May 22, 2024
Z2023137
Page 1 of 4
Report to the Board of Supervisors
Prepared by the Maricopa County Planning and Development Department
Board Hearing Date:
May 22, 2024
Case #/Title:
Z2023137 – Yellow Bell Solar Project
Supervisor District:
5
Applicant/Owner:
Kimley-Horn & Associates, Keith Nichter / Arizona State Land
Department
Request:
Zone change from Rural-43 and Rural-190 to IND-2 IUPD with a plan
of development (POD)
Site Location:
Generally located at the NEC of the intersection of Watermelon Rd.
and Old US Hwy 80
Site Size:
Approximately 802.55 acres
County Island Status:
No
Additional
Comments:
The applicant is seeking a zone change with overlay from Rural-43
and Rural-190 to IND-2 IPD with a plan of development (POD) for an
industrial-scale solar electric energy generation and battery energy
storage facility. The site is currently designated as a Utilities land
use per an approved Comprehensive Plan Amendment approved by
the Board of Supervisors on December 8, 2021 (CPA2021010).
The project is comprised of approximately 2,004.48 acres, but
802.55 acres is located within unincorporated Maricopa County
and the remaining 1,201.48 acres is within the Town of Gila Bend.
The applicant is processing a rezone request with the Town of Gila
Bend for the portion of the site is located within the Towns
jurisdiction. This request was routed to the Town and they have not
provided any comments or concerns.
The subject site to this request is administered by the Arizona State
Trust Land (ASLD). A letter from ASLD was provided along the
application providing permission for the applicant to process a
zone change request with Maricopa County.
The applicant is requesting to change the zoning to IND-2 IUPD, the
overlay request is to vary the parking, pavement, loading/unloading,
landscaping, sight visibility triangles, site enclosure, screening,
May 22, 2024
Z2023137
Page 2 of 4
transmission tower height, and light pole height requirements in
order to be consistent with other similar utility scale solar facilities
in this area of the county. On April 24, 2024 a handout was provided
to the Planning and zoning commissioners to update condition ‘c.7’
per the revised comment letter provided by MCDOT.
There is no known public opposition.
Commission
Recommendation:
On 4/25/24, the Commission voted 6-0 to adopt a motion
recommending the Board of Supervisors approve Z2023137subject
to conditions ‘a’ – ‘h’:
a.
Development of the site that be in substantial conformance with the site plan entitled
“Yellow Bell Solar” consisting of 21 full-size sheets, dated February 9, 2024, and stamped
received March 29, 2024, except as modified by the following conditions. Staff may
determine slight refinements to remain in substantial conformance with the approved site
plan. Minor and major amendments to the site plan will be determined in accordance with
Chapter 3 of the Maricopa County Zoning Ordinance.
b.
Development of the site shall be in substantial conformance with the narrative report
entitled “Narrative Report for Yellow Bell Solar”, consisting of 13 pages, dated February 26,
2026, and stamped received February 29, 2024 except as modified by the following
conditions.
c.
The following Planning Engineering conditions shall apply:
1. The concentrated inflow locations at the east end of the solar fields east of the Gila
Bend Canal may warrant redirection to avoid conflict with the solar field grading.
These locations are generally shown at those depicted as 404 washes and at locations
where the floodplains extend east from the canal. These areas shall be further
evaluated with the final design.
2. On-site retention basins shall be designed to contain overflows/spillways designed to
accommodate the unattenuated peak 100 year inflow to each respective basin,
inclusive of offsite flows.
3. Detailed grading and drainage plans shall be submitted with building permit
application(s) indicating that runoff from each solar field area will be directed to a
retention basin. Diversions may be required to direct flow towards the retention basins
as part of the final design.
4. The site contains area of regulated floodplains (FEMA Zone AO2) along the Gila Bend
Canal. Disturbance of the floodplains will require procurement of a floodplain use
permit prior to or concurrent with building permits. Inverter pads located in a floodplain
shall be elevated to the Regulatory Flood Elevation.
5. Preservation of 65’ of R/W on both sides of Old US 80 (measured from the centerline)
will be required. The preservation area must be shown on the plans submitted for
building permit(s).
May 22, 2024
Z2023137
Page 3 of 4
6. Private utilities that will occupy County R/W (Old US 80) or other County property
require a solar license in addition to any construction related permits. The solar license
must be effectuated prior to issuance if building permit(s).
7. Prior to building permit approval, all the proposed construction access points
approved on the US 80 under MCDOT jurisdiction, a driveway right-turn deceleration
lane shall be provided due to anticipated high speeds on US 80 and anticipated heavy
vehicle usage for the proposed facility. A minimum 160 feet of storage length and an
opening taper rate of 15:1 (L:W) shall be provided as per MCDOT Standards. The
developer shall coordinate with MCDOT’s Planning Branch to identify such proposed
construction access point(s) on OLD US 80 that fall under County jurisdiction.
8. The developer shall coordinate with MCDOT’s Planning Branch who shall approve the
final design for the canal crossing near driveway “F”.
9. Engineering review of planning and/or zoning cases is for conceptual design only. All
development and engineering design shall be in conformance with Section 1205 of
the Maricopa County Zoning Ordinance; Drainage Policies and Standards; Floodplain
Regulations for Maricopa County; MCDOT Roadway Design Manual; and current
engineering policies, standards and best practices at the time of application for
construction.
10. There appears to be public or private irrigation facilities located on or adjacent to this
project site. Certain entities may have rights to work in or use said facilities. There may
be public or private rights associated with the historical conveyance of water within
said irrigation facilities which Maricopa County does not regulate. It will be the
applicant’s sole responsibility to ensure the integrity of any irrigation rights. Any
disputes that may arise with respect to any irrigation rights are a civil matter that will
not involve Maricopa County.
11. Based on the conceptual design nature of the information submitted, changes to the
site layout and/or a reduction in the number of solar arrays may be necessitated by
the final engineering design of the site’s drainage infrastructure.
d.
The following IND-2 IUPD Zoning District standards shall apply:
1. Maximum Electric Transmission Line Height – 150’
2. Parking Spaces Required – None required
3. Loading & Unloading Spaces Required - None required
4. Landscaping – No landscaping strip required
5. Sight Visibility Triangles – No sight visibility triangles are required at project site
entry/access points and road intersection, section line, mid-section line or alignment
corners
6. Article 902.91 – All utility uses shall be permitted to be conducted outdoors
7. Site Enclosure and Screening – Chain-link fencing and gates are permitted around the
perimeter of the site boundaries except that opaque chain-link fencing with vinyl slats
shall be required along any property line abutting a residential zoning boundary
8. Pavement Required – Pavement not required for parking spaces with approval of a
dust control plan by Maricopa County Air Quality Department.
9. Light Pole Height – 30’ maximum from grade
May 22, 2024
Z2023137
Page 4 of 4
e.
The IND-2 IUPD shall limit the use of the site exclusively to a solar electric generating facility
and ancillary uses. Any other uses shall require a Zone Change Major Amendment.
f.
The owner or developer shall receive approval of a traffic statement for construction in
accordance with the comments received by ADOT in an email dated November 29, 2023.
g.
The property owner/s and their successors waive claim for diminution in value if the County
takes action to rescind approval due to noncompliance with these conditions or other
Maricopa County regulations.
h.
The granting of this change in use of the property has been at the request of the applicant,
with the consent of the landowner. The granting of this approval allows the property to
enjoy uses in excess of those permitted by the zoning existing on the date of application,
subject to conditions. In the event of the failure to comply with any condition, and at the
time of expiration of the Zone Change, the property shall revert to the zoning that existed on
the date of application. It is, therefore, stipulated and agreed that either revocation due to
the failure to comply with any conditions, or the expiration of the Zone Change, does not
reduce any rights that existed on the date of application to use, divide, sell or possess the
property and that there would be no diminution in value of the property from the value it held
on the date of application due to such revocation or expiration of the Zone Change. The
Zone Change enhances the value of the property above its value as of the date the Zone
Change is granted and reverting to the prior zoning results in the same value of the property
as if the Zone Change had never been granted.
Presented by:
Paola Jaramillo, Planner
Reviewed by:
Darren Gérard, AICP, Planning Manager
Attachments:
4/25/24 P&Z Packet (53 pages)
4/24/24 P&Z Handout Memo (6 pages)
Note:
4/25/24 Draft P&Z Minutes are not available as of the writing of this report but can be
provided upon request later when available.
Z2023137
Page 1 of 10
Report to the Planning and Zoning Commission
Prepared by the Maricopa County Planning and Development Department
Case:
Z2023137 – Yellow Bell Solar Project
Hearing Date:
April 25, 2024
Supervisor District:
5
Applicant:
Kimley-Horn & Associates – Keith Nichter
Owner:
Arizona State Land Department
Request:
Zone change from Rural-43 and Rural-190 to IND-2 IUPD with a plan of
development (POD)
Site Location:
Generally located at the NEC of the intersection of Watermelon Rd. and Old
US Hwy 80
Site Size:
Approximately 802.55 acres
Density:
N/A
County Island:
No
County Plan:
Maricopa County Vision 2030 Comprehensive Plan - Utilities
Municipal Plan:
N/A
Municipal Comments:
N/A
Support/Opposition:
None Known
Recommendation:
Approve with conditions
Z2023137
Page 2 of 10
Project Summary:
1.
This is a request is for a zone change with overlay from Rural-43 and Rural-190 to IND-2 IUPD with
a POD for an industrial-scale solar electric energy generation and battery energy storage. The
subject site is designated as a Utilities land use per Maricopa County’s Vision 2030
Comprehensive Plan following a Major Comprehensive Plan Amendment approved by the Board
of Supervisors on December 8, 2021 (Case No. CPA2021010). It should be noted that the
applicant is requesting legislative approval of the POD along with rezoning approval.
2.
The project is comprised of approximately 2,004.48 acres, but 802.55 acres is within
unincorporated Maricopa County and the remaining 1,201.93 is within the Town of Gila Bend. The
applicant is processing a rezone request with the Town of Gila Bend for the portion of the project
site that is located within the Town’s jurisdiction. This request was routed to the Town, and they
have not provided any comments. The parcels subject to this request are administered by the
Arizona State Trust Land (ASLD). A letter from ASLD was provided along with the application
providing permission for the applicant to process a zone change request with Maricopa County.
3.
The development of the PV solar generation facility with battery energy storage will include
approximately 160,000 solar modules mounted on a single axis tracker, inverters to convert direct
current into alternating current, transformers to increase the voltage of the electricity generated,
a 200 MW photovoltaic (PV) generating facility and battery energy storage system (BESS) with
associated infrastructure. The project will interconnect to the transmission grid at the Arizona
Public Service (“APS”) Panda Substation located to the southwest of the subject site. On-site
overhead electrical structures would be at a 150-foot maximum height.
4.
The applicant is proposing a single phase and to begin construction in the latter half of 2024. The
construction period is expected to employ approximately 300 employees. Up to 5-10 permanent
full-time employees will be hired for routing maintenance activities, equipment repaid, and
equipment replacement. All of the properties within the immediate vicinity of the project are
privately owned.
5.
Nearly all land used for solar energy project like this are developed for the fields of solar collectors
that capture the energy through photovoltaic technology. The subject site is relatively flat and
allows for the development of solar energy with little or no additional grading. There do not appear
to be any significant washes on the site.
6.
The subject site is currently zoned Rural-43 and Rural-190. The applicant is requesting to change
the zoning to IND-2 IUPD. The base IND-2 zone and requested zoning standards for the IND-2
IUPD district are listed on the next page, shown in bold text:
Z2023137
Page 3 of 10
REGULATION
BASE ZONING DISTRICT
REGULATIONS (IND-2)
PROPOSED ZONING
REGULATIONS
MAX. HEIGHT
40’
40’
MIN. FRONT YARD
10’ – 15’
10’
MIN. SIDE YARD
3’ – 10’
10’
MIN. REAR YARD
25’
10’
MIN. STREET SIDE
YARD
0’ – 10’
10’
LANDSCAPING
ARTICLE 901.4.1: ALL PROPERTIES
ABUTTING A PUBLIC STREET SHALL
HAVE AN OPEN SETBACK AREA
WHICH SHALL BE LANDSCAPED
EXTENDING FOR THE FULL WIDTH OF
THE PROPERTY
NO LANDSCAPE STRIP
REQUIRED
MIN. LOT AREA
6,000 SQ. FT.
6,000 SQ. FT.
MIN. LOT WIDTH
60’
60’
MAX. LOT COVERAGE
60%
60%
PARKING SPACES
REQUIRED
1 PER 600 SQ. FT. OF FLOOR AREA WITH
5% REQUIRED TO BE ADA
NONE REQUIRED WITH A
MARICOPA COUNTY AIR
QUALITY CONTROL APPROVED
DUST CONTROL PLAN
LOADING &
UNLOADING SPACES
ARTICLE 1103.2 ONE LOADING AND
UNLOADING SPACE FOR EACH
10,000 SQ. FT. OF FLOOR AREA, OR
FRACTION THEREOF, DEVOTED TO
SUCH USE IN THE BUILDING
NONE REQUIRED
SIGHT VISIBILITY
TRIANGLES
REQUIRED
NO SVT’S AT PROJECT SITE
ENTRY/EXIT POINTS, SECTION
LINE, AND MIDSECTION LINE
INTERSECTING ALIGNMENTS.
SCREENING
A SOLID MASONRY WALL NOT LESS
THAN SIX FEET IN HEIGHT SHALL BE
REQUIRED ALONG AND ADJACENT TO
ANY SIDE OR REAR PROPERTY LINE
ABUTTING ANY RURAL OR RESIDENTIAL
ZONE BOUNDARY, OR ANY ALLEY
ABUTTING SUCH ZONE BOUNDARY.
FURTHER, ANY ACCESS GATES SHALL BE
CONSTRUCTED OF VIEW OBSCURING
MATERIAL TO PROVIDE EFFECTIVE SITE
SCREENING
CHAIN-LINK FENCING AND
GATES SHALL BE ALLOWED ON
THE PERIMETER OF THE
PROJECT. ONE (1) FOOT OF
BARBED WIRE STRANDS WILL
BE INCORPORATED ATOP 6-
FOOT FENCING FOR
ADDITIONAL SECURITY AND
ALLOW BARBED WIRE FENCING
MATERIALS UNDER 8’ IN
HEIGHT, EXCEPT IF NEXT TO
EXISTING RESIDENCES.
ARTICLE 902.9.1
ALL USES EXCEPT FOR PARKING,
LOADING, UNLOADING OR STORAGE
SHALL BE CONDUCTED WITHIN A
COMPLETELY ENCLOSED BUILDING
ALL UTILITY USES PERMITTED
OUTDOORS
MAX. ELECTRIC
TRANSMISSION LINE
HEIGHT
120’
150’
BARBED WIRE
FENCING
BARBED WIRE ATTACHED TO FENCES IS
PROHIBITED FOR FENCES UNDER 8’
BARBED WIRE ATTACHED TO
FENCING UNDER 8’ WILL BE
ALLOWED WITHIN THE
PROPERTY LINE BOUNDARIES
LIGHT POLE HEIGHT
18’ MAXIMUM FROM GRADE
30’ MAXIMUM FROM GRADE
Z2023137
Page 4 of 10
7.
The applicant is requesting to vary the parking, pavement, loading/unloading, landscaping, sight
visibility triangle, site enclosure, screening, transmission tower height, and light pole height
requirements. The proposed standards are consistent with other similar utility-scale solar
facilities in this area of the County.
8.
The applicant is requesting to waive landscaping requirement but intends to preserve existing
natural desert vegetation. For screening, the applicant has proposed chain-link fencing in lieu of
a 6’ CMU wall abutting rural zoning. Along residential zones the applicant will provide a chain-link
fencing with vinyl slats to provide opacity and screen the proposed substation. Additionally, the
applicant is requesting that uses be permitted outside of an enclosed building as the nature of
the use (solar panels) requires the use to be conducted outdoors to generate energy.
9.
The applicant is also requesting to vary the required site visibility triangles at all project site
entry/exit points, section line, and mid-section line intersecting alignments. The MCZO specifies
that 25 x 25 sight visibility triangles are to be provided at the property line where all access points
are present and at the corner of properties with an intersection. Sight visibility triangles are
unnecessary at alignments internal to the site. Additionally, proposed fencing at the intersecting
alignments and driveways will not include slats and thus visibility will not be obstructed. Also, the
applicant requested that there be no parking or loading spaces and that pavement for parking
spaces be waived with approved dust control plan from Maricopa County Air Quality Control as
no regularly occupied buildings will be placed on site.
10.
There is also a request to vary the standard for electric transmission line height from 120’ to 150’.
This is requested because a new gen-tie route is required for the project. The applicant states
that if the transmission line height were limited to 120’ that less spacing between poles and
additional poles would be required.
Z2023137
Page 5 of 10
2024 Aerial Image of the Site
Zoning of the Site and Adjacent Properties
Z2023137
Page 6 of 10
Site Plan Excerpt
Substation Exhibit
Z2023137
Page 7 of 10
Existing On-Site and Adjacent Zoning / Land Use:
11.
On-site:
Rural-43 & Rural-190 / Vacant
North:
Town of Gila Bend / Vacant
South:
Town of Gila Bend/ Vacant
East:
Rural-43 & Rural-190/ Vacant
West:
Town of Gila Bend / Vacant
Utilities and Services:
12.
Water:
Hauled water
Wastewater:
Onsite septic System
Electric:
APS
School District:
Gila Bend Unified School District
Fire:
Gila Bend Fire Department /Buckeye Valley Fire District
Police:
Maricopa County Sheriff’s Office
Solid Waste: Republic Services
Right-of-Way:
13.
The following table includes existing and proposed half-width right-of-way and the future
classification based on the Maricopa County Department of Transportation (MCDOT) Major
Streets and Routes Plan.
Street Name
Existing R/W
Proposed R/W*
Future Classification
Old US 80
Varies
65’ (half)
Major Arterial
*Right-of-way dedications and preservations will be addressed at the time of construction
permitting.
Adopted Plans:
14.
Maricopa County Vision 2030 Comprehensive Plan (adopted 2013): The site is designated as
Utilities, which is intended for electric generating plants, water, and wastewater treatment
facilities, associated offices, and accessory equipment. Under a Utilities designation, the
appropriate zoning district is IND-2.
15.
Town of Gila Bend General Plan 2026 (adopted 2017): The site is designated as Industrial
Business Park (IBP) and Medium Density Residential (MDR). The designations for the Town Of
Gila Bend General Plan designates Industrial Business Park for the development of areas where
a mix of warehouse/distribution, assembly and storage, office show rooms, and retail sales. The
General Plan designates Medium Density Residential for higher residential densities are desired
within the proximity of vehicular access, water, and sewer services exist. The request was routed
to the Town of Gila Bend and no comments were provided.
Public Participation Summary:
16.
The applicant complied with the Maricopa County Citizen Review Process with the required
posting of the site and notification by first class mail to adjacent property owners within 300’ of
the subject parcel and interested parties. The applicant submitted a Public Participation Results
Report. To date, no opposition has been received.
Z2023137
Page 8 of 10
Outstanding Concerns from Reviewing Agencies:
17.
N/A
Staff Analysis:
18.
Maricopa County recognizes the potential environmental and economic benefits that solar
technology can provide. Yellow Bell Solar will use photovoltaic technology that generates energy
from sun absorption. Photovoltaic technology differs from other models of solar electric
generation that require vast amounts of water to cool the units. In contrast, very little water is
utilized for photovoltaic technology, thus this development would not pose a threat to the
groundwater supply.
19.
Staff believes the proposed solar facility is well suited to this rural area, which requires large
amounts of relatively flat land. Staff agrees with the applicant that the subject site is suitable due
to proximity to electrical transmission lines, nearby stations and substation, and because the
surrounding area is vastly undeveloped. Staff agrees with the applicant that the project will not
detrimentally affect the visual quality of the area.
20.
The development of solar energy over the past several years in Maricopa County reinforces the
County’s interest in promoting the it as an economic leader for solar development. Staff believes
that Yellow Bell Solar would add to this effort in a positive way by providing the potential of 300
temporary construction and 10 permanent operation/maintenance jobs.
21.
Staff is recommending approval of this zone change request for the reasons noted above with
the conditions of approval that would make the site appropriate for the area.
Recommendation:
22.
Staff recommends the Commission adopt a motion recommending that the Board of Supervisors
approve Z2023137 subject to the following conditions ‘a’ – ‘h’:
a.
Development of the site that be in substantial conformance with the site plan entitled
“Yellow Bell Solar” consisting of 21 full-size sheets, dated February 9, 2024, and stamped
received March 29, 2024, except as modified by the following conditions. Staff may
determine slight refinements to remain in substantial conformance with the approved site
plan. Minor and major amendments to the site plan will be determined in accordance with
Chapter 3 of the Maricopa County Zoning Ordinance.
b.
Development of the site shall be in substantial conformance with the narrative report
entitled “Narrative Report for Yellow Bell Solar”, consisting of 13 pages, dated February 26,
2026, and stamped received February 29, 2024 except as modified by the following
conditions.
c.
The following Planning Engineering conditions shall apply:
1. The concentrated inflow locations at the east end of the solar fields east of the Gila
Bend Canal may warrant redirection to avoid conflict with the solar field grading.
These locations are generally shown at those depicted as 404 washes and at locations
Z2023137
Page 9 of 10
where the floodplains extend east from the canal. These areas shall be further
evaluated with the final design.
2. On-site retention basins shall be designed to contain overflows/spillways designed to
accommodate the unattenuated peak 100 year inflow to each respective basin,
inclusive of offsite flows.
3. Detailed grading and drainage plans shall be submitted with building permit
application(s) indicating that runoff from each solar field area will be directed to a
retention basin. Diversions may be required to direct flow towards the retention basins
as part of the final design.
4. The site contains area of regulated floodplains (FEMA Zone AO2) along the Gila Bend
Canal. Disturbance of the floodplains will require procurement of a floodplain use
permit prior to or concurrent with building permits. Inverter pads located in a floodplain
shall be elevated to the Regulatory Flood Elevation.
5. Preservation of 65’ of R/W on both sides of Old US 80 (measured from the centerline)
will be required. The preservation area must be shown on the plans submitted for
building permit(s).
6. Private utilities that will occupy County R/W (Old US 80) or other County property
require a solar license in addition to any construction related permits. The solar license
must be effectuated prior to issuance if building permit(s).
7. Access points from Old US 80 under County jurisdiction shall require driveway right
turn deceleration lanes designed in accordance with MCDOT’s Roadway Design and
Traffic Manuals.
8. The developer shall coordinate with MCDOT’s Planning Branch who shall approve the
final design for the canal crossing near driveway “F”.
9. Engineering review of planning and/or zoning cases is for conceptual design only. All
development and engineering design shall be in conformance with Section 1205 of
the Maricopa County Zoning Ordinance; Drainage Policies and Standards; Floodplain
Regulations for Maricopa County; MCDOT Roadway Design Manual; and current
engineering policies, standards and best practices at the time of application for
construction.
10. There appears to be public or private irrigation facilities located on or adjacent to this
project site. Certain entities may have rights to work in or use said facilities. There may
be public or private rights associated with the historical conveyance of water within
said irrigation facilities which Maricopa County does not regulate. It will be the
applicant’s sole responsibility to ensure the integrity of any irrigation rights. Any
disputes that may arise with respect to any irrigation rights are a civil matter that will
not involve Maricopa County.
11. Based on the conceptual design nature of the information submitted, changes to the
site layout and/or a reduction in the number of solar arrays may be necessitated by
the final engineering design of the site’s drainage infrastructure.
Z2023137
Page 10 of 10
d.
The following IND-2 IUPD Zoning District standards shall apply:
1. Maximum Electric Transmission Line Height – 150’
2. Parking Spaces Required – None required
3. Loading & Unloading Spaces Required - None required
4. Landscaping – No landscaping strip required
5. Sight Visibility Triangles – No sight visibility triangles are required at project site
entry/access points and road intersection, section line, mid-section line or alignment
corners
6. Article 902.91 – All utility uses shall be permitted to be conducted outdoors
7. Site Enclosure and Screening – Chain-link fencing and gates are permitted around the
perimeter of the site boundaries except that opaque chain-link fencing with vinyl slats
shall be required along any property line abutting a residential zoning boundary
8. Pavement Required – Pavement not required for parking spaces with approval of a
dust control plan by Maricopa County Air Quality Department.
9. Light Pole Height – 30’ maximum from grade
e.
The IND-2 IUPD shall limit the use of the site exclusively to a solar electric generating facility
and ancillary uses. Any other uses shall require a Zone Change Major Amendment.
f.
The owner or developer shall receive approval of a traffic statement for construction in
accordance with the comments received by ADOT in an email dated November 29, 2023.
g.
The property owner/s and their successors waive claim for diminution in value if the County
takes action to rescind approval due to noncompliance with these conditions or other
Maricopa County regulations.
h.
The granting of this change in use of the property has been at the request of the applicant,
with the consent of the landowner. The granting of this approval allows the property to
enjoy uses in excess of those permitted by the zoning existing on the date of application,
subject to conditions. In the event of the failure to comply with any condition, and at the
time of expiration of the Zone Change, the property shall revert to the zoning that existed on
the date of application. It is, therefore, stipulated and agreed that either revocation due to
the failure to comply with any conditions, or the expiration of the Zone Change, does not
reduce any rights that existed on the date of application to use, divide, sell or possess the
property and that there would be no diminution in value of the property from the value it held
on the date of application due to such revocation or expiration of the Zone Change. The
Zone Change enhances the value of the property above its value as of the date the Zone
Change is granted and reverting to the prior zoning results in the same value of the property
as if the Zone Change had never been granted.
Presented by:
Paola Jaramillo, Planner
Reviewed by:
Darren Gerard, AICP, Planning Services Manager
Attachments:
Case Map (1 page)
Site Plan (21 pages)
Narrative Report (13 pages)
Engineering comments (2 pages)
MCDOT Comments (3 pages)
Email from ADOT (1 page)
/
Maricopa County Planning & Development - Phoenix, AZ
5
Gross Acres: 802.55 approx.
Generated April 16, 2024 11:07 AM
Z2023137
Application Name:
Legal Description
Yellow Bell Solar Project EDR
Applicant
Case Address
,
Keith J Nichter for Kimley-Horn
Applicant Phone/Email
Parcel Primary:
602.313.7206
keith.nichter@kimley-horn.com
Map scale 1:25,955
Supervisor District No.
ZONE CHANGE WITH OVERLAY (REZONE) FROM RU-43 AND RU-190 TO IND-2 IUPD ZONE FOR THE
YELLOW BELL SOLAR PROJECT, A PROPOSED INDUSTRIAL-SCALE SOLAR ENERGY GENERATION
YELLOW BELL
SOLAR
©
BASIS OF BEARING:
BENCHMARK:
APN
OWNER
PARCEL ACREAGE
PART OF REZONE
ZONE
LAND USE
NORTH
VICINITY MAP
PROJECT INFORMATION:
SITE SUMMARY
SITE REGULATION
UTILITIES:
YELLOW BELL SOLAR SITE PLAN
200 MWac & 200MW BESS
FOR IND-2 IUPD (LIGHT INDUSTRIAL ZONING) WITH AN INDUSTRIAL ZONING
ZONE CHANGE & PLAN OF DEVELOPMENT
KIMLEY-HORN PROJECT NO.
291841000
CASE REFERENCE NO.
Z2023137
NORTH
PARCEL PLAN
PROJECT PARCEL INFORMATION (TOWN OF GILA BEND - NOT A PART)
N.T.S.
N.T.S.
GENERAL NOTES:
LEGAL DESCRIPTION:
APN
OWNER
ADJACENT
PARCEL ACREAGE
ZONE
LAND USE
INCORPORATED IN
GILA BEND
ADJACENT PARCEL INFORMATION
PRESERVATION/DEDICATION OF RIGHT-OF-WAY
C1.0
COVER SHEET
PROJECT PARCEL INFORMATION (ASLD) (MARICOPA COUNTY)
APN
OWNER
PARCEL ACREAGE
PART OF REZONE
ZONE
LAND USE
SHEET NUMBER
SHEET TITLE
YELLOW BELL
SOLAR
©
¬
PRIVATE LEGAL DESCRIPTION:
PRIVATE LEGAL DESCRIPTION (CONTINUED):
PRIVATE LEGAL DESCRIPTION (CONTINUED):
PRIVATE LEGAL DESCRIPTION (CONTINUED):
C1.1
LEGAL
DESCRIPTION
TOWN OF GILA BEND:
YELLOW BELL
SOLAR
©
”
”
”
”
”
”
”
ASLD LEGAL DESCRIPTION:
ASLD LEGAL DESCRIPTION (CONTINUED):
ASLD LEGAL DESCRIPTION (CONTINUED):
C1.2
LEGAL
DESCRIPTION
ASLD LEGAL DESCRIPTION (CONTINUED):
ASLD LEGAL DESCRIPTION (CONTINUED):
MARICOPA COUNTY:
70001
760.41
70003
747.97
70004
731.22
70005
712.33
70010
732.39
70014
694.03
70015
741.68
70017
705.09
70018
734.78
70019
670.24
70020
676.55
70021
690.13
70022
724.40
70023
724.33
7011
762.91
7016
766.53
7070
764.70
70001
760.41
70003
747.97
70004
731.22
70005
712.33
70010
732.39
70014
694.03
70015
741.68
70017
705.09
70018
734.78
70019
670.24
70020
676.55
70021
690.13
70022
724.40
70023
724.33
7011
762.91
7016
766.53
7070
764.70
LEGEND
C2.2
C2.3
C2.4
C2.5
C2.6
C2.7
C2.8
C2.9
YELLOW BELL
SOLAR
©
NORTH
C2.0
OVERALL SITE
PLAN 1
70001
760.41
70003
747.97
70004
731.22
70005
712.33
70010
732.39
70014
694.03
70015
741.68
70017
705.09
70018
734.78
70019
670.24
70020
676.55
70021
690.13
70022
724.40
70023
724.33
7011
762.91
7016
766.53
7070
764.70
70001
760.41
70003
747.97
70004
731.22
70005
712.33
70010
732.39
70014
694.03
70015
741.68
70017
705.09
70018
734.78
70019
670.24
70020
676.55
70021
690.13
70022
724.40
70023
724.33
7011
762.91
7016
766.53
7070
764.70
LEGEND
C2.2
C2.3
C2.4
C2.5
C2.6
C2.7
C2.8
C2.9
YELLOW BELL
SOLAR
©
NORTH
C2.1
OVERALL SITE
PLAN 2
YELLOW BELL
SOLAR
©
C2.2
NORTH
ENLARGED
SITE PLAN
LEGEND
C2.2
C2.3
C2.4
C2.5
C2.6
C2.7
C2.8
C2.9
YELLOW BELL
SOLAR
©
C2.3
ENLARGED
SITE PLAN
NORTH
LEGEND
C2.2
C2.3
C2.4
C2.5
C2.6
C2.7
C2.8
C2.9
YELLOW BELL
SOLAR
©
C2.4
ENLARGED
SITE PLAN
NORTH
LEGEND
C2.2
C2.3
C2.4
C2.5
C2.6
C2.7
C2.8
C2.9