, please include the following for each project: 
1. Maricopa County JOC —5 years 
a. Average number of projects awarded each year —2 
i. All were completed 
ii. Average cost— approx. $100,000 
b. Services Provided: Unitary change outs / Equipment replacements and remodels 
c. No design provided 
d. Design phase constructability —N/A 
e. Client References: 
Ravinder Gannala, Capital Project Manager, Facilities Management Department 
Phone (602) 372-2770 
Ravinder.Gunnala@FM.maricopa.gov  
2. Gordian — Arizona State JOC —5 years 
a. Average number of projects — 35 
i. All were completed on time 
ii. Average cost per project $85k 
b. Services provided: Chiller, Cooling tower and other Equipment replacement, HVAC renovations 
and improvements, Engineering design build and assist projects, Value engineering, Emergency 
services, plumbing and HVAC service and maintenance 
c. We assisted with design and provided preliminary budgets based on scopes of work and existing 
conditions. As well as were contracted to subcontract engineers for design 
d. Worked with the customer and engineer to develop the most reasonable cost-effective design and 
implementation. 
IMCOR has been recognized as a 2018 Award of Merit Winner in the Harry H. 
Mellon Awards in Job Order Contracting for outstanding principles and practices in 
its involvement in the AZ DEMA Renovations project with Arizona Department of 
Emergency and Military Affairs. 
e. Client References: 
Gordian — Arizona State JOC  
Mike Dziubla, Account Manager 
Phone 928-750-9068 
m.dziubla@gordian.com

P - 
Li Li Liti (-7\11:4111 
Statement of Qualifications 
HVAC Job Order Contractor Solicitation No. 200019-J0C 
October 31, 2019 	
Page 2 
3. Medtronic Tempe Campus - —30 years of Service 
a. Average number of Projects awarded each year — 58 
i. All were completed on time 
ii. Average Cost $7,833.00 
b. Services provided: Chiller, Cooling tower and other Equipment replacement, HVAC renovations 
and improvements, Engineering design build and assist projects, Value engineering, Emergency 
services, plumbing and HVAC service and maintenance. 
c. IMCOR assisted with design and provided preliminary budgets based on scopes of work and 
existing conditions 
d. Worked with the customer and engineer to develop the most reasonable cost-effective design and 
implementation 
e. Client Reference 
Medtronic 
Pierre Carlier, Sr. Facilities Engineer 
pierre.carlier@medtronic.com  
Ph (480) 377-2367 / FX (480) 921-6450 
4. Mayo Service and Maintenance Contract —2 years 
a. Average number of projects awarded each year — 352 
i. All were completed as scheduled 
ii. Average Cost - $2,537 
b. Services Provided: Emergency HVAC and Plumbing Services, hydro-jetting, snaking, leak repairs, 
backflow preventer assessment repairs replacement and certification, cast iron replacement, tenant 
improvements 
c. No design provided 
d. Assisted the customer with research of existing conditions for their engineers 
e. Client Reference: 
Mayo Clinic Hospital 
Mark Smith, Supervisor of Facility Operations, Facilities and Campus Management 
Ph (480) 342-0812 
smith.mark@mayo.edu  
5. AHCCCS PM Agreement 
a. Average number of projects awarded each year - 15 small projects per year that range, on average, 
between $2500 to $4000. 
b. Services provided. HVAC Service and maintenance for Boilers, Liebert systems, Water Source 
Heat pumps, Cooling Tower, VFD's, pumps, Evaporative coolers, and Split systems. We perform a 
multitude of projects; VFD change outs, split system installs, WSHP installs, Plumbing emergency 
work, and much more. 
c. Design phase cost estimating experience: N/A for small projects. We create defined estimates for 
all the work and get it completed very quickly. 
d. Design phase constructability: N/A for small projects. We do create mechanical solutions after 
assessing our client's needs. 
e. Client Reference: 
AHCCCS — Arizona Healthcare Cost Containment System - 
Reedy Barfield III, Facilities Administrator, AHCCCS I Division of Business and Finance, 
701 E. Jefferson St., MD-5700, Phoenix, AZ 85034, 
Office: 602-417-4379 / Cell: 602-332-4060 / Fax: 602-258-5943 
Reedy.Barfield@azahcccs.gov

imam 
Statement of Qualifications 
HVAC Job Order Contractor Solicitation No. 20001940C 
October 31, 2019 	
Page 3 
2 
Project Team 
2) Project Team 
IMCOR Pro ect Team 
Industry / IMCOR 
Title 	
Name 
Years of Experience 
— 
Facility Services Division Manager 	 Billy Teston 	
12 / 8 
• 
Time dedicated to this project: To be determined/As Needed 
Similar Projects: 
• 
Maricopa County JOC 
• 
Mayo Clinic Hospital Service & Maintenance Contract 
• 
Gordian — Arizona State JOC (various projects) 
• 
AHCCCS PM Agreement (various projects) 
Medtronic Tempe Campus (various projects) 
Service Division Manager 	
David Dickens 	
9 / 9 
• 
Time dedicated to this project: To be determined/As Needed 
Similar Projects 
• 
Gordian — Arizona State JOC (various projects) 
• 
AHCCCS PM Agreement (various projects) 
Estimating Manager 	
Rick Hogebaum 
• 
Time dedicated to this project: To be determined/As Needed 
Similar Projects 
• 
With over 34 years in the construction industry, Rick has work on many projects that include types 
of work that will be required in this JOC. 
_ 	
— 
Plumbing Service Manager 	
Friend Miller 	
30 / 12 
• 
Time dedicated to this project: To be determined/As Needed 
Similar Projects 
• 
Gordian — Arizona State JOC (various projects) 
• 
AHCCCS PM Agreement (various projects) 
Facility Services Senior Superintendent 	
Mario Zamora 	
28 / 20 
• 
Time dedicated to this project: To be determined/As Needed 
Similar Projects: 
• 
Maricopa County JOC 
• 
Mayo Clinic Hospital Service & Maintenance Contract 
• 
Gordian — Arizona State JOC (various projects) 
• 
AHCCCS PM Agreement (various projects) 
• 
Medtronic Tempe Campus (various projects) 
b) Examples of projects where staff assigned to this project have worked together as a team: 
All the above team members have worked together on the recent Gordian and AHCCCS projects.

C 
U IT 	 ( 1 
Statement of Qualifications 
HVAC Job Order Contractor Solicitation No. 200019-J0C 
October 31, 2019 	
Page 4 
c) List proposed key sub-consultants with qualifications and experience of individuals. Include key sub-consultant 
resumes in Attachments Section 5(b) Resumes. 
Structural Engineers  
O Caruso Turley Scott 
o David Troxell, SE, PE, Project Manager 
o Thomas Morris, SE, LEED AP, Partner/Structural Project Manager 
MEP Consultants 
O Pearson Engineering Associates 
o Jeff Ruthstrom, PE, Mechanical Engineer / Executive Vice President 
• 
LSW Engineers Arizona 
o Lance Jones, PE, President/Mechanical Engineer 
o Cory Killpack, PE, Vice President/Mechanical Engineer 
o Rick Patton, Senior Mechanical Designer 
o Philip Louw, PE, LEED AP, Vice President/Mechanical Engineer 
d) Projects the proposed individuals of your firm and other consultant firms have completed as a team. 
IMCOR has worked with all the consultants listed on design build, and/or design assist projects. We maintain a great 
working relationship with all of them, discussing projects that we are developing and scheduling needs. We discuss 
their work loads and availability for any project that is very demanding in regard to schedule, and get commitments 
so we can complete the projects as required by the client. All listed consultant firms are very forthcoming by letting 
us know whether or not they have staff available to meet our requirements. Additionally, some firms are more 
experienced in particular types of projects or systems and they will be utilized accordingly for their particular 
expertise. 
• 
LSW Engineers (Mechanical and Electrical Engineering) IMCOR has worked with LSW engineers on 
several Kyrene School District projects. A previous example is IMCOR worked with LSW on the APS DVN 
1 Phase II Renovation project. We worked closely together to procure the long-lead equipment before the 
design was complete, and to assure them that the equipment met all the requirements of APS and the design 
intent. We provided additional research for the team to make fast and informed decisions during the design 
process so IMCOR and LSW were in full agreement with submittals and materials. No substitutions were 
requested or required. 
• 
Pearson Engineers (Mechanical and Electrical Engineering) IMCOR has utilized Pearson Engineers on 
the ADOT Sign Shop, as well as on several design build projects, including SRP Coronado CECP Generating 
Station Absorber Building cooling systems located in St. Johns, AZ. IMCOR also utilizes Pearson Engineers 
for many smaller design projects in our Facilities Service Group that require permit design drawings. 
• 
Caruso Turley Scott and IMCOR worked as a team on the ADOT VRF and RTU Changeouts at 
miscellaneous sites and provided design for structural supports for other large equipment.

Statement of Qualifications 
HVAC job Order Contractor Solicitation No. 200019-J0C 
October 31, 2019 	
Page 5 
3 
Team Approach Capability 
3) Team Approach Capability 
a) Information and examples for successful "team" and "project" approach experiences the firm and its team 
members have had interacting with the County project personnel, the design professional project personnel, the 
design professional consultants, subcontractors and any stakeholders. 
IMCOR has many long-term service relationships with clients similar to Maricopa County, such as Scottsdale 
Health Care, CBRE, Mayo, Medtronic Microelectronics, and Banner Health, to name a few. In the case of Mayo, 
IMCOR is the exclusive plumbing service provider for all its campuses in the Phoenix Metro area. 
IMCOR approaches each of these customers with a coordinated and comprehensive plan as well as a detailed 
method of procedure for executing the work. IMCOR has provided everything from routine service work such as 
replacing of pumps and fans, to the installation of larger equipment such as cooling towers, chillers, and air-
handling units. Depending on the scope of a project, IMCOR frequently engages third party consultants, such as 
structural engineers, MEP engineers and commissioning agents, to assist in design and equipment selections. 
IMCOR regularly provides pre-construction services for its customers to assist in determination of the scope 
required to accomplish a particular outcome. Currently, IMCOR is in the preconstruction phase with a customer to 
help resolve a supply air issue from a functioning air handling unit. 
Additional examples of the team approach include IMCOR working with CCRD Partners (MEP engineers), to 
develop design drawings for Banner. For that project, the IMCOR-prepared scope was issued by Banner to other 
mechanical contractors for competitive pricing. IMCOR provided technical support to the engineers and Banner as 
well as an estimated cost of construction so the work could be included in Banner's annual budget. Ultimately, the 
work was performed by IMCOR after confirmation of accuracy in scope and price. 
Perhaps a few references will demonstrate IMCOR's team approach to projects: 
Bob Kerber 
From: 	
Sherick, William R. Jr. <Sherick.William@mayo.edu > 
Sent: 	
Monday, September 30, 2019 9:35 AM 
To: 	
Lazaro Izquierdo; Wesley Watts 
Cc: 	
Cordova, Benjamin F. (Ben); Buschta, Jennifer H.; Rivas, David; Pederson, Jon A.; Brown, 
Dayl S.; Sherick, William R. Jr. 
Laz I want to commend you and your teams on the great job Friday night of the heating water valve installation. The 
coordination and execution went off without a hitch. As unpleasant as a place it was to work didn't make your job an 
easier. You deserve a big pat on the back my friend. Thank You again.

Statement of Qualifications 
HVAC Job Order Contractor Solicitation No. 200019-JOC 
October 31, 2019 
• IMCOI 
Page 6 
Harry I—I. Mellon 
	
Awards 
IMCCIR recognized with Award of Merit for outstanding principles and practices 
in Job Clrcler Contracting 
Maraine, Arizona — IMCOR has been recognized as a 2018 Award of Merit Winner in the Harry H. Mellon 
Awards in Job Order Contracting for outstanding principles and practices in its Involvement In the AZ 
DEIVIA Renovations project with Arizona Department of Emergency and Military Affairs. 
The Arizona Department of Emergency and Military Affairs needed to quickly update an existing, 
outdated two-pipe heating and cooling system with a modern four-pipe system. The new system would 
increase efficiency, reduce energy consumption, facilitate individual room temperature controls and 
ultimately result in operational cost savings. The upgrades needed to comply with stringent on-site 
security protocols, and the flexibility of Job Order Contracting allowed 11V1COR to complete this project 
within the aggressive timeline. 
Job Order Contracting is a competitively bid procurement process used by building and infrastructure 
owners to save money by fast-tracking repair and alteration projects based on locally priced 
construction tasks and competitively awarded contracts. Since its invention In 1982, Job Order 
Contracting has developed into a popular solution for public agencies, such as municipalities, school 
districts, colleges and universities, transit systems and public housing authorities, to manage and 
expedite a large number of construction projects. 
The Harry H. Mellon Award of Excellence In Job Order Contracting is named for the inventor of the 
procurement process and is the highest honor In the industry. Award of Merit finalists are announced 
each year, with one of them going on to win the Harry H. Mellon Award of Excellence In Job Order 
Contracting. A panel of Industry experts chose the finalists and winner from among the projects 
submitted based on adherence to Job Order Contracting principles, innovation, complexity, special 
circumstances and overall time and cost savings. 
Since 2007, this award has recognized the facility owners, managers and contractors who perform the 
essential, yet often thankless, repair, alteration and maintenance work that is the core of the Job Order 
Contracting system, in an efficient and effective manner. The awards are sponsored by Gordian, the 
creator Job Order Contracting and a number of related construction-procurement systems. Gordian is 
the Job Order Contracting industry expert, and as such, advances the discipline through innovation, 
education and recognition. 
4 
Arizona Business and Location of Arizona Office 
4) Arizona Business and Location of Arizona Office 
IMCOR's existing Arizona office complex houses our New Construction, Facilities Services Group, Service 
Department, and Manufacturing Division offices and is equipped with full-service sheet metal, pipe fabrication, and 
plumbing pre-fabrication facilities. Located just a few minutes east of Downtown Phoenix, our property spans over 
one city block, affording us the benefit of storing and staging materials on our site in lieu of at project sites when 
necessary. 
We hold the following licenses appropriate for completion of work required of the HVAC JOG Contract: 
ARIZONA REGISTRAR OF CONTRACTORS 	
Expiration: 
  
94734 (B-1) 	General Commercial Contractor 	
08/31/21 
73195 (C-39) 	Air Conditioning and Refrigeration 	
09/30/21 
73196 (CR45) 	Commercial and Residential Sheet Metal 	
09/30/20 
84435 (C-37) 	Plumbing 	
09/30/21 
84436 (C-4) 	Commercial Boilers, Steamfitting and Process Piping 	
09/30/20 
225789 (CR-5) 	
Rescue Air Systems, Residential & Commercial 	
 10/31/20

imam 
Statement of Qualifications 
HVAC Job Order Contractor Solicitation No. 200019-J0C 
October 31, 2019 	
Page 7 
5 
Attachments 
5) Attachments 
a) General Contractor Arizona License 
The Proposer selected under this Request for Qualifications must hold an appropriate contractor license issued by 
the Arizona Registrar of Contractors when submitting the Proposal. Please include in the Proposal a statement that 
the firm holds the appropriate license, license type and contractor license number. 
b) Resumes (i.e., maximum one page each for five key firm individual's resumes) 
c) References (use Reference Format form, Part II, Attachment 1) 
d) Legal Worker Certification (Part II, Attachment 2) 
e) Surety Bond (current standard form of surety bond or use Part II, Attachment 3) 
f) Proposal Exceptions (NONE) 
g) Non-Collusion Affidavit (Part II, Attachment 4)

Billy Teston 	
Facility Services Division Manager 
Years of Industry Experience:  12 	
Years at IMCOR: 8 
Current Capacity:  Facility Services Division Manager 
As Division Manager, Billy oversees all aspects of the Facility Services (FS) Division from managing ten 
office personnel and up to thirty field personnel. The FS Division is designed to estimate, manage and 
complete all aspects of a wide variety of projects within itself. This means our customers get the knowledge of 
the estimator, the project manager and the field (who are involved in the projects before the initial proposal is 
sent out) all wrapped up in the project from day one. The FS division is designed to handle a wide variety of 
projects from tenant improvements and remodels and customer direct services and replacements, all the way to 
emergency replacements including high-priority shutdowns and repairs. 
Responsibilities include:  
• 
Oversee all HVAC, plumbing and piping work in the Facility Services Division 
• 
Review Estimates and project progress 
• 
Estimation and project management 
• 
Material, equipment and subcontractor purchasing and management 
• 
HVAC, plumbing and piping systems as well as structural steel and specialty sheet metal 
Recent Experience: 
Maricopa County JOC 
Mayo Clinic Hospital Service & Maintenance Contract 
Gordian — Arizona State JOC (various projects) 
AHCCCS PM Agreement (various projects) 
Medtronic Various Clean Room Remodels 
Medtronic Various Tool Relocations 
Medtronic Sub Fab Modifications 
Medtronic Bldg. 4 IC Waste Tank Replacement 
AT&T Data Center P t Floor Remodel 
Fan Wall Retrofits and Unit Replacements (serving Clean rooms) 
AT&T Data Center CRAC Unit install and Replacements 
Rogers Corporation — Headquarters Remodel 
Additional Experience: 
CAD Technician 
Project Management Courses 
Mechanical Engineering Studies 
ABA Leadership Development Forum Graduate 
References:  
Fernanda Munoz, Caliente Construction, Inc. (480) 894-5500 
Pierre Carlier, Medtronic (480) 377-2367 
Phil Huynh, Rogers Corporation (480) 433-1530

David Dickens 	
Service Division Manager 
Years of Industry Experience: 9 	
Years at IMCOR: 	
9 
Current Capacity: Service Division Manager 
In his current capacity as Service Division Manager, David works with the HVAC Technicians, Plumbing 
Technicians and the internal staff which consists of Accounting, Sales, Supervisors and Dispatching. He 
is involved with the overall operations of the Service business unit at IMCOR. He is also heavily 
involved with sales in regards to Job Order Contract, national accounts, healthcare institutions, and many 
local companies. 
Responsibilities include: 
• 
Work directly with the technicians, office personnel and report to the leadership team 
• 
Derive strategies to ensure business and increase efficiencies 
• 
Responsible for disseminating quality leads throughout the company and help align the best personnel 
to perform the work 
• 
Involved with all service work and proposal creation with the IMCOR Team 
• 
Selling more than $2,000,000 to new customers annually, surpassing division quotas consistently 
• 
Responsible for selling Service projects between $2,000 and $500,000 
• 
Retaining 98% of current customers by having multiple touch points and consistent strategy meetings 
• 
Analyze industry trends and potential customers' core competencies to consistently evolve and 
advance the IMCOR sales process. 
Recent Experience: 
Gordian — Arizona State JOC (various projects) 
AHCCCS PM Agreement (various projects) 
ADOT NW MVD unit replacement project 
ADOT (2) 10 Split system at Grand Canyon Airport 
ADOA - Backflow assembly project 
ADOT Harsco Boiler Replacement project 
City of Scottsdale - (3) controls/EMS projects 
References: 
Jim Hibbs (602) 316.0861 
Brit Olachea (602) 292.6560 
Rich Marotta (602) 769.7226 
Chris Franck (602) 292.6560 
Maurice Croteau (602) 501.9468 
Arizona Department of Transportation 
Arizona Department of Administration 
City of Scottsdale 
United Health Care 
Arizona Orthopedic

Rick Hogebaum 	
Estimating Manager/Preconstruction 
Years of Industry Experience: 34 	
Years at IMCOR: 	
1 
Current Capacity: 	
Estimating Manager/Preconstruction 
In his current capacity as Estimating Manager/Preconstruction, Rick manages the Estimating Department 
and reviews all cost estimates, providing assistance in preparation of studies, materials and methods, as 
well as recommendations as a conceptual and design/build/assist estimator. Rick oversees conceptual 
estimates and leads preconstruction efforts during design/build and design/assist phases of construction 
projects, through to the construction phase. 
Responsibilities include direct supervision of the estimating department staff and involvement in project 
bid selection, preconstruction activities, constructability reviews, value engineering, final review of 
detailed estimates, and budget control, and is liaison to customers in addition to his involvement in the 
daily functions of the corporation. 
Responsibilities include: 
• 
Bid selection 
• 
Assignment of projects 
• 
Preconstruction 
• 
Estimating Department Manager 
• 
Coordination with Project Management and Field Operations 
• 
Customer Liaison 
• 
Bid Review/Final Pricing 
Recent Project Experience: 
DPR Construction, Inc. 
DPR Construction, Inc. 
Wespac Construction, Inc. 
Archer Western 
Integrity Building Corp. 
Layton Construction 
TI for Limelight Networks at SkySong 5 
Spec Suite 300 at SkySong 5 
Isola TI Phase 2 
Scottsdale TGTF 
HonorHealth John C Lincoln Hyperbaric Chambers TI 
Deloitte TI at Rivulon Building 300 
References: 
John Newman (602) 956-1323 
Tyson Padget (623) 760-9200 
Brian Jones (480) 967-0880 
Additional Experience/Training: 
Wespac Construction, Inc. 
Environ, Inc. 
Renaissance Companies 
Estimation Management 
HVAC Layout/Sizing 
On-Site Assessment 
Labor/Materials Management 
Project Management 
Planning & Scheduling 
Relationship Management 
Crew/Contractor Supervision 
Business Management 
Project Reporting/Delivery 
Conflict Management 
Commercial/Industrial Equipment 
Microsoft Office (Word, Excel, & Outlook) 
FastEST, FastDUCT and FastPIPE estimation software

Friend Miller 	
Plumbing Service Manager 
Years of Industry Experience: 	
30 	
Years at IMCOR: 	
12 
Current Capacity: 	
Plumbing Service Supervisor 
In his current capacity as Plumbing Service Supervisor, Friend is directly responsible for the supervision 
and coordination of the safe, accurate and productive fabrication, assembly, and installation of complete 
mechanical system components in accordance with plans, specifications, schedule constraints, and state 
and local building codes. Friend is also responsible for trade/craft personnel working under his direction 
and their specific production-related activities on a daily basis. He is in charge of the plumbing team and 
is actively involved with Job Order Contract work. 
Responsibilities include: 
• 
Manages plumbing team 
• 
Meet with customers and attend operational and sales meetings. 
• 
Delegate Service Calls 
• 
Employee Training 
• 
Manage large service projects 
• 
Hiring for all plumbers or plumbing dispatchers 
Recent Project Experience: 
Gordian — Arizona State JOC (various projects) 
AHCCCS PM Agreement (various projects) 
Arizona Department of Juvenile Corrections 
- Hydro jetting project 
- 
Fire pumps project 
- Water softener install 
Piping projects 
ADOA 
- 8" Backflow preventer install 
References:  
Arizona Department of Juvenile Corrections 
Arizona Department of Administration 
Arizona Department of Transportation 
Additional Experience and Training: 
OSHA 30 
Trench Safety 
Confined Space 
Lockout - tagout 
Fall Protection 
Eddie Rodriguez (480) 800-7293 
Britt Olachea (602)542-6229 
Jim Hibbs (602)316-0861 
Forklift/Crane 
Personal Protective Equipment 
Forklift, Scissor Lift, Boom Lift Oper. Training 
Orbital Welding 
Journeymen License

Mario Zamora 	
Senior Superintendent 
Years of Industry Experience: 	
28 	
Years at IMCOR: 20 
Current Capacity: 	
Facility Services Senior Superintendent 
In his current capacity as Senior Superintendent, Mario is directly responsible for the supervision and 
coordination of the safe, accurate and productive fabrication, assembly, and installation of complete 
Plumbing and Piping system components in accordance with plans, specifications, schedule constraints, and 
state and local building codes. He is responsible for trade/craft personnel working under his direction, and 
their specific production-related activities on a daily basis. Mario's extensive industry experience is a 
valuable asset to our company. Prior to becoming Senior Superintendent Mario was the plumbing 
superintendent and for a time managed the Plumbing Service Department at IMCOR. 
Responsibilities include: 
• 
Provide training for new workers and apprentices 
• 
Inspect work in progress and upon completion, by task, to ensure conformance to contract documents 
• 
Supervise and assign work activities for field personnel 
• 
Interpret specifications, blueprints and job orders 
• 
Interpret and enforce company policies, procedures and safety regulations 
• 
Periodic review of job submittals and associated reports, job schedule, shipping dates, job cost 
documents, manpower and crew costs with the respective trade General Superintendent and project 
management personnel 
• 
Attendance at turnover and subcontractor meetings and communication and coordination with office 
administration, production shop departments, and other trades for securing materials and equipment 
is essential to a successful project. 
Recent Experience: 
Maricopa County JOC 
Mayo Clinic Hospital Service & Maintenance Contract 
Gordian — Arizona State JOC (various projects) 
AHCCCS PM Agreement (various projects) 
Medtronic Tempe Campus (various projects) 
Apogee Clinic Remodel 
Encore Plumbing Upgrades 
City of Phoenix Flare Relocation 
North Scottsdale Surgery Center Plumbing and Med Gas TI 
Florence Prison Water Line Replacement 
Florence Prison Waste and Vent Stack Replacement 
Additional Experience/Qualifications: 
OSHA 30, OSHA 10 	
OSHA Forklift Operator Training 
Confined Space 	
Trench Safety 
Foreman's Supervisory Training 	
Scissor and Boom Lift Operator Training 
New Hire Orientation 
References:  
John Ray 	
Hunt Construction Group, Inc. 
Mike Moses 	
Hunt Construction Group, Inc. 
Jeff Cracker 	
McCarthy General Contractors, Inc.

CARUSO 
TURLEY 
SCOTT 
St ructural 
engineers 
21 YEARS OF EXPERIENCE 
18 YEARS WITH CTS 
EDUCATION 
B.S.E. 1998 Civil Engineering 
Geneva College 
Beaver Falls, PA 
PROFESSIONAL REGISTRATION 
Structural Engineering 
AZ 	
2003 40293 
CA 	
2007 S4994 
PA 	
2002 	
061832 
Civil Engineering 
CA 	
2001 	
C61755 
National Council of Examiners for 
Engineering & Surveying: 
NCEES 2005 	
26565 
Structural Specialist I 2010— Present 
Dept of Homeland Security I FEMA 
National Urban Search & Rescue 
Arizona Task Force One (AZ-TF1) 
400+ Hours Specialized Training 
lig PROFESSIONAL ASSOCIATIONS 
Member, ASCE/SEI 
Member, SEAoA SEER Co-Chair 
Member, NCSEA SEER Co-Chair 
z VOLUNTEER 
State of California 
Safety Assessment Evaluator/ 
Coordinator 
ICC 
"When Disaster Strikes" Instructor 
Missouri SAVE Coalition 
Evaluator/Coordinator 
Arizona Earthquake Safety Council  
As an accomplished structural 
engineer and project manager with 
21 years of experience, David will lead 
the structural team for the Maricopa 
County HVAC Job Order Contract. 
David will work in close collaboration 
with the project architect and project 
team members. He has proven 
technical expertise, innovative designs, 
and critical coordination skills. 
David has engineering design 
experience working for Maricopa 
County. His extensive professional 
experience includes mechanical units. 
DAVID TROXELL, SE, PE 
PROJECT MANAGER 
*
ENGINEERING 
RESPONSIBILITIES 
• Project Management 
• Technical leadership in 
structural systems, elements, 
design & analysis software 
• Collaborate/coordinate with 
design disciplines, attend 
project meetings 
• Supervise preparation of 
structural drawings, details & 
reports 
• Value engineering leadership 
RELEVANT EXPERIENCE 
Maricopa County Public Health Services — Phoenix, AZ 
Gila County Jail HVAC Upgrade — Globe, AZ 
Tucson Prison HVAC Upgrade — Tucson, AZ 
ADOT Tucson HVAC Upgrade — Tucson, AZ 
City of Phoenix Morten Yard Foundation Repair On-Call Services — Phoenix, AZ 
Carmax Call Center New Roof Mechanical Screening — Tempe, AZ 
Focus Climbing Gym Mechanical Unit — Mesa, AZ 
Arizona State University Physical Ed. West Building Mechanical Units — Tempe, AZ 
The Walking Company New Mechanical Unit Review — Concord, NH 
Payson High School Mechanical Revisions — Payson, AZ 
Chino Valley High School Roof Mounted Mechanical Units — Chino Valley, AZ 
The Beach Tanning Salon Roof Mechanical Unit — Phoenix, AZ 
Cox at Tempe Marketpalce New Mechanical Units — Tempe, AZ 
STRUCTURAL ENGINEERING SOLUTIONS SINCE 1963 	
1215W Rio Salado Pkwy, Suite 2001 Tempe, AZ 852811480.774.17001 www.ctsaz.com

CARUSO 
TURLEY 
SCOTT 
structural 
engineers 
31 YEARS OF EXPERIENCE 
31 YEARS WITH CTS 
EDUCATION 
B.T. 1988 Civil Engineering 
Rochester Institute of Technology 
Rochester, NY 
Di PROFESSIONAL REGISTRATION 
Structural Engineering 
AZ 	
1996 	
30562 
DE 	
2016 	
20643 
ID 	
2015 	
16611 
MT 	
2016 42347 
SD 	
2016 	
12974 
WI 	
2016 44984 
National Council of Examiners for 
Engineering & Surveying: 
NCEES 2015 	
61315 
U.S. Green Building Council 
LEED 	
2004 	
Accreditation 
PROFESSIONAL ASSOCIATIONS 
SEAoA 
THOMAS MORRIS, SE, LEED AP 
PARTNER I STRUCTURAL PROJECT MANAGER 
As an accomplished structural 
engineer and project manager with 
31 years of experience, Tom will lead 
the structural team for the Maricopa 
County HVAC Job Order Contract. Tom 
will work in close collaboration with 
the project architect and project team 
members. He has proven technical 
expertise, innovative designs, and 
critical coordination skills. 
*
ENGINEERING 
RESPONSIBILITIES 
• 
Project Management 
• Technical leadership in 
structural systems, elements, 
design & analysis software 
• Collaborate/coordinate with 
design disciplines, attend 
project meetings 
• Supervise preparation of 
Tom has a strong background working 	
drawings, details & reports 
with Maricopa County. 	
• Value engineering leadership 
His diverse design experience includes 
all types of mechanical units. 
RELEVANT EXPERIENCE 
Maricopa County Structural Engineering Services Contract  — Maricopa County, AZ 
Serial No. 180009-ROQ 
Contract No. 180009-ROQ 
Example Projects: 
Estrella Jail Bldg Woven Rod Security Screen Walls 8t Doors, 4th Ave. Jail Screen Welding Review, Public 
Health Building Parking Garage Deck Review 
Term: 2017-2022, Ongoing since 2009 
Maricopa County Community College On-Call Services — Phoenix, AZ 
Contract No. 3299-2-75 
Example Projects: Mesa Community College Storage Building 
Term: 2015-2020, Ongoing 
State of Arizona Dept. of Administration Contract  — Various Locations, AZ 
Vendor No. IV0000002945 
Contract No. BPM000£342 
Example Projects: Capitol Museum Underground Tunnel Traffic Loading Review, Attorney General Parking 
Garage Repair, Senate & House of Representatives Buildings Structural Roof Review 
Term: 2019-2020 
Maricopa County OET Site 14-08 HVAC Unit Upgrades — Phoenix, AZ 
City of Phoenix Sky Harbor Airport T4 G1 Mechanical Unit Upgrades — Phoenix, AZ 
City of Scottsdale Mountain View Park HVAC Upgrades — Scottsdale, AZ 
City of Scottsdale Police Dept Station No. 2 Mechanical Units — Scottsdale, AZ 
City of Glendale Airpark HVAC Maintenance & Upgrade — Glendale, AZ 
Salt River Pima-Maricopa Indian Community Public Works HVAC — SRPMIC, AZ 
Arizona State University Physical Education East Building HVAC Upgrades — Tempe, AZ 
Arizona State University Physical Ed. West Building Mechanical Units — Tempe, AZ 
Arizona State University Engineering Ctr Air Handler Unit Replacement — Tempe, AZ 
Paradise Valley Unified School District HVAC Upgrades — Phoenix, AZ 
Red Mesa School District HVAC Upgrades — Res Mesa, AZ 
STRUCTURAL ENGINEERING SOLUTIONS SINCE 1963 	
1215 W Rio Salado Pkwy, Suite 200 I Tempe, AZ 85281 I 480.774.1700 I www.ctsaz.com

COMPANY PROFILE 
BUILDING TYPE EXPERIENCE 
• Healthcare 
• Commercial 
• Research I Technology 
• Educational 
• Hospitality 
• Industrial 
• Multi-Family I Residential 
• Recreational 
• Municipal 
• Federal I State Military 
• Sustainable Design I LEED 
• Solar Structures 
• Aviation 
STRUCTURES 
• Structural Engineering Design 
• Construction Administration 
• Forensics & Failure Analysis 
• Restoration & Renovation 
• Special Structural Inspections 
TECHNOLOGY 
• 3D BIM REVIT Structural 2018 
• AutoCAD Structural 2018 
REGISTRATION I CERTIFICATION 
• 50 States + Washington D.C. 
• United States Territories 
Puerto Rico 
• US Green Building Council 
LEED Accredited Project 
Managers 
• Federal System for Award 
Management (SAM) 
Certified Small Business 
• "Self-Certification" Program 
Third Party Structural Reviews 
RIA71,7 
Caruso 
Turley 
Scott 
structural 
engineers 
Caruso Turley Scott structural engineers, was founded by Sam Caruso 
in 1963 on the promise of excellence in engineering, outstanding 
customer service, and integrity. Building upon that strong foundation is 
a successful reputation for responsiveness, efficient and progressive 
design solutions, and extensive experience in all building types 
including complex projects that benefit from BIM three-dimensional 
modeling. Our team is licensed in all 50 states where we have made 
a lasting impact on communities across the continent. 
Because we are experts in structural design, our innovative engineering 
team can provide practical and economical solutions. We also diagnose 
structural problems, determine the cause and origin of failures, and 
help restore the potential market value of deteriorated structures. 
Caruso Turley Scott's high level of repeat client business demonstrates 
our ability to meet or exceed our clients' expectations. 
BUSINESS FACTS 	
Caruso Turley Scott has a long-standing 
Founded 1963 	
successful performance record meeting the 
Incorporated 1972 	
quality, time, and budget constraints set by our 
82 Current Total Team 	clients. "Highly accurate, quick to respond and 
73 Current Technical Team 	 unbelievable attention to details." 
37 Licensed Engineers 	
- Client: Greg Mooney 
1 COMPANY 	
50 STATES 	
56 YEARS 
1215W. Rio Salado Pkwy, Suite 200, Tempe, AZ 85281 
I  480.774.1700  I  www.CTSAZ.com

Education: 
B.S.M.E., Montana 
State University 
Registration: 
Arizona No. 20975 
Eight other states 
Experience: 
With LSW: Since 1993 
With Others: 10 years 
Professional Affiliations: 
• 
American Society of 
Heating, 
Refrigeration and Air 
Conditioning 
Engineers (ASHRAE) — 
Past President 
• 
American Society of 
Plumbing Engineers 
(ASPE) 
• 
Air Conditioning 
Contractors of 
America (ACCA)- Past 
Board Member and 
Committee Member 
• 
American Council of 
Engineering 
Companies (ACEC) — 
Current Board 
Member 
• 
AIA Affiliate Member 
• 
Arizona Association 
of Economic 
Development (AAED) 
LSW Engineers 
ARIZONA, INCORPORATED 
Lance A. Jones, PE 
President / Mechanical Engineer 
Lance has extensive experience in the analysis and design and layout of HVAC and 
plumbing systems, and energy analysis of building systems. He directs a staff of mechanical 
engineers and designers in the preparation of technical reports, engineering investigations 
and concept studies; preparation of preliminary and final design; preparation of contract 
drawings and specifications; cost estimating and preparation of sketches; and plan 
checking activities. Lance serves as President and remains active in project activities. 
GOVERNMENT 
Maricopa County I Southeast Regional Justice Center, Mesa, AZ: Project Manager for a 
four-story, 235,000-SF courthouse facility housing adult probation, sheriff's substation, 
four justice courts, three EDC/RCC Courts, general administrative offices, and 
maintenance area. Construction was put on hold due to funding. 
Arizona State Health Laboratory, Phoenix, AZ: Mechanical Engineer for the retro-
commissioning/energy audit services. Modifications were implemented to reduce 
utility costs. Duct static pressures were lowered, chilled water temperatures were 
raised, new dampers and actuators on exhaust fans were installed and redundant 
exhaust fans were shut down along with reprogramming of the building management 
system. Occupied and unoccupied temperature schedules were set up in October and 
in February the chilled water plant was scheduled to be shut down in unoccupied 
times and when the outside air temperature was below 60 degrees. 
Federal Bureau of Investigations Headquarters Building, Las Vegas, NV: Project Manager 
for a 107,000-SF building to accommodate FBI operations. Features included an 
emergency operations center, witness interview rooms, photo lab, computer forensics 
unit, gun vault and training simulator room and a 74,415-SF parking garage. 
City of Phoenix 
• 
Phoenix Convention Center, Phase I: Project Manager for the Phase I renovation 
consisting of a new four-level structure with a 46,000-SF ballroom on the third level, a 
21,000-SF Conference Center on level two, 26,000-SF meeting rooms on level one, and 
a 64,000-SF exhibition hall on the lower level. A sky bridge connects the Phase 1 
meeting facility with the existing and expanded convention center.  (LEED Si lver) 
• 
Estrella Police Precinct: Project Manager for this 25,000-SF facility with offices for 
command, administrative staff and motoring officers; holding cells for adults and 
juveniles; interview and monitoring rooms; public space for lobby, meeting room, 
restrooms, walk-up counter and a 30-person briefing room. 
• 
Mountain View Police Precinct: Project Manager for a 25,720-SF facility that houses 
offices, holding cells, mug shot and processing area, officer restrooms, lockers, break 
room, public spaces, restrooms, briefing room, three- to four-bay shooting range and 
storage areas, and a 3,000-SF vehicle maintenance facility on site. 
• 
Black Mountain Police Precinct: Project Manager for a 25,884-SF police precinct that 
contains nine holding cells, mug shot and processing area, interview and monitoring 
areas, officer restrooms, lockers, break room, public spaces and restrooms, briefing 
room, equipment and evidence storage, and three-bay shooting range and storage. 
• 
Smokehouse Trail Police Precinct, Phoenix, AZ: Project Manager for a 25,720 -SF 
station that includes a 3,000-SF, four-bay vehicle maintenance facility with two large 
and two small vehicle lifts, and general vehicle maintenance equipment.

LSW 1-4,11 g ineers 
ARIZONA, INCORPORATED 
City of Tempe I  Transportation Center: Principal in charge for this 40,000-SF, three-story 
building that houses city offices, transportation control/command center, transit 
store, retail areas, bike valet, shower/locker spaces, multi-use leased office space and 
a 2,000-SF community room.  (LEED Platinum) 
City of El Mirage I  Police Station: Project Manager for this 20,000-SF police station 
containing administrative offices, evidence processing and storage, cells for juveniles 
and adults, a firing range with armory, K-9 facilities, public training and media rooms, 
locker rooms, and briefing rooms. Mechanical scope includes design for HVAC 
systems; plumbing design for restroom fixtures, drinking fixtures, showers, and hose 
bibbs. 
City of Goodyear I  Goodyear Operations Center: Project Manager for the 5,000 -SF 
Operations Center with planning for a future addition to be approximately 5,000 SF. 
Mechanical scope included design for HVAC and exhaust to include ductwork, 
equipment and controls. Plumbing design for building interior needs include storm 
water design and gas piping design. 
JUSTICE 
Santa Clara Jail Construction Project Management Design Review Services, Santa Clara, 
CA: Project manager for the new Main Jail South (MJS) and includes demolition of the 
existing MJS, rerouting of essential functions such as emergency generators, 
secondary medical transport, loading dock and other site utility services, and then 
construction of a new ±550-bed, five-story facility. The new MJS may include integral 
or separate structures for listed rerouting functions, a new county-wide booking 
system, a new visitation lobby and a 30,000-SF administrative office space beyond the 
programming of Main Jail East. 
El Dorado Public Safety Building, El Dorado, CA: Project Manager for a new 110,000 -SF 
public safety facility consisting of five buildings located on a 13-acre site. LSW provided 
mechanical, plumbing, electrical and technology engineering services for a new 
campus style complex to consolidate all functions of the El Dorado County Sheriff — 
Coroner and Public Administrator. The buildings included Public Safety —61,000 SF; 
Property/Evidence Building — 17,000 SF; Morgue —4,000 SF; Special Operations — 
15,000 SF; and, Armory/Shooting Range — 12,000 SF. 
Arizona State Prison Complex (ASPC) 
• 
4,000-Bed Minimum Security Prisons 
o 
Cibola Unit: Project Manager for the 1,000-bed minimum level custody male 
w/medium level fence, Yuma 
o 
La Paz Unit: Project Manager for the 1,000-bed minimum level custody male 
w/medium level fence, Yuma 
o 
San Carlos Unit: Project Manager for the 1,000-bed minimum level custody 
female, Perryville 
o 
Whetstone Unit: Project Manager for the 1,000-bed minimum level custody male, 
Tucson 
• 
1,000-Bed Minimum Security Prisons 
o 
Catalina Unit: Project Manager for the 300-bed low custody male, Tucson 
o 
Eggers Unit: Project Manager for the 200-bed low custody male, Douglas 
o 
Piestewa Unit: Project Manager for the 200-bed low custody female, Perryville 
o 
Santa Rosa Unit: Project Manager for the 300-bed low custody male, Perryville 
• 
ASPC I  Florence 
o 
Eyman Rynning Unit: Project Manager for the replacement of old and 
deteriorated evaporative cooling units serving the housing units.

LSW Fn.6neers 
ARIZONA, INCO- RPORATED 
o 
Eyman SMU 1: Project Manager for the replacement of the final four existing air 
handler units. 
o 
Eyman SMU 1: Project Manager for the evaluation of hot water consumption, 
pipe sizing, mixing valves and design of new water softener. 
• 
ASPC I Perryville: Project Manager for the site gas re-pipe at Perryville Prison for the 
Santa Maria Unit, Lumley Unit, Santa Cruz Unit and San Pedro Unit. 
• 
ASPC I Tucson, Rincon Unit: Project Manager for the replacement of cooling towers 
and re-piping of condenser water 
CDCR R.J. Donovan Infill Facility, San Diego, CA: Project Manager for this Level II 259,000 - 
SF facility with 792 beds in three housing units; a Facility Support Services building 
with healthcare services, laundry, canteen and dining areas; a Program Support 
Services building for general visiting, religious programs, classrooms, library, indoor 
recreation, and administrative area; a family visiting building, and a warehouse. 
Central Valley Juvenile Detention Center, San Bernardino, CA: Project Manager for this 
144,068-SF juvenile detention facility consisting of three identical 80-bed housing 
units and one 40-bed unit. Each 40-bed pod, within the housing units, includes a 
dayroom, living quarters, shower/toilet, and classroom. Support areas include 
administration, medical, receiving/warehouse, and a 5,200-SF full kitchen and staff 
dining. 
John M. Roll United States Courthouse, Yuma, AZ: Project Manager for a this 57,000 -SF 
building with two courtrooms, U.S. Marshalls, holding cells, Clerk of Courts, pre-trial, 
and probation. Sustainable Measures included domestic solar hot water, solar 
photovoltaics, and high efficiency chillers.  (LEED Si lver) 
Maricopa County ITR and Jail Expansion: Mechanical Engineer for a new single story, 
153,600-SF building, which will house a 512-bed, 72-hour Inmate Transfer and Release 
(ITR) facility, along with a 320,000-SF 1,280-bed medium-security detention facility. 
Oren R. Fox, Imperial County, CA: Project Manager for a 58,200-SF two-story, medium 
security adult detention facility that houses and provide treatment and program space 
for 270 male and female pretrial and sentence inmates. The housing units consists of 
six two-tiered 45-bed dormitory style housing units with a double bunk configuration 
to house 270 inmates in approximately 22,300 SF. A second building consisting of 
8,700 SF will be a video visitation center with vocational print shop located outside of 
the secure perimeter, but on the same site, to allow for public access. 
ASPC Yuma Cheyenne Unit: Project Manager for the systems and infrastructure to 
remediate damage done to the Laundry and Kitchen buildings from waterflow from 
the evaporative cooling units and resultant demolition by staff. 
OTHER 
Ak-Chin Indian Community, AZ 
• 
Fire Station: Project Manager for a new approximately 21,000 SF fire station. The 
facility houses 12 full time staff and includes four apparatus bays; office areas for 
chief, captain, administration and IT; conference room; dorm rooms; fitness area; 
kitchen/dining; work room, and support areas. Also included is an Emergency 
Operations Center (EOC) that may double as a classroom for 30 to 50 people. 
• 
Justice Center: Project Manager for a new 54,000 SF multipurpose Justice Center, 
which consists of an approximate 19,000 SF detention area, 10,500 SF police area, 
12,000 SF court area, 8,000 SF firing range, outdoor storage and impound 
areas. Mechanical systems for HVAC and exhaust were provided for all occupied 
areas.

LSW Iingineers 
ARIZONA, INCORPORATED 
Bank of American (previously Countrywide Home Loans), Chandler, AZ: Project Manager 
for the expansion of three nearly identical 180,000-SF structures. Also included was 
the design for a 12,400-SF, 2,800-ton central plant to serve the campus, and design for 
a five-story, 661,000-SF above-grade parking garage to accommodate 1,990 vehicles 
(site lighting design included). Project was put on hold at 75% construction due to 
funding issues. 
Bank of America (previously Countrywide Home Loans, Tempe, AZ: Project Manager for 
the tenant improvement of a 226,000-SF facility. Approximately 50% of the plumbing 
fixtures were removed and replaced and new air conditioning distribution was 
provided. 
Las Vegas Review Journal - Donrey Outdoor Systems Building, Las Vegas, NV 
• 
Phase 1: Project Manager for the tenant improvement to various areas in the building 
including removal of central staircase and framing in the opening at the mezzanine 
level to match existing floor and ceiling; remodel of single men's restroom into ADA 
men and women toilet rooms; and adding air conditioning to the Telemarketing 
Department. 
• 
Project 2: Project Manager for the renovations to the 10,000-SF post office building 
and 4,810-SF tenant improvement space in the main facility. 
Palo Verde Nuclear Generating Plant, Tonopah, AZ: Mechanical Engineer for this one-
story 26,000-SF building with approximately 6,000 SF of interior conditioned space. 
The mechanical scope included packaged ground mounted HVAC systems, exhaust 
system, distribution of ductwork and diffusers, heating and cooling load calculations 
for the 6,000-SF conditioned space. 
Mesa Arts Center, Mesa, AZ: Project Manager for the 180,000-SF facility that includes four 
performing arts theaters, technical support, public spaces, administration, Mesa 
Contemporary Arts, Mesa Arts Center, commercial support, community spaces, and 
outdoor spaces. Mechanical design included a district cooling plant and highly 
performing acoustical air systems. 
Herberger Theater Renovations, Phoenix, AZ: Project Manager for the renovations of the 
existing 62,117-SF theater that houses three theaters: an 802-person large 
theater, 332-person small theater, and a black box theater. Mechanical renovations to 
the theater included replacement of major components within all HVAC systems. The 
existing air handlers were fully refurbished and control valving was replaced. 
Estrella Community College Performing Arts, Avondale, AZ: Project Manager for a new 
24,895-SF performing arts building consisting of stage and seating between 300 and 
350 people. 
Mesa District Cooling Plant, Mesa, AZ 
Project Manager for the central plant design of three 900-ton chillers with expansion 
provisions to 4,500 tons. 
Mesa District Cooling Plant Expansion, Mesa, AZ: Project Manager for the addition of a 
fourth 950-ton water cooled chiller, cooling tower, condensing and chilled water 
pumps to the existing district chiller plant. Also included was a master plan update for 
expansion of the piping infrastructure and connection updates. 
OLDER PROJECTS 
JUSTICE 
Adobe Mountain Juvenile Facility, Phoenix, AZ: Project Manager for the replacement of 
AC units in miscellaneous areas in the facility. Areas include Business area, 
Warehouse, Visitation area, West Unit Kachina building, West Unit Voyager building, 
Health Unit, Separation Unit and Central Control. 
Catalina Mountain Juvenile Facility, Phoenix, AZ: Project Manager for the chiller

LSW Engineers 
ARIZONA, INCORPORATED 
replacement. 
Arizona State Prison Complex (ASPC) 
• 
Florence 
o 
Eyman Rynning Unit: Project Manager for the replacement of old and 
deteriorated evaporative cooling units serving the housing units. 
o 
Eyman SMU 1: Project Manager for the replacement of the final four existing air 
handler units. 
o 
Eyman SMU 1: Project Manager for the evaluation of hot water consumption, 
pipe sizing, mixing valves and design of new water softener 
• 
Perryville: Project Manager for the site gas re-pipe at Perryville Prison for the Santa 
Maria Unit, Lumley Unit, Santa Cruz Unit and San Pedro Unit. 
Clark County Detention Center, Las Vegas, NV: Project Manager for this new 1,000 -bed 
detention center on a 17-acre site. The facility is approximately 232,000 SF and 
includes a two-story administration area, warehouse and central plant. The housing 
area is approximately 143,000 SF in one building with two floors and a mezzanine. 
Design includes planning for another future 1,000 beds. 
GOVERNMENT 
City of Phoenix 
• 
Fire Station No. 50: Project Manager for a new 12-person, 4-bay, 13,500 SF fire station 
located on 2.2 acres. The facility includes fitness, training, sleeping quarters, kitchen, 
2,000-gallon fuel storage tank, and natural gas fired emergency generator.  REED Certified) 
• 
Fire Station No. 56: Project Manager for a new 13-person, 4-bay, 13,500 SF fire 
station, CMAR project located on 2.5 acres. The facility includes workout room, 1,000 
SF community room, roof-mounted equipment, above-grade 2,000-gallon fuel tank. 
• 
Fire Station No. 62: Project Manager for a new 2-bay, 8,500 SF fire station on 2.5 acres 
including sleeping quarters, kitchen, workout room, and 1,000 SF community room. 
The facility also has a 2,000-gallon fuel tank. A "Green" building with fire sprinkler. 
• 
Fire Station No. 43: Project Manager for a new 12-person, 17,000 SF fire station with 
Battalion Chief Office, four bays, 1,000 SF community room, 800 SF Weight Room, and 
5,000 SF office space. Sleeping quarters are dormitory style with individual 10' x 10' 
bedrooms. The kitchen is commercial grade. 
• 
Fire Station No. 54: Project Manager for a new 12-person, 4-bay, 13,500 SF fire 
station. The facility included fitness room, community room, sleeping quarters, 
restrooms, kitchen, fuel island, and heating by gas. Green design but no LEED 
certification sought. 
City of Tempe I Apache Boulevard Police Substation/Evidence Storage Facility: Project 
Manager for a 45,325-SF police substation with "911" dispatch equipment, 28,727-SF 
property/evidence storage building, 6,062-SF vehicle storage building, and a packaged 
central plant that provides chilled water for cooling both facilities. 
City of Glendale 
• 
City Courts Building: Project Manager for a 93,000-SF, three-story building with a 
small below-grade secure parking area. The facility was designed to include 10 
courtrooms with design for four future courtrooms, judges' chambers, jury rooms, 
conference rooms, inmate holding area, and vehicle sally port. Construction was 
stopped due to funding. 
• 
Western Area Regional Public Safety Facility: Project Manager for a 34,000 -SF 
combined police substation and fire station. The project includes administrative space 
for 75 officers and other support staff of the police department, four engine bays, 
living quarters for 12 fire department personnel, and health maintenance area. In 
addition, the building design accommodates a future crime laboratory. Package 
rooftop equipment was used for environmental control in occupied spaces. 
• 
Municipal Field Operations Complex: Project Manager for a 100,000-SF maintenance

LSW _Lngineers 
ARIZONA, INCORPORATED 
and operations facility comprised of six buildings including administration building, 
vehicle maintenance with a three-stall welding bay, 23 heavy duty maintenance and 
repair bays, and 10-bay light duty maintenance bays; four-station tire bay; light duty 
and heavy duty wash bays; guard station, and warehouse. 
• 
Fire Department Office: Project Manager for the tenant improvements of an 11,700- 
SF third-floor office space. Project included remodel of existing restroom group, both 
men and women. Mechanical design included reconfiguring duct work for the new 
tenant improvement space and updating outside air system to meet current codes. 
City of Avondale I Northwest Public Safety Facility #74: Project Manager for an 18,252-SF 
joint-use public safety facility with the City of Avondale and Estrella Mountain 
Community College. It houses an Avondale police substation, the college's public 
safety office and two classrooms. The fire station has a nine-person crew and full-size 
ladder truck. 
City of Mesa I District Cooling Plant: Project Manager for the master plan for three new 
expansion connections for the police department main building, Mesa Plaza and ISD 
Building. Project included the addition of a fourth 950-ton water cooled chiller, cooling 
tower, condensing and chilled water pumps to the existing district chiller plant. Also 
included was a master plan update for expansion of the piping infrastructure and 
connection updates. 
Maricopa County 
• 
Nova Safe Haven, Phoenix, AZ: Project Manager for a 13,000-SF building addition to 
an existing site. The facility provides personal care services and houses on a temporary 
basis the homeless that suffer from mild forms of mental disability. The building 
consists of two sleeping areas, each of which has its own private dayroom and exterior 
courtyard, one for male occupants and the other for female occupants. Other primary 
spaces include intake and reception areas with drop-in dayrooms and an exterior 
courtyard for visitors. The building also includes toilet and shower facilities and has a 
small dining room with a full functioning commercial kitchen. 
• 
Northwest Regional Justice Courts, Surprise, AZ: Project Manager for a 36,000-SF 
courts building. This facility contains courts, judicial suites, and administrative space. 
Mechanical design included HVAC design for an air-cooled chiller with VAV distribution 
and electric heat. 
• 
San Tan Regional Justice Courts, Chandler, AZ: Project Manager for a 43,610-SF courts 
building including four courtrooms, judicial suites, hearing rooms, 
conference/mediation rooms, workstation, and secured parking and administrative 
office space. Design included HVAC for package rooftop units and electric heat and 
general plumbing. 
• 
Sheriff's Office I Property Storage and Evidence Storage: Project Manager for this 
50,000-SF facility for the storage of all County Evidence, Inmate Personal Property, 
found property and all biological evidence. Special amenities include a large pallet rack 
evidence storage, outside storage for flammables, bullet proof reception areas, high 
security cameras, card access security system and an impound yard. 
• 
Sheriff's Office I Aid Stations: Project Manager for the demolition of existing buildings 
and replacing with a new like-in-kind for Canyon Lake (1,100 SF), Apache Lake (1,100 
SF), and Bartlett Lake (1,800 SF). 
• 
Sheriff's Office I Durango Parking Garage: Project Manager for the tenant 
improvements of the first-floor parking structure consisting of 18,852 SF. Facility 
includes two telecom rooms of approximately 800 SF each, which required back-up 
power and HVAC. Two new restroom groups; one for public use and one for high 
abuse environment. There is a fish and mosquito holding area that also required back-
up power and HVAC. 
Durango Juvenile Facility: Project Manager for Phase 5 renovation converting 
approximately 6,000 SF of medical area to a life skills and counseling area.

LSW E ngineers 
ARIZONA, INCORPORATED 
Pinal County Courts, Florence, AZ: Project Manager for a four-story, 127,000-SF courts 
building that includes multiple courtrooms, administration offices, inmate holding 
areas and archives/storage areas. 
Polly Rosenbaum Archives & History Building, Phoenix, AZ: Project Manager for a 
212,755-SF facility that holds the State of Arizona's historical artifacts, legal 
documents and other items of legal, social and historical significance. 
OTHER 
Countrywide Home Loans, Expanded Frye Road Campus, Chandler, AZ: Project Manager 
for a 15,433-SF Central Plant, which was designed for a final build out of 2,800 tons 
and consists of two 1,050-ton chillers and one 700-ton chiller. There is also a 
Generator yard with two 2-megawatt generators to provide full backup of building 
services. 
Salt River Pima -Maricopa Indian Community / Detention Center, Scottsdale, AZ: Project 
Manager for a 500 -ton refrigeration plant with a 250 -ton expansion. 
Salt River Pima -Maricopa Indian Community, AZ 
• 
Detention Center: Project Manager for a 75,000-SF, 120-bed detention facility with 
design for future expansion for 200 additional beds. Project also included the 
evaluation of central plant expansion to add 25,000 SF of future office space. 
• 
Indian School Police/Fire Substation: Project Manager for a new 21,340-SF police/fire 
Substation located on 3.2 acres. The police department includes prisoner holding and 
interview area, workspaces for patrol officers to file reports, store information and 
attend daily briefings. There is a training resource room for the officers, officer space, 
and locker rooms. The fire department includes four apparatus bays, 12 bunk rooms, 
day room, training room, and locker/shower areas. There is a shared exercise room for 
the fire and police departments. 
• 
Hualapai Nation Juvenile Detention and Rehabilitation Center, Peach Springs, AZ: 
Project Manager for a 23,000-SF juvenile male and female facility in two-story housing 
units. The units accommodate 11 females and 10 males, with a possible 10 additional 
beds for males only. The administration, training/education, and support areas are in a 
single-story building. 
• 
Fort McDowell Yavapai Nation Criminal Justice Center, AZ: Project Manager for the 
37,225-SF mixed-use facility housing a fire station, police station, adult and juvenile 
detention, court facilities, and prosecutor offices. 
Glendale Municipal Field Operations Complex, AZ: Project Manager for a 100,000 -SF 
maintenance and operations facility comprised of six buildings including 
administration building, vehicle maintenance with a three-stall welding bay, 23 heavy 
duty maintenance and repair bays, and 10-bay light duty maintenance bays; four-
station tire bay; light duty and heavy duty wash bays; guard station, and warehouse. 
Highland Service Center, Phoenix, AZ: Project Manager for this facility with a 24,000-SF 
warehouse; 13,300 SF of equipment and general shop space; 44,000 SF of 
administrative space, two drive-through wash bays, fueling station, and parking for 
360 vehicles both public and large equipment. 
Tempe Police Substation/Evidence Storage Facility, Tempe, AZ: Project Manager for a 
45,325-SF police substation includes a 6,062-SF large vehicle storage building with a 
vehicle cleaning station. 
ADOA 4000-Bed Expansion -Yuma Complex, Yuma, AZ: Project Manager for a 10,800 -SF 
vehicle maintenance building with eight vehicle bays, light duty wash bay, and 
office/administrative areas.

Education: 
B.S.M.E., 
University of Utah 
Registration: 
Arizona No. 50089 
California No. 38644 
Experience: 
With LSW: Since 2006 
With Others: 2 years 
Professional Affiliations: 
• 
American Society of 
Heating, Refrigeration 
and Air Conditioning 
Engineers (ASHRAE) 
• 
American Society of 
Plumbing Engineers 
(ASPE) 
• 
Autodesk User Group 
International (AUGI) 
LSW Engineers 
ARIZONA, INCORPORATED 
Cory E. Killpack, PE 
Vice President / Mechanical Engineer 
Cory has experience in the development of Mechanical and Plumbing systems with an 
understanding of most contemporary HVAC systems encompassing VAV, constant volume, 
heat pump, chilled water and associated systems. He is conscientious of building aesthetics 
and space and is dedicated to providing neat, organized, and complete construction 
documents. Cory is LSW's Revit/BIM Manager and is responsible for standards training and 
development. Cory has served as a mechanical engineer or mechanical designer on the 
following projects: 
AVIATION 
Phoenix Sky Harbor International Airport 
• 
Terminal 3 Modernization: Job Captain for the modernization of Terminal 3 which 
included expanding the passenger screening and checkpoint areas, additional ticket 
counters, additional baggage claim carousels, improved passenger circulation on 
escalators and elevators, new and expanded food concessions and retail, and 
expanded curb for drop-off and pickup. As part of this project, a new south concourse 
was constructed to add nine additional gates to the terminal. Total finished project 
covers 726,000 SF of modernization. 
• 
Southwest Airlines Provisioning Facility: Mechanical Engineer for the renovation of 
the ice production equipment within the 14,500 SF facility. The walk-in cooler and 
freezer had to be reconfigured to create a space to relocate the existing ice making 
machines, which included relocating the evaporator units and lighting and 
reconfiguration of the fire sprinklers. 
• 
Terminal 4 N4 MAG/AMEX Lounge TI: Project Manager for this new 10,000 SF airport 
lounge tenant improvement project located on the lounge/roof level at the 
International Concourse (N4) inside Terminal 4 
• 
Terminal 4 South Concourse 1: Project Manager for this new concourse on the south 
side of Terminal 4 in the Si designated location. The 200,000 SF project will include a 
connector bridge from the Si concourse to the terminal 4 processor as well as a bridge 
on the airside of security to the concourses on the north. 
Phoenix-Mesa Gateway Airport Terminal Expansion, Mesa  (Revit Project) 
• 
Gateway Aviation Center - Building 45: A 4,000 SF renovation with an additional 500 
SF addition was completed in the existing building. 
• 
Security Screening Check Point (SSCP): This project consist of reconfiguration of the 
SSCP and adjacent areas to optimize the queuing area; a feasibility study and design to 
provide an unmanned exit system; and, design of additional bollards at the exterior 
side of the main entry doors. 
• 
West Terminal Building, Phase 1: Mechanical Designer for the new terminal 
expansion, which is the first of four phases to be constructed. The first phase is a 
25,000 SF facility with a central plant for a water-source heat pump system; a central 
heat recovery ventilation air system, and extension of the DDC controls. 
• 
West Terminal Building, Phase 2: Mechanical Designer for the 27,000 SF addition 
which included lobby areas, hold room, baggage claim, concession areas, restrooms 
and storage areas. Renovations within Phase 1 Terminal Building consisted of 15,000 
SF for the relocation of the baggage carrousels to allow for a new security checkpoint, 
security queuing and car rental. Relocation of the security checkpoint area and 
expansion of the existing Explosion Detection System in the existing Terminal Building 
was also included within this project. 
• 
West Terminal Building, Phase 3: This project was the third of a four-phase expansion 
to the existing Gateway Aviation Center. The third phase was an 11,000-SF addition 
that included hold room, concession areas, restrooms and storage areas.

LSW Engineers 
ARIZONA, INCORPORATED 
Terminal Concessions Expansion: This project included 2,000 SF food and beverage 
space and 2,600 SF of public corridor area connecting phases two and three. Retail 
space of 900 SF was added at gate eight. 
Los Angeles International Airport I Terminal 5, Los Angeles, CA 
• 
Mechanical Engineer for a new service elevator includes design to add a new 
dedicated CRAC unit for the new elevator equipment rooms, new elevator sump 
pumps, and relocated of existing plumbing piping. 
• 
Mechanical Engineer for an 88,000 SF renovation of four floors in Terminal 5 
consisting of ticket lobby, security checkpoint expansion, meet & greet hall and 
baggage claim hall. 
• 
Delta Airlines Service Elevator: Engineering services for a new service 
elevator. Mechanical design to add a new dedicated CRAC unit for the new elevator 
equipment room. Plumbing to add a new elevator shaft sump pump. Also included 
relocation of existing plumbing piping. 
• 
Delta Landside Facility Redevelopment A/S#2 Supplemental Services: No data 
• 
Delta Landside Facility Redevelopment: Renovation of 88,000 SF including four floor 
levels. Facility includes the ticket lobby, security checkpoint expansion, meet and greet 
hall and baggage claim hall renovation. 
Falcon Field I Terminal Remodel, Mesa, AZ: Mechanical Engineer for the upgrades to the 
existing 3,680 SF terminal. The project included a comprehensive remodel and update 
to the entire terminal building and site area. The interior was completely gutted and 
remodeled and updates were made to the plumbing, lighting, mechanical, electrical, 
and fire protection systems. 
Carnival Cruise Lines Terminal, Long Beach, CA: Project Manager for the expansion to the 
existing 130,000 SF terminal. This includes reconfiguration of the existing Carnival 
spaces into a debark area; development of new embark entrance, security, lounge, VIP 
lounge, conversion of back of house spaces into terminal operations, addition of a new 
ADA ramp, sterile embark/debark corridor, and relocate customs and CBP functions 
into a single location. 
0 
Ar* This project won an award for "Best Commercial HVAC Design" at the Fourth Annual 
ASH RAE Central Arizona - Honors and Awards Dinner in 2018 
Deer Valley Air Support Hangar Code Related Improvement: Project Manager for the 
schematic design for code corrections of the Phoenix Police Department Hangar at 
Deer Valley Airport. The City opted to install a combination foam-water fire 
suppression system and to accept proposed revisions to lower the NEC Class I, Division 
2 hazardous zone for both the maintenance and executive hangars. The City also 
requested a design to revise the existing kitchen, men's locker/restroom and provide a 
new ADA restroom to comply with the accessibility study. 
Prescott Municipal Airport (PRC) Terminal: Project Manager for this new 17,000 SF, single-
story terminal building at the Prescott Municipal Airport (PRC) in Prescott AZ. 
EDUCATION (HIGHER-ED) 
Arizona State University, Tempe, AZ 
• 
Department of Public Safety Building: Mechanical Designer for a new 40,000 SF, 3- 
story facility which houses the campus police and a "911" Call Center.  REED Gold) 
• 
Barrett Honors College: Mechanical Designer for a new 520,000 SF facility consisting 
of multiple buildings which is used primarily for student housing, but also includes a 
dining facility, administrative offices, faculty and classroom areas, and community 
recreational areas. (LEED Gold) 
Midwestern University, Downers Grove, Illinois Campus

LSW lingineers 
ARIZONA, INCORPORATED 
• 
Multispecialty Medical Clinic: Mechanical Engineer for a new 6-story high-rise 
structure consisting of 193,200 SF with an additional roof mounted mechanical 
penthouse of approximately 10,000 SF. The dental clinic contains 294 dental chairs, 
an operatory room, equipment sterilization area, local equipment sterilization rooms, 
wet labs, teaching labs, offices, classrooms, conference room, and waiting/reception 
area. The optometry clinic includes multiple exam rooms, laser surgery room, testing 
rooms, eyewear center, classrooms, offices and waiting room. The second level 
contains an approximate 13,000 SF multispecialty clinic. The project also included a 
new six level open parking structure containing 956 parking spaces. 
• 
Science Hall: Mechanical Engineer for a new 239,000 SF Science Research Lab / 
Classroom building. The new building is a 6-story, high-rise structure with an open 
parking garage at the first level, classroom rooms on the second level, and laboratory, 
classrooms and office spaces at the upper four levels. 
Midwestern University, Glendale, Arizona Campus 
• 
Dental Institute: Mechanical Designer for an approximately 76,000 SF, 3-level (2-story 
with basement) dental clinic that includes equipment sterilization area, radiology 
rooms, operating rooms, a classroom, storage rooms, and mechanical rooms. 
• 
Eye Institute: Mechanical Designer for an approximate 33,275 SF, 2-story clinic shall 
include exam rooms, laser surgery room, classrooms, office, testing rooms, an 
eyewear center and waiting room. 
• 
Medical Office Building TI: MPE & FP for an approximate 25,000 SF tenant 
improvement of the existing two-story medical office building. 
• 
Student Services Building: Mechanical Designer for the 16,200 SF single-story addition 
to the existing Student Services building. 
Embry Riddle Aeronautical University I ROTC Building, Prescott, AZ: Mechanical Designer 
for a new 16,500 SF facility consisting of classrooms and private offices. 
Maricopa County Community College District 
• 
Glendale CC North Campus: This was the first phase of development for a new 
77,000-SF Campus. It included a 23,000 SF Instruction building for general purpose 
classrooms, computer classrooms, lecture classrooms, science labs, and offices; 23,000 
SF Student Services with a bookstore, fitness/activity center, food service area, offices, 
testing rooms and community room; 22,500 SF Information Building which holds a 
library, media services, computer commons, and study spaces. The 8,500 SF Central 
Plant was designed to accommodate future expansion as the campus expands to a 
total of approximately 340,000 GSF. Site utility infrastructure included chilled water, 
power and raceway system for data/telecommunication cabling. 
• 
Rio Salado Café Remodel/Addition: Mechanical Designer for the remodel of a 3,100 
SF café and a 1,580 SF building addition. The new addition is a two-story volume 
attached to the east side of the building. 
• 
Scottsdale Community College: Mechanical Designer for the Information Technology 
building renovations consisting of 18,160 SF with an 865 SF data center. 
Los Angeles Southwest College, Los Angeles, CA 
• 
School of Career & Technical Education: Revit Designer for a new 53,655 SF facility 
which includes two science labs, general purpose classrooms, student services, and 
faculty offices. 
• 
School of Arts and Humanities: Revit Designer for a for a Recital Hall, Black Box 
Theater, Choral and Music Rehearsal Rooms, two Recording Studios, Digital Film 
Studio, Student Services, and Faculty offices. 
Rio Salado College-Cafe Remodel & Addition: MP&E remodel of a 3,100 SF remodel and a 
1,580 SF building addition. The new addition was a two-story volume attached to the 
east side of existing building. The project added a new HVAC system. The Scramble 
Food area was remodeled with a new grille with hood. 
EDUCATION (K-12)

LSW Engineers 
ARIZONA, INCORPORATED 
Washington ESD I Royal Palm Middle School Addition and Remodel, Phoenix, AZ: 
Mechanical Designer for the addition of three standalone buildings: 4,000 SF 
administration center; 4,000 SF media center, and 7,200 SF Cardinal Academy (Special 
Ed) for a total of 15,200 SF. Also included is an 11,764 SF remodel of the 
administration area, classroom, and art room. 
Payson Unified School District I Julia Randall Elementary School: Mechanical Designer for 
a new 45,000 SF elementary school consisting of three one-story buildings which 
houses classrooms, media center, multipurpose room, and preparation kitchen. 
Buckeye Elementary School District, Buckeye, AZ 
• 
Jasinski Elementary School: Mechanical Designer for a new 74,000 SF single story 
school, which includes classrooms, a full servery kitchen and multipurpose room. 
• 
Inca Elementary School: Mechanical Designer for a new K-8 elementary school, 
approximately 74,000 SF. Partial second floor is designed as additional classroom 
space and in-fill. The school includes a full servery kitchen and multipurpose room. 
• 
Sundance Elementary School: Mechanical Designer for a new 15,400 SF, two-story, 
12- classroom addition to the existing school. Our scope of work including 
mechanical, plumbing, lighting, power and fire alarm designs. The design was utilized 
as a prototype for Inca Elementary School. Design was completed; however, the 
project was not built. 
Blue Ridge Unified School District I New Middle/Jr. High School: Mechanical Designer for 
a new 127,500 SF, single-story building. Components to the school include 
classrooms, media center, multipurpose facility/cafeteria, and administration area. 
Mechanical system is package, roof mounted, air conditioning units with gas fired 
heat. 
Cartwright School District I New Middle School: Mechanical Designer for a new 92,600 SF 
middle school consisting of classrooms, administration areas, multipurpose area, and 
full kitchen service. The mechanical system is roof mounted, packaged heat pump 
units. 
Orange Glen High School Creative Arts Addition: No data — California school 
Wickenburg Unified School District I Festival Foothills: Mechanical Designer for a new 
70,000 SF multi-story K-8 school. The facility includes classrooms, 
multipurpose/dining, food services, media center, and band and choir rooms. 
Wilson Elementary School District I Wilson Elementary School 
Mechanical Designer for a new two-story, 26,000 SF multipurpose classroom addition 
and a new 7,800 SF library addition. 
Casa Grande Union High School District, Casa Grande, AZ 
• 
Vista Grande High School: Mechanical Designer for a new 247,000 SF high school 
which includes six buildings, a 2,500 SF ticket and concession building (two), and an 
8,000 SF City of Grande joint-use library for a total of 257,500 SF. 
• 
Casa Verde High School: Mechanical Designer for the 15,512 SF addition and 
renovations on the first floor and a 9,955 SF addition and renovation on the second 
floor. 
• 
Transportation Center: Mechanical Designer for a new 12,000 transportation facility 
containing shipping and receiving, print shop, office areas, parts storage & full service 
maintenance bays with host capabilities. 
East Valley Institute of Technology (EVIT), Mesa, AZ 
• 
Educational Health Sciences Building: Mechanical Designer for a new 60,000 SF 
building, which houses classrooms, and laboratories for Nursing, Rx, Respiratory and 
Radiology. Surface parking for this building was also included. 
• 
East Campus, Phase 1: Mechanical Designer for two stand-alone buildings with a total 
square footage of 70,000 SF and a separate 5,000 SF central plant. 
Higley Unified School District, Gilbert, AZ 
• 
Williams Field High School: Mechanical Designer for a new 260,000 SF high school

LSW Engineers 
ARIZONA, INCORPORATED 
with two classroom wings, science laboratory two gymnasiums, cafeteria, auditorium, 
and fine arts including theater stage, band, choir, art/drawing and sculpture, dance, 
drama, and digital art design areas. 
• 
Transportation Center: Mechanical Designer for the new 10,700 SF transportation 
facility includes office areas, three full-service bus maintenance bays, and a bus wash 
area. 
• 
Maintenance and Landscape Facility: Mechanical Designer for a new 8,400 SF 
maintenance facility, which includes office space, maintenance area with three bays, 
and storage area. 
Glendale Elementary School District #40 I Discovery Elementary School: Mechanical 
Designer for a new 10,561 SF stand-alone, single story classroom building which 
includes classrooms, workroom and restrooms. 
Chandler Unified School District I New Alternative School, Chandler, AZ: Mechanical 
Designer for the 25,500 SF Alternative School with partial of the second floor for the 
District. 
Joseph City High Schools-Additions & Renovations: Engineering services for the additions 
and renovations to the high school and elementary school. Scope of services for the 
high school included two new replacement chillers and associated pumping system, 
renovation of the 1,500-SF locker and shower rooms, electrical distribution and 
upgrade for new the additions and remodels, two new classrooms and new 6,000 SF 
athletic building addition. 
Peoria Unified School District 
• 
Sun Valley Elementary School: Mechanical Designer for the central plant replacement, 
kitchen remodel, administration remodel, and a new 11,312 SF standalone classroom 
building. 
• 
Raymond Kellis High School: Mechanical Designer for the remodel of an existing 
multipurpose room to convert into training and storage room. 
Queen Creek Unified School District, Queen Creek, AZ 
• 
Queen Creek Elementary School: 
o 
Mechanical Designer for a new addition of approximately 18,000 SF for 12 new 
classrooms on the north wing of the existing building. 
o 
Mechanical Designer for a new addition of approximately 14,700 SF for 10 new 
classrooms on the west wing of the existing building. 
o 
Mechanical Designer for a new 2,500 SF classroom wing addition for a resource 
room, five unisex restrooms, two storage rooms, and a teacher's lounge. 
• 
Queen Creek High School: Mechanical Designer for a new 5,000 SF dining addition to 
the existing cafeteria. Also included 600 SF dry storage addition, new canopy at the 
outdoor eating area and a new serving line at the kitchen. 
• 
District Office: Mechanical design for a new 30,000 SF Administration Center. The 
new building includes a large dividable boardroom with multi-media presentations, 
training facility, conference rooms, reception area, offices for staff and the 
Superintendent, support areas, and public restrooms. 
Phoenix Union High School District #210 
• 
Alhambra High School: Mechanical Designer for a 13,400 SF addition. 
• 
Bostrom High School: Mechanical Designer for a 6,200 SF addition and 13,200 SF 
remodel of classrooms, administration and media center. 
• 
North High School: Mechanical Designer for the renovations of a 15,000 SF, two-story, 
classroom building. 
• 
Central Plant and Cooling Tower Yard: Mechanical Designer for the remodel and 
upgrades at Alhambra High School, Maryvale High School, Metro Tech Vocational, and 
Carl Hayden High School. 
J.O. Combs Unified School District 
• 
New Middle School: Mechanical and Plumbing Designer for a new 96,670 SF school. 
Mechanical system is a packaged roof mounted heat pump unit.

LSW Engineers 
ARIZONA, INCORPORATED 
• 
New K-5 School: Mechanical and Plumbing Designer for a new 67,500 SF school. 
Mechanical system is a packaged roof mounted heat pump unit. 
GOVERNMENT 
City of Cottonwood Emergency Communications Center: Mechanical Engineer for a 4,000 
SF facility including design for a future 3,000 SF expansion. The facility is used as a 
dispatching center for 20,000 police incidents and 3,200 fire/EMS runs per year. 
City of Avondale Northwest Public Safety Facility #74: Mechanical Engineer for a new 
18,252 SF joint public facility with the City of Avondale and Estrella Mountain 
Community College. It houses an Avondale police substation, the college's public 
safety office, and two classrooms. The fire station has a nine-person crew and full-size 
ladder truck. 
City of Surprise 
• 
Energy Star Portfolio Manager: Mechanical Engineer to assist the City with entering 
12 buildings into Energy Star Portfolio Managers to allow for energy use tracking and 
comparison of each building. The buildings include six fire stations, City Hall, Public 
Safety, the sports stadium, library, Communiversity, and a senior center. 
• 
Energy Use Analysis: MP&E for the energy analysis for three city buildings which 
includes the old 57,000 SF City Hall complex, 96,000 SF public safety building, and the 
wastewater treatment plant. 
City of Mesa I Mesa Plaza Building: Mechanical Engineer for the preliminary design of the 
chilled water connection between the roof-mounted chiller plant on the City's Plaza 
Building and the district chilled water loop. Project included design of a screening 
system to conceal the new piping on the exterior of the building. 
City of Glendale Fire Station No. 151: Mechanical Designer for the new 17,600 SF facility, 
with four apparatus bays, kitchen, dining, dayroom, training classroom, living quarters 
for 10, fitness center and support areas. Mechanical systems included packaged 
rooftop gas-pack units serving the dormitory and office areas and evaporative coolers 
serving the truck bays. 
City of Litchfield Park City Hall 
• 
City Hall: Mechanical Designer for the 7,500 SF, single story addition to the existing 
building consisting of private and open offices, conference rooms, lunchroom, and 
a vault. Design was completed at 90%, but the project was put on hold due to 
funding. 
• 
Office/Retail Building: Mechanical Designer for a new two-story 40,000 SF 
office/retail building (shell only) with the main infrastructure, but not completed for 
T.I. HVAC units were set in place for unimproved shell areas, plumbing for future T.I. 
spaces. Common areas, lobby spaces and restroom areas were fully designed with 
mechanical and plumbing systems. Design for one 5,000 SF office suite and a 3,800 SF 
restaurant was also provided. 
City of Scottsdale 
• 
Appaloosa Library: Mechanical Designer for a new single story, 21,242SF building, 
which includes meeting rooms, cyber cafe and drive-up windows. In addition, there is 
a large shaded patio with tables and chairs for reading, discussion and a venue for 
entertainment. Scope included specialty lighting design components within specific 
area. (LEED Gold) 
• 
Center For the Performing Arts Building - Building Automation Control System 
Upgrade: Project Manager for the upgrade of the building automation control system 
on the existing HVAC system. 
• 
Club Sar Building Automation Control System Upgrade: Project Manager for this 
upgrade of the building automation control system on the existing HVAC system. 
City of Surprise Energy Star Portfolio Manager: Mechanical Engineer to assist the City with 
entering 12 buildings into Energy Star Portfolio Managers to allow for energy use

LSW Fngineers 
ARIZONA, INCORPORATED 
tracking and comparison of each building. The buildings include six fire stations, City 
Hall, Public Safety, the sports stadium, library, Communiversity, and a senior center. 
City of Tempe 
• 
Tempe Police Building: Mechanical Designer for the renovation of the first and second 
floors (approximately 25,000 SF) of the existing Police Building with Information 
Technology department on the second floor. This facility is the main Police facility for 
the City Tempe housing multiple police divisions. The scope of the work involved 
existing mechanical system upgrades and extension of system, plumbing systems 
renovations, 
• 
Tempe Municipal District Central Cooling Plant: Mechanical Designer for the upgrade 
to the chilled water plant that serves the City of Tempe Police/Courts Building, 
Municipal Building, Tempe Arts Center, and Tempe 525 Building. Upgrades included 
replacement of existing chillers, pumps, cooling towers, controls, and piping. The 
primary goals of the project were to increase the redundancy, reliability and energy 
efficiency of the central plant. As the central plant served buildings with continuous 
operating schedules, piping and electrical provisions were made to allow temporary 
chillers to be set in place during construction. New cooling towers were craned in 
place on the roof and set on new supporting steel. The obsolete pneumatic controls 
were replaced with new DDC controls. Chillers were equipped with variable frequency 
drives to achieve higher efficiencies at part load conditions. The chiller refrigerant was 
switched from a CFC refrigerant to an HFC refrigerant. 
• 
Transportation Center: Mechanical Designer for the 40,000 SF, 3-story building which 
houses City offices, transportation control/command center, transit store, retail areas, 
bike valet, shower/locker spaces, multi-use leased office space and 2,000 SF 
community room. (LEED Platinum) 
Goodyear Operations Center, Goodyear, AZ: Mechanical Engineer for a new 5,000 SF 
Operations Center with planning for a future addition of approximately 5,000 SF. 
GSA San Luis ll U.S. Land Port of Entry: Mechanical Designer for a new 80 acre site with a 
12,000 SF main building, 17,000 SF commercial inspection building, primary 
commercial inspection building with canopy, hazardous materials isolation area with 
canopy, mobile NII inspection, pedestrian control booths, export control, and 
commercial inspection booths. (LEED Gold) 
Human Services Nova Safe Haven: Nova Safe Haven is part of the Human Services 
Campus, which helps to shelter and feed the homeless in downtown Phoenix. The 
main purpose of Nova Safe Haven is to provide personal care services and house the 
homeless that suffer from mild forms of mental disability on a temporary basis. The 
building is approximately 13,000 SF and consists of two sleeping areas, each of which 
have their own private dayroom and exterior courtyard, one for male and the other 
for female occupants. Other primary spaces include intake and reception areas with 
drop-in dayrooms and an exterior courtyard for visitors. The building also includes 
toilet and shower facilities and has a small dining room with a full functioning 
commercial kitchen. 
Maricopa County 
• 
Nova Safe Haven: Mechanical Designer for a 13,000 SF addition to the existing facility 
which provides personal care services and house on a temporary basis for the 
homeless who suffer from mild forms of mental disability. The project includes two 
sleeping areas, each of which have their own private dayroom and exterior courtyards, 
one for male and one for female occupants. Other primary spaces within the building 
include intake and reception areas with drop-in dayrooms and an exterior courtyard 
for visitors who don't spend the night. The building also includes toilet and shower 
facilities and has a small dining room with a full functioning commercial kitchen. 
San Tan Regional Justice Courts: Mechanical Designer for a new 43,610 SF courts 
building including four courtrooms, judicial suites, hearing rooms, 
conference/mediation rooms, workstation, and secured parking and administrative

LSW Engineers 
ARIZONA, INCORPORATED 
office space. Design included HVAC for package rooftop units, electric heat, and 
general plumbing. 
Maricopa Department of Transportation 
• 
Administration Building: Mechanical Engineer for the tenant improvement of an 
existing 1,200 SF office space at the 2901W. Durango building. 
• 
New River Site: Mechanical Engineer for a new 900 SF Storage building located at the 
New River site. 
HEALTHCARE 
Morristown Recovery Center: This project is the renovation of an existing 14,000 SF two-
story building, an existing 3,000 SF single-story building and the addition of a new 
11,000 SF single-story dormitory. 
JUSTICE 
Central Valley Juvenile Detention Center, San Bernardino, CA: Mechanical Designer for a 
new 232,000 SF, 1,000-bed jail on a 17-acre site. The housing units are located in one 
building with two stories and a mezzanine. The facility includes a two-story, 54,845 SF 
administration building and a 12,201 SF central plant and warehouse. 
CDCR R.J. Donovan Infill Facility, San Diego, CA: Mechanical Engineer for this new Level ll 
facility which includes three housing units that will provide 792 beds. Additional 
structures include a Facility Support Services building that will house healthcare 
services, laundry, canteen and dining areas; Program Support Services building for 
general visiting, religious programs, classrooms, library, indoor recreation, and 
administrative area; Family Visiting building, and a Warehouse. The project 
encompasses approximately 259,000 SF. 
Central Valley Juvenile Detention Center, San Bernardino, CA: Mechanical Designer for 
this new 144,068 SF juvenile detention facility consisting of three identical 80-bed 
housing units and one 40-bed unit. Within the housing units, each 40-bed pods 
include a dayroom, living quarters, shower/toilet, and classroom. Each unit has access 
to an independent outdoor activity area, and each individual housing unit contacts a 
separate multipurpose staff area. Support areas include administration, medical, 
receiving/warehouse, and a 5,200 SF full kitchen and staff dining. 
San Bernardino County Central County Juvenile Detention: Central Valley Juvenile 
Detention Center - MPE for a new juvenile detention center (280 beds). Components 
included three full housing pods and a half housing pod, as well as administration, 
medical, receiving/warehouse and kitchen building. 
MISSION CRITICAL (TELECOM / DATA CENTER) 
A Major Telecommunications Company 
• 
Phoenix Main: Mechanical Designer for Building B Smoke Control. 
• 
Mesa Two Internet Data Center: Mechanical Designer for a 80,000 SF remodel 
including a four megawatt, N+1 isolated-redundant UPS power plant; an N+1 
redundant, six megawatt standby generation plant; a fully automatic smoke detection 
system with air-sampling smoke detection system; an N+1 redundant, 2,250-ton 
chilled water central plant; and raised-floor air distribution. 
Digital Realty Trust I 120 E. Van Buren Facility 
• 
Field investigation of the mechanical equipment for the power study. 
• 
Record drawings for the mechanical and plumbing equipment and systems. 
• 
Modifications of existing ductwork serving Cage 1100 in Suite 101 consist of extending 
the duct mains, adding additional branch duct and diffusers to deliver the cold air to 
the three new aisles.

LSW Hngineers 
ARIZONA, INCORPORATED 
• 
Mechanical design for cooling for the enclosure of the 2,700 SF upper loading dock. 
• 
Removal of existing 5-ton water-source heat pump serving the lobby, security office 
and adjacent electrical room with 3 new units sized for each area. 
• 
Suite C115: Build-out of approximately 3,500 SF of shell space into office space for 10 
private offices, a conference room and break room. 
• 
Suite C130B CRAH Unit Upgrade 
• 
Suite C130B 
• 
Suite 370 CRAC Unit Addition 
OTHER PROJECTS 
Assessments/Evaluations/Study 
Casa Grande Elementary School District I Villago Elementary School: Mechanical Designer 
for the HVAC energy analysis report and life cycle cost analysis for the new elementary 
school and existing adjacent Villago Middle School. In addition to utility company 
rebate calculations and supporting documentation for the installation of the new 
HVAC system selected for the new elementary school. 
Cox Communications: Mechanical Engineer for the study of the HVAC system currently 
serving the Game Room and four adjacent offices at the Deer Valley facility. A written 
report was prepared with several options for repair, along with the estimated 
probable construction costs. 
City of Surprise, Surprise, AZ: Mechanical Engineer for the energy use analysis and 
recommendations to reduce the energy used at the City of Surprise Public Safety 
Facility, Central Utility Plant, Techcelerator Campus, and Wastewater Treatment Plant. 
This analysis made recommendations for spending federal stimulus money to reduce 
the annual energy consumption and costs for the City facilities. 
Assisted Living/Senior Living 
Grandview Terrace Common Core Levels 1 & 2 Remodel: This project was a remodel of 
the first and second floor central commons area of the existing independent living 
senior center in Sun City West, Arizona. 
Royal Oaks Retirement Community, I Memory Care, Sun City, AZ: Mechanical Engineer 
for a new two-story, 52,030 SF Memory Care facility includes 56 resident rooms, 
general open community areas, two warming kitchens, office areas, public restrooms, 
utility room, two elevators, laundry areas and a 3,224 SF basement area. 
Sun Health Grandview Terrace: Mechanical Engineer for the relocation of the building 
entry and lobby by removing the existing resident units on two floors, removing the 
existing kitchen/dining facility to make a new kitchen/dining facility and fitness center 
at the current entry. New build-back area is 32,050 SF and renovation area is 29,700 
SF. The project also includes a new elevator lobby/corridor and machine space added 
on each of the four floors. 
Commissioning 
Arrowhead Mercedes Benz Dealership: Mechanical Designer for the energy calculations 
and commissioning services for a 64,000 SF dealership. 
High Tech and Industrial 
Arizona Public Service, Phoenix, AZ 
• 
APS DVN1 Remodel: Plumbing Designer for the 80,000 SF remodel of the DVN1

(7) LSW Engineers 
ARIZONA, INCORPORATED 
facility. This project included a new customer care center, power generation and 
transmission control room, and a power distribution control room along with 
associate support spaces. The critical areas of the building were provided with an 
underfloor air distribution system utilizing rooftop mounted air handlers. The design 
of a new water-cooled chiller plant to support the DVN1 as well as the DVN2 building 
was also included. 
• 
DVC Building: Mechanical Engineer for the replacement of the existing DX VAV system 
serving the 3,500 SF office area within the building with a new variable refrigerant 
flow system. 
Waste Management Material Recycling Facility, Spokane, WA: Mechanical Engineer for a 
new 66,000 SF facility on a 10.25 -acre site. 
Hospitality 
Luhrs City Center I Residence Inn/Courtyard by Marriott, Phoenix, AZ: Mechanical 
Engineer for a new Residence Inn/Courtyard by Marriott consisting of approximately 
240,000 SF. The main level through the fourth floor includes a two-story lobby, 10,000 
SF of meeting space with a full service kitchen, fitness center, open air pool, and guest 
laundry. The fifth floor through the 19 floor includes approximately 315 tower hotel 
rooms. Three passenger elevators and one service elevator access all floors. 
Native American 
IHS Regional Youth Treatment Ctr-Pyramid Lake: Engineering service for a new 17,900 SF 
Treatment Center on the Pyramid Lake Indian Reservation in Wadsworth, NV 
Navajo Preparatory, Farmington, NM 
• 
Student/Academic Center: Mechanical Designer for a 26,000 SF Student/Academic 
Center consisting of classrooms, library, cafeteria/kitchen, and restrooms.  (LE ED GOLD) 
• 
Fine Arts Building: Mechanical Designer for the 8,000 SF Fine Arts Building contains 
classrooms, computer/data room, and multi-media room. 
• 
Dormitory Building: Mechanical Designer for an 11,000 SF dormitory building 
comprising of 16 rooms for 32 students. 
Colorado River Indian Community: Mechanical Designer for an approximately 20,000 SF 
Head Start facility. The buildings contain 10 classrooms with restrooms, 
administration area, cooking kitchen, multi-purpose area, maintenance shop and 
general restrooms. 
Salt River Pima -Maricopa Indian Community 
• 
Temporary School: Mechanical Designer for a temporary school for pre-school and K-6 
consisting of two new buildings, 28,000 SF each, to house classrooms, offices, dining 
area, and support areas. 
• 
Lehi Memorial Hall (Xalychidom Ychidom Piipaash Nyvaash): Mechanical Engineer for 
a new facility located at the Lehi Cemetery. The facility consists of a new 5,530 SF 
Main Hall building, an 8,120 SF Dining Hall, and a 7,072 SF canopy between the two 
buildings, and a 2,000 SF storage building. 
Tonto Apache Mazatzal Casino Bingo Hall: Mechanical Designer for the 10,500 SF remodel 
of the existing Casino/Bingo Entertainment Hall and support areas. 
Office Buildings 
Wells Fargo Bank 
• 
Gainey Center, Scottsdale, AZ: Project Manager for the 10,300 SF, second floor 
remodel of the Wells Fargo Bank including new offices, conference rooms, and 
breakrooms. Mechanical scope includes complete heating, cooling and ventilation

LSW Hngineers 
ARIZONA, INCORPORATED 
load calculations, HVAC extension design and design of VAV AHU's. The plumbing 
system included selection and sizing of plumbing fixtures and water use calculations. 
Wells Fargo Plaza, Phoenix, AZ: Project Manager for the demolition of the 19th floor 
main floor area and ceiling for the installation of new offices, conference rooms, 
restrooms, break rooms and a new ceiling. The mechanical systems for this project 
includes complete heating, cooling and ventilation load calculations; extension of 
existing HVAC system; VAV design; back-up DX cooling system design, and restroom 
exhaust system design. The plumbing systems for this project includes the selection of 
plumbing fixtures and the sizing and routing of the associated domestic cold, hot 
water and the waste and vent piping for these fixtures. 
Rose Garden Branch: Project Manager for the first floor renovations consisting of 
15,000 SF. The project includes new offices, conference room, training rooms, and a 
break room. The mechanical system includes design of HVAC extension, VAV AHU's 
and a split system DX cooling with piping and controls. 
68th & Camelback Branch: Project Manager for an 8,000 SF renovation consisting of 
replacing the existing HVAC and design of split system DX heating and cooling unitary 
equipment and all associated ductwork, air distribution, refrigerant and condensate 
piping and controls; design of dedicated split system DX cooling in communication and 
ATM rooms including piping and controls, and design of restroom exhaust systems and 
all associated ductwork, exhaust inlets and controls. 
• 
Chandler Ocotillo Branch: Project Manager for a 9,000 SF renovation of the first floor 
consisting new office space, fitness center, and locker rooms. 
• 
Prescott/Miller Valley Branch: Project Manager for the upgrade to the HVAC systems 
on a 7,500 SF building including replacement of the mechanical equipment, ductwork, 
diffusers, and associate controls and power. 
Religious 
LDS Mesa Temple, Mesa, AZ 
Mechanical Designer for various mechanical systems modifications that included 
reducing air noise in the upper two rooms by increasing the supply grille size of the 
two sidewall supply registers and increasing the number of round ceiling supply grilles 
in the other room and exhaust to the elevator equipment room to the outdoors in 
order to put the room under negative pressure and prevent odors from spreading 
from the room. 
Mechanical Designer for the replacement of the central steam system with a hot 
water system and conversion of various steam system components. 
SPORTS 
Scottsdale Stadium Multi-Use Event Center Improvements Phase 1: Project Manager for 
various improvements to the Scottsdale Stadium, Technology Design includes site 
design; passive network cabling; buildout of the MER/Tr rooms; CATV Distribution; 
Intercommunication System; access control/security system; camera surveillance; 
distributed antenna system; and, broadcast and sound system throughout the 
stadium.

Education: 
B.S. Aerospace 
Engineering, University of 
Arizona 
Registration: 
Arizona No. 33490 
California No. 34795 
Colorado No. 0048497 
New Mexico No. 15773 
Experience: 
With [SW: Since 2008 
With Others: 13 years 
Professional Affiliations: 
American Society of 
Heating, Refrigeration 
and Air Conditioning 
Engineers (ASHRAE) 
Awards 
• 
2017 ASHRAE 
Engineer of the Year 
Presentations 
• 
Guest speaker at 
Frank Lloyd Wright 
School of Architecture 
— Air Distribution and 
Acoustics 
• 
"Data Centers for 
Beginners" at 
ASHRAE's Central 
Arizona Chapter 
meeting, 02/2019 
• 
"Critical 
Infrastructure 
Replacement 
Solutions" at the 
Southwest Buildings 
& Facilities 
Management Show & 
Conference, 02/2019 
LSW Engineers 
ARIZONA, INCORPORATED 
Philip J. Mouw, PE, LEED AP 
Vice President / Mechanical Engineer 
Philip has extensive experience in heating, ventilation, and air conditioning (HVAC) systems 
design, clean room design, building automation system evaluation and design, computer 
simulation of HVAC systems, technical report writing, and life cycle cost analysis. He is 
knowledgeable in the operation and use of AutoCAD and has experience in the mechanical 
design of commercial and industrial facilities, telecommunications buildings, 
water/wastewater treatment facilities, medical facilities, education, hotels/ motels, and 
indoor pools. 
ASSESSMENTS/EVALUATIONS/STUDY 
City of Surprise, Surprise, AZ 
• 
Energy Use Analysis: Mechanical Engineer for the energy use analysis and 
recommendations to reduce the energy used at the City of Surprise Public Safety 
Facility, Central Utility Plant, Techcelerator Campus, and Wasterwater Treatment 
Plant. This analysis made recommendations for spending federal stimulus money to 
reduce the annual energy consumption and costs for the City facilities. 
• 
City of Surprise City Hall Complex, Surprise, AZ*: Mechanical Engineer for the 57,400 - 
SF Old City Hall complex. This assessment included an evaluation of the existing 
mechanical equipment and distribution systems as well as a life cycle cost analysis of 
three proposed replacement HVAC systems. 
City of Mesa District Cooling Plant: Mechanical Engineer for the district cooling system 
including an analysis of the connection methods of the existing buildings and 
guidelines for connecting new building to the system. 
Arizona Department of Environmental Quality Data Room, Phoenix, AZ*: Mechanical 
Engineer for the evaluation of the 1,900-SF data room. This assessment included a 
visual inspection of the existing mechanical systems and recommendations to improve 
the operation and efficiency of the room. 
AVIATION 
Phoenix Sky Harbor International Airport I Terminal 3 Modernization: Mechanical 
Engineer for the modernization of Terminal 3, which included expanded passenger 
screening and checkpoint areas, additional ticket counters, additional baggage claim 
carousels, improved passenger circulation on escalators and elevators, new and 
expanded food concessions and retail, and expanded curb for drop-off and pickup. A 
new south concourse was constructed to add nine additional gates to the terminal and 
a new 3,000-ton central plant ties into the existing central plant. Total finished project 
covers 726,000 SF of modernization. 
JUSTICE 
Arizona Department of Administration I Arizona State Prison Complex Florence - Cell 
Blocks 1, 3 & 4: Mechanical Project Manager for the replacement of eight evaporative 
coolers and two heating/cooling units. 
CDCR R.J. Donovan, San Diego, CA: Mechanical Engineer for a new level ll prison on an 
existing site with three housing units that provides 792 beds. Additional structures 
include a Facility Support Services building that houses healthcare services, laundry, 
kitchen and dining areas; Program Support Services building for general visiting, 
religious programs, classrooms, library, indoor recreation, and administrative area; 
Family Visiting building, and Warehouse. Also, part of this project is a central plant

LSW Engineers 
ARIZONA, INCORPORATED 
with two 310-ton chillers, pumps and cooling towers. This project encompasses 
approximately 259,000 SF. 
GOVERNMENT 
Arizona Department of Administration 
• 
1200-1275 W. Washington Central Plant Analysis and Upgrades: Project Manager for 
the upgrades to the existing central plant that includes replacing existing chillers, 
cooling tower, pumps, controls, refrigerant monitor system, and other accessories 
within the chiller plant. 
• 
ASET Data Center: Mechanical Engineer for the replacement of the cooling equipment 
in the basement of the building. 
• 
State Lottery Building: Project Manager for the replacement of the existing Halon fire 
extinguishing system in the data room with a new FM-200 including replacement of 
the fire detection and FM-200 control system. 
• 
Arizona Supreme Court I Central Plant Renovation: Mechanical Engineer for the 
replacement of the existing thermal storage chilled water central plant with a new 
efficient low temperature chiller plant including full redundancy in the HVAC system. 
• 
1300 W. Washington Air Handler Replacement: This project is the replacement of the 
existing large air handling unit and three small handling units with new like-sized 
units. The new large air handler will have a fan array and the smaller air handlers will 
not be provided fan arrays due to their small size. 
• 
1535 West Jefferson Boiler Replacement: This project is the replacement of the 
natural gas fired boiler, pot feeder, expansion tank and heating hot water pump at the 
Arizona State Department of Education Building at 1535 West Jefferson, Phoenix AZ. 
All of this equipment is located in the rooftop penthouse. 
EDUCATION — HIGHER ED 
Midwestern University, Downers Grove, IL Campus I Science Hall: Mechanical Engineer 
for a new 239,000-SF Science Research Lab / Classroom Bldg. The new building is a 
six-story, high-rise structure with an open parking garage at the first level, classroom 
rooms on the second level, and laboratory, classrooms and office spaces at the upper 
four levels. The laboratory spaces include a computerized testing lab, 25 wet labs, 
seven small wet labs, dental simulation facility and associated research lab, 
osteopathic manipulative medicine skills laboratory, multi-use teaching wet lab and 
teaching lab for 50, a large gross anatomy lab with 36 stations and three large labs for 
'dry anatomy studies. The project also includes campus infrastructure improvements 
including the expansion of the central chilled water-cooling plant and re-piping of the 
campus underground chilled water distribution system. 
Northern Arizona University I Student and Academic Services Building, Flagstaff, AZ 
Mechanical Engineer for a new four-story, 94,000-SF classroom and office building 
with a roof-mounted mechanical penthouse. The first level includes offices, 
classrooms and 150-seat auditorium / lecture hall. The second level includes 
classrooms and an 8,300-SF open math center. The third level and fourth levels 
primarily include offices and conference rooms.  REED Gold) 
EDUCATION — K-12 
Kyrene School District, Tempe, AZ  wn Call ) 
• 
Kyrene Middle School Central Plant Upgrades: Project Manager for upgrades to the 
central plant for Kyrene Middle School. The design included demolition to remove the 
two oldest indoor chillers, heat exchangers and other equipment and replacement of 
the building pumps, new controls and control sequences for the thermal storage

LSW Engineers 
ARIZONA, INCORPORATED 
system. This project also included the replacement of the chilled water isolation valves 
and control valve at each fan coil in the buildings at the school. 
HIGH TECH AND INDUSTRIAL 
Agilent Technologies I Above Ground Storage Tank Additional Design; Colorado Springs, 
CO: Mechanical Project Manager for this 12,000-gallon above-ground storage tank, 
new fuel oil piping to connect the new tank to the existing generator belly tanks and 
the existing above-ground storage tank, and fuel oil control system modifications at 
the Powerhouse at Agilent Technologies' facility in Colorado Springs, CO. 
Polymicro Technologies I Anthem WTTP Phase 3 Plant Expansion, Phoenix, AZ*: 
Mechanical Engineer for the expansion of the wastewater treatment plant. The design 
included an odor control system for the expansion of the treatment basins. Cooling 
systems were provided for various electrical rooms and the process blower building. 
Knight Transportation Back -up Data Room, Phoenix, AZ: Mechanical Engineer for a 3,300 - 
SF data center tenant improvement at Knight Transportation's Corporate 
Headquarters. The mechanical system consisted of air-cooled CRAC units with 
refrigerant economizers. 
SRP West Valley Service Center Chiller Replacement, Phoenix, AZ*: Mechanical Engineer 
for the HVAC design for the replacement of two 270-ton chillers, refrigeration 
machinery room upgrades to achieve compliance with current code, and a control 
system upgrade for the central plant. This project also included commissioning of the 
new central plant equipment and control system. This project was completed with 
minimal interruption to the normal operation of the facility through construction 
phasing. 
SRP 27th  Street Facility Chiller Replacement, Phoenix, AZ*: Mechanical Engineer for the 
design for the replacement of a 150-ton chiller and 300-ton cooling tower, 
refrigeration machinery room upgrades to achieve compliance with current code, and 
a control system upgrade for the central plant. This project also included 
commissioning of the new central plant equipment and control system. This project 
was completed with minimal interruption to the normal operation of the facility 
through the use of a temporary chiller. 
SRP Power Operations Building, Scottsdale, AZ* 
• 
Central Plant Controls Upgrades: Mechanical Engineer for upgrades to the HVAC 
control system at Salt River Project's Power Operations Building. This building has two, 
redundant chiller plants. A new control system was provided in each chiller plant to 
eliminate a single point of failure that could take down both plants. The new control 
systems control the equipment within each plant as well as monitor the other chiller 
plant for failure, to enable a seamless changeover from one plant to the other. New 
sequences of control were written to make use of redundant chilled water loops and 
redundant cooling towers and chillers. This project also included replacing 
pneumatically operated valves with new electric/electronic valves as well as 
commissioning of the new control system. 
• 
Building Expansion: Mechanical Engineer for a 25,000-SF expansion to the existing 
58,000-SF Power Operations Building. This project included relocation of the 
Distribution Operations Center into the expansion as well as the installation of new 
chillers and a cooling tower in the existing dual, redundant chilled water central 
plants. 
Digital Realty 120 E. Van Buren Data Center, Phoenix, AZ* 
• 
Suite C100: Mechanical Engineer for an 11,000-SF data center, and a 2,000-SF 
electrical, UPS and battery room. The HVAC systems included water-cooled computer 
room air conditioning units, outside air systems, and a hydrogen exhaust system. 
• 
Suite 130: Mechanical Engineer for a 10,000-SF data center, a 2,000-SF electrical and

LSW Engineers 
ARIZONA, INCORPORATED 
UPS room, a 500-SF remote located battery room, and 600-SF of office space. The 
HVAC systems included water-cooled computer room air conditioning units, outside 
air systems, and a hydrogen exhaust system. 
Toyota Data Center Cooling Loop Integration, Phoenix, AZ: Project Manager for the 
humidifier upgrades at Toyota's Data Center located in Digital Realty's 120EVB facility. 
This is a design-build project for the installation of four new Stultz ultrasonic 
humidifiers with two control cabinets and a new skid-mounted RO/DI water treatment 
plant. 
Nestle Alternate Data Center, Phoenix, AZ*: Mechanical Engineer for the addition of 99 
tons of computer room air conditioning equipment in an existing office building to 
convert it from a light manufacturing space to an alternative data room facility. This 
has since become the primary data facility for Nestle, North America. Also included 
was the design of a special ventilation system for the UPS/Battery Room. 
Medtronic, Tempe, AZ* 
• 	
Buildings #1 & #2 Remodel: Mechanical Engineer for the HVAC and process piping 
design for the complete renovation of 43,700 SF of floor space in Buildings #1 & #2 at 
the Medtronic facility. This includes approximately 30,000 SF of Class 100,000 clean 
room assembly space and 13,700 SF of office/support space. 
HOSPITALITY 
Luhrs City Center I Residence Inn/Courtyard by Marriott, Phoenix, AZ: Mechanical 
Engineer for a new Residence Inn/Courtyard by Marriott consisting of approximately 
240,000 SF. The main level through the fourth floor includes a two-story lobby, 10,000 
SF of meeting space with a full service kitchen, fitness center, open air pool, and guest 
laundry. The fifth floor through the 19 floor includes approximately 315 tower hotel 
rooms. Three passenger elevators and one service elevator access all floors. This 
project also included a central plant with three 325-ton chillers, pumps, cooling 
towers, and combined domestic hot water and heating hot water. 
MEDICAL 
Dignity Health Cooling Tower and Chiller Upgrades: Mechanical Project manager for the 
replacement of two existing roof-mounted cooling towers and two existing basement 
mounted chillers with new 375-ton chillers and towers as well as new chilled and 
condenser water pumps. The mechanical aspect of this project included other minor 
piping modifications in the roof and basement to accommodate the new equipment 
and mechanical system functional testing. 
HonorHealth Deer Valley Medical Center I Central Plant Upgrades, Phoenix, AZ 
Mechanical Engineer for the replacement generators (3MW), upgrades to the 
paralleling power system, distribution switchboard replacement and additions, 
mechanical systems were reconfigured to provide segregated power feeds. 
Construction work occurred without impacting hospital operation. 
HonorHealth John C. Lincoln Medical Center I Central Plant Replacement, Phoenix, AZ 
Electrical Revit modeler for the new/replacement central plant serving the existing 
368,449-SF hospital. The plant is an N+1 design with (3) 600T Chillers/Towers, (2) 
250HP boilers, (1) 1.5MW diesel and (1) 1.4MW Natural Gas parallel connected 
generators. Design includes provisions for additional equipment to supply a future six-
story patient tower.

LSW Engineers 
ARIZONA, INCORPORATED 
MISSION CRITICAL (TELECOM/DATA CENTER 
Agilent Technologies 
• 
CRAC Unit Addition: Mechanical Project Manager for the installation of the CRAC units 
marked future on the original Data Center construction documents. 
• 
Data Center, Colorado Springs, CO: Mechanical Engineer a 26,000-SF data center 
tenant improvement including 14,000 SF of raised floor white space. This project also 
included a 6,000-SF free-standing power house with external fuel storage system. The 
mechanical system consists of air-cooled CRAC units with refrigerant economizers. 
Arizona Public Services 
• 
DVA Building Remodel: Mechanical Project Manager for this remodel of the existing 
60,000-SF building. All HVAC, plumbing, electrical and telecom systems were replaced. 
(DATA) 
• 
DVA Building Remodel - Value Engineering Redesign: Mechanical Project Manager for 
the value engineering redesign of this project. (DATA) 
• 
DVN1 Design Services: Mechanical Project Manager for this 80,000-SF renovation that 
included a new customer care center, power generation and transmission control 
room, and a power distribution control room along with associate support 
spaces. Design consisted of new Category 6 cabling to workstations, buildup of three 
IDF rooms, fiber optic and copper backbone cabling from central service points to each 
IDF room, and security/access control rough-in. The critical areas of the building were 
provided with an underfloor air distribution system utilizing rooftop mounted air 
handlers. The design of a new water-cooled chiller plant to support the DVN1 as well 
as the DVN2 building was also included. 
• 
DVN1 Building 
o 
Remodel: Mechanical Project Manager for this 80,000-SF remodel that included a 
new customer care center, power generation and transmission control room, and 
a power distribution control room along with associate support spaces. The 
critical areas of the building were provided with an underfloor air distribution 
system utilizing rooftop mounted air handlers. The design of a new water-cooled 
chiller plant to support the DVN1 as well as the DVN2 building was also included. 
o 
Secure Space: Mechanical Project Manager for the addition of two new consoles, 
six workstations and an expansion of the existing video wall in Secure Space 1, 
and the addition of eight training stations in the War Room. 
• 
DVN2 Building - Computer Room Buildout: Mechanical Engineer for the build-out of a 
3,400-SF room to accommodate nine new rows of 12 computer cabinets. 
• 
DVN2 Building - Infrastructure Upgrades: Mechanical Engineer for the 65,000 -SF 
renovations which included approximately 28,000 SF of open and private office space, 
8,200 SF of remodeled raised floor data center space, 3,000 SF of new raised floor for 
a Radio Room, Dennark Room and IDF/Telephone Room, a 3,600-SF Inserter Room, a 
3,600-SF existing raised floor data room to remain as-is, and 18,600 SF of support 
spaces for the electrical and mechanical systems. 
• 
502 - 2015 UPGRADES: Mechanical Project Manager for this project that replaced nine 
chilled water CRAH units with nine new dual DX and chilled water units to match the 
cooling capacity of the current units. This included new refrigerant piping between the 
indoor and outdoor units and the reuse of existing chilled water piping. The chilled 
water piping for the CRAH units serving the Microwave Room were revised such that 
they are connected to the West Chiller Plant by extending the existing chilled water 
piping in the Penthouse to the units. Existing condensate drain piping was also 
reused. Galvanized cold water piping serving the new CRAC was replaced. 
APS 502 Building - 2013 Upgrades: Mechanical Project Manager for the new CRAC 
units for new UPS room and sprinkler system modifications. 
APS 502 Building - Level 2 Remodel: Engineering services for an 10,800-SF remodel

LSW Engineers 
ARIZONA, INCORPORATED 
that included a reconfiguration of an open office area. An existing office area and 
conference rooms were converted into four training rooms, a conference room and 
two larger huddle rooms. (DATA) 
502 Building - 2012 Mechanical Upgrades: APS 502 Building Infrastructure Upgrade, 
Phases 1 and 2. Phase One included THE replacement of exiting fan coil units, VAV 
boxes and central air handling units including rezoning of problem areas. Phase Two 
included the complete renovations of two chiller plants including code upgrades, new 
chillers, pumps, controls, and piping. Both phases were completed while the building 
was occupied. The original portion of this building was constructed in the early 1900s 
and the final addition constructed in 1988. 
502 Building: Mechanical Project Manager for the design services associated with this 
new 3,500-SF data room. Converting three separate raised floor areas and an existing 
office area into one new raised floor data room (approximately 3,500 s.f.). Demolish 
existing cafeteria and renovate to accommodate new office area, design a new 
electrical room and chiller room at existing parking area, design a new building 
automation system for the new chiller plant, design for a new electrical and UPS 
room. 
• 
Remove existing HaIon fire suppression system and replacing with a new dry pipe, pre-
action fire suppression system design, new sump pumps. 
• 
Deer Valley - Operations Center: Mechanical Project Manager for Phase 1 
programming/conceptual design. Mechanical and electrical design for approximately 
80,000-SF Operations. Center that incorporated LEED Silver guidelines. 
• 
Garfield Substation Upgrades: This project was for the upgrades for the Control House 
and the GIS System Room. The mechanical scope included complete heating, cooling, 
and ventilation load calculations, design of packaged DX heating and cooling unitary 
equipment, and all associated ductwork, air distribution, condensate piping, and 
controls. (OFFICE) 
Central Arizona Water Conservation District - Headquarters Server Room and Multi-
Purpose Room Conceptual Design Services: This conceptual design project called for 
the remodel of 10,000 SF of cafeteria, kitchen, and conference space into a new 
Multipurpose Conference Center to be used for board meetings. The existing Board 
Room was designed to be remodeled into 2,000 SF of data center space including new 
UPS room(s) for the consolidation of three different data rooms at the site. The three 
existing IT equipment rooms were designed into office spaces. 
Cox Deer Valley Data Center: Mechanical Engineer for the replacement of two existing 
chilled-water CRAH units with new dual cool CRAC units. The new units have chilled-
water cooling coils and DX cooling coils for redundancy. 
City of Chandler, Chandler, AZ 
• 
Data Center: Mechanical Engineer for a 400-SF expansion of the existing 900-SF Data 
Center 
• 
Data Room Remodel: Mechanical Engineer for a 350-SF expansion of the existing 500- 
SF data center. 
City of Glendale I Public Safety Building Data Room CRAC Unit Replacement: This project 
included the replacement of two air-cooled CRAC units. The mechanical systems 
included two DX CRAC units with new rooftop condensers, refrigerant piping and 
condensate drain piping. LSW was the prime contract holder, responsible for 
mechanical, plumbing, and electrical engineering design and construction phase 
services. 
Digital Realty (DLR) 
2055ETC Redevelopment Study: Redevelopment study for Digital Realty's 2055 East 
Technology Circle facility in Tempe, AZ to convey options for redevelopment and

LSW Engineers 
ARIZONA, INCORPORATED 
pricing of this property. The study materials will include narratives as well as high-level 
color block plans and diagrams. 
Edward Jones Data Center Consolidation: Mechanical Project Manager for this MP project 
to convert 18,000 SF of existing data room space into new office space for the Edward 
Jones data center's Tempe facility. 
National Oilwell Varco Data Center, Goodyear, AZ: Mechanical Engineer for a 9,300 -SF 
corporate headquarters for National Oilwell Varco. The design included a secured yard 
and infrastructure for multiple containerized data centers. 
Pima County Data Center Upgrades, Tucson, AZ: Mechanical Engineer for an expansion of 
the 6,000-SF Pima County Data Center. The project included an extension of the 
existing chilled water system and upgrades to the existing ventilation and humidity 
control systems. 
GoDaddy.Com, Buckeye, AZ 
• 
New Server Room: Mechanical Engineer for a new 4,300-SF server room that includes 
three UPS and Battery Rooms. Mechanical scope includes complete heating, cooling 
and ventilation load calculations for the project area; design to extend the existing 
chilled water system to serve the areas of this project; design to extend the existing 
RO water system to serve the humidifiers in the new server room; design of new 
custom CRAH units for cooling; design of an evaporative humidifier system; design of a 
water source heat pump unity and all associated ductwork, air distribution, chilled 
water branch piping, condensate piping and controls for server room pressurization; 
design of a chilled-water air handling unit with economizer and all associated 
ductwork, air distribution, chilled water piping and controls for conditioning; design of 
a battery room exhaust system; coordination for a computational fluid dynamic CFD 
model for the new server room. 
• 
Renovations*: Mechanical Engineer for a new 4,300-SF server room, new UPS and 
Battery Rooms, 5,000-SF of general office area, and an expansion of the existing 
Central Plant including the addition of a new chiller, cooling tower and associated 
pumps. A CFD analysis of the airflow in the new Server Room was performed due to 
constraints imposed by the existing building conditions. Calculations to justify the 
expansion of the Central Plant and the chilled water storage system were also 
performed. 
Casino Arizona Data Room, Scottsdale, AZ: Mechanical Engineer for the HVAC and 
plumbing design for a new 2,000-SF raised floor data room and associated support 
rooms. LSW was the data room consultant for this project. This room was designed in 
conjunction with a larger TI that was done by others. The Data Room and UPS and 
Battery Rooms were provided with N+1, air-cooled, air-conditioning equipment. 
MUNICIPAL 
City of Mesa 
• 
Central Plant Upgrades, Mesa, AZ 
Mechanical Engineer for replacement of two 70-ton chiller tower and a new DDC 
system throughout the approximately 45,000 SF. 
City of Glendale, Glendale, AZ 
• 
City Hall HVAC Replacement and Equipment Management Cooler Replacement: The 
project had 2 phases: 1) The replacement of the HVAC equipment at the City Hall and 
Council Chambers complex, which involved the first through fourth floors in the City 
Hall Building (60,000 SF) and the adjacent Council Chambers Building (25,000 SF). 2)

LSW Engineers 
ARIZONA, INCORPORATED 
The replacement of the seven roof-mounted evaporative cooler/heating units at the 
City of Glendale's Equipment Management Building at the City's Operations Facility in 
Glendale AZ. 
• 
Landfill: Mechanical Engineer for the new facilities at the City of Glendale Landfill. This 
project included the addition of an 850-SF scale house, 3,600-SF administrative 
building and a 3,600-SF vehicle maintenance facility. Unitary heat pumps were 
provided for the Scale House, Administrative Building, and the office areas in the 
Vehicle Maintenance facility. An evaporative cooling system was designed for the 
maintenance areas in the Vehicle Maintenance facility. Compressed air, engine 
coolant, 30W transmission oil, 50W transmission oil, engine oil, and hydraulic oil 
distribution systems were designed for the Vehicle Maintenance Building. The 
electrical design included lighting and general power distribution for all buildings. The 
technology and special systems design included passive network cabling, security 
system and surveillance security cameras. The total budget for this project was $1.4 
million and a CMAR process was utilized. 
• 
Public Safety Building Data Room: Mechanical Engineer for the replacement of two 
air-cooled CRAC units mounted on the roof above the Data Room with a rooftop 
screen wall. The mechanical component includes two DX CRAC units with new rooftop 
condensers, refrigerant piping and condensate drain piping. 
City of Mesa I Communications Building Central Plant Upgrades: Mechanical Project 
Manager for the mechanical, plumbing and electrical upgrades to the central chilled 
water plant. Replacement of two 70-ton chiller towers. Provide a new DDC system 
throughout the approximately 45,000-SF building. 
City of Scottsdale Ion call ) 
• 
Paiute Neighborhood Center & Mayor's Office: Mechanical Engineer for the 
replacement of four split system A/C units. 
OFFICES 
Arizona Public Services 
• 
DVL Building Remodel: Mechanical Engineer of the entire building included a 15,000- 
SF remodel. Existing open office configuration were converted to a combination of 
classroom, conference, and open office layout. Mechanical systems included split 
system DX units to provide proper zone control to each space. Plumbing system 
includes design of new bathroom group and breakroom. 
• 
DVN2 Building Phase 2 Remodel: Mechanical Engineer for the remodel of an 
approximately 20,000-SF portion of the DVN facility consisting of new office space, 
conference rooms and a new restroom group 
• 
DVC Building Remodel: Mechanical Engineer for a remodel and infrastructure 
upgrades throughout the existing 23,000-SF building and light remodeling of 
approximately 12,000 SF, which included changing functions and arrangements within 
the shop type spaces including relocation of tools and equipment. 
• 
DVB 3 & 4 Remodel/Infrastructure Upgrade: Mechanical Engineer for the 
infrastructure upgrades throughout the approximately 44,070-SF building, of which 
7,000 SF was remodeled for office use. 
Central Arizona Project, Phoenix, AZ 
• 
Server Room: Mechanical Engineer for the demolition of the existing board room, 
lobby and halls to convert the space into a 2,000-SF raised data center including new 
UPS rooms for the consolidation of three different data rooms at the site. The three 
existing IT equipment rooms were remodeled into office spaces and a new lobby. The 
new server room accommodates 50 enclosed cabinets and 10 two-post racks with a 
total room load of 130 kW. Five CRAC units were provided for N+1 redundancy and the 
existing emergency generator was replaced with a new 750KW generator and yard. 
• 
Multipurpose Room: Mechanical Engineer for the renovation of existing 12,000-SF

LSW Engineers 
ARIZONA, INCORPORATED 
cafeteria, commercial kitchen, conference and training rooms into a new 14,000-SF 
Multipurpose Conference Center that will be used for board meetings. 
• 
ADA Improvements: Mechanical Engineer for the ADA upgrades including restrooms, 
ramps and automatic door opening at both Building 1 and Building 2. 
• 
Pumping Station Elevator Modernization: Mechanical Engineer in modernizing the 
elevator control equipment in five pumping stations throughout the state. 
Modernizations included replacing control cabinets and providing independent cooling 
for each machine room. 
• 
Fuel Island Upgrades: Project Manager for the design of a new unleaded fueling island 
and a new diesel-fueling island for CAP's fleet of vehicles. The project includes new 
site work, fuel storage, tanks, piping, dispensers, a fuel tracking system and canopy. 
CVS Caremark Data Center, Scottsdale, AZ 
• 
AHU Replacement: Mechanical Engineer to replace air handler units 3 and 7 and 
installation of new lighted handrails and lighting at the main entrance. 
• 
Chilled Water Loop: Mechanical Engineer for a new looped chilled water main around 
the existing data center including connection of the existing CRAH units to the new 
loop. Five of the existing CRAH units were replaced with new units and four of the 
removed units were relocated into in adjacent room and connected to the new chilled 
water loop and provided with power. 
• 
Chilled Water Piping: Mechanical Engineer for the installation of a new rooftop 
mounted chilled water piping loop to serve the existing building air handlers. 
Knight Transportation Corporate Headquarters, Phoenix, AZ 
• 
Corporate Headquarters Remodel: Mechanical Engineer for a remodel of the three 
building corporate headquarters campus. This project included the remodel of 51,000- 
SF of "C-level" and support staff offices, and 16,000 SF of tenant improvement and IT 
areas. 
• 
Building Kitchen Remodel: Mechanical Engineer for the remodel of the 1,800-SF 
commercial kitchen on the first floor. The work included new appliances and 
reconfiguration of the space. 
• 
Central Plant Upgrades: Mechanical and plumbing design for a new water-source heat 
pump central plant to support Knight Transportation's new corporate headquarters in 
Phoenix, Arizona. This project combined three existing central plants into one and 
included redundant fluid coolers, condenser water circulation pumps, boilers, and 
controls. 
*Project completed prior to joining LSW 
Older projects 
Arizona Department Of Administration Arizona State Prison Complex Eyman - Rynning 
Evaporative Coolers: MP&E engineering services for the design of the replacement of old 
and deteriorated evaporative cooling units serving the housing units. (2009009.001) 
OTHER 
APS AT UPTOWN PLAZA: This tenant improvement project was for a new 25,000-SF AJ's 
Fine Foods store at Uptown Plaza. 
Benchmark Electronics 
Tenant Improvement Phase I: Mechanical Project Manager for the modifications of an 
existing 3,600 SF ISO 8 (Class 100,000) cleanroom at the 3201 East Harbor Drive 
Facility to create a 6,000 SF ISO 7 (Class 10,000) cleanroom. 
Benchmark Electronics Tenant Improvement Phases II Through IV: Mechanical 
Project Manager for this design-build modification project consisting of 48,600 SF of

LSW Engineers 
ARIZONA, INCORPORATED 
office space and 62,300 SF of production space. The improvements in the office area 
include removal of a work-out area and shower rooms to expand an existing break 
room as well as other minor improvements. The production area improvements 
include a 3,100-SF plating area, a 10,000-SF cleanroom and tool hook-up throughout 
the remaining areas. Phase II will consist of the plating area. This scope includes 
electrical hook-up for tools. Phase III will consist of a new 10,000-SF cleanroom. LSW 
will be responsible for providing cooling and power to the cleanroom as well as power 
and compressed air to the tools in the cleanroom. Phases IV, V and VI will consist of 
minor remodel work and tool hook-up in the remaining areas. 
Berger Bullets: Mechanical Project Manager for this new projectile manufacturing facility 
located in an existing building at Nammo Talley in Mesa, AZ. 
CAP HQ Fuel Island Upgrades: Mechanical Project Manager for the design of the fuel 
system replacement at Central Arizona Project's Headquarters facility in Phoenix AZ. It was 
the design of a new unleaded fueling island and a new diesel-fueling island for CAP's fleet 
of vehicles. This included site work, fuel storage tanks, piping, dispensers, a fuel tracking 
system and canopy. 
Casino Arizona Data Room: Mechanical Project Manager HVAC, plumbing and electrical 
for a 2,000 SF raised floor data room. New room will be provided with air cooled HVAC 
equipment and a dual redundant UPS system. 
DSSAZ Phase II: This project was a 20,000 SF Phase II extension of the Phase I building at 
Special Device's new inflator plant in Mesa, AZ. It included an extension of the Spine, a 
new restroom core and 18,000 SF of production area. 
Ergon Natural Gas Piping: Mechanical Project Manager for the design of a new natural gas 
pipeline for Ergon Asphalt & Emulsions in Chandler, AZ. This will be a design-build 
project. The project was the design of 700 linear feet of 4" natural gas piping that 
connects to an existing Crafco tank farm to a building in the Chandler A&E facility. The 
existing underground piping was abandoned in place while the new piping was routed 
above ground. 
OLD 
Chase Field Facility & System Assessment: Mechanical Project Manager for the 
engineering evaluation for mechanical and plumbing systems for the facility. (2009)

Experience: 
With LSW: Since 1989 
With Others: 6 years 
Professional Affiliations: 
• 
American Society of 
Heating, Refrigeration 
and Air Conditioning 
Engineers (ASHRAE) 
• 
American Society of 
Plumbing Engineers 
(ASPE) 
LSW Engineers 
ARIZONA, INCORPORATED 
Rick Patton 
Senior Mechanical Designer 
Rick has extensive experience in application, analysis, engineering design and field 
installation of most contemporary HVAC systems encompassing VAV, constant volume, 
heat pump, DX, chilled water and associated systems along with complete plumbing 
systems design. He has responsibility for project schematics through final design, 
equipment and systems sizing and selection for correctional, institutional, municipalities, 
commercial and corporate projects. 
ASSESSMENT/EVALUATION/STUDY 
City of Phoenix Cactus Park Police Precinct: Mechanical Designer for the 
programming for new space and assessment of the existing mechanical and plumbing 
systems, which included HVAC and exhaust systems, water and waste systems, and 
natural gas systems. Included in the assessment was a life cycle cost evaluation of the 
mechanical systems. 
AUDITORIUMS/THEATERS 
Estrella Community College Performing Arts, Avondale, AZ: Mechanical Designer for 
a new 24,895 SF performing arts building consisting of stage and seating between 300 
and 350 people. 
Los Angeles Southwest College I Los Angeles, CA: Mechanical Designer for a recital 
hall, Black Box Theater, choral and music rehearsal rooms, two recording studios, 
digital film studio, student services, and faculty offices. 
CORRECTIONS 
Arizona State Prison Complex 
• 
4000-Bed Minimum Security Prisons: 
o 
Cibola Unit: Mechanical Designer for the 1,000-bed minimum level custody male 
w/medium level fence, Yuma 
o 
La Paz Unit: Mechanical Designer for the 1,000-bed minimum level custody male 
w/medium level fence, Yuma 
o 
San Carlos Unit: Mechanical Designer for the 1,000-bed minimum level custody 
female, Perryville 
o 
Whetstone Unit: Mechanical Designer for the 1,000-bed minimum level custody 
male, Tucson 
• 
1000 -Bed Minimum Security Prisons: 
o 
Catalina Unit: Mechanical Designer for the 300-bed low custody male, Tucson 
o 
Eggers Unit: Mechanical Designer for the 200-bed low custody male, Douglas 
o 
Piestawa Unit: Mechanical Designer for the 200-bed low custody female, 
Perryville 
o 
Santa Rosa Unit: Mechanical Designer for the 300-bed low custody male, 
Perryville 
• 
ASPC Florence Eyman SMU 1: Mechanical Designer for the replacement of 32 existing 
AHU's located on the roof of existing buildings. The project was completed in 16 
phases so inmates could be relocated during construction. On a subsequent project, 
the final four existing air handlers were replaced. 
• 
ASPC Perryville: Plumbing Designer for the site gas re-pipe at Perryville Prison for the 
Santa Maria Unit, Lumbey Unit, Santa Cruz Unit and San Pedro Unit.

LSW Engineers 
ARIZONA, INCORPORATED 
• 
ASPC Yuma Cheyenne Unit: Mechanical Designer for the systems and infrastructure to 
remediate damage done to the Laundry and Kitchen buildings from waterflow from 
the evaporative cooling units and resultant demolition by staff. 
CDCR R.J. Donovan lain Facility, San Diego, CA: Mechanical Designer for this new Level II 
facility which includes three housing units that will provide 792 beds. Additional 
structures include a Facility Support Services building that will house healthcare 
services, laundry, canteen and dining areas; Program Support Services building for 
general visiting, religious programs, classrooms, library, indoor recreation, and 
administrative area; Family Visiting building, and a Warehouse. The project 
encompasses approximately 259,000 SF. 
Central Valley Juvenile Detention Center, San Bernardino, CA: Mechanical Designer for 
this new 144,068 SF juvenile detention facility consisting of three identical 80-bed 
housing units and one 40-bed unit. Within the housing units, each 40-bed pods 
include a dayroom, living quarters, shower/toilet, and classroom. Each unit has access 
to an independent outdoor activity area, and each individual housing unit contacts a 
separate multipurpose staff areas. Support areas include administration, medical, 
receiving/warehouse, and a 5,200 SF full kitchen and staff dining. 
Clark County Detention Center, Las Vegas, NV: Mechanical Designer for this new 1,000 - 
bed detention center on a 17-acre site. The facility is approximately 232,000 SF and 
includes a two-story administration area, warehouse and central plant. The housing 
area is approximately 143,000 SF in one building with two floors and a mezzanine. 
Design includes planning for another future 1,000 beds. 
Catalina Mountain Juvenile Facility, Phoenix, AZ: Mechanical Designer for the chiller 
replacement. 
Adobe Mountain Juvenile Facility, Phoenix, AZ: Mechanical Designer for the replacement 
of AC units in miscellaneous areas in the facility. Areas include Business area, 
Warehouse, Visitation area, West Unit Kachina building, West Unit Voyager building, 
Health Unit, Separation Unit and Central Control. 
Maricopa County ITR and Jail Expansion: Mechanical Designer for a new single story, 
153,600 SF building which will house a 512-bed, 72-hour Inmate Transfer and Release 
(ITR) facility, along with approximately 1,280-bed medium-security detention facility 
consisting of 320,000 SF. 
Oren R. Fox, Imperial County, CA: Mechanical Designer for a new 58,200 SF two-story, 
medium security adult detention facility which will house and provide treatment and 
program space for 270 male and female pretrial and sentence inmates. The housing 
units will consist of six two-tiered 45-bed dormitory style housing units with a double 
bunk configuration to house 270 inmates in approximately 22,300 SF. A second 
building consisting of 8,700 SF will be a video visitation center with vocational print 
shop located outside of the secure perimeter, but on the same site, to allow for public 
access. 
COUNTY/FEDERAL/STATE 
John M. Roll United States Courthouse, Yuma, AZ: Mechanical Designer for a new 57,000 
SF building which includes two courtrooms, U.S. MarshaIls, holding cells, Clerk of Courts, 
pre-trial, and probation. Sustainable Measures included domestic solar hot water, solar 
photovoltaics, and high efficiency chillers.  REED Silver) 
Maricopa County 
• 
Election Office: Mechanical Designer for the renovation and addition of six work 
stations at the election office lobby included replacing the existing air conditioning 
into the new space, and retain two circulation fans in the space, and redistribute air 
due to the partition additions.

L 	
Engineers 
ARIZONA, INCORPORATED 
Northwest Regional Justice Courts, Surprise, AZ: Mechanical Designer for a new 
36,000 SF courts building. This facility contains courts, judicial suites, and 
administrative space. Mechanical design included HVAC design for an air-cooled 
chiller with VAV distribution and electric heat. General plumbing design was also 
included. 
• 
San Tan Regional Justice Courts, Chandler, AZ: Mechanical Designer for a new 43,610 
SF courts building including four courtrooms, judicial suites, hearing rooms, 
conference/mediation rooms, workstation, and secured parking and administrative 
office space. Design included HVAC for package rooftop units and electric heat and 
general plumbing. 
• 
Southeast Regional Justice Center, Mesa, AZ: Mechanical Designer for a four -story, 
235,000 SF courthouse facility which will house adult probation, sheriff's substation, 
four justice courts, three EDC/RCC Courts, general administrative offices, and 
maintenance area. Construction was put on hold due to funding. 
Naco Border Patrol Station, Naco, AZ: Mechanical Designer for a new 1,300 SF support 
facility that is attached to the 50 yard shooting range. The facility includes entry 
vestibule, classroom, armory, gun storage and cleaning space, range closet, range 
access, and range master office. 
EDUCATION (HIGHER ED) 
Midwestern University, Glendale, AZ Campus 
Student Services Building (Barrel 4): Mechanical Designer for a new 18,500 SF wood 
structure which includes offices, conference rooms, central restrooms, and 
breakroom. 
Veterinarian Clinic: Mechanical Designer for a new, three-story, approximately 
110,000 SF clinic building including animal holding areas, exam rooms, treatment 
rooms, wards, surgery rooms, MRI room, CT scanner room, linear accelerator room, 
intensive care units, isolation rooms, and pharmacy area. The veterinary clinic 
provides services for dogs, cats, birds and small mammals. 
Veterinarian Classroom Building: Mechanical Designer for a new, 3-story, veterinary 
classroom building. The building contains classrooms and laboratory spaces and is 
approximately 75,000 SF. 
Large Animal Facility: Mechanical Designer for a new, 72,000 SF large animal facility 
that is part of the veterinary program. The large animal facility consists of several 
buildings and open structures that include BSL2 and BSL3 necropsy laboratory spaces, 
tissue storage, histopath laboratory, biohazard storage, teaching theater, chemical 
storage, feed storage, classrooms, bovine and equine housing areas and treatment 
rooms, pharmacy, locker rooms, offices, conference rooms, and other miscellaneous 
support spaces. 
Student Housing, Phase 5: Mechanical Designer for the four, 3-story apartment 
buildings that includes 30 units in each building. Mechanical design includes split-
system, air-cooled heat pump systems, and exhaust systems for bathrooms and 
laundry. Plumbing systems include sewer, water and roof drainage, dedicated electric 
water heater for each unit, central water conditioning system for the water services 
and central water meter for each building. 
Parking Structure C: 
Mechanical Designer for a new 4-level parking structure that 
accommodates 800 parking spaces and contains approximately 342,000 SF of surface 
area. The structure is designed as an "open" parking garage with no sub grade level. 
Tenant Improvement Projects: 
o 	
Foothills Science Center: Plumbing Designer for the addition of a dedicated 
domestic hot water heating system that serves the cage washer. The new hot 
water heating system consists of two gas-fired boilers mounted on the building 
roof within the existing screen wall enclosure.

LSW Engineers 
ARIZONA, INCORPORATED 
o 
Agave Hall: Mechanical Designer for the remodel of an existing 3,500 classroom 
space for use of private offices, reception/waiting area, and new conference 
room. Mechanical scope included a new fan coil system with chilled water cooling 
and electric heating. 
o 
Glendale Hall Optometry Lab/Classroom: Mechanical Designer for the remodel of 
950 SF of existing shell space for a new classroom/lab space for the optometry 
program. Mechanical scope included reusing the existing VAV and adding a new 
VAV terminal unit with electric heating. 
o 
Dental Clinic: Mechanical Designer for the first floor remodel consisting of 1,500 
SF for the addition of two new dental surgery suites, new supply room, four x-ray 
rooms, new radiology room and waiting/reception area. Mechanical scope 
included modifications of the existing supply and exhaust air systems serving the 
surgery area and adding a new VAV terminal units with electric heating. 
Midwestern University, Downers Grove, I Campus 
• 
Optometry Classroom Building: Mechanical Designer for a new 3-story, 62,519 SF 
optometry classroom building which contains classrooms, offices, optometry 
laboratory spaces, and a 6,200 SF mechanical penthouse. 
• 
Maintenance Facility: Mechanical Designer for a new 11,600 SF, two-story 
maintenance facility. The building will contain equipment services bays, shop areas, 
storage areas, private offices, conference room, restrooms, break room and 
miscellaneous support areas. 
• 
Multispecialty Clinic Tenant Improvement 
o 
Mechanical Designer for a 25,000 SF tenant improvement on the fifth floor. The 
new space includes exam rooms, offices, conference rooms, group therapy rooms 
and x-ray room. 
o 
Mechanical Designer for a 32,000 SF tenant improvement of the fourth floor. The 
improved space includes exam rooms, conference room, offices, laser surgery 
room, vision therapy room, and various other support spaces. 
Embry Riddle Aeronautical University I Classroom & Laboratory Building: Mechanical 
Designer for a new 2-story, 45,000 SF Classroom and Laboratory Building. The 
laboratory spaces includes chemistry, biology and physics. 
Maricopa County Community College District 
• 
Rio Salado Communiversity: Mechanical Designer for a new two-story, 20,400 SF 
building consisting of media classrooms and a large expandable classroom with 
partitions. 
• 
Chandler-Gilbert Community College I Copper Hall, Williams Campus: Mechanical 
Designer for the 15,000 SF addition to Bluford Hall which is used for the Law 
Enforcement Training Academy, Fire Science and Emergency Science and Emergency 
Medical Technician programs, Electric Utility Technology and Energy Industry 
programs. The addition also includes a 150 SF IT room, equipment, lockers, changing 
rooms, laundry and storage for strength and conditioning. 
Los Angeles Southwest College I School of Career & Technical Education: Mechanical 
Designer for a new 53,655 SF facility which includes two science labs, general purpose 
classrooms, student services, and faculty offices. 
Arizona State University, Tempe, AZ 
• 
Palo Verde East and West Dormitories: Mechanical Designer for the remodel of toilet 
rooms in each dormitory room and remodel existing student lounges on each floor. 
EDUCATION (K-12) 
Tuba City School District I New K-5 Elementary School: Mechanical Designer for a 64,000 
SF single story K-5 elementary school consisting of multiple classrooms, cafeteria, 
multipurpose room, library, administrative office and various other support systems.

CD LSW Engineers 
ARIZONA, INCORPORATED 
Laveen School District I Paseo Point K-8 Elementary School, Phoenix, AZ: Mechanical 
Designer for a new 2-story, 93,000 SF elementary school which consists of multiple 
classrooms, cafeteria, multipurpose room, library, administrative offices and various 
other support spaces. 
Washington Elementary School District I Sunburst Elementary: Mechanical Designer for 
the renovations of the existing 62,500 SF school that includes demolition of an existing 
snack bar with replacement, and demolition of a modular building, remodel of the 
existing Facility Manager's office with additional storage areas, remodel of the 
administration office, workroom, nurse's office, and restrooms. Eleven existing 
restrooms require major finish upgrades, underground plumbing repair, exhaust fan 
replacement, and ADA upgrades. 
HOSPITALITY 
Luhrs City Center I Residence Inn/Courtyard by Marriott: Mechanical Designer for a new 
Residence Inn/Courtyard by Marriott consisting of approximately 240,000 SF. The 
main level through the 4th floor includes a two-story lobby, 10,000 SF of meeting 
space with a full service kitchen, fitness center, open-air pool, and guest laundry. The 
5th floor through the 19th floor includes approximately 315 tower hotel rooms. All 
floors are accessed by three passenger elevators and one service elevator. 
MAINTENANCE FACILITIES 
City of Phoenix South Mountain Police Precinct: Mechanical Designer for a 4,600 SF shop 
space designed for the City of Phoenix Public Works Department to maintain their 
fleet. The building consists of a four bay shop space utilizing two vehicle lifts with a 
10,000 lb. and 16,000 lb. capacity, a new/used oil delivery system, and chord reel 
management for oil, water, and compressed air delivery at each bay. The facility also 
includes tool storage, parts storage, flammable storage, tire storage, parts washing 
and office and break room space for employees. 
MUNICIPAL 
City of Tempe 
• 
Parking Garage Improvements: Mechanical Designer to provide HVAC shell design for 
the remaining 9,500 SF of tenant lease space and design for a restroom at both the 
first and second levels. 
• 
Parking Garage Yoga Studio: 
Mechanical Designer for a 2,500 SF yoga studio, 
including one private office, one exercise room, storage room and restrooms. 
City of Avondale Northwest Public Safety Facility: Mechanical Designer for the tenant 
improvement of shell spaces for the fire department at the existing public safety 
building. 
City of Scottsdale Fire Station 613: Mechanical Designer for a new 9,000 SF fire station 
located on a 10-acre site. The facility includes crew quarters and restroom, wellness-
fitness area, day room, dining and kitchen area, offices and three apparatus bays. 
City of El Mirage Police Station: Mechanical Designer for a new 20,000 SF police station 
containing administrative offices, evidence processing and storage, cells for both 
juveniles and adults, a firing range with armory, K-9 facilities, public training and 
media rooms, locker rooms, and briefing rooms. Mechanical scope includes design for 
HVAC systems; plumbing design for restroom fixtures, drinking fountains, showers, 
and hose bibbs. 
City of Phoenix 
• 
Estrella Police Precinct: Mechanical Designer for a new 25,000 SF facility which 
includes offices for command, administrative staff and motoring officers; holding cells

LSW Engineers 
ARIZONA, INCORPORATED 
for 8 adults and 2 juveniles; interview and monitoring rooms; public space for lobby, 
meeting room, restrooms, walk-up counter and a 30 person briefing room. 
• 
Mountain View Police Precinct: Mechanical Designer for a new 25,720 SF facility 
which houses offices, holding cells, mug shot and processing area, officer restrooms, 
lockers, break room, public spaces, restrooms, briefing room, three to four bay 
shooting range and storage areas. There is also an approximate 3,000 SF vehicle 
maintenance facility on site. 
• 
Black Mountain Police Precinct: Mechanical Designer for a new 25,884 SF police 
precinct contains nine holding cells, mug shot and processing area, interview and 
monitoring areas, officer restrooms, lockers, break room, public spaces and restrooms, 
briefing room, equipment and evidence storage, and three bay shooting range and 
storage. 
Town of Fountain Hills Fire Station No. 1: Mechanical Designer for a new 1,400 SF 
expansion and a 500 SF remodel. A new package rooftop AC unit was provided for the 
new space addition and exhaust fan for the new restroom. 
City of Glendale 
• 
Glendale Courts Building: Mechanical Designer for a new approximately 93,000 SF, 3- 
story building with a small below grade secure parking area. The facility will include 10 
courtrooms with design for 4 future courtrooms, judges chambers, jury rooms, 
conference rooms, inmate holding area, and vehicle sally port. Construction was 
stopped due to funding. 
• 
Fire Department Office: Mechanical Designer for the tenant improvement consisting 
of 11,700 SF third floor office space for the Fire Department. Project included 
complete remodel of existing restroonn group, both men and women. Mechanical 
design included reconfiguring duct work for the new tenant improvement space and 
updating outside air system to meet current codes. 
NATIVE AMERICAN 
Ak-Chin Indian Community, AZ 
• 
Fire Station 561: Mechanical Designer a new approximately 21,000 SF fire station. The 
facility houses 12 full time staff and includes four apparatus bays; office areas for 
chief, captain, administration and IT; conference room; dorm rooms; fitness area; 
kitchen/dining; work room, and support areas. Also included is an Emergency 
Operations Center (EOC) that may double as a classroom for 30 to 50 people. 
• 
Multi -Purpose Justice Complex: Mechanical Designer for a new 54,000 SF 
multipurpose Justice Center which consists of an approximate 19,000 SF detention 
area, 10,500 SF police area, 12,000 SF court area, 8,000 SF firing range, outdoor 
storage and impound areas. Mechanical systems for HVAC and exhaust was provided 
for all occupied areas. 
Salt River Pima -Maricopa Indian Community, AZ 
• 
Detention Center: Mechanical Designer for a new 75,000 SF, 120-bed detention 
facility with design for future expansion for 200 additional beds. Project also included 
the evaluation of central plant expansion to add 25,000 SF of future office space. 
• 
Indian School Police/Fire Substation: Mechanical Designer for a new 21,340 SF 
police/fire Substation located on 3.2 acres. The police department includes prisoner 
holding and interview area, work spaces for patrol officers to file reports, store 
information and attend daily briefings. There is a training resource room for the 
officers; officer space for three patrol supervisors, two housing liaisons, two student 
resource officers, and two detective, and locker rooms. The fire department includes 
four apparatus bays, 12 bunk rooms, day room, training room, and locker/shower 
areas for men and women of the fire department. There is a shared exercise room for 
the fire and police departments. 
• 
Zone 2 Operations Building: 
Mechanical Designer for a new standalone 1,440 SF

LSW Engineers 
ARIZONA, INCORPORATED 
zone 2 ground water treatment facility which includes an operator office with three 
workstations, storage/shop area, storage room, restrooms, and a 650 SF covered 
storage area. 
POWER PLANT 
Palo Verde Nuclear Generating Plant: Mechanical Designer for a new one story 26,000 SF 
building with approximately 6,000 SF of interior conditioned space. Mechanical scope 
included packaged ground mounted HVAC systems, exhaust system, distribution of 
ductwork and diffusers, heating and cooling load calculations for the 6,000 SF 
conditioned space. 
C_D

Jeff Ruthstrom, P.E 
Mechanical Engineer / Executive Vice 
President 
Jeff Ruthstrom joined Pearson Engineering Associates, Inc. in 1995, bringing with him expertise in HVAC systems 
design, plumbing systems design and process piping systems design. This expertise has been applied to central 
plants; air-handling systems; domestic water systems; conventional and pumped drainage systems; and toxic, inert, 
medical, corrosive and pyrophoric gas systems. As a project engineer, Jeff manages a project from concept to 
completion in a straight-forward systematic manner. Incorporated into each project are the client's needs to be within 
budget, for the project delivered on time and have the best possible quality and maintenance of aesthetics to design. 
He is accomplished in JOC, design/build and fast-track deliveries. Jeff has been involved with major commercial high 
rise, industrial, healthcare, educational and military projects. 
EDUCATION: 
PROFESSIONAL 
REGISTRATIONS: 
• Bachelor of Science Mechanical Engineering 
Arizona State University, 1990 
• Arizona (#31184) 
• California (#33996) 
• Nevada (#018428) 
• New Mexico (#018428) 
• South Carolina (#23193) 
• Tennessee (#113476) 
PROFESSIONAL 
CERTIFICATIONS: 
PROFESSIONAL 
AFFILIATIONS: 
• Certified in Plumbing Engineering 
• Certified Plumbing Designer 
• Certified Energy Manager 
• American Society of Plumbing Engineers 
• American Society of Heating, Refrigeration and Air 
Conditioning Engineers 
• Air Conditioning Contractors of Arizona 
YEARS OF 
EXPERIENCE: 	
29 Years

VA A 
Jeff Ruthstrom, P.E Maricopa County Experience 
Durango Juvenile Courts HVAC Study, Phoenix, AZ • Jeff Ruthstrom provided an extensive site survey, analysis, and subsequent 
design for the remediation of the HVAC System in the East Wing (Area 2 and 3) of the Durango Juvenile Courts and Detention 
Facilities. Services included detailed Site Inspections of the existing installation necessary to develop sufficient understanding of the 
Building's limitations and requirements in order to develop solutions to the air flow and temperature control problems noted during the 
meeting with F.M.D. personnel. 
Maricopa County Sheriff's Office Training Center, Phoenix, AZ • Jeff Ruthstrom provided Mechanical Design for the installation of 
One (1) Water Heater Combustion Products Exhaust Fan to serve the Two (2) Water Heaters that provide Domestic Hot Water to the 
M.C.S.O. Training Center. 
Maricopa County - Water Storage Tank Replacement, Phoenix, AZ • Provide Plumbing Design to replace Two (2) existing Hot 
Water Storage / Heater Tanks. 
Maricopa County - Durango Complex Chilled Water Study, Phoenix, AZ • Jeff Ruthstrom provided analysis and a formal report 
on a recommended approach to extend the Durango Complex Chilled Water Distribution System to support the needs of the North 
portion of the Complex. 
Maricopa County - Emergency Management Building — HVAC Upgrade, Phoenix, AZ • Jeff provided Mechanical Design to 
upgrade the existing dated HVAC System. Services required an extended Site Survey to develop best alternative for the new System. 
Maricopa County - Evidence Drying Room, Phoenix, AZ • Jeff Ruthstrom provided Mechanical Design for modifications to the 
existing Evidence Drying Room. The Mechanical scope included the following: Removal of the existing Split System Air Conditioning 
System, removal of the the existing Filtration System from the Drying Room, design of a new Roof Top 100% Outside Air Air-
Conditioning Unit, and design of a new HEPA Exhaust System. 
Maricopa County - Durango County Complex - Chilled Water Piping Extension, Phoenix, AZ • Jeff provided design for the 
extension of the Durango Site Chilled Water Piping Distribution to support the Northwest Quadrant including the 911 Services Building. 
Maricopa County - Durango Jail Boiler Replacement, Phoenix, AZ • Jeff provided design for the removal of Three (3) existing 
Steam Boilers serving Heating and Domestic Hot Water Loads and replace them with High Efficiency Gas Fired Heating Water 
Boilers. 
Maricopa County - Durango Jail Dishwasher Steam Modifications, Phoenix, AZ • Jeff provided Mechanical Design for the 
installation of a new High Pressure Steam Boiler to serve the existing Dishwasher at the Durango Jail Kitchen. 
Maricopa County - West Courts Data Room — Cooling Issue Review, Phoenix, AZ • Jeff provided Mechanical Consultation to 
assist in developing an effective strategy to provide additional cooling capacity to support the increases in Computer Equipment load. 
Maricopa County — Food Factory Boiler Room Ventilation Upgrade - Durango Site, Phoenix, AZ • Jeff Ruthstrom provided 
Analysis and Design for the Remediation of the Excessive Temperatures within the Boiler Room by utilizing Plumbing Modifications 
and Ventilation/Air Conditioning to moderate existing conditions. 
Maricopa County 
— Durango/Towers Jail Chilled Water Extension, Phoenix, AZ • Jeff provided Mechanical Design in 
coordination with the Civil Engineer to extend Site Chilled Water Services to Durango and Towers Jail and the Northeast Quadrant of 
Durango Complex. 
Maricopa County - Downtown Justice Center, Phoenix, AZ • Jeff provided Mechanical Design to renovate the existing Second 
Floor Open Office Space into Conference Rooms. Design included the addition of a dedicated Outside Air System, Supply 
Fan/Ductwork, Two (2) Chilled Water Fan Coils, Chilled Water Distribution from Risers located in the Air Handling Room, and air 
distribution. 
Maricopa County - Central Courts Plaza, Phoenix, AZ • Jeff provided Mechanical Design for the renovation of approximately 
25,000 S.F of the existing Court Clerical Area.

Maricopa County - Forensics Lab Washer/Dryer Installation, Phoenix, AZ • Jeff provided Mechanical Design for the installation of 
a new Washer/Dryer in the Special Procedures Admitting Room of the Maricopa County Forensics Lab. 
Maricopa County - Lower Buckeye Jail — Bakery Return Air Duct, Phoenix, AZ • Jeff provided Mechanical Design to extend the 
Return Duct from AH-11 to provide ducted return from the Bakery. 
Maricopa County - West Courts AH-1 Replacement, Phoenix, AZ + Jeff Ruthstrom provided Mechanical Design for the removal 
and replacement of Air Handling Unit AH-1 located in the Basement of West Courts. Design Documents included demolition of the 
existing Air Handling Unit and replacement of the Unit with a new 5-Zone Dual Deck Multi-Zone with Chilled Water Cooling and Hot 
Water Heating. In addition to the Design of the new Air Handling Unit, PEA coordinated the Direct Digital Control (DDC) System with 
Siemens. 
Maricopa County — Lower Buckeye Jail (LBJ) — Central Plant Commissioning, Phoenix, AZ • Jeff Ruthstrom provided 
Mechanical commission service for modifications to the previously designed LBJ Central Plant Expansion that included the installation 
of One (1) Cooling Tower and Two (2) 1,250 Ton Chillers along with the upgraded Hot Water and Steam Boilers. 
Maricopa County - 4th Avenue Jail — 4th Floor HVAC Upgrade, Phoenix, AZ • Jeff provided Mechanical design for upgrades to 
AHU-R1, R2, R3, R4 and for the removal of Eight (8) Exhaust/Relief Fans that exhaust the Hallways of SMU-1, 2, 3, & 4. Design also 
included additional Chilled Water to the AHU's. 
Maricopa County - Durango Jail — Chilled Water System Upgrade, Phoenix, AZ • Jeff provided Mechanical design for the sizing 
and selection of One (1) new Variable Speed Chilled Water Pump; sizing and selection of an associated Variable Frequency Drive 
(VFD); sizing By-Pass Valve(s) at the far end of the Chilled Water Distribution System to allow low flow operation of the Chilled Water 
Pump, and modification of existing Three-Way Valves to Two-Way. 
Maricopa County - 4th Avenue Jail — Office Addition, Phoenix, AZ • Jeff provided Mechanical Design for the new Dock Office 
space to include a dedicated Chilled Water Fan-Coil. 
Maricopa County - 4th Avenue Jail — APS Vault HVAC Upgrade, Phoenix, AZ • Jeff provided Mechanical Design for the 
replacement of the Fan-Coils that served the existing APS Utility Vault at the Maricopa County 4th Avenue Jail, Phoenix, Arizona. 
Maricopa County - Clerk of the Court — Central Court Partial Basement Remodel, Phoenix, AZ • Jeff Ruthstrom provided 
Mechanical Design for the remodel of 7,600 S.F of the existing Basement Area to facilitate the new Office Space for Procurement, 
Technology Systems and House Maintenance. 
Maricopa County — East Courts 1st Floor Lobby, Phoenix, AZ • Jeff provided Field Assistance for associated Shut-Downs of 
Mechanical Systems to allow Abatement of Ceiling Space of the 1st Floor Lobby. 
Maricopa County — East Courts 1 5t Floor Lobby - HVAC & Lighting Replacement, Phoenix, AZ e Jeff provided Mechanical 
Design for upgrade to the HVAC system at East Courts- 1st Floor Lobby. 
Maricopa County - Remote Sites — Phase 3, Various, AZ 
Jeff provided Mechanical design for Telecom Closets for the following 
Six (6) Buildings: 2201, 2801, 2805, 0904, 4805, and 6605. 
Maricopa County - 1st & 2nd Floors — East Courts Building PSD Tenant Improvement, Phoenix, AZ 
Jeff provided Mechanical 
Design for the remodel the existing Open Law Library into an Office Space. 
Maricopa County - OPS — 320 West Lincoln Tenant Improvement, Phoenix, AZ 
Jeff provided Mechanical and Plumbing Design 
Services for the Tenant Improvement of the Central Portion of the First Floor Print Shop Area. 
Maricopa County — West Mesa Justice Courts Building, Mesa, AZ * Jeff provided Mechanical Design for the installation of a new 
Heat Pump to provide Conditioned Air for the Public Entrance to the West Mesa Justice Courts. 
MC - Central Courts Renovation 12 & 13th Floors, Phoenix, AZ to Jeff provided Mechanical Design to support the Remodel of the 
12th & 13th Floors at the Central Courts Building.

VA 
Pearson Engineering Associates, Inc.  
8825 N. 23rd Ave, Phoenix, AZ. 85021 (602) 264-0807 
Firm Overview 
Pearson Engineering Associates, Inc. (PEA) is a dual discipline firm whose history has shown 
dedication to quality Mechanical and Electrical design in Phoenix since 1969. PEA has a solid 
reputation for sound engineering design and personal and appropriate attention to every project we 
undertake. Our reputation is endorsed by the substantial number of repeat clients that make up our 
client base. We have specialized experience in federal, state, and county government, municipal, 
commercial, retail, healthcare, industrial, education, residential, and high-tech facilities of all project 
scopes. In addition, PEA has experience in sustainable Green Building design (LEED) and has LEED 
Accredited and LEED Educated Professionals on staff. 
Our firm is well-known for incorporating in its projects the latest energy conservation techniques, 
systems and equipment. We adhere to high standards of quality and efficiency which encompass the 
use of energy-saving lamp/ballast combinations, air conditioning systems and controls. Our engineers 
take into account all pertinent factors, including aesthetics and the owner's operations, when selecting 
the most appropriate solutions to design problems. We employ only proven methods of reducing energy 
consumption ranging from the use of day lighting and EMCS to the intelligent location of equipment for 
minimum thermal exposure. Perhaps just as important, PEA is an exceptionally experienced Arizona 
engineering firm accomplished in the most comprehensive designs for a desert environment; we design 
as though we were paying the utility bills. 
All our projects are produced via CADD utilizing state-of-the-art AutoCAD systems to produce high 
quality, sophisticated construction documents for our clients. In addition, PEA is experienced in Building 
Information Modeling (BIM). We utilize the latest version of REVIT MEP. 
PEA carries Errors and Omissions insurance of Two Million Dollars. In its entire history, PEA is proud to 
note that we have never been involved with a bankruptcy, foreclosure, litigation, nor have we had any 
claims against our Errors and Omissions insurance. PEA also carries Comprehensive General 
Coverage of One Million Dollars. 
Pearson Engineering Associates, Inc. is one of the larger MPE consulting firms in Arizona. We have a 
professional staff of 26 with the personnel breakdown of: 6 Registered Mechanical Engineers, 8 
Mechanical Designers / Draftsmen, 2 Registered Electrical Engineers, 7 Electrical Designers / 
Draftsmen and 3 Administrative/Management Support Staff. 
All projects undertaken by PEA are designed in our Office located at 8825 North 23rd Avenue, Suite 
11, Phoenix, Arizona 85021.

IMCOI 
Attachment 1 - REFERENCE FORMAT 
Maricopa County requires a minimum of three references and/or a maximum of five (most recently) 
completed projects, which are similar in magnitude, complexity, and dollar value to the proposal being 
submitted. This form may be replicated as needed to be responsive to the Request for Qualifications. 
1. Company Name: 
Address: 
Phone Number: 
Facsimile Number: 
Maricopa County  
c/o Facilities Management Dept. 
401 W. Jefferson St., Phoenix AZ 85003 
(602) 372-2770 
(602) 506-6835 
Person to Contact: 	Ravinder Gannala, Capital Project Manager 
Contact Person's Email Address: Ravinder.Gunnala@FM.maricopa.gov  
Owner's Bid # or Project #: Serial #14085-10C 
Date of Completion: 	
Effective 1/27/15 to Current (extended) 
Brief Project Description (including partnering team and owner's project name): 
HVAC Job Order Contractor — for various unitary change outs / equipment replacements and 
remodel projects at Maricopa County facilities 
2. Company Name: 	Gordian — Arizona State JOC  
Address: 	
30 Patewood dr. Bldg. 2 Suite 350, Greenville, South Carolina 29615 
Phone Number: 	 (928) 750-9068 
Facsimile Number: 	
N/A 
Person to Contact: 	
Mike Dziubla 
Contact Person's Email Address: nn.dziubla@gordian.com   
Owner's Bid # or Project #: ADSP017-174462 
Date of Completion: 	
Current (5-year contract) 
Brief Project Description (including partnering team and owner's project name): 
Arizona State JOC —performed various Chiller, Cooling Tower and other equipment replacement, 
HVAC renovations and improvements, engineering design build and design assist projects, provided 
value engineering, emergency services, plumbing and HVAC service and maintenance. IMCOR 
assisted with design and provided preliminary budgets based on scopes of work and existing 
conditions, as well as were contracted to subcontract engineers for design, and worked with the 
customer and engineer to develop the most reasonable cost-effective design and implementation. 
3. Company Name: 
Address: 
Phone Number: 
Facsimile Number: 
Person to Contact: 
Medtronic Tempe Campus  
2343 W. Medtronic Way, Tempe, AZ 85281 
(480) 377-2367 
(480) 921 -6450 
Pierra Carlier, Sr. Facilities Engineer 
Contact Person's Email Address: pierre.carlier@medtronic.com  
Owner's Bid # or Project #: N/A — Ongoing/Various 
Date of Completion: 	
N/A — Ongoing/Various 
Brief Project Description (including partnering team and owner's project name): 
Medtronic Microelectronics Tempe Campus - performed various Chiller, Cooling Tower and other 
equipment replacement, HVAC renovations and improvements, engineering design build and design 
assist projects, provided value engineering, emergency services, plumbing and HVAC service and 
maintenance. 
Page 1 of 2

imam 
4. Company Name: 
Address: 
Phone Number: 
Facsimile Number: 
Person to Contact: 
Mayo Clinic Hospital  
5777 E Mayo Blvd, Phoenix, AZ 85054 
(480) 342-0812 
N/A 
Mark Smith, Supv. of Facility Operations 
Contact Person's Email Address: snnith.mark@nnayo.edu   
Owner's Bid # or Project #: N/A — Ongoing/Various 
Date of Completion: 	
August 2020 
Brief Project Description (including partnering team and owner's project name): 
Mayo Clinic Hospital Service and Maintenance Contract — 2 years. Provide Emergency HVAC and 
Plumbing Services, hydro-jetting, snaking, leak repairs, backflow preventer assessment repairs 
replacement and certification, cast iron replacement, tenant improvements, and assist the customer 
with research of existing conditions for their engineers. 
5. Company Name: 	Arizona Healthcare Cost Containment System (AHCCCS)  
Address: 	
701 E. Jefferson St., MD-5700, Phoenix, AZ 85034 
Phone Number: 	 602-417-4379 
Facsimile Number: 	
602-258-5943 
Person to Contact: 	Reedy Barfield Ill, Facilities Administrator 
Contact Person's Email Address: Reedy.Barfield@azahcccs.gov  
Owner's Bid # or Project #: We have performed a myriad of projects over the last four years 
Date of Completion: Various. We provide clear expectations with defined time frames to finish the 
work. 
Brief Project Description (including partnering team and owner's project name): 
AHCCCS PM Agreement - HVAC Service and maintenance for Boilers, Liebert systems, Water Source 
Heat pumps, Cooling Tower, VFD's, pumps, Evaporative coolers, and Split systems. We perform a 
multitude of projects; VFD change outs, split system installs, WSHP installs, Plumbing emergency 
work, and much more. 
Page 2 of 2

Attachment 2- LEGAL WORKER CERTIFICATION 
October 31, 2019 
(Date) 
Maricopa County 
Office of Procurement Services 
160 S. 4th Avenue 
Phoenix, Arizona 85003 
As required by A.R.S. § 41-4401, Maricopa County (the "County") is prohibited, after September 30, 2008, from 
awarding a contract to any contractor who fails, or whose subcontractors fail, to comply with A.R.S. § 23-214-A. The 
undersigned entity warrants that it complies fully with all Federal immigration laws and regulations that relate to its 
employees, that it shall verify, through the E-Verify program as jointly administered by the U.S. Department of 
Homeland Security and the Social Security Administration or any of its successor programs, the employment 
eligibility of each employee hired after December 31, 2007, and that it shall require its subcontractors and sub-
subcontractors to provide the same warranties to the below entity. 
The undersigned acknowledges that a breach of this warranty by the below entity or by any subcontractor or sub-
subcontractor under any contract resulting from this solicitation shall be deemed a material breach of the contract, and 
is grounds for penalties, including termination of the contract, by the County. The County retains the right to inspect 
the records of the below entity, subcontractor and sub-subcontractor employee who performs work under the contract, 
and to conduct random verification through E-Verify of employment records of the below entity and any subcontractor 
and sub-subcontractor who works on the contract, to ensure that the below entity and each subcontractor and sub-
subcontractor is complying with the warranties set forth above. 
Interstate Mechanical Corp. 
(Firm) 
Robert M. Karber 
(Print Name) 
Principal 
(Signature Required) 
bob.karber@imcor—az.com 
 
(Email Address)  
1841 E. Washington Street 
(Address Line I) 
Phoenix, AZ 85034-1230 
(Address Line 2) 
( 602 ) 257-1319 
(Phone) 
( 602 ) 254-2945 
(Fax) 
8 6 — 0 4 4 8232 
(Federal Taxpayer ID Number) 
Request For Qualifications 	
20019-JOC 
I-1VAC Job Order Contractor 
Pg. # 22

Interstate Mechanical Corporation 
Principal 
Seal 
By: 
r3 6'6./10)62, Pal NJCIP/IL-,  - 
Hartford Accident and Indemnity Company 
SURETY BOND 
ARIZONA STATUTORY BID BOND FOR CONSTRUCTION 
PURSUANT TO TITLES 28, 34, AND 41, ARIZONA REVISED STATUTES 
(Penalty of this bond must not be less than 10 percent of the bid amount) 
KNOW ALL MEN BY THESE PRESENTS: 
That weInterstate Mechanical Corporation 
	
as Principal, (hereinafter called the Principal), and the _ 
Hartford Accident and Indemnity,  Company 
a corporation duly organized under the laws of the State of 	
Connecticut 
	, as Surety, 
(hereinafter called the Surety), are held and firmly bound unto Maricopa County (hereinafter called the 
Obligee), in the sum of One Hundred Thousand & 00/100 
	
which is 10 percent of the estimated Obligee's project budget for the first year of 
construction, submitted by him to the Obligee, for the work described below, for the payment of which sum, 
well and truly to be made, the said Principal and the said Surety, bind themselves, their heirs, executors, and 
administrators, successors and assigns, jointly and severally, firmly by these presents, and in conformance with 
the A.R.S. 
WHEREAS, the said Principal is herewith submitting its Bid for HVAC Job Order Contractor, Serial # 
200019-JOC. 
NOW, THEREFORE, if the Obligee shall accept the Bid of the Principal and the Principal shall enter into 
a contract with the Obligee in accordance with the terms of the Bid and give the Bonds and Certificates of 
Insurance as specified in the Standard Specifications with good and sufficient Surety for the faithful 
performance of the contract and for the prompt payment of labor and material furnished in the prosecution 
of the contract, or in the event of the failure of the Principal to enter into the contract and give such Bonds 
and Certificates of Insurance, if the Principal pays to the Obligee the difference not to exceed the penalty 
of the bond between the amount specified in the Bid and such larger amount for which the Obligee may in 
good faith contract with another party to perform the work covered by the Bid then this obligation is void. 
Otherwise it remains in full force and effect, provided however, that this bond is executed pursuant to the 
provisions of Section 34-201, A.R.S., and all liabilities on this bond shall be determined in accordance with 
the provisions of the section to the extent as if it were copied at length herein. 
Signed and sealed this 31st day  of 	
October 
	, 20j.
. 
Minard-Ames Insurance Services LLC 
Agent of Record, State of Arizona 
4646 E. Van Buren #200 Phoenix AZ 85008 
Agent Address 
Surety 	
Seal 
Bond Number 	
n/a 
 
By:q/10,t 
-6  V' 
Lori L. Dawson-Brown, Attorney-in-Fact 
Power of Attorney 	 Seal 	
1\\ 
Request For Qualifications 	
20019-JOC 
HVAC Job Order Contractor 
Pg. # 26

POWER OF ATTORNEY 
Direct Inquiries/Claims to: 
THE HARTFORD 
BOND, T-12 
One Hartford Plaza 
Hartford, Connecticut 06155 
Bond.Claimsathehartford.com   
call. 888-266-3488 or fax: 860-757-5835 
KNOW ALL PERSONS BY THESE PRESENTS THAT: 
Agency Name: MINARD -AMES INSURANCE SERVICES LLC 
Agency Code: 59-300536  
X 	
Hartford Fire Insurance Company, a corporation duly organized under the laws of the State of Connecticut 
X 	
Hartford Casualty Insurance Company, a corporation duly organized under the laws of the State of Indiana 
X 	
Hartford Accident and Indemnity Company, a corporation duly organized under the laws of the State of Connecticut 
Hartford Underwriters Insurance Company, a corporation duly organized under the laws of the State of Connecticut 
Twin City Fire Insurance Company, a corporation duly organized under the laws of the State of Indiana 
Hartford Insurance Company of Illinois, a corporation duly organized under the laws of the State of Illinois 
Hartford Insurance Company of the Midwest, a corporation duly organized under the laws of the State of Indiana 
Hartford insurance Company of the Southeast, a corporation duly organized under the laws of the State of Florida 
having their home office in Hartford, Connecticut, (hereinafter collectively referred to as the "Companies) do hereby make, constitute and appoint, 
up to the amount of Unlimited : 
Deborah K. Anderson, Wendy Capirci, Lori L. Dawson-Brown, Michael D. Specht, Cliff 
Spickler of PHOENIX, Arizona 
their true and lawful Attorney(s)-in-Fact, each in their separate capacity if more than one is named above, to sign its name as surety(les) only as 
delineated above by N, and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the 
nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and 
executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. 
In Witness Whereof, and as authorized by a Resolution of the Board of Directors of the Companies on May 6, 2015 the Companies have 
caused these presents to be signed by its Senior Vice President and its corporate seals to be hereto affixed, duly attested by its Assistant 
Secretary. Further, pursuant to Resolution of the Board of Directors of the Companies, the Companies hereby unambiguously affirm that they are 
and will be bound by any mechanically applied signatures applied to this Power of Attorney. 
John Gray, Assistant Secretary 
)
STATE OF CONNECTICUT 
On this 5th day of January, 2018, before me personally came M. Ross Fisher, to me known, who being by me duly sworn, did depose and 
say: that he resides in the County of Hartford, State of Connecticut; that he is the Senior Vice President of the Companies, the corporations 
described in and which executed the above instrument; that he knows the seals of the said corporations; that the seals affixed to the said 
instrument are such corporate seals; that they were so affixed by authority of the Boards of Directors of said corporations and that he signed his 
name thereto by like authority. 
Kathleen T. Maynard 
Nottuy Public 
My Commission Expires July 31, 2021 -- 
'111 
I, the undersigned, Assistant Vice President of the Companies, DO HEREBY CERTIFY that the above and foregoing is a true and correct 
copy of the Power of Attorney executed by said Companies, which is still in full force effective as of October 31, 2019 
Signed and sealed at the City of Hartford. 
i/Wd."4-6,
77'1,.0 1 1A1k , 
Kevin Heckman, Assistant Vice Pfesident'". 
SS. 
Hartford 
COUNTY OF HARTFORD 
POA 2018

Attachment 4— NON-COLLUSION AFFIDAVIT 
STATE OF ARIZONA 
)ss. 
COUNTY OF MARICOPA 
Robert M. Karber 
	
being first duly sworn, deposes and says: 
Thatheis 	
Principal 
	ofinterstate Mechanical Corporation (IMCOR) 
(Title) 	
(Name of Business) 
bidding on 200019-JOC for the construction of HVAC Job Order Contractor in the County of Maricopa, State of 
Arizona. 
That, in connection with the above-mentioned project, neither he, nor anyone associated with the aforesaid business, 
has, directly or indirectly, participated in any collusion, entered into any contract, combination, conspiracy or other 
act in restraint of trade or commerce in violation of the provisions of A.R.S. § 34-251, Article 4, as amended. 
(Signature of Affian 
St 
Subscribed and sworn to before me this 	
31 s 	
day of  Oct. 20 19 
 
My Commission Expires: 	
June 23, 2023 
(Notary Public) 
Request For Qualifications 	
20019-JOC 
HVAC Job Order Contractor 
Pg. # 27