Extracted text (via pymupdf)
5549 characters
Run Date:
07/01/2021
U.S. DEPARTMENT OF TRANSPORTATION
Report: FMISD05A
Run Time:
00:00:27
FEDERAL HIGHWAY ADMINISTRATION
Page 1 of 1
FEDERAL-AID PROJECT AGREEMENT
RECIPIENT:
4-Arizona
FEDERAL PROJECT NO:
MMA0288
RECIPIENT PROJ. NO(S):
T029301X
1. The State through its department of transportation, or other recipient, has complied, or hereby agrees to comply, with the applicable terms and conditions
set forth in (a) Title 23, U.S. Code, highways;
(b) The regulations issued pursuant thereto, and the policies and procedures promulgated by the
Federal Highway Administration; and
(c) All other applicable federal laws and regulations.2. The State, or other recipient, stipulates that as a
condition to payment of the Federal funds obligated, it accepts and will comply with the provisions set forth in 23 CFR 630.112. These provisions
incorporate by reference all other federal laws and regulations pertaining to the project or the activity for which the funds are obligated. Solely for the
purposes of emphasis, such applicable provisions include, but are not limited to, the requirements of Appendix A to 2 CFR Part 170²Award terms for
Reporting subaward and executive compensation information, and 2 CFR 200, including for those funds for which such amount will be subawarded to a
subrecipient, 2 CFR 200.331.3. Relative to the above designated project, the FHWA has authorized certain work to proceed as evidenced by the date entered
opposite the specific item of work. For such authorized work, the federal funds obligated or advance-construction authorized, are not to exceed the amount
shown herein. The balance of the estimated total project cost is an obligation of the State or other direct recipient.4. Such authorization of Federal funds
extends only to project costs incurred by the State, or other recipient, following Federal Highway Administration¶s authorization to proceed with the project.
PROJECT TITLE:
MCDOT Traffic Management Center, Maricopa County
PROJECT DESCRIPTION:
Upgrading current Automated Traffic Signal Performance Measures (ATSPM) system
DUNS#:
098416667
PROJECT END DATE:
12/31/2024
CLASSIFICATION OF PHASE OF WORK
TO BE PUT UNDER AGREEMENT
EFFECTIVE DATE OF
AUTHORIZATION
HIGHWAY PLANNING & RESEARCH
PRELIMINARY ENGINEERING
RIGHT-OF-WAY
CONSTRUCTION
OTHER
06/25/2021
PROGRAM
CODE
FAIN
URBAN/
WITH
TOTAL COST
FEDERAL
SHARE
FEDERAL FUNDS
UNDER
AGREEMENT
ADVANCED
CONST. FUNDS
Z40E
693JJ22130000Z40EAZMMA0288
$354,200.00
94.30%
$334,011.00
$0.00
TOTAL
$354,200.00
$334,011.00
$0.00
ESTIMATED TOTAL COST:
$354,200.00
TOTAL AUTHORIZED FOR PROJECT:
$334,011.00
TRANSPORTATION, ARIZONA DEPT OF
AVAILABLE FUNDS CERTIFIED BY:
Maria Coronado
DATE:
06/22/2021
APPROVED AND REQUESTED BY:
Patrycja Kozaczka
DATE:
06/22/2021
AGRMT/MODIFY REQUESTED BY:
Patrycja Kozaczka
DATE:
06/22/2021
FEDERAL HIGHWAY ADMINISTRATION
PROJECT INFORMATION REVIEWED BY:
Sharzae Cameron
DATE:
06/23/2021
APPROVAL RECOMMENDED BY:
Kimberly Utley
DATE:
06/25/2021
APPROVED AND AUTHORIZED BY:
Thomas Deitering
DATE:
06/28/2021
RECIPIENT REMARKS:
*OTHER
Project End Date: 12/31/2024
CFDA Number: 20.205
FY21 ICAP Rate: 9.90%, not applicable to this project
DIVISION REMARKS:
Project End Date: 12/31/2024
CFDA Number: 20.205
FY 2021 ICAP Rate: 9.90%, not applicable to this project.
OTH authorized on 6/25/2021 by KUtley.
SUFFIX
D
GENERAL LOCATION
GENERAL DESCRIPTION OF WORK
Z40E
94.30%
Project End Date:
12/31/2024
CFDA Number:
20.205
FY21 ICAP Rate:
C & S Engineer
email
contact #
by
for Division Administrator
Authorized by
Date
by
for Division Administrator
Title
Form AZPR2X (03/2012) - Approved by FHWA for use by ADOT
Upgrading current Automated Traffic Signal Performance Measures (ATSPM) system
MCDOT Traffic Management Center, Maricopa County
9.90%, not applicable to this project
$354,200
$354,200
$334,011
THIS AUTHORIZATION
A
D
O
T
F
H
W
A
Authorization
Agreement
Eric Prosnier eprosnier@azdot.gov 602-712-7249
Project Manager
email
contact #
Maria Coronado mcoronado@azdot.gov 602-712-8428 06/21/21
Prepared by
email
contact #
date
OTHER (SPECIFY)
PROJECT TOTALS
$354,200
$354,200
$334,011
RATIO(%)
FUNDING
APPN CODE
TOTAL ESTIMATED PROJECT
COST($)
Accounting Manager
FEDERAL HIGHWAY ADMINISTRATION - ARIZONA DIVISION OFFICE
LETTER OF AUTHORIZATION AND PROJECT AGREEMENT
ARIZONA DEPARTMENT OF TRANSPORTATION
Authorization
Modified Project Agreement
"The FHWA and ADOT Stewardship and Oversight Agreement for Arizona (April, 2015)"
Project Agreement
Grant Agreement
The state agrees that as a condition to payment of the Federal funds obligated, it accepts and will
comply with the agreement provisions set forth in 23 CFR 630.112; and its signature constitutes
the making of the certificates.
DUNS # 098416667
FEDERAL AID PROJECT NO.
PROGRAM / PHASE (ADOT)
FEDERAL PARTICIPATION AMOUNT($)
FEDERAL FUNDS($)
DATE AUTHORIZATION EFFECTIVE
MARICOPA
FMIS DATE
T0293 01X
MMA-0(288)D
COUNTY
YOU ARE AUTHORIZED TO PROCEED WITH THE WORK CHECKED BELOW:
PREVIOUS
AUTHORIZATIONS:
PHASE I: PRELIMINARY ENGINEERING - SCOPING, LOCATION STUDIES,
ENVIRONMENTAL STUDIES AND PRELIMINARY DESIGN
CONSTRUCTION - ADVERTISE FOR RECEIPT OF BIDS
PHASE II: PRELIMINARY ENGINEERING - FINAL DESIGN/PREPARATION OF
CONTRACT PLANS
CONSTRUCTION - PROCEED ON AN AGREED PRICE
AND/OR FORCE ACCOUNT BASIS
ACQUISITION OF RIGHT-OF-WAY
Other: Upgrading current ATSPM system
Th
t t
t
f th
F
PH
EN
P
C
A
Authorized by
Maria Coronado mcoronado@azdot.gov
Prepared by
email
Accounting Manager
06/22/2021