MCDOT TSP 2040_20210913EXECUTIVESUMMARY.PDF
Extracted text (via pymupdf)
44901 characters
Transportation System Plan 2040 Executive Summary Maricopa County Maricopa County Maricopa County "Providing connections that improve people’s lives” is the core purpose of the Maricopa County Department of Transportation (MCDOT). To accomplish this purpose, MCDOT developed a Transportation System Plan (TSP) to guide the planning of limited resources in a large geographic area. The TSP 2040 establishes a plan for the future transportation needs of Maricopa County residents across three planning horizons – 2025, 2030, and 2040 – based on a thorough review of the MCDOT transportation system, planning documents and processes, stakeholder plans, and funding information. TSP 2040 reaffirms the goals, objectives, and strategies from TSP 2035 and strengthened them with guiding principles and performance measures for current and future transportation needs and investments, and compliments Maricopa County’s Comprehensive Plan guidelines for transportation. With TSP 2040, MCDOT updated its approach to include complete projects, which comprehensively address transportation system needs beyond capacity, in addition to active transportation, safety, and Intelligent Transportation Systems (ITS). The identification of these additional needs and the opportunities for complete projects continues to drive MCDOT’s core purpose, by improving the network for all users. The spectrum below represents the method in which MCDOT manages the transportation system and serves as the foundation for TSP 2040. This includes five categories: Plan for short- and long-term needs; Design based upon conditions and community need; Build to accommodate needs utilizing latest technology; Maintain the system to ensure longevity; and Operate the system to best meet the needs of the traveling public. The following summary sheets are provided with additional information for each element of TSP 2040. EXECUTIVE SUMMARY Summary | 2 PLAN OVERVIEW TRANSPORTATION SYSTEM PLAN 2040 Winter 2021 Baseline Conditions Vision Winter 2020 Implementation Plan Summer 2020 Spring 2021 Schedule Spring 2020 Study Purpose The Maricopa County Department of Transportation (MCDOT) Transportation System Plan (TSP) 2040 provides information on the current transportation system and sets the framework of the future transportation system as population, development, technology, and other factors impact Maricopa County. The plan addresses roadway needs, sets performance measures, and provides a clear vision through 2040. TSP 2035 focused on capacity-driven needs. TSP 2040 incorporates recent MCDOT planning efforts to inform a broader scope of needs. The featured icons represent a sample of the many modes of transportation that were considered as part of this plan. As part of this TSP effort, the following occured: § Examination of Intelligent Transportation Systems (ITS) infrastructure in light of changing technologies (rideshare, connected and autonomous vehicles, and others) § Engagement of public and stakeholders through interactive activities § Identification of complete projects addressing capacity, connectivity, safety, ITS, and multimodal needs § Development of cost-constrained near term program Maricopa County TSP 2040 Plans For The Future: Pedestrians Disabled and Vulnerable Users Bicyclists Vehicles Freight Emerging Technologies Study Area The Study Area includes unincorporated Maricopa County and the Project Influence Area (PIA) includes the entire Maricopa County area and the fringe (areas adjacent to County limits) that connect to the County network. The primary focus will be on MCDOT facilities within the Study Area. However, some analysis was conducted for the PIA to determine how MCDOT facilities are impacted by the region. Complete Projects capacity connectivity safety multimodal needs ITS Transportation System Needs Analysis 602.506.4176 TSP2040@maricopa.gov Public and Stakeholder Outreach Questions? Comments? Contact the project team. Summary | 3 Final Report (Request BOS Adoption) BASELINE CONDITIONS TRANSPORTATION SYSTEM PLAN 2040 Baseline Conditions Vision Implementation Plan Schedule Maricopa County Transportation System Needs Analysis 602.506.4176 TSP2040@maricopa.gov Public and Stakeholder Outreach Questions? Comments? Contact the project team. Maricopa County’s Population + Growth 1,271 miles of sidewalk Baseline Conditions Purpose The purpose of Baseline Conditions was to establish an understanding of the transportation system in order to identify transportation needs that could be addressed by TSP 2040. Baseline Conditions provides an overview of the existing transportation network in Maricopa County including roadway characteristics, asset conditions, ITS infrastructure, and active transportation facilities. The review of baseline conditions also included an assessment of socioeconomic information, demographics, and land use and ownership and their potential impacts on traffic volumes and patterns. MCDOT Operates and Maintains 2,476 ROADWAY CENTERLINE MILES 98% of centerline miles have a pavement condition of good or better 15% are unpaved roads 5% are three to six lane roads 80% are two lane roads Percent Satisfactory Minor Arterial 93% Major Collector 97% Parkways 97% Minor Collector 84% Principal Arterial 98% Existing Roadway Level of Service Percent Over Capacity 3% 2% 7% 3% 16% Providing Infrastructure to Support All Users 12,388 curb ramps 357 miles of bicycle lanes 441 bridges and culverts All bridges and culverts are in Good or Fair Condition = Need for More Capacity 2,091,042 employees now 2,863,967 by 2040 4,263,223 residents now 5,962,098 by 2040 Summary | 4 Winter 2021 Winter 2020 Summer 2020 Spring 2021 Spring 2020 Final Report (Request BOS Adoption) TRANSPORTATION SYSTEM PLAN 2040 Baseline Conditions Vision Implementation Plan Schedule Maricopa County Transportation System Needs Analysis 602.506.4176 TSP2040@maricopa.gov Public and Stakeholder Outreach Questions? Comments? Contact the project team. Identification of Needs Needs for the transportation system were identified through several sources, including: Various data sets Planning studies Advisory Committee input Public input Safety Structures Pavement Preservation Drainage Intelligent Transportation Systems PM-10 Road Capacity Pedestrian Bicycle Transportation System Needs Analysis Purpose The purpose of Transportation System Needs Analysis was to identify transportation needs for the next 20 years in nine categories (listed below). The identified needs provide a representation of the opportunities and constraints in achieving a well-connected transportation system that functions for all users. The findings from the analysis was used to develop projects and an implementation plan during the next phase. Dust mitigation and paving of PM-10 roads Upgrade and install new Intelligent Transportation Systems communication Rehabilitation, widening and construction of new bridges Upgraded guardrail end treatments Pavement preservation Drainage and culvert improvements Active Transportation Needs 483 miles of bicycle facility needs 192 miles of pedestrian facility needs 19 transit stops without ADA compliant facilities TRANSPORTATION SYSTEM NEEDS ANALYSIS Projected Level of Service Percent of roads exceeding traffic capacity thresholds if no improvements are made: 2020 2025 2030 2040 2.2% 5.5% 6.3% 7.4% URBAN PARKWAYS TRAFFIC RURAL MAJOR COLLECTORS could see an 11% increase in exceeding traffic capacity thresholds OPERATION could improve 2.3% with construction of SR-30 Other Needs Summary | 5 Winter 2021 Winter 2020 Summer 2020 Spring 2021 Spring 2020 Final Report (Request BOS Adoption) TRANSPORTATION SYSTEM PLAN 2040 Baseline Conditions Vision Implementation Plan Schedule Maricopa County Transportation System Needs Analysis 602.506.4176 TSP2040@maricopa.gov Public and Stakeholder Outreach Questions? Comments? Contact the project team. Performance Measure Core Purpose, Guiding Principles, and Performance Measures Purpose The purpose of the Core Purpose, Guiding Principles, and Performance Measures was to document the strategic planning process for TSP 2040. By developing Guiding Principles and Performance Measures that support the MCDOT Core Purpose, MCDOT can approach day-to-day operations with a clearly-defined vision for the Maricopa County transportation system. CORE PURPOSE, GUIDING PRINCIPLES, and PERFORMANCE MEASURES Guiding Principles How we do BUSINESS and how we approach the LONG TERM. Inclusiveness We are committed to identifying and addressing all user needs including those with varying physical, social, and economic abilities by establishing transportation corridors that accommodate all travel modes, including bicyclists, pedestrians, and others. Partnership We are committed to strong partnerships with those potentially affected by our decisions: public agencies throughout the County, the development and business community, and the public. Performance We are committed to managing and maintaining infrastructure that meets or exceeds widely accepted industry standards. Incorporate MCDOT roadways with Volume/Capacity ratio > 1.0 into the long-range TIP Incorporate MCDOT roadways within the PM-10 area exceeding 100 vehicles per day into the long-range TIP *Complete centerline miles of bike lanes *Complete centerline miles of sidewalk Bring curb ramps into compliance with the Americans with Disabilities Act Actively monitor and adjust signal timing to optimize travel times on MCDOT’s arterial corridors 26% 13% 0 0 > 1% 70% 30% 15% 25 miles 25 miles 50% 80% Target Baseline Core Purpose To provide CONNECTIONS that improve people’s lives. *The performance measure intent is to track the construction of the new facilities over a 5-year period starting in 2020. Summary | 6 Winter 2021 Winter 2020 Summer 2020 Spring 2021 Spring 2020 Final Report (Request BOS Adoption) TRANSPORTATION SYSTEM PLAN 2040 Maricopa County 602.506.4176 TSP2040@maricopa.gov Public and Stakeholder Outreach Questions? Comments? Contact the project team. Baseline Conditions Vision Implementation Plan Schedule Final Report (Request BOS Adoption) Transportation System Needs Analysis IMPLEMENTATION PLAN Over 200 projects were identified in nine categories – Capacity, Pedestrian, Bicycle, PM-10 Roads, Intelligent Transportation Systems, Safety, Structures, Pavement Preservation, and Drainage. The projects were prioritized in an implementation plan for the near-, mid-, and long-term horizons. Projects Scenario Planning Recommended Strategies Ÿ Develop Emerging Technologies Plan Ÿ Facilitate an Air Quality Policy Specific to Autonomous Vehicles Ÿ Support a Regional Approach to Transportation Demand Management Ÿ Support Multimodal Transportation Options Ÿ Develop Curbside Management Policy Ÿ Support a Regional Transportation Funding Strategy Three policy frameworks were explored around Smart Streets, Emerging Technology, and Active Transportation based on the scenario planning recommended strategies. Implementation Plan Purpose The Implementation Plan analyzed and outlined action items needed to support MCDOT in accomplishing its core purpose of providing connections that improve people’s lives. Planning for an Uncertain Future Future transportation funding is unknown and travel trends are changing quickly. To better prepare for this uncertain future, MCDOT and its partners conducted a scenario planning process. By evaluating different possible future scenarios, MCDOT and its partners were able to identify common themes and ways to adjust to different situations including: emerging technology, importance of regional funding, increasing demand for active transportation, and growing use of telecommuting and e-commerce. Recommended strategies from the scenario planning are listed to the right. MCDOT Revenues and Expenditures 70% Capital Roadways, Sidewalks, ITS Facilities Personnel, Supplies, etc. 19% Other State Shared 82% 25c25c25c 5c 1c1c Highway User Revenue Fund, Vehicle License Tax Regional 13% 10c 1c 1c 1c MAG Arterial Life Cycle Program Other 5% 5c Permits, IGAs, Interest Pothole Repairs, Dust Mitigation, Storm Damage Repairs 11% Operations and Maintenance To inform the implementation plan, a funding analysis, including revenue projections and life cycle system costs, was developed. Winter 2021 Winter 2020 Summer 2020 Spring 2021 Spring 2020 Summary | 7 TRANSPORTATION SYSTEM PLAN 2040 Maricopa County Public and Stakeholder Outreach 602.506.4176 TSP2040@maricopa.gov Questions? Comments? Contact the project team. TSP 2040 Final Plan Purpose The TSP 2040 establishes a plan for the future transportation needs of Maricopa County residents across three planning horizons – 2025, 2030, and 2040. Engaging Maricopa County partners and the public was essential to plan development and identifying future action items. FINAL REPORT The Advisory Committee included representatives from Maricopa County, local and regional governments within and surrounding Maricopa County, private utilities and railroads, and state agencies. MCDOT actively engaged the Advisory Committee throughout the TSP 2040 development process to plan and maintain a regionally connected roadway network. Advisory Committee Outreach Schedule MCDOT engaged the public on plan development and solicited input through a project website, interactive map, and social media. Through the various outreach methods, MCDOT received over 500 comments from the public about their interests and needs for the transportation system. Public Outreach Throughout development of the TSP 2040, next steps were identified that support MCDOT’s Core Purpose of “providing connections that improve people’s lives.” Next steps were centered around the following themes: Next Steps A key component for TSP 2040 outreach was a deliberate and dedicated effort to hear from young people. MCDOT engaged high school students, those closest to driving age, to obtain their thoughts on the transportation system and its future. MCDOT was able to attend targeted events, engaging more than 100 students on how they believe the transportation system will change. Youth Outreach AC Website to share plan information in English and Spanish. Interactive map to solicit input. Social media platforms for outreach. x System Performance Collaborative Partnerships Public Engagement State-of-the-Art Technology Baseline Conditions Vision Implementation Plan Transportation System Needs Analysis Final Report (Request BOS Adoption) Winter 2021 Winter 2020 Summer 2020 Spring 2021 Spring 2020 Summary | 8 Project Types| 9 Maricopa County Projects were developed based on a technical analysis of the transportation network maintained by MCDOT and input from a comprehensive Advisory Committee and the public. The technical analysis is documented through a series of memoranda including existing conditions, identified needs, and a potential implementation plan. Projects were identified across nine categories – Capacity, Pedestrian, Bicycle, PM-10 Roads, ITS, Safety Structures, Pavement Preservation, and Drainage. Projects were combined based on proximity along a corridor. Each project has an identified horizon, near- (2025), mid- (2030), and long-term (2040). These horizons are subject to change based on need and available funding. A description of what is included in each project type is below followed by the list of projects organized by roadway name. PROJECT TYPES Project Type Definition Examples of Projects Capacity Projects which alleviate congestion on existing roads or improve connectivity in the region • Roadway widening • New roads Pedestrian Projects which improve or implement facilities for walkability and access • New sidewalk • Close gaps in sidewalk network • Connectivity to transit facilities • ADA-compliant curb ramps • Crossing locations Bicycle Projects which improve or implement facilities for bicycling and access • New bicycle lanes • Close gaps in bicycle network PM-10 Projects which alleviate dust concerns • Pave dirt roadways Safety Projects which improve safety conditions for all users • MASH guardrail upgrades • New handrails by canals ITS Projects which improve or add ITS connectivity to the region • New traffic signals • Communications upgrades Structures Projects which improve existing structures throughout the region or the construction of new structures • New bridges with committed funding • Bridge improvements • Culvert extensions • Low flow crossings Pavement Preservation Projects which improve the pavement conditions of roadways • Crack sealant • Microseal • Mill and fill Drainage Projects which improve drainage conditions or flow capabilities • Clear drainage channels • Extend drainage channels Maricopa County 1 2 3 4 5 0 10 20 Miles I REFERENCE LAYERS Service Layer Credits: Addtional Sources: Maricopa County; Flood Control District of Maricopa County (FCD); Arizona Department of Transportation (ADOT); Arizona State Land Resource Information System (ALRIS) Map Updated: 8/6/2021 FEATURED LAYERS Board of Supervisors District Boundary Incorporated Maricopa County County Boundary Major Roadways Projects Spot Projects Corridor Projects Projects Map: Study Area Projects Map | 10 Maricopa County 1 0 3 6 Miles I Service Layer Credits: Addtional Sources: Maricopa County; Flood Control District of Maricopa County (FCD); Arizona Department of Transportation (ADOT); Arizona State Land Resource Information System (ALRIS) Map Updated: 8/6/2021 Featured Layer REFERENCE LAYERS Board of Supervisors District Boundary Incorporated Maricopa County County Boundary Major Roadways Projects Spot Projects Corridor Projects Projects Map: District - 1 District 1 | 11 1Project includes gap(s) in MCDOT jurisdiction 2A new structure would be needed to complete the connection 3New roadway 4Only capacity projects were combined when overlapping with other project types. Other project types may overlap but were not combined. Projects List: District - 1 Project Roadway From/At To Length (miles) Horizon Needs (Capacity, Pedestrian, Bicycle, PM-10, Safety, ITS, Structure, Pavement Preservation, Drainage) Potential Partners Legend Broadway Road Cottonwood Drive El Dorado Road 0.1 Near Capacity Chandler Heights Road Cooper Road Gilbert Road 1.0 Near Chandler Pedestrian Chandler Heights Road Recker Road Ellsworth Road 4.0 Near Gilbert Queen Creek Bicycle Chandler Heights Road1 0.25 miles west of Lindsay Road Val Vista Drive 1.3 Near Chandler Gilbert PM-10 Cooper Road Riggs Road Kaibab Place 1.7 Near Chandler Safety Dobson Road3 SR-202L McKellips Road 1.3 Long ITS Higley Road Stacey Road Mews Road 0.6 Long Gilbert Structures Hunt Highway Higley Road Ellsworth Road 5.0 Near Queen Creek Pavement Preservation Lindsay Road Spur Road Appleby Road 0.3 Near Chandler Gilbert Drainage Lime Drive Watford Drive San Tan Boulevard 0.1 Near Mary Street Gilbert Drive Curry Road 0.3 Near MASH Northeast Area; multiple roads Limits: 75th Avenue (west), Bush Highway (east), Hunt Highway (south), New River Road (north) 6.4 Near McKellips Road McClintock Drive/Hayden Road - - Near Ocotillo Road 148th Street Greenfield Road 1.4 Mid Gilbert Power Road Hunt Highway Riggs Road 1.0 Long Gilbert Queen Creek Sun Lakes Area Limits: Sun Lakes Boulevard (west), Alma School Road (east), Riggs Road (south), Champagne Drive/Halley Drive (north) - Near District 1 | 12 1Project includes gap(s) in MCDOT jurisdiction 2A new structure would be needed to complete the connection 3New roadway 4Only capacity projects were combined when overlapping with other project types. Other project types may overlap but were not combined. Project Roadway From/At To Length (miles) Horizon Needs (Capacity, Pedestrian, Bicycle, PM-10, Safety, ITS, Structure, Pavement Preservation, Drainage) Potential Partners Legend Sun Lakes; multiple roads Limits: Dobson Road (west), Ribbonwood Drive (east), Hunt Highway (south), Riggs Road (north) 11.9 Near Capacity Sun Lakes; multiple roads Limits: Old Price Road (west), Dobson Road (east), Hunt Highway (south), Riggs Road (north) 20.4 Near Pedestrian Warner Road Power Road 80th Street 1.5 Near Bicycle PM-10 Safety ITS Structures Pavement Preservation Drainage District 1 | 13 Maricopa County 2 0 6 12 Miles I REFERENCE LAYERS Service Layer Credits: Addtional Sources: Maricopa County; Flood Control District of Maricopa County (FCD); Arizona Department of Transportation (ADOT); Arizona State Land Resource Information System (ALRIS) Map Updated: 8/6/2021 Board of Supervisors District Boundary Incorporated Maricopa County County Boundary Major Roadways Featured Layer Projects Spot Projects Corridor Projects Projects Map: District - 2 District 2 | 14 1Project includes gap(s) in MCDOT jurisdiction 2A new structure would be needed to complete the connection 3New roadway 4Only capacity projects were combined when overlapping with other project types. Other project types may overlap but were not combined. Projects List District - 2 Project Roadway From/At To Length (miles) Horizon Needs (Capacity, Pedestrian, Bicycle, PM-10, Safety, ITS, Structure, Pavement Preservation, Drainage) Potential Partners Legend 1st Street Merrill Road Valley Verde 0.1 Near Capacity 56th Street 100 feet south of Albany Street University Drive 0.3 Near Pedestrian 58th Street Main Street Casper Street 0.6 Near Bicycle 96th Street Southern Avenue Apache Trail 1.5 Near PM-10 96th Street University Drive Brown Road 1.0 Near Safety Alma School Road 0.2 miles south of McKellips Road McKellips Road 0.2 Near ITS Avalon Street 67th Avenue Power Road 0.2 Near Structures Chaparral Road Dobson Road - - Near Pavement Preservation Crismon Road 101st Street McKellips Road 3.0 Near Drainage Deer Trail Road Cave Creek Road Manana Road 1.8 Near Old Mine Road Deer Trail Road Hohokkam Lane Near Dobson Road3 SR-202L McKellips Road 1.3 Long East Valley, North of US-60 Limits: 56th Street (west), Meridian Road (east), Southern Avenue (south), Brown Drive (north) - Near Ellsworth Road US-60 Apache Trail 1.9 Near Ellsworth Road US-60 Apache Trail 1.9 Near Gilbert Road Thomas Road SR-87 1.9 Near District 2 | 15 1Project includes gap(s) in MCDOT jurisdiction 2A new structure would be needed to complete the connection 3New roadway 4Only capacity projects were combined when overlapping with other project types. Other project types may overlap but were not combined. Project Roadway From/At To Length (miles) Horizon Needs (Capacity, Pedestrian, Bicycle, PM-10, Safety, ITS, Structure, Pavement Preservation, Drainage) Potential Partners Legend Iris Road 101st Street 103rd Street 0.3 Near Capacity La Plata Road Old Mine Road Blue Wash Road 2.1 Near Pedestrian Tonto Road La Plata Road Blue Wash Road Bicycle Blue Wash Road Old Mine Road La Plata Road PM-10 Lone Mountain Road 48th Street 68th Street 2.3 Long Phoenix Safety MASH Northeast Area; multiple roads Limits: 75th Avenue (west), Bush Highway (east), Hunt Highway (south), New River Road (north) 6.4 Near ITS MASH Northeast Area; multiple roads4 Limits: 75th Avenue (west), South Lake Road (east), Acoma Drive (south), Mingus Road (north) 22.0 Near Structures McDowell Road 92nd Street - - Near Pavement Preservation McDowell Road Alma School Road - - Near Drainage McDowell Road Vicinity, East Valley Limits: 92nd Street (west), Gilbert Road (east), McKellips Road (south), Chaparral Road (north) - Near McKellips Road McClintock Drive SR-101L 1.0 Near McKellips Road McClintock Road SR-101L 1.0 Near McKellips Road Alma School Road - - Near McKellips Road Dobson Road - - Near McKellips Road Longmore Road - - Near McKellips Road McClintock Drive/Hayden Road - - Near District 2 | 16 1Project includes gap(s) in MCDOT jurisdiction 2A new structure would be needed to complete the connection 3New roadway 4Only capacity projects were combined when overlapping with other project types. Other project types may overlap but were not combined. Project Roadway From/At To Length (miles) Horizon Needs (Capacity, Pedestrian, Bicycle, PM-10, Safety, ITS, Structure, Pavement Preservation, Drainage) Potential Partners Legend McLellan Road 103rd Street 106th Way 0.7 Near Capacity 104th Street 101st Street McLellan Road Pedestrian Meridian Road Baseline Road Brown Road 4.0 Long Mesa Apache Junction Bicycle Merrill Road University Drive Adobe Road 0.5 Near PM-10 Power Road Nunneley Road Redfield Road 1.9 Near Gilbert Mesa Safety Recker Road University Drive Colby Street 0.2 Near ITS Rio Verde Drive1 136th Street Forest Road 6.6 Near Scottsdale Structures Sossaman Road Warner Road Peralta Road 1.5 Long Mesa Pavement Preservation Southeast Signals Power Road Warner Road 1.0 Near Drainage Power Road Elliot Road Southern Avenue 96th Street Meridian Road 2.5 Mid Mesa Sunaire Drive Avalon Street Akron Street 0.1 Near Tonto Hills; multiple roads Limits: Hohokam Lane (west), La Plata Road (east), Kachina Road (south), Blue Wash Road (north) 11.3 Near University Drive East of Ellsworth Road West of Payton Street 2.8 Near University Drive Ellsworth Road Meridian Road 3.0 Near District 2 | 17 Maricopa County 3 0 5 10 Miles I Service Layer Credits: Addtional Sources: Maricopa County; Flood Control District of Maricopa County (FCD); Arizona Department of Transportation (ADOT); Arizona State Land Resource Information System (ALRIS) Map Updated: 8/6/2021 Featured Layer REFERENCE LAYERS Board of Supervisors District Boundary Incorporated Maricopa County County Boundary Major Roadways Projects Spot Projects Corridor Projects Projects Map: District - 3 District 3 | 18 1Project includes gap(s) in MCDOT jurisdiction 2A new structure would be needed to complete the connection 3New roadway 4Only capacity projects were combined when overlapping with other project types. Other project types may overlap but were not combined. Projects List District - 3 Project Roadway From/At To Length (miles) Horizon Needs (Capacity, Pedestrian, Bicycle, PM-10, Safety, ITS, Structure, Pavement Preservation, Drainage) Potential Partners Legend 3rd Avenue Honda Bow Road Circle Mountain Road 0.9 Near Capacity 3rd Street Linda Lane Honda Bow Road 0.5 Near Pedestrian 6th Street Mano Drive Venado Drive 1.1 Near Bicycle Venado Drive New River Road 6th Street PM-10 7th Avenue Honda Bow Road Cavalry Road 0.8 Near Safety Calvary Road 7th Avenue 3rd Avenue ITS 7th Street Linda Lane Honda Bow Road 0.3 Near Structures 10th Street Dove Valley Road Paint Your Wagon Trail 0.5 Near Pavement Preservation 11th Avenue Honda Bow Road 13th Avenue 1.5 Near Drainage 13th Avenue 11th Avenue Circle Mountain Road Circle Mountain Road 13th Avenue 3rd Avenue 13th Avenue Mingus Road Lazy K Ranch Road 0.6 Near Lazy K Ranch Road 15th Avenue 11th Avenue 16th Street Gaffney Road Venado Drive 0.4 Near 20th Street Cloud Road Tamar Road 1.3 Near 40th Street Dynamite Boulevard Dale Lane 0.3 Near District 3 | 19 1Project includes gap(s) in MCDOT jurisdiction 2A new structure would be needed to complete the connection 3New roadway 4Only capacity projects were combined when overlapping with other project types. Other project types may overlap but were not combined. Project Roadway From/At To Length (miles) Horizon Needs (Capacity, Pedestrian, Bicycle, PM-10, Safety, ITS, Structure, Pavement Preservation, Drainage) Potential Partners Legend Anthem Area Limits: I-17 (west), Daisy Mountain Drive (east), Pioneer Road (south), Anthem Way (north) - Near Capacity Carefree Highway 7th Street 24th Street 2.0 Near Pedestrian Circle Mountain Road New River Road 10th Street 0.8 Near Bicycle Desert Hills Drive 17th Avenue 14th Avenue 0.9 Near PM-10 Fig Springs Road New River Road Central Avenue 2.1 Near Safety 7th Avenue Fig Springs Road Lazy K Ranch Road ITS Central Avenue Mingus Road Country Road Structures Country Road 3rd Avenue Alignment Central Avenue Pavement Preservation MASH Northeast Area; multiple roads Limits: 75th Avenue (west), Bush Highway (east), Hunt Highway (south), New River Road (north) 6.4 Near Drainage MASH Northeast Area; multiple roads4 Limits: 75th Avenue (west), South Lake Road (east), Acoma Drive (south), Mingus Road (north) 22.0 Near Memorial Drive Gavilan Peak Parkway Whitman Drive 2.0 Near New River Road3 Black Canyon Highway 27th Avenue 1.4 Long New River Road Gibbons Road Gibbons Road 0.1 Near Pinnacle Vista Drive 40th Street 46th Street 0.8 Near Tanya Road 16th Street 16th Place 0.3 Near District 3 | 20 Maricopa County 4 0 6 12 Miles I Service Layer Credits: Addtional Sources: Maricopa County; Flood Control District of Maricopa County (FCD); Arizona Department of Transportation (ADOT); Arizona State Land Resource Information System (ALRIS) Map Updated: 8/6/2021 Featured Layer REFERENCE LAYERS Board of Supervisors District Boundary Incorporated Maricopa County County Boundary Major Roadways Projects Spot Projects Corridor Projects Projects Map: District - 4 District 4 | 21 1Project includes gap(s) in MCDOT jurisdiction 2A new structure would be needed to complete the connection 3New roadway 4Only capacity projects were combined when overlapping with other project types. Other project types may overlap but were not combined. Projects List: District - 4 Project Roadway From/At To Length (miles) Horizon Needs (Capacity, Pedestrian, Bicycle, PM-10, Safety, ITS, Structure, Pavement Preservation, Drainage) Potential Partners Legend 79th Avenue Acoma Drive Country Gables Drive 0.2 Near Capacity 83rd Avenue Northern Avenue Butler Drive 0.5 Near Peoria Pedestrian 91st Avenue Pinnacle Peak Road Happy Valley Parkway 1.0 Near Peoria Bicycle 99th Avenue US-60 Beardsley Road 5.9 Near PM-10 99th Avenue US-60 Bell Road 3.3 Near Safety 99th Avenue 0.4 miles south of Northern Avenue Northern Avenue 0.4 Near Glendale ITS 99th Avenue Olive Avenue Beardsley Road 7.2 Near Structures 99th Avenue Olive Avenue Beardsley Road 7.2 Near Pavement Preservation 107th Avenue1 Williams Road Hatfield Road 1.2 Near Peoria Drainage 111th Avenue Olive Avenue Peoria Avenue 1.0 Near 111th Avenue1 Peoria Avenue Thunderbird Boulevard 2.0 Near Youngtown 117th Avenue Williams Drive Happy Valley Parkway 2.0 Long 163rd Avenue White Wing Road Dove Valley Road 0.1 Near 163rd Avenue Windstone Trail White Wing Road 0.8 Long 191st Avenue McDowell Road Thomas Road 1.0 Near 193rd Avenue Jomax Road Roadrunner Road 0.5 Near District 4 | 22 1Project includes gap(s) in MCDOT jurisdiction 2A new structure would be needed to complete the connection 3New roadway 4Only capacity projects were combined when overlapping with other project types. Other project types may overlap but were not combined. Project Roadway From/At To Length (miles) Horizon Needs (Capacity, Pedestrian, Bicycle, PM-10, Safety, ITS, Structure, Pavement Preservation, Drainage) Potential Partners Legend 211th Avenue2,3 Sun Valley Parkway Patton Road 5.7 Long Surprise Capacity 227th Avenue Lone Mountain Road Montgomery Road 1.0 Near Pedestrian Baseline Road Miller Road MC 85 1.2 Long Bicycle Bethany Home Road Litchfield Road El Mirage Road 2.0 Long Glendale PM-10 Broadway Road MC 85 Rooks Road 1.0 Long Buckeye Safety Camelback Road 146th Avenue 0.2 miles west of Ball Park Boulevard 3.9 Near Litchfield Park Phoenix ITS Citrus Road1 Yuma Road Cactus Road 11.0 Long Goodyear Glendale Surprise Structures Cotton Lane1 Bethany Home Road Peoria Avenue 4.0 Near Goodyear Surprise Pavement Preservation Deer Valley Access Road Deer Valley Drive El Mirage Road 0.2 Near Drainage Del Webb Boulevard Palmeras Drive 99th Avenue 1.0 Near Del Webb Boulevard 99th Avenue Bell Road 0.3 Near Dove Valley Road 171st Avenue 163rd Avenue 1.0 Near Dove Valley Road/Center Street US-60 211th Avenue 1.0 Mid Surprise Dysart Road Las Cruces Drive Rose Lane 2.2 Near Dysart Road Las Cruces Drive Glendale Avenue 2.9 Near El Mirage Road Bethany Home Road Northern Avenue 2.0 Near El Mirage Glendale Galvin Street 0.4 miles east of 219th Avenue 211th Avenue 0.6 Near District 4 | 23 1Project includes gap(s) in MCDOT jurisdiction 2A new structure would be needed to complete the connection 3New roadway 4Only capacity projects were combined when overlapping with other project types. Other project types may overlap but were not combined. Project Roadway From/At To Length (miles) Horizon Needs (Capacity, Pedestrian, Bicycle, PM-10, Safety, ITS, Structure, Pavement Preservation, Drainage) Potential Partners Legend Greenway Road 195th Avenue Roosevelt Irrigation District Canal 2.0 Mid Surprise Capacity Greenway Road 99th Avenue 91st Avenue 0.9 Near Pedestrian Happy Valley Road Dysart Road Vistancia Boulevard 1.6 Mid Bicycle Indian School Road El Mirage Road 99th Avenue 2.8 Near PM-10 Indian School Road3 201st Avenue SR-303L 4.1 Near Goodyear Safety Jackrabbit Trail/Tuthill Road1 I-10 Denton Street 3.6 Near Buckeye ITS Jackrabbit Trail/Tuthill Road1 Queen Creek Road MC 85 8.2 Mid Goodyear Buckeye Structures Jackrabbit Trail1 MC 85 I-10 5.8 Long Buckeye Pavement Preservation Jomax Road El Granada Boulevard Dysart Road 0.5 Mid Surprise Peoria Drainage Lone Mountain Road Crozier Road 215th Avenue 0.5 Near Lower Buckeye Road Cotton Lane Sarival Avenue 1.0 Mid Goodyear Lower Buckeye Road3 Rainbow Road Verrado Way 2.0 Long Buckeye MASH Northeast Area; multiple roads Limits: 75th Avenue (west), Bush Highway (east), Hunt Highway (south), New River Road (north) 6.4 Near MASH Northeast Area; multiple roads4 Limits: 75th Avenue (west), South Lake Road (east), Acoma Drive (south), Mingus Road (north) 22.0 Near MASH Northwest Area; multiple roads Limits: 107th Avenue (west) 91st Avenue (east), Alabama Avenue (south), Beardsley Road (north) 4.8 Near MC 85 MC 85 Verrado Way 0.6 Near MC 85 Baseline Road 0.3 miles east of Dean Road 2.5 Near Buckeye District 4 | 24 1Project includes gap(s) in MCDOT jurisdiction 2A new structure would be needed to complete the connection 3New roadway 4Only capacity projects were combined when overlapping with other project types. Other project types may overlap but were not combined. Project Roadway From/At To Length (miles) Horizon Needs (Capacity, Pedestrian, Bicycle, PM-10, Safety, ITS, Structure, Pavement Preservation, Drainage) Potential Partners Legend MC 85 Tuthill Road Lower Buckeye Road 8.7 Near Buckeye Goodyear Capacity McDowell Road1 195th Avenue SR-303L 2.9 Long Buckeye Goodyear Pedestrian Meeker Boulevard US-60 Beardsley Road 2.6 Near Bicycle Miller Road Tonopah Salome Highway Van Buren Street 1.0 Near PM-10 Northern Avenue 0.5 miles east of El Mirage Road 67th Avenue/US-60 6.5 Near Glendale Peoria Safety Northern Avenue3 Jackrabbit Trail SR-303L 3.5 Mid Glendale ITS Olive Avenue1 White Tank Mountain Road SR-101L 13.7 Mid Glendale El Mirage Youngtown Peoria Structures Palo Verde Road Roosevelt Irrigation District Roosevelt Irrigation District 0.2 Near Pavement Preservation Patton Road 251st Drive US-60 7.1 Mid Buckeye Drainage Peak View Road 205th Avenue 203rd Avenue 0.4 Near 205th Avenue Peak View Road Skinner Drive Skinner Drive 205th Lane 205th Avenue Peoria Avenue1,2,3 Jackrabbit Trail 99th Avenue 12.7 Long Surprise Glendale El Mirage Youngtown Perryville Road1,3 Van Buren Street Cactus Road 9.2 Mid Buckeye Goodyear Glendale Surprise Reems Road Northern Parkway Peoria Avenue 1.5 Long Glendale Surprise Rockaway Hills Drive 256th Avenue 0.4 miles east of 251st Avenue 0.7 Near District 4 | 25 1Project includes gap(s) in MCDOT jurisdiction 2A new structure would be needed to complete the connection 3New roadway 4Only capacity projects were combined when overlapping with other project types. Other project types may overlap but were not combined. Project Roadway From/At To Length (miles) Horizon Needs (Capacity, Pedestrian, Bicycle, PM-10, Safety, ITS, Structure, Pavement Preservation, Drainage) Potential Partners Legend Southern Avenue Perryville Road Extension CSR 1.1 Near Capacity Stardust Boulevard Sunglow Drive Amigo Drive 1.0 Near Pedestrian Sun City Area Limits: Del Webb Boulevard/107th Avenue (west), Burns Drive/Lindgren Avenue (east), Thunderbird Boulevard (south), Union Hills Drive (north) - Near Bicycle Sun City West Area Limits: Sunrise Boulevard (west), 113th Avenue (east), Bell Road (south), Happy Valley Parkway (north) - Near PM-10 Sun City West4 Limits: US-60 (west), El Mirage Road (east), Bell Road (south), Deer Valley Drive (north) - Near Safety Sun City West; multiple roads Limits: US-60 (west), 115th Avenue (east), Meeker Boulevard (south), R H Johnson Boulevard (north) 3.8 Near ITS Sun City; South of Grand Avenue Area Limits: Litchfield Road (west), 99th Avenue (east), Olive Avenue (south), Winsor Drive (north) - Near Structures Sun Valley Parkway 0.5 miles west of Crozier Extension 183rd Avenue 1.2 Long Surprise Pavement Preservation Thunderbird Boulevard 111th Avenue Del Webb Boulevard 0.5 Near Drainage Thunderbird Boulevard 99th Avenue Boswell Boulevard 0.6 Near Peoria Thunderbird Boulevard Dell Webb Boulevard 99th Avenue 1.3 Near Union Hills Road 107th Avenue 99th Avenue 0.6 Near Peoria Vulture Mine Road Vulture Ranch Road Mile Post 21 16.3 Near Waddell Road1,2 Jackrabbit Trail SR-303L 4.2 Long Surprise West Signals South of I-10 Salome Highway at Wintersburg Road - Near West Valley, I-10 to Grand Avenue Limits: Litchfield Road (west), 91st Avenue (east), McDowell Road (south) Bethany Home Road (north) - Near District 4 | 26 1Project includes gap(s) in MCDOT jurisdiction 2A new structure would be needed to complete the connection 3New roadway 4Only capacity projects were combined when overlapping with other project types. Other project types may overlap but were not combined. Project Roadway From/At To Length (miles) Horizon Needs (Capacity, Pedestrian, Bicycle, PM-10, Safety, ITS, Structure, Pavement Preservation, Drainage) Potential Partners Legend West Valley, Other Signals Northern Avenue Reems Road 2.0 Near Capacity Northern Avenue Litchfield Road Pedestrian Williams Drive El Mirage Road 117th Avenue 1.2 Near Bicycle Yuma Road Jackrabbit Trail Perryville Road 1.3 Mid Goodyear PM-10 Safety ITS Structures Pavement Preservation Drainage District 4 | 27 Maricopa County 5 0 10 20 Miles I Service Layer Credits: Addtional Sources: Maricopa County; Flood Control District of Maricopa County (FCD); Arizona Department of Transportation (ADOT); Arizona State Land Resource Information System (ALRIS) Map Updated: 8/6/2021 Featured Layer REFERENCE LAYERS Board of Supervisors District Boundary Incorporated Maricopa County County Boundary Major Roadways Projects Spot Projects Corridor Projects Projects Map: District - 5 District 5 | 28 1Project includes gap(s) in MCDOT jurisdiction 2A new structure would be needed to complete the connection 3New roadway 4Only capacity projects were combined when overlapping with other project types. Other project types may overlap but were not combined. Projects List: District - 5 Project Roadway From/At To Length (miles) Horizon Needs (Capacity, Pedestrian, Bicycle, PM-10, Safety, ITS, Structure, Pavement Preservation, Drainage) Potential Partners Legend 30th Drive Olney Avenue Elliot Road 0.2 Near Capacity 35th Avenue Carver Road McNeil Street 0.7 Near Pedestrian 43rd Avenue Southern Avenue Broadway Road 0.8 Near Phoenix Bicycle 59th Avenue Roosevelt Canal Buckeye Road 0.5 Near PM-10 67th Avenue1 Baseline Road Broadway Road 2.2 Mid Phoenix Safety 75th Avenue2,3 Leodra Lane Broadway Road 1.5 Near Phoenix ITS 91st Avenue Salt River Salt River 0.1 Near Structures 91st Avenue 0.25 miles north of Sunland Road Broadway Road 0.5 Long Phoenix Pavement Preservation 186th Avenue Rustler Road 0.3 miles north of Rustler Road 0.3 Near Drainage 191st Avenue 192nd Avenue Arlington Road 0.4 Near 222nd Avenue Crivello Road Eagle Mountain Road 0.4 Near AZ-238/Maricopa Road Sonoran Park Entrance End of County Road 17.0 Near Baseline Road 71st Avenue SR-202L 1.2 Mid Phoenix Broadway Road 79th Avenue 51st Avenue 3.5 Near Phoenix Buckeye Road 107th Avenue - - Near Buckeye Road 107th Avenue - - Near District 5 | 29 1Project includes gap(s) in MCDOT jurisdiction 2A new structure would be needed to complete the connection 3New roadway 4Only capacity projects were combined when overlapping with other project types. Other project types may overlap but were not combined. Project Roadway From/At To Length (miles) Horizon Needs (Capacity, Pedestrian, Bicycle, PM-10, Safety, ITS, Structure, Pavement Preservation, Drainage) Potential Partners Legend Buckeye Road 83rd Avenue - - Near Capacity Dean Road Eagle Mountain Road 0.1 miles north of Eagle Mountain Road 0.1 Near Pedestrian Dobbins Road 35th Avenue 27th Avenue 1.0 Mid Phoenix Bicycle Dobbins Road 51st Avenue 0.4 miles east of 51st Avenue 0.4 Long Phoenix PM-10 Elliot Road 215th Avenue Airport Road 0.5 Near Safety Hidalgo Avenue 129th Avenue 0.2 miles east of 129th Avenue 0.2 Near ITS Jackrabbit Trail/Tuthill Road1 Queen Creek Road MC 85 8.2 Mid Goodyear Buckeye Structures Lower Buckeye Road 71st Avenue 67th Avenue 0.5 Near Phoenix Pavement Preservation Lower Buckeye Road Cotton Lane Sarival Avenue 1.0 Mid Goodyear Drainage Lower Buckeye Road1 MC 85 0.2 miles east of 107th Avenue 4.5 Near Avondale Goodyear MASH Northeast Area; multiple roads Limits: 75th Avenue (west), Bush Highway (east), Hunt Highway (south), New River Road (north) 6.4 Near MASH South Area; multiple roads Limits: Old US 80 (west), 99th Avenue (east), Patterson Road (south), Southern Avenue (north) 0.2 Near MC 85 107th Avenue 75th Avenue 4.0 Near MC 85 Tuthill Road Lower Buckeye Road 8.7 Near Buckeye Goodyear MC 85 and Lower Buckeye Road Limits: Jackrabbit Trail (west), I-10 (east), Pecos Road (south), McDowell Road (north) - Near McDowell Road 91st Avenue 83rd Avenue 1.0 Near McDowell Road 91st Avenue 83rd Avenue 1.0 Near District 5 | 30 1Project includes gap(s) in MCDOT jurisdiction 2A new structure would be needed to complete the connection 3New roadway 4Only capacity projects were combined when overlapping with other project types. Other project types may overlap but were not combined. Project Roadway From/At To Length (miles) Horizon Needs (Capacity, Pedestrian, Bicycle, PM-10, Safety, ITS, Structure, Pavement Preservation, Drainage) Potential Partners Legend McDowell Road SR-101L 91st Avenue 0.8 Near Tolleson Phoenix Capacity Narramore Road Dean Road Airport Road 2.0 Near Pedestrian Northern Avenue 0.5 miles east of El Mirage Road 67th Avenue/US-60 6.5 Near Glendale Peoria Bicycle Old US 80 Mile Post 22 Agua Caliente Extension Road 0.3 Near PM-10 Old US 80 Desert Rose Road 319th Avenue 0.1 Near Safety Queen Creek Road 195th Avenue 187th Avenue 1.0 Near ITS Riggs Road 195th Avenue 187th Avenue 1.0 Near Structures Shawnee Drive 37th Avenue 35th Avenue 0.3 Near Pavement Preservation Southern Avenue 51st Avenue 37th Lane 1.9 Near Phoenix Drainage Southern Avenue 75th Avenue 59th Avenue 2.0 Near Phoenix West Valley, I-10 to Grand Avenue Limits: Litchfield Road (west), 91st Avenue (east), McDowell Road (south) Bethany Home Road (north) - - Near District 5 | 30