CPA2021010 BOS REPORT.PDF

Maricopa County — Formal (2021-12-08)

View PDF Item 7 Meeting page

Extracted text (via pymupdf) 90335 characters
December 8, 2021 
CPA2021010 
Page 1 of 2 
Report to the Board of Supervisors 
Prepared by the Maricopa County Planning and Development Department 
 
 
 
Board Hearing Date: 
December 8, 2021 
 
Case #/Title:   
 
 
CPA2021010 – Yellow Bell Solar 
 
Supervisor District: 
5 
 
Applicant:  
RWE Solar Development, LLC 
 
Owner: 
Arizona State Land Department 
 
Request: 
Major Comprehensive Plan Amendment to change the land 
use designations in the State Route 85 Corridor Area Plan from 
Large Lot Residential and Community Retail Center to Utilities. 
CPA case approval is by Resolution, attached. 
 
Site Location: 
Generally located west of State Route 85, east of the 299th 
Ave. road alignment, north of Watermelon Rd., and south of 
the Sisson Rd. alignment in the Gila Bend area. 
 
Site Size: 
Approx. 941 acres 
 
County Island Status: 
No 
Additional 
Comments: 
The 
applicant 
seeks 
a 
Major 
Comprehensive 
Plan 
Amendment to change the land use designation in the 
Comprehensive Plan to Utilities in order to develop a solar 
installation. The subject site is identified as having Large Lot 
Residential and Community Retail land use designations in 
the State Route 85 Corridor Area Plan. Staff received two (2) 
letters from other jurisdictions (City of Buckeye and Apache 
Junction) expressing no concerns.  AZ Dept. of Game & Fish 
and AZSHPO commented on the as well.  These comments 
will be considered during a future zone change request.  Luke 
Air Force Base (LAFB) provided comments after the staff 
report was written, see attached memo with their concerns 
and staff’s comments. Although some of the Commissioners 
raised discussion with these late LAFB comments, staff notes 
that these concerns are not related to the CPA application 
for land use. LAFB would be routed any future zone change 
application material and would then be able to review and 
analyze aspects of the site including design considerations 
and provide additional comments if necessary.

December 8, 2021 
CPA2021010 
Page 2 of 2 
 
Commission  
 
Recommendation: 
On 11/4/21, the Commission voted 4-3 to recommend 
approval of CPA2021010 subject to conditions ‘a’ – ‘d’: 
  
a. 
Development and use of the site shall be in general conformance with the 
narrative report entitled “Yellow Bell Solar Project” consisting of 24 pages, dated 
stamped received on September 30, 2021, except as modified by the following 
conditions.  
 
b. 
Development and use of the site shall be in conformance with the land use exhibit 
entitled “Yellow Bell Solar” consisting of 2 pages, dated stamped received on 
September 30, 2021, except as modified by the following conditions. 
 
c. 
The land use designation of utilities approved as part of case CPA20210010 shall 
be subject to the time limits set forth in the subsequent zone change. 
  
d. 
The applicant is proposing to develop a photovoltaic solar electric generating 
facility which, pursuant to the Maricopa County Comprehensive Plan, 
necessitates a change in the land use designation from Large Lot Residential and 
Community Retail to Utilities. The proposal by the applicant represents a 
comprehensive approach to the subject property and will allow the applicant to 
pursue the proper entitlements pursuant to state law so that they can lawfully 
operate in unincorporated Maricopa County. This particular proposal is an 
appropriate plan for the property and is consistent with the overall intention of the 
comprehensive plan. However, in the event that the zone change or a zone 
change phase for this particular proposal is not approved by Maricopa County 
Board of Supervisors (BOS) within five (5) years from the date of Board approval of 
this comprehensive plan amendment, this amendment shall no longer be 
effective as the planning justification for this comprehensive plan amendment will 
no longer be present. In such instance, a change of the land use designation from 
Utilities to Large Lot Residential and Community Retail will occur, and all 
comprehensive plan land use maps shall be altered to reflect as such, because 
this represents superior long-range planning by Maricopa County.  
 
Presented by: 
 
Ray Banker, Senior Planner 
Reviewed by: 
 
Darren Gerard, AICP, Planning Manager   
 
Attachments: 
 
11/4/21 P&Z Packet (50 pages) 
 
 
11/4/21 P&Z Handout Memo (3 pages) 
 
 
CPA2021010 Resolution (2 pages) 
 
 
Note: 
11/4/21 Draft P&Z Minutes are not available as of the writing of this report, but can 
be provided upon request later when available.

CPA2021010 
Page 1 of 10 
Report to the Planning and Zoning Commission 
Prepared by the Maricopa County Planning and Development Department 
 
 
 
Case: 
CPA2021010 – Yellow Bell Solar  
 
Hearing Date: 
November 4, 2021 
 
Supervisor District: 
5 
 
  
 
Applicant: 
RWE Solar Development, LLC 
 
Owner: 
Arizona State Land Department 
   
Request: 
Major Comprehensive Plan Amendment to change the land use 
designations in the State Route 85 Corridor Area Plan from Large Lot 
Residential and Community Retail Center to Utilities. 
 
  
 
Site Location: 
Generally located west of State Route 85, east of the 299th Ave. 
road alignment, north of Watermelon Rd., and south of the Sisson Rd. 
alignment in the Gila Bend area. 
 
  
Site Size: 
Approx. 941 acres 
 
Density: 
N/A 
 
County Island:  
No 
 
 
County Plans: 
State Route 85 Area Plan – Large Lot Residential (1 – 2 d.u./ac.) and 
Community Retail Center 
 
Municipal Plan: 
Town of Gila Bend – Medium Density Residential (5 – 10 d.u./ac.) and 
Industrial Business Park 
 
Municipal Comments: 
Two (2) letters – Apache Junction and Buckeye - No concerns 
 
Support/Opposition: 
None received 
 
Recommendation: 
Approve with conditions

CPA2021010 
Page 2 of 10 
Project Summary: 
 
1. 
RWE Solar Development, LLC is requesting a Major Comprehensive Plan Amendment 
(CPA) to change the land use designation in the State Route 85 Area Plan from Large Lot 
Residential (1 – 2 d.u./ac.) and Community Retail Center to Utilities. Such a change could 
allow development of a future utility-scale solar photovoltaic (PV) with battery storage 
power plant, including possible accessory uses, generating approximately 200 
megawatts (MWs) of electricity. The applicant will subsequently be required to obtain a 
Zone Change with Overlay (including a precise Plan of Development) to IND-2 IUPD as 
part of the entitlement process within five (5) years (on a phase or for the entirety of the 
development. 
 
2. 
The site is comprised of 941 acres of State Trust Land within the Rural-190 and Rural-43 
zoning districts. The entire project consists of 1,787 acres; however, 846 acres are within 
the Town of Gila Bend’s jurisdiction. The site also surrounds BLM land (approx. 40 acres) 
with a future land use designation of Transition Area/Proposed Open Space within the 
State Route 85 Area Plan. This area is not included with the subject request. The project is 
located north of I-8 and just west of State Route 85.  
 
3. 
Nearly all land used for solar energy projects are developed for the large fields of solar 
collectors that capture the energy through photovoltaic technology. The subject site is 
relatively flat and allows for the development of solar energy with little or no additional 
grading. The site is currently vacant, but the general area contains significant local utility 
infrastructure including a gas-fired electrical generating facility (Gila River Power Station), 
other industrial-scale PV solar facilities, electrical transmission lines and substation (APS 
Panda Substation). The applicant mentions that the future development would connect 
to the APS Panda Substation or a Salt River Project/Tucson Electric Power. Other adjacent 
land uses include vacant, agricultural and very limited rural residential uses.  
 
4. 
The narrative asserts that the proposed development meets the Comprehensive Plan 
Amendment criteria in the following manner:  
 
Whether the amendment constitutes an overall improvement to the Comprehensive Plan 
and is not solely for the good or benefit of a particular landowner or owners at a particular 
point in time.  
 
The narrative states that the Yellow Bell Solar Project is within an area that includes large, 
flat areas with a lack of sensitive biological resources as well as compatibility with nearby 
uses and a growing infrastructure for energy. There are limited areas where utility 
infrastructure, flat land, and being in a state where direct sunlight is available, make solar 
at this location a viable option.  The project would generate additional employment 
opportunities for the region as well.  
 
Whether the amendment will adversely impact all or a portion of the planning area.  
 
A. 
Altering acceptable land use patterns to the detriment of the plan  
 
According to the narrative, the amendment will not alter any surrounding land 
uses or land use patterns.  This site would be consistent with the other adjacent

CPA2021010 
Page 3 of 10 
and nearby energy and utility uses including existing generation sites, transmission 
lines, and other solar projects in the vicinity of the project. 
 
B. 
Requiring public expenditures for larger or more expensive infrastructure 
 
The narrative mentions that the project would not require additional public 
infrastructure, and it would use existing electrical infrastructure, such as the APS 
Panda Substation. 
 
C. 
Requiring public improvements to roads, sewer, or water systems that are needed 
to support the planned land uses 
 
The narrative states that the project would not require public improvements to 
roads, sewer or water systems to support the proposed solar development. Water 
is expected to be hauled to the site during construction and operation or 
obtained from new or existing wells on-site. Otherwise, any proposed road 
construction needed to access the project would be constructed and paid for by 
the developer/owner.  
 
D. 
Adversely impacting planned uses because of increased traffic  
 
The narrative indicates there would be minimal increased traffic during the 
construction 
and 
implementation 
period, 
due 
to 
the 
delivery 
of 
equipment/supplies and the commuting of the construction workforce. However, 
there would be no significant increases in traffic during the operation and 
maintenance of the project. 
 
E. 
Affecting the livability of the area or health or safety of present and future residents  
 
There are not many residents in the area around the subject site and the project 
would not create any adverse effects on the livability of the area or health and 
safety of present and future residents. The solar facility would not use or store 
hazardous materials, generate substantial emissions, or have other potential 
negative effects on health and safety. Fugitive dust emissions would likely be 
reduced. 
 
F. 
Adversely impacting the natural environment or scenic quality of the area in 
contradiction to the plan  
 
The applicant states that the project will not significantly impact the natural 
environment or overall scenic quality of the area.  The project is located adjacent 
to the highly traveled I-8, and travelers would likely be able to see the solar facility 
from this route. However, staff notes that screening will be required in certain areas 
and would be discussed for possible additional requirements during the future 
zoning and POD reviews. This could also impact the enclosed BLM site for open 
space. The applicant has indicated that they will maintain access to the BLM site.  
 
The narrative also states that environmental surveys are in the process or have 
been completed. RWE will continue coordinate with state and federal entities as 
needed to identify project design considerations that would avoid, minimize,

CPA2021010 
Page 4 of 10 
and/or mitigate impacts to the natural environmental resources. No federal listed 
species or designated wildlife corridors are present in the project area; however, 
migratory birds and plants protected under the Arizona Native Plant Law are 
expected to be present in the study area. 
 
Whether the amendment is consistent with the overall intent of the Comprehensive Plan. 
 
The project would adhere to the goals, objectives, and policies of the State Route 85 
Area Plan and is consistent with the Vision 2030 Comprehensive Plan,  
 
The extent to which the amendment is consistent with the specific goals and policies 
contained within the plans. 
 
The applicant’s narrative contains a substantial list of Goals and Policies from the Vision 
2030 Maricopa County Comprehensive Plan and State Route 85 Area Plan. This staff 
report identifies which Goals and Policies the applicant’s narrative addressed. 
 
Vision 2030 Maricopa County Comprehensive Plan 
 
Land Use Element – Goal 1, Policy 2, Policy 10, Policy 15, Policy 22, Policy 33 
 
Transportation Element – Policy 1 
 
Environment Element – Policy 2, Policy 3, Policy 4, Policy 7 
 
Economic Growth Element – Goal 1, Policy 10 
 
Open Space Element – Goal 1  
 
Water Resources Element – Goal 5 
 
Energy Element – Goal 2, Goal 6, Goal 7 
 
Cost of Development Element – Goal 2 
 
State Route 85 Area Plan 
 
Land Use Element – Goal L1, Objective L2.1 
 
Transportation Element – Objective T1.2 
 
Environment Element – Goal E1 
 
Economic Growth Element – Goal ED1 
 
Growth Area Element – Goal G1 
 
Open Space Element – Goal OS1,  
 
Water Resources Element – Goal W1 
 
Cost of Development Element – Goal CD1

CPA2021010 
Page 5 of 10 
Other pertinent information as requested by the Maricopa County Planning Department 
Staff. 
 
The applicant was responsive and provided quality information as requested by 
Maricopa County Planning Department Staff. 
 
Aerial Map of Subject Site

CPA2021010 
Page 6 of 10 
Zoning Map – Rural-190, Rural-43, & Surrounding Districts 
 
 
Land Use Exhibit – Current Land Use (Large Lot Residential and Community Retail Center)

CPA2021010 
Page 7 of 10 
Land Use Exhibit – Proposed Land Use (Utilities) 
 
 
 
Existing On-Site and Adjacent Zoning / Land Use: 
 
5. 
On-site: 
 
Rural-190 & Rural-43 / Vacant 
North: 
AG (Gila Bend) / Vacant 
South: 
I-1 & AG (Gila Bend) / Vacant 
East: 
Highway then Rural-190 & Rural-43/ State Route 85 then Vacant 
West: 
AG (Gila Bend) / Vacant

CPA2021010 
Page 8 of 10 
Utilities and Services: 
 
6. 
Water: 
TBD - Private Well or Hauled Water 
Wastewater: 
TBD - Septic 
Fire: 
TBD  
Police:  
MCSO  
 
Right-of-Way: 
 
7. 
The following table includes existing and future right-of-way* and the future 
classification** based upon the Maricopa County Department of Transportation 
(MCDOT) Major Streets and Routes Plan. 
 
Street Name 
Existing R/W 
Future R/W* 
Future 
Classification** 
Old US 80 
Varies 
65’ (half-width) 
Principal Arterial 
Additional Section and 
Mid-Section Alignments 
 
Varies 
55’ and 40’ (half-
widths) 
Section and Mid-
Section 
Alignments 
 
** Required dedication/preservation and future classification of ROW is tentative and 
subject to change and will be established by MCDOT during a future Plan of 
Development review. 
 
Adopted Plan: 
 
8. 
State Route 85 Area Plan: Portions of the entire site approx. 941 acres site are designated 
as Large Lot Residential (1 – 2 d.u./ac.) and Community Retail Center.  
 
Public Participation Summary: 
 
9. 
The applicant posted the subject site and staff notified all property owners within 300’ of 
the site.  Pursuant to state law, Staff issued enhanced notification letters to all adjacent 
and internal jurisdictions to Maricopa County, select state and regional agencies and 
Luke Air Force Base. Staff received two (2) letters from jurisdictions (City of Buckeye and 
City of Apache Junction) expressing no concerns.  Moreover, state agencies such as 
Arizona Game & Fish Department and SHPO issued comments.  Those comments have 
been included in the attachments section and are not actionable until future zoning and  
Plan of Development stages. ADOT also provided comments to request a future copy of 
the TIS to review expected traffic to be generated by the facility during construction. 
County Staff received no opposition letters or any inquiries from the public regarding this 
request.   
 
Outstanding Concerns from Reviewing Agencies: 
 
10. 
N/A

CPA2021010 
Page 9 of 10 
 
Staff Analysis: 
 
11. 
The state and Maricopa County recognize the potential environmental and economic 
benefits that solar technology can provide. The Yellow Bell Solar project will use 
photovoltaic technology that generates energy from sun absorption.  Photovoltaic 
technology differs from other techniques that require vast amounts of water to cool the 
units.  In contrast, very little water is utilized for photovoltaic technology.  As a result, this 
development would not pose a threat to groundwater depletion and would utilize this 
technology to implement water conservation measures.  
  
16. 
Staff believes the proposed solar facility is well suited to this rural area.  Solar facilities 
require large amounts of relatively flat land and the vast majority of the subject site is flat.  
Staff agrees with the applicant that the subject site is suitable due to proximity to 
electrical transmission lines, nearby stations and substations, and because the 
surrounding area is mostly undeveloped.  Staff agrees with the applicant that the project 
will not detrimentally affect the visual quality of the area. Since the area is primarily 
undeveloped vacant land in close proximity to other existing utility-scale solar projects 
and related infrastructure, staff believes there will be minimal impacts to the surrounding 
area.  
 
17. 
Promoting the development of solar energy over the past several years in Maricopa 
County reinforces the County’s interest in promoting the County as an economic leader 
for solar development. Staff believes the Yellow Bell Solar Project would add to this effort 
in a positive way by providing the potential for temporary construction jobs.  There will 
also be small number of long-term employment opportunities for County residents.  
 
18. 
Staff believes the request is consistent with and meets the goals and policies of the 
Comprehensive Plan and the State Route 85 Area Plan. Staff’s position is that this project, 
as proposed and as governed by the recommended conditions, represent proper long-
term land use planning in the region and for Maricopa County as a whole. 
 
Recommendation: 
 
19. 
For the reasons outlined in this report, staff recommends the Commission motion for 
Approval, subject to conditions ‘a’ – ‘d’. 
 
a. 
Development and use of the site shall be in general conformance with the 
narrative report entitled “Yellow Bell Solar Project” consisting of 24 pages, dated 
stamped received on September 30, 2021, except as modified by the following 
conditions.  
 
b. 
Development and use of the site shall be in conformance with the land use exhibit 
entitled “Yellow Bell Solar” consisting of 2 pages, dated stamped received on 
September 30, 2021, except as modified by the following conditions. 
 
c. 
The land use designation of utilities approved as part of case CPA20210010 shall 
be subject to the time limits set forth in the subsequent zone change.

CPA2021010 
Page 10 of 10 
d. 
The applicant is proposing to develop a photovoltaic solar electric generating 
facility which, pursuant to the Maricopa County Comprehensive Plan, 
necessitates a change in the land use designation from Large Lot Residential and 
Community Retail Center to Utilities. The proposal by the applicant represents a 
comprehensive approach to the subject property and will allow the applicant to 
pursue the proper entitlements pursuant to state law so that they can lawfully 
operate in unincorporated Maricopa County. This particular proposal is an 
appropriate plan for the property and is consistent with the overall intention of the 
comprehensive plan. However, in the event that the zone change or a zone 
change phase for this particular proposal is not approved by Maricopa County 
Board of Supervisors (BOS) within five (5) years from the date of Board approval of 
this comprehensive plan amendment, this amendment shall no longer be 
effective as the planning justification for this comprehensive plan amendment will 
no longer be present. In such instance, a change of the land use designation from 
Utilities to Large Lot Residential and Community Retail Center will occur, and all 
comprehensive plan land use maps shall be altered to reflect as such, because 
this represents superior long-range planning by Maricopa County.  
 
Presented by: 
Ray Banker, Senior Planner 
Reviewed by: 
Matthew Holm, AICP, Planning Supervisor 
 
Attachments: 
Case Map (1 page) 
 
Land Use Exhibits (2 pages) 
 
Narrative Report (24 pages) 
 
MCESD Comments (1 page) 
 
AZGFD Comments (5 pages) 
 
SHPO Email (1 page) 
 
ADOT Email (1 page) 
 
City of Buckeye Email (1 page) 
 
City of Apache Junction Comments (1 page) 
 
ASLD Memo (3 pages)

MARICOPA COUNTY 
 
Legal Description: 
T5S, R4W, Section 15, 16, & 21 
Applicant:  RWE Solar Development, LLC 
P&Z Hearing Date: 
November 4, 2021 
MARICOPA COUNTY REGIONAL DEVELOPMENT SERVICES - PHOENIX, ARIZONA 
 
CPA2021010 
 
Case Address: TBD 
Parcels: N/A (State 
Trust Land) 
SUPERVISORAL DISTRICT NO 5 
Major Comprehensive Plan Amendment to change the land use designations in State Route 85 Corridor Area Plan from Large 
Lot Residential and Community Retail Center to Utilities. 
Phone: 415-361-1455

Yellow Bell Solar Project 
Case No. CPA2021010 
Application for a Major 
Comprehensive Plan Amendment 
Narrative Report 
SEPTEMBER 2021 
SUBMITTED TO 
Maricopa County Planning and 
Development Department 
 
PREPARED BY 
SWCA Environmental Consultants

YELLOW BELL SOLAR PROJECT 
APPLICATION FOR A MAJOR COMPREHENSIVE PLAN 
AMENDMENT 
NARRATIVE REPORT 
 
 
 
 
 
 
Prepared for 
Maricopa County Planning and Development Department 
501 North 44th Street, Suite 200 
Phoenix, Arizona 85008 
(602) 506-3301 
Attn: Ray Banker 
 
 
 
 
 
 
Prepared by 
SWCA Environmental Consultants 
20 East Thomas Road #1700 
Phoenix, Arizona 85012 
(602) 274-3831 
www.swca.com 
 
 
 
 
 
 
On Behalf of 
RWE Solar Development, LLC 
20 California Street, Floor 5 
San Francisco, California 94111 
(415) 361-1445 
Attn: Scott Schwartz 
 
 
 
 
 
 
September 2021

Yellow Bell Solar Project Application for a Major Comprehensive Plan Amendment Narrative Report 
i 
CONTENTS 
A. Executive Summary ........................................................................................................................... 1 
A.1 On-site and Regional Location ....................................................................................................... 6 
A.2 CPA Size and Description of Land Use Type by Acreages ............................................................ 6 
A.3 Roads/Transportation Systems Serving the Proposed Project ........................................................ 6 
A.4 Suitability with Surrounding Land Uses ........................................................................................ 6 
A.4.1 
Proposed Use .................................................................................................................... 7 
B. Whether the Amendment Consitutues an Overall Improvement to the Comprehensive 
Plan ............................................................................................................................................................ 7 
C. Whether the Amendment Will Adversely Impact all or a Portion of the Planning Area ............. 8 
C.1 Altering acceptable land use patterns to the detriment of the plan ................................................. 8 
C.2 Requiring public expenditures for larger and more expensive infrastructure ................................. 8 
C.3 Requiring public improvements to roads, sewer, or water systems that are needed to 
support the planned land uses ........................................................................................................ 8 
C.4 Adversely impacting planned uses because of increased traffic ..................................................... 8 
C.5 Affecting the livability of the area or health or safety of present and future residents ................... 9 
C.6 Adversely impacting the natural environment or scenic quality of the area in contradiction 
to the plan ...................................................................................................................................... 9 
D. Whether the Amendment (or Conditional Modification) is Consistent with the Overall 
Intent of the Comprehensive Plan ........................................................................................................... 9 
E. The Extent to Which the Amendment (or Conditional Modification) is Consistent with the 
Specific Goals and Policies Contained within the Plan ........................................................................ 10 
E.1 Vision 2030 Comprehensive Plan ................................................................................................ 10 
E.1.1 
Land Use ......................................................................................................................... 10 
E.1.2 
Transportation ................................................................................................................. 11 
E.1.3 
Environment .................................................................................................................... 12 
E.1.4 
Economic Growth ........................................................................................................... 14 
E.1.5 
Open Space ..................................................................................................................... 14 
E.1.6 
Water Resources ............................................................................................................. 14 
E.1.7 
Energy ............................................................................................................................. 14 
E.1.8 
Cost of Development....................................................................................................... 15 
E.2 State Route 85 Area Plan ............................................................................................................. 15 
E.2.1 
Land Use ......................................................................................................................... 15 
E.2.2 
Transportation ................................................................................................................. 15 
E.2.3 
Environment/Environmental Effects ............................................................................... 16 
E.2.4 
Economic Development .................................................................................................. 16 
E.2.5 
Growth Areas .................................................................................................................. 16 
E.2.6 
Open Space ..................................................................................................................... 16 
E.2.7 
Water Resources ............................................................................................................. 16 
E.2.8 
Cost of Development....................................................................................................... 17 
F. Other Pertinent Information as Requested by the Maricopa County Planning Department 
Staff .......................................................................................................................................................... 17 
G. Literature Cited ................................................................................................................................ 18

Yellow Bell Solar Project Application for a Major Comprehensive Plan Amendment Narrative Report 
ii 
Figures 
Figure 1. Yellow Bell Solar Project location............................................................................................... 2 
Figure 2. Yellow Bell Solar Project Land Ownership and Jurisdiction. ...................................................... 3 
Figure 3. Yellow Bell Solar Project planned land use. ................................................................................ 4 
Figure 4. Yellow Bell Solar Project proposed Planned Land Use. .............................................................. 5

Yellow Bell Solar Project Application for a Major Comprehensive Plan Amendment Narrative Report 
1 
This narrative report addresses the information required to support the request for a comprehensive plan 
amendment (CPA) for the Yellow Bell Solar Project (project). 
A. EXECUTIVE SUMMARY 
RWE Solar Development, LLC, (RWE) is proposing to construct, operate, and maintain the project, an 
industrial-scale solar energy generation and battery energy storage system, at a location approximately 2 
miles northeast of central Gila Bend in Maricopa County, Arizona (Figure 1). The project is 1,787 acres; 
941 acres are in unincorporated Maricopa County and are on Arizona State Land Department (ASLD)– 
administered lands. The remaining 846 acres of the project are contiguous to the ASLD land and within 
the Town of Gila Bend on privately owned land. The project would include photovoltaic (PV) solar 
electrical generating equipment and associated infrastructure, including a battery energy storage system, 
collection and transmission lines, an on-site switchyard, and potentially an operations and maintenance 
building. Water will be hauled onto the site and the project has no need for a sewer system. 
Project construction is expected to occur in one phase of construction starting as soon as October 2022 
with construction lasting approximately 18 months. Up to approximately 300 construction employees are 
expected over the course of the project. RWE would operate the project 24 hours a day, 365 days a year, 
with up to two-to-four permanent, full-time staff. 
RWE is requesting a major CPA (MCPA) of approximately 941 acres to change the land use designation 
in the Maricopa County 2020 Eye to the Future: State Route 85 Corridor Area Plan (Maricopa County 
2003) (State Route 85 Area Plan) from the Large Lot Residential and Community Retail Center land use 
designations to Utilities land use designation because the project is not permitted in the existing land use 
designations (Figures 3 and 4). 
At a future date, RWE will be requesting a zone change of the 941 acres from Rural Zoning District- 
190,000 square feet per dwelling unit (RU-190) and Rural Zoning District- 1 acre per dwelling unit 
(RU-  43) to Industrial (IND-2) zoning for the project because the project is not a permitted use in the 
RU- 190 and RU-43 zones

Yellow Bell Solar Project Application for a Major Comprehensive Plan Amendment Narrative Report 
2 
 
Figure 1. Yellow Bell Solar Project location.

Yellow Bell Solar Project Application for a Major Comprehensive Plan Amendment Narrative Report 
3 
 
Figure 2. Yellow Bell Solar Project Land Ownership and Jurisdiction.

Yellow Bell Solar Project Application for a Major Comprehensive Plan Amendment Narrative Report 
4 
 
Figure 3. Yellow Bell Solar Project planned land use.

Yellow Bell Solar Project Application for a Major Comprehensive Plan Amendment Narrative Report 
5 
 
Figure 4. Yellow Bell Solar Project proposed Planned Land Use.

Yellow Bell Solar Project Application for a Major Comprehensive Plan Amendment Narrative Report 
6 
A.1 
On-site and Regional Location 
Portions of the project are located on lands under the jurisdiction of both the Town of Gila Bend and 
Maricopa County, with the subject of this application being the portion of the project located within 
unincorporated Maricopa County. The Maricopa County prescribed land uses for the portion of the 
project within unincorporated Maricopa County are identified within the State Route 85 Area Plan. 
The closest municipality is the Town of Gila Bend, Arizona, which a portion of the project is within.  
The project is north of Interstate 8 (I-8) directly west of State Route 85 approximately four miles east of 
the intersection of Hwy 85 and I-8. The project area contains existing utility infrastructure such as a 
natural gas-fired electrical generating facility (the Gila River Power Station), industrial-scale PV solar 
facilities, the Arizona Public Service (APS) Panda Substation, electrical transmission lines, a canal, the 
Gila Bend Municipal Airport, as well as isolated rural residences and agricultural fields (see Figure 1).  
A.2 
CPA Size and Description of Land Use Type by 
Acreages 
Land ownership in the area is a mix of private lands, state lands, and federal lands managed by the 
Bureau of Land Management (BLM). There is an approximately 40-acre parcel of BLM-administered 
land located within the project boundary, but it is not included as part of the project (see Figure 2). 
RWE has been in communication with BLM and BLM has no specific concerns regarding the proposed 
development. Access to the BLM property will be maintained following construction. Property 
surrounding the western part of the project is primarily privately owned; property surrounding the east is a 
mix of state land and private land. The land use in the immediate area consists of primarily agricultural, 
utility, and rural residential. Within the project area, existing land uses include power generation and 
transmission facilities such as the APS Panda Substation, the Gila River Power Station power plant, and 
related electrical infrastructure; large lot residential, community retail center; and former/current 
agricultural properties. 
This application requests an MCPA to change the use designation of the State Route 85 Area Plan of 
approximately 941 acres from Large Lot Residential and Community Retail Center land use designations 
to Utilities land use designation. 
A.3 
Roads/Transportation Systems Serving the Proposed 
Project 
Access to the project would be provided via existing roads. The majority of the project would be 
accessible via Old U.S Highway 80 and other local roads. The roads that would provide access are shown 
in Figure 2, Figure 3, and Figure 4. 
A.4 
Suitability with Surrounding Land Uses 
The lands in the immediate vicinity of the project are a mix of private lands, ASLD-administered lands, 
and BLM-administered lands. The land use in the immediate area consists of undeveloped vacant land 
and agriculture uses. However, other related facilities (including a natural gas-fired electrical generating 
facility, industrial-scale PV solar facilities, electrical substations, and high-voltage transmission lines) in

Yellow Bell Solar Project Application for a Major Comprehensive Plan Amendment Narrative Report 
7 
the immediate vicinity of the project make the project site suitable for solar generation. Additionally, 
previously approved solar CPAs are within the project vicinity.  
RWE has coordinated with the AZ Department of Game and Fish (AGFD), the AZ State Historic 
Preservation office (SHPO), and with other state and federal entities as needed to identify project design 
considerations that would avoid, minimize, and/or mitigate impacts to the natural environmental 
resources and culturally significant resources. No federal listed species or designated wildlife corridors 
are present in the project area; however, migratory birds and plants protected under the Arizona Native 
Plant Law are expected to be present in the study area. The project  will comply with all federal and state 
laws, regulations, and guidelines regarding the protection and mitigation of biological, cultural, water, 
and other natural resources as required. See Section E.1.3 for more details 
A.4.1 
Proposed Use 
RWE is proposing the development of the project, a PV solar generation facility with battery energy 
storage, and associated facilities. At this time, RWE estimates that the project would generate 
approximately 200 megawatts, alternating current (MWac) of solar generation and 00MWac, 8-hour 
battery storage. In general, the project could occur on all the property identified (see Figure 1) except for 
obvious restrictions such as floodways, setbacks, and easements or other rights-of-way. 
The PV modules would be mounted on steel support structures or single-axis trackers that are anchored to 
or driven into the ground. The project would connect to the APS Panda Substation or a Salt River Project/ 
Tucson Electric Power point of interconnection collocated with the Gila River Power Station, all of which 
are approximately 0.5 mile west of the project (see Figure 1). 
B. WHETHER THE AMENDMENT CONSITUTUES AN 
OVERALL IMPROVEMENT TO THE COMPREHENSIVE 
PLAN 
The project location was chosen based on the favorable resources available for PV solar facilities in 
southwestern Maricopa County. These resources include large, flat areas with a lack of sensitive 
biological resources as well as compatible or existing land use designations within the project area and 
proximity to existing electrical and transmission infrastructure. 
This amendment would improve the overall State Route 85 Area Plan because it would provide additional 
economic opportunity in an efficient growth pattern and make an efficient use of the ASLD-administered 
lands more so than their current use. Due to the large availability of solar resources in southwestern 
Maricopa County, such as a steady, direct source of sunlight as well as large contiguous areas of 
relatively flat land, numerous solar projects have been permitted in the project vicinity. Additionally, 
several transmission lines, one substation, and natural gas generation plant exist within the project area 
creating an ideal space for large solar development without a need for large transmission infrastructure 
improvements. Considering these resources, there are limited areas where energy facility development is 
possible, making it important to allow solar development on lands where the criteria is met. 
Amending the State Route 85 Area Plan would allow the project and Maricopa County to use favorable 
solar resources, land use designations, and transmission infrastructure to create economic opportunity.

Yellow Bell Solar Project Application for a Major Comprehensive Plan Amendment Narrative Report 
8 
C. WHETHER THE AMENDMENT WILL ADVERSELY 
IMPACT ALL OR A PORTION OF THE PLANNING AREA 
The MCPA for the project is expected to result in negligible adverse impacts on the State Route 85 Area 
Plan, as outlined below. 
C.1 
Altering acceptable land use patterns to the detriment 
of the plan 
The project would not alter any nearby land uses or patterns and would be consistent with the other 
adjacent and nearby energy and utility uses including existing generation sites, transmission lines, and 
several other solar projects in the vicinity of the project. The project would also be compatible with 
nearby agricultural uses. 
C.2 
Requiring public expenditures for larger and more 
expensive infrastructure 
The project would not require additional public infrastructure, and it would use existing electrical 
infrastructure, such as the APS Panda Substation. 
C.3 
Requiring public improvements to roads, sewer, or 
water systems that are needed to support the planned 
land uses 
No public improvements to roads, sewer, or water systems would be needed as a result of the project. 
Water is expected to be hauled to the site during construction and operation or obtained from new or 
existing wells on-site. Water hauled to the site would be from permitted sources, and any new or existing 
wells on-site will be permitted through the Arizona Department of Water Resources (ADWR) as needed. 
Any proposed road construction needed to access the project would be constructed and paid for by RWE, 
in coordination with the Arizona Department of Transportation (ADOT) and the Maricopa County 
Department of Transportation (MCDOT) as necessary and would not require public expenditures. 
C.4 
Adversely impacting planned uses because of 
increased traffic 
The project would have minimal effects on traffic. There would be minimal increased traffic during the 
relatively short construction period due to the delivery of equipment/supplies and the commuting of the 
construction workforce, but there would be no notable increase in traffic during the operation and 
maintenance of the project.

Yellow Bell Solar Project Application for a Major Comprehensive Plan Amendment Narrative Report 
9 
C.5 
Affecting the livability of the area or health or safety of 
present and future residents 
The project would create no adverse effects on the livability of the area or health and safety of present and 
future residents. The project would not use or store hazardous materials, generate substantial emissions, 
or have other potential negative effects on health and safety. Fugitive dust emissions would likely be 
reduced. The project contemplated by this amendment is located near several other solar facilities, 
substations, and transmission lines, making the project location and efficient development pattern since it 
is near an area already containing several electrical generation, transmission, and distribution facilities. 
No current residential developments are planned for this area. 
C.6 
Adversely impacting the natural environment or scenic 
quality of the area in contradiction to the plan 
The project would have minimal impacts on the natural environment and scenic quality of the area. 
The project is located adjacent to the highly traveled I-8, and travelers would likely be able to see the 
solar facility from this route; however, it would only be seen by travelers for a short duration and is 
expected to result in minimal impacts to the scenic quality of the area. The State Route 85 Area Plan notes 
that Old U.S. Highway 80, from the junction with State Route 85 south to Stout Road in the Town of Gila 
Bend, is a scenic corridor. This corridor is approximately 1.7 miles south of the project so no scenic 
impacts are anticipated from this corridor. 
Other potential scenic impacts could be experienced by infrequent dispersed recreational users recreating 
on the BLM landfill parcel enclosed by the solar facility (see Figure 2) or travelers along local roads in 
the area; however, RWE has been in communication with BLM and BLM has no specific concerns 
regarding the proposed development. Access to the BLM property will be maintained following 
construction. The impacts to these users would be minimal because the proposed project is consistent 
with the existing utility uses in the area. 
RWE has completed or is in the process of completing environmental surveys, including biological, 
cultural, Phase I site assessment, and water resource surveys for the project area. RWE will coordinate 
with state and federal entities as needed to identify project design considerations that would avoid, 
minimize, and/or mitigate impacts to the natural environmental resources. No federal listed species or 
designated wildlife corridors are present in the project area; however, migratory birds and plants protected 
under the Arizona Native Plant Law are expected to be present in the study area. The project will comply 
with all federal and state laws, regulations, and guidelines regarding the protection and mitigation of 
biological, cultural, water, and other natural resources as required. See Section E.1.2 for more details. 
D. WHETHER THE AMENDMENT (OR CONDITIONAL 
MODIFICATION) IS CONSISTENT WITH THE OVERALL 
INTENT OF THE COMPREHENSIVE PLAN 
Though the MCPA is specifically land use change in the State Route 85 Area Plan, the project would also 
be consistent with the goals and intents of the Maricopa County Vision 2030 Comprehensive Plan 
(Vision 2030 Plan) (Maricopa County 2016). The overall intent of the Vision 2030 Plan is based on three 
core principles. These principles also guide Maricopa County’s decisions regarding future development, 
and for when changes to this plan are justified: 1) Decisions should support implementation of Maricopa

Yellow Bell Solar Project Application for a Major Comprehensive Plan Amendment Narrative Report 
10 
County’s mission statement and strategic priorities; 2) Maintain a disciplined approach where 
comprehensive plan policies and growth- related decisions are understandable, measurable, consistent, 
practical and promote efficiency. Land use decisions are also based on these factors; 3) Avoid future 
problems by carefully considering past decisions. The policies and recommendations in the Vision 2030 
plan are based on these principles. Since the project adheres to the overall elements, goals, and policies of 
the Vision 2030 plan (see Section E), the project is consistent with the overall intent of the Vision 2030 
plan, as well. 
The State Route 85 Area Plan “was completed to reflect current conditions and to accommodate a portion 
of the anticipated growth in a manner that is consistent with protecting public health, safety, convenience, 
and general welfare. In addition to elements examining Land Use, Transportation, Environment, and 
Economic Development, this Area Plan includes Environmental Effects, Growth Areas, Open Space, 
Water Resources, and Cost of Development elements... This Area Plan contains a series of goals, 
objectives, and policies used to define development standards, guide public investment, and guide public 
and private decision-making” (Maricopa County 2003:VVI). Because the project adheres to the goals, 
objectives, and policies of the State Route 85 Area Plan (see Section E), the project is consistent with the 
overall intent of the State Route 85 Area Plan, as well. 
E. THE EXTENT TO WHICH THE AMENDMENT (OR 
CONDITIONAL MODIFICATION) IS CONSISTENT WITH 
THE SPECIFIC GOALS AND POLICIES CONTAINED 
WITHIN THE PLAN 
E.1 
Vision 2030 Comprehensive Plan 
E.1.1 
Land Use 
Land Use Goal #1: Achieve balanced and efficient development patterns. 
The amendment will be consistent with this goal as it will be compatible with adjacent uses, will have no 
long-term effects on the efficiency of the transportation system, and would be a balanced land use 
decision as there are no sensitive natural environmental features (see Environmental Policy #5 under 
Section E.1.3.). Additionally, the project contemplated by this amendment is located near several other 
solar facilities, substations, and transmission lines, making the project location and efficient development 
pattern since it is near an area already containing several electrical generation, transmission, and 
distribution facilities.  
The proposed project (i.e., a solar facility) contemplated by the amendment requires a large amount of flat 
land. The proposed project site is compatible with this land use because the area is a large amount of flat 
land and in a rural, undeveloped setting and is surrounded by undeveloped or agricultural lands.  
Land Use Policy #2: Maricopa County supports phasing plans for new urban development to 
coordinate such development with new urban services and infrastructure. 
RWE will coordinate with any new urban services and infrastructure as needed (including, but not limited 
to ADOT, the Gila Bend Fire District, or the Buckeye Valley Fire District).

Yellow Bell Solar Project Application for a Major Comprehensive Plan Amendment Narrative Report 
11 
Land Use Policy #10: Maricopa County supports coordinated planning efforts between local, state, 
and federal agencies. 
The portion of the project in unincorporated Maricopa County contemplated by the amendment is located 
entirely on ASLD-administered lands. RWE has begun and is coordinating the lease application process 
with ASLD for the project. 
Land Use Policy #15: Maricopa County supports evaluating comprehensive plan amendments and 
zoning district boundary changes to determine the existence of the urban services and 
infrastructure identified in this element. 
The project contemplated by the amendment is near several high-voltage transmission lines and is 
adjacent to the substation that would serve as the point of interconnection, making the project area an 
appropriate location for this type of facility as existing infrastructure is compatible with this type of 
development. Several other solar facilities are near the project, as well. RWE anticipates no need for 
sewer or septic facilities, and water is expected be hauled to the site during construction and operation or 
obtained from new or existing wells on-site. The Gila Bend Fire District or the Buckeye Valley Fire 
District can provide fire and emergency medical services to the project area through subscription or 
district incorporation, and the Maricopa County Sheriff’s Department provides law enforcement service 
to the project area. RWE will coordinate further with the Gila Bend Fire District and/or Buckeye Valley 
Fire District to determine how best to serve the site with fire and emergency medical services. Therefore, 
existing infrastructure and urban services can support this type of proposed development. 
Land Use Policy #22: Maricopa County supports reducing the impacts of new development on 
environmentally sensitive areas, including native wildlife (flora and fauna) habitat and corridors. 
The project area is mainly mapped as having native vegetation characteristic of the Sonoran/Mohave 
Desert Scrub biome. There is native wildlife (flora and fauna) habitat and corridors in the project area (see 
Environmental Policies #4 and #5 under Section E.1.3 for detailed information). RWE will comply with 
applicable federal, state, and local laws, regulations, and guidelines as required to avoid, minimize, and 
mitigate the impacts to the wildlife habitat present in the project area. RWE will also comply with 
requested construction recommendations made by AZGFD (See Section E.1.3., Environmental Policy 
#4.) 
Land Use Policy #33: Maricopa County supports using land use buffers and compatible land use 
strategies near existing and future high voltage electric utility line corridors. 
The project location was identified because of the close proximity to several high-voltage transmission 
lines, electrical generating facilities, and the substation to which the project will interconnect. The project 
is compatible with these existing electrical generation and transmission facilities and was sited in 
proximity to these facilities based on this compatibility and as a strategy to limit the need for additional 
new transmission and/or substation infrastructure. 
E.1.2 
Transportation 
Transportation Policy #1: As necessary, Maricopa County supports preserving future road 
alignments called for in county-recognized transportation plans, especially mid-section line, section 
line, and arterial roads; parkways; freeways; and interchanges. 
RWE will work with ADOT and/or MCDOT to preserve the alignments of State Route 85 and Old U.S. 
Highway 80 as needed.

Yellow Bell Solar Project Application for a Major Comprehensive Plan Amendment Narrative Report 
12 
E.1.3 
Environment 
Environmental Policy #2: To help improve air quality Maricopa County supports balanced and 
efficient land use patterns where employment, retail and residential land uses are proximate rather 
than separate. 
Air quality impacts resulting from fugitive dust emissions from the subject lands would be lessened from 
current conditions by the development of the project. Dust/dirt would affect the performance of the solar 
panels. Therefore, after development of the solar fields, the ground surface would be treated to reduce 
potential fugitive dust. In addition to minimizing the effects this dust would have on the solar panels, this 
would also reduce the amount of fugitive dust from these lands that could affect local air quality. 
Environmental Policy #3: To help protect water quality Maricopa County supports compliance 
with its Drinking Water program and its Water and Wastewater Treatment program. 
RWE anticipates no need for sewer or septic facilities, and water is expected be hauled to the site during 
construction and operation. 
RWE will comply with the Drinking Water program and Water and Wastewater Treatment program, as 
necessary. 
Environmental Policy #4: Maricopa County supports innovative project design and development 
techniques that protect important plant and animal habitat and migration corridors. 
The project contemplated by the amendment is in an important connectivity zone for wildlife movement, 
however, no designated wildlife corridor is associated with it and the area is already segmented by 
transportation and canal infrastructure. A desktop review of the project determined that wildlife and plant 
species listed under the Endangered Species Act may occur in the project site; however, no critical habitat 
for federally listed species has been designated within or near the project site. Bird species protected by 
the Migratory Bird Treaty Act are expected to forage, nest, and/or migrate through the project area. 
Bat species protected by state statutes are expected to forage and migrate through the project area. 
Plants protected by the Arizona Native Plant Law are likely to be impacted as a result of project 
construction. 
The project will comply with all applicable federal and state laws, regulations, and guidelines regarding 
the protection of plant and animal species, habitat, and migration corridors and recommendations from 
AZGFD (letter dated July 27, 2021). 
Environmental Policy #5: As directed by the State Historic Preservation Office (SHPO) and 
Arizona Game and Fish Department, Maricopa County supports cultural resource and biological 
surveys being completed – and needed mitigation measures established – prior to new development. 
Because the project being contemplated by the amendment is located entirely on ASLD-administered 
lands, RWE will conduct biological and cultural resources surveys as part of obtaining a lease from 
ASLD. A desktop review of cultural, biological, and water resources for the project has determined the 
following: 
• 
Cultural resources: Trail segments, in association with pre-Contact and historic-
era artifacts and the known history of the general area have been identified within the 
project area. The project is situated nearby the Great Bend of the Gila, a traditional 
cultural property and nationally significant cultural landscape. No direct effects to 
this traditional cultural property are anticipated. As part of the ASLD lease

Yellow Bell Solar Project Application for a Major Comprehensive Plan Amendment Narrative Report 
13 
application process, RWE has commissioned a cultural resource survey of the 
project area, and the project will comply with all applicable federal and state laws, 
regulations, and guidelines regarding the protection and mitigation of cultural 
resources as required. 
• 
Biological resources: RWE has coordinated with and prepared a biological 
resources analysis. AZGFD made recommendations for protection of wildlife 
species including western burrowing owl (Athene cunicularia hypugaea), protection 
of Sonoran desert habitat, and general wildlife species. The project will comply 
with  all applicable federal and state laws, regulations, and guidelines regarding the 
protection and mitigation of water resources as required. 
• 
Water resources: Surface water features were found within the project area and 
appear to be ephemeral and are therefore unlikely to be considered jurisdictional 
waters of the United States. Approximately 55.4 acres within the project is mapped 
as special flood hazard areas. Water resource surveys are in process of being 
completed for the project. The project will comply with all applicable federal and 
state laws, regulations, and guidelines regarding the protection and mitigation of 
water resources as required. 
The presence of any potentially significant cultural, biological, or water resources within the project area 
will not be fully known until on-site surveys are conducted. RWE will complete these on-site cultural, 
biological, and water resource surveys and reports in support of the ASLD application process.  
RWE will coordinate with any applicable federal and state agencies regarding these resources based on 
the on-site survey findings of these resources. The following coordination and compliance could occur 
based on the potential presence of certain resources: 
• 
RWE may coordinate with ASLD (who may then coordinate with the State Historic Preservation 
Office) regarding cultural resources. 
• 
RWE may coordinate with ASLD (who may then coordinate with the U.S. Army Corps of 
Engineers) or will coordinate directly with the U.S. Army Corps of Engineers regarding the 
presence of water resources. 
• 
RWE may coordinate with ASLD (who may then coordinate with the U.S. Fish and Wildlife 
Service) or will coordinate directly with the U.S. Fish and Wildlife Service regarding federally 
listed species that are protected under the Endangered Species Act. 
• 
RWE may coordinate with the ASLD (who may then coordinate with the Arizona Department of 
Agriculture) regarding native plants and noxious weeds. 
• 
RWE will comply with the Migratory Bird Treaty Act, as required.  
It is anticipated that these coordination and compliance efforts will ensure that the impacts to cultural, 
biological, and water resources on the project site are sufficiently avoided, minimized, and mitigated. 
Environmental Policy #7: Where necessary Maricopa County supports noise reductions in new 
development design and in the construction of new buildings. 
The project would generate noise during construction; however, the nearest residence is approximately 
0.60 mile west of the project, and the next nearest residence is approximately 0.85 mile southwest of the 
project. No other nearby sensitive noise receptors have been identified. The residence approximately 0.60 
mile away may experience some temporary minor noise impacts from project construction, but the project 
is anticipated to general minimal noise during operation.

Yellow Bell Solar Project Application for a Major Comprehensive Plan Amendment Narrative Report 
14 
E.1.4 
Economic Growth 
Economic Growth Goal #1: Contribute to an effective regional economy. 
RWE estimates that up to approximately 300 construction employees are expected over the 
course of project construction. RWE would operate the project with up to approximately 
two-to-four permanent, full-time staff. These construction and operational jobs as well as 
tax revenue from the project would help contribute to the regional economy. 
Economic Growth Policy #10: Maricopa County supports leveraging its solar resource potential to 
attract solar-related industries and alternative energy research and development. 
The proposed project being contemplated by this amendment (i.e., a solar generation facility) directly 
supports this economic growth policy. 
E.1.5 
Open Space 
Open Space Goal #1: Provide regional leadership to promote environmental quality, including the 
preservation of open, natural park and recreation lands. 
No formal parks, open space, recreational lands, or trails are in the project area contemplated by this 
amendment. The project surrounds, but does not directly impact, BLM-administered land that was 
designated as proposed open space by the State Route 85 Area Plan. No known formal open space uses 
occur on this land, and no public proposals have been submitted to BLM for this land. Access to the BLM 
parcel would remain via Old U.S. Highway 80. 
E.1.6 
Water Resources 
Water Resource Goal #5: Maricopa County supports low water use solar electric generating 
technologies. 
The project being contemplated by this amendment uses PV solar technology, which requires little water 
except for maintenance for cleaning the solar panels and equipment. RWE will either haul water to the 
site during construction and operation or obtain it from new or existing wells on-site. Water hauled to the 
site would be from permitted sources, and any new or existing wells on-site will be permitted through the 
Arizona Department of Water Resources (ADWR) as needed.  
E.1.7 
Energy 
Energy Goal #2: Make Maricopa County a leader in alternative energy research and development. 
The project being contemplated by this amendment would help Maricopa County fulfill this goal because 
the project (i.e., a solar generation facility) is a form of alternative energy development. 
Energy Goal #6: Maricopa County supports being a responsible leader in alternative energy 
research and development. 
The project being contemplated by this amendment would help Maricopa County fulfill this goal because 
the project (i.e., a solar generation facility) is a form of alternative energy development and would be 
sited at a compatible location that has minimal conflict with environmental resources on-site and is

Yellow Bell Solar Project Application for a Major Comprehensive Plan Amendment Narrative Report 
15 
surrounded by similar land use types (i.e., solar generation and electrical transmission and distribution) as 
the proposed project. 
Energy Goal #7: Maricopa County supports efforts to assist businesses and individuals with 
renewable energy options and energy conservation. 
The project being contemplated by this amendment would help Maricopa County fulfill this goal because 
the project (i.e., a solar generation facility) is a form of renewable energy and would provide businesses 
and individuals with additional opportunities to use renewable energy. 
E.1.8 
Cost of Development 
Cost of Development Goal #2: New development pays its proper and reasonable share of the costs 
of new infrastructure, services, and other public improvements. 
The project will not require new infrastructure, services, and other public improvements. Should such 
improvements they be unexpectedly triggered by the project, RWE is committed to paying its proper and 
reasonable share of the costs. While no project-related public expenditures are proposed or anticipated, 
RWE will likely need to develop short, internal access roads to portions of the site for internal circulation. 
These internal roads will be gravel or compacted dirt roads. Any proposed road construction needed to 
access the project would be constructed and paid for by RWE, in coordination with ADOT and MCDOT 
as necessary, and would not require public expenditures.  
E.2 
State Route 85 Area Plan 
E.2.1 
Land Use 
Goal L1: Promote efficient land development that is compatible with adjacent land uses, is well 
integrated with the transportation system, and is sensitive to the natural environment 
See Land Use Goal #1 under Section E.1.1 and Environmental Policy #5 under Section E.1.2 for this 
response. 
Objective L2.1: Encourage development that is compatible with existing and future freeways, as 
well as other prominent land use features within the area immediately adjacent to State Route 85. 
The project being contemplated by this amendment runs parallel to two existing highways: State Route 85 
and Old U.S. Highway 80. The development of a solar facility as an industrial/utility use is a compatible 
land use near transportation facilities, and neither State Route 85 nor Old U.S. Highway 80 are considered 
scenic routes near the project site; however, the State Route 85 Area Plan does note that Old U.S. 
Highway 80 is considered a scenic corridor more than 1 mile south of the project site. No prominent land 
use features exist within the project as identified in the State Route 85 Area Plan, and no existing facilities 
or utilities would be impacted as identified in the State Route 85 Area Plan 
E.2.2 
Transportation 
Objective T1.2: Minimize traffic congestion on regional routes, state highways, and urban arterial 
roads 
During construction, RWE estimates that a total of 150 trips per day on average would occur (for a total 
of 54,000 trips during construction) along primary access roadways. During operation, RWE estimates

Yellow Bell Solar Project Application for a Major Comprehensive Plan Amendment Narrative Report 
16 
that a total of 2 trips per day would occur along primary access roadways. This represents an approximate 
2% increase along State Route 85 (8,273 Average Annual Daily Traffic [AADT] in 2020) (Maricopa 
Association of Governments 2021) during construction and a negligible increase during operations. 
Therefore, traffic volumes along State Route 85 during construction and operation of the project would be 
minimally impacted, resulting in minimal additional traffic congestion. 
RWE will coordinate with the ADOT and/or MCDOT as needed to ensure that any project access 
improvements meet applicable design standards and that any oversize or overweight vehicle traffic is 
properly permitted. 
E.2.3 
Environment/Environmental Effects 
Goal E1: Promote development that mitigates adverse environmental impacts on the natural and 
cultural environment and preserves highly valued open space. 
See Environmental Policy #5 under Section E.1.2 for response. 
E.2.4 
Economic Development 
Goal ED1: Promote a growing, balanced, efficient, and diversified economy, consistent with 
available resources, that enhances quality employment opportunities, improves quality of life, and 
is sensitive to the natural and cultural environment. 
RWE estimates that up to approximately 300 construction employees are expected over the course of 
project construction. RWE would operate the project with up to approximately 2 to 3 permanent, full-time 
staff. These construction and operational jobs would help contribute to a regional, diversified economy. 
E.2.5 
Growth Areas 
Goal G1: Promote orderly, timely, and fiscally responsible growth in the State Route 85 Corridor 
planning area. 
See Land Use Goal #1 under Section E.1.1 for response. 
E.2.6 
Open Space 
Goal OS1: Maintain existing open space and encourage expansion of open space to address public 
access, connectivity, education, preservation, buffering, quantity, quality, and diversity. 
See Open Space Goal #1 under Section E.1.4 for response.  
E.2.7 
Water Resources 
Goal W1: Promote development that makes conservative use of renewable water supplies such as 
effluent, surface water, and Central Arizona Project water when feasible, and that uses 
groundwater as the primary source only in the absence of renewable sources. 
RWE will haul water to the site during construction and operation. Water hauled to the site would be from 
permitted sources.

Yellow Bell Solar Project Application for a Major Comprehensive Plan Amendment Narrative Report 
17 
RWE will consider this goal and will obtain surface water or Central Arizona Project water to the extent 
practicable; however, effluent water cannot be used during operation as clean water is needed to wash PV 
panels. RWE will consider effluent water use during construction for dust suppression. 
E.2.8 
Cost of Development 
Goal CD1: Ensure that new development pays its fair and proportional share of the cost of 
additional public facility and service needs generated by new development. 
See Cost of Development Goal #2 under Section E.1.7 for response. 
F. OTHER PERTINENT INFORMATION AS REQUESTED BY 
THE MARICOPA COUNTY PLANNING DEPARTMENT 
STAFF 
During the preapplication meeting for the project being contemplated by this amendment it was noted that 
while a Traffic Impact Analysis was not required, a discussion of anticipated traffic impacts should be 
included. A brief discussion of these traffic impacts and anticipated road improvements is provided 
below. 
The project would require an access road network, which would consist of existing primary access 
roadways (State Route 85 and Old U.S. Highway 80) and the construction of internal access roads that 
may lead up to these primary access roadways. The project site east and west of State Route 85, and east 
and west of Old U.S. Highway 80, would be accessed via newly constructed roads. Any newly 
constructed roadways would be developed in accordance with state or local building requirements as 
needed. RWE will work with ADOT and/or MCDOT to preserve the alignments of State Route 85 and 
Old U.S. Highway 80 as needed. 
The trip generation during construction of the proposed project would occur during the entire construction 
phase, which is anticipated to last 18 months. The trip generation during operation of the proposed project 
would occur for the operational phase of the project, which is expected to be 35 years. 
During construction, RWE estimates that a total of 150 trips per day on average would occur (for a total of 
54,000 trips during construction) along primary access roadways. During operation, RWE estimates that a 
total of 2 trips per day would occur along primary access roadways

Yellow Bell Solar Project Application for a Major Comprehensive Plan Amendment Narrative Report 
18 
G. LITERATURE CITED 
Bureau of Land Management. 2021. BLM National NEPA Register. Available at: 
https://eplanning.blm.gov/eplanning-ui/home. Accessed April 2021. 
Maricopa Association of Governments. 2021. Traffic Volume Survey and Traffic Count Maps. Available 
at: https://www.azmag.gov/Programs/Transportation/System-Analysis-and-Forecasting/Traffic-
Volume-Survey-and-Traffic-Count-Maps. Accessed May 2021. 
Maricopa County. 2003. Maricopa County 2020 Eye to the Future: State Route 85 Corridor Area Plan. 
Available at: https://www.maricopa.gov/DocumentCenter/View/6626/State-Route-85-Corridor-
Area-Plan-PDF. Accessed May 2021.  
Maricopa County. 2016. Vision 2030 Comprehensive Plan. Available at: 
https://www.maricopa.gov/DocumentCenter/View/3786/Vision-2030-Maricopa-County-
Comprehensive-Plan-PDF#:~:text=Vision%202030%20promotes%20functional%2C%20 
efficient,budget%20and%20minimize%20tax%20burdens. Accessed May 2021.

Subdivision Infrastructure & 
Planning Program 
1001 N. Central Avenue #150 
Phoenix, Arizona 85004 
Phone: (602) 506-1058 
Fax: (602) 506-5813  
TDD 602 506 6704 
 
 
Maricopa County 
Environmental Services Department  
Water and Waste Management Division 
DATE: 
July 20, 2021  
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
TO : 
Ray Banker, Planning & Development Dept. 
 
 
Planner 
 
 
 
 
 
 
 
FROM: 
Souren Naradikian, P.E. 
 
 
Senior Civil Engineer 
 
SUBJECT:  
Yellow Bell Solar - Major CPA. CPA2021010 
 
The Maricopa County Environmental Services Department (MCESD) has reviewed 
revised documents received from the Maricopa County Planning and Development 
Department for the above referenced project. This project is a Yellow Bell Solar - Major 
CPA at APN# Arizona State Trust Land. Water and Sewer information is not provided. 
MCESD has concerns, Water hauled to the site would be from permitted sources, and 
any new or existing the Arizona Department of Water Resources (ADWR) as needed, 
NSA from MCESD Drinking Water program also is needed. Sewer service also must be 
permitted by MCESD. 
 
Based on the above, MCESD raised no objections to the Planning & Development 
Department in Accela: on July 20, 2021 and will allow the project to proceed at this 
time subject to the following stipulations 
 
Stipulations:  
None. 
 
It should be noted that this document does not approve the referenced project.  
Comments are provided only as advisory to Maricopa County Planning and 
Development Department to assist staff to prepare a staff report.  Other Maricopa 
County agencies may have additional requirements. Final review and approval will be 
made through Planning and Development Department procedures. Applicant may 
need to submit separate applications to the Maricopa County Environmental Services 
Department for approval of proposed facilities regulated by the Department.  Review 
of any such application will be based on regulations in force at the time of application.

September 29, 2021 
 Whitney Rubin 
 Sr. Project Manager 
 RWE Solar Development, LLC. 
 20 California Street, Floor 5 
 San Francisco, California 94111 
 Electronically submitted to:  whitney.rubin@rwe.com 
 RE: 
 Yellow Bell Solar Maricopa County Major Comprehensive Plan Amendment 
 Dear Whitney Rubin: 
 The  Arizona  Game  and  Fish  Department  (Department)  appreciates  the  opportunity  to  review  the 
 Yellow  Bell  Solar  Maricopa  County  Major  Comprehensive  Plan  Amendment  (MCPA).  RWE, 
 Solar  Development,  LLC  (RWE)  proposes  to  construct,  operate,  and  maintain  the  Project,  an 
 industrial  scale  solar  energy  generation  and  battery  energy  storage  system  at  a  location 
 approximately  2  miles  northeast  of  central  Gila  Bend,  Maricopa  County,  Arizona,  north  of 
 Interstate  8,  and  west  of  State  Route  85.  The  project  is  approximately  1,787  acres  in  total,  of 
 which  941  acres  are  located  on  Arizona  State  Land  Department  administered  lands  within 
 unincorporated Maricopa County, Arizona. 
 Under  Title  17  of  the  Arizona  Revised  Statutes,  the  Department,  by  and  through  the  Arizona 
 Game  and  Fish  Commission  (Commission),  has  jurisdictional  authority  and  public  trust 
 responsibilities  to  protect  and  conserve  the  state  fish  and  wildlife  resources.  In  addition,  the 
 Department  manages  threatened  and  endangered  species  through  authorities  of  Section  6  of  the 
 Endangered  Species  Act  and  the  Department’s  10(a)1(A)  permit.  It  is  the  mission  of  the 
 Department  to  conserve  and  protect  Arizona's  diverse  fish  and  wildlife  resources  and  manage  for 
 safe,  compatible  outdoor  recreation  opportunities  for  current  and  future  generations.  For  your 
 consideration,  the  Department  provides  the  following  comments  based  on  the  agency's  statutory 
 authorities,  public  trust  responsibilities,  and  special  expertise  related  to  wildlife  resources  and 
 recreation. 
 Department  personnel  had  an  opportunity  to  review  the  Yellow  Bell  Solar  MCPA  (CPA2021010) 
 project  in  July  of  2021;  we  provided  project  comments  and  recommendations  on  July  27,  2021, 
 in  response  to  a  July  7,  2021  review  request  by  the  Maricopa  County  Planning  and  Development 
 Department.  As  no  significant  changes  have  been  made  to  the  design  and  function  of  the  project 
 since  the  July  2021  review,  the  comments  and  recommendations  the  Department  provided 
 previously are still valid, and the comment letter is attached for your consideration.

Yellow Bell Solar Maricopa County Major Comprehensive Plan Amendment 
 September 29, 2021 
 Page  2 
 Thank  you  for  the  opportunity  to  provide  input  on  the  Yellow  Bell  Solar  Maricopa  County  Major 
 Comprehensive  Plan  Amendment.  For  further  coordination,  please  contact  me  at 
 cboucher@azgfd.gov  or 623-236-7615. 
 Sincerely, 
 Cheri Bouchér 
 Project Evaluation Project Specialist, Habitat Branch 
 AGFD # M21-09140233 
 cc 
 Ginger Ritter, Project Evaluation Program Supervisor AGFD (gritter@azgfd.gov) 
 Tyler Williford, Habitat Program Manager, Region IV (twilliford @azgfd.gov )

‌ 
‌ 
‌ 
July‌ ‌27,‌ ‌2021‌ ‌ 
‌ 
Mr.‌ ‌Ray‌ ‌Banker‌ ‌ 
Maricopa‌ ‌County‌ ‌Planning‌ ‌&‌ ‌Development‌ ‌Department‌ ‌ 
501‌ ‌N.‌ ‌44th‌ ‌Street,‌ ‌Suite‌ ‌200‌ ‌ 
Phoenix,‌ ‌AZ‌ ‌85008‌ ‌ 
‌ 
Electronically‌ ‌submitted‌ ‌to:‌ ‌adam.cannon@maricopa.gov‌ ‌ 
‌ 
RE:‌ ‌Yellow‌ ‌Bell‌ ‌Solar‌ ‌and‌ ‌Storage‌ ‌Project‌‌ ‌
  
‌ 
Dear‌ ‌Mr.‌ ‌Banker:‌ ‌ 
‌ 
At‌‌the‌‌request‌‌of‌‌Maricopa‌‌County,‌‌the‌‌Arizona‌‌Game‌‌and‌‌Fish‌‌Department‌‌(Department)‌‌has‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
 
reviewed‌ ‌the‌ ‌Comprehensive‌ ‌Plan‌ ‌Amendment‌ ‌Application‌ ‌(CPA),‌ ‌CPA2019010,‌ ‌for‌ ‌the‌‌
 
 
 
 
 
 
 
 
 
 
proposed‌ ‌solar‌ ‌facility‌ ‌at‌ ‌a‌ ‌location‌ ‌approximately‌ ‌2‌ ‌miles‌ ‌northeast‌ ‌of‌‌central‌‌Gila‌‌Bend‌‌in‌‌
 
 
 
   
 
   
 
 
 
 
 
 
 
Maricopa‌ ‌County,‌ ‌Arizona.‌ ‌The‌‌Department‌‌understands‌‌that‌‌RWE‌‌Solar‌‌Development,‌‌LLC,‌‌
 
 
 
 
 
 
 
 
 
 
 
(RWE)‌ ‌is‌ ‌proposing‌ ‌the‌ ‌construction,‌ ‌operation,‌ ‌and‌ ‌maintenance‌ ‌of‌ ‌an‌‌industrial-scale‌‌solar‌‌
 
 
 
 
 
 
 
 
 
 
 
 
energy‌ ‌generation‌ ‌and‌ ‌battery‌ ‌energy‌ ‌storage‌ ‌system.‌ ‌The‌ ‌project‌ ‌is‌ ‌1,787‌ ‌acres‌ ‌that‌ ‌would‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
 
include‌ ‌photovoltaic‌ ‌(PV)‌ ‌solar‌ ‌electrical‌ ‌generating‌ ‌equipment‌ ‌and‌‌associated‌‌infrastructure,‌‌
 
 
 
 
 
 
 
 
 
 
including‌ ‌a‌ ‌battery‌ ‌energy‌ ‌storage‌ ‌system,‌ ‌collection‌ ‌and‌ ‌transmission‌ ‌lines,‌ ‌an‌ ‌on-site‌‌
 
 
 
 
 
 
 
 
 
 
 
 
switchyard,‌ ‌and‌ ‌potentially‌ ‌an‌ ‌operations‌ ‌and‌ ‌maintenance‌ ‌building.‌ ‌ 
‌ 
Under‌ ‌Title‌ ‌17‌ ‌of‌ ‌the‌‌Arizona‌‌Revised‌‌Statutes,‌‌the‌‌Department,‌‌by‌‌and‌‌through‌‌the‌‌Arizona‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Game‌ ‌and‌ ‌Fish‌ ‌Commission‌ ‌(Commission),‌ ‌has‌ ‌jurisdictional‌ ‌authority‌ ‌and‌ ‌public‌ ‌trust‌‌
 
 
 
 
 
 
 
 
 
 
 
responsibilities‌‌for‌‌management‌‌of‌‌the‌‌state's‌‌fish‌‌and‌‌wildlife‌‌resources.‌‌It‌‌is‌‌the‌‌mission‌‌of‌‌the‌‌
 
 
 
 
 
 
 
 
 
     
 
 
 
 
Department‌‌to‌‌conserve‌‌and‌‌protect‌‌Arizona’s‌‌diverse‌‌fish‌‌and‌‌wildlife‌‌resources‌‌and‌‌manage‌‌for‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
 
safe,‌‌compatible‌‌outdoor‌‌recreation‌‌opportunities‌‌for‌‌current‌‌and‌‌future‌‌generations.‌‌Similarly,‌‌
 
 
 
 
 
 
 
 
 
 
 
the‌‌Department‌‌recognizes‌‌the‌‌importance‌‌of‌‌planning‌‌efforts‌‌that‌‌contribute‌‌to‌‌the‌‌county‌‌and‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
 
the‌‌state’s‌‌economic‌‌growth‌‌needs‌‌and‌‌opportunities‌‌to‌‌develop‌‌renewable‌‌energy‌‌locations.‌‌The‌‌
 
 
 
 
 
 
   
 
 
 
 
 
Department‌ ‌recognizes‌ ‌that‌ ‌appropriate‌ ‌coordination,‌ ‌proper‌ ‌planning,‌ ‌and‌ ‌voluntary‌‌
 
 
 
 
 
 
 
 
 
implementation‌ ‌of‌ ‌best‌ ‌management‌ ‌practices‌ ‌allow‌ ‌projects‌ ‌to‌ ‌be‌ ‌developed‌ ‌that‌ ‌avoid,‌‌
 
 
 
 
 
 
 
 
 
 
 
 
minimize,‌ ‌or‌ ‌mitigate‌ ‌potential‌ ‌impacts‌ ‌to‌ ‌wildlife‌ ‌habitat‌ ‌and‌ ‌populations.‌‌ ‌
  
‌ 
To‌‌the‌‌extent‌‌possible,‌‌the‌‌Department‌‌encourages‌‌pre-construction‌‌surveys‌‌and‌‌monitoring‌‌to‌‌
 
 
 
 
 
 
 
 
 
 
 
 
determine‌‌species‌‌presence‌‌as‌‌referenced‌‌in‌‌our‌‌Guidelines‌‌for‌‌Solar‌‌Development‌‌in‌‌Arizona‌.‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
The‌ ‌Department‌ ‌is‌ ‌available‌ ‌to‌ ‌review‌ ‌survey‌ ‌designs,‌ ‌provide‌ ‌input‌ ‌on‌ ‌developing‌‌
 
 
 
 
 
 
 
 
 
 
 
 
best-management‌‌practices,‌‌and‌‌are‌‌available‌‌to‌‌assist‌‌in‌‌developing‌‌this‌‌economically-important‌‌
 
 
 
 
   
   
 
 
 
facility‌ ‌while‌ ‌also‌ ‌minimizing‌ ‌any‌ ‌potential‌ ‌impacts‌ ‌to‌ ‌wildlife‌ ‌during‌ ‌construction‌ ‌and‌‌
 
 
 
 
 
 
 
 
 
 
 
 
operation‌ ‌of‌ ‌the‌ ‌facility.‌‌ ‌
  
‌ 
‌ 
‌

‌ 
Yellow‌ ‌Bell‌ ‌Solar‌ ‌and‌ ‌Storage‌ ‌Project‌ ‌ 
July‌ ‌27,‌ ‌2021‌ ‌ 
Page‌ ‌2‌ ‌ 
The‌ ‌western‌ ‌burrowing‌ ‌owl‌ ‌(‌Athene‌ ‌cunicularia‌ ‌hypugaea‌)‌ ‌is‌ ‌a‌ ‌special‌‌status‌‌species‌‌that‌‌is‌‌
 
 
 
 
 
 
 
   
 
 
 
   
regulated‌ ‌under‌ ‌the‌ ‌Migratory‌ ‌Bird‌‌Treaty‌‌Act‌‌(MBTA).‌‌If‌‌suitable‌‌habitat‌‌for‌‌this‌‌species‌‌is‌‌
 
 
 
 
 
 
 
   
 
 
 
 
   
present‌ ‌within‌ ‌or‌ ‌adjacent‌ ‌to‌ ‌your‌ ‌project‌ ‌area,‌ ‌the‌ ‌Department‌ ‌recommends‌ ‌conducting‌ ‌an‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
occupancy‌ ‌survey‌ ‌for‌‌western‌‌burrowing‌‌owls‌‌to‌‌determine‌‌if‌‌this‌‌species‌‌occurs‌‌within‌‌your‌‌
 
 
 
 
 
 
 
   
 
 
 
 
 
project‌ ‌footprint.‌ ‌Guidelines‌ ‌for‌ ‌conducting‌ ‌this‌ ‌survey‌ ‌are‌ ‌found‌ ‌in‌ ‌Burrowing‌ ‌Owl‌‌Project‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
Clearance‌ ‌Guidance‌ ‌for‌ ‌Landowners‌.‌ ‌Please‌ ‌note‌ ‌that‌ ‌the‌ ‌survey‌ ‌should‌ ‌be‌ ‌conducted‌ ‌by‌ ‌a‌‌
 
 
 
 
 
 
 
 
 
 
 
 
   
surveyor‌ ‌that‌ ‌is‌ ‌certified‌ ‌by‌ ‌the‌ ‌Department.‌ ‌If‌ ‌an‌ ‌active‌ ‌burrowing‌ ‌owl‌‌burrow‌‌is‌‌detected,‌‌
 
 
 
 
 
 
 
 
 
 
 
 
   
 
please‌‌contact‌‌the‌‌Department‌‌and‌‌the‌‌U.S.‌‌Fish‌‌and‌‌Wildlife‌‌Service‌‌for‌‌direction,‌‌in‌‌accordance‌‌
 
 
 
 
 
 
 
 
 
 
 
 
   
 
with‌ ‌the‌ ‌Burrowing‌ ‌Owl‌ ‌Project‌ ‌Clearance‌ ‌Guidance‌ ‌for‌ ‌Landowners‌.‌ ‌ 
‌ 
The‌ ‌Department‌ ‌would‌ ‌like‌ ‌to‌ ‌provide‌ ‌the‌ ‌following‌ ‌general‌ ‌recommendations:‌ ‌ 
●
Sonoran‌ ‌desert‌ ‌habitats‌ ‌and‌ ‌its‌ ‌associated‌ ‌fauna‌ ‌are‌‌highly‌‌dependent‌‌on‌‌the‌‌minimal‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
precipitation‌‌received‌‌each‌‌year.‌‌The‌‌resulting‌‌sheet‌‌flows‌‌contribute‌‌to‌‌the‌‌hydrology‌‌of‌‌
 
 
 
 
 
 
 
 
   
 
 
 
areas‌ ‌where‌ ‌rain‌ ‌events‌ ‌often‌ ‌occur‌ ‌in‌ ‌isolated‌ ‌patches.‌ ‌To‌ ‌the‌ ‌extent‌ ‌possible,‌ ‌the‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Department‌‌recommends‌‌minimizing‌‌alterations‌‌to‌‌the‌‌landscape‌‌that‌‌have‌‌the‌‌potential‌‌
 
 
 
 
 
 
 
 
 
 
 
to‌ ‌impact‌ ‌vegetation‌ ‌and‌‌alter‌‌wildlife‌‌distributions‌‌and‌‌abundance‌‌beyond‌‌the‌‌project‌‌
 
 
 
 
 
 
 
 
 
 
 
 
area.‌ ‌ 
●
Artificial‌‌night‌‌lighting‌‌may‌‌attract‌‌insects‌‌and‌‌the‌‌species‌‌that‌‌prey‌‌on‌‌them‌‌(e.g.‌‌bats).‌‌It‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
could‌ ‌also‌ ‌impair‌ ‌the‌ ‌ability‌ ‌of‌ ‌nocturnal‌ ‌animals‌ ‌to‌ ‌navigate.‌ ‌The‌ ‌Department‌‌
 
 
 
 
 
 
 
 
 
 
 
 
recommends‌ ‌using‌ ‌only‌ ‌the‌ ‌minimum‌ ‌amount‌ ‌of‌ ‌light‌ ‌needed‌ ‌for‌ ‌safety.‌ ‌If‌ ‌feasible,‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
narrow‌‌spectrum‌‌lighting‌‌is‌‌wildlife-friendly‌‌and‌‌should‌‌be‌‌used‌‌as‌‌often‌‌as‌‌possible‌‌to‌‌
 
 
   
 
 
 
 
 
 
 
 
 
 
minimize‌‌the‌‌number‌‌of‌‌species‌‌affected‌‌by‌‌lighting.‌‌It‌‌is‌‌also‌‌beneficial‌‌that‌‌all‌‌lighting‌‌
 
 
 
 
 
 
 
     
 
 
 
 
 
is‌ ‌shielded,‌ ‌canted,‌ ‌or‌ ‌cut‌ ‌to‌ ‌minimize‌ ‌the‌ ‌amount‌ ‌of‌ ‌upward‌ ‌shining‌ ‌light.‌‌ ‌
  
●
Birds‌‌of‌‌prey‌‌such‌‌as‌‌raptors,‌‌owls,‌‌vultures,‌‌and‌‌eagles‌‌are‌‌vulnerable‌‌to‌‌electrocution‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
 
and‌‌powerline‌‌strikes‌‌during‌‌construction‌‌and‌‌operation.‌‌There‌‌are‌‌a‌‌number‌‌of‌‌design‌‌
 
 
 
 
 
 
 
 
   
 
 
 
features‌‌that‌‌can‌‌minimize‌‌these‌‌impacts‌‌to‌‌these‌‌important‌‌species.‌‌Tuk‌‌Jacobson‌‌is‌‌the‌‌
 
 
 
 
 
 
 
 
 
 
 
   
 
Department’s‌‌raptor‌‌expert‌‌and‌‌will‌‌be‌‌willing‌‌to‌‌share‌‌information‌‌on‌‌best‌‌management‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
practices;‌ ‌he‌ ‌can‌ ‌be‌ ‌contacted‌ ‌at‌ ‌KJacobson@azgfd.gov‌ ‌or‌ ‌623-236-7575.‌ ‌
  
●
Power‌‌poles‌‌can‌‌serve‌‌as‌‌perches‌‌for‌‌many‌‌birds‌‌of‌‌prey‌‌and‌‌there‌‌are‌‌design‌‌features‌‌for‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
structures‌‌that‌‌can‌‌reduce‌‌impacts‌‌to‌‌these‌‌important‌‌species.‌‌Another‌‌possible‌‌alternative‌‌
 
 
 
 
   
 
 
 
 
 
 
to‌‌reduce‌‌mortality‌‌is‌‌using‌‌bird‌‌flight‌‌diverters‌‌to‌‌decrease‌‌avian‌‌mortalities.‌‌Again,‌‌Mr.‌‌
 
 
   
 
 
 
   
 
 
 
 
 
Jacobson‌‌has‌‌expertise‌‌in‌‌all‌‌of‌‌the‌‌best‌‌management‌‌practices‌‌and‌‌would‌‌be‌‌available‌‌to‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
   
share‌ ‌his‌ ‌knowledge‌ ‌in‌ ‌the‌ ‌pre-design‌ ‌phase‌ ‌of‌ ‌this‌ ‌project.‌‌ ‌
  
●
The‌‌Department’s‌‌Wildlife‌‌Compatible‌‌Fencing‌‌Guidelines‌‌provide‌‌information‌‌on‌‌how‌‌
 
 
 
 
 
 
 
 
 
 
fencing‌ ‌impacts‌ ‌wildlife,‌ ‌ways‌‌to‌‌design‌‌fencing‌‌to‌‌prevent‌‌wildlife‌‌entanglement‌‌and‌
 
 
 
 
 
 
 
 
 
 
 
 
impalement,‌ ‌and‌ ‌to‌ ‌ensure‌ ‌wildlife‌ ‌movement‌ ‌is‌ ‌not‌ ‌restricted.‌ ‌The‌ ‌Department‌‌
 
 
 
 
 
 
 
 
 
 
 
developed‌ ‌these‌ ‌guidelines‌ ‌to‌ ‌assist‌ ‌landowners,‌ ‌project‌ ‌managers,‌ ‌land‌ ‌management‌‌
 
 
 
 
 
 
 
 
 
 
agencies,‌ ‌and‌ ‌others‌ ‌in‌ ‌designing‌ ‌wildlife‌ ‌compatible‌ ‌fences.‌ ‌The‌ ‌focus‌ ‌is‌ ‌on‌ ‌fence‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
design‌ ‌rather‌ ‌than‌ ‌detailed‌ ‌fence‌ ‌construction‌ ‌specifications.‌ ‌The‌ ‌goal‌ ‌is‌ ‌to‌ ‌provide‌‌
 
 
 
 
 
 
 
 
 
 
 
 
guidance‌ ‌in‌ ‌designing‌ ‌a‌ ‌fence‌ ‌that‌‌will‌‌achieve‌‌its‌‌objective‌‌with‌‌minimum‌‌impact‌‌to‌‌
 
 
   
 
 
 
 
 
 
 
 
 
 
wildlife.‌ ‌ 
●
If‌ ‌trenching‌ ‌will‌ ‌occur‌ ‌for‌ ‌the‌ ‌proposed‌ ‌project,‌ ‌the‌ ‌Department‌ ‌recommends‌ ‌that‌‌
 
 
 
 
 
 
 
 
 
 
 
 
trenching‌ ‌and‌ ‌backfilling‌ ‌crews‌ ‌be‌ ‌close‌ ‌together‌ ‌to‌ ‌minimize‌ ‌the‌ ‌amount‌ ‌of‌ ‌open‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
trenches‌ ‌at‌ ‌any‌ ‌given‌ ‌time.‌ ‌Where‌ ‌trenches‌ ‌cannot‌ ‌be‌ ‌back-filled‌ ‌immediately,‌ ‌the‌‌
 
 
 
 
 
 
 
 
 
 
 
 
Department‌‌recommends‌‌escape‌‌ramps‌‌be‌‌constructed‌‌at‌‌least‌‌every‌‌90‌‌meters.‌‌Escape‌‌

‌ 
Yellow‌ ‌Bell‌ ‌Solar‌ ‌and‌ ‌Storage‌ ‌Project‌ ‌ 
July‌ ‌27,‌ ‌2021‌ ‌ 
Page‌ ‌3‌ ‌ 
ramps‌‌can‌‌be‌‌short‌‌lateral‌‌trenches‌‌or‌‌wooden‌‌planks‌‌sloping‌‌to‌‌the‌‌surface.‌‌The‌‌slope‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
should‌‌be‌‌less‌‌than‌‌45‌‌degrees‌‌(1:1).‌‌Trenches‌‌that‌‌have‌‌been‌‌left‌‌open‌‌overnight‌‌should‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
be‌ ‌inspected‌ ‌and‌ ‌animals‌ ‌removed‌ ‌prior‌ ‌to‌ ‌backfilling.‌ ‌ 
‌ ‌
  
Thank‌‌you‌‌for‌‌the‌‌opportunity‌‌to‌‌provide‌‌comments‌‌on‌‌this‌‌proposed‌‌project.‌‌The‌‌Department‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
 
looks‌‌forward‌‌to‌‌continued‌‌communications‌‌with‌‌Maricopa‌‌County‌‌and‌‌RWE‌‌regarding‌‌project‌‌
 
 
 
 
 
 
 
 
 
 
 
 
development‌‌and‌‌implementation.‌‌Please‌‌contact‌‌me‌‌at‌‌623-236-7222‌‌or‌‌ACavalcant@azgfd.gov‌‌
 
 
 
 
 
   
 
 
 
if‌ ‌you‌ ‌have‌ ‌any‌ ‌questions,‌ ‌or‌ ‌would‌ ‌like‌ ‌to‌ ‌further‌ ‌discuss‌ ‌our‌ ‌concerns‌ ‌and‌ ‌recommendations.‌‌ ‌
  
‌ 
Sincerely,‌ ‌ 
‌ 
Andrew‌ ‌Cavalcant‌‌ ‌
  
Project‌ ‌Evaluation‌ ‌Project‌ ‌Specialist,‌ ‌Habitat‌ ‌Branch‌ ‌ 
‌ 
Cc‌
Ginger‌ ‌Ritter,‌ ‌Project‌ ‌Evaluation‌ ‌Program‌ ‌Supervisor‌ ‌AGFD‌ ‌(gritter@azgfd.gov)‌ ‌ 
 
Tyler‌ ‌Williford,‌ ‌Habitat‌ ‌Program‌ ‌Manager,‌ ‌Region‌ ‌IV‌ ‌(twilliford‌@azgfd.gov‌)‌ ‌ 
‌ 
AGFD‌ ‌#M21-06184841‌ ‌

From:
David Jacobs
To:
Ray Banker (PND)
Cc:
Michael O"hara
Subject:
CPA2021010 Yellow Bell Solar & CPA2021011 Hyder Solar
Date:
Friday, July 16, 2021 1:46:57 PM
Ray-
Our office recently received notifications for two large solar projects, Yellow Bell Solar
[CPA2021010] and Hyder Solar [CPA2021011], both involving significant acreage of lands
administered by the Arizona State Land Department [ASLD].  Our records indicate these
project areas have not been inventoried for cultural resources, and we recommend a qualified
cultural resource specialist survey the project areas to locate and identify any cultural
resources that may be present within these areas.  The narratives of both of the proposed solar
projects note their intent to complete the required survey and reporting as specified in the
County's Environment Policy # 5.
Our office looks forward to receiving an archaeological survey report for review, and
appreciates your cooperation with this office in considering the impacts of development to
cultural resources in the State of Arizona.  If you have any questions or concerns, please
contact me at djacobs@azstateparks.gov or 602-542-7140.
David Jacobs, Arizona State Historic Preservation Office

From:
Bruce Fenske
To:
whitney.rubin@rwe.com
Cc:
Ray Banker (PND); Gerardo (Gerry) Ramirez
Subject:
MCPA Application for Yellow Bell Solar
Date:
Tuesday, September 28, 2021 8:00:05 AM
Mr. Whitney:
The Southwest District of the Arizona Department of Transportation requests the opportunity
to review and comment on a traffic statement prepared by a professional engineer registered in
Arizona specifying the projected traffic volumes during construction.  Specifically, what is the
type (size and weight) and frequency of vehicles over what period of time expected to
access the site via the nearest crossroad to SR 85?  Please include a turning template for the
largest vehicle(s) turning to/from the intersecting crossroad and SR 85.
Thank you.
Bruce A. Fenske, P.E.
Assistant District Engineer
Southwest District
Tel.       928.317.2138
Mobile  928.210.8882

From:
Hobart Wingard
To:
Ray Banker (PND)
Cc:
Adam Copeland
Subject:
County Case Review
Date:
Tuesday, July 6, 2021 7:52:06 AM
Attachments:
image001.png
Good morning Mr. Banker,
The City of Buckeye is in receipt of the following cases to review/comment on:
·         CPA2021007 – Harquahala Sun
·         CPA2021010 – Yellow Bell Solar
·         CPA2021001 – Hyder Solar and Storage
After reviewing these three (3) solar major Comprehensive Plan Amendments,
Buckeye staff has no comments.
Thank you,
Bart
 
HOBART (BART) WINGARD | PRINCIpAL PLANNER | DEVELOpMENT SERVICEs
CITY OF BUCKEYE  |  530 EAsT MONROE AVENUE, BUCKEYE, AZ 85326
O: 623.349.6207 | C: 623.208.8830 | hwINGARD@BUCKEYEAZ.GOV
 
 
cIty haLL hOURs: mON-thURs 7am-6pm
CLOsED ON FRIDays
www.buckeyeaz.gov
 
This message contains confidential information and is intended only for the individual(s)
addressed in the message. If you are not the named addressee, you should not disseminate,
distribute, or copy this e-mail. If you are not the intended recipient, you are notified that
disclosing, distributing, or copying this e-mail is strictly prohibited.

502 N. 44th Street, Suite 200 ▪ Phoenix, AZ  85008 ▪ (602) 506-2364 ▪ (602) 506-3711 fax 
                                                                                        ➢Internet:  www.maricopa.gov/planning 
 
 
 
DATE: 
November 4, 2021 
 
TO: 
Planning & Zoning Commission  
 
FROM: 
Ray Banker, Senior Planner 
 
 
 
SUBJECT: 
CPA2021010 – Yellow Bell Solar 
 
Agenda Item: PZ-6 
 
After writing of the staff report for CPA2021010, staff received comments from Luke Air 
Force Base (LAFB) which are attached. They mention that the proposed solar facility 
“could possibly impact” flying operations as the site is near Military Training Routes (MTR) 
where jets fly as low as 300’. Their concerns specifically note a potential for glare and/or 
height of future electric transmission lines. However, these are issues not related to this 
CPA application, but rather, if warranted, would be addressed as part of the final site-
specific entitlement and design.  If this major CPA is approved, any future zone change 
application would be routed to LAFB for review and analysis of design considerations.  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Attachment: 
 
LAFB Comment Memo (2 pages)