DocuSign Envelope ID: BFD9DAC0-A5B8-4A2A-9993-378C715944EE
Maricopa County Department of Transportation 
Title VI Assurances
The Maricopa County Department of Transportation (herein referred to as the “Recipient”), HEREBY 
AGREES THAT, as a condition to receiving any Federal financial assistance from the U.S. Department of 
Transportation (DOT), through Federal Highway Administration and Arizona Department of Transportation,
is subject to and will comply with the following:
Statutory/Regulatory Authorities
ͻ
Title VI of the Civil Rights Act of 1964 (42 U.S.C. § 2000d et seq., 78 stat. 252), (prohibits 
discrimination on the basis of race, color, national origin); 
ͻ
49 C.F.R. Part 21 (entitled Non-discrimination In Federally-Assisted Programs of the Department of 
Transportation—Effectuation of Title VI of the Civil Rights Act of 1964); 
ͻ
28 C.F.R. section 50.3 (U.S. Department of Justice Guidelines for Enforcement of Title VI of the 
Civil Rights Act of 1964); 
The preceding statutory and regulatory cites hereinafter are referred to as the “Acts” and “Regulations,” 
respectively.
General Assurances
In accordance with the Acts, the Regulations, and other pertinent directives, circulars, policy, memoranda 
and/or guidance, the Recipient hereby gives assurances that it will promptly take any measures necessary to 
ensure that:
“No person in the United States shall, on the grounds of race, color, or national origin, be excluded 
from participation in, be denied the benefits of, or be otherwise subjected to discrimination under any 
program or activity,” for which the Recipient receives Federal financial assistance from DOT, 
including the Federal Highway Administration.
The Civil Rights Restoration Act of 1987 clarified the original intent of Congress, with respect to Title VI 
and other Non-discrimination requirements (The Age Discrimination Act of 1975, and Section 504 of the 
Rehabilitation Act of 1973), by restoring the broad, institutional-wide scope and coverage of these non-
discrimination statutes and requirements to include all programs and activities of the Recipient, so long as 
any portion of the program is Federally assisted.
	



DocuSign Envelope ID: BFD9DAC0-A5B8-4A2A-9993-378C715944EE
Specific Assurances
More specifically, and without limiting the above general Assurance, the Recipient agrees with and gives the 
following Assurances with respect to its Federal Aid Highway Program.
1. The Recipient agrees that each “activity,” “facility,” or “program,” as defined in §§ 21.23 (b) and
21.23 (e) of 49 C.F.R. § 21 will be (with regard to an “activity”) facilitated, or will be (with regard to 
a “facility”) operated, or will be (with regard to a “program”) conducted in compliance with all 
requirements imposed by, or pursuant to the Acts and the Regulations.
2. The Recipient will insert the following notification in all solicitations for bids, Requests For
Proposals for work, or material subject to the Acts and the Regulations made in connection with all 
Federal Aid Highway Program and, in adapted form, in all proposals for negotiated agreements 
regardless of funding source:
“The Maricopa County Department of Transportation, in accordance with the provisions of 
Title VI of the Civil Rights Act of 1964 (78 Stat. 252.42 U.S.C. §§ 2000d-4) and the 
Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract 
entered into pursuant to this advertisement, disadvantaged business enterprises will be 
afforded full and fair opportunity to submit bids in response to this invitation and will not be 
discriminated against on the grounds of race, color, or national origin in consideration for an
award.”
3. The Recipient will insert the clauses of Appendix A and E of this Assurance in every contract or 
agreement subject to the Acts and the Regulations.
4.
The Recipient will insert the clauses of Appendix B of this Assurance, as a covenant running with 
the land, in any deed from the United States effecting or recording a transfer of real property, 
structures, use, or improvements thereon or interest therein to a Recipient.
5. That where the Recipient receives Federal financial assistance to construct a facility or part of a
facility, the Assurance will extend to the entire facility and facilities operated in connection 
therewith.
6. That where the Recipient receives Federal financial assistance in the form, or for the acquisition of 
real property or an interest in real property, the Assurance will extend to rights to space on, over, or 
under such property.
7. That the Recipient will include the clauses set forth in Appendix C and Appendix D of this 
Assurance, as a covenant running with the land, in any future deeds, leases, licenses, permits, or 
similar instruments entered into by the Recipient with other parties:
	



DocuSign Envelope ID: BFD9DAC0-A5B8-4A2A-9993-378C715944EE
a. for the subsequent transfer of real property acquired or improved under the applicable 
activity, project, or program; and
b. for the construction or use of, or access to, space on, over, or under real property acquired 
or improved under the applicable activity, project or program.
8. That this Assurance obligates the Recipient for the period during which Federal financial assistance is 
extended to the program, except where the Federal financial assistance is to provide, or is in the form 
of, personal property, or real property, or interest therein, or structures or improvements thereon, in 
which case the Assurance obligates the Recipient, or any transference for the longer of the following 
periods:
a. the period during which the property is used for a purpose for which the Federal financial 
assistance is extended, or for another purpose involving the provision of similar services or 
benefits; or
b. the period during which the Recipient retains ownership or possession of the property.
9. The Recipient will provide for such methods of administration for the program as are found by the 
Secretary of Transportation or the official whom he/she delegates specific authority to give 
reasonable guarantee that it, other recipients, sub-recipients, sub-grantees, contractors, 
subcontractors, consultants, transferees, successors in interest, and other participants of Federal 
financial assistance under such program will comply with all requirements imposed or pursuant to the 
Acts, the Regulations, and this Assurance.
10. The Recipient agrees that the United States has a right to seek judicial enforcement with regard to any 
matter arising under the Acts, the Regulations, and this Assurance.
By signing this ASSURANCE, Maricopa County Department of Transportation also agrees to comply (and 
require any sub-recipients, sub-grantees, contractors, successors, transferees, and/or assignees to comply) 
with all applicable provisions governing Federal Highway Administration or Arizona Department of 
Transportation access to records, accounts, documents, information, facilities, and staff. You also recognize 
that you must comply with any program or compliance reviews, and/or complaint investigations conducted 
by the Federal Highway Administration or Arizona Department of Transportation. You must keep records, 
reports, and submit the material for review upon request to Federal Highway Administration, Arizona 
Department of Transportation, or its designee in timely, complete, and accurate way. Additionally, you must 
comply with all other reporting, data collection, and evaluation requirements, as prescribed by law or 
detailed in program guidance.
	



DocuSign Envelope ID: BFD9DAC0-A5B8-4A2A-9993-378C715944EE
Maricopa County Department of Transportation gives this ASSURANCE in consideration of and for 
obtaining any Federal grants, loans, contracts, agreements, property, and/or discounts, or other Federal-aid 
and Federal financial assistance extended after the date hereof to the recipients by the U.S. Department of 
Transportation under the Federal Highway Administration and Arizona Department of Transportation. This 
ASSURANCE is binding on Arizona, other recipients, sub-recipients, sub-grantees, contractors, 
subcontractors and their subcontractors, transferees, successors in interest, and any other participants in the 
Federal Aid Highway Program The person(s) signing below is authorized to sign this ASSURANCE on 
behalf of the Recipient.
Maricopa County Department of Transportation
(Name of Recipient)
8/4/2020
by
DATED
(Signature of Authorized Official)
Attachments
Appendices A, B, C, D, E
	



DocuSign Envelope ID: BFD9DAC0-A5B8-4A2A-9993-378C715944EE
APPENDIX A
During the performance of this contract, the contractor, for itself, its assignees and successors in interest 
(hereinafter referred to as the “contractor”) agrees as follows:
1.
Compliance with Regulations: The contractor (hereinafter includes consultants) will comply with the 
Acts and the Regulations relative to Non-discrimination in Federally-assisted programs of the U.S. 
Department of Transportation, Federal Highway Administration or the Arizona Department of 
Transportation, as they may be amended from time to time, which are herein incorporated byreference 
and made a part of this contract.
2.
Nondiscrimination: The contractor, with regard to the work performance by it during the contract,will 
not discriminate on the grounds of race, color, or national origin in the selection and retention of 
subcontractors, including procurements of materials and leases of equipment. The contractor will not 
participate directly or indirectly in the discrimination prohibited by the Acts and the Regulations, 
including employment practices when the contract covers any activity, project, or program set forth in 
Appendix B of 49 CFR Part 21.
3.
Solicitations for Subcontractors, Including Procurements of Materials and Equipment: In all 
solicitations, either by competitive bidding, or negotiation made by the contractor for work to be 
performed under a subcontract, including procurements of materials, or leases of equipment, each 
potential subcontractor or supplier will be notified by the contractor of the contractor’s obligations under 
this contract and the Acts and Regulations relative to Non-discrimination on the grounds of race, color,or
national origin.
4.
Information and Reports: The contractor will provide all information and reports required by the Acts, 
the Regulations, and directives issued pursuant thereto and will permit access to its books, records, 
accounts, other sources of information, and its facilities as may be determined by the Recipient, the 
Federal Highway Administration or Arizona Department of Transportation to be pertinent to ascertain 
compliance with such Acts, Regulations, and instructions. Where any information required of a contractor 
is in the exclusive possession of another who fails or refuses to furnish the information, the contractorwill 
so certify to the Recipient, the Federal Highway Administration, or Arizona Department of 
Transportation, as appropriate, and will set forth what efforts it has made to obtain the information.
5.
Sanctions for Noncompliance: In the event of a contractor's noncompliance with the Non-discrimination 
provisions of this contract, the Recipient will impose such contract sanctions as it or the Federal Highway 
Administration or Arizona Department of Transportation, may determine to be appropriate, including, but 
not limited to:
a.
withholding payments to the contractor under the contract until the contractor complies; 
and/or
b.
cancelling, terminating, or suspending a contract, in whole or in part.
6.
Incorporation of Provisions: The contractor will include the provisions of paragraphs one through sixin 
every subcontract, including procurements of materials and leases of equipment, unless exempt by the 
Acts, the Regulations and directives issued pursuant thereto. The contractor will take action with respect 
to any subcontract or procurement as the Recipient, the Federal Highway Administration, or Arizona 
Department of Transportation may direct as a means of enforcing such provisions including sanctions for 
noncompliance. Provided, that if the contractor becomes involved in, or is threatened with litigation by a 
subcontractor or supplier because of such direction, the contractor may request the Recipient to enter into 
any litigation to protect the interests of the Recipient. In addition, the contractor may request the United 
States to enter into the litigation to protect the interests of the United States.
	



DocuSign Envelope ID: BFD9DAC0-A5B8-4A2A-9993-378C715944EE
APPENDIX B: CLAUSES FOR DEEDS TRANSFERRING UNITED 
STATES PROPERTY
The following clauses will be included in deeds effecting or recording the transfer of real property, 
structures, or improvements thereon, or granting interest therein from the United States pursuant to the 
provisions of Assurance 4.
NOW, THEREFORE, the U.S. Department of Transportation as authorized by law and upon the condition that 
Maricopa County Department of Transportation will accept title to the lands and maintain the project constructed 
thereon in accordance with Title 23, United States Code the Regulations for the Administration of Federal Aid for 
Highways, and the policies and procedures prescribed by the Arizona Department of Transportation, Federal 
Highway Administration and the U.S. Department of Transportation in accordance and in compliance with all 
requirements imposed by Title 49, Code of Federal Regulations, U.S. Department of Transportation, Subtitle A, 
Office of the Secretary, Part 21, Non-discrimination in Federally-assisted programs of the U.S. Department of 
Transportation pertaining to and effectuating the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat.
252;42 42 U.S.C. § 2000d to 2000d-4), does hereby remise, release, quitclaim and convey unto the Maricopa 
County Department of Transportation all the right, title and interest of the U.S. Department of Transportation in 
and to said lands described in Exhibit A attached hereto and made a part hereof.
(HABENDUM CLAUSE)
TO HAVE AND TO HOLD said lands and interests therein unto Maricopa County Department of Transportation 
and its successors forever, subject, however, to the covenants, conditions, restrictions and reservations herein 
contained as follows, which will remain in effect for the period during which the real property or structures are 
used for a purpose for which Federal financial assistance is extended or for another purpose involving the 
provision of similar services or benefits and will be binding on the Maricopa County Department of 
Transportation, its successors and assigns.
The Maricopa County Department of Transportation, in consideration of the conveyance of said lands and 
interests in lands, does hereby covenant and agree as a covenant running with the land for itself, its successors 
and assigns, that (1) no person will on the grounds of race, color, or national origin, be excluded from 
participation in, be denied the benefits of, or be otherwise subjected to discrimination with regard to any facility 
located wholly or in part on, over, or under such lands hereby conveyed [.] [and]* (2) that the Maricopa County 
Department of Transportation will use the lands and interests in lands and interests in lands so conveyed, in 
compliance with all requirements imposed by or pursuant to Title 49, Code of Federal Regulations, U.S. 
Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Non-discrimination in Federally-
assisted programs of the U.S. Department of Transportation, Effectuation of Title VI of the Civil Rights Act of 
1964, and as said Regulations and Acts may be amended, [and (3) that in the event of breach of any of the above-
mentioned non-discrimination conditions, the Department will have a right to enter or re-enter said lands and 
facilities on said land, and that above described land and facilities will thereon revert to and vest in and become 
the absolute property of the U.S. Department of Transportation and its assigns as such interest existed prior to this 
instruction].*
*Reverter clause and related language to be used only when it is determined that such a clause is necessary in 
order to make clear the purpose of Title VI.
	



DocuSign Envelope ID: BFD9DAC0-A5B8-4A2A-9993-378C715944EE
APPENDIX C: CLAUSES FOR TRANSFER OF REAL PROPERTY 
ACQUIRED OR IMPROVED UNDER THE ACTIVITY, FACILITY, OR 
PROGRAM
The following clauses will be included in deeds, licenses, leases, permits, or similar instruments entered 
into by the Maricopa County Department of Transportation pursuant to the provisions of Assurance 
7(a):
A. The (grantee, lessee, permittee, etc. as appropriate) for himself/herself, his/her heirs, personal 
representatives, successors in interest, and assigns, as a part of the consideration hereof, does hereby 
covenant and agree [in the case of deeds and leases add “as a covenant running with the land”] that:
1.
In the event facilities are constructed, maintained, or otherwise operated on the property 
described in this (deed, license, lease, permit, etc.) for a purpose for which a U.S. Department 
of Transportation activity, facility, or program is extended or for another purpose involving 
the provision of similar services or benefits, the (grantee, licensee, lessee, permittee, etc.) will 
maintain and operate such facilities and services in compliance with all requirements imposed 
by the Acts and Regulations (as may be amended) such that no person on the grounds of race, 
color, or national origin, will be excluded from participation in, denied the benefits of, or be 
otherwise subjected to discrimination in the use of said facilities,
B. With respect to licenses, leases, permits, etc., in the event of breach of any of the above 
Nondiscrimination covenants, Maricopa County Department of Transportation will have the right to 
terminate the (lease, license, permit, etc.) and to enter, re-enter, and repossess said lands and facilities 
thereon, and hold the same as if the (lease, license, permit, etc.) had never been made or issued.*
C. With respect to licenses, leases, permits, etc., in the event of breach of any of the above 
Nondiscrimination covenants, Maricopa County Department of Transportation will have the right to 
enter or re-enter the lands and facilities thereon, and the above described lands and facilities will 
there upon revert to and vest in and become the absolute property of the Maricopa County 
Department of Transportation and its assigns*.
*Reverter clause and related language to be used only when it is determined that such a clause is necessary to 
make clear the purpose of Title VI.
	



DocuSign Envelope ID: BFD9DAC0-A5B8-4A2A-9993-378C715944EE
APPENDIX D: CLAUSES FOR CONSTRUCTION/USE/ACCESS TO 
REAL PROPERTY ACQUIRED UNDER THE ACTIVITY, FACILITY OR 
PROGRAM
The following clauses will be included in deeds, licenses, permits, or similar instruments/agreements 
entered into by Maricopa County Department of Transportation pursuant to the provisions of 
Assurance 7(b):
A. The (grantee, licensee, permittee, etc., as appropriate) for himself/herself, his/her heirs, personal 
representatives, successors in interest, and assigns, as a part of the consideration hereof, does hereby 
covenant and agree (in the case of deeds and leases add, “as a covenant running with the land”) that
(1) no person on the ground of race, color, or national origin, will be excluded from participation in, 
denied the benefits of, or be otherwise subjected to discrimination in the use of said facilities, (2) that 
in the construction of any improvements on, over, or under such land, and the furnishing of services 
thereon, no person on the ground of race, color, or national origin, will be excluded from 
participation in, denied the benefits of, or otherwise be subjected to discrimination, (3) that the 
(grantee, licensee, lessee, permittee etc.) will use the premises in compliance with all other 
requirements imposed by or pursuant to the Acts and Regulations, as amended set forth in this 
Assurance.
B. With respect to (licenses, leases, permits, etc.), in the event of breach of any of the above 
Nondiscrimination covenants, Maricopa County Department of Transportation will have the right to 
terminate the (license, permit, etc., as appropriate) and to enter or re-enter or re-enter and repossess 
said land and the facilities thereon, and hold the same as if said (license, permit, etc., as appropriate) 
had never been made or issued.*
C. With respect to deeds, in the event of breach of any of the above Non-discrimination covenants, 
Maricopa County Department of Transportation will there upon revert to and vest in and become the 
absolute property of Maricopa County Department of Transportation and its assigns.*
*Reverter clause and related language to be used only when it is determined that such a clause is necessary 
in order to make clear the purpose of Title VI.
	



DocuSign Envelope ID: BFD9DAC0-A5B8-4A2A-9993-378C715944EE
APPENDIX E
During the performance of this contract, the contractor, for itself, its assignees, and successors in 
interest (hereinafter referred to as the “contractor”) agrees to comply with the following 
nondiscrimination statutes and authorities; including but not limited to:
Pertinent Non-Discrimination Authorities:
ͻ
Title VI of the Civil Rights Act of 1964 (42 U.S.C. § 2000d et seq., 78 stat. 252), (prohibits 
discrimination on the basis of race, color, national origin): and 49 CFR Part 21. 
ͻ
The Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, (42 U.S.C. §
4601), (prohibits unfair treatment of persons displaced or whose property has been acquired because 
of Federal or Federal-aid programs and projects); 
Federal-Aid Highway Act of 1973, (23 U.S.C. § 324 et seq.), (prohibits discrimination on the basis of 
sex);
ͻ
Section 504 of the Rehabilitation Act of 1973, (29 U.S.C. § 794 et seq.), as amended, (prohibits 
discrimination on the basis of disability); and 49 CFR Part 27; 
The Age Discrimination Act of 1975, as amended, (42 U.S.C. § 6101 et seq.), (prohibits 
discrimination on the basis of age);
Airport and Airway Improvement Act of 1982, (49 USC § 471, Section 47123), as amended, 
(prohibits discrimination based on race, creed, color, national origin, or sex);
ͻ
The Civil Rights Restoration Act of 1987, (PL 100-209), (Broadened the scope, coverage and 
applicability of Title VI of the Civil Rights Act of 1964, The Age Discrimination Act of 1975 and 
Section 504 of the Rehabilitation Act of 1973, by expanding the definition of the terms “programs or 
activities” to include all of the programs or activities of the Federal-aid recipients, sub-recipients and 
contractors, whether such programs or activities are Federally funded 
or not);
ͻ
Titles II and III of the Americans with Disabilities Act, which prohibit discrimination on the basis of 
disability in the operation of public entities, public and private transportation systems, places of 
public accommodation, and certain testing entities (42 U.S.C. §§ 12131-12189) as implemented by 
Department of Transportation regulations at 49 C.F.R. parts 37 and 38; 
ͻ
The Federal Aviation Administration’s Non-discrimination statute (49 U.S.C. § 47123) (prohibits 
discrimination on the basis of race, color, national origin, and sex); 
ͻ
Executive Order 12898, which ensures discrimination against minority populations by discouraging 
programs, policies, and activities with disproportionately high and adverse human health or 
environmental effects on minority and low-income populations; 
ͻ
Executive Order 13166, Improving Access to Services for Persons with Limited English Proficiency, 
and resulting agency guidance, national origin discrimination includes discrimination because of 
limited English proficiency (LEP). To ensure compliance with Title VI, you must take reasonable 
steps to ensure that LEP persons have meaningful access to your programs (70 Fed. Reg. at 74087 to 
74100); 
ͻ
Title IX of the Education Amendments of 1972, as amended, which prohibits you from 
discriminating because of sex in education programs or activities (20 U.S.C. 1687 et seq). 
	



	



EXHIBIT A - GENERAL SCOPE OF WORK 
FOR 
JOB ORDER CONTRACTING OF 
JOC ADA MODERNIZATION SERVICES 
CONTRACT NUMBER: 2021-XXX, XXX, XXX 
GENERAL 
The Contractor shall perform construction services for ADA accessible route improvements. No 
work assignment shall exceed $2,000,000 in total cost. The total of all work assignments shall not 
exceed $5,000,000 during any contract year. 
CONSTRUCTION SERVICES 
The work shall consist of supplying all labor, material, and equipment, for the construction of ADA 
compliant facilities. Work may include, but not limited to, construction of concrete sidewalks, curbs 
and gutters, curb ramps, and related construction activities. Related construction activities may 
include, but are not limited to, removal, disposal, relocation or replacement of existing concrete, 
asphaltic concrete pavement, valley gutters, drainage facilities, portland cement concrete 
pavement, driveway pavement, concrete structures, signage, pavement markings, detectable 
warnings (truncated domes), and construction traffic control for both vehicle & pedestrians. 
Roadway construction or reconstruction related to ADA improvements. 
WORK ASSIGNMENTS 
Each work assignment that is mutually agreed upon and issued by the County will define 
specific project requirements. 
All construction shall conform to the Uniform Standard Specifications and Standard Details for 
Public Works Construction published by the Maricopa Association of Governments (MAG) dated 
2020 (with most current revision or as noted in the work assignment documents) as modified by 
the Maricopa County Department of Transportation (MCDOT) Supplement to the MAG Uniform 
Standard Specifications and Details (most current edition or as noted in the work assignment 
documents), this scope of work, and the work assignment construction documents (plans and 
special provisions). 
Work assignments shall be undertaken only upon the issuance of a written notice to proceed. 
Work assignments shall set forth the following: 
1. Contract number and work assignment identification; 
2. The description of work including the location, list of work items, and applicable
special provisions and drawings; 
3. The period of performance and, if required by County, a work schedule; 
4. The calculated total price for the work to be performed; 
5. Fee proposal signed by the Contractor; and 
6. Approval Signatures by the County. 
	



Work assignments will be at various locations throughout Maricopa County. 
PAYMENTS 
Payment for individual work assignments will be based on unit prices that do not exceed the unit 
prices identified in the Unit Price List of Exhibit B. 
The amount of each work assignment will be the summation of the total amounts calculated for 
each item of the work assignment. The total amount for each item shall be the work assignment 
quantity times a unit price not exceeding the unit price listed in the Unit Price List of Exhibit B. 
Payment for each work assignment will be the calculated total amount for completed and 
accepted quantities of each item. 
The unit prices as identified in the Unit Price List, Exhibit B include all direct and indirect costs 
associated with each individual work assignment of this Job Order Contract. The unit prices 
include adjustments for the following: 
x
Direct labor, material and equipment costs 
x
Contractor’s jobsite General Conditions 
x
Contractor's home office overhead and profit 
x
Subcontractors' overhead and profit 
x
Insurance 
x
All costs associated with bonding (specifically including bond premiums) 
x
Employee payroll taxes, insurance and fringe benefits 
x
Business taxes, contributions, memberships, corporate headquarters support (legal, 
financial, etc.) 
x
Disposal of all waste and excess material 
x
Close out for the total contract and each work assignment 
x
Clean up 
x
Compliance with environmental laws (costs associated with performing work in 
compliance with county, state and federal regulations, including obtaining any necessary 
licenses and permits, reporting requirements, etc.) 
x
Compliance with safety, health, sanitation laws, and specifications (i.e., Contractor’s 
safety plan, face and clothing protection, etc.) 
x
Project management and supervision 
x
Quality control 
x
Depreciation of equipment 
x
Interest associated with funding of equipment and payroll 
x
Submittal preparation 
x
Permits, licenses and fees 
x
Other risks of doing business (i.e., risk of a lower than expected contract dollar value; 
risk of a high inflation cost; risk of poor subcontractor performance and reperformance). 
The amount to be paid for work items not included in Exhibit B, Unit Price List shall be negotiated 
between the Contractor and the County.
	



ORDER OF PRECEDENCE 
In the event a conflict exists between Contract Documents the order of precedence, from highest 
to lowest, shall be as follows: 
1. Change Order 
2. Work Assignment Special Provisions 
3. Work Assignment Project Plans 
4. Exhibit A (This Scope of Work and its Special Provisions) 
5. MCDOT Supplement to MAG Uniform Standard Specifications 
6. MAG Uniform Standard Specifications and Details 
SPECIAL PROVISIONS 
The following special provisions modify the MAG Uniform Standard Specifications as revised by 
the MCDOT Supplement to MAG Uniform Standard Specifications.
SECTION 105 CONTROL OF WORK
105.8 CONSTRUCTION STAKES, LINES AND GRADES, add the following: 
The County will provide survey control and staking as described in the MAG Specifications and 
as modified by the MCDOT Supplemented to MAG. The Contractor shall lay out work in 
accordance with the plans and specifications and shall be responsible for all measurements in 
connection with the layout of the Work. Contractor shall furnish, at Contractor expense, all stakes, 
templates, platforms, equipment, tools, materials, and labor required to layout the Work. The 
Contractor shall also be responsible for maintaining and preserving all control points established 
by the County. 
SECTION 107 LEGAL REGULATIONS AND RESPONSIBILITY TO THE PUBLIC 
107.1 COMPLIANCE WITH LAWS, add the following: 
107.1.2 Environmental Mitigation Measures, revise as follows:
When a work assignment is subject to Environmental Mitigation Measures, the Contractor 
shall adhere to all terms, conditions, and requirements contained in the Environmental 
Clearance. The Environmental Clearance and all related documents are located in 
Appendix A to the projects Special Provision and / or work assignment.
During project construction, MCDOT Environmental Program Branch shall be notified at 
(602) 506-8068 of any proposed changes in scope of work and/or work to be added 
outside the defined project limits, for evaluation of potential environmental impacts.
Payment for Environmental Mitigation Compliance will be an Allowance item. Payment 
shall be full compensation for performing all activities associated with fulfilling 
environmental mitigation measures that are not directly included within other pay items. 
Payment will be based upon approved time and material invoices, in accordance with 
Section 109.5.
	



107.1.3 BIRD NEST SURVEY 
The Contractor shall not remove any trees or large tree limbs or conduct vegetation removal 
activities such as grubbing or shrub clearing between February 1st and August 31st. If vegetation 
removal will occur between February 1st and August 31st, the contractor shall arrange for a 
qualified biologist* to conduct a bird nest survey/search of the grasses, shrubs, trees and/or limbs 
to determine the presence/absence of active bird nests. The survey shall be completed within ten 
(10) calendar days of vegetation removal. If active bird nests are identified during the bird nest 
survey, the contractor shall notify the Engineer. The Engineer will contact the Maricopa County 
Department of Transportation Environmental Program Branch (602.506.8068) to arrange for a 
licensed wildlife rehabilitator to remove any eggs or nestlings from active nests, or have the 
contractor avoid vegetation removal or pruning near the active bird nest(s) to comply with 
provisions of the Migratory Bird Treaty Act. The contractor shall avoid vegetation removal or 
pruning near active bird nest(s) until the Maricopa County Department of Transportation 
Environmental Program Branch Manager authorizes the contractor to proceed. 
Vegetation may be mowed or removed ONLY if it has been surveyed within ten (10) calendar 
days prior to removal and as long as only inactive bird nests, if any, are present. Between 
September 1st and January 31st, grubbing, shrub clearing, and/or tree/limb removal activities are 
not subject to restriction. 
*Qualified Biologist: Qualification Requirements; Successful completion of a full four-year course 
of study in an accredited college or university leading to a bachelor’s or higher degree, which 
included a major field (24 semester hours) of study in biological sciences, natural resources 
management, or related disciplines appropriate to the services provided or a combination of 
education and equivalent experience totaling a minimum of five years. The contractor shall 
provide documentation that the biologist meets these qualifications to the Engineer and to the 
Environmental Program Branch Manager for approval, prior to any survey work being performed.
107.1.4 BIRD NEST Relocation 
If active bird nests are identified during the bird nest survey, the contractor shall notify the 
Engineer. The Engineer will contact the Maricopa County Department of Transportation 
Environmental Program Branch (602.506.8068) to arrange for a licensed wildlife rehabilitator to 
remove any eggs or nestlings from active nests. 
107.2 PERMITS, revise as follows:
107.2.1 Stormwater Control Measures for Erosion Control and Pollution Prevention:
If construction activities are anticipated to disturb less than one acre of land, the project 
does NOT require coverage under the Construction General Permit (CGP). If the 
Contractor’s operations will cause the construction activities to disturb one or more acres 
of land, the Contractor shall be responsible for obtaining CGP coverage and comply with 
permit requirements. 
The Contractor shall take sufficient precautions, to control erosion, to prevent pollution of 
surface waters and groundwater, and to comply with the environmental mitigations of the 
	



project.  Any concrete waste shall be properly controlled to prevent overflow or discharge 
of wastewater from concrete waste management control measures.  
Where the project has the potential to discharge pollutants to waters, pollution prevention 
control measures shall be installed and maintained as approved by the Engineer.  Control 
Measures shall be deemed to include control of erosion and mitigation of any resulting 
sediment.  Control Measures may be temporary or permanent.
At least 15 days prior to the start of ground disturbing activities, the Contractor shall 
submit for the Engineer’s approval, a plan for prevention of erosion and pollution including 
all the Control Measures which the Contractor proposes to implement during the 
construction of the project. 
If, in the opinion of the Engineer, clearing and grubbing, excavation, or other construction 
activities are likely to create an erosion problem because of the exposure of erodible earth 
material, the Engineer may limit the surface area to be disturbed until satisfactory control 
measures have been accomplished.  
Payment for Stormwater Control Measures will be a reimbursable allowance based on 
approved time and materials invoices, in accordance with Section 109.5. The amount 
paid for under the allowance for Stormwater Control Measures shall include all material 
and labor, not limited to the preparation, installation, maintenance, and removal of Control 
Measures assuring proper operation of the pollution control devices installed, and all 
maintenance, cleaning, and disposal costs associated with clean-up and repair following 
storm events, runoff or releases on the project. 
The Contractor shall not be entitled to additional compensation or an extension of contract 
time for any delays to the work because of the Contractor's failure to submit an acceptable 
plan for prevention of erosion and pollution.
107.2.2 Dust Control Permit, add the following:
The Contractor shall obtain a dust control (or earthmoving) permit for all construction and 
maintenance activities that will disturb a surface area equal to or greater than .10 acre 
(4,356 square feet).
Any construction activity capable of generating fugitive dust (such as earthmoving, 
demolition, or weed abatement), regardless of the size of the site, must comply with 
Maricopa County Rule 310 and control sources of dust.   
	



107.2.2.1 Payment:  Payment for Environmental Mitigation Compliance (Dust 
Control Permit) will be a reimbursable allowance based on approved time and 
materials invoices, in accordance with Section 109.5. The amount paid for under the 
allowance for Environmental Mitigation Compliance (Dust Control Permit) shall include 
all activities associated with obtaining permit approvals, preparation of a dust control 
plan, payment of the permit fee and activities associated with permit compliance during 
Pre-Construction and Construction.
107.5 SAFETY, HEALTH, AND SANITATION PROVISIONS, add the following 
The Contractor shall provide and maintain portable toilet facilities in each area of work. Portable 
toilet facilities shall be cleaned not less than once weekly. The associated costs of this 
requirement shall be incidental to each project work assignment.
107.5.5 Safety Plan, add the following: 
The Contractor’s Safety Plan OSHA 300 Logs for the past three years shall be submitted prior to 
commencement of work. The Contractor may submit a comprehensive safety plan for all work 
anticipated to be performed under this contract. Prior to the commencement of work on each work 
assignment, the Contractor shall as a minimum review the Safety Plan for accuracy and 
completeness, then submit a revised plan incorporating any needed changes or submit 
confirmation that the safety plan on record is current and accurate. Contractor safety plan 
guidelines are available on the MCDOT website at: http://www.maricopa.gov/190/Technical (see 
item 7 under Construction Specifications). 
SECTION 108 COMMENCEMENT, PROSECUTION, AND PROGRESS 
108.1 NOTICE TO PROCEED, add the following:
Each work assignment shall have a separate Construction Notice to Proceed issued after a Pre-
Construction Conference has been conducted and submittals in accordance with section 108.1.1 
Pre-Construction Conference have been received by the County. 
108.9 FAILURE TO COMPLETE ON TIME, add the following: 
The liquidated damages provisions of section 108.9 apply to each work assignment of the Job 
Order Contract. The original work assignment amount shall be used in the column labeled 
“Original Contract Amount” of Table 108-1 to determine the Daily Charges. 
SECTION 109 MEASUREMENTS AND PAYMENTS 
109.4 Compensation for Alteration of Work, add the following:
109.4.7 Minor Alterations, Miscellaneous Work 
The Engineer may make an alteration in the project specifications or in the details of construction 
which are not covered by an existing item and are limited in scope, to the extent that the cost of 
the alterations will not exceed Fifteen Thousand ($15,000.00) Dollars per Work Assignment. 
The Engineer will request a cost proposal from the Contractor or direct this work to be performed 
by Force Account method as described under Section 109.4 and 109.5 of the Uniform Standard 
	



Specifications and Details for Public Works Construction (MAG). The Engineer and the contractor 
will agree upon the scope and cost of the work. This cost shall be documented in written form, 
from the Engineer to the contractor, which when executed by both parties and concurred by 
MCDOT shall have the same force and effect as a supplemental agreement. 
Measurement for Minor Alterations, Miscellaneous Work, will be measured by an approved 
Contractor’s proposal or by Force Account method. Payment will be made under item 109.40000, 
Miscellaneous Work (Minor Alterations). 
SECTION 205 ROADWAY EXCAVATION 
205.8 PAYMENT, add the following: 
Payment for Earthwork shall include all Roadway Excavation, Fill Construction, and Imported 
Borrow requirements of the work assignment. Payment for Earthwork shall be a negotiated lump 
sum amount. 
SECTION 301 SUBGRADE PREPARATION 
301.8 PAYMENT, add the following: 
Earthwork and pavement removal shall be paid as separate items and shall not be included as 
part of Subgrade Preparation. 
SECTION 311 PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADE 
311.2 MATERIALS, add the following: 
The amount of cement used on each site shall be documented by the Contractor and reported to 
the Engineer. The method used for documentation shall be agreed upon prior to the start of the 
project. Cement delivered in standard sacks from commercial producers will be assumed to have 
a mass of 94 pounds per sack and need not be weighed. Weighmaster’s Certificates shall be 
submitted for bulk cement in accordance with Section 109.2. 
311.4.2 Application of Cement, add the following: 
The cement spread rate when given as a percentage shall be based on 120 pounds per cubic 
foot dry weight of the soil unless otherwise directed by the Engineer. 
311.4.9 Curing, add the following:
The Engineer shall approve proposed application equipment prior to the start of application. 
SECTION 317 ASPHALT MILLING
317.2 CONSTRUCTION REQUIREMENTS, add the following: 
The Contractor shall be responsible for the removal and disposal of milled material. The County 
reserves the right to direct that the milled material be transported to a County facility or deposited 
on the roadway shoulders. 
	



SECTION 340 CONCRETE CURB, GUTTER, SIDEWALK, CURB RAMPS, DRIVEWAY AND 
ALLEY ENTRANCE 
340.6 PAYMENT, add the following: 
Payment for detectable warnings will be paid for at the contract unit price when not a part of a 
new curb ramp installation. Such payment shall include full compensation for all labor, material, 
tools and equipment for sawcutting, removal, and disposal of the existing concrete including any 
existing detectable warning, and for installation of the new detectable warning. 
SECTION 401 TRAFFIC CONTROL 
401.2.4 PAVEMENT MARKINGS, add the following: 
On projects that will partially or totally obliterate striping; the Contractor shall provide 
documentation of all existing pavement markings on a detailed drawing at 1” = 40’ ft scale. 
MCDOT shall have ten working days to verify the submitted pavement markings documentation 
for approval or modification as required. The documentation of existing pavement markings shall 
be approved by MCDOT prior to any work that will obliterate existing markings. The 
documentation shall include width of the existing pavement, lane widths, lengths and locations of 
all striped tapers, lengths of left and right turn lanes, widths and lengths of two-way left turn lanes, 
start and stop of “no passing” zones, pavement arrows for left and right turn lanes, distance and 
width of diagonal pavement markings, lengths and widths of crosswalks, stop bars, and word 
messages (i.e. stop ahead, etc.), type and location of raised pavement markers, locations of all 
traffic signal detection loops, and location of all fire hydrants and any other items that the Engineer 
determines to be significant.. The documentation shall extend 500 feet beyond the beginning and 
ends of the project. 
401.6 MEASUREMENT, add the following: 
When an officer is used less than 4 hours, a minimum of 4 hours will be charged. Anything over 
4 hours will be measured by the hour.
401.7 PAYMENT, add the following: 
Payment for Traffic Control, based upon approved time and material invoices, in accordance with 
Section 109.5 an amount not to exceed the ALLOWANCE established by mutual agreement 
between the Contractor and the County for the work assignment. 
Payment will be made at the contract bid price in the proposal for uniformed, off-duty law 
enforcement officer. If the officer is utilized in excess of 8 hours in any calendar day or in excess 
of 40 hours in any calendar work week, payment shall be at the rate of 1 1/2 times the contract 
bid price for all hours worked in excess in either of the above time periods. 
Payment for Document Existing Pavement Markings, approved time and material invoices, in 
accordance with Section 109.5 an amount not to exceed the ALLOWANCE established by mutual 
agreement between the Contractor and the County for the work assignment. 
 
	



405.4 INSTALLATION, add the following: 
The contractor will conduct a pre activity meeting to review the type and location of all monuments 
to be installed. No monuments shall be installed without the inspector being present and approval. 
SECTION 460 REMOVAL OF PAVEMENT MARKINGS AND RAISED PAVEMENT MARKERS 
460.4 PAYMENT, add the following: 
No payment will be made when removal of thermoplastic or paint occurs as part of the milling 
process or when existing paint will not affect the project. For all other incidents, payment will be 
made in accordance with Section 460 of the MCDOT Supplement.
	



	



ADA Modernization JOC
Item No.
Description
Unit
Unit Price
$
104.04000
Partnering
Allowance
to be negotiated
105.06200
Flagman Allowance
Allowance
to be negotiated
107.01501
Community Relations Support
Allowance
to be negotiated
107.02000
AZPDES
Allowance
to be negotiated
107.02001
N.P.D.E.S
Allowance
To Be Negotiated
107.02010
Compliance with Maricopa County MS4 Stormwater Regulation
Allowance
to be negotiated
107.02100
Environmental Mitigation Compliance
Allowance
to be negotiated
107.02115
Stormwater Control Measures
Allowance
To Be Negotiated
107.02200
404 Permit Compliance
Allowance
to be negotiated
107.04001
Bird Nest Survey
Allowance
to be negotiated
107.04002
Bird Nest Relocation
Allowance
to be negotiated
109.09000
Mobilization/Demobilization
Lump Sum
to be negotiated
109.40000
Miscellaneous Work (Minor Alterations)
Allowance
to be negotiated
109.90000
Quality Control for Contract Line Items
Allowance
to be negotiated
201.01012
Remove Tree, Diameter > 12"
Each
$ 1,098.00
205.01150
Roadway Excavation (Includes Earthwork, Excavation, Fill Construction and Imported Borrow)
CY
to be negotiated
206.01000
Structural Excavation
CY
$ 53.50
206.02000
Structural Backfill
CY
$ 64.75
215.01510
Earthwork for Retention Basins
CY
$ 53.50
230.02000
Acrylic Copolymer Surface Course Dust Palliative
SY
to be negotiated
301.01000
Subgrade Preparation
SY
$ 6.75
301.01100
Subgrade & Leveling Course Repair
SY
to be negotiated
301.02000
Engineers Authorized Repairs (Contingent Item)
Allowance
to be negotiated
310.03002
Aggregate Base Course (Contingent Item)
Ton
$ 32.00
312.10060
Cement Treated Base, (Indicate Depth)
Ton
to be negotiated
317.01000
Asphalt Milling, (Indicate Depth)
SY
to be negotiated
321.00200
Asphalt Concrete Pavement (Indicate Type of Mix)
Ton
to be negotiated
329.01000
Bituminous Tack Coat SS-1h, Diluted
Ton
to be negotiated
331.03100
Microsurfacing (Type I Aggregate)
SY
to be negotiated
331.03200
Microsurfacing (Type II Aggregate)
SY
to be negotiated
331.03300
Microsurfacing (Type III Aggregate)
SY
to be negotiated
334.00010
MTR Pavement Sealer
SY
to be negotiated
334.03000
Preservative Seal, Type C (TRMSS)
Gal
to be negotiated
334.05000
Preservative Seal, Type E (PMRE)
Gal
to be negotiated
336.01100
Asphalt Pavement Replacement 10 SY or less
SY
$ 123.00
336.01125
Asphalt Pavement Replacement 11-25 SY or less
SY
$ 115.50
336.01150
Asphalt Pavement Replacement 26-50 SY or less
SY
$ 106.00
336.01200
Asphalt Pavement Replacement 51-100 SY or less
SY
$ 78.50
336.01300
Asphalt Pavement Replacement, greater than 100 SY
SY
$ 69.50
336.03210
Asphalt Pavement Repair
SY
to be negotiated
337.01000
Asphalt Pavement - Category 1 Crack Sealing
SY
to be negotiated
UNIT PRICE LIST
DBA Construction, Inc. 
	



340.01110
Vertical Curb & Gutter, MAG Det 220, Type A, H=6"
LF
$ 33.40
340.01114
Vertical Curb & Gutter, MAG Det 220, Type A, H=4"
LF
$ 32.75
340.01116
Concrete Curb & Gutter, ADOT C-05.10, Type D, H=7"
LF
$ 39.70
340.01120
Concrete Ribbon Curb, MAG Det 220, Type B
LF
$ 32.30
340.01130
Roll Curb & Gutter, MAG Det 220, Type C
LF
$ 32.30
340.01140
Roll Curb, MAG Det 220, Type D
LF
$ 32.30
340.01150
Single Curb, MAG Det 222, Type A
LF
$ 35.50
340.01160
Single Curb, MAG Det 222, Type B
LF
$ 35.50
340.01170
Mountable Curb & Gutter, MAG Det 220, Type E
LF
$ 32.50
340.01180
Mountable Curb & Gutter, MAG Det 220, Type F
LF
$ 33.90
340.01182
Concrete Curb & Gutter, ADOT C-05.10,Type B, H=6"
LF
$ 35.00
340.01210
Concrete Sidewalk, MAG Det 230
SF
$ 7.35
340.01215
Concrete Median Paving, 4" Thick
SF
$ 8.72
340.01216
Concrete Median Nose Transition, MAG Det 223 (4" Thick)
SF
$ 12.75
340.01301
Sidewalk Ramp Retrofit,  Det 2030-A
Each
$ 3,877.00
340.01303
Sidewalk Ramp Retrofit,  Det 2030-C
Each
$ 2,367.00
340.01320
Retrofit 20' Return 4" Curb w/Dual Combination Curb Ramps, Det 2022
Each
$ 3,320.00
340.01321
Retrofit 20' Return 6" Curb w/ 2-Combination Curb Ramps, Det 2022
Each
$ 3,330.00
340.01330
35' Return 1-Radial Ramp, Det 2031
Each
$ 3,245.00
340.01331
35' Return 2-Radial Ramps, Det 2031
Each
$ 5,440.00
340.01332
35' Return 2-Radial Ramps w/ 1-Type A Transition, Det 2031
Each
$ 3,820.00
340.01333
35' Return 2-Radial Ramps w/ 1-Type B Transition, Det 2031
Each
$ 3,740.00
340.01335
30' Return 1-Radial Ramp, Det 2031
Each
$ 3,340.00
340.01336
30' Return 2-Radial Ramps, Det 2031
Each
$ 3,670.00
340.01337
30' Return 2-Radial Ramps w/ 1-Type A Transition, Det 2031
Each
$ 3,645.00
340.01338
30' Return 2-Radial Ramps w/ 1-Type B Transition, Det 2031
Each
$ 3,410.00
340.01340
25' Return 6" Curb 1-Radial Ramp, Det 2032
Each
$ 3,220.00
340.01341
25' Return 6" Curb 2-Radial Ramps, Det 2032
Each
$ 3,510.00
340.01342
25' Return 4" Curb 1-Radial Ramp, Det 2032
Each
$ 3,180.00
340.01343
25' Return 4" Curb 2-Radial Ramps, Det 2032
Each
$ 3,365.00
340.01345
20' Return 4" Curb 1-Radial Ramp, Det 2032
Each
$ 2,925.00
340.01346
20' Return 4" Curb 2-Radial Ramps, Det 2032
Each
$ 4,430.00
340.01350
1-Radial Curb Ramp (B=5') - 4" Curb, Det 2033
Each
$ 3,110.00
340.01352
1-Radial Curb Ramp (B=5') - 6" Curb, Det 2033
Each
$ 3,470.00
340.01353
1-Radial Curb Ramp (B=8') - 6" Curb, Det 2033
Each
$ 3,960.00
340.01355
Detectable Warning Mat For Ramps, TOG Det 205 (City of Gilbert)
Each
$ 399.00
340.01380
Curb Ramp, Type E, MAG Det 235-5
Each
$ 2,435.00
340.01390
Radial Curb Ramp, Dual, MAG Det 236-1
Each
$ 3,450.00
340.01391
Radial Combination Curb Ramp, Dual, MAG Det 236-4
Each
$ 3,650.00
340.01392
Parallel Curb Ramp, MAG Det 238-3
Each
$ 2,435.00
340.01396
Radial Curb Ramp, Dual, MAG Det 236-3
Each
$ 3,550.00
340.01400
Driveway Entrance, MAG Det 250-1 (Residential)
SF
$ 10.50
340.01405
Driveway Entrance, MAG Det 250-1 (Commercial/Industrial)
SF
$ 11.70
340.01410
Driveway Entrance, MAG Det 250-1 - Ramp Only no S/W (Residential)
SF
$ 11.25
340.01411
Driveway Entrance, MAG Det 250-1 - Ramp Only no S/W (Commercial/Industrial)
SF
$ 12.25
340.01420
Driveway Entrance, MAG Det 250-2 (Residential)
SF
$ 10.50
340.01425
Driveway Entrance, MAG Det 250-2 (Commercial/Industrial)
SF
$ 11.70
340.01437
Return Type Driveway, Det 2036 (Commercial/Industrial)
SF
$ 11.60
340.01455
Driveway 5" Thick Class B Concrete
SF
$ 10.50
	



340.01456
Driveway 6" Thick Class A Concrete
SF
$ 10.75
340.01459
Driveway 9" Thick Class A Concrete
SF
$ 11.70
340.01500
Alley Entrance, MAG Det 260
SF
$ 11.30
340.01600
Concrete Apron and Valley Gutter, MAG Det 240
SF
$ 13.00
340.02106
Concrete Spillway Paving, 6" Thick w/ Reinforced & Turndown Edges
SY
to be negotiated
340.03030
Concrete Slope Paving, 3" Thick
SY
to be negotiated
342.01100
Concrete Paving Stone
SF
to be negotiated
345.01000
Adjust Frame & Cover to Grade, MAG Det 270
Each
$ 675.00
345.01100
Adjust Manhole Frame & Cover, MAG Det 422
Each
$ 675.00
345.01101
Rebuild Exist. MH w/ Offset Manhole, MAG Det 421
Each
to be negotiated
345.01102
Adjust Manhole Height, MAG Det 420
Each
$ 675.00
345.01200
Adjust Valve Box & Cover, MAG Det 391-1-A
Each
$ 650.00
345.01300
Adjust Valve Box & Cover, MAG Det 391-1-B
Each
$ 650.00
345.01400
Adjust Valve Box & Cover, MAG Det 391-1-C
Each
$ 650.00
345.01401
Change Type A Valve Box & Cover to Type C and Adjust, MAG Det 391-1-C
Each
$ 650.00
345.01500
Adjust Water Meter Box & Cover to Grade
Each
$ 650.00
350.01000
Remove Pipe, Backfill & Compact
LF
to be negotiated
350.01810
Remove Concrete Curb and Gutter, 100 LF or less
LF
$ 6.75
350.01820
Remove Concrete Curb and Gutter, greater than 100 LF
LF
$ 5.75
350.01910
Remove Sidewalk, less than 50 SF
SF
$ 6.50
350.01920
Remove Sidewalk, 51-100 SF
SF
$ 4.75
350.01930
Remove Sidewalk, 100-250 SF
SF
$ 4.75
350.01940
Remove Sidewalk, greater than 250 SF
SF
$ 4.75
350.01990
Remove Concrete Flatwork - Driveway, Valley Gutter, Apron, etc.
SF
to be negotiated
350.50000
Miscellaneous Removals and Other Work
Allowance
to be negotiated
350.90000
Remove Sidewalk Curb Ramp
Allowance
to be negotiated
401.01000
Traffic Control
Allowance
to be negotiated
401.01100
Uniformed Off-Duty Law Enforcement Officer
Allowance
to be negotiated
401.06100
Changeable Message Board for Public Notification
Day
$ 69.25
401.20000
Document Existing Pavement Markings
Lump Sum
to be negotiated
405.00030
Survey Marker, MAG Det 120, Type C
Each
$ 598.00
405.01000
Survey Marker, MAG Det 120, Type B
Each
$ 465.00
405.01100
Survey Marker, MAG Det 120, Type A
Each
$ 330.00
430.01201
Hydro Seeding - Native Seed Mix
Acre
to be negotiated
430.42000
Decomposed Granite, 2" Thick, Indicate Color
SY
$ 16.25
440.10000
Landscape / Irrigation Restoration
Allowance
to be negotiated
460.01000
Remove Paint Stripe
LF
to be negotiated
460.02000
Remove Thermoplastic Stripe
LF
to be negotiated
461.01100
4" White Traffic Paint Stripe
LF
to be negotiated
461.01200
4" Yellow Traffic Paint Stripe
LF
to be negotiated
461.01600
Paint Median Island
LF
to be negotiated
462.01100
4" White Thermoplastic Traffic Stripe
LF
to be negotiated
462.01200
4" Yellow Thermoplastic Traffic Stripe
LF
to be negotiated
463.01200
Reflectorized Raised Pavement Marker (Type G, Clear, 1-Way)
Each
to be negotiated
463.01400
Reflectorized Raised Pavement Marker (Type BB, Blue, 2-Way)
Each
to be negotiated
473.60001
Detector Loop, (indicate size)
Each
to be negotiated
473.60011
6' X 50' Quadrupole Loop
Each
to be negotiated
520.01035
Safety Rail (Height = 3'-6") MAG Det 145
LF
$ 97.00
520.01047
Safety Rail (Height = 4'-8") MAG Det 145
LF
$ 115.00
	



604.01005
Controlled Low Strength Material, ½ Sack
CY
to be negotiated
604.01010
Controlled Low Strength Material, 1 Sack
CY
to be negotiated
604.01015
Controlled Low Strength Material, 1½ Sack
CY
to be negotiated
610.27000
Relocate Fire Hydrant, MAG Det 360
Each
to be negotiated
610.27500
Adjust Fire Hydrant, MAG Det 360
Each
to be negotiated
925.00001
Survey Services
Allowance
to be negotiated
340.01300
Sidewalk Ramp, Type, Detail - to be determined at time of project
Each
to be negotiated
340.00009
Detectable Warning (Truncated Dome)
SF
to be negotiated
	



STATEMENT of QUALIFICATIONS for
Job Order Contractor
ADA MODERNIZATIONS
SERVICES 
SERIAL #210084-JOC
Due:  JUNE 3, 2021
Submitted by: 
P.O. Box 63035 - Phoenix, Arizona  85082-3035
602-442-6767  FAX 602-442-0408
www.dbaconstruction.net
	



	



	



%#"$POTUSVDUJPO
*OD
1SFTJEFOU
5PN%SZTEBMF
+VOF

	



ADA Modernizations Services
Serial #210084-JOC
June 3, 2021
1
 
 
 
 
 
 
DBA Construction, Inc. (DBA) is a self-performing, heavy civil construction Job Order Contractor specializing in ADA 
modernization and associated concrete flatwork upgrades. DBA was established in Arizona in 1996.  In addition to 
our work in Arizona, we have expanded our portfolio to include work in Texas and Louisiana.  We currently employ 110 
construction professionals.  Our staff is supported by a large, company-owned fleet of heavy construction equipment 
and maintained in-house with DBA mechanics.  Over the last 12 years, DBA has been awarded 20 JOCs, (several for 
MCDOT and including this contract’s predecessor for ADA Modernization Services).  It is important to note, DBA’s 
experience working for MCDOT dates back to the late 1990s that included the widening of the Dysart Road bridge 
over the Colter Channel and other concrete rehabilitation projects.
LIST ALL MARICOPA COUNTY PROJECTS ONGOING & PAST 5 YEARS:
Project Name
County Agency
Date
Completed
JOC  White Tanks FRS 3 Channel Rehabilitation
Flood Control District
2016
JOC 6 Bridges Deck Sealing
Transportation
2018
JOC Blue Point Bridge on Bush Highway Rehab
Transportation
2019
JOC ADA Improvements, Hopeville
Transportation
2019
JOC 107th Avenue at Oakmont Driveway
Transportation
2019
Miller Road Construction
Transportation
2020
JOC Four Bridges Rehabilitation and Repairs
Transportation
2020
JOC Country Place & Laurelwood ADA Improvements
Transportation
2020
JOC MC-85 Ditch Relocation
Transportation
2020
JOC Sun City West ADA Improvements
Transportation
2020
JOC 91st Avenue at MC-85
Transportation
2021
JOC ADA Improvements in Sun Lakes
Transportation
2021
JOC ADA Improvements in Sun City
Transportation
2021
 
FIVE COMPARABLE PROJECTS:
Country Place & Laurelwood ADA Upgrades, Maricopa County, AZ
Description:  The project was in 
preparation for a pavement preservation project and 
to upgrade to new ADA standards.  Work included 
construction of median nose, replacement of valley 
gutters and aprons, new sidewalks, new ADA ramps, 
new handrail, scuppers, and signage.  The work 
was completed throughout two large housing 
developments and took place at 22 locations.  
Role of the Firm:  JOB ORDER CONTRACTOR
Construction Cost:     $875,216 
Construction Schedule:     1/2020 - 4/2020
Reference:  MCDOT, Matt Maddux (602) 689-3863  
matt.maddux@maricopa.gov
PROJECT 1
	



ADA Modernizations Services
Serial #210084-JOC
June 3, 2021
2
FIVE COMPARABLE PROJECTS (CONTINUED)
Sun City West, Unit 36 ADA Modernization, Maricopa County, AZ
Description:  In preparation for pavement 
preservation and to upgrade to new ADA standards for the 
area adjacent to Banner’s Del E. Webb Medical Center.  Work 
included subgrade preparation and construction of valley 
gutters, aprons, new sidewalks, ADA ramps (85), manhole and 
utility adjustments, AC patching, & signage.  
Role of the Firm:  JOB ORDER CONTRACTOR
Construction Cost:     $880,510
Construction Schedule:   8/2021 - 12/2021
Reference:  MCDOT, Bonnie Perotti (602) 506-4618 
Bonnie.Perotti@maricopa.gov
Sun City West, Phase I ADA Modernization, Maricopa County, AZ
Description:  In preparation for pavement preservation 
and to upgrade to new ADA standards for another area within Sun 
City West.  Work included subgrade preparation and construction of 
valley gutters, aprons, new sidewalks, ADA ramps (105), manhole and 
utility adjustments, AC patching, & signage.  New to this project was 
the construction of wheelchair passing zones along the sidewalks at 
various locations.
Role of the Firm:  JOB ORDER CONTRACTOR
Construction Cost:     $585,000
Construction Schedule:   4/2021 - 5/2021
Reference:  MCDOT, Leon Adair (602) 506-4684  
Leon.Adair@maricopa.gov
Sun Lakes, Units 11 through 22 ADA Modernization, Maricopa County, AZ
Description:  In preparation for pavement preservation, 
DBA’s scope of work included:  sawcut and remove asphalt and 
out-of-compliance ADA ramps, reconstruct ramps to current ADA 
standards along with ancillary sidewalk, curbs, gutters, and asphalt. 
Drainage work involving the removal and replacement of over 13,000 
SF of concrete valley gutter that was constructed in phases in order 
to maintain access for local residents. The work also included traffic 
control, manhole adjustments, and quality control testing.
Role of the Firm:  JOB ORDER CONTRACTOR
Construction Cost:     $876,278
Construction Schedule:   1/2021 - 4/2021
Reference:  MCDOT, Bill Sloan (QT), (602) 291-0078  
bsloan@qt-az.com
PROJECT 2
PROJECT 3
PROJECT 4
	



ADA Modernizations Services
Serial #210084-JOC
June 3, 2021
3
Old Town Scottsdale ADA Upgrades Phase I, II & III, City of Scottsdale, AZ
Description: The entire project was completed in three 
separate phases between April, 2017 and October, 2017.  It included 
complete replacement or upgrades of the ADA ramps along Indian 
School Road (75th Street to 68th Street) and Second Street (Scottsdale 
Road to Brown) on both sides of the road. The project included:
• 
Removal and replacement or upgrades of 40+ ADA ramps 
throughout Old Town Scottsdale
• 
New concrete driveways
• 
New sidewalks
• 
Replacement of tree grates
• 
New bus bay and bike rack installation
Extensive communication and coordination with adjacent residents 
and businesses was required and DBA was praised for our consideration of their needs.  All of the driveways were 
completed in halves to accommodate business access and in some cases a “field fit” situation was necessary in order to 
work around existing irrigation lines or to eliminate the need to move existing light poles and other appurtenances.  
Role of the Firm:  Job Order Contractor
Construction Cost:  $74,692 Phase I, $153,035 Phase II, $157,307 Phase III
Construction Dates:  4/2017 - 10/2017
Reference:  City of Scottsdale, Roy Herrington (480) 312-7052  rherrington@scottsdaleaz.gov
Verrado Street Improvements (Thomas Rd. & Verrado Way Intersection and Indian School 
Road at Verrado High School), Buckeye, AZ
Description:  Construction of two signalized intersections 
in Verrado for safety improvements.  DBA provided 
a dedicated left-turn lane, upgraded ADA ramps 
for compliance, and restriped the crosswalks.  
Intersection 2 at Verrado High School provided 
an acceleration/deceleration lane, mast arms and 
lighting.  
Role of the Firm:  GENERAL CONTRACTOR
Construction Cost:  $624,500 (Project I) and $573,260 
(Project II)
Construction Schedule:  2/2019 - 10/2020
Reference:  DMB White Tanks, LLC, Ray Fellows (480) 367-
7000  
       rfellows@dmbinc.com
FIVE COMPARABLE PROJECTS (CONTINUED)
PROJECT 5
PROJECT 6
	



ADA Modernizations Services
Serial #210084-JOC
June 3, 2021
4
PROJECT 7 CDBG Grandview Neighborhood Improvements, 
Phases I & II, City of Apache Junction
Description:  The projects were funded with federal grants called  
“Community Development Block Grants” to improve the 
general aethetics of the neighborhood and improve both 
pedestrian and traffic operations.  Our scope of work included:
• 
Preparing subgrade
• 
Placing new aggregate base course
• 
Removing and replacing concrete curb & gutter
• 
Removing and replacing concrete sidewalks
• 
Removing and replacing driveways
• 
Construct new ADA ramps
• 
Placing new asphalt paving
• 
Relocating signage
• 
Adjusting water valves
• 
Adjusting water service laterals
  
Role of the Firm:  GENERAL CONTRACTOR
Construction Cost:  $965,000
Construction Schedule:  5/2018 - 10/2020
Reference:  City of Apache Junction, Raquel Schatz  (480) 474-8549  rschatz@ajcity.net
FIVE COMPARABLE PROJECTS (CONTINUED)
	



ADA Modernizations Services
Serial #210084-JOC
June 3, 2021
5
  
 
 
 
DBA BY THE NUMBERS:
• 
Arizona “S” Corporation
• 
Founded in Phoenix in 1996
• 
110+ employees
• 
Large fleet of company-owned equipment
• 
85% self-performers
• 
0.80 Experience Modification Rate (EMOD)
• 
Zero claims, Zero litigation, Zero change orders
• 
$22 million bonding capacity
• 
Fully insured per MCDOT requirements
GENERAL FIRM DESCRIPTION:  
DBA is proud of the reputation we have earned with our 
clients and subcontractors / suppliers for our QUALITY, 
SAFETY, INTEGRITY AND FLEXIBILITY...our company 
guiding principles.  DBA is confident that by choosing 
us to build your projects under this contract, Maricopa 
County will get the best service possible in the industry.
In order to respond quickly and effectively to the needs of 
Maricopa County, DBA is committed to provide qualified 
PMs with more than 60 years (combined) experience 
and a resource depth that includes Superintendents, 
Specialty Superintendents, Foremen, Concrete Finishers, 
Carpenters, Equipment Operators, CDL Truck Drivers, 
Laborers, Mechanics and administrative staff.  These 
resources are here to support this contract and Maricopa 
County to successfully complete every job order with our 
company principles always in the forefront. 
DBA will “WOW” Maricopa County staff with our quality, 
safe work and field knowledge that has resulted in several 
million dollars in budget savings over the past 10+ years 
of doing JOC project work. 
Our specialty is in the forming and placement of all types 
of concrete including concrete flatwork (ADA ramps, 
sidewalks, curbs, gutters, driveways, and PCCP), as well as 
concrete structures (bridges, dams, drainage structures 
and irrigation structures).  
It is important to note that all DBA employees are 
required to pass a drug screening pre-employment and 
must be able to pass a 7-year background check for 
added security.  Our organizational chart for this JOC is 
included below.  
JOC CONTRACT MANAGER
Bob Maurer
PROJECT ENGINEERS
Stephon Lane
Michael Dorn
PROJECT MANAGER (West)
Bob Maurer
PROJECT MANAGER (East)
Jordan Hamula
SUPERINTENDENT
Terry McBroom
PRECONSTRUCTION MANAGER
Matt Woolwine
ESTIMATING STAFF
SUPERINTENDENT
Adam Pitts
SUPERINTENDENT
Kelly Fisher
RESOURCE POOL
Project Engineers, Specialty Superintendents, Traffic Control Specialists, Heavy Equipment 
Operators, CDL Drivers, Carpenters, Concrete Finishers, Laborers, Administrative Staff, Mechanics
SUBCONTRACTORS / SUPPLIERS
JOC Project Manager
=  KEY PERSONNEL
	



ADA Modernizations Services
Serial #210084-JOC
June 3, 2021
6
PRINCIPAL OFFICE LOCATION:
DBA’s principal office location is at 1833 South 59th 
Avenue, Phoenix, Arizona  85043.  This location houses the 
company’s management and administrative staff, is the 
location of our equipment yard and maintenance shop.  
This office will serve as the JOC local work office for the 
contract’s duration.
CONTRACT TERMINATIONS, CLAIMS, 
LITIGATION:  
None
KNOWLEDGE OF CURRENT & LOCAL 
MARKET:  
In Maricopa County, DBA has been providing heavy 
construction services since 1996.  Our business model has 
always included treating subcontractors and suppliers 
fairly in all business dealings.  For this reason, and our 
overall quality standards, we have developed long-
standing relationships with local construction partners 
who provide services to us for our clients including 
Maricopa County.
Relative to the general labor market, DBA management is 
acutely aware of the current market labor conditions.  We 
work tirelessly to maintain open communications with 
our field staff regarding trends in wages and benefits 
and we regularly review our standards to ensure they 
are competitive.  Within the last six months we have 
stepped up our focus on hiring and have been successful 
at increasing our field crews from 90 to just under 130.  
More than enough to handle the potential increase of 
work associated with this JOC.
LICENSES / REGISTRATIONS:
Held by
License Type
Number
Agency
Tom 
Drysdale
General 
Engineering
ROC 
125006-A
State of 
Arizona
Tim Ginter
Professional 
Engineer
37288 Civil
State of 
Arizona
BONDING STATEMENT:
DBA is a fully bonded and insured, general contractor 
with a surety authorized to do business in Arizona.  A 
letter from our surety addressing our bondability is 
included with this SOQ on the last page and our Bid Bond 
is included with the attachments.
In-house use of technology (including GPS surveying) allows DBA project 
managers to verify and ensure coordinates and elevations are correct prior to 
beginning construction.
	



ADA Modernizations Services
Serial #210084-JOC
June 3, 2021
7
  
 
 
 
TWO COMPARABLE 
PROJECTS:
The matrix on this next page identifies 
all key staff identified for this JOC.  It 
cross references the projects that they 
worked on (referenced in Section A) and 
scopes of work they have performed 
relative to the that required for this JOC. 
KEY STAFF IDENTIFICATION: 
Bob Maurer, JOC Contract Manager & 
Project Manager 
(West):  Mr. 
Maurer is one 
of our most 
experienced JOC 
managers at DBA.  
He began his 
career with DBA 
working at Palo 
Verde Generating 
Station overseeing a multi-year, open-
end contract for facility repairs and 
maintenance projects.  In 2012, he lead 
our team to success with our first JOC in 
Peoria.  Since then, Bob has been DBA’s 
champion for JOCs and has secured 
dozens of additional work using the 
“Piggyback” system.  Bob has more 
than 35 years in the heavy construction 
industry dating back to when he owned 
his own trucking business.  He has a 
B.S. degree from ASU in Construction 
Engineering.
Response times are very important 
to DBA in the execution of our JOC 
contract work.  In order for DBA and 
our crews to be the most efficient 
and have a shorter distance to travel/
quicker response times, we have split 
Maricopa County into two sides (east 
and west).  In addition to serving as 
this JOC Contract Manager and the 
County’s “single-point-of-contact”, Bob 
will also serve as a Project Manager for 
all County job orders on the west side 
of the valley.  Working alongside Bob 
in the role of Project Manager, will be 
Bob Maurer
JOC Contract Manager
Jordan Hamula 
Project Manager
Matt Woolwine
Preconstruction Manager
Terry McBroom
Superintendent
Adam Pitts
Superintendent
Kelly Fisher
Superintendent
Key Personnel
Experience Matrix
40
17
16
32
17
32
Years Experience
16
15
16
8
13
2
Years w/DBA
PROJECTS IN SECTION A
CM
PM
P
S
Country Place & Laurelwood
PM
P
S
Sun City West, Unit 36
PM
P
S
Sun City West, Phase 1
CM
PM
P
S
Sun Lakes ADA Modernization
CM
PM
P
S
Old Town Scottsdale
PM
P
S
Verrado Blvd @ Indian School
PM
P
S
S
Grandview Neighborhood Im-
provements - Phase II
SCOPE ITEMS
‹
‹
‹
‹
‹
‹
Sidewalks
‹
‹
‹
‹
‹
‹
Curb & Gutter
‹
‹
‹
‹
‹
‹
Curb Ramps
‹
‹
‹
‹
‹
‹
Removals & Disposal
‹
‹
‹
‹
‹
‹
Relocations
‹
‹
‹
‹
‹
‹
AC Paving/Patching
‹
‹
‹
‹
‹
‹
Valley Gutters
‹
‹
‹
‹
‹
‹
Drainage Facilities
‹
‹
‹
‹
‹
‹
PCCP
‹
‹
‹
‹
‹
‹
Drainage
‹
‹
‹
‹
‹
‹
Driveways
‹
‹
‹
‹
‹
‹
Concrete Structures
‹
‹
‹
‹
‹
‹
Signage
‹
‹
‹
‹
‹
‹
Pavement Markings
‹
‹
‹
‹
‹
‹
Detectable Warnings
‹
‹
‹
‹
‹
‹
Traffic Control
ABBREVIATIONS
CM=CONTRACT MANAGER; PM=PROJECT MANAGER; 
P=PRECONSTRUCTION; S=SUPERINTENDENT
	



ADA Modernizations Services
Serial #210084-JOC
June 3, 2021
8
Adam Pitts has been DBA’s 
number one JOC superintendent 
for the west valley.  Over the past 
10 years, Adam and his crews have 
developed processes in the field 
that have saved time, equating 
to lower costs for our municipal 
clients.  These processes include 
the use of smaller, more nimble 
equipment to maneuver easier 
in tight work spaces.  They also 
include cross training crewmen in multiple trades so they 
can move freely from one jobsite to another.  This has 
proven to be beneficial when we have multiple locations 
being worked on simultaneously.  Adam has more than 
17 years in the industry.
Kelly Fisher has been with DBA for more than 2 years.  
He has an extensive resume in 
heavy construction dating back 
to 1990.  Beginning his career 
with the USAF in 1985 as a Heavy 
Equipment Operator and Pavement 
Maintenance Specialist, Kelly was 
able to expand his knowledge to 
include some very large military 
construction projects.  Mr. Fisher 
has been responsible for mass 
earthwork operations, paving 
projects in both PCCP and AC, 
installation of underground utilities including storm drains, 
water and sewer lines and multiple road construction 
projects.
Subcontractors:  
We are self-performing contractors.  As such, the 
majority of the work required under this contract could 
be self-performed with DBA staff.  In some cases, a traffic 
control device subcontractor, electrical, or landscaping 
subcontractor may be required.  As the majority of the 
work expected with the JOC is not unique or unusual, 
we have not identified any subcontractors that would be 
selected based on qualifications alone.  Once we have a 
specific job order identified, any scope of work that is not 
typically self-performed by DBA, our Contract Manager, 
Bob Maurer, will meet with the County’s PM to discuss 
his/her preferences and past history with subcontractors 
we have pre-qualified.
Jordan Hamula who is also a seasoned professional in 
JOC execution.  Jordan will oversee all projects in the east 
valley.  Using this method to cover an area the size of a 
small state, is logical and will be more cost-effective for 
the County.
Jordan Hamula, Project 
Manager (East):  Mr. Hamula has 
been associated with the heavy 
construction industry since 2004.  
He has been employed by DBA 
for more than 14 years.  Jordan 
is experienced in the use of the 
JOC method by virtue of his role 
as PM for our Scottsdale JOCs.  
Jordan is respected by clients, 
staff and subcontractors for his 
ability to listen to ideas and work 
together in a partnering atmosphere.  Jordan has a B.S. in 
Construction Management from NAU.
Matt Woolwine, Preconstruction 
Manager:  Matt has been a part 
of the DBA JOC team for several 
JOC contracts.  He is an involved 
estimator who fully understands 
the alternative delivery concept 
and has offered suggestions 
during preconstruction that 
have resulted in innovative 
solutions to challenges.  Matt is an 
experienced project manager who 
has managed projects of all sizes 
for DBA and brings that project management experience 
to the table during preconstruction activities.  Matt has 
been employed by DBA his whole career (16 years).
All three of our superintendents assigned to this JOC 
have extensive experience working on job orders both 
for DBA and with other firms.  
Terry McBroom has more than 32 years experience in 
heavy construction beginning 
with his own decorative concrete 
company.  Terry specializes in 
concrete finishing (all types) and 
is an excellent supervisor in that 
he is able to teach new hands the 
art of concrete finishing.  
KEY STAFF IDENTIFICATION (CONTINUED)
J
M
M
M
as mo
	



ADA Modernizations Services
Serial #210084-JOC
June 3, 2021
9
 
 
Initial Contact
3URMHFWVLGHQWL¿HGE\&RXQW\30'%$30FRRUGLQDWHVZLWKLQKRXUVZLWKWKH&RXQW\
30WRVFKHGXOHDVLWHYLVLW
Scoping
Session
•
,GHQWLI\SRWHQWLDOFRQÀLFWVXWLOLWLHV
SURSHUW\DFFHVV
•
'LVFXVVSURMHFWVFKHGXOHEXGJHW
•
,GHQWLI\VLWHVSHFL¿FFKDOOHQJHVVFKRROV
FKXUFKHVKLVWRULFQHLJKERUKRRGV
•
,GHQWLI\/HYHORI6HUYLFHDUWHULDO
FROOHFWRUORFDOVWUHHWV
• 7DNHSUHFRQVWUXFWLRQSKRWRVDQGYLGHRVWR
YHULI\VLWHFRQGLWLRQV
• ,GHQWLI\SURMHFWJRDOV	REMHFWLYHV
• 'LVFXVVSRWHQWLDOYDOXHDGGHGLGHDV
• 'LVFXVVEDVLFFRQVWUXFWDELOLW\LVVXHV
• &RQ¿UPVWDQGDUGGHWDLOVIRUORFDWLRQ
• 9HULI\TXDQWLWLHV
• 9HULI\IXQGLQJVRXUFHVLH3UHYDLOLQJ
:DJHHWF
Phasing Plan
6LWHVSHFL¿FEXLOGLQJGULYHZD\VDWDWLPHVFKHGXOLQJDURXQGFKLSVHDORSHUDWLRQVPLOO
	RYHUOD\HWF'LVFXVVRSWLRQVIRUWLPHEXGJHWVDYLQJVQHZWHFKQRORJ\DOWHUQDWLYHVWR
SKDVLQJRUPDWHULDOV
Temporary       
Access
³6DIH5RXWHWR6FKRROV´RURWKHUVLWHVSHFL¿FDFFHVVLVVXHVEXVVWRSVSDUNLQJHPHUJHQF\
DFFHVVEXVLQHVVUHVLGHQWLDOWUDVK
Utility
Coordination
& Permits
&RQWDFW$=&RRUGLQDWHZLWKXWLOLW\FRPSDQLHV2EWDLQSURSHU&RXQW\GXVWSHUPLWIRU
DFUHRUODUJHU6:333LIUHTXLUHG
Community
Relations
• +LUH&RPPXQLW\2XWUHDFK
&RRUGLQDWRULIQHFHVVDU\
• 3URYLGHSURMHFWZHEVLWHXSGDWHV
• $VVLVWZLWKJHWWLQJUHIXVH
FRQWDLQHUVWRVWUHHWRQWUDVKGD\V
•
3URYLGHGRRUKDQJHUVÀ\HUVJRLQJGRRUWRGRRU
•
3ODFHYDULDEOHPHVVDJHERDUGVLQDGYDQFHRI
SURMHFW
•
$VVLVWZLWKPDLOGHOLYHU\
•
'LUHFWRUDVVLVWZLWKSHGHVWULDQDFFHVVVDIH
SDVVDJH
Project
Construction
•
7UDI¿FFRQWUROPHDVXUHVSHU
&RXQW\VSHFL¿FDWLRQVDQG
PRQLWRUHGE\LQKRXVHWUDLQHG
$766$VWDII
•
0DLQWDLQFOHDQSURMHFWVLWHIUHH
RIGHEULVUHIXVH
•
8WLOL]HHTXLSPHQWDGDSWHGIRUXVH
RQSURMHFWVZMREVLWHFRQVWUDLQWV
• &RPPXQLFDWLRQZLWKDGMDFHQWEXVLQHVVRZQHUV
VFKRROWUDQVSRUWDWLRQGHSDUWPHQWVHPHUJHQF\
VHUYLFHVKRPHRZQHUV
• $VVHPEOHWHPSRUDU\SHGHVWULDQDFFHVV
• :RUNHI¿FLHQWO\DQGZLWKTXDOLW\QRSXQFKOLVW
LWHPV
• 5HSRUWWR&RXQW\30RQDQ\FRQÀLFWVLPPHGLDWHO\
• &RRUGLQDWHZ&RXQW\4&VWDII
Open to 
7UDIÀF
3URMHFWFRPSOHWHGZLWKLQVFKHGXOHDQGEXGJHWFRQVWUDLQWVXWLOL]LQJVDIHSUDFWLFHVDQGPRUH
HI¿FLHQWSURFHVVHV
INITIAL CONTACT
Utility Coordination / 
Permit Application
CONSTRUCTION
SCOPING SESSION / 
SITE VISIT
Construction Phasing Plan
Temporary Access
Community Relations
Final Job 
Walk / Invoice
Open to 
7UDIÀF
dŚĞŐƌĂƉŚŝĐďĞůŽǁĚĞƉŝĐƚƐ͛Ɛ͞WƌŽĐĞƐƐĨŽƌ:ŽďKƌĚĞƌŽŶƚƌĂĐƟŶŐ^ĞƌǀŝĐĞƐ͘͟ĐŽŵƉůĞƚĞĞdžƉůĂŶĂƟŽŶŽĨ͞dŚĞ
WƌŽĐĞƐƐ͟ŝƐŝŶĐůƵĚĞĚĂůŽŶŐƐŝĚĞ͘
'%$RZQVDQGPDLQWDLQVDODUJHÁHHWRIKHDY\HTXLSPHQWWKDWLVVSHFLÀFDOO\VL]HGIRU-2&ZRUN6PDOOHUPRUHQLPEOHHTXLSPHQWWKDW
FDQXWLOL]HDWWDFKPHQWVLVSDUWRIWKHUHDVRQZHDUHVRVXFFHVVIXOZLWK-2&GHOLYHU\+DYLQJWKHULJKWWRROVIRUWKHULJKWMREPDNHVDUHDO
GLIIHUHQFHLQVLWHVDIHW\DQGSURMHFWTXDOLW\
	



ADA Modernizations Services
Serial #210084-JOC
June 3, 2021
10
CURRENT AND/OR PAST JOC CONTRACTS:
JOC Name:  Citywide Civil 
Construction & Sitework
Description3URMHFWVUHTXLULQJHDUWKZRUNSDYLQJFRQFUHWHÀDWZRUNVWRUPGUDLQSLSHVGUDLQ
DJHVWUXFWXUHVXQGHUJURXQGSLSHOLQHVPLQRUHOHFWULFDODQGODQGVFDSLQJWUDI¿FVLJQDOV&&79V
VLJQDJHDQGVWULSLQJ
Customer&LW\RI3HRULD
Contract Time)HE
-DQ
Value:0LO<U Range8SWR0LOWDVN
order
# of Jobs
JOC Name:  Citywide Civil 
Construction & Sitework
Description3URMHFWVUHTXLULQJHDUWKZRUNSDYLQJFRQFUHWHÀDWZRUNVWRUPGUDLQSLSHVGUDLQ
DJHVWUXFWXUHVXQGHUJURXQGSLSHOLQHVPLQRUHOHFWULFDODQGODQGVFDSLQJWUDI¿FVLJQDOV&&79V
VLJQDJHDQGVWULSLQJ
Customer&LW\RI6FRWWVGDOH
Contract Time$SU
0DU
Value:0LO<U Range8SWR0LO
WDVN
# of Jobs
JOC Name:  Citywide General 
Landscaping
Description,QVWDOODWLRQRISODQWVWUHHVJUDVVLUULJDWLRQV\VWHPVSODFHPHQWRI'*SODQWVDO
YDJHZDOOV	FXUELQJZDONZD\VSDUNLPSURYHPHQWVVHDWLQJIRXQWDLQVWDEOHVGHFRUDWLYHZDOOV
DQGODQGVFDSHOLJKWLQJ
Customer&LW\RI6FRWWVGDOH
Contract Time-DQ
'HF
Value:0LO<U Range8SWR0LO
WDVN
# of Jobs
JOC Name:  Bridge Deck 
Overlay and Sealing
Description&RQVWUXFWLRQVHUYLFHVIRUEULGJHGHFNRYHUOD\VDQGVHDOLQJRIFRQFUHWHEULGJHGHFNV
DQGDSSURDFKVODEV([SDQVLRQMRLQWVFRQFUHWHSDWFKLQJDQGRWKHUDVVRFLDWHGZRUNLVDOVR
LQFOXGHG
Customer0&'27
Contract Time0DU
)HE
Value:0LO<U Range8SWR0LOWDVN
# of Jobs
-2&1DPH$'$0RGHUQL]D-
tion Services
Description&RQVWUXFWLRQRIFRQFUHWHVLGHZDONVFXUEVDQGJXWWHUVFXUEUDPSVDQGUHODWHG
FRQVWUXFWLRQDFWLYLWLHV
Customer0&'27
Contract Time1RY
2FW
Value:0LO<U Range8SWR0LOWDVN
# of Jobs
JOC Name:  Bridge & Guard-
rail Projects
Description&RQVWUXFWLRQVHUYLFHVDVWKH\SHUWDLQWREULGJHDHVWKHWLFVDIHW\PDLQWHQDQFHDQG
UHSDLUSURMHFWV,QDGGLWLRQJXDUGUDLODQGHQGWUHDWPHQWVUHSDLUVUHSODFHPHQWVRUUHKDELOLWDWLRQDW
EULGJHORFDWLRQVLVDOVRSDUWRIWKLVFRQWUDFW
Customer&LW\RI3HRULD
Contract Time0D\
$SU
Value:0LO<U Range8SWR0LOWDVN
# of Jobs
JOC Name:  Civil Construc-
tion Services
Description&RQVWUXFWLRQVHUYLFHVRISDYHGVWUHHWVGLUWURDGVJXDUGUDLOVSDUNLQJDUHDVVLGH
ZDONVKDQGLFDSUDPSVFXUEVJXWWHUVWUDLOVPXOWLXVHSDWKVSDUNSDYHPHQWVEULGJHVFXOYHUWV
DQGEDVLQV
Customer3LQDO&RXQW\
Contract Time-XQ
0D\
Value:0LO<U Range8SWR0LOWDVN
# of Jobs
JOC Name:  Concrete
 Services
Description&RQVWUXFWLRQRIDOOWKLQJVFRQFUHWHLQFOXGLQJÀDWZRUN3&&3GUDLQDJHVWUXFWXUHV
FRQYH\DQFHVDQGXQGHUJURXQGSLSLQJ
Customer0DULFRSD&RXQW\
Contract Time$ZDUGHG
Value:0LO<U Range8SWR0LOWDVN
# of Jobs
	



ADA Modernizations Services
Serial #210084-JOC
June 3, 2021
11
CURRENT AND/OR PAST JOC CONTRACTS (CONTINUED)
JOC Name:  Public Works 
General Contracting
Description&RQVWUXFWLRQRIDQ\KHDY\FLYLOSURMHFWDW6WDWHZLGH'HSDUWPHQWIDFLOLWLHVLQFOXGLQJ
'DPVZDWHUOLQHV$'$LPSURYHPHQWVERDWUDPSVZLOGOLIHKDELWDWVSXPSLQJV\VWHPVHURVLRQ
UHSDLUV
Customer$=*DPH	)LVK
Contract Time0DUWR
'HF
Value:8QOWG
Range8SWR0LOWDVN
# of Jobs
JOC Name:  Citywide Civil 
Construction
Description&RQVWUXFWLRQRIKHDY\FLYLOSURMHFWVLQFOXGLQJFRQFUHWHÀDWZRUNHDUWKZRUNGUDLQDJH
FRQYH\DQFHVSDUNV$'$LPSURYHPHQWVIRXQGDWLRQVGULYHZD\VFUDFNVHDOLQJ
Customer&LW\RI$YRQGDOH
Contract Time0DU
WR-DQ
Value:0LO<U Range8SWR0LOWDVN
# of Jobs
JOC Name:  Minor Street 
Improvements & Repair
Description1HZFRQVWUXFWLRQRUUHSDLUVLQFOXGLQJSDYLQJFRQFUHWHÀDWZRUNVWRUPGUDLQVDQG
XQGHUJURXQGXWLOLWLHV
Customer&LW\RI&KDQGOHU
Contract Time1RY
WR2FW
Value:0LO<U Range8SWR0LOWDVN
# of Jobs
JOC Name:  Concrete
 Services
Description&RQVWUXFWLRQRIDOOWKLQJVFRQFUHWHLQFOXGLQJÀDWZRUN3&&3GUDLQDJHVWUXFWXUHV
FRQYH\DQFHVDQGXQGHUJURXQGSLSLQJ
Customer0RKDYH(GXFDWLRQ
DO&R2SHUDWLYH
Contract Time-XQWR
'HF
Value:0LO<U Range8SWR0LOWDVN
# of Jobs
JOC Name:  Concrete & 
Asphalt Maintenance
Description1HZFRQVWUXFWLRQRUUHKDELOLWDWLRQUHSDLUVIRUFRQFUHWHÀDWZRUNVWUXFWXUHVDQG$&
SDYLQJ
Customer&LW\RI*RRG\HDU
Contract Time-DQWR
'HF
Value:0LO<U Range8SWR0LOWDVN
# of Jobs
-2&1DPH$VSKDOW&RQ-
crete & Grading Projects
Description1HZFRQVWUXFWLRQRUUHSDLUVIRUDQ\SXEOLFZRUNVSURMHFWV&LW\ZLGH
Customer&LW\RI(O0LUDJH
Contract Time-XOWR
-XQ
Value:0LO<U Range8SWR0LOWDVN
# of Jobs:  5
20 JOCs
20 JOCs
since 2011
since 2011
423 Job 
423 Job 
Orders
Orders
Completed 
Completed 
within the 
within the 
last 5 years
last 5 years
1,723 
1,723 
ADA 
ADA 
Ramps
Ramps
Installed last   
Installed last   
5 years
5 years 
43,411.5 
43,411.5 
CY PCC
CY PCC
Placed /
Placed /
ÀQLVKHG
ÀQLVKHG
ÁDWZRUN
ÁDWZRUN
$500 - 
$500 - 
$975,000
$975,000
Job Order size 
Job Order size 
range over last 
range over last 
5 years
5 years
14 
14 
CITIES
CITIES
Used existing 
Used existing 
contracts to 
contracts to 
´3LJJ\EDFNµ
´3LJJ\EDFNµ
Over the last 11 years, DBA has not only been awarded the previous JOC contracts, but additionally, through our 
reputation with our clients, we have been recommended for “piggyback” work with other municipalities.
	



ADA Modernizations Services
Serial #210084-JOC
June 3, 2021
12
 
 
Maricopa County relies on its Job Order Contractors to provide quality and safe construction services, but also to get 
the same quality and safety from our subcontractors and suppliers.  Though we are a self-performing contractor, some 
of this contract’s scope of work will require the assistance of high-quality, pre-vetted subs.  Our qualifying process 
involves the verification that whatever subs are selected can and will complete the project to both the County’s and 
our satisfaction.  This is how we develop long-lasting relationships with our partners who understand Job Order 
Contracting.
DBA will select subcontractors and suppliers for this JOC through a contract specific prequalification, based on a 
number of important criteria, as outlined below.  Our experience serving as a Job Order Contractor has provided 
us with first-hand knowledge of ARS Title 34-603 and its regulations, including hiring subcontractors based on 
qualifications and price, or qualifications alone, but not exclusively on pricing.  
Prior to executing any subcontractor or supplier contract, DBA will communicate with the MCDOT’s Project Manager 
to ascertain their individual history and preferences to give the project the best possible team.
Each job order is unique in its scope and complexity.  Once a job order is awarded to DBA, our Project Manager will 
review the project’s scope with the MCDOT Project Manager and collectively, they will determine if the project would 
be best served with a subcontractor based on qualifications alone.  DBA also embraces the commitment to include a 
pool of qualified SBE prospects by encouraging bid solicitation and SBE outreach activities.
Our prequalification criteria are as follows:
Ź Overall business philosophy
Ź Similar project/task experience
Ź Past performance history (client references)
Ź License status
Ź Safety record (EMR)
Ź Bondability/insurability
Ź Financial status
Ź Current & pending workload
Ź COVID-19 exposure plan
Ź History of claims/litigation, etc.
Having operated a heavy civil construction company in the 
Phoenix area for nearly 25 years, DBA has developed long-
standing relationships with quality subcontractors and 
suppliers across the State of Arizona.  We have a reputation 
amongst local subcontractors and suppliers for conducting 
business ethically and fairly.  As a result, we are able to attract 
the highest quality partners for our clients.
For the purposes of this contract, DBA will self-perform a majority of the work identified in the Contract Scope.  Scopes 
having the potential for subcontractor assistance include:
86%
14%
^hKEdZd/E'KWWKZdhE/d/^
DBA Self-Perform
Potential Subcontracting
• 
AC Paving
• 
Surveying
• 
Materials Testing
• 
Traffic Control
• 
Striping
• 
Signage
• 
Fencing
• 
Signalization
• 
Electrical
• 
Landscaping
• 
Irrigation
	



ADA Modernizations Services
Serial #210084-JOC
June 3, 2021
13
The table below identifies DBA’s Experience Modification Rate for the last 5 years.  These numbers (well below the 
National average) is an indication of our commitment to maintaining safe working environments, not just for our own 
crews but also for the traveling public.
([SHULHQFH0RGLÀFDWLRQ5DWH(02'
Year
2020
2019
2018
2017
2016
Rate





Equal to DBA’s reputation for quality and safe work is our ability to provide our clients with value added ideas on any 
size project.  The table on the following page provides recent examples of value-added / innovations from some of our 
management and field staff on projects.
PROJECT
CLIENT
VALUE-ADDED / INNOVATION
SAVINGS
-2&0F&RUPLFN6WLOOPDQ
5DLOURDG3DUN5HVHUYRLU	
3DUNLQJ/RW
&LW\RI
6FRWWVGDOH
'HPRRIWKHFRQFUHWHXQGHUJURXQGUHVHUYRLUFUHDWHGDORW
RIGHEULVWKDWZDVJRLQJWREHKDXOHGRII+DGHQJLQHHU
UHYLHZSRWHQWLDOVFHQDULRIRUFUXVKLQJFRQFUHWHDQGPL[LQJ
ZLWKLPSRUWPDWHULDOWRXVHDVVWUXFWXUDO¿OO
6DYHGWKHSURMHFWLQKDXOLQJFRVWV
DQGSURYLGHGEHQH¿WWRFRPPXQLW\
E\HOLPLQDWLQJKLJKYROXPHRIGXVW
GXULQJWUDQVSRUW
-2&&RQFUHWH5HSDLUDQG
5HSODFHPHQW
&LW\RI3HRULD
7UDI¿FFRQWUROSODQHQDEOHGVLQJOHODQHFORVXUHVDOORZLQJ
WUDI¿FWRÀRZWKURXJKDURXQGDERXW
0LQLPL]HGWUDI¿FFRQJHVWLRQDQG
DLGHGLQOHVVHQLQJZDLWWLPHVDQG
HPLVVLRQVDQGHOLPLQDWHGQHHGIRU
WHPSRUDU\GHWRXU
-2&%ULGJH5HSDLU	'HFN
6HDOLQJ
&LW\RI3HRULD
:RUNHGZLWKWKH&LW\WRDOORZIXOOEULGJHFORVXUHVDWQLJKW
WRHOLPLQDWHPXOWLSOHODQHFORVXUHVDQGGLVUXSWLRQRIWUDI¿F
GXULQJKLJKSHDNXVDJH
6DYHGLQWUDI¿FFRQWURO
GHYLFHVDQGRIIGXW\SROLFHRI¿FHU
IHHV
-2&6LGHZDON	
0LVFHOODQHRXV&RQFUHWH
5HSDLU
&LW\RI3HRULD
:RUNHGZLWK3HRULDWRDOORZSDUNLQJJDUDJHUHSDLUVWRWDNH
SODFHRQZHHNHQGVVRJDUDJHVFRXOGEHXVHGGXULQJWKH
ZRUNZHHNZLWKRXWWKHSRWHQWLDOIRUYHKLFXODUGDPDJHV
/HVVGLVUXSWLRQWRHPSOR\HHV
-2&+HOPHW3HDN$FFHVV
5RDG,PSURYHPHQWV
&HQWUDO$UL]RQD
Project
3URSRVHGLQVWDOOLQJFRQFUHWHFURVVLQJVLQOLHXRIFXOYHUW
SLSLQJDWORFDWLRQVRQDVWHHSUHPRWHDFFHVVURDG
(OLPLQDWHGIXWXUHPDLQWHQDQFH
FRVWVDQGUHGXFHGWKHSURMHFW
V
RYHUDOOFRVWVDVFRQFUHWHZDV
EHLQJSODFHGLQRWKHUDUHDVDORQJ
WKHURDGZD\
-2&VW$YHQXH	'HHU
9DOOH\5RDG,QWHUVHFWLRQ
,PSURYHPHQWV
&LW\RI3HRULD
:RUNHGZLWK3HRULDWRDOORZDIXOOZHHNHQGFORVXUHRIWKH
LQWHUVHFWLRQ)ULGD\SPWR0RQGD\DPDOORZLQJ
IRUDVKRUWHUVFKHGXOHDQGPLQLPL]LQJLPSDFWV
/HVVGLVUXSWLRQWRFRPPXWHUV
GXULQJKLJKYROXPHWUDI¿FSDWWHUQV
$OVRSURMHFWZDVFRPSOHWHGDKHDG
RIVFKHGXOH6XQGD\QRRQDQG
RSHQHGWRWUDI¿FVRRQHU
&0$5%ODFN&DQ\RQ
/DNH'DP	6SLOOZD\
,PSURYHPHQWV
$=*DPH	)LVK
(OLPLQDWHGULSUDSEHKLQGDUHWDLQLQJZDOODQGFDSSHG
ZLWKVKRWFUHWHVDYLQJWLPHDQGPRQH\5HVHTXHQFHGWKH
ZRUNRQFRQFUHWHWRHSRXUVWRDFFHOHUDWHWKHVFKHGXOH
(OLPLQDWHGZLQWHUVKXWGRZQ
6DYHGRQHOLPLQDWHG
ULSUDS
-2&&DFWXV	'\VDUW
,QWHUVHFWLRQ,PSURYHPHQWV
&LW\RI(O0LUDJH
8VHGDKRXUFORVXUHLQVWHDGRIGRLQJWKHSURMHFWLQ
TXDUWHUV$OORZHGWKHSURMHFWWREHFRPSOHWHGDOODWRQFH
PDNLQJIRUDVPRRWKHUULGHRQ$&SDYLQJ
9HU\VPDOOEXGJHWUHTXLUHG
GLIIHUHQWFRVWPRGHOVWRGHYHORSD
VFRSHRIZRUNWKDWJDYHWKH&LW\
WKHPRVWEDQJIRULWVEXFN
-2&6KHD%RXOHYDUG
/DQGVFDSLQJ
&LW\RI
6FRWWVGDOH
8VHGD'*VKRRWHUWRVSUD\ODUJHYROXPHVRI
GHFRPSRVHGJUDQLWHUDWKHUWKDQZLWKZKHHOEDUURZVDQG
VKRYHOV
6DYHGWKHSURMHFWWLPHDQGRSHQHG
WRSHGHVWULDQVDQGELF\FOHVPXFK
VRRQHU
3UHVKLIW³VWUHWFK	ÀH[´H[HUFLVHVDUH
performed by DBA employees and all of 
RXUVXEFRQWUDFWRUV7KHVHH[HUFLVHVKDYH
proven to be an important part of working 
safe on all job sites.
	



ADA Modernizations Services
Serial #210084-JOC
June 3, 2021
14



-XQH

720DULFRSD&RXQW\

5('%$&RQVWUXFWLRQ,QF  

7R:KRP,W0D\&RQFHUQ

,WLVRXUXQGHUVWDQGLQJRI&RPPHUFLDO:HVW,QVXUDQFH$JHQF\WKDW'%$&RQVWUXFWLRQ,QFLQWHQGVWR
VXEPLWDSURSRVDOWR\RX,WLVDSOHDVXUHWRVKDUHZLWK\RXURXUUHFHQWH[SHULHQFHZLWKRXUFOLHQWDQGWR
RIIHURXUUHFRPPHQGDWLRQWR\RXRQWKHLUEHKDOI 

+DUWIRUG&DVXDOW\,QVXUDQFH&RPSDQ\$;9E\$0%HVWKDVEHHQWKHLUERQGLQJFRPSDQ\VLQFH
7KH\DUHDSSURYHGIRUERQGVFRYHULQJXSWRDVLQJOHOLPLWDQGSRWHQWLDOZRUNSURJUDPRI
XSWR   

2XULQYHVWLJDWLRQRI'%$&RQVWUXFWLRQ,QFKDVEHHQH[WUHPHO\IDYRUDEOH:HDUHFRQILGHQWWKDW\RX
ZLOOILQGWKHPWREHKLJKO\TXDOLILHGDQGUHVSRQVLYHWR\RXUQHHGV:HZRXOGDQWLFLSDWHQRGLIILFXOW\LQ
EHLQJDEOHWRUHVSRQGWRDQ\ERQGUHTXLUHPHQWVRIWKLVSURMHFWVXEMHFWWRUHYLHZDQGGHWHUPLQDWLRQWKDW
WKHFRQWUDFWDQGERQGGRFXPHQWVDUHDFFHSWDEOH

7KLVOHWWHULVQRWEHFRQVWUXHGDVDQDJUHHPHQWWRSURYLGHVXUHW\ERQGVIRUDQ\SDUWLFXODUSURMHFWEXWLV
RIIHUHGDVDQLQGLFDWLRQRIRXUH[SHULHQFHDQGFRQILGHQFHLQWKLVILUP$Q\VSHFLILFUHTXHVWIRUERQGV
ZLOOEHXQGHUZULWWHQLWVRZQPHULW

3OHDVHGRQRWKHVLWDWHWRFRQWDFWPHIRUDQ\IXUWKHURUPRUHGHWDLOHGLQIRUPDWLRQ

6LQFHUHO\

/RUL6SHOGH

/RUL6SHOGH 
$WWRUQH\,Q)DFW


	



	



Robert “Bob” Maurer
Contract/Project Manager
SUMMARY
Heavy Construction since 1981
DBA Employee since August, 2005
EDUCATION
B.S., Construction Engineering—Arizona State 
University 1981
A.A.S., Construction Engineering—State University 
New York—Alfred Tech 1978
TRAINING & CERTIFICATIONS
• 
JOC Fundamentals - Alliance for Construction 
Excellence (ACE)
• 
OSHA 30-hour Certifi cate
• 
Job Order Contracting Training, Alliance for 
Construction Excellence
• 
Forklift Operations & Safety Training—2011
• 
MSHA CFR 30, Part 46/47/48—Experienced Miner
• 
OSHA 10 hr. Certifi cate
• 
Construction Surveying 1, Associated General 
Contractors 2008
• 
Soils 1, Associated General Contractors 2008
• 
Rule 310, Dust Control Certifi cation
• 
EPA Method 9, Visible Emissions Training—2011
• 
First Aid & CPR Trained
Mr. Maurer has worked in the heavy construction 
industry in Arizona since 1981.  His expertise has been 
in grading, paving and structural concrete applications 
for multiple task order contracts for municipalities 
and utility companies.  Mr. Maurer began his career 
working in heavy materials sales and eventually 
owned a trucking company supplying aggregates 
and fi ll for heavy contractors in Arizona.  Bob is 
experienced in planning, coordinating, estimating, 
scheduling and subcontractor management on 
small, simultaneously completed contracts.  He is an 
outstanding communicator and has been responsible 
for the introduction of innovative uses of materials and 
methods in the fi eld that have resulted in lower client 
costs and schedule durations. His recent relevant 
experience includes:
• 
ASU Recreational Sports Fields Improvements, 
University and Rural Road, Arizona State University, 
Tempe, AZ - Upgrades to the playing fi elds at the Main 
Campus required earthwork and extensive concrete 
fl atwork.  DBA’s scope included subgrade preparation, 
the placement of 8’ wide sidewalks (8,753 SF), curb 
and gutter, roll curbs, 13 scuppers, 2 ADA ramps and 
handrails at the scuppers.  Project Manager, 2020
• 
JOC ADA Improvements in Sun City West, MCDOT, 
Arizona - The project was to remove existing and 
replace with newly approved ADA ramps in an area 
within Sun City West near Banner’s Del E. Webb 
Medical Center.  Contract Manager, 2020
• 
JOC 114th Avenue & Butler Drive Dead-End 
Improvements, City of Peoria, AZ - Scope included 
removal of debris and construction of a neighborhood 
pocket park to eliminate a dumping area along the Agua 
Fria River.  Included subgrade preparation, grading, 
landscaping, new sidewalks, ADA ramps, two new catch 
basins, irrigation, signage, and a tie-into the existing 
multi-use path along the river.  Contract Manager, 2020
• 
New Intersection Improvements, Thomas Road 
and Verrado Way in Verrado, DMB White Tank, LLC 
and City of Buckeye, Arizona—Using a CFD Grant, 
the master-planned community of Verrado in Buckeye 
needed a complete intersection with traႈ  c signalization 
with traႈ  c cameras, mast arms, LED light poles, new 
concrete curb, gutter and sidewalks, new AC paving, 
signage, striping, and minor landscaping improvements 
to accommodate heavier traႈ  c in the area due to 
increased development.  Project Manager, 2020
• 
Bus Stop ADA Enhancements, City of Glendale, 
Arizona—Built along three major thoroughfares and at 
10 separate locations, the project required removal and 
replacement of concrete sidewalks to include concrete 
bus pads, installation of 3” PVC sleeves under the slab 
to accommodate potential electrical wiring; two new bus 
shelter installations; and new signage.  Project Manager, 
2020
• 
ADA Improvements, Maricopa County Department 
of Transportation, Hopeville, AZ—Part of our JOC 
with MCDOT, DBA constructed 15 new ADA ramps 
throughout the subdivision (corner ramps and mid-block 
ramps).  Project Manager, 2020
	



Jordan Hamula
Senior Project Manager / Principal
SUMMARY
Heavy Construction since 2004
DBA Employee since August, 2006
EDUCATION
B.S., Construction Management
Northern Arizona University
TRAINING & CERTIFICATIONS
• 
OSHA 10-hour Certifi cate
• 
Forklift Operations & Safety Certifi cate
• 
MSHA CFR 30, Part 46/47/48—Experienced Miner
• 
First Aid & CPR Trained
• 
MSHA Hazard Recognition
Mr. Hamula has worked in the heavy construction 
industry since 2004.  His responsibilities have 
included subcontractor coordination, scheduling, 
supply expediting, utility coordination, and materials 
procurement.  His expertise is in the management of 
projects requiring extensive concrete placement and 
excavation.   He has extensive experience working 
in alternative delivery projects requiring fast turn-
around for both preconstruction and construction 
phase services. Jordan is an experienced construction 
professional who has provided excellent client 
service utilizing outstanding communication skills and 
partnering methods in his project delivery.  His relevant 
experience includes:
• 
ADA Improvements in Sun Lakes, MCDOT, Sun 
Lakes, AZ - Responsible for the construction of more 
than 1,400 SY of ADA ramps throughout Units 11 thru 
22 in the retirement community.  Also included the 
construction of new valley gutters, sidewalks, curb & 
gutter, and subgrade preparation.  Project Manager, 
2021
• 
Johnson Ranch Blvd. & Golf Club Drive Roundabout, 
San Tan Valley, Pinal County, AZ - New roundabout 
construction included concrete curb & gutter, sidewalks, 
ADA ramps, valley gutters, median, 18” headwall 
for drainage, and 300 SY of 9” thick PCCP.  Project 
Manager, 2021
• 
Low Water Crossings, Pool 39, Central Arizona 
Project, Marana, AZ - The project was to provide 
drainage improvements for the CAP access road leading 
to their Pool 39.  DBA constructed 4 reinforced concrete 
low water crossings and placed rip-rap at all four 
locations alongside the roadway.  Project Manager, 2020
• 
Bus Pull-Out and Shelter at Tempe Public Library, 
Tempe, AZ—The project included the demolition of 
the existing bus pullout and new construction of a bus 
shelter with electrical conduit, lighting, new irrigation and 
landscaping, subgrade preparation, PCC paving for the 
new bus pull out, new concrete curb and sidewalks, and 
new AC paving for a new ADA parking area.  Project 
Manager, 2020
• 
Country Place & Laurelwood Park Neighborhood 
ADA Upgrades, Maricopa County Dept. of 
Transportation, Chandler, AZ –Concrete fl atwork 
upgrades and modifi cations in advance of the County’s 
pavement preservation program.  The work included 
Median nose work; replacement of concrete valley 
gutters and aprons; construction of new sidewalks; and 
replacement of ADA ramps.  The project covered a total 
of 22 separate locations within the two subdivisions 
and was constructed in a phased method.  Contract 
Manager, 2020
• 
Old Town Scottsdale ADA Upgrades, Phases I, II and 
III, Scottsdale, AZ—The project included the upgrade 
or replacement of ADA ramps in downtown Scottsdale 
along Indian School Road and on Second Street.  A total 
of 40+ ADA ramps were aႇ ected, sidewalks, driveways 
and tree grates, as well as utility work-arounds and 
adjacent business coordination for access.  Contract 
Manager, 2017
	



Matt Woolwine
Preconstruction Manager / Lead Estimator
SUMMARY
Heavy Construction since 2005
DBA Employee since April, 2005
TRAINING & CERTIFICATIONS
• 
Traႈ  c Control Supervisor - ATSSA Certifi ed, 2013
• 
Traႈ  c Control Technician - ATSSA Certifi ed, 2013
• 
MSHA Part 46/47/48 —Experienced Miner
• 
Flagger/Traႈ  c Control Training
• 
Soils I—Associated General Contractors
• 
Grading—Associated General Contractors
• 
Forklift Operations & SafetyTraining
• 
Confi ned Space Competent
• 
Rigging Certifi ed
• 
OSHA 10-hour Certifi cate
• 
First Aid & CPR Trained
Mr. 
oolwine is an experienced preconstruction 
manager for heavy construction projects, with 
specialized experience in responding to J
 
job orders with short turnaround. tarting as a 
rew oreman, Matt provided supervision and 
subcontractor coordination on a wide variety of heavy 
civil construction projects including fl ood control 
structures, bridges, and extensive paving projects.
His experience and dedication to the industry has 
allowed him to expand his knowledge into estimating, 
scheduling, procurement and project management for 
some of 
s most important clients.  Matt has fi rst-
hand knowledge of design-build and other alternative 
delivery methods and has been instrumental in sharing 
innovative ideas to the team resulting in lowered 
overall project costs and safety management.  Mr. 
oolwine s recent experience includes:
• 
ADA Improvements in Sun Lakes, MCDOT, Sun 
Lakes, AZ - Responsible for the construction of more 
than 1,400 SY of ADA ramps throughout Units 11 thru 
22 in the retirement community.  Also included the 
construction of new valley gutters, sidewalks, curb & 
gutter, and subgrade preparation.  Preconstruction 
Manager, 2021
• 
ASU Recreational Sports Fields Improvements, 
University and Rural Road, Arizona State University, 
Tempe, AZ - Upgrades to the playing fi elds at the Main 
Campus required earthwork and extensive concrete 
fl atwork.  DBA’s scope included subgrade preparation, 
the placement of 8’ wide sidewalks (8,753 SF), curb 
and gutter, roll curbs, 13 scuppers, 2 ADA ramps and 
handrails at the scuppers.  Preconstruction Manager, 
2020
• 
JOC ADA Improvements in Sun City West, MCDOT, 
Arizona - The project was to remove existing and 
replace with newly approved ADA ramps in an area 
within Sun City West near Banner’s Del E. Webb 
Medical Center.  Preconstruction Manager,2020
• 
JOC 114th Avenue & Butler Drive Dead-End 
Improvements, City of Peoria, AZ - Scope included 
removal of debris and construction of a neighborhood 
pocket park to eliminate a dumping area along the Agua 
Fria River.  Included subgrade preparation, grading, 
landscaping, new sidewalks, ADA ramps, two new catch 
basins, irrigation, signage, and a tie-into the existing 
multi-use path along the river.  Preconstruction Manager, 
2020
• 
Grandview Neighborhood Road Improvements– 
Phase II, Apache Junction, AZ—Utilizing a CDBG, 
DBA was contracted to complete a second phase of the 
improvements to neighborhood streets including new 
curb, gutter, sidewalks, ADA ramps, driveways and AC 
paving.  Preconstruction Manager, 2020
• 
Poston Butte Intersection Improvements at Gantzel 
Road, Pinal County, Arizona – The project consisted of 
the removal and replacement of the concrete sidewalk, 
ADA ramps (including two within the roadway median), 
curb and gutter, and the installation of a complete Polera 
Crosswalk System.  The project included 4’ electrical 
pedestrian poles with count-down modules and restriping 
the intersection. Preconstruction Manager, 2018
	



Adam Pitts
Superintendent
SUMMARY
Heavy Construction since 2005
DBA Employee since February, 2008
TRAINING & CERTIFICATIONS
• 
Traႈ  c Control Technician - ATSSA Certifi ed, 2013
• 
OSHA 10-Hour Certifi ed
• 
OSHA 30-Hour Certifi ed
• 
Traႈ  c Controls Certifi ed
• 
First Aid & CPR Trained
• 
Confi ned Space Competent
Mr. itts has 
 years in the heavy construction 
industry, 
 of those years here at 
. uring 
that time, he has proven to be an excellent 
concrete fl atwork superintendent, specializing in 
 improvements under J
s. He has additional 
knowledge in earthwork operations including grading 
and drainage.  dam is experienced in subcontractor 
coordination, safety, quality control, estimating, and 
scheduling techniques.  dam s recent projects have 
been:
• 
ADA Improvements in Sun Lakes, MCDOT, Sun 
Lakes, AZ - Responsible for the construction of more 
than 1,400 SY of ADA ramps throughout Units 11 thru 
22 in the retirement community.  Also included the 
construction of new valley gutters, sidewalks, curb & 
gutter, and subgrade preparation.  Superintendent, 2021
• 
ASU Recreational Sports Fields Improvements, 
University and Rural Road, Arizona State University, 
Tempe, AZ - Upgrades to the playing fi elds at the Main 
Campus required earthwork and extensive concrete 
fl atwork.  DBA’s scope included subgrade preparation, 
the placement of 8’ wide sidewalks (8,753 SF), curb 
and gutter, roll curbs, 13 scuppers, 2 ADA ramps and 
handrails at the scuppers.  Superintendent, 2020
• 
JOC ADA Improvements in Sun City West, MCDOT, 
Arizona - The project was to remove existing and 
replace with newly approved ADA ramps in an area 
within Sun City West near Banner’s Del E. Webb 
Medical Center.  Superintendent, 2020
• 
Grandview Neighborhood Road Improvements– 
Phase II, Apache Junction, AZ—Utilizing a CDBG, 
DBA was contracted to complete a second phase of the 
improvements to neighborhood streets including new 
curb, gutter, sidewalks, ADA ramps, driveways and AC 
paving.  Superintendent, 2020
• 
Bus Stop ADA Enhancements, City of Glendale, 
Arizona—Built along three major thoroughfares and at 
10 separate locations, the project required removal and 
replacement of concrete sidewalks to include concrete 
bus pads, installation of 3” PVC sleeves under the slab 
to accommodate potential electrical wiring; two new bus 
shelter installations; and new signage.  Superintendent, 
2020
• 
Country Place & Laurelwood Park Neighborhood 
ADA Upgrades, Maricopa County Dept. of 
Transportation, Chandler, AZ –Concrete fl atwork 
upgrades and modifi cations in advance of the County’s 
pavement preservation program.  The work included 
Median nose work; replacement of concrete valley 
gutters and aprons; construction of new sidewalks; and 
replacement of ADA ramps.  The project covered a total 
of 22 separate locations within the two subdivisions and 
was constructed in a phased method.  Superintendent, 
2020
	



Kelly Fisher
Superintendent
SUMMARY
Heavy Construction since 1990
DBA Employee since October, 2019
TRAINING & CERTIFICATIONS
• 
A.S., Construction Technology
• 
   Community College of the USAF
• 
Pavement Maintenance and Repair
• 
Construction Materials Testing
• 
Pavement and Construction Equipment 
Apprentorship
Mr. isher has 
 years experience working in 
the heavy civil construction industry.  eginning his 
career with the 
 in 
 as a Heavy quipment 
perator and avement Maintenance pecialist.
Mr. isher has been responsible for mass earthwork 
operations, paving projects in both 
 and 
, 
installation of underground utilities including storm 
drains, water and sewer lines and multiple road 
construction projects.
ince joining 
, Mr. isher has been highly 
successful serving clients under J
 contracts with 
special emphasis on rehabilitation and reconstruction 
projects under heavy tra௻  c conditions.  His pertinent 
project experience includes:
• 
Downtown Glendale Irrigation & Landscaping 
Enhancements, City of Glendale, AZ - Sawcutting of 
multiple residential streets, driveways and sidewalks, 
excavation to allow for the install of new irrigation line 
sleeves for improved landscaping in historic downtown. 
Also included slurry backfi ll and AC patching and crack 
sealing. Superintendent, 2021
• 
Dynamite Road at Pima Road Left-Turn Lane 
Modifi cations, City of Scottsdale, AZ - Earthwork,
removals, new subbase, 7” AC in multiple lifts, roll curb 
and gutter, median nose modifi cations, signage, striping 
and minor landscaping.  Superintendent, 2020
• 
Shea Blvd & 64th Street Bike Route Improvements, 
City of Scottsdale, AZ - Intersection improvements for 
ADA and bike access including new ramp, curb & gutter, 
pavement markings, slurry seal, striping, install new 
handrail at culvert, new pole foundation for pedestrian 
crosswalk system.  Also completed earthwork, AC paving 
and new striping for bike path north of the intersection.
Superintendent, 2020
• 
Indian School Road Improvements, Verrado, DMB 
White Tanks, LLC—The project included providing an 
acceleration/deceleration lane along Indian School Road 
in front of Verrado High School.  The scope of work 
included earthwork, paving, striping, electrical, sidewalks 
and ADA ramps, as well as an improved driveway into 
student parking.  Superintendent, 2020
• 
Mountain View Sidewalks, Scottsdale, AZ—Creating
safer travel for equestrians, Scottsdale hired DBA to 
improve sidewalks along Mountain View Road west of 
112th Street. A specialized, non-slip surface for horses 
was also applied. Superintendent, 2020
• 
Grandview Neighborhood Road Improvements– 
Phase II, Apache Junction, AZ—Utilizing a CDBG, 
DBA was contracted to complete a second phase of the 
improvements to neighborhood streets including new 
curb, gutter, sidewalks, ADA ramps, driveways and AC 
paving.  Superintendent, 2020
• 
Bus Pull-Out and Shelter at Tempe Public Library, 
Tempe, AZ—The project included the demolition of 
the existing bus pullout and new construction of a bus 
shelter with electrical conduit, lighting, new irrigation 
and landscaping, subgrade preparation, PCC paving for 
the new bus pull out, new concrete curb and sidewalks, 
and new AC paving for a new ADA parking area.  
Superintendent, 2020 
	



Terry McBroom
Senior Superintendent
SUMMARY
Heavy Construction since 1990
DBA Employee since August, 2013
TRAINING & CERTIFICATIONS
• 
MSHA CFR 30, Part 46/47/48 - Experienced Miner
• 
30-Hour OSHA Certifi cation
• 
Rule 310 Dust Control
• 
Kinder Morgan TQ Certifi ed
• 
Commercial Driver—Class A
• 
US Army Corps of Engineers QC Trained
• 
First Aid & CPR Trained
• 
Certifi ed Operator for Backhoe, Excavator, Loader, 
Boom Truck, Forklift, Hydro-crane, Welder
Mr. Mc room has more than 0 years experience in 
the heavy construction industry, beginning in 
0, 
with his own decorative concrete placement company.  
Mr. Mc room has been responsible for all types of 
heavy construction projects requiring concrete fl atwork, 
underground pipe installations, concrete structures, 
and heavy earthmoving operations.  His specialization 
is in the supervision and training of crews for concrete 
rehabilitation.  erry has performed or supervised 
crews performing methacrylate applications, epoxy 
overlays, micro-silica applications, polyester concrete 
applications, and carbon fi ber wrapping.  His pertinent 
experience includes:
• 
Johnson Ranch Blvd. & Golf Club Drive Roundabout, 
San Tan Valley, Pinal County, AZ - New roundabout 
construction included concrete curb & gutter, sidewalks, 
ADA ramps, valley gutters, median, 18” headwall for 
drainage, and 300 SY of 9” thick PCCP.  Superintendent, 
2021
• 
Superior Flood Mitigation Project, Pinal County, 
Town of Superior, AZ—The work, completed using 
DBA’s Job Order Contract with the County, included the 
replacement of pavements, reconstruction of driveways, 
the addition of sidewalks and valley gutters for improved 
drainage along Church Avenue and Copper Mountain 
Drive at the east end of town.  Superintendent, 2020
• 
Grandview Neighborhood Road Improvements– 
Phase II, Apache Junction, AZ—Utilizing a CDBG, 
DBA was contracted to complete a second phase of the 
improvements to neighborhood streets including new 
curb, gutter, sidewalks, ADA ramps, driveways and AC 
paving.  Superintendent, 2020
• 
Roadway Reconstruction and Concrete Flatwork, 
ADOT, Globe, AZ—A federally-funded project, ADOT 
was required to manage the project for the City of 
Globe.  Scope of work included mill and overlay, new 
curb, sidewalks, driveways, ADA ramps and catch basins 
along Hill Street and Ash Street in the historic downtown. 
Superintendent, 2019
• 
Grandview CDBG Neighborhood Improvements, 
Apache Junction, AZ—Utilizing a Federal grant, 
the CDBG was able to contract for neighborhood 
infrastructure improvements including concrete fl atwork 
and AC paving for the Grandview housing development.  
Superintendent, 2019
• 
Job Order Contract FY19 for Concrete and AC 
Paving Maintenance and Repairs, City of Goodyear, 
Arizona—This contract was the annual extension of a 
fi ve-year contract initiated in 2018 for minor sidewalk 
repairs and replacement and AC rehabilitation or repairs 
throughout the City.  Superintendent, 2019
• 
JOC City Street Operations Sidewalks and ADA 
Ramp Upgrades, Scottsdale, AZ—The project included 
extensive concrete fl atwork ($1.3 million) near the 
Street Operations Department on San Salvador Drive.
Construction was completed along Hayden Road and 
Shea Blvd. for multiple miles.  Superintendent, 2019
	



Request For Qualifications
MCDOT ADA ModernizationV Services JOC 
Job Order Contractor
Page 2
Thursday, 0D\ 13, 20
Serial# -JOC
Attachment 1 - REFERENCE FORMAT 
0DULFRSD &RXQW\ UHTXLUHV D PLQLPXP RI 7+5((  UHIHUHQFHV DQG RU D PD[LPXP RI ILYH  PRVW UHFHQWO\
FRPSOHWHGSURMHFWVZKLFKDUHVLPLODULQPDJQLWXGHFRPSOH[LW\DQGGROODUYDOXHThis form may be replicated as 
needed to be responsive to the Request for Qualifications.

&RPSDQ\1DPH
$GGUHVV
3KRQH1XPEHU
)DFVLPLOH1XPEHU
3HUVRQWR&RQWDFW
(PDLO$GGUHVV
2ZQHU¶V%LGRU3URMHFW
'DWHRI&RPSOHWLRQ
%ULHI3URMHFW'HVFULSWLRQ,QFOXGLQJ3DUWQHULQJ7HDPDQG2ZQHU¶VSURMHFWQDPH

&RPSDQ\1DPH
$GGUHVV
3KRQH1XPEHU
)DFVLPLOH1XPEHU
3HUVRQWR&RQWDFW
(PDLO$GGUHVV
2ZQHU¶V%LGRU3URMHFW
'DWHRI&RPSOHWLRQ
%ULHI3URMHFW'HVFULSWLRQ,QFOXGLQJ3DUWQHULQJ7HDPDQG2ZQHU¶VSURMHFWQDPH

&RPSDQ\1DPH
$GGUHVV
3KRQH1XPEHU
)DFVLPLOH1XPEHU
3HUVRQWR&RQWDFW
(PDLO$GGUHVV
2ZQHU¶V%LGRU3URMHFW
'DWHRI&RPSOHWLRQ
%ULHI3URMHFW'HVFULSWLRQ,QFOXGLQJ3DUWQHULQJ7HDPDQG2ZQHU¶VSURMHFWQDPH

&RPSDQ\1DPH
$GGUHVV
3KRQH1XPEHU
)DFVLPLOH1XPEHU
3HUVRQWR&RQWDFW
(PDLO$GGUHVV
2ZQHU¶V%LGRU3URMHFW
'DWHRI&RPSOHWLRQ
%ULHI3URMHFW'HVFULSWLRQ,QFOXGLQJ3DUWQHULQJ7HDPDQG2ZQHU¶VSURMHFWQDPH

&RPSDQ\1DPH
$GGUHVV
3KRQH1XPEHU
)DFVLPLOH1XPEHU
3HUVRQWR&RQWDFW
(PDLO$GGUHVV
2ZQHU¶V%LGRU3URMHFW
'DWHRI&RPSOHWLRQ
%ULHI3URMHFW'HVFULSWLRQ,QFOXGLQJ3DUWQHULQJ7HDPDQG2ZQHU¶VSURMHFWQDPH
%LG-2&
0DULFRSD&RXQW\
&LW\RI3HRULD
1RUWKWK$YHQXH3HRULD$=


:LOOLDP%HORLW
:LOOLDPEHORLW#SHRULDD]JRY
&RQWUDFW$&21
2QJRLQJ
&LW\ZLGH&LYLO&RQVWUXFWLRQ	6LWHZRUN
-RE2UGHU&RQWUDFWLQFOXGLQJ$'$PRGHUQL]DWLRQVHUYLFHV
0DULFRSD&RXQW\'HSWRI7UDQVSRUWDWLRQ
:HVW'XUDQJR6W3KRHQL[$=

PDWWPDGGX[#PDLOPDULFRSDJRY
2QJRLQJ
-2&IRU&RQFUHWH6HUYLFHVDQG-2&IRU

0DWW0DGGX[
&LW\RI$YRQGDOH
:HVW&LYLF&HQWHU'ULYH$YRQGDOH$=


WVWUXYH#DYRQGDOHRUJ
7RP6WUXYH
$&21
2QJRLQJ
3LJJ\EDFNFRQWUDFWRQWRH[LVWLQJ3HRULD
-RE2UGHU&RQWUDFWIRU&LW\ZLGH&LYLO&RQVWUXFWLRQDQG6LWHZRUNLQFOXGLQJ$'$PRGHUQL]DWLRQVHUYLFHV
&LW\RI6FRWWVGDOH
(DVW,QGLDQ6FKRRO5G6FRWWVGDOH$=

3LQDO&RXQW\3XEOLF:RUNV
(DVW3LQDO6WUHHW)ORUHQFH$=


&HOHVWH*DU]D
FHOHVWHJDU]D#SLQDOFRXQW\D]JRY
2QJRLQJ
2QJRLQJ
&RQWUDFW&26
&LW\ZLGH&LYLO&RQVWUXFWLRQ	6LWHZRUN
-RE2UGHU&RQWUDFWLQFOXGLQJ$'$PRGHUQL]DWLRQVHUYLFHV

&KULV3HUNLQV
FSHUNLQV#VFRWWVGDOHD]JRY
&RQWUDFW
-2&&LYLO&RQVWUXFWLRQ6HUYLFHVLQFOXGLQJ$'$PRGHUQL]DWLRQVHUYLFHV
$'$0RGHUQL]DWLRQ6HUYLFHV