CPA2021007 BOS REPORT.PDF

Maricopa County — Formal (2021-12-08)

View PDF Item 9 Meeting page

Extracted text (via pymupdf) 109673 characters
December 8, 2021 
CPA2021007 
Page 1 of 2 
Report to the Board of Supervisors 
Prepared by the Maricopa County Planning and Development Department 
 
 
 
Board Hearing Date: 
December 8, 2021 
 
Case #/Title:   
 
 
CPA2021007 – Harquahala Sun 
 
 
Supervisor District: 
5 
 
Applicant:  
Kimley-Horn & Associates 
 
Owners: 
CV Harquahala LLC and Kawela One LLC 
 
Request: 
Major Comprehensive Plan Amendment (CPA) to change 
the land use designation in the Vision 2030 Maricopa County 
Comprehensive Plan from Rural Development Area to Utilities. 
CPA case approval is by Resolution, attached. 
 
Site Location: 
Generally located at the SEC and SWC of Courthouse Rd. 
and 491st Ave. road alignment in the Tonopah area. 
 
Site Size: 
Approx. 705 acres 
 
County Island Status: 
No 
Additional 
Comments: 
The 
applicant 
seeks 
a 
Major 
Comprehensive 
Plan 
Amendment to change the land use designation in the 
Comprehensive Plan to Utilities in order to develop a solar 
installation. The subject site is identified as having Rural 
Development Area land use designation in the Vision 2030 
Maricopa County Comprehensive Plan. All approx. 705 acres 
are designated as Rural Development Area (0-1 d.u./acre).  
This designation encourages low-density rural residential and 
agricultural uses. Staff received two (2) letters from other 
jurisdictions (City of Buckeye and Apache Junction) 
expressing no concerns.  AZ Dept. of Game & Fish and 
AZSHPO commented on the as well.  These comments will be 
considered during a future zone change request.  Luke Air 
Force Base (LAFB) provided comments after the staff report 
was written, see attached memo with their concerns and 
staff’s comments. Although some of the Commissioners raised 
discussion with these late LAFB comments, staff notes that 
these concerns are not related to the CPA application for 
land use. LAFB would be routed any future zone change 
application material and would then be able to review and 
analyze aspects of the site including design considerations 
and provide additional comments if necessary.

December 8, 2021 
CPA2021007 
Page 2 of 2 
 
Commission  
 
Recommendation: 
On 11/4/21, the Commission voted 4-3 to recommend 
approval of CPA2021007 subject to conditions ‘a’ – ‘d’: 
  
a. 
Development and use of the site shall be in general conformance with the 
narrative report entitled “Harquahala Sun” consisting of 31 pages, dated stamped 
received on October 11, 2021, except as modified by the following conditions.  
 
b. 
Development and use of the site shall be in conformance with the land use exhibit 
entitled “Harquahala Sun” consisting of 2 pages, dated stamped received on 
September 7, 2021, except as modified by the following conditions. 
 
c. 
The land use designation of utilities approved as part of case CPA2021007 shall be 
subject to any time limits set forth in the subsequent zone change. 
  
d. 
The applicant is proposing to develop a photovoltaic solar electric generating 
facility which, pursuant to the Maricopa County Comprehensive Plan, 
necessitates a change in the land use designation from Rural Development Area 
to Utilities. The proposal by the applicant represents a comprehensive approach 
to the subject property and will allow the applicant to pursue the proper 
entitlements pursuant to state law so that they can lawfully operate in 
unincorporated Maricopa County. This particular proposal is an appropriate plan 
for the property and is consistent with the overall intention of the comprehensive 
plan. However, in the event that the zone change or a zone change phase for this 
particular proposal is not approved by the Maricopa County Board of Supervisors 
(BOS) within five (5) years from the date of Board approval of this comprehensive 
plan amendment, this amendment shall no longer be effective as the planning 
justification for this comprehensive plan amendment will no longer be present. In 
such instance, a change of the land use designation from Utilities to Rural 
Development Area will occur, and all comprehensive plan land use maps shall be 
altered to reflect as such, because this represents superior long-range planning by 
Maricopa County.  
 
Presented by: 
 
Ray Banker, Senior Planner 
Reviewed by: 
 
Darren Gerard, AICP, Planning Manager   
 
Attachments: 
 
11/4/21 P&Z Packet (53 pages) 
 
 
11/4/21 P&Z Handout Memo (3 pages) 
 
 
CPA2021007 Resolution (2 pages) 
 
 
Note: 
11/4/21 Draft P&Z Minutes are not available as of the writing of this report, but can 
be provided upon request later when available.

CPA2021007 
Page 1 of 10 
Report to the Planning and Zoning Commission 
Prepared by the Maricopa County Planning and Development Department 
 
 
 
Case: 
CPA2021007 – Harquahala Sun 
 
 
Hearing Date: 
November 4, 2021 
 
Supervisor District: 
5 
 
  
 
Applicant: 
Kimley-Horn & Associates 
 
Owners: 
CV Harquahala LLC and Kawela One LLC 
   
Request: 
Major Comprehensive Plan Amendment (CPA) to change the land 
use designation in the Vision 2030 Maricopa County Comprehensive 
Plan from Rural Development Area to Utilities. 
 
  
 
Site Location: 
Generally located at the SEC and SWC of Courthouse Rd. and 491st 
Ave. road alignment in the Tonopah area. 
 
  
Site Size: 
Approx. 705 acres 
 
Density: 
N/A 
 
County Island:  
No 
 
 
County Plans: 
Vision 2030 Maricopa County Comprehensive Plan – Rural 
Development Area (0 -1 d.u./ac.) 
 
Municipal Plan: 
N/A 
 
Municipal Comments: 
Two (2) letters – Apache Junction and Buckeye - No concerns 
 
Support/Opposition: 
None received 
 
Recommendation: 
Approve with conditions

CPA2021007 
Page 2 of 10 
Project Summary: 
 
1. 
Kimley Horn & Associates is requesting a Major Comprehensive Plan Amendment (CPA) 
to change the land use designation in the Vision 2030 Maricopa County Comprehensive 
Plan from Rural Development Area to Utilities to allow development of a future utility-
scale hybrid solar photovoltaic (PV) and battery storage power plant, including 
accessory uses, which would generate approximately 150 megawatts (MWs) of 
electricity. This would also include approximately 400,000 solar modules as well. The 
applicant will subsequently be required to obtain a Zone Change with Overlay (including 
a precise Plan of Development) to IND-2 IUPD as part of the entitlement process within 
five (5) years (on a phase or for the entirety of the development). It should be noted that 
a related POD (Z2021110) and Zone Change with Overlay (Z2021111) have been 
submitted and are currently under review.  
 
2. 
The site is comprised of six (6) private contiguous parcels under two separate ownerships 
– APN 506-29-001, 506-29-002, 506-29-022A, and 506-29-022B (CV Harquahala LLC); 506-
29-023C and 506-29-023D (Kawela One LLC).  Most properties in the immediate vicinity of 
the project are privately owned with a partially developed Rose View Estate and Rose 
View Estates Unit 2 subdivisions located just east of the site with 483rd Ave between.  
 
3. 
Nearly all land used for solar energy projects such as this are developed with large fields 
of solar collectors that capture the energy through photovoltaic technology. The subject 
site is relatively flat and allows for the development of solar energy with little or no 
additional grading. The current use of the site is for agriculture.  The general area contains 
significant local electrical infrastructure including a power generation facility 
(Harquahala Power Plat) and substation (APS Delaney). 
 
4. 
Other adjacent land uses include vacant, agricultural and very limited rural residential 
uses.  Previous CPAs in the area were approved in 2011 under an older land use 
designation; however, the projects were abandoned.  There was also an approved 
CPA2020002 that included much of the area to the east where there are other major 
solar projects located or planned in this corridor south of the I-10 as shown on the map in 
purple below. 
CPA2021007 and surrounding solar projects

CPA2021007 
Page 3 of 10 
 
5. 
The narrative asserts that the proposed development meets the Comprehensive Plan 
Amendment criteria in the following manner:  
 
Whether the amendment constitutes an overall improvement to the Comprehensive Plan 
and is not solely for the good or benefit of a particular landowner or owners at a particular 
point in time.  
 
The narrative states that the Harquahala Sun Project is in direct alignment with the 
County’s mission and guiding principles for leadership and strategic priorities. The supply 
of energy is essential to the region’s transportation and manufacturing sectors.  
According to the narrative, the project would benefit the state, county, local and 
regional economy by providing employment for approximately 240 construction and 
related employees.  A power purchase agreement (PPA) has been executed with an 
Arizona corporate entity for energy and plans to be able to deliver energy by late 2022.  
 
Whether the amendment will adversely impact all or a portion of the planning area.  
 
A. 
Altering acceptable land use patterns to the detriment of the plan  
 
According to the narrative, the amendment will not alter any surrounding land 
uses or land use patterns.  This site is situated near other solar developments and 
comprises a key use-sector of unincorporated Maricopa County including utilities 
(solar and electric generating stations), agriculture and rural-residential. This 
project would add to the infrastructure of these types of facilities and could help 
with lower cost of energy production as a long-term tangible impact.  
 
B. 
Requiring public expenditures for larger or more expensive infrastructure 
 
The narrative states that the project would not require public expenditures for 
larger or more expensive infrastructure.  The costs of the project’s infrastructure 
needs shall be borne by the owner/developer. 
 
C. 
Requiring public improvements to roads, sewer, or water systems that are needed 
to support the planned land uses 
 
The narrative states that the project would not require public improvements to 
roads, sewer or water systems to support the proposed solar development. 
However, any costs that may come up in the future would be borne solely by the 
developer. The applicant then identified the right-of-way dedication and 
preservation requests by MCDOT to be further evaluated at the time of future 
entitlements (zoning, POD, etc.) based on a traffic study review. Otherwise, sewer 
is not proposed, and discussions would be done when phasing for other related 
uses (O&M building, etc.) are part of a site plan review.  
 
D. 
Adversely impacting planned uses because of increased traffic  
 
The narrative indicates there would be increased traffic during the construction 
and implementation period, but there would be no significant increase in traffic 
during the operational life of the project following the construction phase.  With a

CPA2021007 
Page 4 of 10 
small number of staff operating the facility during the project’s operating life, 
planned uses overall will not be adversely impacted. 
 
E. 
Affecting the livability of the area or health or safety of present and future residents  
 
There are not many residents in the area around the subject site. Site preparation, 
construction, and operation will not include hazardous material or activities where 
noise would also be limited to the construction period. Dust control would be 
maintained during construction and operational periods by implementing proper 
draining and erosion control measures. Fire hazard and wildlife mitigation would 
be further discussed and addressed with the future POD.  
 
F. 
Adversely impacting the natural environment or scenic quality of the area in 
contradiction to the plan  
 
The applicant states that the project will not significantly impact the natural 
environment or overall scenic quality of the area.  There are key measures of 
responsibility that demonstrate an applicant’s commitment to avoiding adverse 
impacts to the natural environment and scenic quality of a site.  These measures 
are subjective in a sense, but may include animals, plants, historical resources, 
scenic views and hydrology/ground disturbance.  
 
As discussed within the transportation section, no major offsite road improvements 
would be required to support this project. Dust control measures are to be 
provided to protect air quality during the construction phases of the project. 
Vegetation may be required to be reduced in height to maintain appropriate 
levels for fire and dust control.  
 
The site would have minor visual impacts to surrounding areas as it would be 
screened by a minimum 6’ fencing with opaque material to be requested at time 
of zone change and would include input from adjacent or nearby residents and 
property owners.  
 
At the maximum point during sunrise and sunset the solar arrays would be 
approximately 10’ in height. However, there are other future utility uses planned to 
the west and northwest of the site. The Rose View Estates subdivision is separated 
by a 60’ right-of-way in 483rd Ave. with most residences within 300’ of the subject 
site although the closest is 60’.  
 
PV technology is the most water-efficient solar generation available where the 
project would implement water conservation measures. The project’s water-
conscious design is consistent with the applicable water goals and policies of the 
Comprehensive Plan.   
 
Whether the amendment is consistent with the overall intent of the Comprehensive Plan. 
 
The applicant’s narrative states that the request is consistent with the overall intent of the 
Comprehensive Plan as the plan explicitly identifies encouraging solar energy 
development as an important goal and strategy to attract solar and other alternative 
energy research and development to Maricopa County.  In addition to the state, county,

CPA2021007 
Page 5 of 10 
local and regional benefits, the narrative asserts that the project displays consistency with 
the County’s vision to work collaboratively and effectively for residents and the County’s 
mission to provide regional leadership by encouraging solar energy development.  
Additionally, the applicant believes that the project aligns with the County’s priorities to 
leverage resources, plan for effective/efficient infrastructure and manage County 
resources. 
 
The extent to which the amendment is consistent with the specific goals and policies 
contained within the plan. 
 
The applicant’s narrative contains a substantial list of Goals and Policies from the Vision 
2030 Maricopa County Comprehensive Plan. This staff report identifies which Goals and 
Policies the applicant’s narrative addressed. 
 
Vision 2030 Maricopa County Comprehensive Plan 
 
Land Use Element – Goal 1, Goal 2, Policy 1, Policy 7, Policy 22 
 
Transportation Element – Goal 1, Goal 2, Goal 3, Policy 11, Policy 12 
 
Environment Element – Goal 1, Policy 3, Policy 4, Policy 5 
 
Economic Growth Element – Goal 1, Policy 5, Policy 10 
 
Growth Area Element – Goal 1, Policy 1 
 
Open Space Element – Goal 1, Goal 2, Policy 2,  
 
Water Resources Element – Goal 1, Goal 2, Goal 4, Policy 2, Policy 4, Policy 5, Policy 7 
 
Energy Element – Goal 1, Goal 2, Policy 6 
 
Cost of Development Element – Goal 2, Policy 2 
 
 
Other pertinent information as requested by the Maricopa County Planning Department 
Staff. 
 
The applicant was responsive and provided quality information as requested by 
Maricopa County Planning Department Staff.

CPA2021007 
Page 6 of 10 
 
2018 Aerial Map 
 
 
 
 
Zoning Map - Rural-43 & Surrounding Districts

CPA2021007 
Page 7 of 10 
 
Land Use Exhibit – Current Land Use (Rural Development Area)  
 
 
Land Use Exhibit – Proposed Land Use (Utilities)

CPA2021007 
Page 8 of 10 
Existing On-Site and Adjacent Zoning / Land Use: 
 
6. 
On-site: 
 
Rural-43 / Vacant-Agricultural 
North: 
Arterial then Rural-43 / Courthouse Rd. then Vacant/Agricultural as  
 
well as a Power Plant (Harquahala) 
South: 
Rural-43 / Vacant-Agricultural 
East: 
Arterial then Rural-43, R-5, C-2, & C-3 / 483rd Ave. then Rose View 
Estates Subdivisions 
West: 
Rural-43 / Vacant-Agricultural 
 
 
Utilities and Services: 
 
7. 
Water: 
TBD - Private Well or Hauled Water 
Wastewater: 
TBD - Septic 
School Districts: 
Arlington Valley Elementary School District #47  
 
Buckeye Union High School District #1 
Fire: 
TBD – within Harquahala Valley Fire District 
Police:  
MCSO  
 
Right-of-Way: 
 
8. 
The following table includes existing and future right-of-way* and the future 
classification** based upon the Maricopa County Department of Transportation 
(MCDOT) Major Streets and Routes Plan. 
 
 
Street Name 
Existing R/W 
Future R/W* 
Future 
Classification** 
Courthouse Road 
55’ (half-width) 
65’ (half-width) 
Arterial 
491st Ave. 
Approx. 38’ (half-
width) 
55’ 
Section Line 
Alignment 
Additional Section and 
Mid-Section Alignments 
 
Varies 
55’ and 40’ (half-
widths) 
Section and Mid-
Section 
Alignments 
 
** Required dedication/preservation and future classification of ROW is tentative and 
subject to change and will be established by MCDOT during a future Plan of 
Development review. 
 
Adopted Plan: 
 
9. 
Vision 2030 Maricopa County Comprehensive Plan: The entire site (approx. 705 acres) is 
designated as Rural Development Area (0-1 d.u./ac.).  The Rural Development Area land 
use designation encourages low-density rural residential and agricultural uses. 
 
Public Participation Summary: 
 
10. 
The applicant posted the subject site and staff notified all property owners within 300’ of 
the site.  Pursuant to state law, Staff issued enhanced notification letters to all adjacent 
and internal jurisdictions to Maricopa County, select state and regional agencies and 
Luke Air Force Base. Staff received two (2) letters from jurisdictions (City of Buckeye and

CPA2021007 
Page 9 of 10 
City of Apache Junction) expressing no concerns.  Moreover, state agencies such as 
Arizona Game & Fish Department and SHPO issued comments.  Those comments have 
been included in the attachments section and are not actionable until future zoning and  
Plan of Development stages. ADOT also provided comments to request a future copy of 
the TIS to review expected traffic to be generated by the facility. County Staff received 
no opposition letters or any inquiries from the public regarding this request.  The applicant 
also provided staff with a Public Participation Results Report that indicated no concerns 
with only a couple of correspondence received regarding interest of the subject request.  
 
Outstanding Concerns from Reviewing Agencies: 
 
11. 
N/A 
 
Staff Analysis: 
 
12. 
The state and Maricopa County recognize the potential environmental and economic 
benefits that solar technology can provide. The Harquahala Sun project will use 
photovoltaic technology that generates energy from sun absorption.  Photovoltaic 
technology differs from other techniques that required vast amounts of water to cool the 
units.  In contrast, very little water is utilized for photovoltaic technology.  As a result, this 
development would not pose a threat to groundwater depletion and would utilize this 
technology to implement water conservation measures.  
  
16. 
Staff believes the proposed solar facility is well suited to this rural area.  Solar facilities 
require large amounts of relatively flat land and the vast majority of the subject site is flat.  
Staff agrees with the applicant that the subject site is suitable due to proximity to 
electrical transmission lines, nearby stations and substations, and because the 
surrounding area is mostly undeveloped.  Staff agrees with the applicant that the project 
will not detrimentally affect the visual quality of the area. Since the area is primarily 
undeveloped vacant land in close proximity to other existing utility-scale solar projects, 
staff believes there will be minimal impacts to the surrounding area. Additionally, as 
previously mentioned, the subject site was already approved as part of a large-scale 
project for solar land uses in 2011 with stipulations that required entitlement/development 
by a certain, but which have subsequently expired. Now that there is even more 
infrastructure and means for solar in the area, this project is more suitable at this time.   
 
17. 
Promoting the development of solar energy over the past several years in Maricopa 
County reinforces the County’s interest in promoting the County as an economic leader 
for solar development. Staff believes the Harquahala Sun Project would add to this effort 
in a positive way by providing the potential for temporary construction jobs.  There will 
also be small number of long-term employment opportunities for County residents.  
 
18. 
Staff believes the request is consistent with and meets the goals and policies of the 
Comprehensive Plan. Staff’s position is that this project, as proposed and as governed by 
the recommended conditions, represent proper long-term land use planning in the 
region and for Maricopa County as a whole.

CPA2021007 
Page 10 of 10 
Recommendation: 
 
19. 
For the reasons outlined in this report, staff recommends the Commission motion for 
Approval, subject to conditions ‘a’ – ‘d’. 
 
a. 
Development and use of the site shall be in general conformance with the 
narrative report entitled “Harquahala Sun” consisting of 31 pages, dated stamped 
received on October 11, 2021, except as modified by the following conditions.  
 
b. 
Development and use of the site shall be in conformance with the land use exhibit 
entitled “Harquahala Sun” consisting of 2 pages, dated stamped received on 
September 7, 2021, except as modified by the following conditions. 
 
c. 
The land use designation of utilities approved as part of case CPA2021007 shall be 
subject to any time limits set forth in the subsequent zone change. 
  
d. 
The applicant is proposing to develop a photovoltaic solar electric generating 
facility which, pursuant to the Maricopa County Comprehensive Plan, 
necessitates a change in the land use designation from Rural Development Area 
to Utilities. The proposal by the applicant represents a comprehensive approach 
to the subject property and will allow the applicant to pursue the proper 
entitlements pursuant to state law so that they can lawfully operate in 
unincorporated Maricopa County. This particular proposal is an appropriate plan 
for the property and is consistent with the overall intention of the comprehensive 
plan. However, in the event that the zone change or a zone change phase for this 
particular proposal is not approved by the Maricopa County Board of Supervisors 
(BOS) within five (5) years from the date of Board approval of this comprehensive 
plan amendment, this amendment shall no longer be effective as the planning 
justification for this comprehensive plan amendment will no longer be present. In 
such instance, a change of the land use designation from Utilities to Rural 
Development Area will occur, and all comprehensive plan land use maps shall be 
altered to reflect as such, because this represents superior long-range planning by 
Maricopa County.  
 
Presented by: 
Ray Banker, Senior Planner 
Reviewed by: 
Matthew Holm, AICP, Planning Supervisor 
 
Attachments: 
Case Map (1 page) 
 
Land Use Exhibits (2 pages) 
 
Narrative Report (31 pages) 
 
MCESD Comments (1 page) 
 
AZGFD Comments (3 pages) 
 
SHPO Email (1 page) 
 
ADOT Email (2 pages) 
 
City of Buckeye Email (1 page) 
 
City of Apache Junction Comments (1 page)

MARICOPA COUNTY 
 
Legal Description: 
T1N, R8W, Section 5 & 6 
Applicant:  Kimley-Horn & Associates 
P&Z Hearing Date: 
November 4, 2021 
MARICOPA COUNTY REGIONAL DEVELOPMENT SERVICES - PHOENIX, ARIZONA 
 
CPA2021007 
Aerial Date: 2018 
Case Address: TBD 
Parcels: 506-29-001 + 
SUPERVISORAL DISTRICT NO 5 
Major Comprehensive Plan Amendment to change the land use designation in the Maricopa County Comprehensive Plan from 
Rural Development Area to Utilities. 
Phone: 602-313-7206

kimley-horn.com 
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
480 207 2666 
 
 
 
 
Kimley-Horn and Associates 
HARQUAHALA 
SUN 
MAJOR COMPREHENSIVE PLAN AMENDMENT 
PROJECT NARRATIVE  
CPA2021007 
 
8-4-2021 
Revision Date: 10-08-2021

Page 1 
kimley-horn.com 
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
 480 207 2666 
 
Contents 
A. EXECUTIVE SUMMARY ......................................................................................................... 2 
I. 
ON-SITE AND REGIONAL LOCATION ..........................................................................2 
II. 
CPA SIZE AND DESCRIPTION OF LAND USE TYPES BY ACREAGES ............................4 
III. 
ROADS/TRANSPORTATION SYSTEMS SERVING THE PROPOSED PROJECT ...............4 
IV. SUITABILITY WITH SURROUNDING LAND USES .........................................................5 
EXISTING SURROUNDING SOLAR (UTILITY) LAND USE APPROVALS...............................6 
B. WHETHER THE AMENDMENT (OR CONDITION MODIFICATION) CONSTITUTES AN 
OVERALL IMPROVEMENT TO THE COMPREHENSIVE PLAN AND IS NOT SOLELY FOR 
THE GOOD OR BENEFIT OF A PARTICULAR LANDOWNER OR OWNERS AT A 
PARTICULAR POINT IN TIME. ............................................................................................... 8 
C. THE AMENDMENT WILL NOT ADVERSELY IMPACT ALL OR A PORTION OF THE 
PLANNING AREA BY:............................................................................................................. 9 
I. 
ALTERING ACCEPTABLE LAND USE PATTERNS TO THE DETRIMENT OF THE PLAN. 9 
II. 
REQUIRING PUBLIC EXPENDITURES FOR LARGER AND MORE EXPENSIVE 
INFRASTRUCTURE...................................................................................................... 10 
III. REQUIRING PUBLIC IMPROVEMENTS TO ROADS, SEWER, OR WATER SYSTEMS 
THAT ARE NEEDED TO SUPPORT THE PLANNED LAND USES. ..................................... 10 
IV. ADVERSELY IMPACTING PLANNED USES BECAUSE OF INCREASED TRAFFIC....... 11 
V. 
AFFECTING THE LIVABILITY OF THE AREA OR HEALTH OR SAFETY OF PRESENT 
AND FUTURE RESIDENTS. .......................................................................................... 12 
VI. ADVERSELY IMPACTING THE NATURAL ENVIRONMENT OR SCENIC QUALITY OF 
THE AREA IN CONTRADICTION TO THE PLAN. ............................................................. 12 
D. WHETHER THE AMENDMENT IS CONSISTENT WITH OVERALL INTENT OF THE 
COMPREHENSIVE PLAN: .................................................................................................... 14 
E. THE EXTENT TO WHICH THE AMENDMENT IS CONSISTENT WITH THE SPECIFIC GOALS 
AND POLICIES CONTAINED WITHIN THE PLAN. ................................................................ 15 
F. COMPREHENSIVE PLAN AMENDMENT MAP EXHIBIT ....................................................... 23 
G. COMPREHENSIVE PLAN AMENDMENT LEGAL DESCRIPTIONS EXHIBITS....................... 25

Page 2 
kimley-horn.com 
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
 480 207 2666 
 
A. EXECUTIVE SUMMARY  
HV Sunrise, LLC, (hereafter, “Applicant”) on behalf of the property owners, Kawala One, LLC and CV 
Harquahala, LLC, is requesting a major Comprehensive Plan Amendment (CPA) of the Vision 2030 
Comprehensive Plan to change the land use designation of ±704.68 acres from Rural Development Area 
to Utilities. The CPA request will be accompanied by a subsequent zone change request to rezone the 
underlying parcels from RU-43 to the IND-2 Zone. The CPA will affect the land use designation of the 
following six (6) underlying parcels: Parcel ID Nos.: 506-29-001, 506-29-002, 506-29-022A, 506-29-022B, 
506-29-023C, & 506-29-023D.  
The Applicant proposes to construct, operate, and maintain a 150-MWac hybrid solar photovoltaic (PV) and 
battery power plant and associated infrastructure for the Harquahala Sun Project (Project).  
The Project will include approximately 400,000 solar modules mounted on single axis trackers, inverters to 
convert direct current into grid-compatible alternating current, transformers to increase the voltage of the 
electricity generated, a 500 kV utility substation, battery energy storage system, and one or more small 
buildings to house telecommunication equipment. The Project will interconnect to the transmission grid at 
the Arizona Public Service (APS) Delaney Substation.  
Off-site supporting improvements, infrastructure, and/or uses include a 200-foot-wide gen-tie route corridor 
that extends approximately 4 miles through a combination of private land, land owned by Flood Control 
District of Maricopa County (FCDMC), Maricopa County Department of Transportation (MCDOT), Arizona 
State Land Department (ASLD), and land administered by the Bureau of Land Management (BLM). 
The proposed CPA in support of the ±704.68-acre Project will not adversely impact the planning area in 
part nor portion. Approval of the proposed CPA, subsequent rezone (Zone Change case number 
Z2021111), and associated development plans (Plan of Development case number Z2021110) for the 
proposed Project will not generate undue nor unmitigated impacts to the following areas of consideration 
identified in the Comprehensive Plan, which include, but are not specifically limited to: land use; public 
transportation system improvements; drainage and/or stormwater management; environmental 
considerations (air & water quality, potable water & wastewater treatment), areas of geologic concern, 
hazard, and/or significance; plant and wildlife habitat/migration environs and/or patterns; aviation and 
military installation operations and flight paths/patterns; economic growth; growth areas; open space, water 
resources; energy; and/or the cost of development. 
Issues relating to these are addressed by the required reports, plans, and analysis submitted in support of 
the CPA and subsequent rezone application. 
I. ON-SITE AND REGIONAL LOCATION  
The proposed Project is located northwest of Saddle Mountain, east of Granite Mountain, and northeast 
of the Eagle Tail Mountains in Section 6, Township 1 North, Range 8 West, and Section 5, Township 1 
North, Range 8 West. The site is approximately 20 miles west of the City of Buckeye, Arizona in 
unincorporated Maricopa County, Arizona with parcels lying southwest and southeast of the 
intersections of N. 491st Ave and W. Courthouse Road. The Project area is bound on the north by W. 
Courthouse Road and on the south by an unimproved segment of Van Buren Street right-of-way (ROW) 
located at the west line of the east one-half of Section 6, Township 1 North, Range 8 West.

Page 3 
kimley-horn.com 
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
 480 207 2666 
 
 
 
The CPA is inclusive of six (6) parcels identified below which are held under two separate ownerships. 
The cumulative area of the property included in the CPA request is ±704.68 acres. The subject 
properties are currently used for irrigated agricultural uses. Property considered under this CPA include: 
 
PARCEL NO. (APN) 
OWNER 
ACREAGE (±AC) 
ZONING 
LOCATION 
506-29-001 
CV HARQUAHALA LLC 
158.28 
RU-43 
S5 T1N R8W 
506-29-002 
CV HARQUAHALA LLC 
59.98 
RU-43 
S5 T1N R8W 
506-29-022A 
CV HARQUAHALA LLC 
253.76 
RU-43 
S5 T1N R8W 
506-29-022B 
CV HARQUAHALA LLC 
66.40 
RU-43 
S5 T1N R8W 
*506-29-023C & 
506-29-023D 
KAWELA ONE LLC 
166.26 
RU-43 
S6 T1N R8W 
Cumulative CPA Area Acreage: 
±704.68 
 
 
(*) Parcels were conveyed together by special warranty deed dated 11/19/2010 at Recording no. 20101014589 in the 
records of the Maricopa County Recorder. These parcels have been legally described as a single parcel; however, the 
parcels are depicted separately by the Maricopa County Assessor.

Page 4 
kimley-horn.com 
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
 480 207 2666 
 
 
II. CPA SIZE AND DESCRIPTION OF LAND USE TYPES BY ACREAGES  
The CPA request is inclusive of six (6) parcels totaling ±704.68 acres in the RU-43 zone district which 
is intended to conserve and protect farms and other open land uses, foster orderly growth in rural and 
agricultural areas, to prevent urban and agricultural land use conflicts, and to encourage sustainable 
development. The zone district has a maximum residential density 1DU/acre. Principal permitted uses 
in the RU-43 district include both farming and non-farming related residential uses, farms, and 
recreational and institutional uses. 
III. ROADS/TRANSPORTATION SYSTEMS SERVING THE PROPOSED PROJECT  
The roadway network serving the proposed Project from the I-10 corridor includes the I-10/Salome 
Highway interchange that connects Salome Hwy to Harquahala Valley Rd and 491st Ave southerly to 
W. Courthouse Rd. The site can be accessed from the I-10/ Salome Highway interchange. Salome 
Highway provides connections to both Harquahala Valley Road and 491st Ave which both extend 
southerly to W. Courthouse Road.  Primary access to the site is from the adjacent W. Courthouse Road 
on the northern site boundary and 491st Ave that intersects W. Courthouse Road and extends southerly 
into the overall development area. There are a number of smaller, existing roads, both named and 
unnamed, that traverse the Project site, which are anticipated to be used and improved for construction 
and ongoing operations of the Project. Site access will be identified with the zone change and plan of 
development applications. Final access locations will be determined in accordance with access 
management policies and permitting requirements of Maricopa County. 
 
Properties within the Project area are located along the southern ROW of W. Courthouse Road at the 
southwest intersections of W. Courthouse Road and 483rd, 487th, and 491st Aves. Van Buren Street on 
the southern boundary is an existing unimproved agricultural road (within existing County ROW). There 
are currently no identified public or private plans to make public improvements to Van Buren Street.

Page 5 
kimley-horn.com 
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
 480 207 2666 
 
The Maricopa County Department of Transportation has requested ROW dedications/preservations 
along the following alignments: 
 
ROW Dedication Requests (measured as half-width of ROW from centerline): 
• 
W. Courthouse Road: 65’ dedication of 130’ ROW 
• 
491st. Avenue: 55’ dedication of 110’ ROW 
 
ROW Preservation Requests (measured as half-width of ROW from centerline): 
• 
483rd Avenue: 65’ preservation of 130’ ROW  
• 
487th Avenue 40’ preservation of 80’ ROW  
• 
495th Avenue: 40’ preservation of 80’ ROW 
• 
Roosevelt Street: 40’ preservation of 80’ ROW  
• 
W. Van Buren Street: 55’ preservation of 110’ ROW 
There would be no significant increase in traffic during the operational life of the Project that would 
require road improvements. There would be a relatively minor increase in the level of traffic during the 
approximately 12 months required for Project construction. This increased traffic is expected to be 
fewer than 100 trips during single peak morning and evening hours, primarily for the delivery of 
equipment and supplies and the commuting of the construction workforce. A traffic impact statement 
will be completed as part of the zone change process associated with the Project. The Applicant has 
agreed to financial responsibility for repair of roads used during construction, including bonding for such 
work, so that there is not public expenditure for transportation infrastructure associated with the Project. 
IV. SUITABILITY WITH SURROUNDING LAND USES 
The surrounding area is characterized by active and passive agricultural land uses, natural gas-
powered electric generation facilities, solar powered electric generation facilities, and native desert 
lands. The dominant private land use within the area surrounding the current CPA is solar generation 
facilities, which occurs on parcels or combinations of parcels totaling several hundred to thousands of 
acres in irregular configurations. Other surrounding land uses include publicly owned and managed 
Local, State, and Federal Lands. These include lands controlled by the Maricopa Flood Control District, 
Arizona State Land Trust, and Bureau of Land Management. Other surrounding land uses include 
vacant and active agricultural uses with limited residential development. One concentration of 
residential development is within the Rose View Estates (RVE) development area. Other than RVE, 
there is limited, and sparse distribution of privately owned parcels used for residential purposes within 
the surrounding area. 
 
The Rose View Estates (RVE) and Rose View Estates Unit 2 (RVE2) Subdivisions, platted in 1964, are 
located east of 481st Street which forms the eastern edge (3,636.14 feet/0.647 miles) of the proposed 
CPA and solar Project area.  These subdivisions contain 244 lots zoned RU-43 (173 lots), R-5 (65 lots), 
and C-3 (6 lots). Only 28 lots have been developed for residential use. Considerations for buffering and 
screening of the Project and mitigation of construction and operational visual impacts will be addressed 
in greater detail at the rezone and plan of development submittals. Four (4) residences are located 
within 500 feet of the development boundary. Eleven (11) residences are located within 501 feet to 
1000 feet of the proposed solar development within the R-5 zone. The remaining 13 residences are 
located greater than 1,000 feet from the eastern CPA/Solar Project boundary. After 56 years, the 
subdivision currently has an 11.5% buildout and is unlikely that any substantial residential development 
will occur within the subdivisions that will be negatively impacted by the proposed solar project. Property 
owners and residents will be notified of the project and efforts will be made to identify concerns over

Page 6 
kimley-horn.com 
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
 480 207 2666 
 
visual impacts and incorporate effective mitigation and screening of the site against the residential 
boundaries.  
 
Considerations for buffering and screening of the Project and mitigation of visual impacts during 
construction and operational activities. Screening and mitigation of visual impacts will be addressed in 
greater detail at the rezone and plan of development submittals.  
 
Site parcels will be enclosed by perimeter security fencing located along the project boundaries and 
the Courthouse Rd, 483rd Ave, 487th Ave, 491st Ave, and 499th Ave rights of way. No fencing will impede 
or otherwise enclose existing roads within the project boundaries.  
 
The proposed Utility land use contemplated by the Harquahala Sun CPA is compatible with similar 
approved and implemented solar Projects within an approximately 4-mile radius of the site. Associated 
facilities within this radius include approved CPA’s for Utility (solar) land uses, PV solar generation 
facilities, utility corridors, transmission lines and a utility substation. 
 
The parcels surrounding the CPA boundary have been subject to several CPA approvals by the BOS, 
that include the following solar and storage generation Projects: Harquahala 160, Almeria Solar, Sun 
Valley North, Sun Valley South, Harquahala (Generation Facility), Papago, and Harquahala Solar 
Project.  
 
The Maricopa County Board of Supervisors (BOS) approved a CPA for the ‘Harquahala Solar Project’ 
(File No. CPA 20111002), November 17, 2011 for a 3,514-acre area for future development as a PV 
Solar powered generation facility. This CPA was not implemented through requisite rezoning and 
approval of a plan of development and was subsequently expired. The current CPA parcels were 
included in the previous BOS approval. Approval of the 2011 CPA included findings that the Project 
was appropriately sited among other similar facilities; the Project was in substantial conformance with 
the goals of policies of the Comprehensive Plan in effect at the time of review and approval, and that, 
subject to the terms/conditions of approval, the Project represented appropriate long term land use 
planning in the subject region and in Maricopa County as a whole. The current CPA area is 
approximately 25-percent of the previous land area and remains consistent with the general findings of 
conformance with the comprehensive plan and amendment criteria, as amended.  
 
EXISTING SURROUNDING SOLAR (UTILITY) LAND USE APPROVALS 
Project 
Location (Township/Range) 
Harquahala 160 
(T2N R9W) 
Harquahala Solar Project 
(T1N R8W; T2N R9W) 
Almeria Solar 
T2N R8W 
Sun Valley North 
T2N R8W 
Sun Valley South 
T2N R8W 
Harquahala (Generation 
Facility) 
T2N R8W 
Harquahala Solar Project 
T1N R8W 
*Maricopa Solar and Storage 
Project  
T1N R8W; T1N R9W; T2N R8W; T2N R9W 
Areva Solar AZ II 
T2N R7W 
Papago Solar 
T2N R8W 
Tonopah Photovoltaic 
T2N R8W

Page 7 
kimley-horn.com 
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
 480 207 2666 
 
 
The BOS recently approved the Maricopa Solar and Storage Project CPA2020002 (Maricopa Solar) to 
change the land use of 11,260 acres from Rural Development Area to Utilities. This CPA boundaries 
are contiguous and congruent with the Harquahala Sun CPA boundaries. Approximately ±314 AC of 
property approved under the Maricopa Solar CPA will be included in the Harquahala Sun Project 
boundaries and will be incorporated as such in the subsequent Zone Change (Z2021111) and Plan of 
Development (Z2021110) applications.

Page 8 
kimley-horn.com 
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
 480 207 2666 
 
BLM is the lead federal agency for NEPA compliance. A Biological Evaluation (BE) was submitted to 
the Bureau of Land Management (BLM) on July 13, 2021 for review.  in preparation for BLM 
coordination, the U.S. Fish and Wildlife Service (USFWS) Information for Planning and Consultation 
(IPaC) system was accessed March 21, 2021 (Consultation Code 02EAAZ00-2021-SLI-0639) and the 
Arizona Game and Fish Department (AGFD) Online Environmental Review Tool (OERT) was accessed 
on February 12, 2021 (HGIS-12827).  BLM is actively leading coordinating with AGFD, SHPO, & 
USFWS. 
B. WHETHER THE AMENDMENT (OR CONDITION MODIFICATION) CONSTITUTES AN 
OVERALL IMPROVEMENT TO THE COMPREHENSIVE PLAN AND IS NOT SOLELY FOR 
THE GOOD OR BENEFIT OF A PARTICULAR LANDOWNER OR OWNERS AT A 
PARTICULAR POINT IN TIME. 
 
Per the Vision 2030, Maricopa County Comprehensive Plan (2016), Master Plan Amendments should 
improve the county’s overall condition and not undermine the plan’s core principles. The Plan recognizes 
the need to redesignate land uses in response to changing market conditions and to address the increasing 
demands of growth to the public infrastructure needs, specifically energy generation and consumption 
demands within the local economy.  
As stated, and reinforced in the Plan, the supply of energy is essential to the region’s transportation and 
manufacturing sectors. Energy resources significantly impact economic development by contributing to the 
region’s overall attractivity on basic and corresponding non-basic employment, primary and secondary 
employment sectors and markets, and research and development within existing and emerging markets 
and industries. Additionally, energy availability and even surplus opportunities function as an incubator for 
innovations within all segments of the local, regional, and state economy. 
The Project is anticipated to generate up to 240 jobs in the construction, contracting, administrative, and 
Project management fields during the construction and implementation phase. Operation of the site will 
employ approximately 5 full time employees daily. Routine maintenance activities will require up to 15 part-
time or seasonal employees and up to 20 employees for equipment repair and replacement as needed.  
A power purchase agreement (PPA) has been executed with an Arizona corporate entity for energy from 
Harquahala Sun. The Project is scheduled to deliver energy by December 31st, 2022.  The Applicant has 
a Facility Study with APS to interconnect the Generation Facility to APS’s 500-kV Delaney Switchyard. The 
final execution of the Generator Interconnection Agreement is anticipated to occur in June 2021. 
The Project benefits the County and greater region within the state by providing additional renewable 
energy resources, battery storage for local energy reliability and resiliency, and directly supports Arizona 
corporations that seek competitively priced renewable energy. Local Projects like Harquahala Sun will 
provide construction jobs, long term technical careers, and uses local engineering and development 
contractors in Maricopa County. 
The Plan is intended to promote and incentivize the production and delivery of renewable energy resources 
that meet and otherwise support consumption needs of existing and emerging markets which benefit the 
regional and state economies and tax bases. The availability of sustainable, renewable, and economically 
efficient energy and the resulting cost savings, both immediate and over time, creates opportunity for 
reinvestment of public and private capital back into the local and regional economy.

Page 9 
kimley-horn.com 
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
 480 207 2666 
 
The Plan identifies the County’s potential to be a “global leader in renewable energy research and 
development, especially with respect to solar energy” because the region’s environment is considered “one 
of the most productive spots in the world for both photovoltaic and concentrated solar energy generation.” 
In response to these conditions, the County has taken a proactive approach to attracting and realizing the 
economic and environmental benefits of solar research and development by its regulation and approval of 
utility scale solar developments.  
The proposed Harquahala Sun Project is in direct support of this stated goal, the implementation of which 
is evidenced by the current approved CPA and rezoning of property within the current Project vicinity for 
solar Projects. The need for this Project is established by growing demand for renewable energy as 
evidenced by APS’s request for proposals to supply renewable energy and by Arizona’s Renewable 
Portfolio Standard (RPS), which set renewable energy portfolio standards for investor-owned utilities at 
45% by 2030 and 100% by 2050. 
Approval of the Project strengthens the overall energy production output within Maricopa County. The 
increased local production over time will create energy surplus within the market resulting in a reduction of 
cost and consumption by additional sectors of the local and regional economy. Project approval facilitates 
a larger Regional share of renewable energy generation activities within the national production mix thereby 
promoting energy independence throughout related national industries and markets. 
C. THE AMENDMENT WILL NOT ADVERSELY IMPACT ALL OR A PORTION OF THE 
PLANNING AREA BY: 
*EACH CRITERION IS ADDRESSED SEPARATELY WITH THE CRITERIA LISTED AND GENERAL 
RESPONSES TO THE CRITERIA CITED AS SUBHEADINGS IN THE PROCEEDING SUBSECTIONS 
BELOW: 
I. ALTERING ACCEPTABLE LAND USE PATTERNS TO THE DETRIMENT OF THE PLAN.  
The proposed CPA will not alter the acceptable land use patterns in the planning area in an adverse 
manner to the detriment of the plan. The proposed change in land use is consistent with existing 
approved utility land use patterns and subsequent zone change requests. Previous land use approvals 
should not be construed to imply future precedents, nor obligate future Board of Supervisor decisions. 
However, the infrastructure investment and development within this portion of the planning area make 
the Project site a more suitable and logical location for future development of solar powered generation. 
The single Renewable Energy Strategy in the Plan promotes/encourages the “[attraction] of solar and 
other alternative energy research and development to Maricopa County.” Approval of the CPA is 
consistent with this strategy and the utility pattern that has been established in the Project area by 
recent BOS approvals in favor of large-scale solar powered generation facilities in the Project area. 
Previous CPAs and zoning actions in support of the following solar Projects surrounding the site, 
inclusive of the approved unimplemented 2011 CPA approval (CPA 2011002) which included the area 
under consideration. 
 
Increasing the County’s investment (in terms of land use planning) in local solar powered generation 
facilities and infrastructure has a long-term tangible impact of lowering costs of energy production, 
delivery, and consumption. This goal is achieved in part by increasing local/regional energy 
production/generation. The increased supply has a proportionate impact on the accessibility of the 
resource and encourages integration of applied uses and transitions away from reliance on outdated

Page 10 
kimley-horn.com 
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
 480 207 2666 
 
and inefficient modes of energy generation and transmission creating efficiencies in these areas. 
Increased supply and efficiencies will promote increased integration into the market for various sectors 
of the economy (housing, manufacturing, transportation, etc.).  
 
The CPA to change the land use from Rural Development Area to Utility to accommodate the proposed 
solar facility is in substantial conformance with renewable energy policies identified in the Plan, 
addressed in the Energy Goal and Policy Considerations in Section D of this report.  
II. REQUIRING 
PUBLIC 
EXPENDITURES 
FOR 
LARGER 
AND 
MORE 
EXPENSIVE 
INFRASTRUCTURE.  
No public expenditures for infrastructure improvements are proposed in support of the proposed 
Project. Improvements for adjacent access roads will be borne solely at the expense of the developer 
proportionate to the impacts placed on the transportation network. Any public or private electric 
transmission infrastructure improvement costs needed in support of the Project will be borne solely by 
the developer. 
III. REQUIRING PUBLIC IMPROVEMENTS TO ROADS, SEWER, OR WATER SYSTEMS THAT ARE 
NEEDED TO SUPPORT THE PLANNED LAND USES.  
The amendment will not adversely impact the planning area by requiring public improvements to roads, 
sewer, or water system needed to support the planned land uses. The provision of these services will 
be the responsibility of the developer in a manner that does not detract or negatively impact the 
availability, delivery, and/or use of existing services within the planning area. All costs for public 
improvements or services necessary to support the planned development will be borne solely by the 
developer. 
The Maricopa County Department of Transportation has requested ROW dedication or preservation of 
the section and mid-section line ROW alignments adjacent to and through the site that include: 
ROW Dedication Requests (measured as half-width of ROW from centerline): 
• 
W. Courthouse Road: 65’ dedication of 130’ ROW 
• 
491st. Avenue: 55’ dedication of 110’ ROW 
 
ROW Preservation Requests (measured as half-width of ROW from centerline): 
• 
483rd Avenue: 65’ preservation of 130’ ROW  
• 
487th Avenue 40’ preservation of 80’ ROW  
• 
495th Avenue: 40’ preservation of 80’ ROW 
• 
Roosevelt Street: 40’ preservation of 80’ ROW  
• 
W. Van Buren Street: 55’ preservation of 110’ ROW 
Potential additional section line alignments and/or extensions of unimproved segments will require 55’ 
and 40’ half width right-of-way dedications, per the Maricopa County Zoning Ordinance Section 1105, 
unless otherwise reduced during TAC review.  
Final dedication, preservation, alignments, terminations, and vacations of unneeded ROW will be 
determined in negotiation with MCDOT with input from the TAC review of the CPA, zone change, and 
plan of development, and may be subject to negotiated terms of a development agreement. Additional

Page 11 
kimley-horn.com 
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
 480 207 2666 
 
offsite improvements and any additional right-of-way needed will be determined by MCDOT Traffic 
Design and MCDOT Permits based on submittal of a TIA/TIS with subsequent zone change and plan 
of development review. 
Construction is anticipated to occur within a 12-18-month period. Impacts during construction 
phase/period is limited to equipment/materials delivery and construction worker traffic, with a Projected 
increase of less than 100 average daily trips (ADT) on surrounding roadway network. 
The applicant will maintain ongoing coordination with MCDOT to identify ROW dedication, preservation, 
and improvements needs throughout the entitlement process (CPA, Rezone, & Plan of Development) 
as well as construction and operational phases of the Project. 
Required financial assurances for construction traffic improvements, longer term improvements, and 
maintenance for the operational impacts will be addressed during the zone change and plan of 
development submittal and review. 
It is anticipated the Project would not connect to any existing sewer system.  Personnel who are on-
site to perform module washing (up to four times per year) would be provided with portable restrooms 
serviced by a licensed provider. Construction staff would also utilize portable restrooms serviced by a 
licensed provider. 
Options for construction and operational water needs is currently under examination by the applicant, 
and none of these options would require improvements to public water systems.  
The Project is anticipated to require approximately 210 acre-feet of water over the construction period. 
This water will be sourced from an on-site well, a nearby well, or delivered from the Harquahala Valley 
Irrigation District. Neither water storage tanks nor holding ponds are expected to be needed or placed 
within the adjacent Courthouse Rd., 483rd Ave, 487th Ave, or 491st Ave ROW. During the O&M phase, 
up to approximately 10 acre-feet of water would be required per year for module washing and 
maintenance. The Project will be consistent with Maricopa County’s water and wastewater treatment 
programs during all phases of the development. 
Underground wet/dry utility service or transmission lines within adjacent right-of-way will be solely at 
the developer’s expense. Required on-site water and wastewater service and/or treatment for 
construction, operations, and maintenance, activities will be the sole financial burden of the developer. 
Required services and the developer’s plan of provision will meet County and State requirements for 
water and on-site wastewater disposal criteria, permitting, and monitoring standards. 
IV. ADVERSELY IMPACTING PLANNED USES BECAUSE OF INCREASED TRAFFIC.  
Existing and planned uses surrounding the site which are dependent on the surrounding transportation 
system are not anticipated to be impacted due to increased traffic. Planned uses on-site will not be 
adversely impacted due to increased traffic. Increased traffic will be limited to construction and 
implementation activities associated with this Project and not from others. It is not anticipated that 
surrounding approved, but not yet implemented solar utility Projects will begin construction activities at 
the same time as the Harquahala Sun Project. During the construction period less than 100 additional

Page 12 
kimley-horn.com 
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
 480 207 2666 
 
ADT are expected; therefore, per the MCDOT Traffic Impact Study Manual, a traffic statement will be 
required for the proposed site. A traffic impact statement will be provided in support of the necessary 
zone change and plan of development application and review process. A traffic statement is a scaled 
down and simplified version of the traffic impact study and is intended for smaller Projects that will have 
lesser impacts on existing traffic as compared to the larger type developments. At that time, a clearer 
Projection of traffic impacts will be available which will consider construction and operational ADT, 
construction haul routes, necessary ROW dedications, and road improvements. 
V. AFFECTING THE LIVABILITY OF THE AREA OR HEALTH OR SAFETY OF PRESENT AND 
FUTURE RESIDENTS.  
The CPA will not adversely affect the liveability of the area or health or safety of present and future 
residents of the area. As previously discussed, there are relatively few residences in the area. Site 
preparation, construction, or operation will not include any hazardous activities, materials, processes, 
or outputs. Noise impacts would be limited construction activities during specified construction hours. 
Fugitive dust control will be achieved during construction and operational periods by implementation of 
proper grading and erosion control measures, BMP’s to include appropriate dust control and mitigation 
of dust on unpaved roads. Standard operational activities conform to applicable noise ordinances. Fire 
hazard and wildfire mitigation will be addressed with the plan of development. The CPA will not result 
in undue or unmitigated social, visual, traffic, air quality, water quality, or other impacts which may have 
a disproportionate affecting the livability of the area.  
VI. ADVERSELY IMPACTING THE NATURAL ENVIRONMENT OR SCENIC QUALITY OF THE AREA 
IN CONTRADICTION TO THE PLAN. 
The Project is not anticipated to generate adverse impacts to the natural environment or the scenic 
quality of the area. Preliminary site investigations have not identified any significant, unique, or critical 
wildlife habitats, endangered and/or protected flora/fauna species, or significant cultural resources 
within the Project area. As discussed in the transportation sections, no major offsite road or 
transportation network improvements are required to support the Project. Dust control measures will 
be provided to protect air quality during construction activities. Ground disturbing activities may also 
require dust mitigation, erosion control BMPs, and select soils stabilization or enhancement where 
existing erosion is encountered to maintain compliance with local, state, and federal air and water 
quality standards. 
The site is predominately flat and will require little to no grading for access, PV pedestals, or supporting 
accessory equipment or storage structures. Construction activities will implement accepted BMP’s for 
solar PV facility development, which include minimum ground disturbance and non-disturbance of 
existing low-lying vegetation and vegetation for erosion control purposes. Vegetation may require 
mowing to heights approved by the fire district or other environmental agencies to maintain appropriate 
levels of fire mitigation and erosion control.  
 
The site will have minor visual impacts to surrounding areas and properties. The site will be screened 
with a minimum 6-foot opaque fence to provide optimal screening effect, where required to provide 
adequate visual relief and screening against existing residential uses. Details of proposed screening

Page 13 
kimley-horn.com 
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
 480 207 2666 
 
wall will be provided with subsequent zone change and plan of development applications and finalized 
through coordination and input from residents and impacted property owners.  
 
The solar arrays will extend to an approximate 10-foot vertical height (typical) when panels are nearly 
vertical during sunrise and sunset. The site is adjacent to a future utility use (solar farm) to the west 
and northwest, vacant agricultural land adjacent to the north, separated by Courthouse Road (120-foot 
ROW); unimplemented utility use (solar farm) to the northeast; the Rose View Estates residential 
development to the east separated by 483rd Ave (60-foot ROW); and a commercial nursery on 
agricultural exempt land to the south. One residence is located within 60 feet of the site opposite the 
483rd Avenue frontage. Most residences within this subdivision are more than 300 feet away from the 
Project area’s eastern most boundary.  
 
The Project will utilize photovoltaic (PV) modules to generate electricity. PV technology is the most 
water-efficient solar generation technology available. The application recognizes that the proposed site 
receives a high degree of solar radiation and that water supplies in the vicinity are limited. The Project 
straddles the Phoenix Active Management Area and the Harquahala Irrigation Non-expansion Area, 
and Applicant understands the limitations and restrictions imposed by each of these designations. The 
Project will implement water conservation measures while utilizing water-efficient technology. PV 
technology use the least amount of water of any utility-scale solar energy design. The Project’s water-
conscious design and implementation is consistent with the applicable water goals and policies of the 
Comprehensive Plan. 
No adverse or otherwise unmitigated impacts to the natural environment or scenic quality of the area 
are anticipated. The Project will be consistent with previous approvals for similar facilities located 
adjacent and nearby the current site.  
The site will be surveyed prior to construction activities to identify plant/vegetation species which are 
protected by the Arizona Department of Agriculture under the Arizona Native Plant Law. Protected plant 
life and/or vegetation will be relocated or otherwise salvaged. All activities associated with the removal, 
relocation, or sale of protected plants/vegetation will comply with the notice requirements of Title 3, 
Chapter 3, Title II, of the Arizona Administrative Code. 
Additional detailed analysis of environmental impacts will occur with pending zone change and plan of 
development submittals. Any identified impacts will be evaluated together with Planning and other staff 
within affected local, state, federal regulatory agencies and corresponding County departments and 
agencies, and participating stakeholders to identify appropriate mitigation strategies and/or other 
acceptable offsetting measures. The Project will maintain compliance with applicable Maricopa County 
Air Quality Department permitting and operational standards, including conformance with U.S. 
Environmental Protection Agency (EPA), and Arizona Department of Environmental Quality.

Page 14 
kimley-horn.com 
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
 480 207 2666 
 
 
D. WHETHER THE AMENDMENT IS CONSISTENT WITH OVERALL INTENT OF THE 
COMPREHENSIVE PLAN: 
The County’s Vision 2030 Comprehensive Plan places emphasis on the value and desire for 
Maricopa County to become a global leader in renewable energy. More specifically Maricopa County 
notably states encouraging solar energy development as an important goal, within the Economic 
Growth Policy 10, Energy Goal 2, Energy Policy 6, and Water Resources Policy 5. The County’s 
strategy to boost renewable energy development is specified below: 
 
Renewable Energy 
Maricopa County has the potential to be a global leader in renewable energy research and 
development, especially with respect to solar energy. Maricopa County is one of the most 
productive spots in the world for both photovoltaic and concentrated solar energy generation. 
Many companies have already discovered this potential, evidenced by the large number of 
utility-scale plants being planned in unincorporated areas. Because of the economic and 
environmental benefits Maricopa County supports state and local efforts to attract solar 
research and development to this region. 
Strategies – Attract solar and other alternative energy research and development to Maricopa 
County 
The project is consistent with overall intent and spirit of the County’s Vision 2030 Comprehensive 
Plan. Additionally, the project is in line with the County’s strategy to support solar generation 
industry’s development. The project would create employment opportunities for many experienced 
professionals in the County and therefore supplement and benefit the local, County, state, and 
regional economy.  
As mentioned previously the project is not anticipated to generate adverse impacts to the natural 
environment or the scenic quality of the area. Preliminary site investigations have not identified any 
significant, unique, or critical wildlife habitats, endangered and/or protected flora/fauna species, or 
significant cultural resources within the Project area. Once completed the project’s generation of solar 
electricity could also result in improved air quality through the reduction of emissions from other 
electrical generating solutions currently used. 
In summary, the project is in alignment with the County’s goals and future vision. Approval of this 
application to facilitate the development of solar energy generation in close proximity to existing 
electrical infrastructure in addition to proximity to existing and planned solar generation facilities 
would further the implementation of the County’s strategic priorities to become a global leader in 
renewable energy. This project supports One of the County’s Core Principles and benefits the 
County’s strategic priorities identified in the Comprehensive Plan as discussed in the following 
section.

Page 15 
kimley-horn.com 
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
 480 207 2666 
 
E. THE EXTENT TO WHICH THE AMENDMENT IS CONSISTENT WITH THE SPECIFIC GOALS 
AND POLICIES CONTAINED WITHIN THE PLAN. 
 
LAND USE GOALS AND POLICIES 
COMP PLAN ELEMENT 
(GOALS/POLICIES) 
CPA CONSISTENCY/JUSTIFICATION 
Land Use Goal #1: Achieve 
balanced and efficient 
development patterns.  
 
Approval of the CPA is consistent with the existing and approved utility solar 
powered generation land uses in the sub region of the County. The site is 
located in a region within unincorporated County surrounded by similar solar 
generation utility facilities with nearby utility/transmission corridors, overhead 
high voltage power lines, and the APS Delaney Substation. This CPA is 
located within the boundaries of the previously approved Harquahala Solar 
Project (CPA 2011002, approved 12-14-2011) in support of a 3,514 AC CPA. 
This CPA remains consistent with the previously approved, unimplemented 
CPA. 
 
Land Use Goal #2: Provide 
regional leadership on land 
use issues. 
 
An identified energy strategy in the Plan is to “Attract solar and other 
alternative energy research and development to Maricopa County.” Approval 
of the CPA is demonstrative of the County’s implementation of this land use 
goal in support of the cited energy strategy. 
 
Land Use Policy #7:  
Maricopa County supports 
coordinating land use and 
infrastructure planning with 
state agencies, counties, and 
municipalities.  
 
Approval of the CPA and subsequent zone change and plan of development 
require ongoing coordination with local, state, and federal agencies to ensure 
protections of public services, utilities, infrastructure, and natural resources. 
This coordination will also ensure these are available and adequate to meet 
current and future demands of development. The coordination includes 
considerations for the provision as well as protection of natural resources and 
public services including, but not limited to, water resources (ground/surface 
water supplies), flora and fauna impacts, air and water quality, and stormwater 
impacts, open spaces, buffering and screening, and transportation facilities 
and rights-of-way. 
 
Land Use Policy #22: 
Maricopa County supports 
reducing the impacts of new 
development on 
environmentally sensitive 
areas, including native flora 
and fauna habitat and 
corridors.  
 
The Project boundary does not include environmentally sensitive areas 
requiring avoidance or mitigation. Initial environmental studies have not 
identified any flora or fauna species requiring special mitigation or 
preservation. All development activities will remain compliant with applicable 
environmental regulations requiring flora/fauna habitat and/or environmental 
protection or relocation. Ongoing coordination with local, state, and federal 
environmental and natural resource agencies throughout the Project life cycle 
to ensure regulatory compliance with applicable environmental policies, 
protocols, and regulations.

Page 16 
kimley-horn.com 
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
 480 207 2666 
 
TRANSPORTATION GOALS AND POLICY CONSIDERATIONS 
COMP PLAN ELEMENT 
(GOALS/POLICIES) 
CPA CONSISTENCY/JUSTIFICATION 
Transportation Goal #1: 
Promote and protect public 
health through a safe 
transportation system.  
 
A TIS will be submitted with the zone change/plan of development application 
to evaluate existing conditions of roadways impacted by the proposed 
development during construction and operation. The Project will be 
responsible for ROW dedication from its respective boundaries to comply with 
the Maricopa County Transportation Plan and road/ROW dedication 
standards of the County. Exceptions will be negotiated with MCDOT and 
authorized by the MC BOS and may require specific development agreements 
to memorialize terms of negotiated dedications, preservation, and/or and 
deferments or exemptions. 
 
Transportation Goal #2: 
Contribute to a safe, seamless 
and effective transportation 
system.  
 
The Project will support a safe, seamless, and effective transportation system 
by dedicating and/or preserving required ROW in support of future road 
alignments as coordinated with MCDOT in a manner consistent with 
Departmental planning objectives and the Maricopa County Transportation 
Plan. 
 
Transportation Goal #3: 
Coordinate land use decisions 
with transportation investments 
to help the county exercise 
sound financial management 
and build the county’s fiscal 
strength.   
 
All transportation improvements required to support the planned use or any 
expansion thereof will be borne solely by the developer, subject to all required 
agreements, financial assurances and/or performance bonds. 
Transportation Policy #11: 
Maricopa County supports 
National Ambient Air Quality 
Standards (NAAQS) 
compliance.  
 
The Project will maintain compliance with National Ambient Air Quality 
Standards throughout development phases. Operation of the Project will result 
in lower overall emissions 
Transportation Policy #12: 
Maricopa County supports 
improving low volume dirt 
roads as directed by its PM-10 
Dust Abatement Program.  
 
The Project will maintain compliance with the permitting and operational 
standards of the Maricopa County Air Quality Department dust control 
requirements as governed by activities regulated by a dust control permit or 
Rule 310.01.

Page 17 
kimley-horn.com 
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
 480 207 2666 
 
ENVIRONMENTAL GOAL AND POLICY CONSIDERATIONS 
COMP PLAN ELEMENT 
(GOALS/POLICIES) 
CPA CONSISTENCY/JUSTIFICATION 
Environment Goal #1: 
Provide regional leadership to 
promote all aspects of regional 
environmental quality.  
 
Approval of the CPA supports improved air quality by decreasing emissions 
that result from electricity produced by fossil fuels. Transitioning from coal-
powered plants to solar powered plants significantly decreases carbon dioxide 
emissions and eliminates sulfur, nitrous oxides, and mercury emissions 
generated by conventional electric generation facilities. The Project footprint 
requires significantly less disturbance and disruption to existing flora and 
fauna species than power generation activities conducted within conventional 
structures (brick/mortar type facilities). Reports, plans, and permits to identify 
areas of concern, demonstrate proposed methods of mitigation and 
compliance, and identify compliance with environmental performance criteria 
will be provided for all on-site and off-site Project activities and phases. The 
County demonstrates its leadership in regional environmental quality by 
authorizing the CPA in conformance with local, state, and federal 
environmental permits, regulations, and policies throughout the Project’s 
lifecycle (entitlements, implementation, and operational activities). 
 
Environment Policy #3: 
To help protect water quality 
Maricopa County supports 
compliance with its Drinking 
Water program and its Water 
and Wastewater Treatment 
program.  
 
The Project as proposed is consistent with and will maintain compliance with 
Maricopa County Drinking and Wastewater Treatment program including 
water supply of the Maricopa County Environmental Health Code. 
Environment Policy #4: 
Maricopa County supports 
innovative Project design and 
development techniques that 
protect and mitigate damage to 
important plant and animal 
habitat and migration corridors.   
 
The Project will be designed to minimize, avoid, and/or mitigate negative 
impacts to flora and fauna habitat and wildlife migration corridors during 
implementation and operational activities. Comments from the AZGAFD will 
be addressed in a manner consistent with the intent of this policy, which may 
include preservation and/or relocation of impacted flora and/or fauna species. 
Best management practices will be employed to address flora/fauna impacts. 
Environment Policy #5: As 
directed by SHPO and Arizona 
Game and Fish Department, 
Maricopa County supports 
cultural resource and biological 
surveys being completed – 
and needed mitigation 
measures established – prior 
to new development.   
 
Cultural and biological reporting and surveys as required by the State Historic 
Preservation Office and Arizona Game and Fish Department will be submitted 
with the zone change and plan of development application to identify sensitive 
areas requiring protection, preservation, and/or mitigation of impacts to 
respective natural, biologic, and/or cultural resources. Mitigation identified by 
these or by the respective agency’s staff or other guidance documents will be 
adhered to during implementation, and operation of the use.

Page 18 
kimley-horn.com 
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
 480 207 2666 
 
ECONOMIC GROWTH GOAL AND POLICY CONSIDERATIONS 
COMP PLAN ELEMENT 
(GOALS/POLICIES) 
CPA CONSISTENCY/JUSTIFICATION 
Economic Growth Goal #1: 
Contribute to an effective 
Regional economy. 
The physical development of the site will employ hundreds of specialized 
construction and skilled trade workers and laborers from unincorporated areas 
and incorporated municipalities within Maricopa County. Construction 
activities will generate employment opportunities for qualified workers over a 
12 to 18-month construction period which is anticipated to occur from early 
2022 through the end of 2022. Local businesses including, but not limited to 
retail, food service, gas station/convenience, and hospitality businesses will 
be supported by workers commuting to the site or lodging near the site for 
short/long terms during their respective periods of construction activities. No 
construction camps or on-site housing are proposed during the 
implementation (construction) phase of the Project. No on-site security or 
maintenance housing is proposed during the operational phase of this 
development. 
Economic Growth Policy #5:  
Maricopa County supports 
programs that attract a variety 
of Basic Sector industry 
clusters that have long-term, 
stable growth prospects. 
Economic Growth Policy 
#10: Maricopa County 
supports leveraging its solar 
resource potential to attract 
solar-related industries and 
alternative energy research 
and development. 
More accessible energy sources will attract energy dependent employment 
sectors to the region and allow existing basic sector industries to reinvest 
energy savings into expansions, research and development, and retrofitting 
activities to increase productivity in response to growing demands and 
competition in the regional and national share of their respective industries. 
Increasing the supply of locally generated renewable energy increases the 
attractiveness of the region on the demand for technological innovations to 
meet the demand for additional skilled and specialized workers. There will also 
be an increase in the demand for specialized workers to respond to changes 
and innovations in the solar powered generation industry and in the 
development of spin off applications in the manufacturing, transportation, and 
research/development industries.   
 
 
 
(The remainder of this page is left intentionally blank)

Page 19 
kimley-horn.com 
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
 480 207 2666 
 
GROWTH AREAS GOAL AND POLICY CONSIDERATIONS 
COMP PLAN ELEMENT 
(GOALS/POLICIES) 
CPA CONSISTENCY/JUSTIFICATION 
Growth Areas Goal #1: 
Achieve orderly urban growth 
that is fiscally and 
environmentally responsible, 
protects public health and 
safety and promotes sensible 
annexation patterns. 
The Project is located adjacent to and near existing and approved generation 
facilities and has convenient access to existing electrical infrastructure, major 
transmission corridors, and a major electrical substation. Proximity to existing 
transmission lines, corridors, and easements reduces the applicant’s 
expenditures to utilize existing infrastructure and to obtain necessary 
easements to interconnect to the electrical grid. Construction and operational 
activities will maintain compliance with applicable environmental criteria, 
regulations, and permitting to ensure protection of biologic and natural 
resources.  
Growth Areas Policy #1: 
Maricopa County supports 
consistent implementation of 
its urban growth area except in 
the noted instances.   
The proposed Project is considered an industrial land use requiring large 
amounts of land to operate that do not require a corresponding level of urban 
services and infrastructure and can be located in rural remote areas. As the 
plan recommends, this land use is acceptable outside the urban growth area. 
These uses could include electric generating facilities, proving grounds and 
test facilities, agriculturally oriented businesses, and other rural-type industrial 
uses on a case-by-case basis. 
 
 
 
 
(The remainder of this page is left intentionally blank)

Page 20 
kimley-horn.com 
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
 480 207 2666 
 
WATER RESOURCES GOAL AND POLICY CONSIDERATIONS 
COMP PLAN ELEMENT 
(GOALS/POLICIES) 
CPA CONSISTENCY/JUSTIFICATION 
Water Resources Goal #1:  
Promote and protect public 
health with a clean water 
supply. 
The Project will utilize photovoltaic (PV) modules to generate electricity. PV 
technology is the most water-efficient solar generation technology available. 
The Applicant recognizes that the proposed site receives a high degree of 
solar radiation and that water supplies in the vicinity are limited. The Project 
will implement water conservation measures while utilizing water-efficient 
technology. 
 
The Project will include a comprehensive Water Conservation Plan with 
established BMPs for water conservation. Drinking water will be delivered by 
truck. If a local well is required for water use, such well will comply with local 
and state permitting, operations, monitoring, and recharge requirements. The 
Project’s water-conscious design and implementation is consistent with the 
applicable water goals and policies of the Comprehensive Plan. 
 
The Project will maintain compliance with Maricopa County’s wastewater 
treatment programs during the construction activity period. The Project as 
proposed will not have wastewater demands or discharge. A septic system 
will be used if an O&M building is required. Alternatively, portable restroom 
facilities will be provided for employee use during the implementation and 
operational phases.  
 
If landscape treatments are required to provide visual buffering, they will be 
selected from drought tolerant xeric species which will require low water use 
to establish and maintain. 
 
The Arizona Department of Water Resources has been notified of this CPA 
request and may provide comments. No specific renewable water resources 
are planned for use during construction phases of the project. 
Water Resources Goal #2: 
Provide leadership to promote 
regional water quality and  
water use.   
Water Resources Goal #4:  
Increase water conservation. 
Water Resources Policy #2: 
Maricopa County supports 
water conservation techniques 
in the planning and design of 
new development. 
Water Resources Policy #4: 
Maricopa County supports 
compliance with its Drinking 
Water and Water and 
Wastewater Treatment 
Programs. 
Water Resources Policy #5: 
Maricopa County supports low 
water use solar electric 
generating technologies.   
Water Resources Policy #7: 
Maricopa County supports low 
water use and drought tolerant 
landscaping.   
 
 
 
(The remainder of this page is left intentionally blank)

Page 21 
kimley-horn.com 
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
 480 207 2666 
 
ENERGY GOAL AND POLICY CONSIDERATIONS 
COMP PLAN ELEMENT 
(GOALS/POLICIES) 
CPA CONSISTENCY/JUSTIFICATION 
Energy Goal #1: 
Provide leadership to promote 
regional environmental quality.  
 
Approval of the Project has a long-term environmental impact of improving air 
quality by reducing emissions associated with conventional electric energy 
generation. The County has adopted environmental performance standards 
intended to preserve and sustain biologic, cultural, and environmental 
resources of the region which are evidence of the County’s regional leadership 
role in the promotion of environmental quality.  
Energy Goal #2: 
Make Maricopa County a 
leader in alternative energy 
research and development. 
 
Approval of the Project provides the opportunity to implement, test, and 
evaluate the efficiencies of the most current PV solar generation equipment 
and battery energy storage systems. Evaluation of their operational 
performance is key to the research and development of more efficient 
equipment and related processes. An operational facility provides 
opportunities to implement advances in the associated technologies over the 
life of the Project. Approval of the facility provides opportunities to test storage 
systems in response to increasing demands for the use of stored energy.  
Energy Policy #6: 
Maricopa County supports 
being a responsible leader in 
alternative energy research 
and development. 
Approval of the Project will be reflective of the Maricopa County Board of 
Supervisor’s regional and statewide leadership in the attraction, promotion, 
and delivery of renewable energy resources and infrastructure.  
 
 
COST OF DEVELOPMENT GOAL AND POLICY CONSIDERATIONS 
COMP PLAN ELEMENT 
(GOALS/POLICIES) 
CPA CONSISTENCY/JUSTIFICATION 
Cost of Development Goal #2: 
New development pays its proper 
and reasonable share of the costs 
of new infrastructure, services 
and other public improvements. 
 
All Project costs, including, but not limited to, on-site improvements, gen-
tie line infrastructure and connections, collection lines, off-site road 
improvements, and water and wastewater treatment service, shall be borne 
solely by the applicant. 
Cost of Development Policy #2: 
Maricopa County supports 
recouping the costs of its 
products and services without 
unfairly burdening those most in 
need of its products and services. 
All development costs will be borne solely by the developer, including, but 
not limited to, applicable fees for service, impact fees, performance bonds 
and sureties, and property taxes.

Page 22 
kimley-horn.com 
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
 480 207 2666 
 
OPEN SPACE GOAL AND POLICY CONSIDERATIONS 
COMP PLAN ELEMENT 
(GOALS/POLICIES) 
CPA CONSISTENCY/JUSTIFICATION 
Open Space Goal #2:  Protect 
and expand the regional park 
system proportionately with  
 population growth. 
 
Open Space Policy #2:  
Maricopa County supports 
dedication and improvement of 
trail right-of-way within new 
development, including the 
Maricopa Trail, the Maricopa 
County Regional Trail System, 
and wildlife linkages. 
All Project costs, including, but not limited to, on-site improvements, gen-
tie line infrastructure and connections, collection lines, off-site road 
improvements, and water and wastewater treatment service, shall be borne 
solely by the applicant. 
Open Space Goal #1:  Provide 
regional leadership to promote 
environmental quality, in- 
cluding the preservation of open, 
natural park and recreation lands. 
Reduction of emissions in support of increased air quality, water usage for 
energy production, consumption (including extraction and transport of 
inputs for use in energy production promoted by Solar Generation activities 
has net positive impacts to environmental quality in terms of air quality 
 
 
 
 
 
 
(The remainder of this page is left intentionally blank)

Page 23 
kimley-horn.com 
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
 480 207 2666 
 
F. COMPREHENSIVE PLAN AMENDMENT MAP EXHIBIT 
 
 
 
 
 
 
 
 
 
 
 
(The remainder of this page is left intentionally blank)

Page 24 
kimley-horn.com 
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
 480 207 2666

Page 25 
kimley-horn.com 
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
 480 207 2666 
 
G. COMPREHENSIVE PLAN AMENDMENT LEGAL DESCRIPTIONS EXHIBITS 
 
 
 
 
 
 
 
 
 
 
 
(The remainder of this page is left intentionally blank)

Page 26 
kimley-horn.com 
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
 480 207 2666 
 
 
 
 
 
 
 
 
 
(The remainder of this page is left intentionally blank) 
 
 
 
 
 
 
 
LEGAL DESCRIPTION - PARCEL 506-29-001 (158.28 AC) 
THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE COUNTY OF MARICOPA, 
STATE OF ARIZONA, AND IS DESCRIBED AS FOLLOWS: 
LOTS 1 AND 2 AND THE SOUTH HALF OF THE NORTHEAST QUARTER OF SECTION 5, 
TOWNSHIP 1 NORTH, RANGE 8 WEST OF THE GILA AND SALT RIVER BASE AND 
MERIDIAN, MARICOPA COUNTY, ARIZONA; 
EXCEPT THE NORTH 33 FEET THEREOF; AND 
EXCEPT 50% OF ALL MINERALS, MINERAL RIGHTS, OIL, OIL RIGHTS, NATURAL GAS, 
NATURAL GAS RIGHTS AND OTHER HYDROCARBON AND HYDROCARBON RIGHTS, BY 
WHATSOEVER NAME KNOWN, GEOTHERMAL HOT WATER OR STEAM, ROCK, SAND AND 
GRAVEL AS RESERVED IN DEED RECORDED AS DOCKET 11672, PAGE 363, RECORDS OF 
MARICOPA COUNTY, ARIZONA.

Page 27 
kimley-horn.com 
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
 480 207 2666 
 
LEGAL DESCRIPTION - PARCEL 506-29-002 (59.98 AC) 
THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE COUNTY OF MARICOPA, 
STATE OF ARIZONA, AND IS DESCRIBED AS FOLLOWS: 
THAT PORTION OF SECTION 5, TOWNSHIP 1 NORTH, RANGE 8 WEST OF THE GILA AND 
SALT RIVER BASE AND MERIDIAN, MARICOPA COUNTY, ARIZONA, MORE PARTICULARLY 
DESCRIBED AS FOLLOWS: 
BEGINNING AT THE NORTHEAST CORNER OF SAID SECTION 5; 
THENCE SOUTH 00 DEGREES 35 MINUTES 46 SECONDS WEST, ALONG THE EAST LINE OF 
THE NORTHEAST QUARTER OF SAID SECTION 5, A DISTANCE OF 2645.56 FEET TO THE 
EAST QUARTER CORNER OF SAID SECTION 5; 
THENCE CONTINUING ALONG SAID LINE SOUTH 00 DEGREES 35 MINUTES 47 SECONDS 
WEST, A DISTANCE OF 990.67 FEET TO A POINT ON THE NORTH LINE OF THE SOUTH 
1650.00 FEET; 
THENCE ALONG SAID LINE, NORTH 89 DEGREES 38 MINUTES 58 SECONDS WEST, A 
DISTANCE OF 2639.89 FEET TO THE WEST LINE OF THE SOUTHEAST QUARTER OF SAID 
SECTION 5; 
THENCE ALONG SAID LINE, NORTH 00 DEGREES 33 MINUTES 24 SECONDS EAST, A 
DISTANCE OF 989.44 FEET TO THE NORTHWEST CORNER OF THE SOUTHEAST QUARTER 
OF SAID SECTION 5; 
THENCE NORTH 00 DEGREES 33 MINUTES 23 SECONDS EAST, ALONG THE WEST LINE OF 
THE NORTHEAST QUARTER OF SAID SECTION 5, A DISTANCE OF 2642.23 FEET TO THE 
NORTH QUARTER CORNER OF SAID SECTION 5; 
THENCE ALONG THE NORTH LINE OF THE NORTHEAST QUARTER OF SAID SECTION 5, 
SOUTH 89 DEGREES 44 MINUTES 53 SECONDS EAST, A DISTANCE OF 2642.44 FEET TO 
THE POINT OF BEGINNING; 
EXCEPT THAT PORTION LYING WITHIN THE NORTHEAST QUARTER OF SAID SECTION 5; 
EXCEPT 50% OF ALL MINERALS, MINERAL RIGHTS, OIL, OIL RIGHTS, NATURAL GAS, 
NATURAL GAS RIGHTS AND OTHER HYDROCARBON AND HYDROCARBON RIGHTS, BY 
WHATSOEVER NAME KNOWN, GEOTHERMAL HOT WATER OR STEAM, ROCK, SAND AND 
GRAVEL AS RESERVED IN DEED RECORDED AS DOCKET 11672, PAGE 363, RECORDS OF 
MARICOPA COUNTY, ARIZONA.

Page 28 
kimley-horn.com 
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
 480 207 2666 
 
 
 
 
 
LEGAL DESCRIPTION - PARCEL 506-29-022A (253.76 AC) 
THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE COUNTY OF MARICOPA, 
STATE OF ARIZONA, AND IS DESCRIBED AS FOLLOWS: 
THAT PORTION OF SECTION 5, TOWNSHIP 1 NORTH, RANGE 8 WEST OF THE GILA AND 
SALT RIVER BASE AND MERIDIAN, MARICOPA COUNTY, ARIZONA, MORE 
PARTICULARLY DESCRIBED AS FOLLOWS: 
BEGINNING AT THE SOUTHWEST CORNER OF SAID SECTION 5; 
THENCE ALONG THE WEST LINE OF SECTION 5, NORTH 00 DEGREES 30 MINUTES 41 
SECONDS EAST, A DISTANCE OF 4185.00 FEET; 
THENCE LEAVING SAID LINE, SOUTH 89 DEGREES 42 MINUTES 15 SECONDS EAST, A 
DISTANCE OF 2641.14 FEET TO THE NORTH-SOUTH MID SECTION LINE; 
THENCE ALONG SAID LINE, SOUTH 00 DEGREES 33 MINUTES 23 SECONDS WEST, A 
DISTANCE OF 1546.74 FEET TO THE NORTH-SOUTH MID-SECTION LINE OF SAID 
SECTION 5; 
THENCE CONTINUING ALONG SAID LINE, SOUTH 00 DEGREES 33 MINUTES 23 
SECONDS WEST, A DISTANCE OF 2639.45 FEET TO THE SOUTH QUARTER CORNER OF 
SAID SECTION 5; 
THENCE ALONG THE SOUTH LINE OF THE SOUTHWEST QUARTER OF SAID SECTION 5, 
NORTH 89 DEGREES 40 MINUTES 43 SECONDS WEST, A DISTANCE OF 2637.85 FEET TO 
THE POINT OF BEGINNING; 
EXCEPT 50% OF ALL MINERALS, MINERAL RIGHTS, OIL, OIL RIGHTS, NATURAL GAS, 
NATURAL GAS RIGHTS AND OTHER HYDROCARBON AND HYDROCARBON RIGHTS, BY 
WHATSOEVER NAME KNOWN, GEOTHERMAL HOT WATER OR STEAM, ROCK, SAND 
AND GRAVEL AS RESERVED IN DEED RECORDED AS DOCKET 11672, PAGE 363, 
RECORDS OF MARICOPA COUNTY, ARIZONA.

Page 29 
kimley-horn.com 
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
 480 207 2666 
 
 
 
 
(The remainder of this page is left intentionally blank) 
 
 
 
 
LEGAL DESCRIPTION - PARCEL 506-29-022B (66.40 AC) 
THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE COUNTY OF MARICOPA, 
STATE OF ARIZONA, AND IS DESCRIBED AS FOLLOWS: 
THAT PORTION OF SECTION 5, TOWNSHIP 1 NORTH, RANGE 8 WEST OF THE GILA AND 
SALT RIVER BASE AND MERIDIAN, MARICOPA COUNTY, ARIZONA, MORE PARTICULARLY 
DESCRIBED AS FOLLOWS: 
BEGINNING AT THE NORTHWEST CORNER OF SAID SECTION 5; 
THENCE SOUTH 89 DEGREES 44 MINUTES 02 SECONDS EAST, ALONG THE NORTH LINE 
OF SAID SECTION 5, A DISTANCE OF 2642.01 FEET TO THE NORTH QUARTER CORNER OF 
SAID SECTION 5; 
THENCE ALONG THE NORTH-SOUTH MID SECTION LINE, SOUTH 00 DEGREES 33 
MINUTES 23 SECONDS WEST, A DISTANCE OF 1095.49 FEET; 
THENCE LEAVING SAID LINE, NORTH 89 DEGREES 42 MINUTES 15 SECONDS WEST, A 
DISTANCE OF 2641.14 FEET TO THE WEST LINE OF THE NORTHWEST QUARTER OF SAID 
SECTION 5; 
THENCE ALONG SAID LINE, NORTH 00 DEGREES 30 MINUTES 41 SECONDS EAST, A 
DISTANCE OF 1094.12 FEET TO THE POINT OF BEGINNING; 
EXCEPT 50% OF ALL MINERALS, MINERAL RIGHTS, OIL, OIL RIGHTS, NATURAL GAS, 
NATURAL GAS RIGHTS AND OTHER HYDROCARBON AND HYDROCARBON RIGHTS, BY 
WHATSOEVER NAME KNOWN, GEOTHERMAL HOT WATER OR STEAM, ROCK, SAND AND 
GRAVEL AS RESERVED IN DEED RECORDED MAY 12, 1976 AS DOCKET 11672, PAGE 363, 
RECORDS OF MARICOPA COUNTY, ARIZONA.

Page 30 
kimley-horn.com 
1001 West Southern Avenue Suite 131, Mesa, AZ 85210 
 480 207 2666 
 
 
 
 
 
LEGAL DESCRIPTION - PARCELS 506-29-023C & 506-29-023D (166.26 AC) 
Owner: KAWELA ONE 
 
THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE COUNTY OF MARICOPA, 
STATE OF ARIZONA, AND IS DESCRIBED AS FOLLOWS: 
 
PARCEL NO. 1: 
 
LOTS 1 AND 2; THE SOUTH HALF OF THE NORTHEAST QUARTER; AND THE WEST 126.00 
FEET OF THE SOUTHEAST QUARTER OF SECTION 6, TOWNSHIP 1 NORTH, RANGE 8 
WEST OF THE GILA AND SALT RIVER BASE AND MERIDIAN, MARICOPA COUNTY, 
ARIZONA; 
 
EXCEPT THE SOUTH 25 FEET THEREOF; AND 
 
EXCEPT THE WEST 126 FEET OF SAID SOUTH 25 FEET OF SAID NORTHEAST QUARTER 
THEREOF; AND 
 
EXCEPT 50% OF ALL MINERALS, MINERAL RIGHTS, OIL, OIL RIGHTS, NATURAL GAS, 
NATURAL GAS RIGHTS AND OTHER HYDROCARBON AND HYDROCARBON RIGHTS, BY 
WHATSOEVER NAME KNOWN, GEOTHERMAL HOT WATER OR STEAM, ROCK, SAND AND 
GRAVEL AS RESERVED IN DEED RECORDED IN DOCKET 11672, PAGE 363 RECORDS OF 
MARICOPA COUNTY, ARIZONA. 
 
PARCEL NO. 2: 
 
AN EASEMENT FOR ROADWAY FOR INGRESS AND EGRESS AS CREATED BY 
INSTRUMENT RECORDED IN DOCUMENT NO. 95-0464234, RECORDS OF MARICOPA 
COUNTY, ARIZONA, OVER THE SOUTH 25.00 FEET OF THE NORTHEAST QUARTER OF 
SECTION 6, TOWNSHIP 1 NORTH, RANGE 8 WEST OF THE GILA AND SALT RIVER BASE 
AND MERIDIAN, MARICOPA COUNTY, ARIZONA; EXCEPT THE WEST 126.00 FEET 
THEREOF.

Subdivision Infrastructure & 
Planning Program 
1001 N. Central Avenue #150 
Phoenix, Arizona 85004 
Phone: (602) 506-1058 
Fax: (602) 506-5813  
TDD 602 506 6704 
 
 
Maricopa County 
Environmental Services Department  
Water and Waste Management Division 
DATE: 
June 30, 2021  
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
TO : 
Ray Banker, Planning & Development Dept. 
 
 
Planner 
 
 
 
 
 
 
 
FROM: 
Souren Naradikian, P.E. 
 
 
Senior Civil Engineer 
 
SUBJECT:  
CPA for Harquahala Sun. CPA2021007 
 
The Maricopa County Environmental Services Department (MCESD) has reviewed 
revised documents received from the Maricopa County Planning and Development 
Department for the above referenced project. This project is a CPA for Harquahala 
Sun at APN# 506-29001, 2, 22A, 22B, 23C & 23 D. Water and Sewer information is 
not provided. MCESD has concerns, ATC/NOID must be obtained prior to construction 
permit approval. 
 
Based on the above, MCESD raised no objections to the Planning & Development 
Department in Accela: on June 30, 2021 and will allow the project to proceed at this 
time subject to the following stipulations 
 
Stipulations:  
None. 
 
It should be noted that this document does not approve the referenced project.  
Comments are provided only as advisory to Maricopa County Planning and 
Development Department to assist staff to prepare a staff report.  Other Maricopa 
County agencies may have additional requirements. Final review and approval will be 
made through Planning and Development Department procedures. Applicant may 
need to submit separate applications to the Maricopa County Environmental Services 
Department for approval of proposed facilities regulated by the Department.  Review 
of any such application will be based on regulations in force at the time of application.

‌ 
‌ 
‌ 
‌ 
July‌ ‌28,‌ ‌2021‌ ‌ 
‌ 
Mr.‌ ‌Ray‌ ‌Banker‌ ‌ 
Maricopa‌ ‌County‌ ‌Planning‌ ‌&‌ ‌Development‌ ‌Department‌ ‌ 
501‌ ‌N.‌ ‌44th‌ ‌Street,‌ ‌Suite‌ ‌200‌ ‌ 
Phoenix,‌ ‌AZ‌ ‌85008‌ ‌ 
‌ 
Electronically‌ ‌submitted‌ ‌to:‌ ‌ray.banker@maricopa.gov‌ ‌ 
‌ 
RE:‌ ‌Harquahala‌ ‌Sun‌ ‌Solar‌ ‌and‌ ‌Storage‌ ‌Project‌‌ ‌
  
‌ 
Dear‌ ‌Mr.‌ ‌Banker:‌ ‌ 
‌ 
At‌‌the‌‌request‌‌of‌‌Maricopa‌‌County,‌‌the‌‌Arizona‌‌Game‌‌and‌‌Fish‌‌Department‌‌(Department)‌‌has‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
 
reviewed‌ ‌the‌ ‌Comprehensive‌ ‌Plan‌ ‌Amendment‌ ‌Application‌ ‌(CPA),‌ ‌CPA2021007,‌ ‌for‌ ‌the‌‌
 
 
 
 
 
 
 
 
 
 
proposed‌ ‌solar‌ ‌facility‌ ‌at‌ ‌a‌ ‌location‌ ‌approximately‌ ‌2‌ ‌miles‌ ‌northeast‌ ‌of‌‌central‌‌Gila‌‌Bend‌‌in‌‌
 
 
 
   
 
   
 
 
 
 
 
 
 
Maricopa‌ ‌County,‌ ‌Arizona.‌ ‌The‌‌Department‌‌understands‌‌that‌‌RWE‌‌Solar‌‌Development,‌‌LLC,‌‌
 
 
 
 
 
 
 
 
 
 
 
(RWE)‌ ‌is‌ ‌proposing‌ ‌the‌ ‌construction,‌ ‌operation,‌ ‌and‌ ‌maintenance‌ ‌of‌ ‌150-MWac‌‌hybrid‌‌solar‌‌
 
 
 
 
 
 
 
 
 
 
 
 
photovoltaic‌‌(PV)‌‌and‌‌battery‌‌power‌‌plant‌‌and‌‌associated‌‌infrastructure.‌‌The‌‌Project‌‌will‌‌include‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
approximately‌‌400,000‌‌solar‌‌modules‌‌mounted‌‌on‌‌single‌‌axis‌‌trackers,‌‌inverters‌‌to‌‌convert‌‌direct‌‌
 
 
 
 
 
 
 
 
 
   
 
 
current‌ ‌into‌ ‌grid-compatible‌ ‌alternating‌ ‌current,‌ ‌transformers‌ ‌to‌ ‌increase‌ ‌the‌ ‌voltage‌ ‌of‌ ‌the‌‌
 
 
 
 
 
 
 
 
 
 
 
 
electricity‌‌generated,‌‌a‌‌500‌‌kV‌‌utility‌‌substation,‌‌battery‌‌energy‌‌storage‌‌system,‌‌and‌‌one‌‌or‌‌more‌‌
 
   
 
 
 
 
 
 
 
 
 
 
 
 
small‌ ‌buildings‌ ‌to‌ ‌house‌ ‌telecommunication‌ ‌equipment.‌ ‌Additionally,‌ ‌the‌ ‌project‌ ‌includes‌ ‌a‌‌
 
 
 
 
 
 
 
 
 
   
200-foot‌‌wide‌‌gen-tie‌‌route‌‌corridor‌‌that‌‌extends‌‌approximately‌‌4‌‌miles.‌‌It‌‌is‌‌the‌‌Departments‌‌
 
 
 
 
 
 
 
   
     
 
 
understanding‌‌that‌‌this‌‌gen-tie‌‌route‌‌is‌‌still‌‌under‌‌development‌‌and‌‌RWE‌‌will‌‌coordinate‌‌with‌‌the‌‌
 
 
 
 
   
 
 
 
 
 
 
 
 
 
Department‌ ‌once‌ ‌this‌ ‌route‌ ‌is‌ ‌finalized.‌‌ ‌
  
‌ 
Under‌ ‌Title‌ ‌17‌ ‌of‌ ‌the‌‌Arizona‌‌Revised‌‌Statutes,‌‌the‌‌Department,‌‌by‌‌and‌‌through‌‌the‌‌Arizona‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Game‌ ‌and‌ ‌Fish‌ ‌Commission‌ ‌(Commission),‌ ‌has‌ ‌jurisdictional‌ ‌authority‌ ‌and‌ ‌public‌ ‌trust‌‌
 
 
 
 
 
 
 
 
 
 
 
responsibilities‌‌for‌‌management‌‌of‌‌the‌‌state's‌‌fish‌‌and‌‌wildlife‌‌resources.‌‌It‌‌is‌‌the‌‌mission‌‌of‌‌the‌‌
 
 
 
 
 
 
 
 
 
     
 
 
 
 
Department‌‌to‌‌conserve‌‌and‌‌protect‌‌Arizona’s‌‌diverse‌‌fish‌‌and‌‌wildlife‌‌resources‌‌and‌‌manage‌‌for‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
 
safe,‌‌compatible‌‌outdoor‌‌recreation‌‌opportunities‌‌for‌‌current‌‌and‌‌future‌‌generations.‌‌Similarly,‌‌
 
 
 
 
 
 
 
 
 
 
 
the‌‌Department‌‌recognizes‌‌the‌‌importance‌‌of‌‌planning‌‌efforts‌‌that‌‌contribute‌‌to‌‌the‌‌county‌‌and‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
 
the‌‌state’s‌‌economic‌‌growth‌‌needs‌‌and‌‌opportunities‌‌to‌‌develop‌‌renewable‌‌energy‌‌locations.‌‌The‌‌
 
 
 
 
 
 
   
 
 
 
 
 
Department‌ ‌recognizes‌ ‌that‌ ‌appropriate‌ ‌coordination,‌ ‌proper‌ ‌planning,‌ ‌and‌ ‌voluntary‌‌
 
 
 
 
 
 
 
 
 
implementation‌ ‌of‌ ‌best‌ ‌management‌ ‌practices‌ ‌allow‌ ‌projects‌ ‌to‌ ‌be‌ ‌developed‌ ‌that‌ ‌avoid,‌‌
 
 
 
 
 
 
 
 
 
 
 
 
minimize,‌ ‌or‌ ‌mitigate‌ ‌potential‌ ‌impacts‌ ‌to‌ ‌wildlife‌ ‌habitat‌ ‌and‌ ‌populations.‌‌ ‌
  
‌ 
To‌‌the‌‌extent‌‌possible,‌‌the‌‌Department‌‌encourages‌‌pre-construction‌‌surveys‌‌and‌‌monitoring‌‌to‌‌
 
 
 
 
 
 
 
 
 
 
 
 
determine‌‌species‌‌presence‌‌as‌‌referenced‌‌in‌‌our‌‌Guidelines‌‌for‌‌Solar‌‌Development‌‌in‌‌Arizona‌.‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
‌ 
‌

‌ 
Harquahala‌ ‌Sun‌ ‌Solar‌ ‌and‌ ‌Storage‌ ‌Project‌ ‌ 
July‌ ‌28,‌ ‌2021‌ ‌ 
Page‌ ‌2‌ ‌ 
The‌ ‌Department‌ ‌is‌ ‌available‌ ‌to‌ ‌review‌ ‌survey‌ ‌designs,‌ ‌provide‌ ‌input‌ ‌on‌ ‌developing‌‌
 
 
 
 
 
 
 
 
 
 
 
 
best-management‌ ‌practices,‌ ‌and‌ ‌to‌ ‌assist‌ ‌in‌ ‌developing‌ ‌this‌ ‌economically-important‌ ‌facility‌‌
 
 
 
 
 
 
 
 
 
 
while‌‌also‌‌minimizing‌‌any‌‌potential‌‌impacts‌‌to‌‌wildlife‌‌during‌‌construction‌‌and‌‌operation‌‌of‌‌the‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
 
facility.‌‌ ‌
  
‌ 
The‌ ‌western‌ ‌burrowing‌ ‌owl‌ ‌(‌Athene‌ ‌cunicularia‌ ‌hypugaea‌)‌ ‌is‌ ‌a‌ ‌special‌‌status‌‌species‌‌that‌‌is‌‌
 
 
 
 
 
 
 
   
 
 
 
   
regulated‌ ‌under‌ ‌the‌ ‌Migratory‌ ‌Bird‌ ‌Treaty‌ ‌Act‌ ‌(MBTA).‌ ‌The‌ ‌Department‌ ‌recommends‌‌
 
 
 
 
 
 
 
 
 
 
 
conducting‌‌an‌‌occupancy‌‌survey‌‌for‌‌western‌‌burrowing‌‌owls‌‌to‌‌determine‌‌if‌‌this‌‌species‌‌occurs‌‌
 
 
 
 
 
 
 
 
 
   
 
 
 
within‌‌your‌‌project‌‌footprint.‌‌Guidelines‌‌for‌‌conducting‌‌this‌‌survey‌‌are‌‌found‌‌in‌‌Burrowing‌‌Owl‌‌
 
 
 
 
 
 
 
 
 
 
   
 
 
Project‌ ‌Clearance‌ ‌Guidance‌ ‌for‌ ‌Landowners‌ ‌which‌ ‌can‌ ‌be‌ ‌accessed‌ ‌on-line‌ ‌through‌ ‌the‌‌
 
 
 
 
 
 
 
 
 
 
 
 
Department’s‌ ‌website.‌ ‌Please‌ ‌note‌ ‌that‌ ‌the‌ ‌survey‌ ‌should‌ ‌be‌‌conducted‌‌by‌‌a‌‌surveyor‌‌that‌‌is‌‌
 
 
 
 
 
 
 
 
 
 
   
 
   
certified‌‌by‌‌the‌‌Department.‌‌If‌‌an‌‌active‌‌burrowing‌‌owl‌‌burrow‌‌is‌‌detected,‌‌please‌‌contact‌‌the‌‌
 
 
 
   
 
 
 
 
   
 
 
 
 
Department‌ ‌and‌ ‌the‌ ‌U.S.‌ ‌Fish‌ ‌and‌ ‌Wildlife‌ ‌Service‌ ‌for‌ ‌direction,‌ ‌in‌ ‌accordance‌ ‌with‌ ‌the‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Burrowing‌ ‌Owl‌ ‌Project‌ ‌Clearance‌ ‌Guidance‌ ‌for‌ ‌Landowners‌.‌ ‌ 
‌ 
In‌ ‌addition,‌ ‌the‌ ‌Department‌ ‌would‌ ‌like‌ ‌to‌ ‌provide‌ ‌the‌ ‌following‌ ‌general‌ ‌recommendations:‌ ‌ 
●
Artificial‌‌night‌‌lighting‌‌may‌‌attract‌‌insects‌‌and‌‌the‌‌species‌‌that‌‌prey‌‌on‌‌them‌‌(e.g.‌‌bats).‌‌It‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
could‌ ‌also‌ ‌impair‌ ‌the‌ ‌ability‌ ‌of‌ ‌nocturnal‌ ‌animals‌ ‌to‌ ‌navigate.‌ ‌The‌ ‌Department‌‌
 
 
 
 
 
 
 
 
 
 
 
 
recommends‌ ‌using‌ ‌only‌ ‌the‌ ‌minimum‌ ‌amount‌ ‌of‌ ‌light‌ ‌needed‌ ‌for‌ ‌safety.‌ ‌If‌ ‌feasible,‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
narrow‌‌spectrum‌‌lighting‌‌is‌‌wildlife-friendly‌‌and‌‌should‌‌be‌‌used‌‌as‌‌often‌‌as‌‌possible‌‌to‌‌
 
 
   
 
 
 
 
 
 
 
 
 
 
minimize‌‌the‌‌number‌‌of‌‌species‌‌affected‌‌by‌‌lighting.‌‌It‌‌is‌‌also‌‌beneficial‌‌that‌‌all‌‌lighting‌‌
 
 
 
 
 
 
 
     
 
 
 
 
 
is‌ ‌shielded,‌ ‌canted,‌ ‌or‌ ‌cut‌ ‌to‌ ‌minimize‌ ‌the‌ ‌amount‌ ‌of‌ ‌upward‌ ‌shining‌ ‌light.‌‌ ‌
  
●
Birds‌‌of‌‌prey‌‌such‌‌as‌‌raptors,‌‌owls,‌‌vultures,‌‌and‌‌eagles‌‌are‌‌vulnerable‌‌to‌‌electrocution‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
 
and‌‌powerline‌‌strikes‌‌during‌‌construction‌‌and‌‌operation.‌‌There‌‌are‌‌a‌‌number‌‌of‌‌design‌‌
 
 
 
 
 
 
 
 
   
 
 
 
features‌‌that‌‌can‌‌minimize‌‌these‌‌impacts‌‌to‌‌these‌‌important‌‌species.‌‌Tuk‌‌Jacobson‌‌is‌‌the‌‌
 
 
 
 
 
 
 
 
 
 
 
   
 
Department’s‌‌raptor‌‌expert‌‌and‌‌will‌‌be‌‌willing‌‌to‌‌share‌‌information‌‌on‌‌best‌‌management‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
practices;‌ ‌he‌ ‌can‌ ‌be‌ ‌contacted‌ ‌at‌ ‌KJacobson@azgfd.gov‌ ‌or‌ ‌623-236-7575.‌ ‌
  
●
Power‌‌poles‌‌can‌‌serve‌‌as‌‌perches‌‌for‌‌many‌‌birds‌‌of‌‌prey‌‌and‌‌there‌‌are‌‌design‌‌features‌‌for‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
structures‌‌that‌‌can‌‌reduce‌‌impacts‌‌to‌‌these‌‌important‌‌species.‌‌Another‌‌possible‌‌alternative‌‌
 
 
 
 
   
 
 
 
 
 
 
to‌‌reduce‌‌mortality‌‌is‌‌using‌‌bird‌‌flight‌‌diverters‌‌to‌‌decrease‌‌avian‌‌mortalities.‌‌Again,‌‌Mr.‌‌
 
 
   
 
 
 
   
 
 
 
 
 
Jacobson‌‌has‌‌expertise‌‌in‌‌all‌‌of‌‌the‌‌best‌‌management‌‌practices‌‌and‌‌would‌‌be‌‌available‌‌to‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
   
share‌ ‌his‌ ‌knowledge‌ ‌in‌ ‌the‌ ‌pre-design‌ ‌phase‌ ‌of‌ ‌this‌ ‌project.‌‌ ‌
  
●
The‌
‌Department’s‌
‌Wildlife‌
‌Compatible‌
‌Fencing‌
‌Guidelines‌‌
 
 
 
 
 
 
(‌https://s3.amazonaws.com/azgfd-portal-wordpress/PortalImages/files/wildlife/planningF‌
or/wildlifeFriendlyGuidelines/110125_AGFD_fencing_guidelines.pdf‌)‌
‌provide‌‌
 
 
information‌‌on‌‌how‌‌fencing‌‌impacts‌‌wildlife,‌‌ways‌‌to‌‌design‌‌fencing‌‌to‌‌prevent‌‌wildlife‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
entanglement‌ ‌and‌ ‌impalement,‌ ‌and‌ ‌to‌ ‌ensure‌ ‌wildlife‌‌movement‌‌is‌‌not‌‌restricted.‌‌The‌‌
 
 
 
 
 
 
 
   
 
 
 
Department‌ ‌developed‌ ‌these‌ ‌guidelines‌ ‌to‌ ‌assist‌ ‌landowners,‌ ‌project‌ ‌managers,‌ ‌land‌‌
 
 
 
 
 
 
 
 
 
 
management‌‌agencies,‌‌and‌‌others‌‌in‌‌designing‌‌wildlife‌‌compatible‌‌fences.‌‌The‌‌focus‌‌is‌‌
 
 
 
 
 
 
 
 
 
 
   
on‌ ‌fence‌ ‌design‌ ‌rather‌ ‌than‌ ‌detailed‌ ‌fence‌ ‌construction‌ ‌specifications.‌ ‌The‌ ‌goal‌ ‌is‌ ‌to‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
provide‌ ‌guidance‌ ‌in‌ ‌designing‌ ‌a‌ ‌fence‌ ‌that‌ ‌will‌ ‌achieve‌ ‌its‌ ‌objective‌ ‌with‌ ‌minimum‌‌
 
 
 
   
 
 
 
 
 
 
 
 
impact‌ ‌to‌ ‌wildlife.‌ 
●
If‌ ‌trenching‌ ‌will‌ ‌occur‌ ‌for‌ ‌the‌ ‌proposed‌ ‌project,‌ ‌the‌ ‌Department‌ ‌recommends‌ ‌that‌‌
 
 
 
 
 
 
 
 
 
 
 
 
trenching‌ ‌and‌ ‌backfilling‌ ‌crews‌ ‌be‌ ‌close‌ ‌together‌ ‌to‌ ‌minimize‌ ‌the‌ ‌amount‌ ‌of‌ ‌open‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
trenches‌ ‌at‌ ‌any‌ ‌given‌ ‌time.‌ ‌Where‌ ‌trenches‌ ‌cannot‌ ‌be‌ ‌back-filled‌ ‌immediately,‌ ‌the‌‌

‌ 
Harquahala‌ ‌Sun‌ ‌Solar‌ ‌and‌ ‌Storage‌ ‌Project‌ ‌ 
July‌ ‌28,‌ ‌2021‌ ‌ 
Page‌ ‌3‌ ‌ 
Department‌‌recommends‌‌escape‌‌ramps‌‌be‌‌constructed‌‌at‌‌least‌‌every‌‌90‌‌meters.‌‌Escape‌‌
 
 
 
 
 
 
 
 
 
 
 
 
ramps‌‌can‌‌be‌‌short‌‌lateral‌‌trenches‌‌or‌‌wooden‌‌planks‌‌sloping‌‌to‌‌the‌‌surface.‌‌The‌‌slope‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
should‌‌be‌‌less‌‌than‌‌45‌‌degrees‌‌(1:1).‌‌Trenches‌‌that‌‌have‌‌been‌‌left‌‌open‌‌overnight‌‌should‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
be‌ ‌inspected‌ ‌and‌ ‌animals‌ ‌removed‌ ‌prior‌ ‌to‌ ‌backfilling.‌ ‌ 
‌ ‌
  
Thank‌‌you‌‌for‌‌the‌‌opportunity‌‌to‌‌provide‌‌comments‌‌on‌‌this‌‌proposed‌‌project.‌‌The‌‌Department‌‌
 
 
 
 
 
 
 
 
 
 
 
 
 
 
looks‌‌forward‌‌to‌‌continued‌‌communications‌‌with‌‌Maricopa‌‌County‌‌and‌‌RWE‌‌regarding‌‌project‌‌
 
 
 
 
 
 
 
 
 
 
 
 
development‌‌and‌‌implementation.‌‌Please‌‌contact‌‌me‌‌at‌‌623-236-7222‌‌or‌‌ACavalcant@azgfd.gov‌‌
 
 
 
 
 
   
 
 
 
if‌ ‌you‌ ‌have‌ ‌any‌ ‌questions,‌ ‌or‌ ‌would‌ ‌like‌ ‌to‌ ‌further‌ ‌discuss‌ ‌our‌ ‌concerns‌ ‌and‌ ‌recommendations.‌‌ ‌
  
‌ 
Sincerely,‌ ‌ 
‌ 
Andrew‌ ‌Cavalcant‌‌ ‌
  
Project‌ ‌Evaluation‌ ‌Project‌ ‌Specialist,‌ ‌Habitat‌ ‌Branch‌ ‌ 
‌ 
Cc‌
Ginger‌ ‌Ritter,‌ ‌Project‌ ‌Evaluation‌ ‌Program‌ ‌Supervisor‌ ‌AGFD‌ ‌(gritter@azgfd.gov)‌ ‌ 
 
Tyler‌ ‌Williford,‌ ‌Habitat‌ ‌Program‌ ‌Manager,‌ ‌Region‌ ‌IV‌ ‌(twilliford‌@azgfd.gov‌)‌ ‌ 
‌ 
AGFD‌ ‌#M21-07074314‌ ‌

From:
David Jacobs
To:
Ray Banker (PND)
Subject:
CPA2021007 Harquahala Sun
Date:
Thursday, July 8, 2021 5:04:05 PM
Ray-
The narrative for the project states [page 16] under Environmental Policy # 5 that a cultural
resource survey will be submitted to our office with the zone change and plan of development
to identify sensitive areas requiring protection, preservation, and/or mitigation of impacts. 
Our records indicate that both Section 5 and 6 of Township 1 North and Range 8 West have
not been surveyed or assessed for cultural resources.  Our office awaits those surveys for
review and comment.
David Jacobs, Arizona State Historic Preservation Office

From:
Bruce Fenske
To:
Ray Banker (PND)
Cc:
Gerardo Ramirez; Isabell Garcia
Subject:
Re: New Case: CPA2021007 (Harquahala Sun - Major CPA)
Date:
Tuesday, July 6, 2021 12:10:56 PM
Attachments:
image001.png
image002.png
Mr. Banker:
Thank you for notifying the Southwest District of the Arizona Department of Transportation of the proposed
amendment to the county's comprehensive plan.
As stated on pages 5 and 10 of the project's narrative provided by the developer for the Harquahala Sun, the
developer will prepare and submit a traffic impact statement (TIS) per county standards for the project.  We request a
copy of the referenced TIS to allow us to review the more detailed information on expected traffic generated by the
proposed facility.
Bruce A. Fenske, P.E.
Assistant District Engineer
Southwest District
Tel.       928.317.2138
Mobile  928.210.8882
On Fri, 2 Jul 2021 at 16:55, Gerardo Ramirez <gramirez@azdot.gov> wrote:
Bruce did you get this?
---------- Forwarded message ---------
From: Ray Banker (PND) <Ray.Banker@maricopa.gov>
Date: Fri, Jul 2, 2021 at 4:46 PM
Subject: New Case: CPA2021007 (Harquahala Sun - Major CPA)
To: 
Good afternoon,
 
You are receiving this email as the above mentioned case is in an area which you are considered an “Area of
Interest”. Attached are documents relating to the subject case and upcoming TAC Meeting. Please let me know if
you if have any questions.
 
Thank you,
 
  
Ray Banker
Senior Planner
Maricopa County Planning & Development Department
301 W. Jefferson Street, Suite 170
Phoenix, AZ 85003
602-506-2364

Ray.Banker@maricopa.gov

From:
Hobart Wingard
To:
Ray Banker (PND)
Cc:
Adam Copeland
Subject:
County Case Review
Date:
Tuesday, July 6, 2021 7:52:06 AM
Attachments:
image001.png
Good morning Mr. Banker,
The City of Buckeye is in receipt of the following cases to review/comment on:
·         CPA2021007 – Harquahala Sun
·         CPA2021010 – Yellow Bell Solar
·         CPA2021001 – Hyder Solar and Storage
After reviewing these three (3) solar major Comprehensive Plan Amendments,
Buckeye staff has no comments.
Thank you,
Bart
 
HOBART (BART) WINGARD | PRINCIpAL PLANNER | DEVELOpMENT SERVICEs
CITY OF BUCKEYE  |  530 EAsT MONROE AVENUE, BUCKEYE, AZ 85326
O: 623.349.6207 | C: 623.208.8830 | hwINGARD@BUCKEYEAZ.GOV
 
 
cIty haLL hOURs: mON-thURs 7am-6pm
CLOsED ON FRIDays
www.buckeyeaz.gov
 
This message contains confidential information and is intended only for the individual(s)
addressed in the message. If you are not the named addressee, you should not disseminate,
distribute, or copy this e-mail. If you are not the intended recipient, you are notified that
disclosing, distributing, or copying this e-mail is strictly prohibited.

502 N. 44th Street, Suite 200 ▪ Phoenix, AZ  85008 ▪ (602) 506-2364 ▪ (602) 506-3711 fax 
                                                                                        ➢Internet:  www.maricopa.gov/planning 
 
 
 
DATE: 
November 4, 2021 
 
TO: 
Planning & Zoning Commission  
 
FROM: 
Ray Banker, Senior Planner 
 
 
 
SUBJECT: 
CPA2021007 – Harquahala Sun 
 
Agenda Item: PZ-5 
 
After writing of the staff report for CPA2021007, staff received comments from Luke Air 
Force Base (LAFB) which are attached. They mention that the proposed solar facility 
“could possibly impact” flying operations as the site is within a Military Training Route (MTR) 
where jets fly as low as 300’. Their concerns specifically note a potential for glare and/or 
height of future electric transmission lines. However, these are issues not related to this 
CPA application, but rather, if warranted, would be addressed as part of the final site-
specific entitlement and design.  If this major CPA is approved, any future zone change 
application would be routed to LAFB for review and analysis of design considerations.  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Attachment:  
LAFB Comment Memo (2 pages)