Transportation System Plan 2040
Executive Summary
Maricopa County

Maricopa County
Maricopa County
"Providing connections that improve people’s lives” is the core purpose of the Maricopa County 
Department of Transportation (MCDOT). To accomplish this purpose, MCDOT developed a Transportation 
System Plan (TSP) to guide the planning of limited resources in a large geographic area. The TSP 2040 
establishes a plan for the future transportation needs of Maricopa County residents across three 
planning horizons – 2025, 2030, and 2040 – based on a thorough review of the MCDOT 
transportation system, planning documents and processes, stakeholder plans, and funding information. 
TSP 2040 reaffirms the goals, objectives, and strategies from TSP 2035 and strengthened them with 
guiding principles and performance measures for current and future transportation needs and 
investments, and compliments Maricopa County’s Comprehensive Plan guidelines for transportation.
With TSP 2040, MCDOT updated its approach to include         
complete projects, which comprehensively 
address transportation system needs beyond capacity, in addition to active transportation, safety, and 
Intelligent Transportation Systems (ITS). The identification of these additional needs and the opportunities 
for complete projects continues to drive MCDOT’s core purpose, by improving the network for all users. 
The spectrum below represents the method in which MCDOT manages the transportation system and 
serves as the foundation for TSP 2040. This includes five categories: Plan for short- and long-term needs; 
Design based upon conditions and community need; Build to accommodate needs utilizing latest 
technology; Maintain the system to ensure longevity; and Operate the system to best meet the needs of 
the traveling public. The following summary sheets are provided with additional information for each 
element of TSP 2040.
EXECUTIVE SUMMARY
Summary  |  2

PLAN OVERVIEW
TRANSPORTATION SYSTEM PLAN 2040
Winter 2021
Baseline
Conditions
Vision
Winter 2020
Implementation 
Plan
 
Summer 2020
Spring 2021
Schedule
Spring 2020
Study Purpose
The Maricopa County Department of Transportation 
(MCDOT) Transportation System Plan (TSP) 2040 
provides information on the current transportation 
system and sets the framework of the future 
transportation system as population, development, 
technology, and other factors impact Maricopa County. 
The plan addresses roadway needs, sets performance 
measures, and provides a clear vision through 2040.
TSP 2035 focused on capacity-driven needs. TSP 2040  
incorporates recent MCDOT planning efforts to inform a 
broader scope of needs. The featured icons represent a 
sample of the many modes of transportation that were 
considered as part of this plan.
As part of this TSP effort, the following occured:
§
Examination of Intelligent Transportation Systems (ITS)
infrastructure in light of changing technologies
(rideshare, connected and autonomous vehicles, and
others)
§
Engagement of public and stakeholders through
interactive activities
§
Identification of complete projects addressing capacity,
connectivity, safety, ITS, and multimodal needs
§
Development of cost-constrained near term program
Maricopa County
TSP 2040 Plans For The Future:
Pedestrians
Disabled and 
Vulnerable 
Users
Bicyclists
Vehicles
Freight
Emerging 
Technologies
Study Area
The Study Area includes unincorporated Maricopa County 
and the Project Influence Area (PIA) includes the entire 
Maricopa County area and the fringe (areas adjacent to 
County limits) that connect to the County network. The 
primary focus will be on MCDOT facilities within the 
Study Area. However, some analysis was conducted for 
the PIA to determine how MCDOT facilities are 
impacted by the region.
Complete Projects
capacity
connectivity
safety
multimodal needs
ITS
Transportation 
System Needs
Analysis
602.506.4176
TSP2040@maricopa.gov
Public and Stakeholder Outreach
Questions? Comments? Contact the project team.
Summary  |  3
Final Report 
(Request BOS 
Adoption)

BASELINE CONDITIONS
TRANSPORTATION SYSTEM PLAN 2040
Baseline
Conditions
Vision
Implementation 
Plan
 
Schedule
Maricopa County
Transportation 
System Needs
Analysis
602.506.4176
TSP2040@maricopa.gov
Public and Stakeholder Outreach
Questions? Comments? Contact the project team.
Maricopa County’s Population + Growth  
1,271 miles of sidewalk
Baseline Conditions Purpose
The purpose of Baseline Conditions was to establish an 
understanding of the transportation system in order to 
identify transportation needs that could be addressed by 
TSP 2040. Baseline Conditions provides an overview of 
the existing transportation network in Maricopa County 
including roadway characteristics, asset conditions, ITS 
infrastructure, and active transportation facilities. The 
review of baseline conditions also included an 
assessment of socioeconomic information, demographics, 
and land use and ownership and their potential impacts 
on traffic volumes and patterns.
MCDOT Operates and Maintains
2,476 ROADWAY CENTERLINE MILES
98% of centerline miles
have a pavement condition of good or better
15% are
unpaved roads
5% are
three to six 
lane roads
80% are two
lane roads
Percent Satisfactory 
Minor Arterial 93%
Major Collector 97%
Parkways 97%
Minor Collector 84%
Principal Arterial 98%
Existing Roadway Level of Service
Percent Over Capacity 
3%
2%
7%
3%
16%
Providing Infrastructure to 
Support All Users
12,388 curb ramps
357 miles of bicycle lanes
441 bridges and culverts
All bridges and culverts are in Good or Fair 
Condition
= Need for More Capacity
2,091,042 employees now
2,863,967 by 2040
4,263,223 residents now
5,962,098 by 2040
Summary  |  4
Winter 2021
Winter 2020
Summer 2020
Spring 2021
Spring 2020
Final Report 
(Request BOS 
Adoption)

TRANSPORTATION SYSTEM PLAN 2040
Baseline
Conditions
Vision
Implementation 
Plan
 
Schedule
Maricopa County
Transportation 
System Needs
Analysis
602.506.4176
TSP2040@maricopa.gov
Public and Stakeholder Outreach
Questions? Comments? Contact the project team.
Identification of Needs
Needs for the transportation 
system were identified through 
several sources, including:
Various data sets
Planning studies
Advisory Committee input
Public input
Safety
Structures
Pavement 
Preservation 
Drainage
Intelligent 
Transportation 
Systems
PM-10 Road
Capacity
Pedestrian
Bicycle
Transportation System 
Needs Analysis Purpose
The purpose of Transportation System Needs Analysis 
was to identify transportation needs for the next 20 
years in nine categories (listed below). The identified 
needs provide a representation of the opportunities 
and constraints in achieving a well-connected 
transportation system that functions for all users. The 
findings from the analysis was used to develop 
projects and an implementation plan during the next 
phase.
Dust mitigation and paving of PM-10 roads
Upgrade and install new Intelligent Transportation 
Systems communication
Rehabilitation, widening and 
construction of new bridges
Upgraded guardrail end treatments
Pavement preservation
Drainage and culvert improvements
Active Transportation Needs
483 miles 
of bicycle 
facility needs
192 miles 
of pedestrian
facility needs
19 transit 
stops 
without ADA
compliant facilities
TRANSPORTATION SYSTEM
NEEDS ANALYSIS
Projected Level of Service
Percent of roads exceeding traffic capacity
thresholds if no improvements are made:
2020
2025
2030
2040
2.2%
5.5%
6.3%
7.4%
URBAN PARKWAYS TRAFFIC
 
RURAL MAJOR COLLECTORS could see an
11% increase in exceeding traffic
capacity thresholds
OPERATION could improve 2.3%
with construction of SR-30
Other Needs
Summary  |  5
Winter 2021
Winter 2020
Summer 2020
Spring 2021
Spring 2020
Final Report  
(Request BOS 
Adoption)

TRANSPORTATION SYSTEM PLAN 2040
Baseline
Conditions
Vision
Implementation 
Plan
 
Schedule
Maricopa County
Transportation 
System Needs
Analysis
602.506.4176
TSP2040@maricopa.gov
Public and Stakeholder Outreach
Questions? Comments? Contact the project team.
Performance Measure
Core Purpose,
Guiding Principles,
and Performance
Measures Purpose
The purpose of the Core 
Purpose, Guiding Principles, and 
Performance Measures was to 
document the strategic planning 
process for TSP 2040. By 
developing Guiding Principles 
and Performance Measures that 
support the MCDOT Core 
Purpose, MCDOT can approach 
day-to-day operations with a 
clearly-defined vision for the 
Maricopa County transportation 
system.
CORE PURPOSE, GUIDING PRINCIPLES,
and PERFORMANCE MEASURES
Guiding Principles
How we do BUSINESS and how we approach the
LONG TERM.
Inclusiveness
We are committed to identifying and addressing all user needs including 
those with varying physical, social, and economic abilities by establishing 
transportation corridors that accommodate all travel modes, including 
bicyclists, pedestrians, and others.
Partnership
We are committed to strong partnerships with those potentially affected 
by our decisions: public agencies throughout the County, the 
development and business community, and the public. 
Performance
We are committed to managing and maintaining infrastructure that 
meets or exceeds widely accepted industry standards. 
Incorporate MCDOT roadways with Volume/Capacity ratio > 1.0 into the long-range TIP
Incorporate MCDOT roadways within the PM-10 area exceeding 100 vehicles 
per day into the long-range TIP
*Complete centerline miles of bike lanes
*Complete centerline miles of sidewalk
Bring curb ramps into compliance with the Americans with Disabilities Act
Actively monitor and adjust signal timing to optimize travel times on MCDOT’s 
arterial corridors
26%
13%
0
0
> 1%
70%
30%
15%
25 miles
25 miles
50%
80%
Target
Baseline
Core Purpose
To provide CONNECTIONS that improve people’s lives.
*The performance measure intent is to track the construction of the new facilities over a 5-year period starting in 2020.
Summary  |  6
Winter 2021
Winter 2020
Summer 2020
Spring 2021
Spring 2020
Final Report  
(Request BOS 
Adoption)

TRANSPORTATION SYSTEM PLAN 2040
Maricopa County
602.506.4176
TSP2040@maricopa.gov
Public and Stakeholder Outreach
Questions? Comments? Contact the project team.
Baseline
Conditions
Vision
Implementation 
Plan
 
Schedule
Final Report 
(Request BOS 
Adoption)
Transportation 
System Needs
Analysis
IMPLEMENTATION PLAN
Over 200 projects were identified in nine categories – 
Capacity, Pedestrian, Bicycle, PM-10 Roads, Intelligent 
Transportation Systems, Safety, Structures, Pavement 
Preservation, and Drainage. The projects were prioritized in 
an implementation plan for the near-, mid-, and long-term 
horizons.
Projects
Scenario Planning Recommended Strategies
Ÿ
Develop Emerging Technologies Plan
Ÿ
Facilitate an Air Quality Policy Specific to
Autonomous Vehicles
Ÿ
Support a Regional Approach to Transportation
Demand Management
Ÿ
Support Multimodal Transportation Options
Ÿ
Develop Curbside Management Policy
Ÿ
Support a Regional Transportation Funding Strategy
Three policy frameworks were explored around Smart 
Streets, Emerging Technology, and Active 
Transportation based on the scenario planning 
recommended strategies.
Implementation Plan Purpose
The Implementation Plan analyzed and outlined action 
items needed to support MCDOT in accomplishing its 
core purpose of providing connections that improve 
people’s lives.
Planning for an Uncertain Future
Future transportation funding is unknown and travel 
trends are changing quickly. To better prepare for this 
uncertain future, MCDOT and its partners conducted a 
scenario planning process. By evaluating different 
possible future scenarios, MCDOT and its partners were 
able to identify common themes and ways to adjust to 
different situations including: emerging technology, 
importance of regional funding, increasing demand for 
active transportation, and growing use of telecommuting 
and e-commerce. Recommended strategies from the 
scenario planning are listed to the right.
MCDOT Revenues and Expenditures
70%
Capital
Roadways, Sidewalks,
ITS Facilities
Personnel,
Supplies, etc.
19%
Other
State Shared
82%
25c25c25c
5c 1c1c
Highway User Revenue
Fund, Vehicle License Tax
Regional
13%
10c
1c 1c 1c
MAG Arterial Life
Cycle Program
Other
5%
5c
Permits, IGAs,
Interest
Pothole Repairs, Dust
Mitigation, Storm
Damage Repairs
11%
Operations and
Maintenance
To inform the implementation plan, a funding analysis, including revenue projections and life cycle system costs, 
was developed.
Winter 2021
Winter 2020
Summer 2020
Spring 2021
Spring 2020
Summary  |  7

TRANSPORTATION SYSTEM PLAN 2040
Maricopa County
Public and Stakeholder Outreach
602.506.4176
TSP2040@maricopa.gov
Questions? Comments? Contact the project team.
TSP 2040 Final Plan Purpose
The TSP 2040 establishes a plan for the future 
transportation needs of Maricopa County residents 
across three planning horizons – 2025, 2030, and 2040. 
Engaging Maricopa County partners and the public was 
essential to plan development and identifying future 
action items.
FINAL REPORT
The Advisory Committee included 
representatives from Maricopa County, local 
and regional governments within and 
surrounding Maricopa County, private 
utilities and railroads, and state agencies. MCDOT 
actively engaged the Advisory Committee throughout the 
TSP 2040 development process to plan and maintain a 
regionally connected roadway network.
Advisory Committee Outreach
Schedule
MCDOT engaged the public on plan 
development and solicited input through a 
project website, interactive map, and social 
media. Through the various outreach methods, MCDOT 
received over 500 comments from the public about their 
interests and needs for the transportation system.
Public Outreach
Throughout development of the TSP 2040, 
next steps were identified that support 
MCDOT’s Core Purpose of “providing 
connections that improve people’s lives.” 
Next steps were centered around the following themes:
Next Steps
A key component for TSP 2040 outreach 
was a deliberate and dedicated effort to 
hear from young people. MCDOT engaged 
high school students, those closest to 
driving age, to obtain their thoughts on the 
transportation system and its future. MCDOT was able to 
attend targeted events, engaging more than 100 
students on how they believe the transportation system 
will change.
Youth Outreach
AC
Website to share plan information in 
English and Spanish.
Interactive map to solicit input.
Social media platforms for outreach.
x
System Performance
Collaborative Partnerships
Public Engagement
State-of-the-Art Technology
Baseline
Conditions
Vision
Implementation 
Plan
Transportation 
System Needs
Analysis 
Final Report 
(Request BOS 
Adoption)
Winter 2021
Winter 2020
Summer 2020
Spring 2021
Spring 2020
Summary  |  8

Project Types| 9
Maricopa County
Projects were developed based on a technical analysis of the transportation network maintained by 
MCDOT and input from a comprehensive Advisory Committee and the public. The technical analysis is 
documented through a series of memoranda including existing conditions, identified needs, and a potential 
implementation plan. Projects were identified across nine categories – Capacity, Pedestrian, Bicycle, PM-10 
Roads, ITS, Safety Structures, Pavement Preservation, and Drainage. Projects were combined based on 
proximity along a corridor. Each project has an identified horizon, near- (2025), mid- (2030), and long-term 
(2040). These horizons are subject to change based on need and available funding. A description of what 
is included in each project type is below followed by the list of projects organized by roadway name.   
PROJECT TYPES
Project Type
Definition
Examples of Projects
Capacity
Projects which alleviate congestion on 
existing roads or improve connectivity in the 
region
•
Roadway widening
•
New roads
Pedestrian
Projects which improve or implement 
facilities for walkability and access
•
New sidewalk
•
Close gaps in sidewalk network
•
Connectivity to transit facilities
•
ADA-compliant curb ramps
•
Crossing locations
Bicycle
Projects which improve or implement 
facilities for bicycling and access
•
New bicycle lanes
•
Close gaps in bicycle network
PM-10
Projects which alleviate dust concerns 
•
Pave dirt roadways
Safety
Projects which improve safety conditions for 
all users
• 
MASH guardrail upgrades
• 
New handrails by canals
ITS
Projects which improve or add ITS 
connectivity to the region
•
New traffic signals
•
Communications upgrades
Structures
Projects which improve existing structures 
throughout the region or the construction of 
new structures
•
New bridges with committed
funding
•
Bridge improvements
•
Culvert extensions
•
Low flow crossings
Pavement 
Preservation
Projects which improve the pavement 
conditions of roadways
• 
Crack sealant
• 
Microseal
•
Mill and fill
Drainage
Projects which improve drainage conditions 
or flow capabilities
•
Clear drainage channels
•
Extend drainage channels

Maricopa County
1
2
3
4
5
0
10
20
Miles I
REFERENCE LAYERS
Service Layer Credits:  Addtional Sources:  Maricopa County; Flood Control District of
Maricopa County (FCD); Arizona Department of Transportation (ADOT); Arizona State
Land Resource Information System (ALRIS)
Map Updated: 8/6/2021
FEATURED LAYERS
Board of Supervisors
District Boundary
Incorporated
Maricopa County
County Boundary
Major Roadways
Projects
Spot Projects
Corridor Projects
Projects Map: Study Area
Projects Map |  10

Maricopa County
1
0
3
6
Miles I
Service Layer Credits:  Addtional Sources:  Maricopa County; Flood Control District of
Maricopa County (FCD); Arizona Department of Transportation (ADOT); Arizona State Land
Resource Information System (ALRIS)
Map Updated: 8/6/2021
Featured Layer
REFERENCE LAYERS
Board of Supervisors
District Boundary
Incorporated
Maricopa County
County Boundary
Major Roadways
Projects
Spot Projects
Corridor Projects
Projects Map: District - 1
District 1 |  11

1Project includes gap(s) in MCDOT jurisdiction 
2A new structure would be needed to complete the connection 
3New roadway  
4Only capacity projects were combined when overlapping with other project types. Other project types may overlap but were not combined. 
Projects List: District - 1
Project Roadway 
From/At 
To 
Length 
(miles) 
Horizon 
Needs 
(Capacity, Pedestrian, Bicycle, PM-10, Safety, ITS, Structure, 
Pavement Preservation, Drainage) 
Potential 
Partners 
Legend 
Broadway Road 
Cottonwood Drive 
El Dorado Road 
0.1 
Near 
Capacity 
Chandler Heights Road 
Cooper Road 
Gilbert Road 
1.0 
Near 
Chandler 
Pedestrian 
Chandler Heights Road 
Recker Road 
Ellsworth Road 
4.0 
Near 
Gilbert 
Queen 
Creek 
Bicycle 
Chandler Heights Road1 
0.25 miles west of Lindsay 
Road 
Val Vista Drive 
1.3 
Near 
Chandler 
Gilbert 
PM-10 
Cooper Road 
Riggs Road 
Kaibab Place 
1.7 
Near 
Chandler 
Safety 
Dobson Road3 
SR-202L 
McKellips Road 
1.3 
Long 
ITS 
Higley Road 
Stacey Road 
Mews Road 
0.6 
Long 
Gilbert 
Structures 
Hunt Highway 
Higley Road 
Ellsworth Road 
5.0 
Near 
Queen 
Creek 
Pavement 
Preservation 
Lindsay Road 
Spur Road 
Appleby Road 
0.3 
Near 
Chandler 
Gilbert 
Drainage 
Lime Drive 
Watford Drive 
San Tan Boulevard 
0.1 
Near 
Mary Street 
Gilbert Drive 
Curry Road 
0.3 
Near 
MASH Northeast Area; 
multiple roads 
Limits: 75th Avenue (west), Bush Highway (east), Hunt 
Highway (south), New River Road (north) 
6.4 
Near 
McKellips Road 
McClintock Drive/Hayden 
Road 
- 
- 
Near 
Ocotillo Road 
148th Street 
Greenfield Road 
1.4 
Mid 
Gilbert 
Power Road 
Hunt Highway 
Riggs Road 
1.0 
Long 
Gilbert 
Queen 
Creek 
Sun Lakes Area 
Limits: Sun Lakes Boulevard (west), Alma School Road (east), 
Riggs Road (south), Champagne Drive/Halley Drive (north) 
- 
Near 
District 1  |  12

1Project includes gap(s) in MCDOT jurisdiction 
2A new structure would be needed to complete the connection 
3New roadway  
4Only capacity projects were combined when overlapping with other project types. Other project types may overlap but were not combined. 
Project Roadway 
From/At 
To 
Length 
(miles) 
Horizon 
Needs 
(Capacity, Pedestrian, Bicycle, PM-10, Safety, ITS, Structure, 
Pavement Preservation, Drainage) 
Potential 
Partners 
Legend 
Sun Lakes; multiple roads 
Limits: Dobson Road (west), Ribbonwood Drive (east), Hunt 
Highway (south), Riggs Road (north) 
11.9 
Near 
Capacity 
Sun Lakes; multiple roads 
Limits: Old Price Road (west), Dobson Road (east), Hunt 
Highway (south), Riggs Road (north) 
20.4 
Near 
Pedestrian 
Warner Road 
Power Road 
80th Street 
1.5 
Near 
Bicycle 
PM-10 
Safety 
ITS 
Structures 
Pavement 
Preservation 
Drainage 
District 1  |  13

Maricopa County
2
0
6
12
Miles I
REFERENCE LAYERS
Service Layer Credits:  Addtional Sources:  Maricopa County; Flood Control District of
Maricopa County (FCD); Arizona Department of Transportation (ADOT); Arizona State Land
Resource Information System (ALRIS)
Map Updated: 8/6/2021
Board of Supervisors
District Boundary
Incorporated
Maricopa County
County Boundary
Major Roadways
Featured Layer
Projects
Spot Projects
Corridor Projects
Projects Map: District - 2
District 2 | 14

1Project includes gap(s) in MCDOT jurisdiction 
2A new structure would be needed to complete the connection 
3New roadway  
4Only capacity projects were combined when overlapping with other project types. Other project types may overlap but were not combined. 
Projects List District - 2
Project Roadway 
From/At 
To 
Length 
(miles) 
Horizon 
Needs 
(Capacity, Pedestrian, Bicycle, PM-10, Safety, ITS, Structure, 
Pavement Preservation, Drainage) 
Potential 
Partners 
Legend 
1st Street 
Merrill Road 
Valley Verde 
0.1 
Near 
Capacity 
56th Street 
100 feet south of Albany 
Street 
University Drive 
0.3 
Near 
Pedestrian 
58th Street 
Main Street 
Casper Street 
0.6 
Near 
Bicycle 
96th Street 
Southern Avenue 
Apache Trail 
1.5 
Near 
PM-10 
96th Street 
University Drive 
Brown Road 
1.0 
Near 
Safety 
Alma School Road 
0.2 miles south of McKellips 
Road 
McKellips Road 
0.2 
Near 
ITS 
Avalon Street 
67th Avenue 
Power Road 
0.2 
Near 
Structures 
Chaparral Road 
Dobson Road 
- 
- 
Near 
Pavement 
Preservation 
Crismon Road 
101st Street 
McKellips Road 
3.0 
Near 
Drainage 
Deer Trail Road 
Cave Creek Road 
Manana Road 
1.8 
Near 
Old Mine Road 
Deer Trail Road 
Hohokkam Lane 
Near 
Dobson Road3 
SR-202L 
McKellips Road 
1.3 
Long 
East Valley, North of US-60 
Limits: 56th Street (west), Meridian Road (east), Southern 
Avenue (south), Brown Drive (north) 
- 
Near 
Ellsworth Road 
US-60 
Apache Trail 
1.9 
Near 
Ellsworth Road 
US-60 
Apache Trail 
1.9 
Near 
Gilbert Road 
Thomas Road 
SR-87 
1.9 
Near 
District 2 |  15

1Project includes gap(s) in MCDOT jurisdiction 
2A new structure would be needed to complete the connection 
3New roadway  
4Only capacity projects were combined when overlapping with other project types. Other project types may overlap but were not combined. 
Project Roadway 
From/At 
To 
Length 
(miles) 
Horizon 
Needs 
(Capacity, Pedestrian, Bicycle, PM-10, Safety, ITS, Structure, 
Pavement Preservation, Drainage) 
Potential 
Partners 
Legend 
Iris Road 
101st Street 
103rd Street 
0.3 
Near 
Capacity 
La Plata Road 
Old Mine Road 
Blue Wash Road 
2.1 
Near 
Pedestrian 
Tonto Road 
La Plata Road 
Blue Wash Road 
Bicycle 
Blue Wash Road 
Old Mine Road 
La Plata Road 
PM-10 
Lone Mountain Road 
48th Street 
68th Street 
2.3 
Long 
Phoenix 
Safety 
MASH Northeast Area; 
multiple roads 
Limits: 75th Avenue (west), Bush Highway (east), Hunt 
Highway (south), New River Road (north) 
6.4 
Near 
ITS 
MASH Northeast Area; 
multiple roads4 
Limits: 75th Avenue (west), South Lake Road (east), Acoma 
Drive (south), Mingus Road (north) 
22.0 
Near 
Structures 
McDowell Road 
92nd Street 
- 
- 
Near 
Pavement 
Preservation 
McDowell Road 
Alma School Road 
- 
- 
Near 
Drainage 
McDowell Road Vicinity, East 
Valley 
Limits: 92nd Street (west), Gilbert Road (east), McKellips Road 
(south), Chaparral Road (north) 
- 
Near 
McKellips Road 
McClintock Drive 
SR-101L 
1.0 
Near 
McKellips Road 
McClintock Road 
SR-101L 
1.0 
Near 
McKellips Road 
Alma School Road 
- 
- 
Near 
McKellips Road 
Dobson Road 
- 
- 
Near 
McKellips Road 
Longmore Road 
- 
- 
Near 
McKellips Road 
McClintock Drive/Hayden 
Road 
- 
- 
Near 
District 2 |  16

1Project includes gap(s) in MCDOT jurisdiction 
2A new structure would be needed to complete the connection 
3New roadway  
4Only capacity projects were combined when overlapping with other project types. Other project types may overlap but were not combined. 
Project Roadway 
From/At 
To 
Length 
(miles) 
Horizon 
Needs 
(Capacity, Pedestrian, Bicycle, PM-10, Safety, ITS, Structure, 
Pavement Preservation, Drainage) 
Potential 
Partners 
Legend 
McLellan Road 
103rd Street 
106th Way 
0.7 
Near 
Capacity 
104th Street 
101st Street 
McLellan Road 
Pedestrian 
Meridian Road 
Baseline Road 
Brown Road 
4.0 
Long 
Mesa 
Apache 
Junction 
Bicycle 
Merrill Road 
University Drive 
Adobe Road 
0.5 
Near 
PM-10 
Power Road 
Nunneley Road 
Redfield Road 
1.9 
Near 
Gilbert 
Mesa 
Safety 
Recker Road 
University Drive 
Colby Street 
0.2 
Near 
ITS 
Rio Verde Drive1 
136th Street 
Forest Road 
6.6 
Near 
Scottsdale 
Structures 
Sossaman Road 
Warner Road 
Peralta Road 
1.5 
Long 
Mesa 
Pavement 
Preservation 
Southeast Signals 
Power Road 
Warner Road 
1.0 
Near 
Drainage 
Power Road 
Elliot Road 
Southern Avenue 
96th Street 
Meridian Road 
2.5 
Mid 
Mesa 
Sunaire Drive 
Avalon Street 
Akron Street 
0.1 
Near 
Tonto Hills; multiple roads 
Limits: Hohokam Lane (west), La Plata Road (east), Kachina 
Road (south), Blue Wash Road (north) 
11.3 
Near 
University Drive 
East of Ellsworth Road 
West of Payton Street 
2.8 
Near 
University Drive 
Ellsworth Road 
Meridian Road 
3.0 
Near 
District 2 |  17

Maricopa County
3
0
5
10
Miles I
Service Layer Credits:  Addtional Sources:  Maricopa County; Flood Control District of
Maricopa County (FCD); Arizona Department of Transportation (ADOT); Arizona State Land
Resource Information System (ALRIS)
Map Updated: 8/6/2021
Featured Layer
REFERENCE LAYERS
Board of Supervisors
District Boundary
Incorporated
Maricopa County
County Boundary
Major Roadways
Projects
Spot Projects
Corridor Projects
Projects Map: District - 3
District 3 |  18

1Project includes gap(s) in MCDOT jurisdiction 
2A new structure would be needed to complete the connection 
3New roadway  
4Only capacity projects were combined when overlapping with other project types. Other project types may overlap but were not combined. 
Projects List District - 3
Project Roadway 
From/At 
To 
Length 
(miles) 
Horizon 
Needs 
(Capacity, Pedestrian, Bicycle, PM-10, Safety, ITS, Structure, 
Pavement Preservation, Drainage) 
Potential 
Partners 
Legend 
3rd Avenue 
Honda Bow Road 
Circle Mountain Road 
0.9 
Near 
Capacity 
3rd Street 
Linda Lane 
Honda Bow Road 
0.5 
Near 
Pedestrian 
6th Street 
Mano Drive 
Venado Drive 
1.1 
Near 
Bicycle 
Venado Drive 
New River Road 
6th Street 
PM-10 
7th Avenue 
Honda Bow Road 
Cavalry Road 
0.8 
Near 
Safety 
Calvary Road 
7th Avenue 
3rd Avenue 
ITS 
7th Street 
Linda Lane 
Honda Bow Road 
0.3 
Near 
Structures 
10th Street 
Dove Valley Road 
Paint Your Wagon Trail 
0.5 
Near 
Pavement 
Preservation 
11th Avenue 
Honda Bow Road 
13th Avenue 
1.5 
Near 
Drainage 
13th Avenue 
11th Avenue 
Circle Mountain Road 
Circle Mountain Road 
13th Avenue 
3rd Avenue 
13th Avenue 
Mingus Road 
Lazy K Ranch Road 
0.6 
Near 
Lazy K Ranch Road 
15th Avenue 
11th Avenue 
16th Street 
Gaffney Road 
Venado Drive 
0.4 
Near 
20th Street 
Cloud Road 
Tamar Road 
1.3 
Near 
40th Street 
Dynamite Boulevard 
Dale Lane 
0.3 
Near 
District 3 |  19

1Project includes gap(s) in MCDOT jurisdiction 
2A new structure would be needed to complete the connection 
3New roadway  
4Only capacity projects were combined when overlapping with other project types. Other project types may overlap but were not combined. 
Project Roadway 
From/At 
To 
Length 
(miles) 
Horizon 
Needs 
(Capacity, Pedestrian, Bicycle, PM-10, Safety, ITS, Structure, 
Pavement Preservation, Drainage) 
Potential 
Partners 
Legend 
Anthem Area 
Limits: I-17 (west), Daisy Mountain Drive (east), Pioneer Road 
(south), Anthem Way (north) 
- 
Near 
Capacity 
Carefree Highway 
7th Street 
24th Street 
2.0 
Near 
Pedestrian 
Circle Mountain Road 
New River Road 
10th Street 
0.8 
Near 
Bicycle 
Desert Hills Drive 
17th Avenue 
14th Avenue 
0.9 
Near 
PM-10 
Fig Springs Road 
New River Road 
Central Avenue 
2.1 
Near 
Safety 
7th Avenue 
Fig Springs Road 
Lazy K Ranch Road 
ITS 
Central Avenue 
Mingus Road 
Country Road 
Structures 
Country Road 
3rd Avenue Alignment 
Central Avenue 
Pavement 
Preservation 
MASH Northeast Area; 
multiple roads 
Limits: 75th Avenue (west), Bush Highway (east), Hunt 
Highway (south), New River Road (north) 
6.4 
Near 
Drainage 
MASH Northeast Area; 
multiple roads4 
Limits: 75th Avenue (west), South Lake Road (east), Acoma 
Drive (south), Mingus Road (north) 
22.0 
Near 
Memorial Drive 
Gavilan Peak Parkway 
Whitman Drive 
2.0 
Near 
New River Road3 
Black Canyon Highway 
27th Avenue 
1.4 
Long 
New River Road 
Gibbons Road 
Gibbons Road 
0.1 
Near 
Pinnacle Vista Drive 
40th Street 
46th Street 
0.8 
Near 
Tanya Road 
16th Street 
16th Place 
0.3 
Near 
District 3 |  20

Maricopa County
4
0
6
12
Miles I
Service Layer Credits:  Addtional Sources:  Maricopa County; Flood Control District of
Maricopa County (FCD); Arizona Department of Transportation (ADOT); Arizona State Land
Resource Information System (ALRIS)
Map Updated: 8/6/2021
Featured Layer
REFERENCE LAYERS
Board of Supervisors
District Boundary
Incorporated
Maricopa County
County Boundary
Major Roadways
Projects
Spot Projects
Corridor Projects
Projects Map: District - 4
District 4 |  21

1Project includes gap(s) in MCDOT jurisdiction 
2A new structure would be needed to complete the connection 
3New roadway  
4Only capacity projects were combined when overlapping with other project types. Other project types may overlap but were not combined. 
Projects List: District - 4
Project Roadway 
From/At 
To 
Length 
(miles) 
Horizon 
Needs 
(Capacity, Pedestrian, Bicycle, PM-10, Safety, ITS, Structure, 
Pavement Preservation, Drainage) 
Potential 
Partners 
Legend 
79th Avenue 
Acoma Drive 
Country Gables Drive 
0.2 
Near 
Capacity 
83rd Avenue 
Northern Avenue 
Butler Drive 
0.5 
Near 
Peoria 
Pedestrian 
91st Avenue 
Pinnacle Peak Road 
Happy Valley Parkway 
1.0 
Near 
Peoria 
Bicycle 
99th Avenue 
US-60 
Beardsley Road 
5.9 
Near 
PM-10 
99th Avenue 
US-60 
Bell Road 
3.3 
Near 
Safety 
99th Avenue 
0.4 miles south of Northern 
Avenue 
Northern Avenue 
0.4 
Near 
Glendale 
ITS 
99th Avenue 
Olive Avenue 
Beardsley Road 
7.2 
Near 
Structures 
99th Avenue 
Olive Avenue 
Beardsley Road 
7.2 
Near 
Pavement 
Preservation 
107th Avenue1 
Williams Road 
Hatfield Road 
1.2 
Near 
Peoria 
Drainage 
111th Avenue 
Olive Avenue 
Peoria Avenue 
1.0 
Near 
111th Avenue1 
Peoria Avenue 
Thunderbird Boulevard 
2.0 
Near 
Youngtown 
117th Avenue 
Williams Drive 
Happy Valley Parkway 
2.0 
Long 
163rd Avenue 
White Wing Road 
Dove Valley Road 
0.1 
Near 
163rd Avenue 
Windstone Trail 
White Wing Road 
0.8 
Long 
191st Avenue 
McDowell Road 
Thomas Road 
1.0 
Near 
193rd Avenue 
Jomax Road 
Roadrunner Road 
0.5 
Near 
District 4 | 22

1Project includes gap(s) in MCDOT jurisdiction 
2A new structure would be needed to complete the connection 
3New roadway  
4Only capacity projects were combined when overlapping with other project types. Other project types may overlap but were not combined. 
Project Roadway 
From/At 
To 
Length 
(miles) 
Horizon 
Needs 
(Capacity, Pedestrian, Bicycle, PM-10, Safety, ITS, Structure, 
Pavement Preservation, Drainage) 
Potential 
Partners 
Legend 
211th Avenue2,3 
Sun Valley Parkway 
Patton Road 
5.7 
Long 
Surprise 
Capacity 
227th Avenue 
Lone Mountain Road 
Montgomery Road 
1.0 
Near 
Pedestrian 
Baseline Road 
Miller Road 
MC 85 
1.2 
Long 
Bicycle 
Bethany Home Road 
Litchfield Road 
El Mirage Road 
2.0 
Long 
Glendale 
PM-10 
Broadway Road 
 MC 85 
Rooks Road 
1.0 
Long 
Buckeye 
Safety 
Camelback Road 
146th Avenue 
0.2 miles west of Ball Park 
Boulevard 
3.9 
Near 
Litchfield 
Park 
Phoenix 
ITS 
Citrus Road1 
Yuma Road 
Cactus Road 
11.0 
Long 
Goodyear 
Glendale 
Surprise 
Structures 
Cotton Lane1 
Bethany Home Road 
Peoria Avenue 
4.0 
Near 
Goodyear 
Surprise 
Pavement 
Preservation 
Deer Valley Access Road 
Deer Valley Drive 
El Mirage Road 
0.2 
Near 
Drainage 
Del Webb Boulevard 
Palmeras Drive 
99th Avenue 
1.0 
Near 
Del Webb Boulevard 
99th Avenue 
Bell Road 
0.3 
Near 
Dove Valley Road 
171st Avenue 
163rd Avenue 
1.0 
Near 
Dove Valley Road/Center 
Street 
US-60 
211th Avenue 
1.0 
Mid 
Surprise 
Dysart Road 
Las Cruces Drive 
Rose Lane 
2.2 
Near 
Dysart Road 
Las Cruces Drive 
Glendale Avenue 
2.9 
Near 
El Mirage Road 
Bethany Home Road 
Northern Avenue 
2.0 
Near 
El Mirage 
Glendale 
Galvin Street 
0.4 miles east of 219th 
Avenue 
211th Avenue 
0.6 
Near 
District 4 |  23

1Project includes gap(s) in MCDOT jurisdiction 
2A new structure would be needed to complete the connection 
3New roadway  
4Only capacity projects were combined when overlapping with other project types. Other project types may overlap but were not combined. 
Project Roadway 
From/At 
To 
Length 
(miles) 
Horizon 
Needs 
(Capacity, Pedestrian, Bicycle, PM-10, Safety, ITS, Structure, 
Pavement Preservation, Drainage) 
Potential 
Partners 
Legend 
Greenway Road 
195th Avenue 
Roosevelt Irrigation District 
Canal 
2.0 
Mid 
Surprise 
Capacity 
Greenway Road 
99th Avenue 
91st Avenue 
0.9 
Near 
Pedestrian 
Happy Valley Road 
Dysart Road 
Vistancia Boulevard 
1.6 
Mid 
Bicycle 
Indian School Road 
El Mirage Road 
99th Avenue 
2.8 
Near 
PM-10 
Indian School Road3 
201st Avenue 
SR-303L 
4.1 
Near 
Goodyear 
Safety 
Jackrabbit Trail/Tuthill Road1 
I-10
Denton Street 
3.6 
Near 
Buckeye 
ITS 
Jackrabbit Trail/Tuthill Road1 
Queen Creek Road 
MC 85 
8.2 
Mid 
Goodyear 
Buckeye 
Structures 
Jackrabbit Trail1 
MC 85 
I-10
5.8 
Long 
Buckeye 
Pavement 
Preservation 
Jomax Road 
El Granada Boulevard 
Dysart Road 
0.5 
Mid 
Surprise 
Peoria 
Drainage 
Lone Mountain Road 
Crozier Road 
215th Avenue 
0.5 
Near 
Lower Buckeye Road 
Cotton Lane 
Sarival Avenue 
1.0 
Mid 
Goodyear 
Lower Buckeye Road3 
Rainbow Road 
Verrado Way 
2.0 
Long 
Buckeye 
MASH Northeast Area; 
multiple roads 
Limits: 75th Avenue (west), Bush Highway (east), Hunt 
Highway (south), New River Road (north) 
6.4 
Near 
MASH Northeast Area; 
multiple roads4 
Limits: 75th Avenue (west), South Lake Road (east), Acoma 
Drive (south), Mingus Road (north) 
22.0 
Near 
MASH Northwest Area; 
multiple roads 
Limits: 107th Avenue (west) 91st Avenue (east), Alabama 
Avenue (south), Beardsley Road (north) 
4.8 
Near 
MC 85 
MC 85 
Verrado Way 
0.6 
Near 
MC 85 
Baseline Road 
0.3 miles east of Dean Road 
2.5 
Near 
Buckeye 
District 4 |  24

1Project includes gap(s) in MCDOT jurisdiction 
2A new structure would be needed to complete the connection 
3New roadway  
4Only capacity projects were combined when overlapping with other project types. Other project types may overlap but were not combined. 
Project Roadway 
From/At 
To 
Length 
(miles) 
Horizon 
Needs 
(Capacity, Pedestrian, Bicycle, PM-10, Safety, ITS, Structure, 
Pavement Preservation, Drainage) 
Potential 
Partners 
Legend 
MC 85 
Tuthill Road 
Lower Buckeye Road 
8.7 
Near 
Buckeye 
Goodyear 
Capacity 
McDowell Road1 
195th Avenue 
SR-303L 
2.9 
Long 
Buckeye 
Goodyear 
Pedestrian 
Meeker Boulevard 
US-60 
Beardsley Road 
2.6 
Near 
Bicycle 
Miller Road 
Tonopah Salome Highway 
Van Buren Street 
1.0 
Near 
PM-10 
Northern Avenue 
0.5 miles east of El Mirage 
Road 
67th Avenue/US-60 
6.5 
Near 
Glendale 
Peoria 
Safety 
Northern Avenue3 
Jackrabbit Trail 
SR-303L 
3.5 
Mid 
Glendale 
ITS 
Olive Avenue1 
White Tank Mountain Road 
SR-101L 
13.7 
Mid 
Glendale 
El Mirage 
Youngtown 
Peoria 
Structures 
Palo Verde Road 
Roosevelt Irrigation District 
Roosevelt Irrigation District 
0.2 
Near 
Pavement 
Preservation 
Patton Road 
251st Drive 
US-60 
7.1 
Mid 
Buckeye 
Drainage 
Peak View Road 
205th Avenue 
203rd Avenue 
0.4 
Near 
205th Avenue 
Peak View Road 
Skinner Drive 
Skinner Drive 
205th Lane 
205th Avenue 
Peoria Avenue1,2,3 
Jackrabbit Trail 
99th Avenue 
12.7 
Long 
Surprise 
Glendale 
El Mirage 
Youngtown 
Perryville Road1,3 
Van Buren Street 
Cactus Road 
9.2 
Mid 
Buckeye 
Goodyear 
Glendale 
Surprise 
Reems Road 
Northern Parkway 
Peoria Avenue 
1.5 
Long 
Glendale 
Surprise 
Rockaway Hills Drive 
256th Avenue 
0.4 miles east of 251st 
Avenue 
0.7 
Near 
District 4 |  25

1Project includes gap(s) in MCDOT jurisdiction 
2A new structure would be needed to complete the connection 
3New roadway  
4Only capacity projects were combined when overlapping with other project types. Other project types may overlap but were not combined. 
Project Roadway 
From/At 
To 
Length 
(miles) 
Horizon 
Needs 
(Capacity, Pedestrian, Bicycle, PM-10, Safety, ITS, Structure, 
Pavement Preservation, Drainage) 
Potential 
Partners 
Legend 
Southern Avenue 
Perryville Road 
Extension CSR 
1.1 
Near 
Capacity 
Stardust Boulevard 
Sunglow Drive 
Amigo Drive 
1.0 
Near 
Pedestrian 
Sun City Area 
Limits: Del Webb Boulevard/107th Avenue (west), Burns 
Drive/Lindgren Avenue (east), Thunderbird Boulevard (south), 
Union Hills Drive (north) 
- 
Near 
Bicycle 
Sun City West Area 
Limits: Sunrise Boulevard (west), 113th Avenue (east), Bell 
Road (south), Happy Valley Parkway (north) 
- 
Near 
PM-10 
Sun City West4 
Limits: US-60 (west), El Mirage Road (east), Bell Road (south), 
Deer Valley Drive (north) 
- 
Near 
Safety 
Sun City West; multiple roads 
Limits: US-60 (west), 115th Avenue (east), Meeker Boulevard 
(south), R H Johnson Boulevard (north) 
3.8 
Near 
ITS 
Sun City; South of Grand 
Avenue Area 
Limits: Litchfield Road (west), 99th Avenue (east), Olive 
Avenue (south), Winsor Drive (north) 
- 
Near 
Structures 
Sun Valley Parkway 
0.5 miles west of Crozier 
Extension 
183rd Avenue 
1.2 
Long 
Surprise 
Pavement 
Preservation 
Thunderbird Boulevard 
111th Avenue 
Del Webb Boulevard 
0.5 
Near 
Drainage 
Thunderbird Boulevard 
99th Avenue 
Boswell Boulevard 
0.6 
Near 
Peoria 
Thunderbird Boulevard 
Dell Webb Boulevard 
99th Avenue 
1.3 
Near 
Union Hills Road 
107th Avenue 
99th Avenue 
0.6 
Near 
Peoria 
Vulture Mine Road 
Vulture Ranch Road 
Mile Post 21 
16.3 
Near 
Waddell Road1,2 
Jackrabbit Trail 
SR-303L 
4.2 
Long 
Surprise 
West Signals South of I-10 
Salome Highway at Wintersburg Road 
- 
Near 
West Valley, I-10 to Grand 
Avenue 
Limits: Litchfield Road (west), 91st Avenue (east), McDowell 
Road (south) Bethany Home Road (north) 
- 
Near 
District 4 |  26

1Project includes gap(s) in MCDOT jurisdiction 
2A new structure would be needed to complete the connection 
3New roadway  
4Only capacity projects were combined when overlapping with other project types. Other project types may overlap but were not combined. 
Project Roadway 
From/At 
To 
Length 
(miles) 
Horizon 
Needs 
(Capacity, Pedestrian, Bicycle, PM-10, Safety, ITS, Structure, 
Pavement Preservation, Drainage) 
Potential 
Partners 
Legend 
West Valley, Other Signals 
Northern Avenue 
Reems Road 
2.0 
Near 
Capacity 
Northern Avenue 
Litchfield Road 
Pedestrian 
Williams Drive 
El Mirage Road 
117th Avenue 
1.2 
Near 
Bicycle 
Yuma Road 
Jackrabbit Trail 
Perryville Road 
1.3 
Mid 
Goodyear 
PM-10 
Safety 
ITS 
Structures 
Pavement 
Preservation 
Drainage 
District 4 |  27

Maricopa County
5
0
10
20
Miles I
Service Layer Credits:  Addtional Sources:  Maricopa County; Flood Control District of
Maricopa County (FCD); Arizona Department of Transportation (ADOT); Arizona State Land
Resource Information System (ALRIS)
Map Updated: 8/6/2021
Featured Layer
REFERENCE LAYERS
Board of Supervisors
District Boundary
Incorporated
Maricopa County
County Boundary
Major Roadways
Projects
Spot Projects
Corridor Projects
Projects Map: District - 5
District 5 |  28

1Project includes gap(s) in MCDOT jurisdiction 
2A new structure would be needed to complete the connection 
3New roadway  
4Only capacity projects were combined when overlapping with other project types. Other project types may overlap but were not combined. 
Projects List: District - 5
Project Roadway 
From/At 
To 
Length 
(miles) 
Horizon 
Needs 
(Capacity, Pedestrian, Bicycle, PM-10, Safety, ITS, Structure, 
Pavement Preservation, Drainage) 
Potential 
Partners 
Legend 
30th Drive 
Olney Avenue 
Elliot Road 
0.2 
Near 
Capacity 
35th Avenue 
Carver Road 
McNeil Street 
0.7 
Near 
Pedestrian 
43rd Avenue 
Southern Avenue 
Broadway Road 
0.8 
Near 
Phoenix 
Bicycle 
59th Avenue 
Roosevelt Canal 
Buckeye Road 
0.5 
Near 
PM-10 
67th Avenue1 
Baseline Road 
Broadway Road 
2.2 
Mid 
Phoenix 
Safety 
75th Avenue2,3 
Leodra Lane 
Broadway Road 
1.5 
Near 
Phoenix 
ITS 
91st Avenue 
Salt River 
Salt River 
0.1 
Near 
Structures 
91st Avenue 
0.25 miles north of Sunland 
Road 
Broadway Road 
0.5 
Long 
Phoenix 
Pavement 
Preservation 
186th Avenue 
Rustler Road 
0.3 miles north of Rustler 
Road 
0.3 
Near 
Drainage 
191st Avenue 
192nd Avenue 
Arlington Road 
0.4 
Near 
222nd Avenue 
Crivello Road 
Eagle Mountain Road 
0.4 
Near 
AZ-238/Maricopa Road 
Sonoran Park Entrance 
End of County Road 
17.0 
Near 
Baseline Road 
71st Avenue 
SR-202L 
1.2 
Mid 
Phoenix 
Broadway Road 
79th Avenue 
51st Avenue 
3.5 
Near 
Phoenix 
Buckeye Road 
107th Avenue 
- 
- 
Near 
Buckeye Road 
 107th Avenue 
- 
- 
Near 
District 5 |  29

1Project includes gap(s) in MCDOT jurisdiction 
2A new structure would be needed to complete the connection 
3New roadway  
4Only capacity projects were combined when overlapping with other project types. Other project types may overlap but were not combined. 
Project Roadway 
From/At 
To 
Length 
(miles) 
Horizon 
Needs 
(Capacity, Pedestrian, Bicycle, PM-10, Safety, ITS, Structure, 
Pavement Preservation, Drainage) 
Potential 
Partners 
Legend 
Buckeye Road 
83rd Avenue 
- 
- 
Near 
Capacity 
Dean Road 
Eagle Mountain Road 
0.1 miles north of Eagle 
Mountain Road 
0.1 
Near 
Pedestrian 
Dobbins Road 
35th Avenue 
27th Avenue 
1.0 
Mid 
Phoenix 
Bicycle 
Dobbins Road 
51st Avenue 
0.4 miles east of 51st Avenue 
0.4 
Long 
Phoenix 
PM-10 
Elliot Road 
215th Avenue 
Airport Road 
0.5 
Near 
Safety 
Hidalgo Avenue 
129th Avenue 
0.2 miles east of 129th 
Avenue 
0.2 
Near 
ITS 
Jackrabbit Trail/Tuthill Road1 
Queen Creek Road 
MC 85 
8.2 
Mid 
Goodyear 
Buckeye 
Structures 
Lower Buckeye Road 
71st Avenue 
67th Avenue 
0.5 
Near 
Phoenix 
Pavement 
Preservation 
Lower Buckeye Road 
Cotton Lane 
Sarival Avenue 
1.0 
Mid 
Goodyear 
Drainage 
Lower Buckeye Road1 
MC 85 
0.2 miles east of 107th 
Avenue 
4.5 
Near 
Avondale 
Goodyear 
MASH Northeast Area; 
multiple roads 
Limits: 75th Avenue (west), Bush Highway (east), Hunt 
Highway (south), New River Road (north) 
6.4 
Near 
MASH South Area; multiple 
roads 
Limits: Old US 80 (west), 99th Avenue (east), Patterson Road 
(south), Southern Avenue (north) 
0.2 
Near 
MC 85 
107th Avenue 
75th Avenue 
4.0 
Near 
MC 85 
Tuthill Road 
Lower Buckeye Road 
8.7 
Near 
Buckeye 
Goodyear 
MC 85 and Lower Buckeye 
Road 
Limits: Jackrabbit Trail (west), I-10 (east), Pecos Road 
(south), McDowell Road (north) 
- 
Near 
McDowell Road 
91st Avenue 
83rd Avenue 
1.0 
Near 
McDowell Road 
91st Avenue 
83rd Avenue 
1.0 
Near 
District 5 |  30

1Project includes gap(s) in MCDOT jurisdiction 
2A new structure would be needed to complete the connection 
3New roadway  
4Only capacity projects were combined when overlapping with other project types. Other project types may overlap but were not combined. 
Project Roadway 
From/At 
To 
Length 
(miles) 
Horizon 
Needs 
(Capacity, Pedestrian, Bicycle, PM-10, Safety, ITS, Structure, 
Pavement Preservation, Drainage) 
Potential 
Partners 
Legend 
McDowell Road 
SR-101L 
91st Avenue 
0.8 
Near 
Tolleson 
Phoenix 
Capacity 
Narramore Road 
Dean Road 
Airport Road 
2.0 
Near 
Pedestrian 
Northern Avenue 
0.5 miles east of El Mirage 
Road 
67th Avenue/US-60 
6.5 
Near 
Glendale 
Peoria 
Bicycle 
Old US 80 
Mile Post 22 
Agua Caliente Extension Road 
0.3 
Near 
PM-10 
Old US 80 
Desert Rose Road 
319th Avenue 
0.1 
Near 
Safety 
Queen Creek Road 
195th Avenue 
187th Avenue 
1.0 
Near 
ITS 
Riggs Road 
195th Avenue 
187th Avenue 
1.0 
Near 
Structures 
Shawnee Drive 
37th Avenue 
35th Avenue 
0.3 
Near 
Pavement 
Preservation 
Southern Avenue 
51st Avenue 
37th Lane 
1.9 
Near 
Phoenix 
Drainage 
Southern Avenue 
75th Avenue 
59th Avenue 
2.0 
Near 
Phoenix 
West Valley, I-10 to Grand 
Avenue 
Limits: Litchfield Road (west), 91st Avenue (east), McDowell 
Road (south) Bethany Home Road (north) 
- 
- 
Near 
District 5 |  30