December 8, 2021 
CPA2021011 
Page 1 of 2 
Report to the Board of Supervisors 
Prepared by the Maricopa County Planning and Development Department 
 
 
 
Board Hearing Date: 
December 8, 2021 
 
Case #/Title:   
 
 
CPA2021011 – Hyder Solar and Storage Project  
 
Supervisor District: 
5 
 
Applicant:  
Wood 
 
Owner: 
Multiple – See Attached Parcel/Ownership Exhibit with P&Z 
Report 
 
Request: 
Major Comprehensive Plan Amendment (CPA) to change 
the land use designation in the Vision 2030 Maricopa County 
Comprehensive Plan from Rural Development Area to Utilities. 
CPA case approval is by Resolution, attached. 
 
Site Location: 
Generally located north and south of the Hyder Rd. alignment 
with the northern boundary at W. Farm 42800 alignment, 
southern boundary at the Farm 50000S alignment, west 
boundary at the S Farm 587000W alignment, and the eastern 
portion at the NEC of Gila Mountain Rd. and Farm 57100W 
alignment. 
 
Site Size: 
Approx. 3,619 acres 
 
County Island Status: 
No 
Additional 
Comments: 
The 
applicant 
seeks 
a 
Major 
Comprehensive 
Plan 
Amendment to change the land use designation in the 
Comprehensive Plan to Utilities in order to develop a solar 
installation. The subject site is identified as having Rural 
Development Area land use designation in the Vision 2030 
Maricopa County Comprehensive Plan. All approx. 3,619 
acres are designated as Rural Development Area (0-1 
d.u./acre). This designation encourages low-density rural 
residential and agricultural uses. Staff received three (3) 
letters from other jurisdictions (Yuma County, City of Buckeye, 
and Apache Junction) expressing no concerns.  AZ Dept. of 
Game & Fish and AZSHPO commented on the as well.  These 
comments will be considered during a future zone change 
request.  Luke Air Force Base (LAFB) provided comments after 
the staff report was written, see attached memo with their 
concerns and staff’s comments. Although some of the 
Commissioners raised discussion with these late LAFB

December 8, 2021 
CPA2021011 
Page 2 of 2 
comments, staff notes that these concerns are not related to 
the CPA application for land use. LAFB would be routed any 
future zone change application material and would then be 
able to review and analyze aspects of the site including 
design considerations and provide additional comments if 
necessary. 
 
Commission  
 
Recommendation: 
On 11/4/21, the Commission voted 4-3 to recommend 
approval of CPA2021011 subject to conditions ‘a’ – ‘d’: 
  
a. 
Development and use of the site shall be in general conformance with the 
narrative report entitled “Hyder Solar and Storage Project” consisting of 21 pages, 
dated stamped received on September 29, 2021, except as modified by the 
following conditions.  
 
b. 
Development and use of the site shall be in conformance with the land use exhibit 
entitled “Hyder Solar and Storage Project – Land Use Exhibit” consisting of 1 page, 
dated stamped received on September 29, 2021, except as modified by the 
following conditions. 
 
c. 
The land use designation of utilities approved as part of case CPA2021011 shall be 
subject to the time limits set forth in the subsequent zone change. 
  
d. 
The applicant is proposing to develop a photovoltaic solar electric generating 
facility which, pursuant to the Maricopa County Comprehensive Plan, 
necessitates a change in the land use designation from Rural Development Area 
to Utilities. The proposal by the applicant represents a comprehensive approach 
to the subject property and will allow the applicant to pursue the proper 
entitlements pursuant to state law so that they can lawfully operate in 
unincorporated Maricopa County. This particular proposal is an appropriate plan 
for the property and is consistent with the overall intention of the comprehensive 
plan. However, in the event that the zone change or a zone change phase for this 
particular proposal is not approved by Maricopa County Board of Supervisors 
(BOS) within five (5) years from the date of Board approval of this comprehensive 
plan amendment, this amendment shall no longer be effective as the planning 
justification for this comprehensive plan amendment will no longer be present. In 
such instance, a change of the land use designation from Utilities to Rural 
Development Area will occur, and all comprehensive plan land use maps shall be 
altered to reflect as such, because this represents superior long-range planning by 
Maricopa County.  
 
Presented by: 
 
Ray Banker, Senior Planner 
Reviewed by: 
 
Darren Gerard, AICP, Planning Manager   
 
Attachments: 
 
11/4/21 P&Z Packet (46 pages) 
 
 
11/4/21 P&Z Handout Memo (3 pages) 
 
 
CPA2021011 Resolution (2 pages) 
 
 
Note: 
11/4/21 Draft P&Z Minutes are not available as of the writing of this report, but can 
be provided upon request later when available.

CPA2021011 
Page 1 of 12 
Report to the Planning and Zoning Commission 
Prepared by the Maricopa County Planning and Development Department 
 
 
 
Case: 
CPA2021011 – Hyder Solar and Storage Project  
 
Hearing Date: 
November 4, 2021 
 
Supervisor District: 
5 
 
  
 
Applicant: 
Wood 
 
Owners: 
Multiple – See Attached Parcel/Ownership Exhibit 
   
Request: 
Major Comprehensive Plan Amendment (CPA) to change the land 
use designation in the Vision 2030 Maricopa County Comprehensive 
Plan from Rural Development Area to Utilities. 
 
  
 
Site Location: 
Generally located north and south of the Hyder Rd. alignment with 
the northern boundary at W. Farm 42800 alignment, southern 
boundary at the Farm 50000S alignment, west boundary at the S 
Farm 587000W alignment, and the eastern portion at the NEC of Gila 
Mountain Rd. and Farm 57100W alignment. 
 
  
Site Size: 
Approx. 3,619 acres 
 
Density: 
N/A 
 
County Island:  
No 
 
 
County Plans: 
Vision 2030 Maricopa County Comprehensive Plan – Rural 
Development Area (0 -1 d.u./ac.) 
 
Municipal Plan: 
N/A 
 
Municipal Comments: 
Three (3) letters – Yuma County, Apache Junction, and Buckeye - No 
concerns 
 
Support/Opposition: 
None received 
 
Recommendation: 
Approve with conditions

CPA2021011 
Page 2 of 12 
Project Summary: 
 
1. 
Wood is requesting a Major Comprehensive Plan Amendment (CPA) to change the land 
use designation in the Vision 2030 Maricopa County Comprehensive Plan from Rural 
Development Area to Utilities to allow development of a future solar photovoltaic (PV) 
and battery energy storage system (BESS) power plant, including accessory uses 
(substation and O&M building). At full capacity, the facility would generate 
approximately 500 megawatts (MWs) of electricity with up to 1.1 million solar modules. 
The applicant will subsequently be required to obtain a zone change with overlay 
(including a precise plan of development) to IND-2 IUPD as part of the entitlement 
process within five (5) years (on a phase or for the entirety of the development).  
 
2. 
The site is comprised of multiple parcels under several different ownerships, which consists 
of approximately 2,490 acres of the 3,619-acre site. The remaining area in this proposal 
(approximately 1,128 acres) is overseen by the Arizona State Land Department (ASLD) 
located at the ultimate eastern, southern, and western boundaries of the site. See map 
below and attached parcel/ownership exhibit for full property ownership details 
including acreage and related APN’s. The Yuma County boundary line is located just 
west of the subject site.  
 
CPA2021011 Aerial with Project and Surrounding Area and ASLD Identified Land

CPA2021011 
Page 3 of 12 
3. 
Nearly all land used for solar energy projects are developed with large fields of solar 
collectors that capture the energy through photovoltaic technology. The subject site is 
relatively flat and allows for the development of solar energy with little or no additional 
grading. The current use of the site is primarily for agriculture, but includes other vacant 
land as well.  The general area contains significant local electrical infrastructure including 
a proposed connection to the 500kV Hoodoo Wash – Hassayampa transmission lines 
which bisect the site. Also bisecting the site is Hyder Rd. where there is an out of service 
Union Pacific Railroad right-of-way running parallel to this roadway.  
 
4. 
Other adjacent land uses include vacant, agricultural and very limited rural residential 
uses.  The applicant identifies that the nearest residences are located approx. ¾ of a mile 
from the subject site boundary. The site also includes approximately 182 acres of a 
previously approved ‘Industrial’ land use category at the northwest portion of the site. 
This was part of a previous request for a similar solar project per cases CPA2009023 & 
CPA2009024 (). These sites were never developed but show the ability for solar uses to be 
considered for this mostly rural and vacant area of the County.  
 
5. 
The narrative asserts that the proposed development meets the Comprehensive Plan 
Amendment criteria in the following manner:  
 
Whether the amendment constitutes an overall improvement to the Comprehensive Plan 
and is not solely for the good or benefit of a particular landowner or owners at a particular 
point in time.  
 
The narrative states that the Hyder Solar Project is in direct alignment with the County’s 
mission and core principles for leadership and strategic priorities. The project would 
provide benefits for the County, State and regional economy by providing employment 
during an 18 to 24-month construction window. As well as providing revenue 
opportunities for local businesses in the area.  
 
This project would also contribute to the regional electrical grid and could result in 
improved air quality through reduced emissions for electrical generation. This would be 
achieved by using interconnection with existing electrical infrastructure in the area. Solar 
technology is also good for keeping low water use as it does not require water for the 
generation of electric power. Water would only be used for panel and equipment 
maintenance.  
 
A majority of the site is relatively flat and undeveloped land where most of the request 
area has not been identified to have known sensitive biological or cultural resources. 
Ongoing discussions with SHPO and AZGFD indicated that additional analysis may be 
required in the future. The project would enable environmentally responsible and efficient 
land development and electrical generation.  
 
Whether the amendment will adversely impact all or a portion of the planning area.  
 
A. 
Altering acceptable land use patterns to the detriment of the plan  
 
According to the narrative, the amendment will not alter any surrounding land 
uses or land use patterns.  Most of the land use within the site is undeveloped open 
space. Agriculture land use would be temporarily unavailable during the life of the

CPA2021011 
Page 4 of 12 
project, but these practices could resume at the end of the design life of the 
project.  
 
B. 
Requiring public expenditures for larger or more expensive infrastructure 
 
The narrative states that the project would not require public expenditures for 
larger or more expensive infrastructure.  The costs of the project’s infrastructure 
such as gen-tie line, on-site connection lines, and access improvements shall be 
borne by the owner/developer. 
 
C. 
Requiring public improvements to roads, sewer, or water systems that are needed 
to support the planned land uses 
 
The narrative mentions that the project would require improvements to roads and 
the septic/potable water systems associated with the O&M building to support this 
type of use. However, any costs that may come up in the future would be borne 
solely by the developer. Water for construction would utilize on-site water wells 
associated with the project.  
 
D. 
Adversely impacting planned uses because of increased traffic  
 
The applicant describes that traffic in the area would increase during the 
construction of the project. However, this would only be a temporary impact to 
the transportation network lasting approximately 18-24 or 24-36 months 
depending on phasing. The project would not affect planned land uses during 
either construction or operation. Access to all existing land uses within the project 
area will remain open and unaffected. Potential traffic alterations will be 
addressed as part of the entitlement process for the future zone change 
application and plan of development for this project. A construction traffic plan 
would be developed in an effort to minimize impacts on existing land uses and 
access to these land uses. 
 
E. 
Affecting the livability of the area or health or safety of present and future residents  
 
There is existing electrical infrastructure in the area which the facility will tie into. 
The applicant is with understanding that screening and site enclosure would be 
required with proposed screening opacity at 80%. Specific type and location of 
site enclosures and screenings will be determined during the entitlement process 
to meet County zoning requirements. Prepping and construction would generate 
some emissions due to the equipment needed. However, dust control measures 
would be implanted for the purpose of mitigation. Once operational, the facility is 
not anticipated to generate air emissions, minimal vehicular and equipment visits 
would limit fugitive dust emissions.  
 
Wildfire prevention and mitigation would be incorporated with the subsequent 
POD/Zone Change proposals. Fire hazard risk may be reduced through the control 
or suppression of weeds. Herbicides would likely be necessary to control the 
spread of invasive weeds following construction disturbance as part of an 
integrated pest management strategy.

CPA2021011 
Page 5 of 12 
F. 
Adversely impacting the natural environment or scenic quality of the area in 
contradiction to the plan  
 
The applicant states that the project will not significantly impact the natural 
environment or overall scenic quality of the area.  A biological resources report 
that discusses fauna and flora within the project area is in progress. Desktop 
reviews to date have identified no federally listed species or their associated 
habitats as likely to occur on the site. The applicant has been in contact and will 
work with necessary agencies (AZGFD, AZ Department of Agriculture, etc.) to 
meet requirements.  
 
With the stated electrical infrastructure including transmission lines and other solar 
electric generation facilities within the region, the area is already set up for this 
type of use. Existing views from within the site will not be significantly obscured, 
because the height of panels will not obscure scenic views beyond the site. 
Screening requirements to be constructed in areas adjacent to existing residences 
will help minimize visual impact. 
 
Whether the amendment is consistent with the overall intent of the Comprehensive Plan. 
 
Maricopa County explicitly identifies encouraging solar energy development as an 
important goal, particularly in Economic Growth Policy 10, Energy Goal 2, Energy Policy 
6, and Water Resources Policy 5. This proposal of a future a utility-scale renewable energy 
facility, is in direct alignment with the County’s strategy to support the development of 
solar electrical generation. 
 
The project would benefit the local, County, state and regional economy by providing 
employment opportunities for numerous experienced professionals during the 
construction and implementation phases. Further, the electricity generated by the 
project would be distributed to the regional electrical grid. 
 
Environmental benefits of the project include the generation of up to 500 MWac and 
storage of up to 500 MWac of new electric energy. This project directly supports the 
County’s strategic priorities, as indicated in the discussion of the specific goals and 
policies of the Comprehensive Plan. 
 
The extent to which the amendment is consistent with the specific goals and policies 
contained within the plan. 
 
The applicant’s narrative contains a substantial list of Goals and Policies from the Vision 
2030 Maricopa County Comprehensive Plan. This staff report identifies which Goals and 
Policies the applicant’s narrative addressed. 
 
Vision 2030 Maricopa County Comprehensive Plan 
 
Land Use Element – Goal 1, Goal 3, Policy 1, Policy 2, Policy 7, Policy 11, Policy 13, Policy 
20, Policy 22, Policy 23, Policy 27, Policy 31, Policy 33 
 
Transportation Element – Goal 2, Policy 1, Policy 2, Policy 9, Policy 11, Policy 12, Policy 14 
 
Environment Element – Goal 1, Policy 3, Policy 4, Policy 5, Policy 7

CPA2021011 
Page 6 of 12 
Economic Growth Element – Goal 1, Goal 2, Policy 3, Policy 5, Policy 6, Policy 10 
 
Growth Area Element – Goal 1 
 
Open Space Element – Goal 1, Policy 2 
 
Water Resources Element – Goal 2, Policy 2, Policy 4, Policy 5, Policy 7 
 
Energy Element – Goal 1, Goal 2, Policy 1, Policy 4, Policy 6, Policy 7 
 
Cost of Development Element – Goal 2, Policy 1, Policy 2 
 
Other pertinent information as requested by the Maricopa County Planning Department 
Staff. 
 
The applicant was responsive and provided quality information as requested by 
Maricopa County Planning Department Staff. 
 
2018 Aerial Map

CPA2021011 
Page 7 of 12 
 
Zoning Map - Rural-190 Zoning District

CPA2021011 
Page 8 of 12 
 
 
Land Use Exhibits – Current Land Use (Rural Development Area) and Proposed Land Use (Utilities)

CPA2021011 
Page 9 of 12 
 
 
Existing On-Site and Adjacent Zoning / Land Use: 
 
6. 
On-site: 
 
Rural-190 / Vacant-Agricultural 
North: 
Rural-190 / Vacant-Agricultural  
South: 
Rural-190 / Vacant-Agricultural 
East: 
Rural-190 / Vacant-Agricultural 
West: 
Rural-190 / Vacant-Agricultural 
 
 
Utilities and Services: 
 
7. 
Water: 
TBD - Private Well or Hauled Water 
Wastewater: 
TBD - Septic 
School District: 
Sentinel Elementary School District #71  
Fire: 
TBD 
Police:  
MCSO  
 
Right-of-Way: 
 
8. 
The following table includes existing and future right-of-way* and the future 
classification** based upon the Maricopa County Department of Transportation 
(MCDOT) Major Streets and Routes Plan. 
 
Street Name 
Existing R/W 
Future R/W* 
Future 
Classification** 
Agua 
Caliente 
Rd./571st 
Ave. 
Varies 
65’ (half-width) 
Principal Arterial 
Hyder Rd.  
Varies 
30’ (half-width) 
Section Line 
Alignment 
Additional Section and 
Mid-Section Alignments 
 
Varies 
55’ and 40’ (half-
widths) 
Section and Mid-
Section 
Alignments 
 
**Required dedication/preservation and future classification of ROW is tentative and 
subject to change and will be established by MCDOT during a future Plan of 
Development review. 
 
Adopted Plan: 
 
9. 
Vision 2030 Maricopa County Comprehensive Plan: The entire site (approx. 3,619 acres) 
is designated as Rural Development Area (0-1 d.u./ac.).  The Rural Development Area 
land use designation encourages low-density rural residential and agricultural uses. 
 
Public Participation Summary: 
 
10. 
The applicant posted the subject site and staff notified all property owners within 300’ of 
the site.  Pursuant to state law, Staff issued enhanced notification letters to all adjacent 
and internal jurisdictions to Maricopa County, select state and regional agencies and 
Luke Air Force Base. Staff received three letters from jurisdictions (Yuma County, City of 
Buckeye, and City of Apache Junction) expressing no concerns. Moreover, state

CPA2021011 
Page 10 of 12 
agencies such as Arizona Game & Fish Department and SHPO issued comments.  Those 
comments have been included in the attachments section and are not actionable until 
future zoning and Plan of Development stages. ADOT also provided comments to request 
a future copy of the TIS to review expected traffic to be generated by the facility. County 
Staff received no opposition letters or any inquiries from the public regarding this request. 
 
11. 
The applicant stated within their Public Participation Results Report that a virtual public 
meeting was held on September 15, 2021 from 6:00 p.m. to 7:00 p.m. Notification was 
published in the Arizona Business Gazette and the Gila Bend Sun on September 2 & 9, 
2021. The report mentions that 6 members of the public attended the meeting where no 
questions were asked during this meeting. Also discussed within the report is mention of 
correspondence with the Tohono O’odham Nation which asked for copies of the cultural 
resources and biological surveys of the project area and requested further outreach to 
their Chairman for more detailed discussions moving forward.   
 
Outstanding Concerns from Reviewing Agencies: 
 
12. 
N/A 
 
Staff Analysis: 
 
13. 
The state and Maricopa County recognize the potential environmental and economic 
benefits that solar technology can provide. The Hyder Solar and Storage project will use 
photovoltaic technology that generates energy from sun absorption.  Photovoltaic 
technology differs from other techniques that required vast amounts of water to cool the 
units.  In contrast, very little water is utilized for photovoltaic technology.  As a result, this 
development would not pose a threat to groundwater depletion and would utilize this 
technology to implement water conservation measures. The additional temporary jobs 
for such a large facility are a benefit to Maricopa County and the region and would also 
benefit the local economy and businesses in the area with the influx of workers during the 
construction phases of this project.  
  
16. 
Staff believes the proposed solar facility is well suited to this rural area.  Solar facilities 
require large amounts of relatively flat land and the vast majority of the subject site is flat.  
Staff agrees with the applicant that the subject site is suitable due to proximity to 
electrical transmission lines, nearby stations and substations, and because the 
surrounding area is mostly undeveloped.  Staff agrees with the applicant that the project 
will not detrimentally affect the visual quality of the area. Since the area is primarily 
undeveloped vacant land in near proximity to existing solar and energy related 
infrastructure, staff believes there will be minimal impacts to the surrounding area. 
Screening would also be required and evaluated for type, location, height, etc. during 
the subsequent POD and zone change processes. Additionally, as previously mentioned, 
a portion of the subject site was already approved as part of a large-scale project for 
solar land uses in 2009. Given the existing infrastructure and means for solar in the area, 
this project is more suitable for solar energy related development in the near future.   
 
17. 
Promoting the development of solar energy over the past several years in Maricopa 
County reinforces the interest in promoting the County as an economic leader for solar 
development. Staff believes the Hyder Solar and Storage Project would add to this effort

CPA2021011 
Page 11 of 12 
in a positive way by providing the potential for temporary construction jobs.  There will 
also be small number of long-term employment opportunities for County residents.  
 
18. 
Staff believes the request is consistent with and meets the goals and policies of the 
Comprehensive Plan. Staff’s position is that this project, as proposed and as governed by 
the recommended conditions, represent proper long-term land use planning in the 
region and for Maricopa County as a whole. 
 
Recommendation: 
 
19. 
For the reasons outlined in this report, staff recommends the Commission motion for 
Approval, subject to conditions ‘a’ – ‘d’. 
 
a. 
Development and use of the site shall be in general conformance with the 
narrative report entitled “Hyder Solar and Storage Project” consisting of 21 pages, 
dated stamped received on September 29, 2021, except as modified by the 
following conditions.  
 
b. 
Development and use of the site shall be in conformance with the land use exhibit 
entitled “Hyder Solar and Storage Project – Land Use Exhibit” consisting of 1 page, 
dated stamped received on September 29, 2021, except as modified by the 
following conditions. 
 
c. 
The land use designation of utilities approved as part of case CPA2021011 shall be 
subject to the time limits set forth in the subsequent zone change. 
  
d. 
The applicant is proposing to develop a photovoltaic solar electric generating 
facility which, pursuant to the Maricopa County Comprehensive Plan, 
necessitates a change in the land use designation from Rural Development Area 
to Utilities. The proposal by the applicant represents a comprehensive approach 
to the subject property and will allow the applicant to pursue the proper 
entitlements pursuant to state law so that they can lawfully operate in 
unincorporated Maricopa County. This particular proposal is an appropriate plan 
for the property and is consistent with the overall intention of the comprehensive 
plan. However, in the event that the zone change or a zone change phase for this 
particular proposal is not approved by Maricopa County Board of Supervisors 
(BOS) within five (5) years from the date of Board approval of this comprehensive 
plan amendment, this amendment shall no longer be effective as the planning 
justification for this comprehensive plan amendment will no longer be present. In 
such instance, a change of the land use designation from Utilities to Rural 
Development Area will occur, and all comprehensive plan land use maps shall be 
altered to reflect as such, because this represents superior long-range planning by 
Maricopa County.

CPA2021011 
Page 12 of 12 
 
Presented by: 
Ray Banker, Senior Planner 
Reviewed by: 
Matthew Holm, AICP, Planning Supervisor 
 
Attachments: 
Case Map (1 page) 
 
Land Use Exhibits (1 page) 
 
Parcel Ownership Exhibit (1 page) 
 
Narrative Report (21 pages) 
 
MCESD Comments (1 page) 
 
AZGFD Comments (4 pages) 
 
SHPO Email (1 page) 
 
ADOT Email (1 page) 
 
Yuma County Email (1 page) 
 
City of Buckeye Email (1 page) 
 
City of Apache Junction Comments (1 page)

MARICOPA COUNTY 
 
Legal Description: Secs. 5, 7, 8, 17, T5S, R10W and Secs. 29, 32, 33, 34, T4S, 
R10W. 
Applicant:  Wood 
P&Z Hearing Date: November 4, 2021 
 
CPA2021011 
Aerial Date: 2018 
Case Address: TBD 
Parcels: Multiple 
SUPERVISORAL DISTRICT NO 5 
Major Comprehensive Plan Amendment to change the land use designation in the Maricopa County Comprehensive Plan from 
Rural Development Area to Utilities. 
Phone: 512-670-6152

CPA #2021011 
Major Comprehensive Plan Amendment Application  
Project Narrative 
Hyder Solar and Storage Project 
Maricopa County, Arizona 
 
 
 
 
 
Project Name:   
Hyder Solar and Storage Project  
Wood Project No.  
247775 
 
Wood Project Contact: Erin Cozart 
 
 
 
(512) 670-6152 
 
 
 
erin.cozart@woodplc.com 
 
 
 
Prepared for: 
 
 
Ellwood Land Holdings, LLC  
150 North Dairy Ashford Rd. 
Houston, Texas 77079 
 
Prepared by: 
 
 
Wood Environment & Infrastructure Solutions, Inc. 
4600 East Washington Street, Suite 600 
Phoenix, Arizona 85034-1917 
(602) 733-6000 
 
 
 
September 29, 2021 
Revision 3

CPA2021011 – Major Comprehensive Plan Amendment Application Project Narrative 
Hyder Solar and Storage Project 
 
September 29, 2021 
 
Revision 2 
 
Page i 
 
 
 
 
TABLE OF CONTENTS 
1 
PART A – EXECUTIVE SUMMARY ........................................................................................................................... 1 
1.1 
On-site and Regional Location ........................................................................................................................................ 1 
1.2 
CPA Size and Description of Land Use Types by Acreage ..................................................................................... 2 
1.3 
Roads/Transportation Systems Serving the Project ................................................................................................. 2 
1.4 
Suitability with Surrounding Land Uses ........................................................................................................................ 2 
2 
PART B - WHETHER THE AMENDMENT (OR CONDITION MODIFICATION) CONSTITUTES AN OVERALL 
IMPROVEMENT TO THE COMPREHENSIVE PLAN AND IS NOT SOLELY FOR THE GOOD OR BENEFIT OF A 
PARTICULAR LANDOWNER OR OWNERS AT A PARTICULAR POINT IN TIME. ................................................ 3 
3 
PART C - WHETHER THE AMENDMENT (OR CONDITION MODIFICATION) WILL ADVERSELY IMPACT ALL 
OR A PORTION OF THE PLANNING AREA BY: ..................................................................................................... 5 
3.1 
Altering Acceptable Land Use Patterns to the Detriment of the Plan. .............................................................. 5 
3.2 
Requiring Public Expenditures for Larger and More Expensive Infrastructure............................................... 5 
3.3 
Requiring Public Improvements to Roads, Sewer, or Water Systems that are Needed to Support the 
Planned Land Uses. .............................................................................................................................................................. 5 
3.4 
Adversely Impacting Planned Land Uses Because of Increased Traffic. ........................................................... 5 
3.5 
Affecting the Livability of the Area or Health or Safety of Present and Future Residents. ........................ 5 
3.6 
Adversely Impacting the Natural Environment or Scenic Quality of the Area in Contradiction to the 
Plan. ........................................................................................................................................................................................... 6 
4 
PART D - WHETHER THE AMENDMENT (OR CONDITION MODIFICATION) IS CONSISTENT WITH THE 
OVERALL INTENT OF THE COMPREHENSIVE PLAN. ............................................................................................ 7 
5 
PART E - THE EXTENT TO WHICH THE AMENDMENT (OR CONDITION MODIFICATION) IS CONSISTENT 
WITH THE SPECIFIC GOALS AND POLICIES CONTAINED WITHIN THE PLAN. ................................................. 8 
6 
PART F - OTHER PERTINENT INFORMATION AS REQUESTED BY THE MARICOPA COUNTY PLANNING 
DEPARTMENT STAFF. ........................................................................................................................................... 19 
List of Tables 
Table 1 
Consistency with Comprehensive Plan

CPA2021011 – Major Comprehensive Plan Amendment Application Project Narrative 
Hyder Solar and Storage Project 
 
September 29, 2021 
 
Revision 2 
 
Page 1 
 
 
 
1 
PART A – EXECUTIVE SUMMARY 
This narrative report addresses the required information to support the request for a Major Comprehensive 
Plan Amendment (CPA) to change the future land use designation from Rural-Densities (density range of 0 
– 1 d.u./ac.) to Utilities for the Hyder Solar and Storage Project (the project). Ellwood Land Holdings, LLC 
(Ellwood), as the Applicant, is proposing the construction and operation of an up to 500 megawatt 
alternating current (MWac) electrical generation facility consisting of solar modules and a battery energy 
storage system (BESS), collectively referred to as the project. The electrical generation capacity of the solar 
(photovoltaic) project will be up to 500 MWac and the BESS would have a net power capacity of up to 500 
MWac. The BESS will likely be designed to go through a single charge/discharge cycle on a 24-hour basis, 
storing/discharging up to 2 gigawatt hours (GWh). The project may be developed in approximately 250-
megawatt (MW) phases. The project would be located on up to 3,619 acres of land in unincorporated 
Maricopa County (County), approximately 30 miles west of the Town of Gila Bend.  
The project would include up to 1.1 million solar modules, rated at 655 watts direct current (dc) per module, 
and mounted on single-axis trackers. It should be noted that watts per module may vary at the time of 
construction; however, for planning purposes we have included an approximate module output of 665 watts 
dc. In addition to the installation of solar modules, the project would include the construction of a project 
substation, BESS, and operation and maintenance (O&M) building that would include a connection to a 
septic system. The project will interconnect to one of the 500kV Hoodoo Wash – Hassayampa transmission 
lines owned by San Diego Gas & Electric (SDG&E) and controlled through the California Independent 
System Operator (CAISO), located 0.4 mile north of Hyder Road. The substation, BESS, and O&M building 
would be located on approximately 50 acres within the project site. The project transmission interconnect 
would be a short span, anticipated less than 1,500 feet in length that connects to a 500-kilovolt (kV) 
transmission line on 135- to 200-foot structures above grade within an up to 200-foot right-of-way (ROW). 
The expected maximum net output, at the proposed point of interconnection from the combined solar 
modules and BESS is up to 500 MWac. The design life of the project is anticipated to be 40 years.  
1.1 
On-site and Regional Location 
The Applicant’s site is situated northeast of the Agua Caliente Mountains and north of the Gila River. 
Topographically, the site slopes slightly to the southeast toward the Gila River. Elevations within the Project 
site range between approximately 444 and 628 feet above mean sea level. The site is primarily open desert 
land and agricultural crop land and was historically native desert land. 
The site comprises up to 3,619 acres of land within unincorporated Maricopa County, located approximately 
30 miles west of Gila Bend. The site is bounded by Butterfield Stage Road to the north, the Gila River to the 
east and south, and the Maricopa and Yuma County boundary to the west. Generally, the center of the 
project is located at Hyder Road and Agua Caliente Road. The project will interconnect to the 500kV Hoodoo 
Wash - Hassayampa line transmission line, located 0.4 miles north of Hyder Road. The Applicant’s site 
consists of multiple parcels of land within the following Township (T), Range (R) and Sections: 
• 
T5S/R10W: Sections 5, 7, 8, 17; and, 
• 
T4SN/10W: Section 29, 32, 33, 34.

CPA2021011 – Major Comprehensive Plan Amendment Application Project Narrative 
Hyder Solar and Storage Project 
 
September 29, 2021 
 
Revision 2 
 
Page 2 
 
 
 
 
 
The Applicant has secured site control options or applied for Arizona State Land Department (ASLD) leases 
for all parcels included within the project boundary. A list of all parcels within the project boundary and a 
list of parcels within 300 feet of the project boundary are available under separate cover.  
1.2 
CPA Size and Description of Land Use Types by Acreage 
The request is for a major CPA to change the future land use of approximately 3,619 acres from Rural -
Densities (density range of 0 – 1 d.u./ac.) to Utilities. 
Land uses within and surrounding the site include rural development, irrigated row crops, aquatic 
agriculture, some commercial, utilities, and open space (i.e., native desert land). Also included within the 
site are two parcels designated as “Industrial” land use for the previously approved Verma Solar Hyder 
Parcels 1 and 2 (CPA2009023 and CPA2009024; approximately 182 acres). An out of service Union Pacific 
Railroad right of way, the existing 500kV Hoodoo Wash - Hassayampa transmission line corridor, and a 
pipeline (unknown commodity pipeline) all bisect the site parallel to Hyder Road. Various above-ground 
electric lines occur in and around the site.  
Several parcels in the northeast and southwest project area are State Trust Land owned by ASLD, 
approximately 1,128 acres. A commercial lease application with the ASLD was made and paid in November 
2020. As of the writing of this narrative, the ASLD has not provided a final opinion on the application. State 
Trust Land and land owned by the Bureau of Land Management (BLM) are also located within 0.5 miles of 
the Project site. 
1.3 
Roads/Transportation Systems Serving the Project 
The project site is located approximately 12 miles north of Interstate 8, via Agua Caliente Road. The project 
site is currently accessible along Hyder Road bisecting southwest to northeast in the middle of the site, as 
well as by Agua Caliente Road bisecting north to south. Several existing graded and asphalt-paved 
major/minor/local/farm roads exist within the project site.  
1.4 
Suitability with Surrounding Land Uses 
The site is situated in a prime location within the regional electric grid and in a relatively remote area suited 
for renewable energy development. Two CPAs were approved in 2011 (Verma Solar Hyder Parcels 1 and 2 
[CPA2009023 and CPA 2009024]) under an older land use designation for solar projects within the 
Applicant’s site. Although these sites were never developed, the suitability of this project with surrounding 
land uses is demonstrated by the County’s approval of these types of uses (i.e., solar farms); high voltage 
transmission lines occur near the site; and existing substation connecting to distribution level lines along 
Hyder Road. Further, the BLM has established two Solar Energy Zones in the vicinity of the site, Agua 
Caliente (10 miles to the west) and Gillespie (25 miles to the east). These Solar Energy Zones have been 
identified by BLM as areas well suited for utility-scale production of solar energy, where the BLM will 
prioritize solar energy and associated transmission infrastructure development. An agency stakeholder 
letter was sent to the BLM on July 29, 2021 to solicit comments, questions or concerns regarding this CPA 
request.

CPA2021011 – Major Comprehensive Plan Amendment Application Project Narrative 
Hyder Solar and Storage Project 
 
September 29, 2021 
 
Revision 2 
 
Page 3 
 
 
 
The site is relatively flat, primarily native desert land and agricultural land and is surrounded by agricultural 
land and native desert land. Dust generation as a result of the project is anticipated to be relatively low, as 
the land would lay fallow beneath solar arrays with minimal ground disturbance or vehicular activity 
compared to present activities. The project would not generate noise or use water during the production 
of electricity. The solar array (up to approximately 10 feet above ground when fully tilted) would be 
noticeable up to one-quarter to one-half mile away, generally along roads and nearby residences, but would 
blend into the background terrain for sensitive viewers at distances greater than one-half to one mile. 
However, the nearest residences to the site are located approximately 0.75 miles west of the site, near the 
junction of Yuma County Road 14 and Palomas Road/Hyder Road, in Yuma County. One additional 
residence is located approximately 0.9 miles southwest to the site is approximately 0.9 miles southwest of 
the site, on the south side of the Agua Caliente Mountains along Old Agua Caliente Road. The Agua Caliente 
Mountains provide screening of the project from this residence and other residences further west along Old 
Agua Caliente Road. The next closest residence is located approximately 1.4 miles southeast of the eastern 
site boundary.  
2 
PART B - WHETHER THE AMENDMENT (OR CONDITION MODIFICATION) CONSTITUTES AN 
OVERALL IMPROVEMENT TO THE COMPREHENSIVE PLAN AND IS NOT SOLELY FOR THE GOOD 
OR BENEFIT OF A PARTICULAR LANDOWNER OR OWNERS AT A PARTICULAR POINT IN TIME. 
The project would constitute an overall improvement to the Comprehensive Plan and is not being 
developed solely for the good or benefit of a particular landowner or owners. The County places 
demonstrable value on alternative energy development, as evidenced by the strategic priorities and core 
principles of the County’s Vison 2030 Comprehensive Plan. Maricopa County explicitly identifies 
encouraging solar energy development as an important goal, particularly in Economic Growth Policy 10, 
Energy Goal 2, Energy Policy 6, and Water Resources Policy 5.  
The project, as a utility-scale renewable energy generation and storage facility, is in direct alignment with 
the County’s mission and guiding principles for leadership and strategic priorities to leverage its resources 
to provide for a balanced regional economy.   
The project would benefit the local, County, state and regional economy by providing employment 
opportunities for numerous professionals per 250-MW phase of construction, each of which would occur 
over an 18- to 24-month construction window, beginning in 2023/2024, as well as revenue opportunities 
for local businesses. Further, the electricity generated by the project would be distributed to the regional 
electrical grid and wider west/southwest regions. The generation of solar electricity could also result in 
improved air quality through reduced emissions for electric generation, providing a benefit to air quality in 
Maricopa County and the State of Arizona, aligning with the County’s Environmental Goal 1. 
Many site characteristics were taken into consideration to ensure the project would be consistent with and 
upholding the County’s Comprehensive Plan policies and goals, and would enable efficient, responsible 
development. Amending the Comprehensive Plan to allow for solar energy electric generation in this 
location represents compatible land use strategy and efficient development patterns near existing electric 
utilities. The County’s Land Use Goal 1, Land Use Policy 33, and Energy Goal 3 for efficient development 
patterns would be supported by the project, given the location in an area that allows for efficient

CPA2021011 – Major Comprehensive Plan Amendment Application Project Narrative 
Hyder Solar and Storage Project 
 
September 29, 2021 
 
Revision 2 
 
Page 4 
 
 
 
interconnection with existing electrical infrastructure (i.e., high voltage transmission lines) serving regional 
electrical load growth. As stated previously, there are two previously approved (but never developed) solar 
energy generation projects sited in the project, demonstrating consistency in land use and utility siting by 
the County.  
The area has a developed road system, such that the need for additional infrastructure would be minimized 
and the project would not place excess burden on existing infrastructure, and existing and future road 
alignments would be maintained, supporting the County’s Transportation Goal 2 and Transportation Policy 
1 and Policy 2.  
As a low water use facility (construction = approximately 30,000 gallons per acre and O&M = approximately 
200 gallons per acre per year), it does not require water in the generation of electrical power and requires 
very little water for panel and equipment maintenance, supporting the County’s Water Resources Goal 4 
and Water Resources Policy 3 and Policy 5.  
The site is primarily relatively flat undeveloped desert land or agricultural land and would require little 
additional grading for site development, reducing topographic disturbance and directly aligning with the 
County’s Environmental Policy 8. The majority of the site consists of native desert land and has not been 
identified to have known sensitive biological resources or cultural resources, demonstrating compatibility 
with the County’s Land Use Policy 22 and Policy 27, and Environmental Policy 4. Ongoing consultation with 
Arizona State Historic Preservation Office (AZ SHPO) and Arizona Game and Fish Department (AZGFD) have 
indicated additional biological and cultural resources analyses may be required. AZ SHPO has 
recommended cultural resources survey of the project area given a large portion of the project area has not 
previously been inventoried for cultural resources and provided to the AZ SHPO (email addressed to Ray 
Banker, MCPND, dated July 16, 2021). AZGFD has recommended the project follow the AZGFD’s Guidelines 
for Solar Development in Arizona to determine species presence in the project area (letter addressed to Ray 
Banker and Adam Cannon, MCPND, dated July 27, 2021). Specifically, AZGFD indicated additional 
coordination is recommended to address potential concerns with the Sonoran pronghorn designated 
experimental nonessential population. AZGFD also recommended evaluating for suitable habitat for 
western burrowing owl and Sonoran desert tortoise. Further, AZGFD provided general recommendations 
for best management practices during construction, and project design elements such as facility lighting, 
power poles and powerlines, fencing, site hydrology, and temporary trenching.    
In summary, the project would enable environmentally responsible, efficient land development and 
electrical generation within the County that would support County, state, and regional residents and the 
economy. The project would allow for the use of existing powerline corridors, existing road infrastructure 
and existing energy transmission, and would require minimal disturbance to topography and natural or 
cultural resources to generate solar electricity. The project would provide employment and revenue 
opportunities within the County over an 18- to 24-month construction window for each development phase. 
These project characteristics uphold the County’s Comprehensive Plan strategies, goals, and policies and 
constitute an overall improvement to the comprehensive plan, local and regional economy, and regional 
energy production, that is not solely for the good or benefit of a particular landowner or other project 
proponent at a particular time.

CPA2021011 – Major Comprehensive Plan Amendment Application Project Narrative 
Hyder Solar and Storage Project 
 
September 29, 2021 
 
Revision 2 
 
Page 5 
 
 
 
3 
PART C - WHETHER THE AMENDMENT (OR CONDITION MODIFICATION) WILL ADVERSELY 
IMPACT ALL OR A PORTION OF THE PLANNING AREA BY: 
3.1 
Altering Acceptable Land Use Patterns to the Detriment of the Plan. 
The project would not alter acceptable land use patterns that would be detrimental to the Comprehensive 
Plan. Most of the land use within the site is open space (i.e., undeveloped native desert land). Other existing 
land uses within the site include utilities and commercial/industrial operations. These land uses would 
continue with the implementation of the project.  
Some of the land uses within the site are associated with agriculture. These land uses would be temporarily 
unavailable during the life of the project (i.e., 40 years). Agricultural practices could resume at the end of 
the design life of the project.  
3.2 
Requiring Public Expenditures for Larger and More Expensive Infrastructure.  
The project would not require any public expenditures for larger and more expensive infrastructure. The 
costs of the project’s infrastructure needs, such as gen-tie line and on-site collection lines, and required site 
access improvements shall be borne by the Applicant. 
3.3 
Requiring Public Improvements to Roads, Sewer, or Water Systems that are Needed to 
Support the Planned Land Uses. 
The project would require improvements to roads (e.g., underground cabling and access), septic, and 
potable water system associated with the O&M building to support the planned land use. The project area 
is served by existing roads and the temporary project construction traffic is not anticipated to overburden 
the existing road system. The costs of the project’s infrastructure needs, such as access road improvements, 
MCDOT-requested road improvements (e.g., project required underground conduit and wiring, entrance 
road apron), septic, limited temporary and operational water needs and domestic waste, shall be borne by 
the Applicant. Water for construction and O&M would utilize on-site water wells associated with the project. 
3.4 
Adversely Impacting Planned Land Uses Because of Increased Traffic.  
During construction, traffic will increase in the area. However, this would be a temporary impact to the 
transportation network, lasting approximately 24-36 months per 250-MW phase of construction. If the 
project is constructed in approximately 250-MW phases, there would be approximately two construction 
phases, each over an 18- to 24-month period. The project would not affect planned land uses during either 
construction or operation. Access to all existing land uses within the project area will remain open and 
unaffected. Potential traffic alterations will be addressed as part of the entitlement process for the future 
zone change application and plan of development for this project. A construction traffic plan would be 
developed in an effort to minimize impacts on existing land uses and access to these land uses. 
3.5 
Affecting the Livability of the Area or Health or Safety of Present and Future Residents.  
The project would not have an impact on livability or health or safety of present or future residences within 
the project area. Currently there is electrical infrastructure (e.g., transmission lines, solar electrical generating 
facilities) as well as above-ground electrical distribution lines and transportation networks within the project 
area and the region. The Applicant understands that the County will require a site enclosure and screening

CPA2021011 – Major Comprehensive Plan Amendment Application Project Narrative 
Hyder Solar and Storage Project 
 
September 29, 2021 
 
Revision 2 
 
Page 6 
 
 
 
to provide screening where the project is adjacent to existing residences. This screening would be at 80% 
opacity per county direction. Specific type and location of site enclosures and screenings will be determined 
during the entitlement process to meet County zoning requirements. Site preparation and construction 
would generate some emissions due to the use of construction equipment and dust control measures would 
be implemented to minimize fugitive dust emissions. Project operations would not generate air emissions; 
project maintenance would generate minimal vehicle and equipment emissions and fugitive dust emissions 
from personnel accessing the project site and utilizing limited vehicles or equipment. The project would be 
managed in accordance with local, state, and federal regulations to minimize risk and exposure to the public 
and the environment. 
Wildfire prevention and mitigation measures would be incorporated into the Specific Plan of Development 
associated with the Zone Overlay process. All applicable local and county fire laws and regulations will be 
complied with and all reasonable measures will be taken to prevent fires on the site. Fire hazard risk may 
be reduced through the control or suppression of weeds. All weed control would be conducted in 
compliance with County regulations. Herbicides would likely be necessary to control the spread of invasive 
weeds following construction disturbance as part of an integrated pest management strategy. 
3.6 
Adversely Impacting the Natural Environment or Scenic Quality of the Area in Contradiction 
to the Plan.  
The project would not adversely impact the natural environment or the scenic quality of the area. A 
biological resources report that discusses fauna and flora within the project area is in progress and will be 
provided under separate cover. In addition to a field site investigation, the US Fish and Wildlife Service 
Information for Planning and Consultation website and the AZGFD Online Environmental Review Tool will 
be queried for information on special status species, including federal threatened and endangered species, 
for the project area. Desktop reviews to date have identified no federally listed species or their associated 
habitats as likely to occur on the site. Native plants protected under Arizona Native Plant Law, administered 
by the Arizona Department of Agriculture, will be identified on the site prior to construction and relocated 
or salvaged as required. Native plant removal, relocation, or sale will be noticed as required by Arizona 
Administrative Code Title 3, Chapter 3, Article II. Further, the project will strive to avoid the Gila River as well 
as identified Waters of the United States and wetlands. 
A Class I Cultural Resources Inventory consisting of a literature review and site files review is in progress 
and will be provided under separate cover. Known archeological sites would be avoided.  Additionally, the 
State of Arizona requires that the inadvertent discovery, during construction, of human remains and 
funerary objects be reported to the Director of the Arizona State Museum (ARS 41-865) upon discovery.  
Finally, the project would not significantly impact the scenic quality of the area. Currently there is electrical 
infrastructure (e.g., transmission lines, solar electrical generating facilities) as well as above-ground electrical 
distribution lines and transportation networks within the project area and the region. Existing views from 
within the site will not be significantly obscured, because the height of panels will not obscure scenic views 
beyond the site. The Applicant understands that the County will require an 80% opacity screen be 
constructed in areas adjacent to existing residences to minimize visual impact.

CPA2021011 – Major Comprehensive Plan Amendment Application Project Narrative 
Hyder Solar and Storage Project 
 
September 29, 2021 
 
Revision 2 
 
Page 7 
 
 
 
4 
PART D - WHETHER THE AMENDMENT (OR CONDITION MODIFICATION) IS CONSISTENT WITH 
THE OVERALL INTENT OF THE COMPREHENSIVE PLAN. 
Maricopa County places demonstrable value on alternative energy development, as evidenced by the 
strategic priorities and core principles of the County’s Vison 2030 Comprehensive Plan. Maricopa County 
explicitly identifies encouraging solar energy development as an important goal, particularly in Economic 
Growth Policy 10, Energy Goal 2, Energy Policy 6, and Water Resources Policy 5. The County’s strategy 
encouraging renewable energy development is provided as follows: 
Renewable Energy 
Maricopa County has the potential to be a global leader in renewable energy research and 
development, especially with respect to solar energy. Maricopa County is one of the most 
productive spots in the world for both photovoltaic and concentrated solar energy generation. 
Many companies have already discovered this potential, evidenced by the large number of 
utility-scale plants being planned in unincorporated areas. Because of the economic and 
environmental benefits Maricopa County supports state and local efforts to attract solar 
research and development to this region. 
Strategies - Attract solar and other alternative energy research and development to Maricopa 
County. 
The project, a utility-scale renewable energy facility, is in direct alignment with the County’s strategy to 
support the development of solar electrical generation.  
The project would benefit the local, County, state and regional economy by providing employment 
opportunities for numerous experienced professionals per 250-MW phase of construction, each of which 
would occur over an 18- to 24-month construction window, beginning in 2023/2024. Spending for 
construction activities and workers would also provide revenue opportunities to local businesses in the 
County and state. Further, the electricity generated by the project would be distributed to the regional 
electrical grid.  
Environmental benefits of the project include the generation of up to 500 MWac and storage of up to 500 
MWac of new solar energy to meet the needs of a growing population in Maricopa County and the state. 
The generation of solar electricity could also result in improved air quality through reduced emissions for 
electric generation, aligning with the County’s Environmental Goal 1. 
Further, the project displays consistency with the County’s vision to work collaboratively and effectively for 
its residents and mission to provide regional leadership by encouraging the development of solar energy 
generation facilities. The decision to support this project would directly align with the County’s strategic 
priorities to leverage its resources, plan for effective and efficient infrastructure, and manage county 
resources to promote financial stability and economic prosperity for its residents. One of the County’s core 
principles is to support implementation of the County’s strategic priorities. This project directly supports 
the County’s strategic priorities, as indicated in the discussion of the specific goals and policies of the 
Comprehensive Plan in the following section.

CPA2021011 – Major Comprehensive Plan Amendment Application Project Narrative 
Hyder Solar and Storage Project 
 
September 29, 2021 
 
Revision 2 
 
Page 8 
 
 
 
5 
PART E - THE EXTENT TO WHICH THE AMENDMENT (OR CONDITION MODIFICATION) IS 
CONSISTENT WITH THE SPECIFIC GOALS AND POLICIES CONTAINED WITHIN THE PLAN.  
The project will use photovoltaic and battery technology and will require very little water use during 
operations, with the exception of as-needed maintenance for cleaning the solar panels and equipment and 
water use associated with the O&M building. Maricopa County recognizes the potential environmental and 
economic benefits of solar developments within the Comprehensive Plan, as indicated by multiple goals 
and policies, which are highlighted in Table 1. 
The Applicant believes the project is well suited for the selected area, given the availability of a large amount 
of relatively flat land. Further, proximity to the 500kV Hoodoo Wash - Hassayampa transmission line corridor 
makes this location ideal in terms of minimizing the long electrical interconnects required for the 
transmission of electricity to the regional electrical grid. Moreover, the area surrounding the site is mostly 
undeveloped, although agricultural lands are located to the north and south of the site.  
It is recognized that several residences occur outside of but near the project, to the west, southwest, and 
one residence north of the southeastern portion of the project. U.S. Census tract data indicate approximately 
9 households are located within 2 miles of the project. All landowners within 300 feet of the project site 
have been sent notification letters soliciting comments, questions and concerns regarding the proposed 
project. Signs to notify the public have been posted along County-maintained roadways. The existing visual 
setting has been previously impacted by: electrical infrastructure including high voltage transmission lines, 
and electrical substations; transportation network (e.g., arterial roads and railway); and agricultural farms 
and their attendant infrastructure (e.g., water pumps, canals, farm roads, distribution lines, and cotton gin). 
Further, for residences south of the project, the Agua Caliente Mountains provide screening of the project 
from these residences. 
The project would contribute to the existing visual clutter within the region; however, given the low-profile 
design of the array, BESS, O&M building, and other ancillary facilities, it is not expected to adversely impact 
existing views or the existing natural/man-made setting. The most prominent feature on the landscape 
would be the project’s 500kV interconnect, which would be constructed on structures approximately 135 to 
200 feet tall and would be visible. However, this interconnect would occur in an area that already has a 
500kV transmission line present (i.e., the 500kV Hoodoo Wash – Hassayampa transmission line) and would 
be relatively short, anticipated to be less than 1,500 feet in length. 
Finally, the Applicant believes that this project would assist the County in promoting its goal to encourage 
solar development and the creation of jobs (both temporary construction jobs and permanent O&M jobs) 
associated with these types of development. The Applicant believes the project is wholly consistent with 
specific goals and policies within Maricopa County’s Comprehensive Plan. 
Table 1 includes a complete accounting of relevant comprehensive plan elements, their attendant policies, 
and the consistency of the project with these policies. The project is overwhelmingly consistent with the 
intent of the Comprehensive Plan.

CPA2021011 – Major Comprehensive Plan Amendment Application Project Narrative 
Hyder Solar and Storage Project 
 
September 29, 2021 
 
Revision 2 
 
Page 9 
 
 
 
Table 1 – Consistency with Comprehensive Plan 
Comprehensive Plan 
Elements 
Comprehensive Plan Policies 
Consistency with Comprehensive Plan 
Land Use Element 
Land Use  
Goal #1  
Achieve balanced and efficient 
development patterns. 
Consistent 
The project is located near existing high voltage 
transmission lines; amending the Comprehensive Plan 
to allow for solar energy electric generation in this 
location represents compatible land use strategy and 
efficient development patterns near existing electric 
utilities.  
Land Use  
Goal #3 
Protect the public health, safety, 
and well-being. 
Consistent 
The 
project 
would 
provide 
renewable 
energy 
generation that could result in improved air quality 
through reduced emissions from fossil fuel electric 
generation. The project would be considered a low-
intensity use.  
Land Use  
Policy #1  
Maricopa 
County 
supports 
compliance 
with 
its 
capital 
improvement and other funding 
programs, 
except 
when 
reimbursement is made to the 
County for unplanned costs or 
when services and infrastructure 
are funded by private capital. 
Consistent  
The project would be funded by private capital. All 
infrastructure improvements required for the project 
shall be paid for by the Applicant.  
Land Use 
Policy #2 
Maricopa 
County 
supports 
phasing plans for new urban 
development to coordinate such 
development with new urban 
services and infrastructure. 
Consistent 
The project may be developed as a phased energy 
infrastructure development and the Applicant will 
coordinate with County agencies regarding new 
services and infrastructure. 
Land Use  
Policy #7 
Maricopa 
County 
supports 
coordinating 
land 
use 
and 
infrastructure 
planning 
with 
state agencies, counties, and 
municipalities. 
Consistent 
The Applicant will continue to coordinate closely with 
all applicable local, county, state, and federal agencies 
throughout development of the project, including the 
evaluation of enhanced gen-tie routing to adjacent and 
internal jurisdictions, as well as addressing topics 
pertaining to land and resource management, public 
safety, 
environmental 
and 
cultural 
resources, 
transportation 
and 
infrastructure, 
economic 
development, and large-scale solar electrical generation 
permitting.

CPA2021011 – Major Comprehensive Plan Amendment Application Project Narrative 
Hyder Solar and Storage Project 
 
September 29, 2021 
 
Revision 2 
 
Page 10 
 
 
 
Comprehensive Plan 
Elements 
Comprehensive Plan Policies 
Consistency with Comprehensive Plan 
Land Use  
Policy #11  
Where 
feasible, 
Maricopa 
County supports including State 
Trust land in the planning and 
design of large-scale urban 
development. 
Consistent 
Several parcels in the Project area are State Trust Land, 
approximately 1,128 acres. A commercial lease 
application with the ASLD was made and paid in 
November 2020. As of the writing of this narrative, the 
ASLD has not provided a final opinion on the 
application. 
Land Use  
Policy #13  
Where 
necessary, 
Maricopa 
County 
supports 
wildfire 
prevention 
and 
mitigation 
measures in the design of 
development. 
Consistent 
Wildfire prevention and mitigation measures would be 
incorporated into the Specific Plan of Development. All 
applicable local and county fire laws and regulations will 
be complied with and all reasonable measures will be 
taken to prevent fires in the project. All construction 
personnel will be instructed on emergency response to 
fire events; clear away all flammable material for a 
minimum of 10 feet from areas of operations where a 
spark, fire, or flame could be generated; equipment 
parking areas and small stationary engine sites will be 
cleared of all flammable materials prior to use; gas and 
oil storage areas will be clearly marked, cleared of all 
flammable material, “No Smoking” signs will be posted, 
and all used and discarded oil filters, oily rags, or other 
waste will be disposed of in an approved manner. The 
project will reduce fire hazard risk through the control 
or suppression of weeds, and all weed control would be 
conducted in compliance with County and State 
requirements.  
Land Use  
Policy #20  
Maricopa 
County 
supports 
reducing the impacts of new 
urban development on existing 
rural land uses and agriculture. 
Consistent 
The project would have no impact on nearby 
agricultural and rural land uses. At the end of the life of 
the project, agricultural practices could resume on the 
site because the underlying soils would have been 
minimally impacted during the lifetime of the project.

CPA2021011 – Major Comprehensive Plan Amendment Application Project Narrative 
Hyder Solar and Storage Project 
 
September 29, 2021 
 
Revision 2 
 
Page 11 
 
 
 
Comprehensive Plan 
Elements 
Comprehensive Plan Policies 
Consistency with Comprehensive Plan 
Land Use  
Policy #22  
Maricopa 
County 
supports 
reducing the impacts of new 
development in environmentally 
sensitive areas, including native 
wildlife (flora and fauna) habitat 
and corridors. 
Consistent 
The project is located in an area away from 
environmentally sensitive areas and agency dedicated 
wildlife habitats. No development would occur within 
the Gila River, allowing wildlife to continue to use that 
habitat. The Applicant will continue to coordinate with 
AZGFD and AZ SHPO (for additional information please 
see Section 2 Part B above), Arizona Department of 
Agriculture, and other agencies and will be used to 
refine site development and environmental protective 
measures. The project would comply with the Arizona 
Native Plant Law and other regulations associated with 
the protection of sensitive native wildlife. 
Land Use  
Policy #23  
Maricopa 
County 
supports 
reducing the impacts of new 
development 
on 
Maricopa 
County’s regional parks, the 
Maricopa Trail, and other public 
open spaces. 
Consistent 
The project is located away from, and will not impact, 
Maricopa County’s regional parks, the Maricopa Trail, or 
other public open spaces. 
Land Use  
Policy #27  
Maricopa 
County 
supports 
keeping development out of 
delineated floodways and, where 
necessary, 100-year floodplains. 
Consistent 
The project will not be developed in a floodway. Further, 
the project will comply with Maricopa County and 
federal regulations associated with development in a 
floodplain. 
Land Use  
Policy #31 
To promote safe and active 
communities Maricopa County 
supports 
public 
safety 
and 
security features included in the 
design of new and existing 
development. 
Consistent 
All required safety and security measures will be 
incorporated into the project. For example, the project 
will be fenced and include nighttime security lighting, 
all roads will be consistent with County regulations 
associated with first responder access (turn-around 
radii, Knox Box, road widths), and fire detection and 
suppression systems will be in conformance with 
County Fire Marshal requirements.

CPA2021011 – Major Comprehensive Plan Amendment Application Project Narrative 
Hyder Solar and Storage Project 
 
September 29, 2021 
 
Revision 2 
 
Page 12 
 
 
 
Comprehensive Plan 
Elements 
Comprehensive Plan Policies 
Consistency with Comprehensive Plan 
Land Use  
Policy #33  
Maricopa County supports using 
land use buffers and compatible 
land use strategies near existing 
and future high voltage electric 
utility line corridors. 
Consistent 
The project is located near existing high voltage 
transmission lines. Sufficient buffers, as directed by the 
County, to provide safety exclusion zones/distancing 
will be incorporated to not interfere with these existing 
land uses. A solar farm acts as an efficient buffer by 
providing further separation from these existing 
electrical features and surrounding agriculture and rural 
land uses. Further, all applicable setbacks will be 
incorporated into the project layout. 
Transportation Element 
Transportation 
Goal #2 
Contribute to a safe, seamless 
and 
effective 
transportation 
system. 
Consistent 
The project will support preserving the existing and 
future road alignments in the project area and will 
comply 
with 
Maricopa 
County 
Department 
of 
Transportation planning objectives. 
Transportation 
Policy #1  
As necessary, Maricopa County 
supports preserving future road 
alignments called for in County-
recognized transportation plans, 
especially 
mid-section 
line, 
section line and arterial roads; 
parkways; 
freeways; 
and 
interchanges. 
Consistent 
The project will support preserving the existing and 
future road alignments in the project area and will 
comply 
with 
Maricopa 
County 
Department 
of 
Transportation planning objectives. Technical review for 
preserving the existing and future road alignments 
would occur during the zoning/plan of development 
review; potential needs for traffic impact statements or 
studies will be identified depending on Maricopa 
County Department of Transportation requirements. 
Transportation 
Policy #2  
Maricopa 
County 
supports 
compliance 
with 
its 
Major 
Streets and Routes Plan. 
Consistent 
The project will support preserving the existing and 
future road alignments in the project area and will 
comply 
with 
Maricopa 
County 
Department 
of 
Transportation planning objectives. 
Transportation 
Policy #9  
Maricopa 
County 
supports 
balanced and efficient land use 
patterns that reduce the number 
and length of vehicle trips. 
Consistent 
Once operational, the project site will require minimal 
staff (2-3 personnel per 8-hour shift [24-hour round the 
clock staffing]), resulting in few vehicle trips to and from 
the site.

CPA2021011 – Major Comprehensive Plan Amendment Application Project Narrative 
Hyder Solar and Storage Project 
 
September 29, 2021 
 
Revision 2 
 
Page 13 
 
 
 
Comprehensive Plan 
Elements 
Comprehensive Plan Policies 
Consistency with Comprehensive Plan 
Transportation 
Policy #11  
Maricopa 
County 
supports 
National Ambient Air Quality 
Standards compliance. 
Consistent 
The project would adhere to the National Ambient Air 
Quality Standards. The project will generate renewable 
energy that would result in improved air quality through 
reduced emissions for electric generation as compared 
to other electric generation technologies. 
Transportation 
Policy #12  
Maricopa 
County 
supports 
improving low volume dirt roads 
as directed by its PM-10 Dust 
Abatement Program. 
Consistent 
A Dust Abatement Permit will be required prior to 
project construction. The project will submit a dust 
control 
plan 
to 
Maricopa 
County 
Air 
Quality 
department. 
Use 
of 
dirt 
roads 
will 
include 
implementation of, when and where needed, dust 
abatement techniques during construction and O&M.  
Transportation 
Policy #14  
Where 
necessary, 
Maricopa 
County 
supports 
roadway 
planning 
that 
promotes 
identified 
scenic 
corridors, 
wildlife 
connectivity 
and 
linkages. 
Consistent 
Continued coordination with AZGFD will facilitate 
identification 
of 
pertinent 
mitigation 
measures, 
incorporated into the project design, that provide for 
wildlife connectivity and linkages. 
Environment Element 
Environmental 
Goal #1 
Provide regional leadership to 
promote all aspects of regional 
environmental quality. 
Consistent 
The project will generate renewable energy that would 
result in improved air quality through reduced 
emissions for electric generation, providing a benefit to 
air quality in Maricopa County. Appropriate protective 
measures for biological and cultural resources will be 
implemented to minimize or prevent impacts to these 
resources. The project will require very little water for 
construction 
and 
operation. 
Amending 
the 
Comprehensive Plan to enable this project would 
demonstrate 
responsible 
leadership 
to 
promote 
regional environmental quality.  
Environment  
Policy #3  
To help protect water quality, 
Maricopa 
County 
supports 
compliance with its Drinking 
Water program and its Water 
and 
Wastewater 
Treatment 
program. 
Consistent 
The project would be consistent with Maricopa County’s 
Drinking and Wastewater Treatment programs, to 
provide appropriate water management and treatment 
to maintain water quality standards as required.

CPA2021011 – Major Comprehensive Plan Amendment Application Project Narrative 
Hyder Solar and Storage Project 
 
September 29, 2021 
 
Revision 2 
 
Page 14 
 
 
 
Comprehensive Plan 
Elements 
Comprehensive Plan Policies 
Consistency with Comprehensive Plan 
Environment  
Policy #4  
Maricopa 
County 
supports 
innovative project design and 
development techniques that 
protect important plant and 
animal habitat and migration 
corridors. 
Consistent 
The project will be designed to avoid impacts to 
identified 
agency-designated 
animal 
habitats 
or 
migration corridors during project construction and 
O&M. The Applicant will continue to coordinate with 
AZGFD to identify  pertinent habitats and corridors, and 
identify potential development techniques to avoid or 
minimize impacts to these resources (for additional 
information please see Section 2 Part B above). 
Environment 
Policy #5  
As directed by the State Historic 
Preservation Office and Arizona 
Game and Fish Department, 
Maricopa 
County 
supports 
cultural resource and biological 
surveys being completed – and 
needed 
mitigation 
measures 
established – prior to new 
development. 
Consistent 
The project would complete required cultural and 
biological reporting and surveys as directed from the 
State Historic Preservation Office and Arizona Game 
and Fish Department. A Biological Resources Report 
and Class I Cultural Resources Inventory are in progress. 
Appropriate 
protection 
measures 
or 
mitigation 
measures will be developed in coordination with the 
agencies. 
Environment 
Policy #7  
Where 
necessary, 
Maricopa 
County 
supports 
noise 
reductions in new development 
design and in the construction of 
new buildings. 
Consistent 
The project would conform to required noise mitigation 
during construction and would maintain hours of 
operation consistent with County regulations. The 
project would not generate audible noise from sensitive 
receptors during the production of electricity. 
Economic Element 
Economic Growth  
Goal #1 
Contribute 
to 
an 
effective 
regional economy. 
Consistent 
Because of the high solar resource available in Arizona, 
and Maricopa County in particular, the project would 
harness and convert the readily available solar 
irradiation into an important power resource. The 
project 
would 
employ 
numerous 
experienced 
professionals from the local community, Maricopa 
County 
and 
surrounding 
region 
per 
250-MW 
construction phase which would occur over an 18- to 
24-month 
construction 
window, 
beginning 
in 
2023/2024. Construction workers would purchase food 
and incidentals at local retail businesses. Construction 
workers would sleep either at their homes or at local 
motels. On-site housing would not be provided during 
construction.

CPA2021011 – Major Comprehensive Plan Amendment Application Project Narrative 
Hyder Solar and Storage Project 
 
September 29, 2021 
 
Revision 2 
 
Page 15 
 
 
 
Comprehensive Plan 
Elements 
Comprehensive Plan Policies 
Consistency with Comprehensive Plan 
Economic Growth  
Goal #2 
Have a diverse and balanced 
economy to promote long-term 
stability and economic resiliency. 
Consistent 
The project would further expand electric generating 
resources in the County by harvesting readily available 
solar irradiation and would provide these resources 
over the approximately 40-year operational lifetime, 
providing long-term stability and economic resiliency. 
Economic Growth 
Policy #3  
Maricopa 
County 
supports 
increasing 
entrepreneurial 
activities 
and 
business 
formation. 
Consistent 
The project would create hundreds of construction jobs 
per 250-MW construction phase which would occur 
over an 18- to 24-month construction window, 
beginning in 2023/2024. Construction workers would 
purchase food and incidentals at local retail businesses. 
Construction workers would sleep either at their homes 
or at local motels. On-site housing would not be 
provided during construction, providing revenue 
opportunities for local businesses. 
Economic Growth  
Policy #5 
Maricopa 
County 
supports 
programs that attract a variety of 
Basic Sector industry clusters 
that have long-term, stable 
growth prospects 
Consistent 
The project would employ numerous experienced 
professionals per 250-MW construction phase which 
would occur over an 18- to 24-month construction 
window, beginning in 2023/2024 and estimated to 
complete by 2024-2026. As the solar electrical 
generating and storage sector continues to grow, 
Maricopa County has the opportunity to expand this 
sector by supporting this and similar projects. An 
expanded sector base would attract additional 
opportunities for business development and worker 
training programs, providing long-term employment 
and economic development opportunities. Numerous 
trades are required for the construction of a utility-scale 
solar 
project 
including 
electricians, 
plumbers, 
mechanics, heavy equipment operators, assemblers, 
security, administrators and project management.  
Economic Growth  
Policy #6  
Maricopa 
County 
supports 
efforts to recruit prospective 
businesses and industries to the 
County, and efforts to retain 
existing 
businesses 
and 
industries. 
Consistent 
The high solar irradiance of Arizona, in addition to the 
availability of highly suitable land for development in 
Maricopa County and the proximity to existing electrical 
infrastructure, were prime factors that attracted the 
Applicant to this area.

CPA2021011 – Major Comprehensive Plan Amendment Application Project Narrative 
Hyder Solar and Storage Project 
 
September 29, 2021 
 
Revision 2 
 
Page 16 
 
 
 
Comprehensive Plan 
Elements 
Comprehensive Plan Policies 
Consistency with Comprehensive Plan 
Economic Growth  
Policy #10 
Maricopa 
County 
supports 
leveraging its solar resource 
potential to attract solar-related 
industries and alternative energy 
research and development. 
Consistent 
Because of the high solar resource and highly suitable 
land available in Maricopa County for development of 
solar energy facilities, Maricopa County is a prime 
location for solar resource development. The project is 
a utility-scale solar and battery storage project that 
Maricopa County could use to leverage their leadership 
in this industry to attract solar-related industries and 
additional development. The BLM has established two 
Solar Energy Zones within 10-25 miles of the site, (Agua 
Caliente and Gillespie, respectively). These Solar Energy 
Zones have been identified as areas well suited for 
utility-scale production of solar energy, where the BLM 
will prioritize solar energy and associated transmission 
infrastructure development. 
Growth Area Element 
Growth Area 
Goal #1 
Achieve orderly urban growth 
that 
is 
fiscally 
and 
environmentally 
responsible, 
protects public health and safety 
and 
promotes 
sensible 
annexation patterns. 
Consistent 
This project would enable the County to site utility-scale 
solar generation near existing electrical infrastructure, in 
an area that development would result in limited impact 
to the environment and would provide benefits to air 
quality in the County, while utilizing a readily available 
resource to generate electricity for the southwest and 
western grid – a demonstration of efficient, orderly 
growth by the County. While this area is currently rural, 
it provides services and infrastructure that urban growth 
areas utilize and would provide a foundation for future 
urban growth patterns to consider. 
Open Space Element 
Open Space 
Goal # 1 
Provide regional leadership to 
promote environmental quality, 
including the preservation of 
open, 
natural 
park 
and 
recreation lands. 
Consistent 
This project would enable the County to site utility-scale 
solar generation near existing electrical infrastructure 
and agricultural use, in an area that development would 
result in limited impact to open space lands and would 
demonstrate efficient, orderly growth. In addition, the 
project will generate renewable energy that would 
result in improved air quality through reduced 
emissions for electric generation, allowing Maricopa 
County to provide regional leadership in promoting 
environmental quality through improved air quality in 
the County.

CPA2021011 – Major Comprehensive Plan Amendment Application Project Narrative 
Hyder Solar and Storage Project 
 
September 29, 2021 
 
Revision 2 
 
Page 17 
 
 
 
Comprehensive Plan 
Elements 
Comprehensive Plan Policies 
Consistency with Comprehensive Plan 
Open Space 
Policy #2  
Maricopa 
County 
supports 
dedication and improvement of 
trail right-of-way within new 
development, 
including 
the 
Maricopa Trail and Maricopa 
County Regional Trail System. 
Consistent 
While the project does not include trail development, 
we support the development of recreational resources 
and connectivity for users, including trail right-of-way 
and the greater Maricopa County Regional Trail System.  
Water Resources Element 
Water Resources  
Goal #2 
Provide leadership to promote 
regional water quality and water 
use. 
Consistent 
The project does not require water in the generation of 
electrical power and requires very little water for panel 
and equipment maintenance. By promoting solar 
electrical generation, the County provides leadership on 
responsible water use by enabling low-water use 
infrastructure to provide the southwest and western 
electrical grid with a renewable source of electricity.  
Water Resources  
Policy #2  
Maricopa County supports water 
conservation techniques in the 
planning and design of new 
development. 
Consistent 
The project does not require water in the generation of 
electrical power and requires very little water for panel 
and equipment maintenance. Very little water will be 
required 
for 
construction 
activities. 
Water 
for 
construction and long term O&M will come from on-
site private ground water wells. The approximate water 
usage for construction is 30,000 gallons per acre and 
during O&M is 200 gallons per acre per annum. The 
project will be designed to incorporate feasible water 
conservation techniques. 
Water Resources  
Policy #4  
Maricopa 
County 
supports 
compliance with its Drinking 
Water 
and 
Water 
and 
Wastewater 
Treatment 
Programs. 
Consistent 
The project will be consistent with Maricopa County’s 
Drinking and Wastewater Treatment programs. 
Water Resources  
Policy #5  
Maricopa County supports low 
water 
use 
solar 
electric 
generating technologies. 
Consistent 
The project does not require water in the generation of 
electrical power and requires very little water for panel 
and equipment maintenance. Panel washing may be 
required if bi-annual rains are not sufficient or if soiling 
of panels is excessive due to dust accumulation.

CPA2021011 – Major Comprehensive Plan Amendment Application Project Narrative 
Hyder Solar and Storage Project 
 
September 29, 2021 
 
Revision 2 
 
Page 18 
 
 
 
Comprehensive Plan 
Elements 
Comprehensive Plan Policies 
Consistency with Comprehensive Plan 
Water Resources  
Policy #7  
Maricopa County supports low 
water use and drought-tolerant 
landscaping. 
Consistent 
Any required landscaping for the project would use 
drought-tolerant low-water-use landscaping. The water 
to support any required project landscaping would 
come from on-site private wells. 
Energy Element 
Energy  
Goal #1 
Provide leadership to promote 
regional environmental quality. 
Consistent 
The project will provide renewable energy generation 
that would result in improved air quality through 
reduced emissions for electric generation, providing a 
benefit to air quality in Maricopa County. Appropriate 
protective measures for biological and cultural 
resources will be implemented to minimize or prevent 
impacts to these resources. The project will require very 
little water for construction and operation. Amending 
the Comprehensive Plan to enable this project would 
demonstrate 
responsible 
leadership 
to 
promote 
regional environmental quality. 
Energy  
Goal #2 
Make Maricopa County a leader 
in alternative energy research 
and development. 
Consistent 
The project is a utility-scale solar and storage project. 
While utility-scale solar is not a “new” technology, the 
battery energy storage system is a fairly new technology 
in utility-scale renewable energy generation. Solar 
industry trends are leaning towards battery storage 
systems in an effort to maximize the production of 
stored energy when the sun sets. 
Energy  
Policy #1 
Maricopa 
County 
supports 
energy efficient design and 
construction 
of 
new 
development. 
Consistent 
The project will utilize current technologies and best 
practices in all components to support energy efficient 
design and construction. All project components (e.g., 
panels, inverters, SCADA, batteries) will utilize leading 
edge technology to insure the most efficient solar 
generation and storage system is developed. 
Energy Policy #4  
To limit energy consumption, 
Maricopa 
County 
supports 
alternative 
transportation 
options in new development. 
Consistent 
During construction, employees will be encouraged to 
carpool to the site to reduce the number of personal 
vehicle trips and emissions. Once operational, the 
project site will require minimal staff (2-3 personnel per 
8-hour shift [24-hour round the clock staffing]), 
resulting in few vehicle trips to and from the site.

CPA2021011 – Major Comprehensive Plan Amendment Application Project Narrative 
Hyder Solar and Storage Project 
 
September 29, 2021 
 
Revision 2 
 
Page 19 
 
 
 
Comprehensive Plan 
Elements 
Comprehensive Plan Policies 
Consistency with Comprehensive Plan 
Energy  
Policy #6  
Maricopa County supports being 
a 
responsible 
leader 
in 
alternative energy research and 
development. 
Consistent 
The project is a utility-scale solar and battery storage 
project and would facilitate Maricopa County’s 
continued 
leadership 
in 
alternative 
energy 
development. 
Energy  
Policy #7  
Maricopa 
County 
supports 
efforts to assist businesses and 
individuals 
with 
renewable 
energy 
options 
and 
energy 
conservation. 
Consistent 
The project is a utility-scale solar and storage project 
and would provide additional renewable energy options 
to the southwest and western electrical grid. 
Cost of Development Element 
Cost of Development  
Goal #2 
New 
development 
pays 
its 
proper and reasonable share of 
the costs of new infrastructure, 
services, 
and 
other 
public 
improvements. 
Consistent 
The costs of the project’s infrastructure needs, such as 
gen-tie 
line, 
on-site 
collection 
lines, 
road 
improvements, 
conduit, 
limited 
temporary 
and 
operational water needs, and domestic waste shall be 
borne by the Applicant. 
Cost of Development  
Policy #1  
Maricopa 
County 
supports 
recouping the costs of its 
products and services without 
unfairly burdening those most in 
need 
of 
its 
products 
and 
services. 
Consistent 
The project will pay all associated fees required by 
Maricopa County throughout project development. 
Cost of Development  
Policy #2  
Maricopa County supports using 
the preferred funding methods 
identified in this plan to offset 
costs of new development. 
Consistent 
The project will pay all associated fees required by 
Maricopa County throughout project development. 
6 
PART F - OTHER PERTINENT INFORMATION AS REQUESTED BY THE MARICOPA COUNTY 
PLANNING DEPARTMENT STAFF.  
Ellwood Land Holdings, LLC (Applicant), and its consultant, Wood, are available to provide any additional 
information requested by Maricopa County Planning and Development or by the Technical Advisory 
Committee.

Subdivision Infrastructure & 
Planning Program 
1001 N. Central Avenue #150 
Phoenix, Arizona 85004 
Phone: (602) 506-1058 
Fax: (602) 506-5813  
TDD 602 506 6704 
 
 
Maricopa County 
Environmental Services Department  
Water and Waste Management Division 
DATE: 
July 20, 2021  
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
TO : 
Ray Banker, Planning & Development Dept. 
 
 
Planner 
 
 
 
 
 
 
 
FROM: 
Souren Naradikian, P.E. 
 
 
Senior Civil Engineer 
 
SUBJECT:  
Hyder Solar and Storage Project CPA. CPA2021011 
 
The Maricopa County Environmental Services Department (MCESD) has reviewed 
revised documents received from the Maricopa County Planning and Development 
Department for the above referenced project. This project is a Hyder Solar and Storage 
Project CPA at APN# 403-29-001. Water and Sewer information is not provided. 
MCESD has concerns, Hyder Solar and Storage Project CPA supports compliance with 
MCESD Drinking Water and Water and Wastewater Treatment Programs. 
 
Based on the above, MCESD raised no objections to the Planning & Development 
Department in Accela: on July 20, 2021 and will allow the project to proceed at this 
time subject to the following stipulations 
 
Stipulations:  
None. 
 
It should be noted that this document does not approve the referenced project.  
Comments are provided only as advisory to Maricopa County Planning and 
Development Department to assist staff to prepare a staff report.  Other Maricopa 
County agencies may have additional requirements. Final review and approval will be 
made through Planning and Development Department procedures. Applicant may 
need to submit separate applications to the Maricopa County Environmental Services 
Department for approval of proposed facilities regulated by the Department.  Review 
of any such application will be based on regulations in force at the time of application.

‌ 
‌ 
‌ 
July‌ ‌27,‌ ‌2021‌ ‌ 
‌ 
Mr.‌ ‌Ray‌ ‌Banker‌ ‌ 
Maricopa‌ ‌County‌ ‌Planning‌ ‌&‌ ‌Development‌ ‌Department‌ ‌ 
501‌ ‌N.‌ ‌44th‌ ‌Street,‌ ‌Suite‌ ‌200‌ ‌ 
Phoenix,‌ ‌AZ‌ ‌85008‌ ‌ 
‌ 
Electronically‌ ‌submitted‌ ‌to:‌ ‌adam.cannon@maricopa.gov‌ ‌ 
‌ 
RE:‌ ‌Hyder‌ ‌Solar‌ ‌and‌ ‌Storage‌ ‌Project‌‌ ‌
  
‌ 
Dear‌ ‌Mr.‌ ‌Banker:‌ ‌ 
‌ 
At‌‌the‌‌request‌‌of‌‌Maricopa‌‌County,‌‌the‌‌Arizona‌‌Game‌‌and‌‌Fish‌‌Department‌‌(Department)‌‌has‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
 
reviewed‌ ‌the‌ ‌Comprehensive‌ ‌Plan‌ ‌Amendment‌ ‌Application‌ ‌(CPA),‌ ‌CPA2021011,‌ ‌for‌ ‌the‌‌
 
 
 
 
 
 
 
 
 
 
proposed‌‌solar‌‌facility‌‌in‌‌unincorporated‌‌Maricopa‌‌County,‌‌approximately‌‌30‌‌miles‌‌west‌‌of‌‌the‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
Town‌‌of‌‌Gila‌‌Bend,‌‌Arizona.‌‌The‌‌Department‌‌understands‌‌that‌‌Ellwood‌‌Land‌‌Holdings,‌‌LLC‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
(Ellwood)‌ ‌is‌ ‌proposing‌ ‌the‌ ‌construction‌ ‌and‌ ‌operation‌ ‌of‌ ‌an‌ ‌up‌ ‌to‌ ‌500‌ ‌megawatt‌‌alternating‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
 
current‌‌(MWac)‌‌electrical‌‌generation‌‌facility‌‌consisting‌‌of‌‌solar‌‌modules‌‌and‌‌a‌‌battery‌‌energy‌‌
 
 
 
 
 
 
 
 
 
   
 
 
storage‌ ‌system‌ ‌(BESS).‌ ‌The‌ ‌project‌ ‌would‌ ‌be‌ ‌located‌ ‌on‌ ‌up‌ ‌to‌ ‌3,542‌ ‌acres‌ ‌of‌ ‌land‌ ‌in‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
unincorporated‌ ‌Maricopa‌ ‌County.‌ ‌Additionally,‌ ‌there‌ ‌will‌ ‌be‌ ‌approximately‌ ‌1,500‌ ‌feet‌ ‌of‌‌
 
 
 
 
 
 
 
 
 
 
 
transmission‌ ‌line.‌‌ ‌
  
‌ 
Under‌ ‌Title‌ ‌17‌ ‌of‌ ‌the‌‌Arizona‌‌Revised‌‌Statutes,‌‌the‌‌Department,‌‌by‌‌and‌‌through‌‌the‌‌Arizona‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Game‌ ‌and‌ ‌Fish‌ ‌Commission‌ ‌(Commission),‌ ‌has‌ ‌jurisdictional‌ ‌authority‌ ‌and‌ ‌public‌ ‌trust‌‌
 
 
 
 
 
 
 
 
 
 
 
responsibilities‌‌for‌‌management‌‌of‌‌the‌‌state's‌‌fish‌‌and‌‌wildlife‌‌resources.‌‌It‌‌is‌‌the‌‌mission‌‌of‌‌the‌‌
 
 
 
 
 
 
 
 
 
     
 
 
 
 
Department‌‌to‌‌conserve‌‌and‌‌protect‌‌Arizona’s‌‌diverse‌‌fish‌‌and‌‌wildlife‌‌resources‌‌and‌‌manage‌‌for‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
 
safe,‌‌compatible‌‌outdoor‌‌recreation‌‌opportunities‌‌for‌‌current‌‌and‌‌future‌‌generations.‌‌Similarly,‌‌
 
 
 
 
 
 
 
 
 
 
 
the‌‌Department‌‌recognizes‌‌the‌‌importance‌‌of‌‌planning‌‌efforts‌‌that‌‌contribute‌‌to‌‌the‌‌county‌‌and‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
 
the‌‌state’s‌‌economic‌‌growth‌‌needs‌‌and‌‌opportunities‌‌to‌‌develop‌‌renewable‌‌energy‌‌locations.‌‌The‌‌
 
 
 
 
 
 
   
 
 
 
 
 
Department‌ ‌recognizes‌ ‌that‌ ‌appropriate‌ ‌coordination,‌ ‌proper‌ ‌planning,‌ ‌and‌ ‌voluntary‌‌
 
 
 
 
 
 
 
 
 
implementation‌ ‌of‌ ‌best‌ ‌management‌ ‌practices‌ ‌allow‌ ‌projects‌ ‌to‌ ‌be‌ ‌developed‌ ‌that‌ ‌avoid,‌‌
 
 
 
 
 
 
 
 
 
 
 
 
minimize,‌ ‌or‌ ‌mitigate‌ ‌potential‌ ‌impacts‌ ‌to‌ ‌wildlife‌ ‌habitat‌ ‌and‌ ‌populations.‌‌ ‌
  
‌ 
To‌‌the‌‌extent‌‌possible,‌‌the‌‌Department‌‌encourages‌‌pre-construction‌‌surveys‌‌and‌‌monitoring‌‌to‌‌
 
 
 
 
 
 
 
 
 
 
 
 
determine‌‌species‌‌presence‌‌as‌‌referenced‌‌in‌‌our‌‌Guidelines‌‌for‌‌Solar‌‌Development‌‌in‌‌Arizona‌.‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
The‌ ‌Department‌ ‌is‌ ‌available‌ ‌to‌ ‌review‌ ‌survey‌ ‌designs,‌ ‌provide‌ ‌input‌ ‌on‌ ‌developing‌‌
 
 
 
 
 
 
 
 
 
 
 
 
best-management‌‌practices,‌‌and‌‌are‌‌available‌‌to‌‌assist‌‌in‌‌developing‌‌this‌‌economically-important‌‌
 
 
 
 
   
   
 
 
 
facility‌ ‌while‌ ‌also‌ ‌minimizing‌ ‌any‌ ‌potential‌ ‌impacts‌ ‌to‌ ‌wildlife‌ ‌during‌ ‌construction‌ ‌and‌‌
 
 
 
 
 
 
 
 
 
 
 
 
operation‌ ‌of‌ ‌the‌ ‌facility.‌‌ ‌
  
‌ 
‌ 
‌

‌ 
Hyder‌ ‌Solar‌ ‌and‌ ‌Storage‌ ‌Project‌ ‌ 
July‌ ‌27,‌ ‌2021‌ ‌ 
Page‌ ‌3‌ ‌ 
Based‌‌on‌‌Department‌‌data,‌‌a‌‌portion‌‌of‌‌the‌‌project‌‌area‌‌has‌‌been‌‌used‌‌by‌‌the‌‌10J‌‌designated,‌‌
 
 
 
   
 
 
 
 
 
 
 
 
 
 
 
 
experimental‌‌nonessential‌‌population‌‌of‌‌the‌‌endangered‌‌Sonoran‌‌pronghorn.‌‌Sonoran‌‌pronghorn‌‌
 
 
 
 
 
 
 
 
 
 
have‌ ‌specific‌ ‌habitat‌ ‌requirements‌ ‌based‌ ‌on‌ ‌their‌ ‌life‌ ‌history‌ ‌and‌ ‌survival‌ ‌strategy.‌ ‌This‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
population‌‌is‌‌relatively‌‌new‌‌and‌‌its‌‌range‌‌is‌‌expanding‌‌into‌‌previously‌‌unused‌‌areas.‌‌Based‌‌on‌‌
   
 
 
 
 
   
 
 
 
 
 
 
 
the‌ ‌proposed‌ ‌location‌‌of‌‌the‌‌project,‌‌the‌‌Department‌‌would‌‌welcome‌‌the‌‌opportunity‌‌to‌‌work‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
 
with‌‌Maricopa‌‌County‌‌and‌‌Ellwood‌‌to‌‌minimize‌‌any‌‌potential‌‌impacts‌‌to‌‌Sonoran‌‌pronghorn.‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
The‌ ‌Department‌ ‌recommends‌ ‌the‌ ‌following‌ ‌measures‌ ‌to‌ ‌avoid‌ ‌and‌ ‌minimize‌ ‌potential‌ ‌impacts:‌ ‌ 
‌ 
●
Coordination‌ ‌between‌ ‌the‌ ‌Department‌ ‌and‌ ‌Ellwood‌ ‌prior‌ ‌to‌ ‌construction‌ ‌activities‌ ‌in‌‌
 
 
 
 
 
 
 
 
 
 
 
order‌ ‌to‌ ‌exchange‌ ‌information‌ ‌on‌ ‌current‌ ‌Sonoran‌ ‌pronghorn‌ ‌use‌ ‌in‌ ‌the‌ ‌project‌ ‌area.‌‌ ‌
  
●
If‌ ‌pronghorn‌ ‌are‌‌detected‌‌during‌‌construction‌‌activities,‌‌please‌‌notify‌‌the‌‌US‌‌Fish‌‌and‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
Wildlife‌ ‌Service,‌ ‌Arizona‌ ‌Ecological‌ ‌Services‌ ‌Office‌ ‌(AESO)‌ ‌and‌ ‌the‌ ‌Department’s‌‌
 
 
 
 
 
 
 
 
 
 
Sonoran‌ ‌Pronghorn‌ ‌Program‌ ‌Lead‌ ‌(‌jbright@azgfd.gov‌)‌ ‌as‌ ‌soon‌ ‌as‌ ‌possible.‌ ‌ 
‌ 
The‌ ‌western‌ ‌burrowing‌ ‌owl‌ ‌(‌Athene‌ ‌cunicularia‌ ‌hypugaea‌)‌ ‌is‌ ‌a‌ ‌special‌‌status‌‌species‌‌that‌‌is‌‌
 
 
 
 
 
 
 
   
 
 
 
   
regulated‌ ‌under‌ ‌the‌ ‌Migratory‌ ‌Bird‌‌Treaty‌‌Act‌‌(MBTA).‌‌If‌‌suitable‌‌habitat‌‌for‌‌this‌‌species‌‌is‌‌
 
 
 
 
 
 
 
   
 
 
 
 
   
present‌ ‌within‌ ‌or‌ ‌adjacent‌ ‌to‌ ‌your‌ ‌project‌ ‌area,‌ ‌the‌ ‌Department‌ ‌recommends‌ ‌conducting‌ ‌an‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
occupancy‌ ‌survey‌ ‌for‌‌western‌‌burrowing‌‌owls‌‌to‌‌determine‌‌if‌‌this‌‌species‌‌occurs‌‌within‌‌your‌‌
 
 
 
 
 
 
 
   
 
 
 
 
 
project‌ ‌footprint.‌ ‌Guidelines‌ ‌for‌ ‌conducting‌ ‌this‌ ‌survey‌ ‌are‌ ‌found‌ ‌in‌ ‌Burrowing‌ ‌Owl‌‌Project‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
Clearance‌ ‌Guidance‌ ‌for‌ ‌Landowners‌.‌ ‌Please‌ ‌note‌ ‌that‌ ‌the‌ ‌survey‌ ‌should‌ ‌be‌ ‌conducted‌ ‌by‌ ‌a‌‌
 
 
 
 
 
 
 
 
 
 
 
 
   
surveyor‌ ‌that‌ ‌is‌ ‌certified‌ ‌by‌ ‌the‌ ‌Department.‌ ‌If‌ ‌an‌ ‌active‌ ‌burrowing‌ ‌owl‌‌burrow‌‌is‌‌detected,‌‌
 
 
 
 
 
 
 
 
 
 
 
 
   
 
please‌‌contact‌‌the‌‌Department‌‌and‌‌the‌‌U.S.‌‌Fish‌‌and‌‌Wildlife‌‌Service‌‌for‌‌direction,‌‌in‌‌accordance‌‌
 
 
 
 
 
 
 
 
 
 
 
 
   
 
with‌ ‌the‌ ‌Burrowing‌ ‌Owl‌ ‌Project‌ ‌Clearance‌ ‌Guidance‌ ‌for‌ ‌Landowners‌.‌ ‌ 
‌ 
Although‌‌the‌‌Sonoran‌‌desert‌‌tortoise‌‌(‌Gopherus‌‌morafkai‌),‌‌a‌‌Candidate‌‌species‌‌for‌‌listing‌‌under‌‌
 
 
 
 
 
 
   
 
 
 
 
 
the‌‌Endangered‌‌Species‌‌Act‌‌(ESA),‌‌has‌‌not‌‌been‌‌recorded‌‌within‌‌the‌‌vicinity‌‌of‌‌your‌‌project,‌‌the‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
southernmost‌ ‌portion‌ ‌of‌ ‌the‌ ‌project‌ ‌area‌ ‌may‌ ‌provide‌ ‌suitable‌ ‌habitat‌ ‌for‌ ‌this‌ ‌species.‌ ‌The‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Department‌‌recommends‌‌conducting‌‌a‌‌survey‌‌for‌‌Sonoran‌‌desert‌‌tortoise‌‌within‌‌suitable‌‌habitat,‌‌
 
 
   
 
 
 
 
 
 
 
 
in‌ ‌accordance‌ ‌with‌ ‌the‌ ‌Desert‌ ‌Tortoise‌ ‌Survey‌ ‌Guidelines‌ ‌for‌ ‌Environmental‌ ‌Consultants,‌ ‌to‌‌
 
 
 
 
 
 
 
 
 
 
 
 
determine‌ ‌the‌ ‌presence/absence‌ ‌of‌ ‌this‌ ‌species.‌ ‌If‌ ‌tortoises‌ ‌are‌ ‌identified‌ ‌during‌ ‌the‌ ‌survey,‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
please‌ ‌refer‌ ‌and‌ ‌adhere‌ ‌to‌ ‌The‌ ‌Recommended‌ ‌Standard‌ ‌Mitigation‌‌Measures‌‌For‌‌Projects‌‌In‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
Sonoran‌ ‌Desert‌ ‌Tortoise‌ ‌Habitat‌ ‌and‌ ‌Guidelines‌ ‌For‌ ‌Handling‌ ‌Sonoran‌ ‌Desert‌ ‌Tortoises‌‌
 
 
 
 
 
 
 
 
 
 
 
Encountered‌ ‌On‌ ‌Development‌ ‌Projects.‌ ‌All‌ ‌of‌ ‌these‌ ‌documents‌ ‌can‌ ‌be‌ ‌found‌ ‌at‌‌
 
 
 
 
 
 
 
 
 
 
 
 
https://www.azgfd.com/wildlife/nongamemanagement/tortoise/.‌ ‌ 
‌ 
The‌ ‌Department‌ ‌would‌ ‌like‌ ‌to‌ ‌provide‌ ‌the‌ ‌following‌ ‌general‌ ‌recommendations:‌ ‌ 
●
During‌ ‌construction‌ ‌activities,‌ ‌if‌ ‌wildlife‌ ‌such‌ ‌as‌ ‌the‌ ‌Sonoran‌ ‌desert‌ ‌tortoise‌ ‌are‌‌
 
 
 
 
 
 
 
 
 
 
 
 
encountered,‌‌please‌‌contact‌‌the‌‌Department‌‌to‌‌discuss‌‌relocation.‌‌This‌‌also‌‌applies‌‌to‌‌any‌‌
 
 
 
 
   
 
 
 
 
   
 
wildlife‌ ‌that‌ ‌may‌ ‌need‌ ‌to‌ ‌be‌ ‌removed‌ ‌from‌ ‌the‌ ‌facility‌ ‌once‌ ‌it‌ ‌is‌ ‌operational.‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Additionally,‌ ‌please‌ ‌share‌ ‌wildlife‌ ‌related‌ ‌mortalities‌ ‌from‌ ‌facility‌ ‌operation(s)‌ ‌to‌‌
 
 
 
 
 
 
 
 
 
 
pep@azgfd.gov‌.‌ ‌ 
●
Sonoran‌ ‌desert‌ ‌habitats‌ ‌and‌ ‌its‌ ‌associated‌ ‌fauna‌ ‌are‌‌highly‌‌dependent‌‌on‌‌the‌‌minimal‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
precipitation‌‌received‌‌each‌‌year.‌‌The‌‌resulting‌‌sheet‌‌flows‌‌contribute‌‌to‌‌the‌‌hydrology‌‌of‌‌
 
 
 
 
 
 
 
 
   
 
 
 
areas‌ ‌where‌ ‌rain‌ ‌events‌ ‌often‌ ‌occur‌ ‌in‌ ‌isolated‌ ‌patches.‌ ‌To‌ ‌the‌ ‌extent‌ ‌possible,‌ ‌the‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Department‌‌recommends‌‌minimizing‌‌alterations‌‌to‌‌the‌‌landscape‌‌that‌‌have‌‌the‌‌potential‌‌

‌ 
Hyder‌ ‌Solar‌ ‌and‌ ‌Storage‌ ‌Project‌ ‌ 
July‌ ‌27,‌ ‌2021‌ ‌ 
Page‌ ‌4‌ ‌ 
to‌ ‌impact‌ ‌vegetation‌ ‌and‌‌alter‌‌wildlife‌‌distributions‌‌and‌‌abundance‌‌beyond‌‌the‌‌project‌‌
 
 
 
 
 
 
 
 
 
 
 
 
area.‌ ‌ 
●
Artificial‌‌night‌‌lighting‌‌may‌‌attract‌‌insects‌‌and‌‌the‌‌species‌‌that‌‌prey‌‌on‌‌them‌‌(e.g.‌‌bats).‌‌It‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
could‌ ‌also‌ ‌impair‌ ‌the‌ ‌ability‌ ‌of‌ ‌nocturnal‌ ‌animals‌ ‌to‌ ‌navigate.‌ ‌The‌ ‌Department‌‌
 
 
 
 
 
 
 
 
 
 
 
 
recommends‌ ‌using‌ ‌only‌ ‌the‌ ‌minimum‌ ‌amount‌ ‌of‌ ‌light‌ ‌needed‌ ‌for‌ ‌safety.‌ ‌If‌ ‌feasible,‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
narrow‌‌spectrum‌‌lighting‌‌is‌‌wildlife-friendly‌‌and‌‌should‌‌be‌‌used‌‌as‌‌often‌‌as‌‌possible‌‌to‌‌
 
 
   
 
 
 
 
 
 
 
 
 
 
minimize‌‌the‌‌number‌‌of‌‌species‌‌affected‌‌by‌‌lighting.‌‌It‌‌is‌‌also‌‌beneficial‌‌that‌‌all‌‌lighting‌‌
 
 
 
 
 
 
 
     
 
 
 
 
 
is‌ ‌shielded,‌ ‌canted,‌ ‌or‌ ‌cut‌ ‌to‌ ‌minimize‌ ‌the‌ ‌amount‌ ‌of‌ ‌upward‌ ‌shining‌ ‌light.‌‌ ‌
  
●
Birds‌‌of‌‌prey‌‌such‌‌as‌‌raptors,‌‌owls,‌‌vultures,‌‌and‌‌eagles‌‌are‌‌vulnerable‌‌to‌‌electrocution‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
 
and‌‌powerline‌‌strikes‌‌during‌‌construction‌‌and‌‌operation.‌‌There‌‌are‌‌a‌‌number‌‌of‌‌design‌‌
 
 
 
 
 
 
 
 
   
 
 
 
features‌‌that‌‌can‌‌minimize‌‌these‌‌impacts‌‌to‌‌these‌‌important‌‌species.‌‌Tuk‌‌Jacobson‌‌is‌‌the‌‌
 
 
 
 
 
 
 
 
 
 
 
   
 
Department’s‌‌raptor‌‌expert‌‌and‌‌will‌‌be‌‌willing‌‌to‌‌share‌‌information‌‌on‌‌best‌‌management‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
practices;‌ ‌he‌ ‌can‌ ‌be‌ ‌contacted‌ ‌at‌ ‌KJacobson@azgfd.gov‌ ‌or‌ ‌623-236-7575.‌ ‌
  
●
Power‌‌poles‌‌can‌‌serve‌‌as‌‌perches‌‌for‌‌many‌‌birds‌‌of‌‌prey‌‌and‌‌there‌‌are‌‌design‌‌features‌‌for‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
structures‌‌that‌‌can‌‌reduce‌‌impacts‌‌to‌‌these‌‌important‌‌species.‌‌Another‌‌possible‌‌alternative‌‌
 
 
 
 
   
 
 
 
 
 
 
to‌‌reduce‌‌mortality‌‌is‌‌using‌‌bird‌‌flight‌‌diverters‌‌to‌‌decrease‌‌avian‌‌mortalities.‌‌Again,‌‌Mr.‌‌
 
 
   
 
 
 
   
 
 
 
 
 
Jacobson‌‌has‌‌expertise‌‌in‌‌all‌‌of‌‌the‌‌best‌‌management‌‌practices‌‌and‌‌would‌‌be‌‌available‌‌to‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
   
share‌ ‌his‌ ‌knowledge‌ ‌in‌ ‌the‌ ‌pre-design‌ ‌phase‌ ‌of‌ ‌this‌ ‌project.‌‌ ‌
  
●
The‌‌Department’s‌‌Wildlife‌‌Compatible‌‌Fencing‌‌Guidelines‌‌provide‌‌information‌‌on‌‌how‌‌
 
 
 
 
 
 
 
 
 
 
fencing‌ ‌impacts‌ ‌wildlife,‌ ‌ways‌‌to‌‌design‌‌fencing‌‌to‌‌prevent‌‌wildlife‌‌entanglement‌‌and‌
 
 
 
 
 
 
 
 
 
 
 
 
impalement,‌ ‌and‌ ‌to‌ ‌ensure‌ ‌wildlife‌ ‌movement‌ ‌is‌ ‌not‌ ‌restricted.‌ ‌The‌ ‌Department‌‌
 
 
 
 
 
 
 
 
 
 
 
developed‌ ‌these‌ ‌guidelines‌ ‌to‌ ‌assist‌ ‌landowners,‌ ‌project‌ ‌managers,‌ ‌land‌ ‌management‌‌
 
 
 
 
 
 
 
 
 
 
agencies,‌ ‌and‌ ‌others‌ ‌in‌ ‌designing‌ ‌wildlife‌ ‌compatible‌ ‌fences.‌ ‌The‌ ‌focus‌ ‌is‌ ‌on‌ ‌fence‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
design‌ ‌rather‌ ‌than‌ ‌detailed‌ ‌fence‌ ‌construction‌ ‌specifications.‌ ‌The‌ ‌goal‌ ‌is‌ ‌to‌ ‌provide‌‌
 
 
 
 
 
 
 
 
 
 
 
 
guidance‌ ‌in‌ ‌designing‌ ‌a‌ ‌fence‌ ‌that‌‌will‌‌achieve‌‌its‌‌objective‌‌with‌‌minimum‌‌impact‌‌to‌‌
 
 
   
 
 
 
 
 
 
 
 
 
 
wildlife.‌ ‌ 
●
If‌ ‌trenching‌ ‌will‌ ‌occur‌ ‌for‌ ‌the‌ ‌proposed‌ ‌project,‌ ‌the‌ ‌Department‌ ‌recommends‌ ‌that‌‌
 
 
 
 
 
 
 
 
 
 
 
 
trenching‌ ‌and‌ ‌backfilling‌ ‌crews‌ ‌be‌ ‌close‌ ‌together‌ ‌to‌ ‌minimize‌ ‌the‌ ‌amount‌ ‌of‌ ‌open‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
trenches‌ ‌at‌ ‌any‌ ‌given‌ ‌time.‌ ‌Where‌ ‌trenches‌ ‌cannot‌ ‌be‌ ‌back-filled‌ ‌immediately,‌ ‌the‌‌
 
 
 
 
 
 
 
 
 
 
 
 
Department‌‌recommends‌‌escape‌‌ramps‌‌be‌‌constructed‌‌at‌‌least‌‌every‌‌90‌‌meters.‌‌Escape‌‌
 
 
 
 
 
 
 
 
 
 
 
 
ramps‌‌can‌‌be‌‌short‌‌lateral‌‌trenches‌‌or‌‌wooden‌‌planks‌‌sloping‌‌to‌‌the‌‌surface.‌‌The‌‌slope‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
should‌‌be‌‌less‌‌than‌‌45‌‌degrees‌‌(1:1).‌‌Trenches‌‌that‌‌have‌‌been‌‌left‌‌open‌‌overnight‌‌should‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
be‌ ‌inspected‌ ‌and‌ ‌animals‌ ‌removed‌ ‌prior‌ ‌to‌ ‌backfilling.‌ ‌ 
‌ ‌
  
‌
 
‌
 
‌
 
‌
 
‌
 
‌
 
‌
 
‌
 
‌
 
‌
 
‌

‌ 
Hyder‌ ‌Solar‌ ‌and‌ ‌Storage‌ ‌Project‌ ‌ 
July‌ ‌27,‌ ‌2021‌ ‌ 
Page‌ ‌5‌ ‌ 
Thank‌‌you‌‌for‌‌the‌‌opportunity‌‌to‌‌provide‌‌comments‌‌on‌‌this‌‌proposed‌‌project.‌‌The‌‌Department‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
 
looks‌ ‌forward‌ ‌to‌ ‌continued‌ ‌communications‌ ‌with‌ ‌Maricopa‌ ‌County‌ ‌and‌ ‌Ellwood‌ ‌regarding‌‌
 
 
 
 
 
 
 
 
 
 
 
project‌
‌development‌
‌and‌
‌implementation.‌ ‌Please‌ ‌contact‌ ‌me‌ ‌at‌ ‌623-236-7222‌ ‌or‌‌
 
 
 
 
 
 
 
 
 
 
ACavalcant@azgfd.gov‌‌if‌‌you‌‌have‌‌any‌‌questions,‌‌or‌‌would‌‌like‌‌to‌‌further‌‌discuss‌‌our‌‌concerns‌‌
   
 
 
 
 
 
 
   
 
 
 
 
and‌ ‌recommendations.‌‌ ‌
  
‌ 
Sincerely,‌ ‌ 
‌ 
Andrew‌ ‌Cavalcant‌‌ ‌
  
Project‌ ‌Evaluation‌ ‌Project‌ ‌Specialist,‌ ‌Habitat‌ ‌Branch‌ ‌ 
‌ 
Cc‌
Ginger‌ ‌Ritter,‌ ‌Project‌ ‌Evaluation‌ ‌Program‌ ‌Supervisor‌ ‌AGFD‌ ‌(gritter@azgfd.gov)‌ ‌ 
 
Tyler‌ ‌Williford,‌ ‌Habitat‌ ‌Program‌ ‌Manager,‌ ‌Region‌ ‌IV‌ ‌(twilliford‌@azgfd.gov‌)‌ ‌ 
‌ 
AGFD‌ ‌#M21-07095937‌ ‌

From:
David Jacobs
To:
Ray Banker (PND)
Cc:
Michael O"hara
Subject:
CPA2021010 Yellow Bell Solar & CPA2021011 Hyder Solar
Date:
Friday, July 16, 2021 1:46:57 PM
Ray-
Our office recently received notifications for two large solar projects, Yellow Bell Solar
[CPA2021010] and Hyder Solar [CPA2021011], both involving significant acreage of lands
administered by the Arizona State Land Department [ASLD].  Our records indicate these
project areas have not been inventoried for cultural resources, and we recommend a qualified
cultural resource specialist survey the project areas to locate and identify any cultural
resources that may be present within these areas.  The narratives of both of the proposed solar
projects note their intent to complete the required survey and reporting as specified in the
County's Environment Policy # 5.
Our office looks forward to receiving an archaeological survey report for review, and
appreciates your cooperation with this office in considering the impacts of development to
cultural resources in the State of Arizona.  If you have any questions or concerns, please
contact me at djacobs@azstateparks.gov or 602-542-7140.
David Jacobs, Arizona State Historic Preservation Office

From:
Bruce Fenske
To:
hssp@woodplc.com
Cc:
Gerardo (Gerry) Ramirez; Ray Banker (PND); jennifer.skulstad@woodplc.com
Subject:
Proposed Hyder Solar and Storage Project
Date:
Wednesday, September 15, 2021 4:30:33 PM
Sir/Madam:
The Southwest District of the Arizona Department of Transportation requests the opportunity
to review and comment on a traffic statement prepared by a professional engineer registered in
Arizona specifying the projected traffic volumes during construction.  Specifically, what is the
type (size and weight) and frequency of vehicles over what period of time expected to
access the site via the exit at milepost 87 (Agua Caliente Road) along I-8?  Please include a
turning template for the largest vehicle(s) turning to/from the ramps along I-8 onto Agua
Caliente Road.
Thank you.
Bruce A. Fenske, P.E.
Assistant District Engineer
Southwest District
Tel.       928.317.2138
Mobile  928.210.8882

From:
Anson Lihosit
To:
Ray Banker (PND)
Subject:
CPA2021011 Request For Comments
Date:
Tuesday, July 13, 2021 3:14:57 PM
Attachments:
image001.png
Good Afternoon Ray,
 
With regards to the proposed Major Comprehensive Plan Amendment, CPA2021011,
Yuma County Planning and Zoning Division has no comment.
 
Thank you for the opportunity to review.
 
Anson K. Lihosit
Associate Planner/Deputy Zoning Inspector
Department of Development Services/Planning & Zoning Division
2351 W. 26th Street Yuma, AZ  85364
Telephone: (928) 817-5090
Email: Anson.Lihosit@yumacountyaz.gov

From:
Hobart Wingard
To:
Ray Banker (PND)
Cc:
Adam Copeland
Subject:
County Case Review
Date:
Tuesday, July 6, 2021 7:52:06 AM
Attachments:
image001.png
Good morning Mr. Banker,
The City of Buckeye is in receipt of the following cases to review/comment on:
·         CPA2021007 – Harquahala Sun
·         CPA2021010 – Yellow Bell Solar
·         CPA2021001 – Hyder Solar and Storage
After reviewing these three (3) solar major Comprehensive Plan Amendments,
Buckeye staff has no comments.
Thank you,
Bart
 
HOBART (BART) WINGARD | PRINCIpAL PLANNER | DEVELOpMENT SERVICEs
CITY OF BUCKEYE  |  530 EAsT MONROE AVENUE, BUCKEYE, AZ 85326
O: 623.349.6207 | C: 623.208.8830 | hwINGARD@BUCKEYEAZ.GOV
 
 
cIty haLL hOURs: mON-thURs 7am-6pm
CLOsED ON FRIDays
www.buckeyeaz.gov
 
This message contains confidential information and is intended only for the individual(s)
addressed in the message. If you are not the named addressee, you should not disseminate,
distribute, or copy this e-mail. If you are not the intended recipient, you are notified that
disclosing, distributing, or copying this e-mail is strictly prohibited.

502 N. 44th Street, Suite 200 ▪ Phoenix, AZ  85008 ▪ (602) 506-2364 ▪ (602) 506-3711 fax 
                                                                                        ➢Internet:  www.maricopa.gov/planning 
 
 
 
DATE: 
November 4, 2021 
 
TO: 
Planning & Zoning Commission  
 
FROM: 
Ray Banker, Senior Planner 
 
SUBJECT: 
CPA2021011 – Hyder Solar & Storage Project 
 
Agenda Item: PZ-7 
 
After writing of the staff report for CPA2021011, staff has received comments from Luke 
Air Force Base (LAFB), which are attached. They mention concerns that the proposed 
solar facility “could possibly impact” flying operations as the site is within Military Training 
Routes (MTR). It should be noted that notice was sent to LAFB regarding the subject 
request on June 24, 2021 via USPS as part of the enhanced outreach for 2021 Major CPA’s.  
If this Major CPA is approved, future zone change entitlement documents would be 
routed to LAFB for review and they could provide further comments if necessary.   
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Attachment: 
 
LAFB Comment Memo (2 pages)