--7-"Arr-E,72.4 7L TZ JOB ORDER CONTRACTOR (JOC) CONTRACT MARICOPA COUNTY, ARIZONA HVAC Job Order Contractor Office of Procurement Services Serial # 200019-JOC Contract # 200019-JOC C-70- Project # N/A Facilities Management Department, Maricopa County Arizona Division 0 - Bidding & Contract Requirements Section Description Number of Pages 00005 Table of Contents 1 00500 Construction Contract 4 00610 Payment Bond and Performance Bond 3 00700 General Conditions Table of Contents 6 00700 General Conditions to the Construction Contract 43 Exhibit A — Definitions to the General Conditions 3 Exhibit B — Alternate Dispute Resolution 5 Exhibit C — Legal Worker Certification 1 Exhibit D — Request for Proposal for Task Order 1 Exhibit E — Performance Bond and Payment Bond Forms 2 Exhibit F — SBE Reporting Document 1 Exhibit G — Request for Qualifications dated 10/31/19 Exhibit H — Statement of Qualifications dated 10/31/19 Exhibit I — Certificate of Insurance for Job Order Contract 2 Exhibit J — General Requirements for the Job Order Contracts All of the exhibits above are incorporated by reference as though fully set forth herein whether or not physically attached to this contract. NOTE: All references to "JOC" in this document are understood to mean the HVAC JOC. END OF SECTION 2 SECTION 00500 JOB ORDER CONTRACT A. EFFECTIVE DATE: This CONTRACT is entered into by and between the Owner and the Job Order Contractor as Contract No. FMD-N/A, and shall be effective as of 3/26/2020. B. OWNER: MARICOPA COUNTY do Facilities Management Department 401 West Jefferson Street Phoenix, Arizona 85003 C. JOB ORDER CONTRACTOR: Interstate Mechanical Corporation 1841 E. Washington Street Phoenix, Arizona 85034 Robert M. Karber-Principal Office: (602) 257-1319; Fax: (602) 254-2945; E-Mail: bob.karber@imcor-az.com. D. RECITALS: The scope of work and specifications for a broad range of services will be identified in individual Task Orders which will be issued by the Owner from time to time. See EXHIBIT D hereto. NOW THEREFORE, intending to be legally bound and for valuable consideration, the receipt and sufficiency of which are acknowledged, the Owner and Job Order Contractor agree as follows: E. AGREEMENT: Article I. THE CONTRACT The Task Order and other Contract Documents explained in Section 7.1 below and the definitions which are contained Section 00700, Exhibit A, govern this Job Order Contract. Article II. THE WORK 2.1 The Job Order Contractor shall execute the entire Work described by each Task Order, including work which is reasonably inferable and necessary to produce the results intended by the Contract and the Task Order. Article III. CONTRACT TIME 3.1 The Job Order Contractor shall have access to the area of the Work effective from the date of the Notice to Proceed for the assigned Task and shall achieve Substantial Completion and Final Completion of the Work no later than the performance period specified in each Task Order issued. The length of this Contract for services will be for a period of three (3) years with two one-year options to extend the contract, but in no event will this Contract's Term continue longer than five (5) years from the date of the Contract. The term of this Contract shall not be extended. All Work issued hereunder must be completed in full by the final expiration date of this Contract. Extensions to this Contract for years 4 and 5 may only be made by an amendment signed by both parties. A permission to complete a Task Order that extends into Year 4 or Year 5 does not extend the Contract in its entirety for the additional year. 3.2 The Job Order Contractor shall achieve Substantial Completion of the Work (as defined in Section 00700, Article 9.8 herein, and evidenced by a Certificate of Substantial Completion) not later than as specified in each Task Order. 1.1 3 3.3 The Job Order Contractor shall achieve (as defined in Section 00700, Article 9.9 herein, and evidenced by a Certificate of Final Completion) no later than as specified in each Task Order. Article IV. CONTRACT SUM 4.1 The Owner shall pay the Job Order Contractor in current funds for the Job Order Contractor's performance of individual Task Orders in an aggregate amount not to exceed Three Million Dollars ($3,000,000.00) in total, (over a 3 year period) and not to exceed One Million Dollars ($1,000,000.00) per Fiscal Year, which Fiscal Year shall be designated by the Owner as beginning on July 1st and ending on June 30th of the next calendar year. The single maximum value of a task issued shall not exceed $1,000,000.00. The Owner does not guarantee a minimum Contract Sum under this Contract, and Job Order Contractor, in accepting this Contract, does not expect a minimum Contract Sum. Payments will be made in accordance with the sum negotiated for each specific Task Order. Maricopa County, at its sole discretion, may require the Job Order Contractor to purchase from a specified or designated County supplier (i.e. Home Depot) any and/or all available materials applied or installed by the Job Order Contractor or its subcontractors for a Task Order. The materials purchased by the Job Order Contractor(s), or its subcontractor(s), shall be purchased by the Job Order Contractor(s), or its subcontractor's, using their own funds and/or credit. Any discounts offered to the JOC by the County's material supplier shall be passed through to the County without markup. The County is not a party to these transactions and any issue/disputes shall be resolved without the involvement of the County. 4.2 FEE AND OVERHEAD CALCULATIONS FOR CONSTRUCTION COSTS UP TO $250,000.00 Overhead must be all inclusive and include all "costs of doing business". The County will not pay for items such as, but not limited to warranty, project closeout, home office expense, vehicles, vehicle maintenance, fuel, mileage, personal safety equipment, safety personnel, unless safety personnel is specifically required for the Work being performed and approved by the Owner. The Job Order Contractor agrees the overhead shall be no more than 8% and the fee shall be capped at 5%. 4.3 FEE AND OVERHEAD CALCULATIONS FOR CONSTRUCTION OVER $250,000.00 Overhead must be all inclusive and include all "costs of doing business". The County will not pay for items such as, but not limited to warranty, project closeout, home office expense, vehicles, vehicle maintenance, fuel, mileage, personal safety equipment, safety personnel, unless safety personnel is specifically required for the Work being performed and approved by the Owner. Overhead cost and percentages in addition to Job Order Contractor fee(s) shall be negotiated between the Job Order Contractor and the County for any projects exceeding $250,000.00. Article V. PROGRESS PAYMENTS 5.1 Progress payments will be made in accordance with Article 9 of the General Conditions to the Job Order Contract. Article VI. FINAL PAYMENT 6.1 Final Payment will be made in accordance with Article 9 of the General Conditions to the Job Order Contract. Article VII. CONTRACT DOCUMENTS 7.1 The Contract consists of the following documents incorporated herein by this reference: 7.1.1 The Job Order Contract — Section 00500. 7.1.2 The General Conditions to the Job Order Contract — Section 00700. 7.1.3 Permits, Task Modifications, Change Directives, amendments or modifications to the Contract. 4 7.1.4 Any and all documents issued during the procurement process for this Contract. 7.1.5 Task Order documents including, but not limited to, Task Orders, associated plans and specifications. 7.1.6 Any addenda to any issued Task Orders or other Contract documents. 7.1.7 Exhibits to Section 00700: Exhibit A — Definitions to the General Conditions Exhibit B — Alternate Dispute Resolution Exhibit C — Legal Worker Certification Exhibit D — Request for Proposal for Task Order Exhibit E — Performance Bond and Payment Bond Forms Exhibit F — SBE Reporting Document Exhibit G — Request for Qualifications dated 10/31/19_ Exhibit H — Statement of Qualifications dated 10/31/19 Exhibit I — Certificate of Insurance for Job Order Contract. Exhibit J — General Requirements for the Job Order Contracts All of the exhibits listed above are incorporated by reference as though fully set forth, whether or not they are physically attached to this Contract. 7.1.8 All amendments to this Contract shall be in writing and approved/signed by both parties. Maricopa County Office of Procurement Services shall be responsible for approving all amendments for Maricopa County. 7.1.9 UNIFORM ADMINISTRATIVE REQUIREMENTS: When applicable and by entering into this Contract the Contractor agrees to comply with all applicable provisions of Title 2, Subtitle A, Chapter II, PART 200—UNIFORM ADMINISTRATIVE REQUIREMENTS, COST PRINCIPLES, AND AUDIT REQUIREMENTS FOR FEDERAL AWARDS contained in Title 2 C.F.R. § 200 et seq. 5 February 10, 2020 Date Robert M. Karber Printed Name Principal Title Net 30 from date of invoice 86-0448232 Federal Tax Identification Number R00073195 / R0007316 License Number 90924 IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the day and date first above written, in counterparts, each of which shall, without proof or accounting for the other counterparts, be deemed an original contract. Vendor Terms NIGP Commodity Code (Advantage) COUNTY OF MARICOPA, ARIZONA RECOMMENDED BY: ACCEPTED AND APPROVED: Department Head Date Chairman, Board of Supervisors Date LEGAL REVIEW Approved as to form and within the powers and authority granted under the laws of the State of Arizona to Maricopa County. ATTEST: Clerk of the Board Date By: Deputy County Attorney Date: 6 Facilities Management Department 1/30/20 MARICOPA COUNTY, ARIZONA 200019-JOC HVAC JOB ORDER CONTRACT SERIAL # 200019-JOC CONTRACT NO. 200019-10C COMPANY NAME: INTERSTATE MECHANICAL CORPORATION - IMCOR Please fill out the following rate chart with the hourly rates that match the staff classification description. Rates shall be provided EXCLUSIVE of Overhead and Profit. Please utilize these staff classifications and do not add or modify any classifications. STAFF CLASSIFICATION BILLING HOURLY RATE Project Manager $84.00 General Foreman $77.32 Journeyman $71.68 Apprentice $63.71 Laborer $55.71 Markups for quoted work is limited to the following overhead and profit percentages: Overhead —8% Profit — 5% Maricopa County Office of Procurement Services 320 W. Lincoln Street Phoenix AZ 85003 1 AUTHORIZED REPRESENTATIVE ..--- 7 ® AccPRE) CERTIFICATE OF LIABILITY INSURANCE L...------ DATE IMM/DD/YYYY) 2/13/2020 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER INSURICA / Minard-Ames Insurance Services LLC 4646 E. Van Buren St., #200 Phoenix AZ 85008 CONTACT NAME: Certificates PHONE FAX (A/C. No, E at) : 602-273-1625 IA/C, No): 602-273-0212 E-MAIL ADDRESS: certs@INSURICA.com INSURER(S) AFFORDING COVERAGE NAIC # INSURER A: Old Republic Insurance Company 24147 INSURED INTEMECO2C Interstate Mechanical Corporation aka IMCOR 1841 E. Washington St. Phoenix AZ 85034 INSURER B: Great American Insurance Company 16691 INSURER C: Hanover Insurance Company 22292 INSURER D: INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER: 1361217319 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT 1MTH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR LTR TYPE OF INSURANCE ADDL INSD SUBR WVD POLICY NUMBER POLICY EFF (MM/DD/YYYY) POLICY EXP (MMIDD/YYYY) LIMITS A X COMMERCIAL GENERAL LIABILITY Y Y MVVZY30712119 4/1/2019 4/1/2020 EACH OCCURRENCE $ 1,000,000 DAMAGE TO RENTED PREMISES (Ea occurrence) $ 100,000 CLAIMS-MADE X OCCUR MED EXP (Any one person) $ 5,000 PERSONAL & ADV INJURY $ 1,000,000 GENERAL AGGREGATE $ 2,000,000 GE 'L AGGREGATE POLICY OTHER: X LIMITAPPLIES INT- PER: LOC PRODUCTS - COMP/OP AGG $ 2,000,000 $ A AU X OMOBILE LIABILITY ANY AUTO OVVNED AUTOS ONLY HIRED AUTOS ONLY SCHEDULED AUTOS NON-OWNED AUTOS ONLY Y Y MWTB30712219 4/1/2019 4/1/2020 COMBINED SINGLE LIMIT (Ea accident) $ 1,000,000 BODILY INJURY (Per person) BODILY INJURY (Per accident) PROPERTY DAMAGE (Per accident) $ $ B _ X UMBRELLA LIAB EXCESS LIAB X OCCUR CLAIMS-MADE Y TUE405724615 4/1/2019 4/1/2020 EACH OCCURRENCE $ 7,000,000 , AGGREGATE $ 7,000,000 $ DED RETENTION $ A WORKERS COMPENSATION AND EMPLOYERS' LIABILITY ANYPROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED? (Mandatory in NH) If yes, describe under DESCRIPTION OF OPERATIONS below Y / N . " N/A Y MWC30712019 4/1/2019 4/1/2020 X PER STATUTE OTH- ER E.L. EACH ACCIDENT $ 1,000,000 EL. DISEASE - EA EMPLOYEE $ 1,000,000 EL. DISEASE - POLICY LIMIT $ 1,000,000 C *Installation Floater Stored Materials Ded: $1,000 RH4A58215004 4/1/2019 411/2020 One Loc/Per Disaster Temp Loc/Transit Stored Materials $2,200,000 $1,000,000 $500,000 DESCRIPTION OF OPERATIONS / LOCATIONS /VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) *Includes Earthquake/Flood: Sub Limit/Ded: $1,000,000/$25,000. Certificate Holder is defined as additional insured with respects to the general, auto and excess liability if required or agreed to in a written contract subject to all provisions and limitations of the policy. General, Auto and Excess liability coverage is primary and non-contributory. A Waiver of subrogation in favor of Certificate Holder applies to the general and auto liability and employers liability/workers compensation if required or agreed to in a written contract subject to all provisions and limitation of the policy. Per attached forms: CG2010 07/04; CG2037 07/04; PCA035 4/06; TAU10042 11/16; CG2001 04/13; TAU9999 11/97; CG2404 05/09; PCA044 4/06; WC000313; CG2503 05/09. RE: Work performed under Contract No. 200019-JOC, HVAC. Additional Insured: The County, its agents, representatives, officers, directors, officials, and employees. Waiver of subrogation applies in favor of the additional insured. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. © 1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25 (2016103) The ACORD name and logo are registered marks of ACORD Policy No: mwzy307121 COMMERCIAL GENERAL LIABILITY CG 20 10 07 04 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED OWNERS, LESSEES OR CONTRACTORS - SCHEDULED PERSON OR ORGANIZATION This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s) Or Organization(s): Location(s) Of Covered Operations All persons or organizations as required by written contract or agreement The locations as specified in the wrtften contracts or agreements Information required to complete this Schedule, if not shown above, will be shown in the Declarations. A. Section II — Who Is An Insured is amended to B. With respect to the insurance afforded to these include as an additional insured the person(s) or additional insureds, the following additional exclu- organization(s) shown in the Schedule, but only sions apply: with respect to liability for "bodily injury", "property This insurance does not apply to "bodily injury or damage" or "personal and advertising injury" "property damage" occurring after: caused, in whole or in part, by: 1. All work, including materials, parts or equip- 1. Your acts or omissions; or ment furnished in connection with such work, 2. The acts or omissions of those acting on your on the project (other than service, maintenance behalf; or repairs) to be performed by or on behalf of in the performance of your ongoing operations for the additional insured(s) at the location of the the additional insured(s) at the location(s) desig- covered operations has been completed; or nated above. 2. That portion of "your work" out of which the injury or damage arises has been put to its in- tended use by any person or organization other than another contractor or subcontractor en- gaged in performing operations for a principal as a part of the same project, CG 20 10 07 04 ISO Properties, Inc., 2004 Page 1 of 1 Policy No: . MWZY30712119 COMMERCIAL GENERAL LIABILITY CG 20 37 07 04 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - COMPLETED OPERATIONS This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s) Or Organization(s): Location And Description Of Completed Operations All persons or organizations as required by written contract or agreement The locations as specified In the written contracts or agreements Information required to complete this Schedule, if not shown above, will be shown in the Declarations. Section II — Who Is An Insured is amended to include as an additional insured the person(s) or organization(s) shown in the Schedule, but only with respect to liability for "bodily injury" or "property damage" caused, in whole or in part, by "your work" at the location designated and described in the schedule of this endorsement performed for that additional insured and included in the "products- completed operations hazard". CG 20 37 07 04 © ISO Properties, Inc., 2004 Page 1 of 1 Policy No: MWTB30712219 IL 10 (12106) OLD REPUBLIC 1NSUFtANCE COMPANY THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM SCHEDULE Designated Person(s) or Organization(s): All persons or organizations where required by written contract. WHO IS AN INSURED (SECTION II) is amended to include the person(s) or organization(s) shown in the above Schedule, but only with respect to "accidents" arising out of work being performed for such person(s) or organization(s). As respects any person(s) or organization(s) shown in the above Schedule with whom you have agreed in a written contract to provide primary insurance coverage, this coverage will be primary and any insurance maintained by such person(s) or organization(s) will apply on an excess basis. PCA 035 04 06 larater;tent of Qualifications for Job Orier Contractor ..SERI#200019-JOC CT #200019-JOC Due e: Thursday, October 31, 2019 0 PM MST 1311.u:1111-ifJ1.fri._d Complete pre-construction, design, construction and system maintenance service for all facets of new retrofit,. tenant improvement., mechanical upgrades and service projects throughout Arizona and the Southwest. HVAC . Sheet Metal. Plumbing. Process Piping General Commercial Contracting interstate mechanical corporation 1841 East Washington Street . Phoenix, AZ 85034 602-257-1319 . 800-628-0211.. Fax 602-271-0674 www.imcor:az.corri tit.6 Sougumst sista? 1.971 With COPttliterda4 iff4644triel4 CthiC, & medical,preject3- General Contracting B-01 R00094734 • AC & Refrigeration L-39 R00073195 • Sheet Metal L-45 1l00073196 • Plumbing L-37 R00084435 • Process Piping L-04 R00084436 it October 31, 2019 Maricopa County Office of Procurement Services 160S. 4th Avenue Phoenix AZ 85003 • 1 gik Interstate mechanicol corporation 602-257-1319 Fax 602-254-2945 iIitc 010!:'•10n 602-257-1319 Fax 602-256-5916 602-253-0430 Fax 602-256-5915 Reference: Request for Qualifications — HVAC Job Order Contractor Solicitation 200019-JOC Interstate Mechanical Corporation (IMCOR) is pleased to submit its Statement of Qualifications and Proposal to perform Job Order Contracting Services for Maricopa County pursuant to Solicitation 200019-JOC. IMCOR offers a proven team of construction professionals with significant JOC experience dedicated to superior competency and customer service. Our team is available and eager to extend our exceptional JOC services to the City. As you may know, IMCOR is one of the leading mechanical contractors in Arizona, with more than 300 employees. IMCOR is regularly recognized as an industry leader in our market, recently ranked as the fifth largest mechanical contractor by the Arizona Journal. If selected to perform HCAC job order contracting for the County, IMCOR is uniquely qualified to exceed the County's expectations: • Dedicated JOC Team — IMCOR's Facility Services Division is dedicated to providing exceptional Job Order Contracting services. The team is available around the clock to serve our customers by providing quick response times, with qualified subcontractors, accurate estimates, trained professionals and quality construction, all of which are essential to the delivery of successful JOC projects. • JOC Experience — In 2018 alone, IMCOR delivered more than $10 million in projects and services to public sector owners. These job orders ranged in size and complexity from routine and emergency repairs and preventative maintenance, to specialty mechanical projects pertaining to HVAC, Plumbing/Piping, and Energy Management systems. As a full-service provider across multiple disciplines, IMCOR is uniquely capable of assisting customers with all their mechanical needs. Many of our JOC orders were completed for repeat customers, confirming our quality of work and commitment to customer satisfaction. • Customer Service — We are dedicated to earning the trust of our customers by providing the highest quality service to our customers. In order to do so, IMCOR encourages open and honest communications with all of our customers, with the goal of being available at all times. We truly believe that a project's success can be objectively measured when it is delivered on time and on budget, to the customer's satisfaction. We often tell our customers that partnering with IMCOR eliminates the logistical complexity of engaging multiple mechanical contractors for diverse systems and drives value through expertise, efficiency and superior quality at every stage of a building's life cycle. We would welcome the opportunity to continue our long-standing relationship with the County. Should you need any other information or if you have any questions, please feel free to contact me at (602) 257-1319. Sincerely, INTERSTATENECHANICAL CORPORATION O 1 • I William P. Mason, President CC: Bob Karber, Principal Dave Dickens, Service Division Manager Billy Teston, Facilities Division Manager Corporate Office 1841 East Washington Street . Phoenix, AZ 85034 602.257.1319 . 800-628-0211 Fax 602.271.0674 . www.imcor-oz.com licensed I iVAC General Sheet Metal Plumbing Process Pining General Commemat Contractor General Recidennal Contractor Arizona C-39 H00073196 CR-45 R00073196 C-37 R000134435 . C-4 000064436 13-1 1R00094734 8- R0009530/ Calitorme 550841 C-4 C-20 C-36 . 8-46 HVAC Job Order Contractor Solicitation No. 200019-10C Statement of Qualifications October 31, 2019 TABLE OF CONTENTS Section: 1 Prior Experience 2 Project Team 3 Team Approach Capability 4 Arizona Business and Location of Arizona Office 5 Attachments • unapt ) (-70Ail hit Statement of Qualifications HVAC Job Order Contractor Solicitation No. 20001940C October 31, 2019 Page 1 1 Prior Experience 1) Prior Experience Provide a project description for five similar projects for which your firm was a JOC for a period of at least three consecutive year(s) for design phase services, construction phase services, and either maintenance services postconstruction or maintenance services in conjunction with construction. If you have not had JOC project delivery method experience on similar projects, but if your firm has done similar projects and you believe that your firm has experience on those projects which is comparable to the JOC project delivery method, provide a project synopsis for each such project and also include an explanation of why you believe the experience is comparable to the JOC project delivery method. To communicate prior experience, please include the following for each project: 1. Maricopa County JOC —5 years a. Average number of projects awarded each year —2 i. All were completed ii. Average cost— approx. $100,000 b. Services Provided: Unitary change outs / Equipment replacements and remodels c. No design provided d. Design phase constructability —N/A e. Client References: Ravinder Gannala, Capital Project Manager, Facilities Management Department Phone (602) 372-2770 Ravinder.Gunnala@FM.maricopa.gov 2. Gordian — Arizona State JOC —5 years a. Average number of projects — 35 i. All were completed on time ii. Average cost per project $85k b. Services provided: Chiller, Cooling tower and other Equipment replacement, HVAC renovations and improvements, Engineering design build and assist projects, Value engineering, Emergency services, plumbing and HVAC service and maintenance c. We assisted with design and provided preliminary budgets based on scopes of work and existing conditions. As well as were contracted to subcontract engineers for design d. Worked with the customer and engineer to develop the most reasonable cost-effective design and implementation. IMCOR has been recognized as a 2018 Award of Merit Winner in the Harry H. Mellon Awards in Job Order Contracting for outstanding principles and practices in its involvement in the AZ DEMA Renovations project with Arizona Department of Emergency and Military Affairs. e. Client References: Gordian — Arizona State JOC Mike Dziubla, Account Manager Phone 928-750-9068 m.dziubla@gordian.com P - Li Li Liti (-7\11:4111 Statement of Qualifications HVAC Job Order Contractor Solicitation No. 200019-J0C October 31, 2019 Page 2 3. Medtronic Tempe Campus - —30 years of Service a. Average number of Projects awarded each year — 58 i. All were completed on time ii. Average Cost $7,833.00 b. Services provided: Chiller, Cooling tower and other Equipment replacement, HVAC renovations and improvements, Engineering design build and assist projects, Value engineering, Emergency services, plumbing and HVAC service and maintenance. c. IMCOR assisted with design and provided preliminary budgets based on scopes of work and existing conditions d. Worked with the customer and engineer to develop the most reasonable cost-effective design and implementation e. Client Reference Medtronic Pierre Carlier, Sr. Facilities Engineer pierre.carlier@medtronic.com Ph (480) 377-2367 / FX (480) 921-6450 4. Mayo Service and Maintenance Contract —2 years a. Average number of projects awarded each year — 352 i. All were completed as scheduled ii. Average Cost - $2,537 b. Services Provided: Emergency HVAC and Plumbing Services, hydro-jetting, snaking, leak repairs, backflow preventer assessment repairs replacement and certification, cast iron replacement, tenant improvements c. No design provided d. Assisted the customer with research of existing conditions for their engineers e. Client Reference: Mayo Clinic Hospital Mark Smith, Supervisor of Facility Operations, Facilities and Campus Management Ph (480) 342-0812 smith.mark@mayo.edu 5. AHCCCS PM Agreement a. Average number of projects awarded each year - 15 small projects per year that range, on average, between $2500 to $4000. b. Services provided. HVAC Service and maintenance for Boilers, Liebert systems, Water Source Heat pumps, Cooling Tower, VFD's, pumps, Evaporative coolers, and Split systems. We perform a multitude of projects; VFD change outs, split system installs, WSHP installs, Plumbing emergency work, and much more. c. Design phase cost estimating experience: N/A for small projects. We create defined estimates for all the work and get it completed very quickly. d. Design phase constructability: N/A for small projects. We do create mechanical solutions after assessing our client's needs. e. Client Reference: AHCCCS — Arizona Healthcare Cost Containment System - Reedy Barfield III, Facilities Administrator, AHCCCS I Division of Business and Finance, 701 E. Jefferson St., MD-5700, Phoenix, AZ 85034, Office: 602-417-4379 / Cell: 602-332-4060 / Fax: 602-258-5943 Reedy.Barfield@azahcccs.gov imam Statement of Qualifications HVAC Job Order Contractor Solicitation No. 20001940C October 31, 2019 Page 3 2 Project Team 2) Project Team IMCOR Pro ect Team Industry / IMCOR Title Name Years of Experience — Facility Services Division Manager Billy Teston 12 / 8 • Time dedicated to this project: To be determined/As Needed Similar Projects: • Maricopa County JOC • Mayo Clinic Hospital Service & Maintenance Contract • Gordian — Arizona State JOC (various projects) • AHCCCS PM Agreement (various projects) Medtronic Tempe Campus (various projects) Service Division Manager David Dickens 9 / 9 • Time dedicated to this project: To be determined/As Needed Similar Projects • Gordian — Arizona State JOC (various projects) • AHCCCS PM Agreement (various projects) Estimating Manager Rick Hogebaum • Time dedicated to this project: To be determined/As Needed Similar Projects • With over 34 years in the construction industry, Rick has work on many projects that include types of work that will be required in this JOC. _ — Plumbing Service Manager Friend Miller 30 / 12 • Time dedicated to this project: To be determined/As Needed Similar Projects • Gordian — Arizona State JOC (various projects) • AHCCCS PM Agreement (various projects) Facility Services Senior Superintendent Mario Zamora 28 / 20 • Time dedicated to this project: To be determined/As Needed Similar Projects: • Maricopa County JOC • Mayo Clinic Hospital Service & Maintenance Contract • Gordian — Arizona State JOC (various projects) • AHCCCS PM Agreement (various projects) • Medtronic Tempe Campus (various projects) b) Examples of projects where staff assigned to this project have worked together as a team: All the above team members have worked together on the recent Gordian and AHCCCS projects. C U IT ( 1 Statement of Qualifications HVAC Job Order Contractor Solicitation No. 200019-J0C October 31, 2019 Page 4 c) List proposed key sub-consultants with qualifications and experience of individuals. Include key sub-consultant resumes in Attachments Section 5(b) Resumes. Structural Engineers O Caruso Turley Scott o David Troxell, SE, PE, Project Manager o Thomas Morris, SE, LEED AP, Partner/Structural Project Manager MEP Consultants O Pearson Engineering Associates o Jeff Ruthstrom, PE, Mechanical Engineer / Executive Vice President • LSW Engineers Arizona o Lance Jones, PE, President/Mechanical Engineer o Cory Killpack, PE, Vice President/Mechanical Engineer o Rick Patton, Senior Mechanical Designer o Philip Louw, PE, LEED AP, Vice President/Mechanical Engineer d) Projects the proposed individuals of your firm and other consultant firms have completed as a team. IMCOR has worked with all the consultants listed on design build, and/or design assist projects. We maintain a great working relationship with all of them, discussing projects that we are developing and scheduling needs. We discuss their work loads and availability for any project that is very demanding in regard to schedule, and get commitments so we can complete the projects as required by the client. All listed consultant firms are very forthcoming by letting us know whether or not they have staff available to meet our requirements. Additionally, some firms are more experienced in particular types of projects or systems and they will be utilized accordingly for their particular expertise. • LSW Engineers (Mechanical and Electrical Engineering) IMCOR has worked with LSW engineers on several Kyrene School District projects. A previous example is IMCOR worked with LSW on the APS DVN 1 Phase II Renovation project. We worked closely together to procure the long-lead equipment before the design was complete, and to assure them that the equipment met all the requirements of APS and the design intent. We provided additional research for the team to make fast and informed decisions during the design process so IMCOR and LSW were in full agreement with submittals and materials. No substitutions were requested or required. • Pearson Engineers (Mechanical and Electrical Engineering) IMCOR has utilized Pearson Engineers on the ADOT Sign Shop, as well as on several design build projects, including SRP Coronado CECP Generating Station Absorber Building cooling systems located in St. Johns, AZ. IMCOR also utilizes Pearson Engineers for many smaller design projects in our Facilities Service Group that require permit design drawings. • Caruso Turley Scott and IMCOR worked as a team on the ADOT VRF and RTU Changeouts at miscellaneous sites and provided design for structural supports for other large equipment. Statement of Qualifications HVAC job Order Contractor Solicitation No. 200019-J0C October 31, 2019 Page 5 3 Team Approach Capability 3) Team Approach Capability a) Information and examples for successful "team" and "project" approach experiences the firm and its team members have had interacting with the County project personnel, the design professional project personnel, the design professional consultants, subcontractors and any stakeholders. IMCOR has many long-term service relationships with clients similar to Maricopa County, such as Scottsdale Health Care, CBRE, Mayo, Medtronic Microelectronics, and Banner Health, to name a few. In the case of Mayo, IMCOR is the exclusive plumbing service provider for all its campuses in the Phoenix Metro area. IMCOR approaches each of these customers with a coordinated and comprehensive plan as well as a detailed method of procedure for executing the work. IMCOR has provided everything from routine service work such as replacing of pumps and fans, to the installation of larger equipment such as cooling towers, chillers, and air- handling units. Depending on the scope of a project, IMCOR frequently engages third party consultants, such as structural engineers, MEP engineers and commissioning agents, to assist in design and equipment selections. IMCOR regularly provides pre-construction services for its customers to assist in determination of the scope required to accomplish a particular outcome. Currently, IMCOR is in the preconstruction phase with a customer to help resolve a supply air issue from a functioning air handling unit. Additional examples of the team approach include IMCOR working with CCRD Partners (MEP engineers), to develop design drawings for Banner. For that project, the IMCOR-prepared scope was issued by Banner to other mechanical contractors for competitive pricing. IMCOR provided technical support to the engineers and Banner as well as an estimated cost of construction so the work could be included in Banner's annual budget. Ultimately, the work was performed by IMCOR after confirmation of accuracy in scope and price. Perhaps a few references will demonstrate IMCOR's team approach to projects: Bob Kerber From: Sherick, William R. Jr. <Sherick.William@mayo.edu > Sent: Monday, September 30, 2019 9:35 AM To: Lazaro Izquierdo; Wesley Watts Cc: Cordova, Benjamin F. (Ben); Buschta, Jennifer H.; Rivas, David; Pederson, Jon A.; Brown, Dayl S.; Sherick, William R. Jr. Laz I want to commend you and your teams on the great job Friday night of the heating water valve installation. The coordination and execution went off without a hitch. As unpleasant as a place it was to work didn't make your job an easier. You deserve a big pat on the back my friend. Thank You again. Statement of Qualifications HVAC Job Order Contractor Solicitation No. 200019-JOC October 31, 2019 • IMCOI Page 6 Harry I—I. Mellon Awards IMCCIR recognized with Award of Merit for outstanding principles and practices in Job Clrcler Contracting Maraine, Arizona — IMCOR has been recognized as a 2018 Award of Merit Winner in the Harry H. Mellon Awards in Job Order Contracting for outstanding principles and practices in its Involvement In the AZ DEIVIA Renovations project with Arizona Department of Emergency and Military Affairs. The Arizona Department of Emergency and Military Affairs needed to quickly update an existing, outdated two-pipe heating and cooling system with a modern four-pipe system. The new system would increase efficiency, reduce energy consumption, facilitate individual room temperature controls and ultimately result in operational cost savings. The upgrades needed to comply with stringent on-site security protocols, and the flexibility of Job Order Contracting allowed 11V1COR to complete this project within the aggressive timeline. Job Order Contracting is a competitively bid procurement process used by building and infrastructure owners to save money by fast-tracking repair and alteration projects based on locally priced construction tasks and competitively awarded contracts. Since its invention In 1982, Job Order Contracting has developed into a popular solution for public agencies, such as municipalities, school districts, colleges and universities, transit systems and public housing authorities, to manage and expedite a large number of construction projects. The Harry H. Mellon Award of Excellence In Job Order Contracting is named for the inventor of the procurement process and is the highest honor In the industry. Award of Merit finalists are announced each year, with one of them going on to win the Harry H. Mellon Award of Excellence In Job Order Contracting. A panel of Industry experts chose the finalists and winner from among the projects submitted based on adherence to Job Order Contracting principles, innovation, complexity, special circumstances and overall time and cost savings. Since 2007, this award has recognized the facility owners, managers and contractors who perform the essential, yet often thankless, repair, alteration and maintenance work that is the core of the Job Order Contracting system, in an efficient and effective manner. The awards are sponsored by Gordian, the creator Job Order Contracting and a number of related construction-procurement systems. Gordian is the Job Order Contracting industry expert, and as such, advances the discipline through innovation, education and recognition. 4 Arizona Business and Location of Arizona Office 4) Arizona Business and Location of Arizona Office IMCOR's existing Arizona office complex houses our New Construction, Facilities Services Group, Service Department, and Manufacturing Division offices and is equipped with full-service sheet metal, pipe fabrication, and plumbing pre-fabrication facilities. Located just a few minutes east of Downtown Phoenix, our property spans over one city block, affording us the benefit of storing and staging materials on our site in lieu of at project sites when necessary. We hold the following licenses appropriate for completion of work required of the HVAC JOG Contract: ARIZONA REGISTRAR OF CONTRACTORS Expiration: 94734 (B-1) General Commercial Contractor 08/31/21 73195 (C-39) Air Conditioning and Refrigeration 09/30/21 73196 (CR45) Commercial and Residential Sheet Metal 09/30/20 84435 (C-37) Plumbing 09/30/21 84436 (C-4) Commercial Boilers, Steamfitting and Process Piping 09/30/20 225789 (CR-5) Rescue Air Systems, Residential & Commercial 10/31/20 imam Statement of Qualifications HVAC Job Order Contractor Solicitation No. 200019-J0C October 31, 2019 Page 7 5 Attachments 5) Attachments a) General Contractor Arizona License The Proposer selected under this Request for Qualifications must hold an appropriate contractor license issued by the Arizona Registrar of Contractors when submitting the Proposal. Please include in the Proposal a statement that the firm holds the appropriate license, license type and contractor license number. b) Resumes (i.e., maximum one page each for five key firm individual's resumes) c) References (use Reference Format form, Part II, Attachment 1) d) Legal Worker Certification (Part II, Attachment 2) e) Surety Bond (current standard form of surety bond or use Part II, Attachment 3) f) Proposal Exceptions (NONE) g) Non-Collusion Affidavit (Part II, Attachment 4) Billy Teston Facility Services Division Manager Years of Industry Experience: 12 Years at IMCOR: 8 Current Capacity: Facility Services Division Manager As Division Manager, Billy oversees all aspects of the Facility Services (FS) Division from managing ten office personnel and up to thirty field personnel. The FS Division is designed to estimate, manage and complete all aspects of a wide variety of projects within itself. This means our customers get the knowledge of the estimator, the project manager and the field (who are involved in the projects before the initial proposal is sent out) all wrapped up in the project from day one. The FS division is designed to handle a wide variety of projects from tenant improvements and remodels and customer direct services and replacements, all the way to emergency replacements including high-priority shutdowns and repairs. Responsibilities include: • Oversee all HVAC, plumbing and piping work in the Facility Services Division • Review Estimates and project progress • Estimation and project management • Material, equipment and subcontractor purchasing and management • HVAC, plumbing and piping systems as well as structural steel and specialty sheet metal Recent Experience: Maricopa County JOC Mayo Clinic Hospital Service & Maintenance Contract Gordian — Arizona State JOC (various projects) AHCCCS PM Agreement (various projects) Medtronic Various Clean Room Remodels Medtronic Various Tool Relocations Medtronic Sub Fab Modifications Medtronic Bldg. 4 IC Waste Tank Replacement AT&T Data Center P t Floor Remodel Fan Wall Retrofits and Unit Replacements (serving Clean rooms) AT&T Data Center CRAC Unit install and Replacements Rogers Corporation — Headquarters Remodel Additional Experience: CAD Technician Project Management Courses Mechanical Engineering Studies ABA Leadership Development Forum Graduate References: Fernanda Munoz, Caliente Construction, Inc. (480) 894-5500 Pierre Carlier, Medtronic (480) 377-2367 Phil Huynh, Rogers Corporation (480) 433-1530 David Dickens Service Division Manager Years of Industry Experience: 9 Years at IMCOR: 9 Current Capacity: Service Division Manager In his current capacity as Service Division Manager, David works with the HVAC Technicians, Plumbing Technicians and the internal staff which consists of Accounting, Sales, Supervisors and Dispatching. He is involved with the overall operations of the Service business unit at IMCOR. He is also heavily involved with sales in regards to Job Order Contract, national accounts, healthcare institutions, and many local companies. Responsibilities include: • Work directly with the technicians, office personnel and report to the leadership team • Derive strategies to ensure business and increase efficiencies • Responsible for disseminating quality leads throughout the company and help align the best personnel to perform the work • Involved with all service work and proposal creation with the IMCOR Team • Selling more than $2,000,000 to new customers annually, surpassing division quotas consistently • Responsible for selling Service projects between $2,000 and $500,000 • Retaining 98% of current customers by having multiple touch points and consistent strategy meetings • Analyze industry trends and potential customers' core competencies to consistently evolve and advance the IMCOR sales process. Recent Experience: Gordian — Arizona State JOC (various projects) AHCCCS PM Agreement (various projects) ADOT NW MVD unit replacement project ADOT (2) 10 Split system at Grand Canyon Airport ADOA - Backflow assembly project ADOT Harsco Boiler Replacement project City of Scottsdale - (3) controls/EMS projects References: Jim Hibbs (602) 316.0861 Brit Olachea (602) 292.6560 Rich Marotta (602) 769.7226 Chris Franck (602) 292.6560 Maurice Croteau (602) 501.9468 Arizona Department of Transportation Arizona Department of Administration City of Scottsdale United Health Care Arizona Orthopedic Rick Hogebaum Estimating Manager/Preconstruction Years of Industry Experience: 34 Years at IMCOR: 1 Current Capacity: Estimating Manager/Preconstruction In his current capacity as Estimating Manager/Preconstruction, Rick manages the Estimating Department and reviews all cost estimates, providing assistance in preparation of studies, materials and methods, as well as recommendations as a conceptual and design/build/assist estimator. Rick oversees conceptual estimates and leads preconstruction efforts during design/build and design/assist phases of construction projects, through to the construction phase. Responsibilities include direct supervision of the estimating department staff and involvement in project bid selection, preconstruction activities, constructability reviews, value engineering, final review of detailed estimates, and budget control, and is liaison to customers in addition to his involvement in the daily functions of the corporation. Responsibilities include: • Bid selection • Assignment of projects • Preconstruction • Estimating Department Manager • Coordination with Project Management and Field Operations • Customer Liaison • Bid Review/Final Pricing Recent Project Experience: DPR Construction, Inc. DPR Construction, Inc. Wespac Construction, Inc. Archer Western Integrity Building Corp. Layton Construction TI for Limelight Networks at SkySong 5 Spec Suite 300 at SkySong 5 Isola TI Phase 2 Scottsdale TGTF HonorHealth John C Lincoln Hyperbaric Chambers TI Deloitte TI at Rivulon Building 300 References: John Newman (602) 956-1323 Tyson Padget (623) 760-9200 Brian Jones (480) 967-0880 Additional Experience/Training: Wespac Construction, Inc. Environ, Inc. Renaissance Companies Estimation Management HVAC Layout/Sizing On-Site Assessment Labor/Materials Management Project Management Planning & Scheduling Relationship Management Crew/Contractor Supervision Business Management Project Reporting/Delivery Conflict Management Commercial/Industrial Equipment Microsoft Office (Word, Excel, & Outlook) FastEST, FastDUCT and FastPIPE estimation software Friend Miller Plumbing Service Manager Years of Industry Experience: 30 Years at IMCOR: 12 Current Capacity: Plumbing Service Supervisor In his current capacity as Plumbing Service Supervisor, Friend is directly responsible for the supervision and coordination of the safe, accurate and productive fabrication, assembly, and installation of complete mechanical system components in accordance with plans, specifications, schedule constraints, and state and local building codes. Friend is also responsible for trade/craft personnel working under his direction and their specific production-related activities on a daily basis. He is in charge of the plumbing team and is actively involved with Job Order Contract work. Responsibilities include: • Manages plumbing team • Meet with customers and attend operational and sales meetings. • Delegate Service Calls • Employee Training • Manage large service projects • Hiring for all plumbers or plumbing dispatchers Recent Project Experience: Gordian — Arizona State JOC (various projects) AHCCCS PM Agreement (various projects) Arizona Department of Juvenile Corrections - Hydro jetting project - Fire pumps project - Water softener install Piping projects ADOA - 8" Backflow preventer install References: Arizona Department of Juvenile Corrections Arizona Department of Administration Arizona Department of Transportation Additional Experience and Training: OSHA 30 Trench Safety Confined Space Lockout - tagout Fall Protection Eddie Rodriguez (480) 800-7293 Britt Olachea (602)542-6229 Jim Hibbs (602)316-0861 Forklift/Crane Personal Protective Equipment Forklift, Scissor Lift, Boom Lift Oper. Training Orbital Welding Journeymen License Mario Zamora Senior Superintendent Years of Industry Experience: 28 Years at IMCOR: 20 Current Capacity: Facility Services Senior Superintendent In his current capacity as Senior Superintendent, Mario is directly responsible for the supervision and coordination of the safe, accurate and productive fabrication, assembly, and installation of complete Plumbing and Piping system components in accordance with plans, specifications, schedule constraints, and state and local building codes. He is responsible for trade/craft personnel working under his direction, and their specific production-related activities on a daily basis. Mario's extensive industry experience is a valuable asset to our company. Prior to becoming Senior Superintendent Mario was the plumbing superintendent and for a time managed the Plumbing Service Department at IMCOR. Responsibilities include: • Provide training for new workers and apprentices • Inspect work in progress and upon completion, by task, to ensure conformance to contract documents • Supervise and assign work activities for field personnel • Interpret specifications, blueprints and job orders • Interpret and enforce company policies, procedures and safety regulations • Periodic review of job submittals and associated reports, job schedule, shipping dates, job cost documents, manpower and crew costs with the respective trade General Superintendent and project management personnel • Attendance at turnover and subcontractor meetings and communication and coordination with office administration, production shop departments, and other trades for securing materials and equipment is essential to a successful project. Recent Experience: Maricopa County JOC Mayo Clinic Hospital Service & Maintenance Contract Gordian — Arizona State JOC (various projects) AHCCCS PM Agreement (various projects) Medtronic Tempe Campus (various projects) Apogee Clinic Remodel Encore Plumbing Upgrades City of Phoenix Flare Relocation North Scottsdale Surgery Center Plumbing and Med Gas TI Florence Prison Water Line Replacement Florence Prison Waste and Vent Stack Replacement Additional Experience/Qualifications: OSHA 30, OSHA 10 OSHA Forklift Operator Training Confined Space Trench Safety Foreman's Supervisory Training Scissor and Boom Lift Operator Training New Hire Orientation References: John Ray Hunt Construction Group, Inc. Mike Moses Hunt Construction Group, Inc. Jeff Cracker McCarthy General Contractors, Inc. CARUSO TURLEY SCOTT St ructural engineers 21 YEARS OF EXPERIENCE 18 YEARS WITH CTS EDUCATION B.S.E. 1998 Civil Engineering Geneva College Beaver Falls, PA PROFESSIONAL REGISTRATION Structural Engineering AZ 2003 40293 CA 2007 S4994 PA 2002 061832 Civil Engineering CA 2001 C61755 National Council of Examiners for Engineering & Surveying: NCEES 2005 26565 Structural Specialist I 2010— Present Dept of Homeland Security I FEMA National Urban Search & Rescue Arizona Task Force One (AZ-TF1) 400+ Hours Specialized Training lig PROFESSIONAL ASSOCIATIONS Member, ASCE/SEI Member, SEAoA SEER Co-Chair Member, NCSEA SEER Co-Chair z VOLUNTEER State of California Safety Assessment Evaluator/ Coordinator ICC "When Disaster Strikes" Instructor Missouri SAVE Coalition Evaluator/Coordinator Arizona Earthquake Safety Council As an accomplished structural engineer and project manager with 21 years of experience, David will lead the structural team for the Maricopa County HVAC Job Order Contract. David will work in close collaboration with the project architect and project team members. He has proven technical expertise, innovative designs, and critical coordination skills. David has engineering design experience working for Maricopa County. His extensive professional experience includes mechanical units. DAVID TROXELL, SE, PE PROJECT MANAGER * ENGINEERING RESPONSIBILITIES • Project Management • Technical leadership in structural systems, elements, design & analysis software • Collaborate/coordinate with design disciplines, attend project meetings • Supervise preparation of structural drawings, details & reports • Value engineering leadership RELEVANT EXPERIENCE Maricopa County Public Health Services — Phoenix, AZ Gila County Jail HVAC Upgrade — Globe, AZ Tucson Prison HVAC Upgrade — Tucson, AZ ADOT Tucson HVAC Upgrade — Tucson, AZ City of Phoenix Morten Yard Foundation Repair On-Call Services — Phoenix, AZ Carmax Call Center New Roof Mechanical Screening — Tempe, AZ Focus Climbing Gym Mechanical Unit — Mesa, AZ Arizona State University Physical Ed. West Building Mechanical Units — Tempe, AZ The Walking Company New Mechanical Unit Review — Concord, NH Payson High School Mechanical Revisions — Payson, AZ Chino Valley High School Roof Mounted Mechanical Units — Chino Valley, AZ The Beach Tanning Salon Roof Mechanical Unit — Phoenix, AZ Cox at Tempe Marketpalce New Mechanical Units — Tempe, AZ STRUCTURAL ENGINEERING SOLUTIONS SINCE 1963 1215W Rio Salado Pkwy, Suite 2001 Tempe, AZ 852811480.774.17001 www.ctsaz.com CARUSO TURLEY SCOTT structural engineers 31 YEARS OF EXPERIENCE 31 YEARS WITH CTS EDUCATION B.T. 1988 Civil Engineering Rochester Institute of Technology Rochester, NY Di PROFESSIONAL REGISTRATION Structural Engineering AZ 1996 30562 DE 2016 20643 ID 2015 16611 MT 2016 42347 SD 2016 12974 WI 2016 44984 National Council of Examiners for Engineering & Surveying: NCEES 2015 61315 U.S. Green Building Council LEED 2004 Accreditation PROFESSIONAL ASSOCIATIONS SEAoA THOMAS MORRIS, SE, LEED AP PARTNER I STRUCTURAL PROJECT MANAGER As an accomplished structural engineer and project manager with 31 years of experience, Tom will lead the structural team for the Maricopa County HVAC Job Order Contract. Tom will work in close collaboration with the project architect and project team members. He has proven technical expertise, innovative designs, and critical coordination skills. * ENGINEERING RESPONSIBILITIES • Project Management • Technical leadership in structural systems, elements, design & analysis software • Collaborate/coordinate with design disciplines, attend project meetings • Supervise preparation of Tom has a strong background working drawings, details & reports with Maricopa County. • Value engineering leadership His diverse design experience includes all types of mechanical units. RELEVANT EXPERIENCE Maricopa County Structural Engineering Services Contract — Maricopa County, AZ Serial No. 180009-ROQ Contract No. 180009-ROQ Example Projects: Estrella Jail Bldg Woven Rod Security Screen Walls 8t Doors, 4th Ave. Jail Screen Welding Review, Public Health Building Parking Garage Deck Review Term: 2017-2022, Ongoing since 2009 Maricopa County Community College On-Call Services — Phoenix, AZ Contract No. 3299-2-75 Example Projects: Mesa Community College Storage Building Term: 2015-2020, Ongoing State of Arizona Dept. of Administration Contract — Various Locations, AZ Vendor No. IV0000002945 Contract No. BPM000£342 Example Projects: Capitol Museum Underground Tunnel Traffic Loading Review, Attorney General Parking Garage Repair, Senate & House of Representatives Buildings Structural Roof Review Term: 2019-2020 Maricopa County OET Site 14-08 HVAC Unit Upgrades — Phoenix, AZ City of Phoenix Sky Harbor Airport T4 G1 Mechanical Unit Upgrades — Phoenix, AZ City of Scottsdale Mountain View Park HVAC Upgrades — Scottsdale, AZ City of Scottsdale Police Dept Station No. 2 Mechanical Units — Scottsdale, AZ City of Glendale Airpark HVAC Maintenance & Upgrade — Glendale, AZ Salt River Pima-Maricopa Indian Community Public Works HVAC — SRPMIC, AZ Arizona State University Physical Education East Building HVAC Upgrades — Tempe, AZ Arizona State University Physical Ed. West Building Mechanical Units — Tempe, AZ Arizona State University Engineering Ctr Air Handler Unit Replacement — Tempe, AZ Paradise Valley Unified School District HVAC Upgrades — Phoenix, AZ Red Mesa School District HVAC Upgrades — Res Mesa, AZ STRUCTURAL ENGINEERING SOLUTIONS SINCE 1963 1215 W Rio Salado Pkwy, Suite 200 I Tempe, AZ 85281 I 480.774.1700 I www.ctsaz.com COMPANY PROFILE BUILDING TYPE EXPERIENCE • Healthcare • Commercial • Research I Technology • Educational • Hospitality • Industrial • Multi-Family I Residential • Recreational • Municipal • Federal I State Military • Sustainable Design I LEED • Solar Structures • Aviation STRUCTURES • Structural Engineering Design • Construction Administration • Forensics & Failure Analysis • Restoration & Renovation • Special Structural Inspections TECHNOLOGY • 3D BIM REVIT Structural 2018 • AutoCAD Structural 2018 REGISTRATION I CERTIFICATION • 50 States + Washington D.C. • United States Territories Puerto Rico • US Green Building Council LEED Accredited Project Managers • Federal System for Award Management (SAM) Certified Small Business • "Self-Certification" Program Third Party Structural Reviews RIA71,7 Caruso Turley Scott structural engineers Caruso Turley Scott structural engineers, was founded by Sam Caruso in 1963 on the promise of excellence in engineering, outstanding customer service, and integrity. Building upon that strong foundation is a successful reputation for responsiveness, efficient and progressive design solutions, and extensive experience in all building types including complex projects that benefit from BIM three-dimensional modeling. Our team is licensed in all 50 states where we have made a lasting impact on communities across the continent. Because we are experts in structural design, our innovative engineering team can provide practical and economical solutions. We also diagnose structural problems, determine the cause and origin of failures, and help restore the potential market value of deteriorated structures. Caruso Turley Scott's high level of repeat client business demonstrates our ability to meet or exceed our clients' expectations. BUSINESS FACTS Caruso Turley Scott has a long-standing Founded 1963 successful performance record meeting the Incorporated 1972 quality, time, and budget constraints set by our 82 Current Total Team clients. "Highly accurate, quick to respond and 73 Current Technical Team unbelievable attention to details." 37 Licensed Engineers - Client: Greg Mooney 1 COMPANY 50 STATES 56 YEARS 1215W. Rio Salado Pkwy, Suite 200, Tempe, AZ 85281 I 480.774.1700 I www.CTSAZ.com Education: B.S.M.E., Montana State University Registration: Arizona No. 20975 Eight other states Experience: With LSW: Since 1993 With Others: 10 years Professional Affiliations: • American Society of Heating, Refrigeration and Air Conditioning Engineers (ASHRAE) — Past President • American Society of Plumbing Engineers (ASPE) • Air Conditioning Contractors of America (ACCA)- Past Board Member and Committee Member • American Council of Engineering Companies (ACEC) — Current Board Member • AIA Affiliate Member • Arizona Association of Economic Development (AAED) LSW Engineers ARIZONA, INCORPORATED Lance A. Jones, PE President / Mechanical Engineer Lance has extensive experience in the analysis and design and layout of HVAC and plumbing systems, and energy analysis of building systems. He directs a staff of mechanical engineers and designers in the preparation of technical reports, engineering investigations and concept studies; preparation of preliminary and final design; preparation of contract drawings and specifications; cost estimating and preparation of sketches; and plan checking activities. Lance serves as President and remains active in project activities. GOVERNMENT Maricopa County I Southeast Regional Justice Center, Mesa, AZ: Project Manager for a four-story, 235,000-SF courthouse facility housing adult probation, sheriff's substation, four justice courts, three EDC/RCC Courts, general administrative offices, and maintenance area. Construction was put on hold due to funding. Arizona State Health Laboratory, Phoenix, AZ: Mechanical Engineer for the retro- commissioning/energy audit services. Modifications were implemented to reduce utility costs. Duct static pressures were lowered, chilled water temperatures were raised, new dampers and actuators on exhaust fans were installed and redundant exhaust fans were shut down along with reprogramming of the building management system. Occupied and unoccupied temperature schedules were set up in October and in February the chilled water plant was scheduled to be shut down in unoccupied times and when the outside air temperature was below 60 degrees. Federal Bureau of Investigations Headquarters Building, Las Vegas, NV: Project Manager for a 107,000-SF building to accommodate FBI operations. Features included an emergency operations center, witness interview rooms, photo lab, computer forensics unit, gun vault and training simulator room and a 74,415-SF parking garage. City of Phoenix • Phoenix Convention Center, Phase I: Project Manager for the Phase I renovation consisting of a new four-level structure with a 46,000-SF ballroom on the third level, a 21,000-SF Conference Center on level two, 26,000-SF meeting rooms on level one, and a 64,000-SF exhibition hall on the lower level. A sky bridge connects the Phase 1 meeting facility with the existing and expanded convention center. (LEED Si lver) • Estrella Police Precinct: Project Manager for this 25,000-SF facility with offices for command, administrative staff and motoring officers; holding cells for adults and juveniles; interview and monitoring rooms; public space for lobby, meeting room, restrooms, walk-up counter and a 30-person briefing room. • Mountain View Police Precinct: Project Manager for a 25,720-SF facility that houses offices, holding cells, mug shot and processing area, officer restrooms, lockers, break room, public spaces, restrooms, briefing room, three- to four-bay shooting range and storage areas, and a 3,000-SF vehicle maintenance facility on site. • Black Mountain Police Precinct: Project Manager for a 25,884-SF police precinct that contains nine holding cells, mug shot and processing area, interview and monitoring areas, officer restrooms, lockers, break room, public spaces and restrooms, briefing room, equipment and evidence storage, and three-bay shooting range and storage. • Smokehouse Trail Police Precinct, Phoenix, AZ: Project Manager for a 25,720 -SF station that includes a 3,000-SF, four-bay vehicle maintenance facility with two large and two small vehicle lifts, and general vehicle maintenance equipment. LSW 1-4,11 g ineers ARIZONA, INCORPORATED City of Tempe I Transportation Center: Principal in charge for this 40,000-SF, three-story building that houses city offices, transportation control/command center, transit store, retail areas, bike valet, shower/locker spaces, multi-use leased office space and a 2,000-SF community room. (LEED Platinum) City of El Mirage I Police Station: Project Manager for this 20,000-SF police station containing administrative offices, evidence processing and storage, cells for juveniles and adults, a firing range with armory, K-9 facilities, public training and media rooms, locker rooms, and briefing rooms. Mechanical scope includes design for HVAC systems; plumbing design for restroom fixtures, drinking fixtures, showers, and hose bibbs. City of Goodyear I Goodyear Operations Center: Project Manager for the 5,000 -SF Operations Center with planning for a future addition to be approximately 5,000 SF. Mechanical scope included design for HVAC and exhaust to include ductwork, equipment and controls. Plumbing design for building interior needs include storm water design and gas piping design. JUSTICE Santa Clara Jail Construction Project Management Design Review Services, Santa Clara, CA: Project manager for the new Main Jail South (MJS) and includes demolition of the existing MJS, rerouting of essential functions such as emergency generators, secondary medical transport, loading dock and other site utility services, and then construction of a new ±550-bed, five-story facility. The new MJS may include integral or separate structures for listed rerouting functions, a new county-wide booking system, a new visitation lobby and a 30,000-SF administrative office space beyond the programming of Main Jail East. El Dorado Public Safety Building, El Dorado, CA: Project Manager for a new 110,000 -SF public safety facility consisting of five buildings located on a 13-acre site. LSW provided mechanical, plumbing, electrical and technology engineering services for a new campus style complex to consolidate all functions of the El Dorado County Sheriff — Coroner and Public Administrator. The buildings included Public Safety —61,000 SF; Property/Evidence Building — 17,000 SF; Morgue —4,000 SF; Special Operations — 15,000 SF; and, Armory/Shooting Range — 12,000 SF. Arizona State Prison Complex (ASPC) • 4,000-Bed Minimum Security Prisons o Cibola Unit: Project Manager for the 1,000-bed minimum level custody male w/medium level fence, Yuma o La Paz Unit: Project Manager for the 1,000-bed minimum level custody male w/medium level fence, Yuma o San Carlos Unit: Project Manager for the 1,000-bed minimum level custody female, Perryville o Whetstone Unit: Project Manager for the 1,000-bed minimum level custody male, Tucson • 1,000-Bed Minimum Security Prisons o Catalina Unit: Project Manager for the 300-bed low custody male, Tucson o Eggers Unit: Project Manager for the 200-bed low custody male, Douglas o Piestewa Unit: Project Manager for the 200-bed low custody female, Perryville o Santa Rosa Unit: Project Manager for the 300-bed low custody male, Perryville • ASPC I Florence o Eyman Rynning Unit: Project Manager for the replacement of old and deteriorated evaporative cooling units serving the housing units. LSW Fn.6neers ARIZONA, INCO- RPORATED o Eyman SMU 1: Project Manager for the replacement of the final four existing air handler units. o Eyman SMU 1: Project Manager for the evaluation of hot water consumption, pipe sizing, mixing valves and design of new water softener. • ASPC I Perryville: Project Manager for the site gas re-pipe at Perryville Prison for the Santa Maria Unit, Lumley Unit, Santa Cruz Unit and San Pedro Unit. • ASPC I Tucson, Rincon Unit: Project Manager for the replacement of cooling towers and re-piping of condenser water CDCR R.J. Donovan Infill Facility, San Diego, CA: Project Manager for this Level II 259,000 - SF facility with 792 beds in three housing units; a Facility Support Services building with healthcare services, laundry, canteen and dining areas; a Program Support Services building for general visiting, religious programs, classrooms, library, indoor recreation, and administrative area; a family visiting building, and a warehouse. Central Valley Juvenile Detention Center, San Bernardino, CA: Project Manager for this 144,068-SF juvenile detention facility consisting of three identical 80-bed housing units and one 40-bed unit. Each 40-bed pod, within the housing units, includes a dayroom, living quarters, shower/toilet, and classroom. Support areas include administration, medical, receiving/warehouse, and a 5,200-SF full kitchen and staff dining. John M. Roll United States Courthouse, Yuma, AZ: Project Manager for a this 57,000 -SF building with two courtrooms, U.S. Marshalls, holding cells, Clerk of Courts, pre-trial, and probation. Sustainable Measures included domestic solar hot water, solar photovoltaics, and high efficiency chillers. (LEED Si lver) Maricopa County ITR and Jail Expansion: Mechanical Engineer for a new single story, 153,600-SF building, which will house a 512-bed, 72-hour Inmate Transfer and Release (ITR) facility, along with a 320,000-SF 1,280-bed medium-security detention facility. Oren R. Fox, Imperial County, CA: Project Manager for a 58,200-SF two-story, medium security adult detention facility that houses and provide treatment and program space for 270 male and female pretrial and sentence inmates. The housing units consists of six two-tiered 45-bed dormitory style housing units with a double bunk configuration to house 270 inmates in approximately 22,300 SF. A second building consisting of 8,700 SF will be a video visitation center with vocational print shop located outside of the secure perimeter, but on the same site, to allow for public access. ASPC Yuma Cheyenne Unit: Project Manager for the systems and infrastructure to remediate damage done to the Laundry and Kitchen buildings from waterflow from the evaporative cooling units and resultant demolition by staff. OTHER Ak-Chin Indian Community, AZ • Fire Station: Project Manager for a new approximately 21,000 SF fire station. The facility houses 12 full time staff and includes four apparatus bays; office areas for chief, captain, administration and IT; conference room; dorm rooms; fitness area; kitchen/dining; work room, and support areas. Also included is an Emergency Operations Center (EOC) that may double as a classroom for 30 to 50 people. • Justice Center: Project Manager for a new 54,000 SF multipurpose Justice Center, which consists of an approximate 19,000 SF detention area, 10,500 SF police area, 12,000 SF court area, 8,000 SF firing range, outdoor storage and impound areas. Mechanical systems for HVAC and exhaust were provided for all occupied areas. LSW Iingineers ARIZONA, INCORPORATED Bank of American (previously Countrywide Home Loans), Chandler, AZ: Project Manager for the expansion of three nearly identical 180,000-SF structures. Also included was the design for a 12,400-SF, 2,800-ton central plant to serve the campus, and design for a five-story, 661,000-SF above-grade parking garage to accommodate 1,990 vehicles (site lighting design included). Project was put on hold at 75% construction due to funding issues. Bank of America (previously Countrywide Home Loans, Tempe, AZ: Project Manager for the tenant improvement of a 226,000-SF facility. Approximately 50% of the plumbing fixtures were removed and replaced and new air conditioning distribution was provided. Las Vegas Review Journal - Donrey Outdoor Systems Building, Las Vegas, NV • Phase 1: Project Manager for the tenant improvement to various areas in the building including removal of central staircase and framing in the opening at the mezzanine level to match existing floor and ceiling; remodel of single men's restroom into ADA men and women toilet rooms; and adding air conditioning to the Telemarketing Department. • Project 2: Project Manager for the renovations to the 10,000-SF post office building and 4,810-SF tenant improvement space in the main facility. Palo Verde Nuclear Generating Plant, Tonopah, AZ: Mechanical Engineer for this one- story 26,000-SF building with approximately 6,000 SF of interior conditioned space. The mechanical scope included packaged ground mounted HVAC systems, exhaust system, distribution of ductwork and diffusers, heating and cooling load calculations for the 6,000-SF conditioned space. Mesa Arts Center, Mesa, AZ: Project Manager for the 180,000-SF facility that includes four performing arts theaters, technical support, public spaces, administration, Mesa Contemporary Arts, Mesa Arts Center, commercial support, community spaces, and outdoor spaces. Mechanical design included a district cooling plant and highly performing acoustical air systems. Herberger Theater Renovations, Phoenix, AZ: Project Manager for the renovations of the existing 62,117-SF theater that houses three theaters: an 802-person large theater, 332-person small theater, and a black box theater. Mechanical renovations to the theater included replacement of major components within all HVAC systems. The existing air handlers were fully refurbished and control valving was replaced. Estrella Community College Performing Arts, Avondale, AZ: Project Manager for a new 24,895-SF performing arts building consisting of stage and seating between 300 and 350 people. Mesa District Cooling Plant, Mesa, AZ Project Manager for the central plant design of three 900-ton chillers with expansion provisions to 4,500 tons. Mesa District Cooling Plant Expansion, Mesa, AZ: Project Manager for the addition of a fourth 950-ton water cooled chiller, cooling tower, condensing and chilled water pumps to the existing district chiller plant. Also included was a master plan update for expansion of the piping infrastructure and connection updates. OLDER PROJECTS JUSTICE Adobe Mountain Juvenile Facility, Phoenix, AZ: Project Manager for the replacement of AC units in miscellaneous areas in the facility. Areas include Business area, Warehouse, Visitation area, West Unit Kachina building, West Unit Voyager building, Health Unit, Separation Unit and Central Control. Catalina Mountain Juvenile Facility, Phoenix, AZ: Project Manager for the chiller LSW Engineers ARIZONA, INCORPORATED replacement. Arizona State Prison Complex (ASPC) • Florence o Eyman Rynning Unit: Project Manager for the replacement of old and deteriorated evaporative cooling units serving the housing units. o Eyman SMU 1: Project Manager for the replacement of the final four existing air handler units. o Eyman SMU 1: Project Manager for the evaluation of hot water consumption, pipe sizing, mixing valves and design of new water softener • Perryville: Project Manager for the site gas re-pipe at Perryville Prison for the Santa Maria Unit, Lumley Unit, Santa Cruz Unit and San Pedro Unit. Clark County Detention Center, Las Vegas, NV: Project Manager for this new 1,000 -bed detention center on a 17-acre site. The facility is approximately 232,000 SF and includes a two-story administration area, warehouse and central plant. The housing area is approximately 143,000 SF in one building with two floors and a mezzanine. Design includes planning for another future 1,000 beds. GOVERNMENT City of Phoenix • Fire Station No. 50: Project Manager for a new 12-person, 4-bay, 13,500 SF fire station located on 2.2 acres. The facility includes fitness, training, sleeping quarters, kitchen, 2,000-gallon fuel storage tank, and natural gas fired emergency generator. REED Certified) • Fire Station No. 56: Project Manager for a new 13-person, 4-bay, 13,500 SF fire station, CMAR project located on 2.5 acres. The facility includes workout room, 1,000 SF community room, roof-mounted equipment, above-grade 2,000-gallon fuel tank. • Fire Station No. 62: Project Manager for a new 2-bay, 8,500 SF fire station on 2.5 acres including sleeping quarters, kitchen, workout room, and 1,000 SF community room. The facility also has a 2,000-gallon fuel tank. A "Green" building with fire sprinkler. • Fire Station No. 43: Project Manager for a new 12-person, 17,000 SF fire station with Battalion Chief Office, four bays, 1,000 SF community room, 800 SF Weight Room, and 5,000 SF office space. Sleeping quarters are dormitory style with individual 10' x 10' bedrooms. The kitchen is commercial grade. • Fire Station No. 54: Project Manager for a new 12-person, 4-bay, 13,500 SF fire station. The facility included fitness room, community room, sleeping quarters, restrooms, kitchen, fuel island, and heating by gas. Green design but no LEED certification sought. City of Tempe I Apache Boulevard Police Substation/Evidence Storage Facility: Project Manager for a 45,325-SF police substation with "911" dispatch equipment, 28,727-SF property/evidence storage building, 6,062-SF vehicle storage building, and a packaged central plant that provides chilled water for cooling both facilities. City of Glendale • City Courts Building: Project Manager for a 93,000-SF, three-story building with a small below-grade secure parking area. The facility was designed to include 10 courtrooms with design for four future courtrooms, judges' chambers, jury rooms, conference rooms, inmate holding area, and vehicle sally port. Construction was stopped due to funding. • Western Area Regional Public Safety Facility: Project Manager for a 34,000 -SF combined police substation and fire station. The project includes administrative space for 75 officers and other support staff of the police department, four engine bays, living quarters for 12 fire department personnel, and health maintenance area. In addition, the building design accommodates a future crime laboratory. Package rooftop equipment was used for environmental control in occupied spaces. • Municipal Field Operations Complex: Project Manager for a 100,000-SF maintenance LSW _Lngineers ARIZONA, INCORPORATED and operations facility comprised of six buildings including administration building, vehicle maintenance with a three-stall welding bay, 23 heavy duty maintenance and repair bays, and 10-bay light duty maintenance bays; four-station tire bay; light duty and heavy duty wash bays; guard station, and warehouse. • Fire Department Office: Project Manager for the tenant improvements of an 11,700- SF third-floor office space. Project included remodel of existing restroom group, both men and women. Mechanical design included reconfiguring duct work for the new tenant improvement space and updating outside air system to meet current codes. City of Avondale I Northwest Public Safety Facility #74: Project Manager for an 18,252-SF joint-use public safety facility with the City of Avondale and Estrella Mountain Community College. It houses an Avondale police substation, the college's public safety office and two classrooms. The fire station has a nine-person crew and full-size ladder truck. City of Mesa I District Cooling Plant: Project Manager for the master plan for three new expansion connections for the police department main building, Mesa Plaza and ISD Building. Project included the addition of a fourth 950-ton water cooled chiller, cooling tower, condensing and chilled water pumps to the existing district chiller plant. Also included was a master plan update for expansion of the piping infrastructure and connection updates. Maricopa County • Nova Safe Haven, Phoenix, AZ: Project Manager for a 13,000-SF building addition to an existing site. The facility provides personal care services and houses on a temporary basis the homeless that suffer from mild forms of mental disability. The building consists of two sleeping areas, each of which has its own private dayroom and exterior courtyard, one for male occupants and the other for female occupants. Other primary spaces include intake and reception areas with drop-in dayrooms and an exterior courtyard for visitors. The building also includes toilet and shower facilities and has a small dining room with a full functioning commercial kitchen. • Northwest Regional Justice Courts, Surprise, AZ: Project Manager for a 36,000-SF courts building. This facility contains courts, judicial suites, and administrative space. Mechanical design included HVAC design for an air-cooled chiller with VAV distribution and electric heat. • San Tan Regional Justice Courts, Chandler, AZ: Project Manager for a 43,610-SF courts building including four courtrooms, judicial suites, hearing rooms, conference/mediation rooms, workstation, and secured parking and administrative office space. Design included HVAC for package rooftop units and electric heat and general plumbing. • Sheriff's Office I Property Storage and Evidence Storage: Project Manager for this 50,000-SF facility for the storage of all County Evidence, Inmate Personal Property, found property and all biological evidence. Special amenities include a large pallet rack evidence storage, outside storage for flammables, bullet proof reception areas, high security cameras, card access security system and an impound yard. • Sheriff's Office I Aid Stations: Project Manager for the demolition of existing buildings and replacing with a new like-in-kind for Canyon Lake (1,100 SF), Apache Lake (1,100 SF), and Bartlett Lake (1,800 SF). • Sheriff's Office I Durango Parking Garage: Project Manager for the tenant improvements of the first-floor parking structure consisting of 18,852 SF. Facility includes two telecom rooms of approximately 800 SF each, which required back-up power and HVAC. Two new restroom groups; one for public use and one for high abuse environment. There is a fish and mosquito holding area that also required back- up power and HVAC. Durango Juvenile Facility: Project Manager for Phase 5 renovation converting approximately 6,000 SF of medical area to a life skills and counseling area. LSW E ngineers ARIZONA, INCORPORATED Pinal County Courts, Florence, AZ: Project Manager for a four-story, 127,000-SF courts building that includes multiple courtrooms, administration offices, inmate holding areas and archives/storage areas. Polly Rosenbaum Archives & History Building, Phoenix, AZ: Project Manager for a 212,755-SF facility that holds the State of Arizona's historical artifacts, legal documents and other items of legal, social and historical significance. OTHER Countrywide Home Loans, Expanded Frye Road Campus, Chandler, AZ: Project Manager for a 15,433-SF Central Plant, which was designed for a final build out of 2,800 tons and consists of two 1,050-ton chillers and one 700-ton chiller. There is also a Generator yard with two 2-megawatt generators to provide full backup of building services. Salt River Pima -Maricopa Indian Community / Detention Center, Scottsdale, AZ: Project Manager for a 500 -ton refrigeration plant with a 250 -ton expansion. Salt River Pima -Maricopa Indian Community, AZ • Detention Center: Project Manager for a 75,000-SF, 120-bed detention facility with design for future expansion for 200 additional beds. Project also included the evaluation of central plant expansion to add 25,000 SF of future office space. • Indian School Police/Fire Substation: Project Manager for a new 21,340-SF police/fire Substation located on 3.2 acres. The police department includes prisoner holding and interview area, workspaces for patrol officers to file reports, store information and attend daily briefings. There is a training resource room for the officers, officer space, and locker rooms. The fire department includes four apparatus bays, 12 bunk rooms, day room, training room, and locker/shower areas. There is a shared exercise room for the fire and police departments. • Hualapai Nation Juvenile Detention and Rehabilitation Center, Peach Springs, AZ: Project Manager for a 23,000-SF juvenile male and female facility in two-story housing units. The units accommodate 11 females and 10 males, with a possible 10 additional beds for males only. The administration, training/education, and support areas are in a single-story building. • Fort McDowell Yavapai Nation Criminal Justice Center, AZ: Project Manager for the 37,225-SF mixed-use facility housing a fire station, police station, adult and juvenile detention, court facilities, and prosecutor offices. Glendale Municipal Field Operations Complex, AZ: Project Manager for a 100,000 -SF maintenance and operations facility comprised of six buildings including administration building, vehicle maintenance with a three-stall welding bay, 23 heavy duty maintenance and repair bays, and 10-bay light duty maintenance bays; four- station tire bay; light duty and heavy duty wash bays; guard station, and warehouse. Highland Service Center, Phoenix, AZ: Project Manager for this facility with a 24,000-SF warehouse; 13,300 SF of equipment and general shop space; 44,000 SF of administrative space, two drive-through wash bays, fueling station, and parking for 360 vehicles both public and large equipment. Tempe Police Substation/Evidence Storage Facility, Tempe, AZ: Project Manager for a 45,325-SF police substation includes a 6,062-SF large vehicle storage building with a vehicle cleaning station. ADOA 4000-Bed Expansion -Yuma Complex, Yuma, AZ: Project Manager for a 10,800 -SF vehicle maintenance building with eight vehicle bays, light duty wash bay, and office/administrative areas. Education: B.S.M.E., University of Utah Registration: Arizona No. 50089 California No. 38644 Experience: With LSW: Since 2006 With Others: 2 years Professional Affiliations: • American Society of Heating, Refrigeration and Air Conditioning Engineers (ASHRAE) • American Society of Plumbing Engineers (ASPE) • Autodesk User Group International (AUGI) LSW Engineers ARIZONA, INCORPORATED Cory E. Killpack, PE Vice President / Mechanical Engineer Cory has experience in the development of Mechanical and Plumbing systems with an understanding of most contemporary HVAC systems encompassing VAV, constant volume, heat pump, chilled water and associated systems. He is conscientious of building aesthetics and space and is dedicated to providing neat, organized, and complete construction documents. Cory is LSW's Revit/BIM Manager and is responsible for standards training and development. Cory has served as a mechanical engineer or mechanical designer on the following projects: AVIATION Phoenix Sky Harbor International Airport • Terminal 3 Modernization: Job Captain for the modernization of Terminal 3 which included expanding the passenger screening and checkpoint areas, additional ticket counters, additional baggage claim carousels, improved passenger circulation on escalators and elevators, new and expanded food concessions and retail, and expanded curb for drop-off and pickup. As part of this project, a new south concourse was constructed to add nine additional gates to the terminal. Total finished project covers 726,000 SF of modernization. • Southwest Airlines Provisioning Facility: Mechanical Engineer for the renovation of the ice production equipment within the 14,500 SF facility. The walk-in cooler and freezer had to be reconfigured to create a space to relocate the existing ice making machines, which included relocating the evaporator units and lighting and reconfiguration of the fire sprinklers. • Terminal 4 N4 MAG/AMEX Lounge TI: Project Manager for this new 10,000 SF airport lounge tenant improvement project located on the lounge/roof level at the International Concourse (N4) inside Terminal 4 • Terminal 4 South Concourse 1: Project Manager for this new concourse on the south side of Terminal 4 in the Si designated location. The 200,000 SF project will include a connector bridge from the Si concourse to the terminal 4 processor as well as a bridge on the airside of security to the concourses on the north. Phoenix-Mesa Gateway Airport Terminal Expansion, Mesa (Revit Project) • Gateway Aviation Center - Building 45: A 4,000 SF renovation with an additional 500 SF addition was completed in the existing building. • Security Screening Check Point (SSCP): This project consist of reconfiguration of the SSCP and adjacent areas to optimize the queuing area; a feasibility study and design to provide an unmanned exit system; and, design of additional bollards at the exterior side of the main entry doors. • West Terminal Building, Phase 1: Mechanical Designer for the new terminal expansion, which is the first of four phases to be constructed. The first phase is a 25,000 SF facility with a central plant for a water-source heat pump system; a central heat recovery ventilation air system, and extension of the DDC controls. • West Terminal Building, Phase 2: Mechanical Designer for the 27,000 SF addition which included lobby areas, hold room, baggage claim, concession areas, restrooms and storage areas. Renovations within Phase 1 Terminal Building consisted of 15,000 SF for the relocation of the baggage carrousels to allow for a new security checkpoint, security queuing and car rental. Relocation of the security checkpoint area and expansion of the existing Explosion Detection System in the existing Terminal Building was also included within this project. • West Terminal Building, Phase 3: This project was the third of a four-phase expansion to the existing Gateway Aviation Center. The third phase was an 11,000-SF addition that included hold room, concession areas, restrooms and storage areas. LSW Engineers ARIZONA, INCORPORATED Terminal Concessions Expansion: This project included 2,000 SF food and beverage space and 2,600 SF of public corridor area connecting phases two and three. Retail space of 900 SF was added at gate eight. Los Angeles International Airport I Terminal 5, Los Angeles, CA • Mechanical Engineer for a new service elevator includes design to add a new dedicated CRAC unit for the new elevator equipment rooms, new elevator sump pumps, and relocated of existing plumbing piping. • Mechanical Engineer for an 88,000 SF renovation of four floors in Terminal 5 consisting of ticket lobby, security checkpoint expansion, meet & greet hall and baggage claim hall. • Delta Airlines Service Elevator: Engineering services for a new service elevator. Mechanical design to add a new dedicated CRAC unit for the new elevator equipment room. Plumbing to add a new elevator shaft sump pump. Also included relocation of existing plumbing piping. • Delta Landside Facility Redevelopment A/S#2 Supplemental Services: No data • Delta Landside Facility Redevelopment: Renovation of 88,000 SF including four floor levels. Facility includes the ticket lobby, security checkpoint expansion, meet and greet hall and baggage claim hall renovation. Falcon Field I Terminal Remodel, Mesa, AZ: Mechanical Engineer for the upgrades to the existing 3,680 SF terminal. The project included a comprehensive remodel and update to the entire terminal building and site area. The interior was completely gutted and remodeled and updates were made to the plumbing, lighting, mechanical, electrical, and fire protection systems. Carnival Cruise Lines Terminal, Long Beach, CA: Project Manager for the expansion to the existing 130,000 SF terminal. This includes reconfiguration of the existing Carnival spaces into a debark area; development of new embark entrance, security, lounge, VIP lounge, conversion of back of house spaces into terminal operations, addition of a new ADA ramp, sterile embark/debark corridor, and relocate customs and CBP functions into a single location. 0 Ar* This project won an award for "Best Commercial HVAC Design" at the Fourth Annual ASH RAE Central Arizona - Honors and Awards Dinner in 2018 Deer Valley Air Support Hangar Code Related Improvement: Project Manager for the schematic design for code corrections of the Phoenix Police Department Hangar at Deer Valley Airport. The City opted to install a combination foam-water fire suppression system and to accept proposed revisions to lower the NEC Class I, Division 2 hazardous zone for both the maintenance and executive hangars. The City also requested a design to revise the existing kitchen, men's locker/restroom and provide a new ADA restroom to comply with the accessibility study. Prescott Municipal Airport (PRC) Terminal: Project Manager for this new 17,000 SF, single- story terminal building at the Prescott Municipal Airport (PRC) in Prescott AZ. EDUCATION (HIGHER-ED) Arizona State University, Tempe, AZ • Department of Public Safety Building: Mechanical Designer for a new 40,000 SF, 3- story facility which houses the campus police and a "911" Call Center. REED Gold) • Barrett Honors College: Mechanical Designer for a new 520,000 SF facility consisting of multiple buildings which is used primarily for student housing, but also includes a dining facility, administrative offices, faculty and classroom areas, and community recreational areas. (LEED Gold) Midwestern University, Downers Grove, Illinois Campus LSW lingineers ARIZONA, INCORPORATED • Multispecialty Medical Clinic: Mechanical Engineer for a new 6-story high-rise structure consisting of 193,200 SF with an additional roof mounted mechanical penthouse of approximately 10,000 SF. The dental clinic contains 294 dental chairs, an operatory room, equipment sterilization area, local equipment sterilization rooms, wet labs, teaching labs, offices, classrooms, conference room, and waiting/reception area. The optometry clinic includes multiple exam rooms, laser surgery room, testing rooms, eyewear center, classrooms, offices and waiting room. The second level contains an approximate 13,000 SF multispecialty clinic. The project also included a new six level open parking structure containing 956 parking spaces. • Science Hall: Mechanical Engineer for a new 239,000 SF Science Research Lab / Classroom building. The new building is a 6-story, high-rise structure with an open parking garage at the first level, classroom rooms on the second level, and laboratory, classrooms and office spaces at the upper four levels. Midwestern University, Glendale, Arizona Campus • Dental Institute: Mechanical Designer for an approximately 76,000 SF, 3-level (2-story with basement) dental clinic that includes equipment sterilization area, radiology rooms, operating rooms, a classroom, storage rooms, and mechanical rooms. • Eye Institute: Mechanical Designer for an approximate 33,275 SF, 2-story clinic shall include exam rooms, laser surgery room, classrooms, office, testing rooms, an eyewear center and waiting room. • Medical Office Building TI: MPE & FP for an approximate 25,000 SF tenant improvement of the existing two-story medical office building. • Student Services Building: Mechanical Designer for the 16,200 SF single-story addition to the existing Student Services building. Embry Riddle Aeronautical University I ROTC Building, Prescott, AZ: Mechanical Designer for a new 16,500 SF facility consisting of classrooms and private offices. Maricopa County Community College District • Glendale CC North Campus: This was the first phase of development for a new 77,000-SF Campus. It included a 23,000 SF Instruction building for general purpose classrooms, computer classrooms, lecture classrooms, science labs, and offices; 23,000 SF Student Services with a bookstore, fitness/activity center, food service area, offices, testing rooms and community room; 22,500 SF Information Building which holds a library, media services, computer commons, and study spaces. The 8,500 SF Central Plant was designed to accommodate future expansion as the campus expands to a total of approximately 340,000 GSF. Site utility infrastructure included chilled water, power and raceway system for data/telecommunication cabling. • Rio Salado Café Remodel/Addition: Mechanical Designer for the remodel of a 3,100 SF café and a 1,580 SF building addition. The new addition is a two-story volume attached to the east side of the building. • Scottsdale Community College: Mechanical Designer for the Information Technology building renovations consisting of 18,160 SF with an 865 SF data center. Los Angeles Southwest College, Los Angeles, CA • School of Career & Technical Education: Revit Designer for a new 53,655 SF facility which includes two science labs, general purpose classrooms, student services, and faculty offices. • School of Arts and Humanities: Revit Designer for a for a Recital Hall, Black Box Theater, Choral and Music Rehearsal Rooms, two Recording Studios, Digital Film Studio, Student Services, and Faculty offices. Rio Salado College-Cafe Remodel & Addition: MP&E remodel of a 3,100 SF remodel and a 1,580 SF building addition. The new addition was a two-story volume attached to the east side of existing building. The project added a new HVAC system. The Scramble Food area was remodeled with a new grille with hood. EDUCATION (K-12) LSW Engineers ARIZONA, INCORPORATED Washington ESD I Royal Palm Middle School Addition and Remodel, Phoenix, AZ: Mechanical Designer for the addition of three standalone buildings: 4,000 SF administration center; 4,000 SF media center, and 7,200 SF Cardinal Academy (Special Ed) for a total of 15,200 SF. Also included is an 11,764 SF remodel of the administration area, classroom, and art room. Payson Unified School District I Julia Randall Elementary School: Mechanical Designer for a new 45,000 SF elementary school consisting of three one-story buildings which houses classrooms, media center, multipurpose room, and preparation kitchen. Buckeye Elementary School District, Buckeye, AZ • Jasinski Elementary School: Mechanical Designer for a new 74,000 SF single story school, which includes classrooms, a full servery kitchen and multipurpose room. • Inca Elementary School: Mechanical Designer for a new K-8 elementary school, approximately 74,000 SF. Partial second floor is designed as additional classroom space and in-fill. The school includes a full servery kitchen and multipurpose room. • Sundance Elementary School: Mechanical Designer for a new 15,400 SF, two-story, 12- classroom addition to the existing school. Our scope of work including mechanical, plumbing, lighting, power and fire alarm designs. The design was utilized as a prototype for Inca Elementary School. Design was completed; however, the project was not built. Blue Ridge Unified School District I New Middle/Jr. High School: Mechanical Designer for a new 127,500 SF, single-story building. Components to the school include classrooms, media center, multipurpose facility/cafeteria, and administration area. Mechanical system is package, roof mounted, air conditioning units with gas fired heat. Cartwright School District I New Middle School: Mechanical Designer for a new 92,600 SF middle school consisting of classrooms, administration areas, multipurpose area, and full kitchen service. The mechanical system is roof mounted, packaged heat pump units. Orange Glen High School Creative Arts Addition: No data — California school Wickenburg Unified School District I Festival Foothills: Mechanical Designer for a new 70,000 SF multi-story K-8 school. The facility includes classrooms, multipurpose/dining, food services, media center, and band and choir rooms. Wilson Elementary School District I Wilson Elementary School Mechanical Designer for a new two-story, 26,000 SF multipurpose classroom addition and a new 7,800 SF library addition. Casa Grande Union High School District, Casa Grande, AZ • Vista Grande High School: Mechanical Designer for a new 247,000 SF high school which includes six buildings, a 2,500 SF ticket and concession building (two), and an 8,000 SF City of Grande joint-use library for a total of 257,500 SF. • Casa Verde High School: Mechanical Designer for the 15,512 SF addition and renovations on the first floor and a 9,955 SF addition and renovation on the second floor. • Transportation Center: Mechanical Designer for a new 12,000 transportation facility containing shipping and receiving, print shop, office areas, parts storage & full service maintenance bays with host capabilities. East Valley Institute of Technology (EVIT), Mesa, AZ • Educational Health Sciences Building: Mechanical Designer for a new 60,000 SF building, which houses classrooms, and laboratories for Nursing, Rx, Respiratory and Radiology. Surface parking for this building was also included. • East Campus, Phase 1: Mechanical Designer for two stand-alone buildings with a total square footage of 70,000 SF and a separate 5,000 SF central plant. Higley Unified School District, Gilbert, AZ • Williams Field High School: Mechanical Designer for a new 260,000 SF high school LSW Engineers ARIZONA, INCORPORATED with two classroom wings, science laboratory two gymnasiums, cafeteria, auditorium, and fine arts including theater stage, band, choir, art/drawing and sculpture, dance, drama, and digital art design areas. • Transportation Center: Mechanical Designer for the new 10,700 SF transportation facility includes office areas, three full-service bus maintenance bays, and a bus wash area. • Maintenance and Landscape Facility: Mechanical Designer for a new 8,400 SF maintenance facility, which includes office space, maintenance area with three bays, and storage area. Glendale Elementary School District #40 I Discovery Elementary School: Mechanical Designer for a new 10,561 SF stand-alone, single story classroom building which includes classrooms, workroom and restrooms. Chandler Unified School District I New Alternative School, Chandler, AZ: Mechanical Designer for the 25,500 SF Alternative School with partial of the second floor for the District. Joseph City High Schools-Additions & Renovations: Engineering services for the additions and renovations to the high school and elementary school. Scope of services for the high school included two new replacement chillers and associated pumping system, renovation of the 1,500-SF locker and shower rooms, electrical distribution and upgrade for new the additions and remodels, two new classrooms and new 6,000 SF athletic building addition. Peoria Unified School District • Sun Valley Elementary School: Mechanical Designer for the central plant replacement, kitchen remodel, administration remodel, and a new 11,312 SF standalone classroom building. • Raymond Kellis High School: Mechanical Designer for the remodel of an existing multipurpose room to convert into training and storage room. Queen Creek Unified School District, Queen Creek, AZ • Queen Creek Elementary School: o Mechanical Designer for a new addition of approximately 18,000 SF for 12 new classrooms on the north wing of the existing building. o Mechanical Designer for a new addition of approximately 14,700 SF for 10 new classrooms on the west wing of the existing building. o Mechanical Designer for a new 2,500 SF classroom wing addition for a resource room, five unisex restrooms, two storage rooms, and a teacher's lounge. • Queen Creek High School: Mechanical Designer for a new 5,000 SF dining addition to the existing cafeteria. Also included 600 SF dry storage addition, new canopy at the outdoor eating area and a new serving line at the kitchen. • District Office: Mechanical design for a new 30,000 SF Administration Center. The new building includes a large dividable boardroom with multi-media presentations, training facility, conference rooms, reception area, offices for staff and the Superintendent, support areas, and public restrooms. Phoenix Union High School District #210 • Alhambra High School: Mechanical Designer for a 13,400 SF addition. • Bostrom High School: Mechanical Designer for a 6,200 SF addition and 13,200 SF remodel of classrooms, administration and media center. • North High School: Mechanical Designer for the renovations of a 15,000 SF, two-story, classroom building. • Central Plant and Cooling Tower Yard: Mechanical Designer for the remodel and upgrades at Alhambra High School, Maryvale High School, Metro Tech Vocational, and Carl Hayden High School. J.O. Combs Unified School District • New Middle School: Mechanical and Plumbing Designer for a new 96,670 SF school. Mechanical system is a packaged roof mounted heat pump unit. LSW Engineers ARIZONA, INCORPORATED • New K-5 School: Mechanical and Plumbing Designer for a new 67,500 SF school. Mechanical system is a packaged roof mounted heat pump unit. GOVERNMENT City of Cottonwood Emergency Communications Center: Mechanical Engineer for a 4,000 SF facility including design for a future 3,000 SF expansion. The facility is used as a dispatching center for 20,000 police incidents and 3,200 fire/EMS runs per year. City of Avondale Northwest Public Safety Facility #74: Mechanical Engineer for a new 18,252 SF joint public facility with the City of Avondale and Estrella Mountain Community College. It houses an Avondale police substation, the college's public safety office, and two classrooms. The fire station has a nine-person crew and full-size ladder truck. City of Surprise • Energy Star Portfolio Manager: Mechanical Engineer to assist the City with entering 12 buildings into Energy Star Portfolio Managers to allow for energy use tracking and comparison of each building. The buildings include six fire stations, City Hall, Public Safety, the sports stadium, library, Communiversity, and a senior center. • Energy Use Analysis: MP&E for the energy analysis for three city buildings which includes the old 57,000 SF City Hall complex, 96,000 SF public safety building, and the wastewater treatment plant. City of Mesa I Mesa Plaza Building: Mechanical Engineer for the preliminary design of the chilled water connection between the roof-mounted chiller plant on the City's Plaza Building and the district chilled water loop. Project included design of a screening system to conceal the new piping on the exterior of the building. City of Glendale Fire Station No. 151: Mechanical Designer for the new 17,600 SF facility, with four apparatus bays, kitchen, dining, dayroom, training classroom, living quarters for 10, fitness center and support areas. Mechanical systems included packaged rooftop gas-pack units serving the dormitory and office areas and evaporative coolers serving the truck bays. City of Litchfield Park City Hall • City Hall: Mechanical Designer for the 7,500 SF, single story addition to the existing building consisting of private and open offices, conference rooms, lunchroom, and a vault. Design was completed at 90%, but the project was put on hold due to funding. • Office/Retail Building: Mechanical Designer for a new two-story 40,000 SF office/retail building (shell only) with the main infrastructure, but not completed for T.I. HVAC units were set in place for unimproved shell areas, plumbing for future T.I. spaces. Common areas, lobby spaces and restroom areas were fully designed with mechanical and plumbing systems. Design for one 5,000 SF office suite and a 3,800 SF restaurant was also provided. City of Scottsdale • Appaloosa Library: Mechanical Designer for a new single story, 21,242SF building, which includes meeting rooms, cyber cafe and drive-up windows. In addition, there is a large shaded patio with tables and chairs for reading, discussion and a venue for entertainment. Scope included specialty lighting design components within specific area. (LEED Gold) • Center For the Performing Arts Building - Building Automation Control System Upgrade: Project Manager for the upgrade of the building automation control system on the existing HVAC system. • Club Sar Building Automation Control System Upgrade: Project Manager for this upgrade of the building automation control system on the existing HVAC system. City of Surprise Energy Star Portfolio Manager: Mechanical Engineer to assist the City with entering 12 buildings into Energy Star Portfolio Managers to allow for energy use LSW Fngineers ARIZONA, INCORPORATED tracking and comparison of each building. The buildings include six fire stations, City Hall, Public Safety, the sports stadium, library, Communiversity, and a senior center. City of Tempe • Tempe Police Building: Mechanical Designer for the renovation of the first and second floors (approximately 25,000 SF) of the existing Police Building with Information Technology department on the second floor. This facility is the main Police facility for the City Tempe housing multiple police divisions. The scope of the work involved existing mechanical system upgrades and extension of system, plumbing systems renovations, • Tempe Municipal District Central Cooling Plant: Mechanical Designer for the upgrade to the chilled water plant that serves the City of Tempe Police/Courts Building, Municipal Building, Tempe Arts Center, and Tempe 525 Building. Upgrades included replacement of existing chillers, pumps, cooling towers, controls, and piping. The primary goals of the project were to increase the redundancy, reliability and energy efficiency of the central plant. As the central plant served buildings with continuous operating schedules, piping and electrical provisions were made to allow temporary chillers to be set in place during construction. New cooling towers were craned in place on the roof and set on new supporting steel. The obsolete pneumatic controls were replaced with new DDC controls. Chillers were equipped with variable frequency drives to achieve higher efficiencies at part load conditions. The chiller refrigerant was switched from a CFC refrigerant to an HFC refrigerant. • Transportation Center: Mechanical Designer for the 40,000 SF, 3-story building which houses City offices, transportation control/command center, transit store, retail areas, bike valet, shower/locker spaces, multi-use leased office space and 2,000 SF community room. (LEED Platinum) Goodyear Operations Center, Goodyear, AZ: Mechanical Engineer for a new 5,000 SF Operations Center with planning for a future addition of approximately 5,000 SF. GSA San Luis ll U.S. Land Port of Entry: Mechanical Designer for a new 80 acre site with a 12,000 SF main building, 17,000 SF commercial inspection building, primary commercial inspection building with canopy, hazardous materials isolation area with canopy, mobile NII inspection, pedestrian control booths, export control, and commercial inspection booths. (LEED Gold) Human Services Nova Safe Haven: Nova Safe Haven is part of the Human Services Campus, which helps to shelter and feed the homeless in downtown Phoenix. The main purpose of Nova Safe Haven is to provide personal care services and house the homeless that suffer from mild forms of mental disability on a temporary basis. The building is approximately 13,000 SF and consists of two sleeping areas, each of which have their own private dayroom and exterior courtyard, one for male and the other for female occupants. Other primary spaces include intake and reception areas with drop-in dayrooms and an exterior courtyard for visitors. The building also includes toilet and shower facilities and has a small dining room with a full functioning commercial kitchen. Maricopa County • Nova Safe Haven: Mechanical Designer for a 13,000 SF addition to the existing facility which provides personal care services and house on a temporary basis for the homeless who suffer from mild forms of mental disability. The project includes two sleeping areas, each of which have their own private dayroom and exterior courtyards, one for male and one for female occupants. Other primary spaces within the building include intake and reception areas with drop-in dayrooms and an exterior courtyard for visitors who don't spend the night. The building also includes toilet and shower facilities and has a small dining room with a full functioning commercial kitchen. San Tan Regional Justice Courts: Mechanical Designer for a new 43,610 SF courts building including four courtrooms, judicial suites, hearing rooms, conference/mediation rooms, workstation, and secured parking and administrative LSW Engineers ARIZONA, INCORPORATED office space. Design included HVAC for package rooftop units, electric heat, and general plumbing. Maricopa Department of Transportation • Administration Building: Mechanical Engineer for the tenant improvement of an existing 1,200 SF office space at the 2901W. Durango building. • New River Site: Mechanical Engineer for a new 900 SF Storage building located at the New River site. HEALTHCARE Morristown Recovery Center: This project is the renovation of an existing 14,000 SF two- story building, an existing 3,000 SF single-story building and the addition of a new 11,000 SF single-story dormitory. JUSTICE Central Valley Juvenile Detention Center, San Bernardino, CA: Mechanical Designer for a new 232,000 SF, 1,000-bed jail on a 17-acre site. The housing units are located in one building with two stories and a mezzanine. The facility includes a two-story, 54,845 SF administration building and a 12,201 SF central plant and warehouse. CDCR R.J. Donovan Infill Facility, San Diego, CA: Mechanical Engineer for this new Level ll facility which includes three housing units that will provide 792 beds. Additional structures include a Facility Support Services building that will house healthcare services, laundry, canteen and dining areas; Program Support Services building for general visiting, religious programs, classrooms, library, indoor recreation, and administrative area; Family Visiting building, and a Warehouse. The project encompasses approximately 259,000 SF. Central Valley Juvenile Detention Center, San Bernardino, CA: Mechanical Designer for this new 144,068 SF juvenile detention facility consisting of three identical 80-bed housing units and one 40-bed unit. Within the housing units, each 40-bed pods include a dayroom, living quarters, shower/toilet, and classroom. Each unit has access to an independent outdoor activity area, and each individual housing unit contacts a separate multipurpose staff area. Support areas include administration, medical, receiving/warehouse, and a 5,200 SF full kitchen and staff dining. San Bernardino County Central County Juvenile Detention: Central Valley Juvenile Detention Center - MPE for a new juvenile detention center (280 beds). Components included three full housing pods and a half housing pod, as well as administration, medical, receiving/warehouse and kitchen building. MISSION CRITICAL (TELECOM / DATA CENTER) A Major Telecommunications Company • Phoenix Main: Mechanical Designer for Building B Smoke Control. • Mesa Two Internet Data Center: Mechanical Designer for a 80,000 SF remodel including a four megawatt, N+1 isolated-redundant UPS power plant; an N+1 redundant, six megawatt standby generation plant; a fully automatic smoke detection system with air-sampling smoke detection system; an N+1 redundant, 2,250-ton chilled water central plant; and raised-floor air distribution. Digital Realty Trust I 120 E. Van Buren Facility • Field investigation of the mechanical equipment for the power study. • Record drawings for the mechanical and plumbing equipment and systems. • Modifications of existing ductwork serving Cage 1100 in Suite 101 consist of extending the duct mains, adding additional branch duct and diffusers to deliver the cold air to the three new aisles. LSW Hngineers ARIZONA, INCORPORATED • Mechanical design for cooling for the enclosure of the 2,700 SF upper loading dock. • Removal of existing 5-ton water-source heat pump serving the lobby, security office and adjacent electrical room with 3 new units sized for each area. • Suite C115: Build-out of approximately 3,500 SF of shell space into office space for 10 private offices, a conference room and break room. • Suite C130B CRAH Unit Upgrade • Suite C130B • Suite 370 CRAC Unit Addition OTHER PROJECTS Assessments/Evaluations/Study Casa Grande Elementary School District I Villago Elementary School: Mechanical Designer for the HVAC energy analysis report and life cycle cost analysis for the new elementary school and existing adjacent Villago Middle School. In addition to utility company rebate calculations and supporting documentation for the installation of the new HVAC system selected for the new elementary school. Cox Communications: Mechanical Engineer for the study of the HVAC system currently serving the Game Room and four adjacent offices at the Deer Valley facility. A written report was prepared with several options for repair, along with the estimated probable construction costs. City of Surprise, Surprise, AZ: Mechanical Engineer for the energy use analysis and recommendations to reduce the energy used at the City of Surprise Public Safety Facility, Central Utility Plant, Techcelerator Campus, and Wastewater Treatment Plant. This analysis made recommendations for spending federal stimulus money to reduce the annual energy consumption and costs for the City facilities. Assisted Living/Senior Living Grandview Terrace Common Core Levels 1 & 2 Remodel: This project was a remodel of the first and second floor central commons area of the existing independent living senior center in Sun City West, Arizona. Royal Oaks Retirement Community, I Memory Care, Sun City, AZ: Mechanical Engineer for a new two-story, 52,030 SF Memory Care facility includes 56 resident rooms, general open community areas, two warming kitchens, office areas, public restrooms, utility room, two elevators, laundry areas and a 3,224 SF basement area. Sun Health Grandview Terrace: Mechanical Engineer for the relocation of the building entry and lobby by removing the existing resident units on two floors, removing the existing kitchen/dining facility to make a new kitchen/dining facility and fitness center at the current entry. New build-back area is 32,050 SF and renovation area is 29,700 SF. The project also includes a new elevator lobby/corridor and machine space added on each of the four floors. Commissioning Arrowhead Mercedes Benz Dealership: Mechanical Designer for the energy calculations and commissioning services for a 64,000 SF dealership. High Tech and Industrial Arizona Public Service, Phoenix, AZ • APS DVN1 Remodel: Plumbing Designer for the 80,000 SF remodel of the DVN1 (7) LSW Engineers ARIZONA, INCORPORATED facility. This project included a new customer care center, power generation and transmission control room, and a power distribution control room along with associate support spaces. The critical areas of the building were provided with an underfloor air distribution system utilizing rooftop mounted air handlers. The design of a new water-cooled chiller plant to support the DVN1 as well as the DVN2 building was also included. • DVC Building: Mechanical Engineer for the replacement of the existing DX VAV system serving the 3,500 SF office area within the building with a new variable refrigerant flow system. Waste Management Material Recycling Facility, Spokane, WA: Mechanical Engineer for a new 66,000 SF facility on a 10.25 -acre site. Hospitality Luhrs City Center I Residence Inn/Courtyard by Marriott, Phoenix, AZ: Mechanical Engineer for a new Residence Inn/Courtyard by Marriott consisting of approximately 240,000 SF. The main level through the fourth floor includes a two-story lobby, 10,000 SF of meeting space with a full service kitchen, fitness center, open air pool, and guest laundry. The fifth floor through the 19 floor includes approximately 315 tower hotel rooms. Three passenger elevators and one service elevator access all floors. Native American IHS Regional Youth Treatment Ctr-Pyramid Lake: Engineering service for a new 17,900 SF Treatment Center on the Pyramid Lake Indian Reservation in Wadsworth, NV Navajo Preparatory, Farmington, NM • Student/Academic Center: Mechanical Designer for a 26,000 SF Student/Academic Center consisting of classrooms, library, cafeteria/kitchen, and restrooms. (LE ED GOLD) • Fine Arts Building: Mechanical Designer for the 8,000 SF Fine Arts Building contains classrooms, computer/data room, and multi-media room. • Dormitory Building: Mechanical Designer for an 11,000 SF dormitory building comprising of 16 rooms for 32 students. Colorado River Indian Community: Mechanical Designer for an approximately 20,000 SF Head Start facility. The buildings contain 10 classrooms with restrooms, administration area, cooking kitchen, multi-purpose area, maintenance shop and general restrooms. Salt River Pima -Maricopa Indian Community • Temporary School: Mechanical Designer for a temporary school for pre-school and K-6 consisting of two new buildings, 28,000 SF each, to house classrooms, offices, dining area, and support areas. • Lehi Memorial Hall (Xalychidom Ychidom Piipaash Nyvaash): Mechanical Engineer for a new facility located at the Lehi Cemetery. The facility consists of a new 5,530 SF Main Hall building, an 8,120 SF Dining Hall, and a 7,072 SF canopy between the two buildings, and a 2,000 SF storage building. Tonto Apache Mazatzal Casino Bingo Hall: Mechanical Designer for the 10,500 SF remodel of the existing Casino/Bingo Entertainment Hall and support areas. Office Buildings Wells Fargo Bank • Gainey Center, Scottsdale, AZ: Project Manager for the 10,300 SF, second floor remodel of the Wells Fargo Bank including new offices, conference rooms, and breakrooms. Mechanical scope includes complete heating, cooling and ventilation LSW Hngineers ARIZONA, INCORPORATED load calculations, HVAC extension design and design of VAV AHU's. The plumbing system included selection and sizing of plumbing fixtures and water use calculations. Wells Fargo Plaza, Phoenix, AZ: Project Manager for the demolition of the 19th floor main floor area and ceiling for the installation of new offices, conference rooms, restrooms, break rooms and a new ceiling. The mechanical systems for this project includes complete heating, cooling and ventilation load calculations; extension of existing HVAC system; VAV design; back-up DX cooling system design, and restroom exhaust system design. The plumbing systems for this project includes the selection of plumbing fixtures and the sizing and routing of the associated domestic cold, hot water and the waste and vent piping for these fixtures. Rose Garden Branch: Project Manager for the first floor renovations consisting of 15,000 SF. The project includes new offices, conference room, training rooms, and a break room. The mechanical system includes design of HVAC extension, VAV AHU's and a split system DX cooling with piping and controls. 68th & Camelback Branch: Project Manager for an 8,000 SF renovation consisting of replacing the existing HVAC and design of split system DX heating and cooling unitary equipment and all associated ductwork, air distribution, refrigerant and condensate piping and controls; design of dedicated split system DX cooling in communication and ATM rooms including piping and controls, and design of restroom exhaust systems and all associated ductwork, exhaust inlets and controls. • Chandler Ocotillo Branch: Project Manager for a 9,000 SF renovation of the first floor consisting new office space, fitness center, and locker rooms. • Prescott/Miller Valley Branch: Project Manager for the upgrade to the HVAC systems on a 7,500 SF building including replacement of the mechanical equipment, ductwork, diffusers, and associate controls and power. Religious LDS Mesa Temple, Mesa, AZ Mechanical Designer for various mechanical systems modifications that included reducing air noise in the upper two rooms by increasing the supply grille size of the two sidewall supply registers and increasing the number of round ceiling supply grilles in the other room and exhaust to the elevator equipment room to the outdoors in order to put the room under negative pressure and prevent odors from spreading from the room. Mechanical Designer for the replacement of the central steam system with a hot water system and conversion of various steam system components. SPORTS Scottsdale Stadium Multi-Use Event Center Improvements Phase 1: Project Manager for various improvements to the Scottsdale Stadium, Technology Design includes site design; passive network cabling; buildout of the MER/Tr rooms; CATV Distribution; Intercommunication System; access control/security system; camera surveillance; distributed antenna system; and, broadcast and sound system throughout the stadium. Education: B.S. Aerospace Engineering, University of Arizona Registration: Arizona No. 33490 California No. 34795 Colorado No. 0048497 New Mexico No. 15773 Experience: With [SW: Since 2008 With Others: 13 years Professional Affiliations: American Society of Heating, Refrigeration and Air Conditioning Engineers (ASHRAE) Awards • 2017 ASHRAE Engineer of the Year Presentations • Guest speaker at Frank Lloyd Wright School of Architecture — Air Distribution and Acoustics • "Data Centers for Beginners" at ASHRAE's Central Arizona Chapter meeting, 02/2019 • "Critical Infrastructure Replacement Solutions" at the Southwest Buildings & Facilities Management Show & Conference, 02/2019 LSW Engineers ARIZONA, INCORPORATED Philip J. Mouw, PE, LEED AP Vice President / Mechanical Engineer Philip has extensive experience in heating, ventilation, and air conditioning (HVAC) systems design, clean room design, building automation system evaluation and design, computer simulation of HVAC systems, technical report writing, and life cycle cost analysis. He is knowledgeable in the operation and use of AutoCAD and has experience in the mechanical design of commercial and industrial facilities, telecommunications buildings, water/wastewater treatment facilities, medical facilities, education, hotels/ motels, and indoor pools. ASSESSMENTS/EVALUATIONS/STUDY City of Surprise, Surprise, AZ • Energy Use Analysis: Mechanical Engineer for the energy use analysis and recommendations to reduce the energy used at the City of Surprise Public Safety Facility, Central Utility Plant, Techcelerator Campus, and Wasterwater Treatment Plant. This analysis made recommendations for spending federal stimulus money to reduce the annual energy consumption and costs for the City facilities. • City of Surprise City Hall Complex, Surprise, AZ*: Mechanical Engineer for the 57,400 - SF Old City Hall complex. This assessment included an evaluation of the existing mechanical equipment and distribution systems as well as a life cycle cost analysis of three proposed replacement HVAC systems. City of Mesa District Cooling Plant: Mechanical Engineer for the district cooling system including an analysis of the connection methods of the existing buildings and guidelines for connecting new building to the system. Arizona Department of Environmental Quality Data Room, Phoenix, AZ*: Mechanical Engineer for the evaluation of the 1,900-SF data room. This assessment included a visual inspection of the existing mechanical systems and recommendations to improve the operation and efficiency of the room. AVIATION Phoenix Sky Harbor International Airport I Terminal 3 Modernization: Mechanical Engineer for the modernization of Terminal 3, which included expanded passenger screening and checkpoint areas, additional ticket counters, additional baggage claim carousels, improved passenger circulation on escalators and elevators, new and expanded food concessions and retail, and expanded curb for drop-off and pickup. A new south concourse was constructed to add nine additional gates to the terminal and a new 3,000-ton central plant ties into the existing central plant. Total finished project covers 726,000 SF of modernization. JUSTICE Arizona Department of Administration I Arizona State Prison Complex Florence - Cell Blocks 1, 3 & 4: Mechanical Project Manager for the replacement of eight evaporative coolers and two heating/cooling units. CDCR R.J. Donovan, San Diego, CA: Mechanical Engineer for a new level ll prison on an existing site with three housing units that provides 792 beds. Additional structures include a Facility Support Services building that houses healthcare services, laundry, kitchen and dining areas; Program Support Services building for general visiting, religious programs, classrooms, library, indoor recreation, and administrative area; Family Visiting building, and Warehouse. Also, part of this project is a central plant LSW Engineers ARIZONA, INCORPORATED with two 310-ton chillers, pumps and cooling towers. This project encompasses approximately 259,000 SF. GOVERNMENT Arizona Department of Administration • 1200-1275 W. Washington Central Plant Analysis and Upgrades: Project Manager for the upgrades to the existing central plant that includes replacing existing chillers, cooling tower, pumps, controls, refrigerant monitor system, and other accessories within the chiller plant. • ASET Data Center: Mechanical Engineer for the replacement of the cooling equipment in the basement of the building. • State Lottery Building: Project Manager for the replacement of the existing Halon fire extinguishing system in the data room with a new FM-200 including replacement of the fire detection and FM-200 control system. • Arizona Supreme Court I Central Plant Renovation: Mechanical Engineer for the replacement of the existing thermal storage chilled water central plant with a new efficient low temperature chiller plant including full redundancy in the HVAC system. • 1300 W. Washington Air Handler Replacement: This project is the replacement of the existing large air handling unit and three small handling units with new like-sized units. The new large air handler will have a fan array and the smaller air handlers will not be provided fan arrays due to their small size. • 1535 West Jefferson Boiler Replacement: This project is the replacement of the natural gas fired boiler, pot feeder, expansion tank and heating hot water pump at the Arizona State Department of Education Building at 1535 West Jefferson, Phoenix AZ. All of this equipment is located in the rooftop penthouse. EDUCATION — HIGHER ED Midwestern University, Downers Grove, IL Campus I Science Hall: Mechanical Engineer for a new 239,000-SF Science Research Lab / Classroom Bldg. The new building is a six-story, high-rise structure with an open parking garage at the first level, classroom rooms on the second level, and laboratory, classrooms and office spaces at the upper four levels. The laboratory spaces include a computerized testing lab, 25 wet labs, seven small wet labs, dental simulation facility and associated research lab, osteopathic manipulative medicine skills laboratory, multi-use teaching wet lab and teaching lab for 50, a large gross anatomy lab with 36 stations and three large labs for 'dry anatomy studies. The project also includes campus infrastructure improvements including the expansion of the central chilled water-cooling plant and re-piping of the campus underground chilled water distribution system. Northern Arizona University I Student and Academic Services Building, Flagstaff, AZ Mechanical Engineer for a new four-story, 94,000-SF classroom and office building with a roof-mounted mechanical penthouse. The first level includes offices, classrooms and 150-seat auditorium / lecture hall. The second level includes classrooms and an 8,300-SF open math center. The third level and fourth levels primarily include offices and conference rooms. REED Gold) EDUCATION — K-12 Kyrene School District, Tempe, AZ wn Call ) • Kyrene Middle School Central Plant Upgrades: Project Manager for upgrades to the central plant for Kyrene Middle School. The design included demolition to remove the two oldest indoor chillers, heat exchangers and other equipment and replacement of the building pumps, new controls and control sequences for the thermal storage LSW Engineers ARIZONA, INCORPORATED system. This project also included the replacement of the chilled water isolation valves and control valve at each fan coil in the buildings at the school. HIGH TECH AND INDUSTRIAL Agilent Technologies I Above Ground Storage Tank Additional Design; Colorado Springs, CO: Mechanical Project Manager for this 12,000-gallon above-ground storage tank, new fuel oil piping to connect the new tank to the existing generator belly tanks and the existing above-ground storage tank, and fuel oil control system modifications at the Powerhouse at Agilent Technologies' facility in Colorado Springs, CO. Polymicro Technologies I Anthem WTTP Phase 3 Plant Expansion, Phoenix, AZ*: Mechanical Engineer for the expansion of the wastewater treatment plant. The design included an odor control system for the expansion of the treatment basins. Cooling systems were provided for various electrical rooms and the process blower building. Knight Transportation Back -up Data Room, Phoenix, AZ: Mechanical Engineer for a 3,300 - SF data center tenant improvement at Knight Transportation's Corporate Headquarters. The mechanical system consisted of air-cooled CRAC units with refrigerant economizers. SRP West Valley Service Center Chiller Replacement, Phoenix, AZ*: Mechanical Engineer for the HVAC design for the replacement of two 270-ton chillers, refrigeration machinery room upgrades to achieve compliance with current code, and a control system upgrade for the central plant. This project also included commissioning of the new central plant equipment and control system. This project was completed with minimal interruption to the normal operation of the facility through construction phasing. SRP 27th Street Facility Chiller Replacement, Phoenix, AZ*: Mechanical Engineer for the design for the replacement of a 150-ton chiller and 300-ton cooling tower, refrigeration machinery room upgrades to achieve compliance with current code, and a control system upgrade for the central plant. This project also included commissioning of the new central plant equipment and control system. This project was completed with minimal interruption to the normal operation of the facility through the use of a temporary chiller. SRP Power Operations Building, Scottsdale, AZ* • Central Plant Controls Upgrades: Mechanical Engineer for upgrades to the HVAC control system at Salt River Project's Power Operations Building. This building has two, redundant chiller plants. A new control system was provided in each chiller plant to eliminate a single point of failure that could take down both plants. The new control systems control the equipment within each plant as well as monitor the other chiller plant for failure, to enable a seamless changeover from one plant to the other. New sequences of control were written to make use of redundant chilled water loops and redundant cooling towers and chillers. This project also included replacing pneumatically operated valves with new electric/electronic valves as well as commissioning of the new control system. • Building Expansion: Mechanical Engineer for a 25,000-SF expansion to the existing 58,000-SF Power Operations Building. This project included relocation of the Distribution Operations Center into the expansion as well as the installation of new chillers and a cooling tower in the existing dual, redundant chilled water central plants. Digital Realty 120 E. Van Buren Data Center, Phoenix, AZ* • Suite C100: Mechanical Engineer for an 11,000-SF data center, and a 2,000-SF electrical, UPS and battery room. The HVAC systems included water-cooled computer room air conditioning units, outside air systems, and a hydrogen exhaust system. • Suite 130: Mechanical Engineer for a 10,000-SF data center, a 2,000-SF electrical and LSW Engineers ARIZONA, INCORPORATED UPS room, a 500-SF remote located battery room, and 600-SF of office space. The HVAC systems included water-cooled computer room air conditioning units, outside air systems, and a hydrogen exhaust system. Toyota Data Center Cooling Loop Integration, Phoenix, AZ: Project Manager for the humidifier upgrades at Toyota's Data Center located in Digital Realty's 120EVB facility. This is a design-build project for the installation of four new Stultz ultrasonic humidifiers with two control cabinets and a new skid-mounted RO/DI water treatment plant. Nestle Alternate Data Center, Phoenix, AZ*: Mechanical Engineer for the addition of 99 tons of computer room air conditioning equipment in an existing office building to convert it from a light manufacturing space to an alternative data room facility. This has since become the primary data facility for Nestle, North America. Also included was the design of a special ventilation system for the UPS/Battery Room. Medtronic, Tempe, AZ* • Buildings #1 & #2 Remodel: Mechanical Engineer for the HVAC and process piping design for the complete renovation of 43,700 SF of floor space in Buildings #1 & #2 at the Medtronic facility. This includes approximately 30,000 SF of Class 100,000 clean room assembly space and 13,700 SF of office/support space. HOSPITALITY Luhrs City Center I Residence Inn/Courtyard by Marriott, Phoenix, AZ: Mechanical Engineer for a new Residence Inn/Courtyard by Marriott consisting of approximately 240,000 SF. The main level through the fourth floor includes a two-story lobby, 10,000 SF of meeting space with a full service kitchen, fitness center, open air pool, and guest laundry. The fifth floor through the 19 floor includes approximately 315 tower hotel rooms. Three passenger elevators and one service elevator access all floors. This project also included a central plant with three 325-ton chillers, pumps, cooling towers, and combined domestic hot water and heating hot water. MEDICAL Dignity Health Cooling Tower and Chiller Upgrades: Mechanical Project manager for the replacement of two existing roof-mounted cooling towers and two existing basement mounted chillers with new 375-ton chillers and towers as well as new chilled and condenser water pumps. The mechanical aspect of this project included other minor piping modifications in the roof and basement to accommodate the new equipment and mechanical system functional testing. HonorHealth Deer Valley Medical Center I Central Plant Upgrades, Phoenix, AZ Mechanical Engineer for the replacement generators (3MW), upgrades to the paralleling power system, distribution switchboard replacement and additions, mechanical systems were reconfigured to provide segregated power feeds. Construction work occurred without impacting hospital operation. HonorHealth John C. Lincoln Medical Center I Central Plant Replacement, Phoenix, AZ Electrical Revit modeler for the new/replacement central plant serving the existing 368,449-SF hospital. The plant is an N+1 design with (3) 600T Chillers/Towers, (2) 250HP boilers, (1) 1.5MW diesel and (1) 1.4MW Natural Gas parallel connected generators. Design includes provisions for additional equipment to supply a future six- story patient tower. LSW Engineers ARIZONA, INCORPORATED MISSION CRITICAL (TELECOM/DATA CENTER Agilent Technologies • CRAC Unit Addition: Mechanical Project Manager for the installation of the CRAC units marked future on the original Data Center construction documents. • Data Center, Colorado Springs, CO: Mechanical Engineer a 26,000-SF data center tenant improvement including 14,000 SF of raised floor white space. This project also included a 6,000-SF free-standing power house with external fuel storage system. The mechanical system consists of air-cooled CRAC units with refrigerant economizers. Arizona Public Services • DVA Building Remodel: Mechanical Project Manager for this remodel of the existing 60,000-SF building. All HVAC, plumbing, electrical and telecom systems were replaced. (DATA) • DVA Building Remodel - Value Engineering Redesign: Mechanical Project Manager for the value engineering redesign of this project. (DATA) • DVN1 Design Services: Mechanical Project Manager for this 80,000-SF renovation that included a new customer care center, power generation and transmission control room, and a power distribution control room along with associate support spaces. Design consisted of new Category 6 cabling to workstations, buildup of three IDF rooms, fiber optic and copper backbone cabling from central service points to each IDF room, and security/access control rough-in. The critical areas of the building were provided with an underfloor air distribution system utilizing rooftop mounted air handlers. The design of a new water-cooled chiller plant to support the DVN1 as well as the DVN2 building was also included. • DVN1 Building o Remodel: Mechanical Project Manager for this 80,000-SF remodel that included a new customer care center, power generation and transmission control room, and a power distribution control room along with associate support spaces. The critical areas of the building were provided with an underfloor air distribution system utilizing rooftop mounted air handlers. The design of a new water-cooled chiller plant to support the DVN1 as well as the DVN2 building was also included. o Secure Space: Mechanical Project Manager for the addition of two new consoles, six workstations and an expansion of the existing video wall in Secure Space 1, and the addition of eight training stations in the War Room. • DVN2 Building - Computer Room Buildout: Mechanical Engineer for the build-out of a 3,400-SF room to accommodate nine new rows of 12 computer cabinets. • DVN2 Building - Infrastructure Upgrades: Mechanical Engineer for the 65,000 -SF renovations which included approximately 28,000 SF of open and private office space, 8,200 SF of remodeled raised floor data center space, 3,000 SF of new raised floor for a Radio Room, Dennark Room and IDF/Telephone Room, a 3,600-SF Inserter Room, a 3,600-SF existing raised floor data room to remain as-is, and 18,600 SF of support spaces for the electrical and mechanical systems. • 502 - 2015 UPGRADES: Mechanical Project Manager for this project that replaced nine chilled water CRAH units with nine new dual DX and chilled water units to match the cooling capacity of the current units. This included new refrigerant piping between the indoor and outdoor units and the reuse of existing chilled water piping. The chilled water piping for the CRAH units serving the Microwave Room were revised such that they are connected to the West Chiller Plant by extending the existing chilled water piping in the Penthouse to the units. Existing condensate drain piping was also reused. Galvanized cold water piping serving the new CRAC was replaced. APS 502 Building - 2013 Upgrades: Mechanical Project Manager for the new CRAC units for new UPS room and sprinkler system modifications. APS 502 Building - Level 2 Remodel: Engineering services for an 10,800-SF remodel LSW Engineers ARIZONA, INCORPORATED that included a reconfiguration of an open office area. An existing office area and conference rooms were converted into four training rooms, a conference room and two larger huddle rooms. (DATA) 502 Building - 2012 Mechanical Upgrades: APS 502 Building Infrastructure Upgrade, Phases 1 and 2. Phase One included THE replacement of exiting fan coil units, VAV boxes and central air handling units including rezoning of problem areas. Phase Two included the complete renovations of two chiller plants including code upgrades, new chillers, pumps, controls, and piping. Both phases were completed while the building was occupied. The original portion of this building was constructed in the early 1900s and the final addition constructed in 1988. 502 Building: Mechanical Project Manager for the design services associated with this new 3,500-SF data room. Converting three separate raised floor areas and an existing office area into one new raised floor data room (approximately 3,500 s.f.). Demolish existing cafeteria and renovate to accommodate new office area, design a new electrical room and chiller room at existing parking area, design a new building automation system for the new chiller plant, design for a new electrical and UPS room. • Remove existing HaIon fire suppression system and replacing with a new dry pipe, pre- action fire suppression system design, new sump pumps. • Deer Valley - Operations Center: Mechanical Project Manager for Phase 1 programming/conceptual design. Mechanical and electrical design for approximately 80,000-SF Operations. Center that incorporated LEED Silver guidelines. • Garfield Substation Upgrades: This project was for the upgrades for the Control House and the GIS System Room. The mechanical scope included complete heating, cooling, and ventilation load calculations, design of packaged DX heating and cooling unitary equipment, and all associated ductwork, air distribution, condensate piping, and controls. (OFFICE) Central Arizona Water Conservation District - Headquarters Server Room and Multi- Purpose Room Conceptual Design Services: This conceptual design project called for the remodel of 10,000 SF of cafeteria, kitchen, and conference space into a new Multipurpose Conference Center to be used for board meetings. The existing Board Room was designed to be remodeled into 2,000 SF of data center space including new UPS room(s) for the consolidation of three different data rooms at the site. The three existing IT equipment rooms were designed into office spaces. Cox Deer Valley Data Center: Mechanical Engineer for the replacement of two existing chilled-water CRAH units with new dual cool CRAC units. The new units have chilled- water cooling coils and DX cooling coils for redundancy. City of Chandler, Chandler, AZ • Data Center: Mechanical Engineer for a 400-SF expansion of the existing 900-SF Data Center • Data Room Remodel: Mechanical Engineer for a 350-SF expansion of the existing 500- SF data center. City of Glendale I Public Safety Building Data Room CRAC Unit Replacement: This project included the replacement of two air-cooled CRAC units. The mechanical systems included two DX CRAC units with new rooftop condensers, refrigerant piping and condensate drain piping. LSW was the prime contract holder, responsible for mechanical, plumbing, and electrical engineering design and construction phase services. Digital Realty (DLR) 2055ETC Redevelopment Study: Redevelopment study for Digital Realty's 2055 East Technology Circle facility in Tempe, AZ to convey options for redevelopment and LSW Engineers ARIZONA, INCORPORATED pricing of this property. The study materials will include narratives as well as high-level color block plans and diagrams. Edward Jones Data Center Consolidation: Mechanical Project Manager for this MP project to convert 18,000 SF of existing data room space into new office space for the Edward Jones data center's Tempe facility. National Oilwell Varco Data Center, Goodyear, AZ: Mechanical Engineer for a 9,300 -SF corporate headquarters for National Oilwell Varco. The design included a secured yard and infrastructure for multiple containerized data centers. Pima County Data Center Upgrades, Tucson, AZ: Mechanical Engineer for an expansion of the 6,000-SF Pima County Data Center. The project included an extension of the existing chilled water system and upgrades to the existing ventilation and humidity control systems. GoDaddy.Com, Buckeye, AZ • New Server Room: Mechanical Engineer for a new 4,300-SF server room that includes three UPS and Battery Rooms. Mechanical scope includes complete heating, cooling and ventilation load calculations for the project area; design to extend the existing chilled water system to serve the areas of this project; design to extend the existing RO water system to serve the humidifiers in the new server room; design of new custom CRAH units for cooling; design of an evaporative humidifier system; design of a water source heat pump unity and all associated ductwork, air distribution, chilled water branch piping, condensate piping and controls for server room pressurization; design of a chilled-water air handling unit with economizer and all associated ductwork, air distribution, chilled water piping and controls for conditioning; design of a battery room exhaust system; coordination for a computational fluid dynamic CFD model for the new server room. • Renovations*: Mechanical Engineer for a new 4,300-SF server room, new UPS and Battery Rooms, 5,000-SF of general office area, and an expansion of the existing Central Plant including the addition of a new chiller, cooling tower and associated pumps. A CFD analysis of the airflow in the new Server Room was performed due to constraints imposed by the existing building conditions. Calculations to justify the expansion of the Central Plant and the chilled water storage system were also performed. Casino Arizona Data Room, Scottsdale, AZ: Mechanical Engineer for the HVAC and plumbing design for a new 2,000-SF raised floor data room and associated support rooms. LSW was the data room consultant for this project. This room was designed in conjunction with a larger TI that was done by others. The Data Room and UPS and Battery Rooms were provided with N+1, air-cooled, air-conditioning equipment. MUNICIPAL City of Mesa • Central Plant Upgrades, Mesa, AZ Mechanical Engineer for replacement of two 70-ton chiller tower and a new DDC system throughout the approximately 45,000 SF. City of Glendale, Glendale, AZ • City Hall HVAC Replacement and Equipment Management Cooler Replacement: The project had 2 phases: 1) The replacement of the HVAC equipment at the City Hall and Council Chambers complex, which involved the first through fourth floors in the City Hall Building (60,000 SF) and the adjacent Council Chambers Building (25,000 SF). 2) LSW Engineers ARIZONA, INCORPORATED The replacement of the seven roof-mounted evaporative cooler/heating units at the City of Glendale's Equipment Management Building at the City's Operations Facility in Glendale AZ. • Landfill: Mechanical Engineer for the new facilities at the City of Glendale Landfill. This project included the addition of an 850-SF scale house, 3,600-SF administrative building and a 3,600-SF vehicle maintenance facility. Unitary heat pumps were provided for the Scale House, Administrative Building, and the office areas in the Vehicle Maintenance facility. An evaporative cooling system was designed for the maintenance areas in the Vehicle Maintenance facility. Compressed air, engine coolant, 30W transmission oil, 50W transmission oil, engine oil, and hydraulic oil distribution systems were designed for the Vehicle Maintenance Building. The electrical design included lighting and general power distribution for all buildings. The technology and special systems design included passive network cabling, security system and surveillance security cameras. The total budget for this project was $1.4 million and a CMAR process was utilized. • Public Safety Building Data Room: Mechanical Engineer for the replacement of two air-cooled CRAC units mounted on the roof above the Data Room with a rooftop screen wall. The mechanical component includes two DX CRAC units with new rooftop condensers, refrigerant piping and condensate drain piping. City of Mesa I Communications Building Central Plant Upgrades: Mechanical Project Manager for the mechanical, plumbing and electrical upgrades to the central chilled water plant. Replacement of two 70-ton chiller towers. Provide a new DDC system throughout the approximately 45,000-SF building. City of Scottsdale Ion call ) • Paiute Neighborhood Center & Mayor's Office: Mechanical Engineer for the replacement of four split system A/C units. OFFICES Arizona Public Services • DVL Building Remodel: Mechanical Engineer of the entire building included a 15,000- SF remodel. Existing open office configuration were converted to a combination of classroom, conference, and open office layout. Mechanical systems included split system DX units to provide proper zone control to each space. Plumbing system includes design of new bathroom group and breakroom. • DVN2 Building Phase 2 Remodel: Mechanical Engineer for the remodel of an approximately 20,000-SF portion of the DVN facility consisting of new office space, conference rooms and a new restroom group • DVC Building Remodel: Mechanical Engineer for a remodel and infrastructure upgrades throughout the existing 23,000-SF building and light remodeling of approximately 12,000 SF, which included changing functions and arrangements within the shop type spaces including relocation of tools and equipment. • DVB 3 & 4 Remodel/Infrastructure Upgrade: Mechanical Engineer for the infrastructure upgrades throughout the approximately 44,070-SF building, of which 7,000 SF was remodeled for office use. Central Arizona Project, Phoenix, AZ • Server Room: Mechanical Engineer for the demolition of the existing board room, lobby and halls to convert the space into a 2,000-SF raised data center including new UPS rooms for the consolidation of three different data rooms at the site. The three existing IT equipment rooms were remodeled into office spaces and a new lobby. The new server room accommodates 50 enclosed cabinets and 10 two-post racks with a total room load of 130 kW. Five CRAC units were provided for N+1 redundancy and the existing emergency generator was replaced with a new 750KW generator and yard. • Multipurpose Room: Mechanical Engineer for the renovation of existing 12,000-SF LSW Engineers ARIZONA, INCORPORATED cafeteria, commercial kitchen, conference and training rooms into a new 14,000-SF Multipurpose Conference Center that will be used for board meetings. • ADA Improvements: Mechanical Engineer for the ADA upgrades including restrooms, ramps and automatic door opening at both Building 1 and Building 2. • Pumping Station Elevator Modernization: Mechanical Engineer in modernizing the elevator control equipment in five pumping stations throughout the state. Modernizations included replacing control cabinets and providing independent cooling for each machine room. • Fuel Island Upgrades: Project Manager for the design of a new unleaded fueling island and a new diesel-fueling island for CAP's fleet of vehicles. The project includes new site work, fuel storage, tanks, piping, dispensers, a fuel tracking system and canopy. CVS Caremark Data Center, Scottsdale, AZ • AHU Replacement: Mechanical Engineer to replace air handler units 3 and 7 and installation of new lighted handrails and lighting at the main entrance. • Chilled Water Loop: Mechanical Engineer for a new looped chilled water main around the existing data center including connection of the existing CRAH units to the new loop. Five of the existing CRAH units were replaced with new units and four of the removed units were relocated into in adjacent room and connected to the new chilled water loop and provided with power. • Chilled Water Piping: Mechanical Engineer for the installation of a new rooftop mounted chilled water piping loop to serve the existing building air handlers. Knight Transportation Corporate Headquarters, Phoenix, AZ • Corporate Headquarters Remodel: Mechanical Engineer for a remodel of the three building corporate headquarters campus. This project included the remodel of 51,000- SF of "C-level" and support staff offices, and 16,000 SF of tenant improvement and IT areas. • Building Kitchen Remodel: Mechanical Engineer for the remodel of the 1,800-SF commercial kitchen on the first floor. The work included new appliances and reconfiguration of the space. • Central Plant Upgrades: Mechanical and plumbing design for a new water-source heat pump central plant to support Knight Transportation's new corporate headquarters in Phoenix, Arizona. This project combined three existing central plants into one and included redundant fluid coolers, condenser water circulation pumps, boilers, and controls. *Project completed prior to joining LSW Older projects Arizona Department Of Administration Arizona State Prison Complex Eyman - Rynning Evaporative Coolers: MP&E engineering services for the design of the replacement of old and deteriorated evaporative cooling units serving the housing units. (2009009.001) OTHER APS AT UPTOWN PLAZA: This tenant improvement project was for a new 25,000-SF AJ's Fine Foods store at Uptown Plaza. Benchmark Electronics Tenant Improvement Phase I: Mechanical Project Manager for the modifications of an existing 3,600 SF ISO 8 (Class 100,000) cleanroom at the 3201 East Harbor Drive Facility to create a 6,000 SF ISO 7 (Class 10,000) cleanroom. Benchmark Electronics Tenant Improvement Phases II Through IV: Mechanical Project Manager for this design-build modification project consisting of 48,600 SF of LSW Engineers ARIZONA, INCORPORATED office space and 62,300 SF of production space. The improvements in the office area include removal of a work-out area and shower rooms to expand an existing break room as well as other minor improvements. The production area improvements include a 3,100-SF plating area, a 10,000-SF cleanroom and tool hook-up throughout the remaining areas. Phase II will consist of the plating area. This scope includes electrical hook-up for tools. Phase III will consist of a new 10,000-SF cleanroom. LSW will be responsible for providing cooling and power to the cleanroom as well as power and compressed air to the tools in the cleanroom. Phases IV, V and VI will consist of minor remodel work and tool hook-up in the remaining areas. Berger Bullets: Mechanical Project Manager for this new projectile manufacturing facility located in an existing building at Nammo Talley in Mesa, AZ. CAP HQ Fuel Island Upgrades: Mechanical Project Manager for the design of the fuel system replacement at Central Arizona Project's Headquarters facility in Phoenix AZ. It was the design of a new unleaded fueling island and a new diesel-fueling island for CAP's fleet of vehicles. This included site work, fuel storage tanks, piping, dispensers, a fuel tracking system and canopy. Casino Arizona Data Room: Mechanical Project Manager HVAC, plumbing and electrical for a 2,000 SF raised floor data room. New room will be provided with air cooled HVAC equipment and a dual redundant UPS system. DSSAZ Phase II: This project was a 20,000 SF Phase II extension of the Phase I building at Special Device's new inflator plant in Mesa, AZ. It included an extension of the Spine, a new restroom core and 18,000 SF of production area. Ergon Natural Gas Piping: Mechanical Project Manager for the design of a new natural gas pipeline for Ergon Asphalt & Emulsions in Chandler, AZ. This will be a design-build project. The project was the design of 700 linear feet of 4" natural gas piping that connects to an existing Crafco tank farm to a building in the Chandler A&E facility. The existing underground piping was abandoned in place while the new piping was routed above ground. OLD Chase Field Facility & System Assessment: Mechanical Project Manager for the engineering evaluation for mechanical and plumbing systems for the facility. (2009) Experience: With LSW: Since 1989 With Others: 6 years Professional Affiliations: • American Society of Heating, Refrigeration and Air Conditioning Engineers (ASHRAE) • American Society of Plumbing Engineers (ASPE) LSW Engineers ARIZONA, INCORPORATED Rick Patton Senior Mechanical Designer Rick has extensive experience in application, analysis, engineering design and field installation of most contemporary HVAC systems encompassing VAV, constant volume, heat pump, DX, chilled water and associated systems along with complete plumbing systems design. He has responsibility for project schematics through final design, equipment and systems sizing and selection for correctional, institutional, municipalities, commercial and corporate projects. ASSESSMENT/EVALUATION/STUDY City of Phoenix Cactus Park Police Precinct: Mechanical Designer for the programming for new space and assessment of the existing mechanical and plumbing systems, which included HVAC and exhaust systems, water and waste systems, and natural gas systems. Included in the assessment was a life cycle cost evaluation of the mechanical systems. AUDITORIUMS/THEATERS Estrella Community College Performing Arts, Avondale, AZ: Mechanical Designer for a new 24,895 SF performing arts building consisting of stage and seating between 300 and 350 people. Los Angeles Southwest College I Los Angeles, CA: Mechanical Designer for a recital hall, Black Box Theater, choral and music rehearsal rooms, two recording studios, digital film studio, student services, and faculty offices. CORRECTIONS Arizona State Prison Complex • 4000-Bed Minimum Security Prisons: o Cibola Unit: Mechanical Designer for the 1,000-bed minimum level custody male w/medium level fence, Yuma o La Paz Unit: Mechanical Designer for the 1,000-bed minimum level custody male w/medium level fence, Yuma o San Carlos Unit: Mechanical Designer for the 1,000-bed minimum level custody female, Perryville o Whetstone Unit: Mechanical Designer for the 1,000-bed minimum level custody male, Tucson • 1000 -Bed Minimum Security Prisons: o Catalina Unit: Mechanical Designer for the 300-bed low custody male, Tucson o Eggers Unit: Mechanical Designer for the 200-bed low custody male, Douglas o Piestawa Unit: Mechanical Designer for the 200-bed low custody female, Perryville o Santa Rosa Unit: Mechanical Designer for the 300-bed low custody male, Perryville • ASPC Florence Eyman SMU 1: Mechanical Designer for the replacement of 32 existing AHU's located on the roof of existing buildings. The project was completed in 16 phases so inmates could be relocated during construction. On a subsequent project, the final four existing air handlers were replaced. • ASPC Perryville: Plumbing Designer for the site gas re-pipe at Perryville Prison for the Santa Maria Unit, Lumbey Unit, Santa Cruz Unit and San Pedro Unit. LSW Engineers ARIZONA, INCORPORATED • ASPC Yuma Cheyenne Unit: Mechanical Designer for the systems and infrastructure to remediate damage done to the Laundry and Kitchen buildings from waterflow from the evaporative cooling units and resultant demolition by staff. CDCR R.J. Donovan lain Facility, San Diego, CA: Mechanical Designer for this new Level II facility which includes three housing units that will provide 792 beds. Additional structures include a Facility Support Services building that will house healthcare services, laundry, canteen and dining areas; Program Support Services building for general visiting, religious programs, classrooms, library, indoor recreation, and administrative area; Family Visiting building, and a Warehouse. The project encompasses approximately 259,000 SF. Central Valley Juvenile Detention Center, San Bernardino, CA: Mechanical Designer for this new 144,068 SF juvenile detention facility consisting of three identical 80-bed housing units and one 40-bed unit. Within the housing units, each 40-bed pods include a dayroom, living quarters, shower/toilet, and classroom. Each unit has access to an independent outdoor activity area, and each individual housing unit contacts a separate multipurpose staff areas. Support areas include administration, medical, receiving/warehouse, and a 5,200 SF full kitchen and staff dining. Clark County Detention Center, Las Vegas, NV: Mechanical Designer for this new 1,000 - bed detention center on a 17-acre site. The facility is approximately 232,000 SF and includes a two-story administration area, warehouse and central plant. The housing area is approximately 143,000 SF in one building with two floors and a mezzanine. Design includes planning for another future 1,000 beds. Catalina Mountain Juvenile Facility, Phoenix, AZ: Mechanical Designer for the chiller replacement. Adobe Mountain Juvenile Facility, Phoenix, AZ: Mechanical Designer for the replacement of AC units in miscellaneous areas in the facility. Areas include Business area, Warehouse, Visitation area, West Unit Kachina building, West Unit Voyager building, Health Unit, Separation Unit and Central Control. Maricopa County ITR and Jail Expansion: Mechanical Designer for a new single story, 153,600 SF building which will house a 512-bed, 72-hour Inmate Transfer and Release (ITR) facility, along with approximately 1,280-bed medium-security detention facility consisting of 320,000 SF. Oren R. Fox, Imperial County, CA: Mechanical Designer for a new 58,200 SF two-story, medium security adult detention facility which will house and provide treatment and program space for 270 male and female pretrial and sentence inmates. The housing units will consist of six two-tiered 45-bed dormitory style housing units with a double bunk configuration to house 270 inmates in approximately 22,300 SF. A second building consisting of 8,700 SF will be a video visitation center with vocational print shop located outside of the secure perimeter, but on the same site, to allow for public access. COUNTY/FEDERAL/STATE John M. Roll United States Courthouse, Yuma, AZ: Mechanical Designer for a new 57,000 SF building which includes two courtrooms, U.S. MarshaIls, holding cells, Clerk of Courts, pre-trial, and probation. Sustainable Measures included domestic solar hot water, solar photovoltaics, and high efficiency chillers. REED Silver) Maricopa County • Election Office: Mechanical Designer for the renovation and addition of six work stations at the election office lobby included replacing the existing air conditioning into the new space, and retain two circulation fans in the space, and redistribute air due to the partition additions. L Engineers ARIZONA, INCORPORATED Northwest Regional Justice Courts, Surprise, AZ: Mechanical Designer for a new 36,000 SF courts building. This facility contains courts, judicial suites, and administrative space. Mechanical design included HVAC design for an air-cooled chiller with VAV distribution and electric heat. General plumbing design was also included. • San Tan Regional Justice Courts, Chandler, AZ: Mechanical Designer for a new 43,610 SF courts building including four courtrooms, judicial suites, hearing rooms, conference/mediation rooms, workstation, and secured parking and administrative office space. Design included HVAC for package rooftop units and electric heat and general plumbing. • Southeast Regional Justice Center, Mesa, AZ: Mechanical Designer for a four -story, 235,000 SF courthouse facility which will house adult probation, sheriff's substation, four justice courts, three EDC/RCC Courts, general administrative offices, and maintenance area. Construction was put on hold due to funding. Naco Border Patrol Station, Naco, AZ: Mechanical Designer for a new 1,300 SF support facility that is attached to the 50 yard shooting range. The facility includes entry vestibule, classroom, armory, gun storage and cleaning space, range closet, range access, and range master office. EDUCATION (HIGHER ED) Midwestern University, Glendale, AZ Campus Student Services Building (Barrel 4): Mechanical Designer for a new 18,500 SF wood structure which includes offices, conference rooms, central restrooms, and breakroom. Veterinarian Clinic: Mechanical Designer for a new, three-story, approximately 110,000 SF clinic building including animal holding areas, exam rooms, treatment rooms, wards, surgery rooms, MRI room, CT scanner room, linear accelerator room, intensive care units, isolation rooms, and pharmacy area. The veterinary clinic provides services for dogs, cats, birds and small mammals. Veterinarian Classroom Building: Mechanical Designer for a new, 3-story, veterinary classroom building. The building contains classrooms and laboratory spaces and is approximately 75,000 SF. Large Animal Facility: Mechanical Designer for a new, 72,000 SF large animal facility that is part of the veterinary program. The large animal facility consists of several buildings and open structures that include BSL2 and BSL3 necropsy laboratory spaces, tissue storage, histopath laboratory, biohazard storage, teaching theater, chemical storage, feed storage, classrooms, bovine and equine housing areas and treatment rooms, pharmacy, locker rooms, offices, conference rooms, and other miscellaneous support spaces. Student Housing, Phase 5: Mechanical Designer for the four, 3-story apartment buildings that includes 30 units in each building. Mechanical design includes split- system, air-cooled heat pump systems, and exhaust systems for bathrooms and laundry. Plumbing systems include sewer, water and roof drainage, dedicated electric water heater for each unit, central water conditioning system for the water services and central water meter for each building. Parking Structure C: Mechanical Designer for a new 4-level parking structure that accommodates 800 parking spaces and contains approximately 342,000 SF of surface area. The structure is designed as an "open" parking garage with no sub grade level. Tenant Improvement Projects: o Foothills Science Center: Plumbing Designer for the addition of a dedicated domestic hot water heating system that serves the cage washer. The new hot water heating system consists of two gas-fired boilers mounted on the building roof within the existing screen wall enclosure. LSW Engineers ARIZONA, INCORPORATED o Agave Hall: Mechanical Designer for the remodel of an existing 3,500 classroom space for use of private offices, reception/waiting area, and new conference room. Mechanical scope included a new fan coil system with chilled water cooling and electric heating. o Glendale Hall Optometry Lab/Classroom: Mechanical Designer for the remodel of 950 SF of existing shell space for a new classroom/lab space for the optometry program. Mechanical scope included reusing the existing VAV and adding a new VAV terminal unit with electric heating. o Dental Clinic: Mechanical Designer for the first floor remodel consisting of 1,500 SF for the addition of two new dental surgery suites, new supply room, four x-ray rooms, new radiology room and waiting/reception area. Mechanical scope included modifications of the existing supply and exhaust air systems serving the surgery area and adding a new VAV terminal units with electric heating. Midwestern University, Downers Grove, I Campus • Optometry Classroom Building: Mechanical Designer for a new 3-story, 62,519 SF optometry classroom building which contains classrooms, offices, optometry laboratory spaces, and a 6,200 SF mechanical penthouse. • Maintenance Facility: Mechanical Designer for a new 11,600 SF, two-story maintenance facility. The building will contain equipment services bays, shop areas, storage areas, private offices, conference room, restrooms, break room and miscellaneous support areas. • Multispecialty Clinic Tenant Improvement o Mechanical Designer for a 25,000 SF tenant improvement on the fifth floor. The new space includes exam rooms, offices, conference rooms, group therapy rooms and x-ray room. o Mechanical Designer for a 32,000 SF tenant improvement of the fourth floor. The improved space includes exam rooms, conference room, offices, laser surgery room, vision therapy room, and various other support spaces. Embry Riddle Aeronautical University I Classroom & Laboratory Building: Mechanical Designer for a new 2-story, 45,000 SF Classroom and Laboratory Building. The laboratory spaces includes chemistry, biology and physics. Maricopa County Community College District • Rio Salado Communiversity: Mechanical Designer for a new two-story, 20,400 SF building consisting of media classrooms and a large expandable classroom with partitions. • Chandler-Gilbert Community College I Copper Hall, Williams Campus: Mechanical Designer for the 15,000 SF addition to Bluford Hall which is used for the Law Enforcement Training Academy, Fire Science and Emergency Science and Emergency Medical Technician programs, Electric Utility Technology and Energy Industry programs. The addition also includes a 150 SF IT room, equipment, lockers, changing rooms, laundry and storage for strength and conditioning. Los Angeles Southwest College I School of Career & Technical Education: Mechanical Designer for a new 53,655 SF facility which includes two science labs, general purpose classrooms, student services, and faculty offices. Arizona State University, Tempe, AZ • Palo Verde East and West Dormitories: Mechanical Designer for the remodel of toilet rooms in each dormitory room and remodel existing student lounges on each floor. EDUCATION (K-12) Tuba City School District I New K-5 Elementary School: Mechanical Designer for a 64,000 SF single story K-5 elementary school consisting of multiple classrooms, cafeteria, multipurpose room, library, administrative office and various other support systems. CD LSW Engineers ARIZONA, INCORPORATED Laveen School District I Paseo Point K-8 Elementary School, Phoenix, AZ: Mechanical Designer for a new 2-story, 93,000 SF elementary school which consists of multiple classrooms, cafeteria, multipurpose room, library, administrative offices and various other support spaces. Washington Elementary School District I Sunburst Elementary: Mechanical Designer for the renovations of the existing 62,500 SF school that includes demolition of an existing snack bar with replacement, and demolition of a modular building, remodel of the existing Facility Manager's office with additional storage areas, remodel of the administration office, workroom, nurse's office, and restrooms. Eleven existing restrooms require major finish upgrades, underground plumbing repair, exhaust fan replacement, and ADA upgrades. HOSPITALITY Luhrs City Center I Residence Inn/Courtyard by Marriott: Mechanical Designer for a new Residence Inn/Courtyard by Marriott consisting of approximately 240,000 SF. The main level through the 4th floor includes a two-story lobby, 10,000 SF of meeting space with a full service kitchen, fitness center, open-air pool, and guest laundry. The 5th floor through the 19th floor includes approximately 315 tower hotel rooms. All floors are accessed by three passenger elevators and one service elevator. MAINTENANCE FACILITIES City of Phoenix South Mountain Police Precinct: Mechanical Designer for a 4,600 SF shop space designed for the City of Phoenix Public Works Department to maintain their fleet. The building consists of a four bay shop space utilizing two vehicle lifts with a 10,000 lb. and 16,000 lb. capacity, a new/used oil delivery system, and chord reel management for oil, water, and compressed air delivery at each bay. The facility also includes tool storage, parts storage, flammable storage, tire storage, parts washing and office and break room space for employees. MUNICIPAL City of Tempe • Parking Garage Improvements: Mechanical Designer to provide HVAC shell design for the remaining 9,500 SF of tenant lease space and design for a restroom at both the first and second levels. • Parking Garage Yoga Studio: Mechanical Designer for a 2,500 SF yoga studio, including one private office, one exercise room, storage room and restrooms. City of Avondale Northwest Public Safety Facility: Mechanical Designer for the tenant improvement of shell spaces for the fire department at the existing public safety building. City of Scottsdale Fire Station 613: Mechanical Designer for a new 9,000 SF fire station located on a 10-acre site. The facility includes crew quarters and restroom, wellness- fitness area, day room, dining and kitchen area, offices and three apparatus bays. City of El Mirage Police Station: Mechanical Designer for a new 20,000 SF police station containing administrative offices, evidence processing and storage, cells for both juveniles and adults, a firing range with armory, K-9 facilities, public training and media rooms, locker rooms, and briefing rooms. Mechanical scope includes design for HVAC systems; plumbing design for restroom fixtures, drinking fountains, showers, and hose bibbs. City of Phoenix • Estrella Police Precinct: Mechanical Designer for a new 25,000 SF facility which includes offices for command, administrative staff and motoring officers; holding cells LSW Engineers ARIZONA, INCORPORATED for 8 adults and 2 juveniles; interview and monitoring rooms; public space for lobby, meeting room, restrooms, walk-up counter and a 30 person briefing room. • Mountain View Police Precinct: Mechanical Designer for a new 25,720 SF facility which houses offices, holding cells, mug shot and processing area, officer restrooms, lockers, break room, public spaces, restrooms, briefing room, three to four bay shooting range and storage areas. There is also an approximate 3,000 SF vehicle maintenance facility on site. • Black Mountain Police Precinct: Mechanical Designer for a new 25,884 SF police precinct contains nine holding cells, mug shot and processing area, interview and monitoring areas, officer restrooms, lockers, break room, public spaces and restrooms, briefing room, equipment and evidence storage, and three bay shooting range and storage. Town of Fountain Hills Fire Station No. 1: Mechanical Designer for a new 1,400 SF expansion and a 500 SF remodel. A new package rooftop AC unit was provided for the new space addition and exhaust fan for the new restroom. City of Glendale • Glendale Courts Building: Mechanical Designer for a new approximately 93,000 SF, 3- story building with a small below grade secure parking area. The facility will include 10 courtrooms with design for 4 future courtrooms, judges chambers, jury rooms, conference rooms, inmate holding area, and vehicle sally port. Construction was stopped due to funding. • Fire Department Office: Mechanical Designer for the tenant improvement consisting of 11,700 SF third floor office space for the Fire Department. Project included complete remodel of existing restroonn group, both men and women. Mechanical design included reconfiguring duct work for the new tenant improvement space and updating outside air system to meet current codes. NATIVE AMERICAN Ak-Chin Indian Community, AZ • Fire Station 561: Mechanical Designer a new approximately 21,000 SF fire station. The facility houses 12 full time staff and includes four apparatus bays; office areas for chief, captain, administration and IT; conference room; dorm rooms; fitness area; kitchen/dining; work room, and support areas. Also included is an Emergency Operations Center (EOC) that may double as a classroom for 30 to 50 people. • Multi -Purpose Justice Complex: Mechanical Designer for a new 54,000 SF multipurpose Justice Center which consists of an approximate 19,000 SF detention area, 10,500 SF police area, 12,000 SF court area, 8,000 SF firing range, outdoor storage and impound areas. Mechanical systems for HVAC and exhaust was provided for all occupied areas. Salt River Pima -Maricopa Indian Community, AZ • Detention Center: Mechanical Designer for a new 75,000 SF, 120-bed detention facility with design for future expansion for 200 additional beds. Project also included the evaluation of central plant expansion to add 25,000 SF of future office space. • Indian School Police/Fire Substation: Mechanical Designer for a new 21,340 SF police/fire Substation located on 3.2 acres. The police department includes prisoner holding and interview area, work spaces for patrol officers to file reports, store information and attend daily briefings. There is a training resource room for the officers; officer space for three patrol supervisors, two housing liaisons, two student resource officers, and two detective, and locker rooms. The fire department includes four apparatus bays, 12 bunk rooms, day room, training room, and locker/shower areas for men and women of the fire department. There is a shared exercise room for the fire and police departments. • Zone 2 Operations Building: Mechanical Designer for a new standalone 1,440 SF LSW Engineers ARIZONA, INCORPORATED zone 2 ground water treatment facility which includes an operator office with three workstations, storage/shop area, storage room, restrooms, and a 650 SF covered storage area. POWER PLANT Palo Verde Nuclear Generating Plant: Mechanical Designer for a new one story 26,000 SF building with approximately 6,000 SF of interior conditioned space. Mechanical scope included packaged ground mounted HVAC systems, exhaust system, distribution of ductwork and diffusers, heating and cooling load calculations for the 6,000 SF conditioned space. C_D Jeff Ruthstrom, P.E Mechanical Engineer / Executive Vice President Jeff Ruthstrom joined Pearson Engineering Associates, Inc. in 1995, bringing with him expertise in HVAC systems design, plumbing systems design and process piping systems design. This expertise has been applied to central plants; air-handling systems; domestic water systems; conventional and pumped drainage systems; and toxic, inert, medical, corrosive and pyrophoric gas systems. As a project engineer, Jeff manages a project from concept to completion in a straight-forward systematic manner. Incorporated into each project are the client's needs to be within budget, for the project delivered on time and have the best possible quality and maintenance of aesthetics to design. He is accomplished in JOC, design/build and fast-track deliveries. Jeff has been involved with major commercial high rise, industrial, healthcare, educational and military projects. EDUCATION: PROFESSIONAL REGISTRATIONS: • Bachelor of Science Mechanical Engineering Arizona State University, 1990 • Arizona (#31184) • California (#33996) • Nevada (#018428) • New Mexico (#018428) • South Carolina (#23193) • Tennessee (#113476) PROFESSIONAL CERTIFICATIONS: PROFESSIONAL AFFILIATIONS: • Certified in Plumbing Engineering • Certified Plumbing Designer • Certified Energy Manager • American Society of Plumbing Engineers • American Society of Heating, Refrigeration and Air Conditioning Engineers • Air Conditioning Contractors of Arizona YEARS OF EXPERIENCE: 29 Years VA A Jeff Ruthstrom, P.E Maricopa County Experience Durango Juvenile Courts HVAC Study, Phoenix, AZ • Jeff Ruthstrom provided an extensive site survey, analysis, and subsequent design for the remediation of the HVAC System in the East Wing (Area 2 and 3) of the Durango Juvenile Courts and Detention Facilities. Services included detailed Site Inspections of the existing installation necessary to develop sufficient understanding of the Building's limitations and requirements in order to develop solutions to the air flow and temperature control problems noted during the meeting with F.M.D. personnel. Maricopa County Sheriff's Office Training Center, Phoenix, AZ • Jeff Ruthstrom provided Mechanical Design for the installation of One (1) Water Heater Combustion Products Exhaust Fan to serve the Two (2) Water Heaters that provide Domestic Hot Water to the M.C.S.O. Training Center. Maricopa County - Water Storage Tank Replacement, Phoenix, AZ • Provide Plumbing Design to replace Two (2) existing Hot Water Storage / Heater Tanks. Maricopa County - Durango Complex Chilled Water Study, Phoenix, AZ • Jeff Ruthstrom provided analysis and a formal report on a recommended approach to extend the Durango Complex Chilled Water Distribution System to support the needs of the North portion of the Complex. Maricopa County - Emergency Management Building — HVAC Upgrade, Phoenix, AZ • Jeff provided Mechanical Design to upgrade the existing dated HVAC System. Services required an extended Site Survey to develop best alternative for the new System. Maricopa County - Evidence Drying Room, Phoenix, AZ • Jeff Ruthstrom provided Mechanical Design for modifications to the existing Evidence Drying Room. The Mechanical scope included the following: Removal of the existing Split System Air Conditioning System, removal of the the existing Filtration System from the Drying Room, design of a new Roof Top 100% Outside Air Air- Conditioning Unit, and design of a new HEPA Exhaust System. Maricopa County - Durango County Complex - Chilled Water Piping Extension, Phoenix, AZ • Jeff provided design for the extension of the Durango Site Chilled Water Piping Distribution to support the Northwest Quadrant including the 911 Services Building. Maricopa County - Durango Jail Boiler Replacement, Phoenix, AZ • Jeff provided design for the removal of Three (3) existing Steam Boilers serving Heating and Domestic Hot Water Loads and replace them with High Efficiency Gas Fired Heating Water Boilers. Maricopa County - Durango Jail Dishwasher Steam Modifications, Phoenix, AZ • Jeff provided Mechanical Design for the installation of a new High Pressure Steam Boiler to serve the existing Dishwasher at the Durango Jail Kitchen. Maricopa County - West Courts Data Room — Cooling Issue Review, Phoenix, AZ • Jeff provided Mechanical Consultation to assist in developing an effective strategy to provide additional cooling capacity to support the increases in Computer Equipment load. Maricopa County — Food Factory Boiler Room Ventilation Upgrade - Durango Site, Phoenix, AZ • Jeff Ruthstrom provided Analysis and Design for the Remediation of the Excessive Temperatures within the Boiler Room by utilizing Plumbing Modifications and Ventilation/Air Conditioning to moderate existing conditions. Maricopa County — Durango/Towers Jail Chilled Water Extension, Phoenix, AZ • Jeff provided Mechanical Design in coordination with the Civil Engineer to extend Site Chilled Water Services to Durango and Towers Jail and the Northeast Quadrant of Durango Complex. Maricopa County - Downtown Justice Center, Phoenix, AZ • Jeff provided Mechanical Design to renovate the existing Second Floor Open Office Space into Conference Rooms. Design included the addition of a dedicated Outside Air System, Supply Fan/Ductwork, Two (2) Chilled Water Fan Coils, Chilled Water Distribution from Risers located in the Air Handling Room, and air distribution. Maricopa County - Central Courts Plaza, Phoenix, AZ • Jeff provided Mechanical Design for the renovation of approximately 25,000 S.F of the existing Court Clerical Area. Maricopa County - Forensics Lab Washer/Dryer Installation, Phoenix, AZ • Jeff provided Mechanical Design for the installation of a new Washer/Dryer in the Special Procedures Admitting Room of the Maricopa County Forensics Lab. Maricopa County - Lower Buckeye Jail — Bakery Return Air Duct, Phoenix, AZ • Jeff provided Mechanical Design to extend the Return Duct from AH-11 to provide ducted return from the Bakery. Maricopa County - West Courts AH-1 Replacement, Phoenix, AZ + Jeff Ruthstrom provided Mechanical Design for the removal and replacement of Air Handling Unit AH-1 located in the Basement of West Courts. Design Documents included demolition of the existing Air Handling Unit and replacement of the Unit with a new 5-Zone Dual Deck Multi-Zone with Chilled Water Cooling and Hot Water Heating. In addition to the Design of the new Air Handling Unit, PEA coordinated the Direct Digital Control (DDC) System with Siemens. Maricopa County — Lower Buckeye Jail (LBJ) — Central Plant Commissioning, Phoenix, AZ • Jeff Ruthstrom provided Mechanical commission service for modifications to the previously designed LBJ Central Plant Expansion that included the installation of One (1) Cooling Tower and Two (2) 1,250 Ton Chillers along with the upgraded Hot Water and Steam Boilers. Maricopa County - 4th Avenue Jail — 4th Floor HVAC Upgrade, Phoenix, AZ • Jeff provided Mechanical design for upgrades to AHU-R1, R2, R3, R4 and for the removal of Eight (8) Exhaust/Relief Fans that exhaust the Hallways of SMU-1, 2, 3, & 4. Design also included additional Chilled Water to the AHU's. Maricopa County - Durango Jail — Chilled Water System Upgrade, Phoenix, AZ • Jeff provided Mechanical design for the sizing and selection of One (1) new Variable Speed Chilled Water Pump; sizing and selection of an associated Variable Frequency Drive (VFD); sizing By-Pass Valve(s) at the far end of the Chilled Water Distribution System to allow low flow operation of the Chilled Water Pump, and modification of existing Three-Way Valves to Two-Way. Maricopa County - 4th Avenue Jail — Office Addition, Phoenix, AZ • Jeff provided Mechanical Design for the new Dock Office space to include a dedicated Chilled Water Fan-Coil. Maricopa County - 4th Avenue Jail — APS Vault HVAC Upgrade, Phoenix, AZ • Jeff provided Mechanical Design for the replacement of the Fan-Coils that served the existing APS Utility Vault at the Maricopa County 4th Avenue Jail, Phoenix, Arizona. Maricopa County - Clerk of the Court — Central Court Partial Basement Remodel, Phoenix, AZ • Jeff Ruthstrom provided Mechanical Design for the remodel of 7,600 S.F of the existing Basement Area to facilitate the new Office Space for Procurement, Technology Systems and House Maintenance. Maricopa County — East Courts 1st Floor Lobby, Phoenix, AZ • Jeff provided Field Assistance for associated Shut-Downs of Mechanical Systems to allow Abatement of Ceiling Space of the 1st Floor Lobby. Maricopa County — East Courts 1 5t Floor Lobby - HVAC & Lighting Replacement, Phoenix, AZ e Jeff provided Mechanical Design for upgrade to the HVAC system at East Courts- 1st Floor Lobby. Maricopa County - Remote Sites — Phase 3, Various, AZ Jeff provided Mechanical design for Telecom Closets for the following Six (6) Buildings: 2201, 2801, 2805, 0904, 4805, and 6605. Maricopa County - 1st & 2nd Floors — East Courts Building PSD Tenant Improvement, Phoenix, AZ Jeff provided Mechanical Design for the remodel the existing Open Law Library into an Office Space. Maricopa County - OPS — 320 West Lincoln Tenant Improvement, Phoenix, AZ Jeff provided Mechanical and Plumbing Design Services for the Tenant Improvement of the Central Portion of the First Floor Print Shop Area. Maricopa County — West Mesa Justice Courts Building, Mesa, AZ * Jeff provided Mechanical Design for the installation of a new Heat Pump to provide Conditioned Air for the Public Entrance to the West Mesa Justice Courts. MC - Central Courts Renovation 12 & 13th Floors, Phoenix, AZ to Jeff provided Mechanical Design to support the Remodel of the 12th & 13th Floors at the Central Courts Building. VA Pearson Engineering Associates, Inc. 8825 N. 23rd Ave, Phoenix, AZ. 85021 (602) 264-0807 Firm Overview Pearson Engineering Associates, Inc. (PEA) is a dual discipline firm whose history has shown dedication to quality Mechanical and Electrical design in Phoenix since 1969. PEA has a solid reputation for sound engineering design and personal and appropriate attention to every project we undertake. Our reputation is endorsed by the substantial number of repeat clients that make up our client base. We have specialized experience in federal, state, and county government, municipal, commercial, retail, healthcare, industrial, education, residential, and high-tech facilities of all project scopes. In addition, PEA has experience in sustainable Green Building design (LEED) and has LEED Accredited and LEED Educated Professionals on staff. Our firm is well-known for incorporating in its projects the latest energy conservation techniques, systems and equipment. We adhere to high standards of quality and efficiency which encompass the use of energy-saving lamp/ballast combinations, air conditioning systems and controls. Our engineers take into account all pertinent factors, including aesthetics and the owner's operations, when selecting the most appropriate solutions to design problems. We employ only proven methods of reducing energy consumption ranging from the use of day lighting and EMCS to the intelligent location of equipment for minimum thermal exposure. Perhaps just as important, PEA is an exceptionally experienced Arizona engineering firm accomplished in the most comprehensive designs for a desert environment; we design as though we were paying the utility bills. All our projects are produced via CADD utilizing state-of-the-art AutoCAD systems to produce high quality, sophisticated construction documents for our clients. In addition, PEA is experienced in Building Information Modeling (BIM). We utilize the latest version of REVIT MEP. PEA carries Errors and Omissions insurance of Two Million Dollars. In its entire history, PEA is proud to note that we have never been involved with a bankruptcy, foreclosure, litigation, nor have we had any claims against our Errors and Omissions insurance. PEA also carries Comprehensive General Coverage of One Million Dollars. Pearson Engineering Associates, Inc. is one of the larger MPE consulting firms in Arizona. We have a professional staff of 26 with the personnel breakdown of: 6 Registered Mechanical Engineers, 8 Mechanical Designers / Draftsmen, 2 Registered Electrical Engineers, 7 Electrical Designers / Draftsmen and 3 Administrative/Management Support Staff. All projects undertaken by PEA are designed in our Office located at 8825 North 23rd Avenue, Suite 11, Phoenix, Arizona 85021. IMCOI Attachment 1 - REFERENCE FORMAT Maricopa County requires a minimum of three references and/or a maximum of five (most recently) completed projects, which are similar in magnitude, complexity, and dollar value to the proposal being submitted. This form may be replicated as needed to be responsive to the Request for Qualifications. 1. Company Name: Address: Phone Number: Facsimile Number: Maricopa County c/o Facilities Management Dept. 401 W. Jefferson St., Phoenix AZ 85003 (602) 372-2770 (602) 506-6835 Person to Contact: Ravinder Gannala, Capital Project Manager Contact Person's Email Address: Ravinder.Gunnala@FM.maricopa.gov Owner's Bid # or Project #: Serial #14085-10C Date of Completion: Effective 1/27/15 to Current (extended) Brief Project Description (including partnering team and owner's project name): HVAC Job Order Contractor — for various unitary change outs / equipment replacements and remodel projects at Maricopa County facilities 2. Company Name: Gordian — Arizona State JOC Address: 30 Patewood dr. Bldg. 2 Suite 350, Greenville, South Carolina 29615 Phone Number: (928) 750-9068 Facsimile Number: N/A Person to Contact: Mike Dziubla Contact Person's Email Address: nn.dziubla@gordian.com Owner's Bid # or Project #: ADSP017-174462 Date of Completion: Current (5-year contract) Brief Project Description (including partnering team and owner's project name): Arizona State JOC —performed various Chiller, Cooling Tower and other equipment replacement, HVAC renovations and improvements, engineering design build and design assist projects, provided value engineering, emergency services, plumbing and HVAC service and maintenance. IMCOR assisted with design and provided preliminary budgets based on scopes of work and existing conditions, as well as were contracted to subcontract engineers for design, and worked with the customer and engineer to develop the most reasonable cost-effective design and implementation. 3. Company Name: Address: Phone Number: Facsimile Number: Person to Contact: Medtronic Tempe Campus 2343 W. Medtronic Way, Tempe, AZ 85281 (480) 377-2367 (480) 921 -6450 Pierra Carlier, Sr. Facilities Engineer Contact Person's Email Address: pierre.carlier@medtronic.com Owner's Bid # or Project #: N/A — Ongoing/Various Date of Completion: N/A — Ongoing/Various Brief Project Description (including partnering team and owner's project name): Medtronic Microelectronics Tempe Campus - performed various Chiller, Cooling Tower and other equipment replacement, HVAC renovations and improvements, engineering design build and design assist projects, provided value engineering, emergency services, plumbing and HVAC service and maintenance. Page 1 of 2 imam 4. Company Name: Address: Phone Number: Facsimile Number: Person to Contact: Mayo Clinic Hospital 5777 E Mayo Blvd, Phoenix, AZ 85054 (480) 342-0812 N/A Mark Smith, Supv. of Facility Operations Contact Person's Email Address: snnith.mark@nnayo.edu Owner's Bid # or Project #: N/A — Ongoing/Various Date of Completion: August 2020 Brief Project Description (including partnering team and owner's project name): Mayo Clinic Hospital Service and Maintenance Contract — 2 years. Provide Emergency HVAC and Plumbing Services, hydro-jetting, snaking, leak repairs, backflow preventer assessment repairs replacement and certification, cast iron replacement, tenant improvements, and assist the customer with research of existing conditions for their engineers. 5. Company Name: Arizona Healthcare Cost Containment System (AHCCCS) Address: 701 E. Jefferson St., MD-5700, Phoenix, AZ 85034 Phone Number: 602-417-4379 Facsimile Number: 602-258-5943 Person to Contact: Reedy Barfield Ill, Facilities Administrator Contact Person's Email Address: Reedy.Barfield@azahcccs.gov Owner's Bid # or Project #: We have performed a myriad of projects over the last four years Date of Completion: Various. We provide clear expectations with defined time frames to finish the work. Brief Project Description (including partnering team and owner's project name): AHCCCS PM Agreement - HVAC Service and maintenance for Boilers, Liebert systems, Water Source Heat pumps, Cooling Tower, VFD's, pumps, Evaporative coolers, and Split systems. We perform a multitude of projects; VFD change outs, split system installs, WSHP installs, Plumbing emergency work, and much more. Page 2 of 2 Attachment 2- LEGAL WORKER CERTIFICATION October 31, 2019 (Date) Maricopa County Office of Procurement Services 160 S. 4th Avenue Phoenix, Arizona 85003 As required by A.R.S. § 41-4401, Maricopa County (the "County") is prohibited, after September 30, 2008, from awarding a contract to any contractor who fails, or whose subcontractors fail, to comply with A.R.S. § 23-214-A. The undersigned entity warrants that it complies fully with all Federal immigration laws and regulations that relate to its employees, that it shall verify, through the E-Verify program as jointly administered by the U.S. Department of Homeland Security and the Social Security Administration or any of its successor programs, the employment eligibility of each employee hired after December 31, 2007, and that it shall require its subcontractors and sub- subcontractors to provide the same warranties to the below entity. The undersigned acknowledges that a breach of this warranty by the below entity or by any subcontractor or sub- subcontractor under any contract resulting from this solicitation shall be deemed a material breach of the contract, and is grounds for penalties, including termination of the contract, by the County. The County retains the right to inspect the records of the below entity, subcontractor and sub-subcontractor employee who performs work under the contract, and to conduct random verification through E-Verify of employment records of the below entity and any subcontractor and sub-subcontractor who works on the contract, to ensure that the below entity and each subcontractor and sub- subcontractor is complying with the warranties set forth above. Interstate Mechanical Corp. (Firm) Robert M. Karber (Print Name) Principal (Signature Required) bob.karber@imcor—az.com (Email Address) 1841 E. Washington Street (Address Line I) Phoenix, AZ 85034-1230 (Address Line 2) ( 602 ) 257-1319 (Phone) ( 602 ) 254-2945 (Fax) 8 6 — 0 4 4 8232 (Federal Taxpayer ID Number) Request For Qualifications 20019-JOC I-1VAC Job Order Contractor Pg. # 22 Interstate Mechanical Corporation Principal Seal By: r3 6'6./10)62, Pal NJCIP/IL-, - Hartford Accident and Indemnity Company SURETY BOND ARIZONA STATUTORY BID BOND FOR CONSTRUCTION PURSUANT TO TITLES 28, 34, AND 41, ARIZONA REVISED STATUTES (Penalty of this bond must not be less than 10 percent of the bid amount) KNOW ALL MEN BY THESE PRESENTS: That weInterstate Mechanical Corporation as Principal, (hereinafter called the Principal), and the _ Hartford Accident and Indemnity, Company a corporation duly organized under the laws of the State of Connecticut , as Surety, (hereinafter called the Surety), are held and firmly bound unto Maricopa County (hereinafter called the Obligee), in the sum of One Hundred Thousand & 00/100 which is 10 percent of the estimated Obligee's project budget for the first year of construction, submitted by him to the Obligee, for the work described below, for the payment of which sum, well and truly to be made, the said Principal and the said Surety, bind themselves, their heirs, executors, and administrators, successors and assigns, jointly and severally, firmly by these presents, and in conformance with the A.R.S. WHEREAS, the said Principal is herewith submitting its Bid for HVAC Job Order Contractor, Serial # 200019-JOC. NOW, THEREFORE, if the Obligee shall accept the Bid of the Principal and the Principal shall enter into a contract with the Obligee in accordance with the terms of the Bid and give the Bonds and Certificates of Insurance as specified in the Standard Specifications with good and sufficient Surety for the faithful performance of the contract and for the prompt payment of labor and material furnished in the prosecution of the contract, or in the event of the failure of the Principal to enter into the contract and give such Bonds and Certificates of Insurance, if the Principal pays to the Obligee the difference not to exceed the penalty of the bond between the amount specified in the Bid and such larger amount for which the Obligee may in good faith contract with another party to perform the work covered by the Bid then this obligation is void. Otherwise it remains in full force and effect, provided however, that this bond is executed pursuant to the provisions of Section 34-201, A.R.S., and all liabilities on this bond shall be determined in accordance with the provisions of the section to the extent as if it were copied at length herein. Signed and sealed this 31st day of October , 20j. . Minard-Ames Insurance Services LLC Agent of Record, State of Arizona 4646 E. Van Buren #200 Phoenix AZ 85008 Agent Address Surety Seal Bond Number n/a By:q/10,t -6 V' Lori L. Dawson-Brown, Attorney-in-Fact Power of Attorney Seal 1\\ Request For Qualifications 20019-JOC HVAC Job Order Contractor Pg. # 26 POWER OF ATTORNEY Direct Inquiries/Claims to: THE HARTFORD BOND, T-12 One Hartford Plaza Hartford, Connecticut 06155 Bond.Claimsathehartford.com call. 888-266-3488 or fax: 860-757-5835 KNOW ALL PERSONS BY THESE PRESENTS THAT: Agency Name: MINARD -AMES INSURANCE SERVICES LLC Agency Code: 59-300536 X Hartford Fire Insurance Company, a corporation duly organized under the laws of the State of Connecticut X Hartford Casualty Insurance Company, a corporation duly organized under the laws of the State of Indiana X Hartford Accident and Indemnity Company, a corporation duly organized under the laws of the State of Connecticut Hartford Underwriters Insurance Company, a corporation duly organized under the laws of the State of Connecticut Twin City Fire Insurance Company, a corporation duly organized under the laws of the State of Indiana Hartford Insurance Company of Illinois, a corporation duly organized under the laws of the State of Illinois Hartford Insurance Company of the Midwest, a corporation duly organized under the laws of the State of Indiana Hartford insurance Company of the Southeast, a corporation duly organized under the laws of the State of Florida having their home office in Hartford, Connecticut, (hereinafter collectively referred to as the "Companies) do hereby make, constitute and appoint, up to the amount of Unlimited : Deborah K. Anderson, Wendy Capirci, Lori L. Dawson-Brown, Michael D. Specht, Cliff Spickler of PHOENIX, Arizona their true and lawful Attorney(s)-in-Fact, each in their separate capacity if more than one is named above, to sign its name as surety(les) only as delineated above by N, and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. In Witness Whereof, and as authorized by a Resolution of the Board of Directors of the Companies on May 6, 2015 the Companies have caused these presents to be signed by its Senior Vice President and its corporate seals to be hereto affixed, duly attested by its Assistant Secretary. Further, pursuant to Resolution of the Board of Directors of the Companies, the Companies hereby unambiguously affirm that they are and will be bound by any mechanically applied signatures applied to this Power of Attorney. John Gray, Assistant Secretary ) STATE OF CONNECTICUT On this 5th day of January, 2018, before me personally came M. Ross Fisher, to me known, who being by me duly sworn, did depose and say: that he resides in the County of Hartford, State of Connecticut; that he is the Senior Vice President of the Companies, the corporations described in and which executed the above instrument; that he knows the seals of the said corporations; that the seals affixed to the said instrument are such corporate seals; that they were so affixed by authority of the Boards of Directors of said corporations and that he signed his name thereto by like authority. Kathleen T. Maynard Nottuy Public My Commission Expires July 31, 2021 -- '111 I, the undersigned, Assistant Vice President of the Companies, DO HEREBY CERTIFY that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies, which is still in full force effective as of October 31, 2019 Signed and sealed at the City of Hartford. i/Wd."4-6, 77'1,.0 1 1A1k , Kevin Heckman, Assistant Vice Pfesident'". SS. Hartford COUNTY OF HARTFORD POA 2018 Attachment 4— NON-COLLUSION AFFIDAVIT STATE OF ARIZONA )ss. COUNTY OF MARICOPA Robert M. Karber being first duly sworn, deposes and says: Thatheis Principal ofinterstate Mechanical Corporation (IMCOR) (Title) (Name of Business) bidding on 200019-JOC for the construction of HVAC Job Order Contractor in the County of Maricopa, State of Arizona. That, in connection with the above-mentioned project, neither he, nor anyone associated with the aforesaid business, has, directly or indirectly, participated in any collusion, entered into any contract, combination, conspiracy or other act in restraint of trade or commerce in violation of the provisions of A.R.S. § 34-251, Article 4, as amended. (Signature of Affian St Subscribed and sworn to before me this 31 s day of Oct. 20 19 My Commission Expires: June 23, 2023 (Notary Public) Request For Qualifications 20019-JOC HVAC Job Order Contractor Pg. # 27