ARIZONA@WORK Infrastructure Funding Agreement 
 
1 
 
 
 
 
Local Workforce Development Area Maricopa County 
 
This Infrastructure Funding Agreement (IFA) is effective from 7/01/2026to 6/30/2027 and includes required elements 
described in 20 CFR 678.755 (b) through (f), specifically: 
 
● Identification of an infrastructure and shared services budget that will be periodically reconciled against actual costs 
incurred and adjusted accordingly to ensure that it reflects a cost allocation methodology that demonstrates how 
infrastructure costs are charged to each partner in proportion to its use of the one-stop center and relative benefit 
received, and that complies with 2 CFR part 200 (or any corresponding similar regulation or ruling). 
● Identification of all one-stop partners, chief elected officials, and local workforce development board 
(LWDB) participating in the infrastructure funding arrangement. 
● Steps the LWDB, chief elected officials, and one-stop partners used to reach consensus or an assurance that 
the local area followed the guidance for the State funding process. 
● Description of the process to be used among partners to resolve issues during the MOU duration period when 
consensus cannot be reached. 
● Description of the periodic modification and review process to ensure equitable benefit among one-stop partners. See 
MOU Section 5.1 and 12.6. 
 
This IFA is developed in accordance with 20 CFR 678.700, which describes one-stop infrastructure costs, and 20 CFR 
678.760, which describes other shared costs. 
 
Steps to Reach Consensus and Resolve Issues 
 
In accordance with 20 CFR 678.755(d), the LWDB, chief elected officials, and one-stop partners took the steps described 
below to reach a consensus on infrastructure funding. Steps described should include meeting dates, brief summary of 
meeting, those who attended, etc.

ARIZONA@WORK Infrastructure Funding Agreement 
 
2 
 
(Steps taken to reach a consensus.) 
Maricopa County Workforce Development (MCWDB) staff will conduct a partner meeting in March-May 2026 if requested by the 
partners after revisions are reviewed and engage the CEO Liaison for feedback. Partners will have an opportunity to review all 
documents and provide any revisions/feedback prior to signing. 
The Infrastructure Funding Agreement (IFA) will also be reviewed and voted upon by the MCWDB and the Maricopa County Board 
of Supervisors (CEO) when the agreement is finalized.

ARIZONA@WORK Infrastructure Funding Agreement 
 
3 
 
 
In instances when consensus cannot be reached, the Parties agree to resolve issues through a process described below 
(20 CFR 678.755[e]). 
 
 
The Parties assure that if they do not reach consensus agreement on methods of sufficiently funding the costs of 
infrastructure of one-stop centers for a program year, the State funding mechanism is applicable to the local area for that 
program year (20 CFR 678.730[a]). In the State funding mechanism, the Governor, subject to the limitations in 20 CFR 
678.730(c), determines one-stop partner contributions after consultation with the chief elected officials, LWDB, and the 
State WDB. 
 
IFA Attachments 
 
A. 
ARIZONA@WORK Job Center Partners, Chief Executive Official(s), and the LWDB Participating in the IFA 
 
B. 
ARIZONA@WORK Operating Budget: Infrastructure Costs 
 
C. 
Signatures of Colocated ARIZONA@WORK Job Center Partners Agreeing to Share Infrastructure Costs 
 
D. 
Signatures of Noncolocated ARIZONA@WORK Job Center Partners Agreeing to Negotiate the Sharing of 
Infrastructure Costs When Sufficient Data is Available to Determine Relative Benefit and Proportionate 
Share 
 
E. 
ARIZONA@WORK Operating Budget: Additional Costs (Applicable Career Services) 
 
F. 
OPTIONAL: 
 
ARIZONA@WORK Operating Budget: Additional Costs (Shared Operating Costs and Shared Services) and 
Signature of ARIZONA@WORK Job Center Partners Agreeing to Share Identified Operating Costs/Shared 
Services
(Process to resolve issues when consensus cannot be reached.) 
See MOU Section 19.1

ARIZONA@WORK Infrastructure Funding Agreement 
 
4 
 
 
Attachment A: 
ARIZONA@WORK One-Stop Partners, Chief Elected Official(s), and the Local Workforce Development Board (LWDB) 
participating in the IFA 
Local Workforce Development Board: 
Name, Title, Address, Telephone, Email 
 
Maricopa County Workforce Development Board (MCWDB)  
MCWDB Executive Director, Steve Clark  
301 W. Jefferson St., 9th Floor Phoenix, AZ 85003  
O: 602-506-0154 | C: 602-377-3844  
Steve.Clark@maricopa.gov  
 
Chief Elected Official(s): 
List All CEOs and Name, Title, Address, Telephone, Email for Each 
 
Kate Brophy Mcgee, Chair  
Supervisor, District 3 
Maricopa County Board of Supervisors 
301 W Jefferson, 10th Fl. 
Phoenix, AZ 85003 
 
Debbie Lesko, Vice Chair 
Supervisor, District 4 
Maricopa County Board of Supervisors 
301 W Jefferson, 10th Fl. 
Phoenix, AZ 85003 
 
Mark Stewart 
Supervisor, District 1

ARIZONA@WORK Infrastructure Funding Agreement 
 
5 
 
Maricopa County Board of Supervisors 
301 W Jefferson, 10th Fl. 
Phoenix, AZ 85003 
 
Thomas Glavin 
Supervisor, District 2 
Maricopa County Board of Supervisors 
301 W Jefferson, 10th Fl. 
Phoenix, AZ 85003 
 
Steve Gallardo 
Supervisor, District 5 
Maricopa County Board of Supervisors 
301 W Jefferson, 10th Fl. 
Phoenix, AZ 85003 
 
 
 
 
 
Required WIOA and 
ARIZONA@WORK Job Center Partner 
ARIZONA@WORK 
One-Stop Partner 
Serving Local Area 
Point of Contact Information 
Name, Title, Address, Telephone, Email 
Adult, Dislocated Worker (DW), and Youth 
Programs under Title I-B of WIOA 
X 
Jared Beard, Assistant Director Maricopa County 
Workforce Development Division 
234 N Central Avenue, 3rd Floor, Phoenix, AZ 85004 
O: 602-502-2744 CL 623-7487 
Jared.Beard@maricopa.gov 
Job Corps under Title I of WIOA 
X 
Dennisonwordi.Ramona@JobCorps.org and 
MSmith@adamsaai.com 
YouthBuild under Title I of WIOA 
N/A 
N/A 
Indian and Native American Programs 
(INAP) under WIOA Title I 
N/A 
N/A

ARIZONA@WORK Infrastructure Funding Agreement 
 
6 
 
 
National Farmworker Jobs Program 
(NFJP) under Title I of WIOA 
X 
Kari Hogan, Chief Administrative Officer 
PPEP, Inc. 
802 E. 46th Street, Tucson, AZ 85713 (State Admin. 
Office) 
520-770-2500 
khogan@ppep.org 
Adult Education and Family Literacy Act 
programs under Title II of WIOA 
X 
Beverly Wilson, Deputy Associate Superintendent/State 
Director 
602-364-2707 
Beverly.wilson@azed.gov 
Wagner-Peyser under Title III of WIOA 
X 
Wagner Peyser Employment Service:   
Kevin Herring, Workforce Solutions Administration 
kherring@azdes.gov 
520-910-1896 
State Unemployment Insurance (UI) 
X 
Sandra Canez UI Administrator 
Division of Employment and Rehabilitation Services 
Department of Economic Security 
1789 W. Jefferson St 
Phoenix, AZ 85007  
sandracanez@azdes.gov 
Trade Adjustment Assistance (TAA) under 
Title II of Trade Act 
X 
Chevera Trillo, Administrator  
Arizona Department of Economic Security  
1789 West Jefferson, Mail Drop 5271 Phoenix, Arizona 
85007  
480-487-7806  
CTrillo@azdes.gov   
Anna Hunter (DES/DERS Assistant Director) 
ahunter@azdes.gov 
Jobs for Veterans State Grants (JVSG) 
under Title 38, U.S.C. 
X 
JVSG/DVOP & JVSG/LVER 
Kevin Herring, Workforce Solutions Administration 
kherring@azdes.gov

ARIZONA@WORK Infrastructure Funding Agreement 
 
7 
 
520-910-1896 
Vocational Rehabilitation under Title IV of 
WIOA 
X 
Kristen Mackey, Administrator  
Arizona Department of Economic Security  
Rehabilitation Services Administration  
1789 West Jefferson Phoenix, Arizona 85007  
480-665-6736  
kmackey@azdes.gov   
Senior Community Service Employment 
Programs (SCSEP) under Title V of Older 
Americans Act--State of Arizona 
X 
Chevera Trillo, Administrator  
Arizona Department of Economic Security  
1789 West Jefferson, Mail Drop 5272 Phoenix, Arizona 
85007  
C: 480-487-7806  
CTrillo@azdes.gov  
Easter Seals (Grantee)  
Alfred Jernigan 
ajernigan@aarp.org 
O: 602-841-0403 
Senior Community Service Employment 
Programs (SCSEP)—National Grantees 
under Title V of Older Americans Act 
X 
AARP (Grantee)  
Alfred Jernigan 
ajernigan@aarp.org 
O: 602-841-0403 
 
Career and Technical Education programs 
at the postsecondary level (CTE) under 
Perkins Career and Technical Education 
Act 
X 
Colette Chapman, Associate Superintendent  
1535 W Jefferson Street Phoenix, AZ 85007   
602-542-4352  
Colette.chapman@azed.gov

ARIZONA@WORK Infrastructure Funding Agreement 
 
8 
 
Housing and Urban 
Development---Employment and Training 
Programs 
N/A 
N/A

ARIZONA@WORK Infrastructure Funding Agreement 
 
9 
 
 
Community Services Block Grants 
(CSBG)—Employment and Training 
Activities 
X 
Tamara Bridwell, Director Maricopa County 
Human Services Department 
234 N Central Avenue, 3rd Floor, Phoenix, AZ 85004 
O: 602-506-4812 C: 602-214-3264 
Tamara.Bridwell@maricopa.gov 
Re-entry Employment Opportunities 
(REO) under Second Chance Act 
N/A 
N/A 
Other Colocated Partner: 
Early Head Start and Head Start 
 
X 
Tamara Bridwell, Director Maricopa County 
Human Services Department 
234 N Central Avenue, 3rd Floor, Phoenix, AZ 85004 
O: 602-506-4812 C: 602-214-3264 
Tamara.Bridwell@maricopa.gov 
Other Itinerate Partner: 
N/A 
N/A 
Additional ARIZONA@WORK One-Stop Partners Approved by the LWDB and CEO(s), If Any 
Temporary Assistance for Needy Families 
(TANF) employment & training under part 
A of Title IV of Social Security Act1 
X 
Eduardo Soto Program Manager 
O: (602) 887-4644 
M: (480) 788-0285 
Eduardo.Soto@equusworks.com EduardoSoto@azdes.gov 
AND 
Priscilla Zuniga Regional Director Cell:858-330-9069 
Priscilla.Zuniga@EquusWorks.com

ARIZONA@WORK Infrastructure Funding Agreement 
 
10 
 
 
 
 
1 The Governor notified the Secretaries of the U.S. Departments of Labor and Health and Human Services in writing that TANF will not be a 
required partner in Arizona, or within some specific local areas in the State. Local TANF programs may still opt to be a one-stop partner, or to 
work in collaboration with the one-stop center. ARIZONA@WORK Job Center Vision and Structure Of One Stop Delivery System Policy

ARIZONA@WORK Infrastructure Funding Agreement 
 
11 
 
 
Attachment B1:  
ARIZONA@WORK Comprehensive Job Center and Affiliate Site Locations 
Local Workforce Development Area: Maricopa County 
 
ARIZONA@WORK Comprehensive Job Center Locations 
(Name, Address, Contact Name, Phone Number) 
ARIZONA@WORK Affiliate Site Locations 
(Name, Address, Contact Name, Phone Number) 
ARIZONA@WORK Comprehensive Job Center Location 
#1: 
Maricopa – East  
(ARIZONA@WORK One-Stop Center)1001 West Southern 
Avenue Ste. 101 Mesa, AZ 85210  
Jinkee Pacifico  
602-372-4248   
 
Affiliate Site Location #1: 
Mesa Workforce Center  
(ARIZONA@WORK Specialized Center)  
635 East Broadway Road 2nd Floor  
Mesa, Arizona 85204  
Minerva Vicuna 
602-372-4236 
*Note that costs are paid directly by the located Partner 
program Title 1B   
ARIZONA@WORK Comprehensive Job Center Location 
#2: 
ARIZONA@WORK Job Center Location #2:  
  
Maricopa – West  
(ARIZONA@WORK One-Stop Center)   
4425 West Olive Avenue Ste. 190 Glendale, AZ 85302  
Andrew Lucero  
602-372- 4224  
 
Affiliate Site Location #2: 
 
Surprise  
(ARIZONA@WORK Specialized Center)  
12425 West Bell Road Building A, Ste 124 Surprise, 
Arizona 85378  
Minerva Vicuna 
602-372-4236 
*Note that costs are paid directly by the located Partner 
program Title 1B

ARIZONA@WORK Infrastructure Funding Agreement 
 
12 
 
ARIZONA@WORK Comprehensive Job Center Location 
#3: 
Affiliate Site Location #3: 
 
 
Tempe Library  
(ARIZONA@WORK Specialized Center)  
3500 South Rural Road Ste 202 Tempe, Arizona 85282  
Minerva Vicuna 
6 602-372-4236 
*Note that costs are paid directly by the located Partner 
program Title 1B  
 
Affiliate Site Location #4: 
 
Tempe Youth Hub  
(ARIZONA@WORK Specialized Center)  
2150 East Orange Street Tempe, Arizona 85281  
 Zach Lynch  
 602-372-9747  
*Note that costs are paid directly by the located Partner 
program Title 1B  
 
Affiliate Site Location #5: 
 
Goodyear Campus 
(ARIZONA@WORK Specialized Center)  
14140 W. McDowell Rd. Goodyear, AZ 85395 
Minerva Vicuna 
602-372-4236

ARIZONA@WORK Infrastructure Funding Agreement 
 
13 
 
 
Affiliate Site Location #6: 
 
Avondale Community Center 
(ARIZONA@WORK Specialized Center)  
995 E. Riley Dr Avondale, AZ 85323 
Minerva Vicuna 
602-372-4236 
*Note that costs are paid directly by the located Partner 
program Title 1B  
 
 
 
Attachment B2:  
ARIZONA@WORK One-Stop Partners Colocated in Each ARIZONA@WORK Job Center Location  
Local Workforce Development Area:  
 
(Place an “X” If the ARIZONA@WORK Job Center Partner is Colocated in the Identified ARIZONA@WORK Job Center 
or Affiliate Site) 
ARIZONA@WORK 
one-Stop Partner 
ARIZONA@WORK 
Comprehensive 
Job Center #1: 
EVCC 
ARIZONA@WORK 
Comprehensive 
Job Center #2: 
WVCC 
Affiliate Site #1: 
Mesa 
Affiliate 
Site #2: 
Surprise 
Affiliate 
Site #3: 
Tempe 
Library 
Affiliate Site 
#4: Tempe 
Youth 
Adult/Dislocated 
Worker 
X 
X 
X 
X 
X 
 
Youth 
X 
X 
 
 
 
X 
Job Corps 
 
 
 
 
 
 
Native American

ARIZONA@WORK Infrastructure Funding Agreement 
 
14 
 
NFJP 
 
 
 
 
 
 
Adult Education 
 
 
 
 
 
 
Wagner-Peyser 
X 
X 
 
 
 
 
Trade 
 
 
 
 
 
 
JVSG 
X 
X 
 
 
 
 
SCSEP--State 
 
 
 
 
 
 
SCSEP-National 
 
 
 
 
 
 
Career/Tech Ed 
 
 
 
 
 
 
HUD E&T 
 
 
 
 
 
 
CSBG E&T

ARIZONA@WORK Infrastructure Funding Agreement 
 
15 
 
 
Second Chance 
 
 
 
 
 
 
Vocational 
Rehabilitation 
X 
X 
 
 
 
 
YouthBuild 
 
 
 
 
 
 
Other Colocated 
Partner: 
NFJP/MSFW 
 
X 
 
 
 
 
Other Itinerate 
Partner: 
 
 
 
 
 
 
 
Attachment B2:  
ARIZONA@WORK One-Stop Partners Colocated in Each ARIZONA@WORK Job Center Location  
Local Workforce Development Area:  
 
(Place an “X” If the ARIZONA@WORK Job Center Partner is Colocated in the Identified ARIZONA@WORK Job Center 
or Affiliate Site) 
ARIZONA@WORK 
one-Stop Partner 
Affiliate Site #5: 
Goodyear 
Affiliate Site #6: 
Avondale 
 
 
 
 
Adult/Dislocated 
Worker 
X 
X 
Youth 
 
 
Job Corps 
 
 
Native American 
 
 
NFJP 
 
 
Adult Education 
 
 
Wagner-Peyser

ARIZONA@WORK Infrastructure Funding Agreement 
 
16 
 
Trade 
 
 
JVSG 
 
 
SCSEP--State 
 
 
SCSEP-National 
 
 
Career/Tech Ed 
 
 
HUD E&T 
 
 
CSBG E&T 
 
 
 
Second Chance 
 
 
Vocational 
Rehabilitation 
 
 
YouthBuild 
 
 
Other Colocated 
Partner: 
 
 
Other Itinerate 
Partner: 
 
 
 
 
 
 
Attachment B3:  
Annual Infrastructure Budget for Each ARIZONA@WORK Comprehensive Job Center and Affiliate Site 
ARIZONA@WORK Comprehensive Job Center:Maricopa- East 1001 W Southern Ave, Ste. 101 Mesa, AZ 85210

ARIZONA@WORK Infrastructure Funding Agreement 
 
17 
 
Cost Category/Line Item 
Line Item Cost Detail 
Cost 
Rent 
Rental of Facilities 
East Valley location (41,917 sq. ft.) 
$998,934 
Subtotal: Rental Costs 
$998,934 
Utilities and Maintenance 
Electric 
N/A 
N/A 
Gas 
N/A 
N/A 
Water 
N/A 
N/A 
Sewer Connections 
N/A 
N/A 
High-Speed Internet 
N/A 
N/A 
Telephones (Landlines) 
N/A 
N/A 
Facility Maintenance Contract 
Water Dispensing Equipment & Pest 
Control Services Annual Costs 
$1,097 
Security Contract 
N/A 
N/A 
Subtotal: Utilities and Maintenance Costs 
$1,097 
 
Equipment 
Assessment-related products 
OPAC & BESI 
$2,788 
Assistive technology for individuals with 
disabilities 
(“Access and Accommodation”) 
2 computer, 1 printer, MISC ADA 
Hardware, Adjustable Height Desks 
$4,375 
Copiers 
N/A 
Printers 
Public Computer Lab- 2, Training Lab-1, 
Assessment Lab-1 
$8,400 
Fax Machines 
Public Computer Lab-4 
$2,400

ARIZONA@WORK Infrastructure Funding Agreement 
 
18 
 
Computers 
Public Computer Lab-24, Training Lab- 
13, Assessment Lab-13 
$42,500 
Other tangible equipment used to serve 
all center customers (not specific to an 
individual program partner) 
Specify Other Tangible Equipment 
2 WiFi i-Pads with Stands/Kiosk 
$4,000 
Subtotal: Equipment Costs 
$64,463 
Technology to Facilitate Access to the ARIZONA@WORK Job Center 
Technology used for the center’s planning 
and outreach activities 
Specify the Technology 
Email Software for sending email 
distribution lists 
Constant Contact 
Mass Text Messaging & Alerts 
Engage By Cell 
$3,635 
Cost of creation and maintenance of a 
center website (not specific to an 
individual program partner) that provides 
outreach to customers by providing 
information on ARIZONA@WORK Job 
Center services and/or provides direct 
service access to the ARIZONA@WORK 
Job Center 
N/A 
N/A 
 
Website 
Address: 
 
(Does not include data systems or case 
management systems specific to 
individual program partners.)

ARIZONA@WORK Infrastructure Funding Agreement 
 
19 
 
Subtotal: Technology to Facilitate Access Costs 
$3,635 
Supplies to Support the General Operation of the ARIZONA@WORK Job Center (Local Option, If Agreed By All 
Colocated ARIZONA@WORK Job Center Partners) 
Supplies, as defined in Uniform Guidance 
at 2 CFR 200.94, to support the general 
operation of the ARIZONA@WORK Job 
Center 
Specify Supplies to Support General 
Operation and Not Specific to a Colocated 
Partner (e.g., Printing; Postage, Office 
Supplies) 
Based on average annual costs 
$12,000 
Subtotal: Supplies to Support the General Operation of the 
ARIZONA@WORK Job Center 
$12,000 
Common Identifier Costs (Local Option, If Agreed By All Colocated ARIZONA@WORK Job Center Partners) 
Creating New Signage 
N/A 
N/A 
Updating Templates/Materials 
N/A 
N/A 
Subtotal: Common Identifier 
SUMMARY OF TOTAL INFRASTRUCTURE COSTS TO BE SHARED BY COLOCATED ARIZONA@WORK Job Center 
PARTNERS 
 
Cost Category 
Total Cost 
Subtotal: Rental Costs 
$998,934 
Subtotal: Utilities and Maintenance Costs 
$1,097 
Subtotal: Equipment Costs 
$64,463 
Subtotal: Technology to Facilitate Access Costs 
$3,635

ARIZONA@WORK Infrastructure Funding Agreement 
 
20 
 
Subtotal: Supplies to Support the General Operation of the ARIZONA@WORK 
Job Center 
$12,000 
Subtotal: Common Identifier Costs 
N/A 
TOTAL INFRASTRUCTURE COSTS FOR THIS LOCATION 
$1,080,129 
 
Attachment B3:  
Annual Infrastructure Budget for Each ARIZONA@WORK Comprehensive Job Center and Affiliate Site 
ARIZONA@WORK Comprehensive Job Center:Maricopa West 4425 West Olive Avenue Ste. 190 Glendale, AZ 
85302) Or 
 
Cost Category/Line Item 
Line Item Cost Detail 
Cost 
Rent 
Rental of Facilities 
West Valley location (26,290 sq. ft.) 
$559,875 
Subtotal: Rental Costs 
$559,875 
Utilities and Maintenance 
Electric 
N/A 
N/A 
Gas 
N/A 
N/A 
Water 
N/A 
N/A 
Sewer Connections 
N/A 
N/A 
High-Speed Internet 
N/A 
N/A 
Telephones (Landlines) 
N/A 
N/A 
Facility Maintenance Contract 
Water Dispensing Equipment & Pest 
Control Services Annual Costs 
$857 
Security Contract 
N/A 
N/A

ARIZONA@WORK Infrastructure Funding Agreement 
 
21 
 
Subtotal: Utilities and Maintenance Costs 
$857 
 
Equipment 
Assessment-related products 
OPAC & BESI 
$2,788 
Assistive technology for individuals with 
disabilities 
(“Access and Accommodation”) 
2 computer, 1 printer, MISC ADA Hardware, 
Adjustable Height Desks 
$4,375 
Copiers 
N/A 
N/A 
Printers 
Public Computer Lab-2, Training Lab-1, 
Assessment Lab-1 
$8,400 
Fax Machines 
Public Computer Lab-4 
$2,400 
Computers 
Public Computer Lab-24, Training Lab-20, 
Assessment Lab-12 
$47,600 
Other tangible equipment used to serve 
all center customers (not specific to an 
individual program partner) 
Specify Other Tangible Equipment 
3 Wi-Fi i-Pads with Stands/Kiosk 
$6000 
Subtotal: Equipment Costs 
$71,563 
Technology to Facilitate Access to the ARIZONA@WORK Job Center 
Technology used for the center’s planning 
and outreach activities 
Specify the Technology 
Email Software for sending email 
distribution lists 
Constant Contact 
Mass Text Messaging & Alerts 
Engage By Cell 
$3,635

ARIZONA@WORK Infrastructure Funding Agreement 
 
22 
 
Cost of creation and maintenance of a 
center website (not specific to an 
individual program partner) that provides 
outreach to customers by providing 
information on ARIZONA@WORK Job 
Center services and/or provides direct 
service access to the ARIZONA@WORK 
Job Center 
N/A 
N/A 
 
Website 
Address: 
 
(Does not include data systems or case 
management systems specific to 
individual program partners.) 
N/A 
N/A 
Subtotal: Technology to Facilitate Access Costs 
$3,635 
Supplies to Support the General Operation of the ARIZONA@WORK Job Center (Local Option, If Agreed By All Colocated 
ARIZONA@WORK Job Center Partners) 
Supplies, as defined in Uniform Guidance 
at 2 CFR 200.94, to support the general 
operation of the ARIZONA@WORK Job 
Center 
Specify Supplies to Support General 
Operation and Not Specific to a Colocated 
Partner (e.g., Printing; Postage, Office 
Supplies) 
Based on average annual cost 
$12,000 
Subtotal: Supplies to Support the General Operation of the ARIZONA@WORK 
Job Center 
$12,000

ARIZONA@WORK Infrastructure Funding Agreement 
 
23 
 
Common Identifier Costs (Local Option, If Agreed By All Colocated ARIZONA@WORK Job Center Partners) 
Creating New Signage 
N/A 
N/A 
Updating Templates/Materials 
N/A 
N/A 
Subtotal: Common Identifier 
N/A 
SUMMARY OF TOTAL INFRASTRUCTURE COSTS TO BE SHARED BY COLOCATED ARIZONA@WORK Job Center 
PARTNERS 
 
Cost Category 
Total Cost 
Subtotal: Rental Costs 
$559,875 
Subtotal: Utilities and Maintenance Costs 
$857 
Subtotal: Equipment Costs 
$71,563 
Subtotal: Technology to Facilitate Access Costs 
$3,635 
Subtotal: Supplies to Support the General Operation of the ARIZONA@WORK 
Job Center 
$12,000 
Subtotal: Common Identifier Costs 
N/A 
TOTAL INFRASTRUCTURE COSTS FOR THIS LOCATION 
$647,930

ARIZONA@WORK Infrastructure Funding Agreement 
 
24 
 
 
Attachment B4: Percentage of Colocated ARIZONA@WORK Job Center Partner’s Occupancy in Each Center 
ARIZONA@WORK Job Center Location: Maricopa- East 1001 W Southern Ave, Ste. 101 Mesa, AZ 85210  
Total Square Footage of the ARIZONA@WORK Job Center: 41917Square Feet 
Total Square Footage of Dedicated/Assigned Space For All Colocated or Itinerate ARIZONA@WORK Partners:  
41,917 Square Feet 
Colocated  
ARIZONA@WORK  
Job Center Partners 
Square Footage of the 
ARIZONA@WORK 
 Job Center Partner’s 
Dedicated/Assigned Space 
ARIZONA@WORK Job 
Center Partner’s 
DedicatedNumber of 
Offices and/or Cubicles 
(Floor Plan Outline 
Recommended)  
ARIZONA@WORK Job Center 
Partner’s Dedicated Space  
as a % of 
All Colocated ARIZONA@WORK 
Job Center Partners’ Space 
WIOA Title I-B Adult/Dislocated 
Worker 
8898 sq. ft 
43 
21.23% 
WIOA Title I-B Youth 
2966 sq. ft 
14 
7.08% 
Wagner-Peyser 
1397 sq. ft 
8 
3.33% 
Trade 
 
 
 
JVSG 
206 sq. ft. 
2 
0.49 % 
NFJP MSFW 
 
 
 
Adult Education 
 
 
 
Vocational Rehabilitation 
162 sq. ft. 
1 
0.39% 
Other Colocated Partner: Arbor 
E&T, LLC/Equus One Stop 
Operator 
203 sq. ft. 
2 
0.48% 
Other Itinerate Partner: Maricopa 
County Human Services Head 
28,085 sq. ft. 
74 
67.00%

ARIZONA@WORK Infrastructure Funding Agreement 
 
25 
 
Start 
Total Percentage of the Designated/Assigned Space of 
All Colocated ARIZONA@WORK Job Center Partners 
41,917 sq. ft. 
100% 
Attachment B4: Percentage of Colocated ARIZONA@WORK Job Center Partner’s Occupancy in Each Center 
ARIZONA@WORK Job Center Location: Maricopa West 4425 West Olive Avenue Ste. 190 Glendale, AZ 85302 
 
Total Square Footage of the ARIZONA@WORK Job Center: 26,290 Square Feet 
Total Square Footage of Dedicated/Assigned Space For All Colocated or Itinerate ARIZONA@WORK Partners:  
26,290 Square Feet 
Colocated  
ARIZONA@WORK  
Job Center Partners 
Square Footage of the 
ARIZONA@WORK 
 Job Center Partner’s 
Dedicated/Assigned Space 
ARIZONA@WORK Job 
Center Partner’s 
DedicatedNumber of 
Offices and/or Cubicles 
(Floor Plan Outline 
Recommended)  
ARIZONA@WORK Job Center 
Partner’s Dedicated Space  
as a % of 
All Colocated ARIZONA@WORK 
Job Center Partners’ Space 
WIOA Title I-B Adult/Dislocated 
Worker 
18140 sq.ft. 
53 
69.00% 
WIOA Title I-B Youth 
6047 sq.ft. 
17 
23.00% 
Wagner-Peyser 
1710 sq.ft. 
9 
6.50% 
Trade 
 
 
 
JVSG 
131 sq.ft. 
1 
0.50% 
Adult Education 
 
 
 
Vocational Rehabilitation 
131 sq.ft. 
1 
0.50% 
Other Colocated Partner: NFJP 
MSFW 
131 sq.ft. 
1 
0.50% 
Other Itinerate Partner:

ARIZONA@WORK Infrastructure Funding Agreement 
 
26 
 
Total Percentage of the Designated/Assigned Space of 
All Colocated ARIZONA@WORK Job Center Partners 
26,290 sq. ft 
100% 
 
 
Attachment B5: 
Proportionate Share of Infrastructure Costs Allocated to Each Colocated ARIZONA@WORK Job Center Partner 
ARIZONA@WORK Job Center Location: Maricopa- East 1001 W Southern Ave, Ste. 101 Mesa, AZ 85210 
 
Total Infrastructure Costs for This ARIZONA@WORK Job Center: $1,080,129(See Attachment B3) 
Colocated 
ARIZONA@WORK 
Job Center 
Partner 
ARIZONA@WORK 
Job Center 
Partner’s Dedicated 
Space as a % of 
All Colocated 
ARIZONA@WORK 
Job Center 
Partners’ Space 
Proportionate Share 
(% of 
ARIZONA@WORK Job 
Center Partner Space X 
Total Infrastructure 
Cost 
=ARIZONA@WORK Job 
Center Partner Share) 
$ Share to Be 
Paid 
In Cash 
$ Share to Be Paid 
In Non-Cash 
WIOA Title I-B 
Adult/Dislocated Worker 
21.23% 
$232,856 
$232,856 
WIOA Title I-B Youth 
7.08% 
$77,619 
$77,619 
Wagner-Peyser 
Employment Services 
3.33% 
$32,542 
$32,542 
Veterans 
0.49% 
$4,788 
$4,788 
Vocational 
Rehabilitation 
0.39% 
$3,811 
$3,811 
Arbor E&T, LLC/Equus 
One-Stop Operator 
0.48% 
$4,827 
$4,827 
Maricopa County Human 
Services Head Start 
67% 
$723,686 
$723,868

ARIZONA@WORK Infrastructure Funding Agreement 
 
27 
 
Total Infrastructure Costs to Be Shared by ARIZONA@WORK Job 
Center Partners in Cash/Non-Cash 
(Must Equal the Total Infrastructure Costs for This 
ARIZONA@WORK Job Center 
$1,080,129 
Attachment B5: 
Proportionate Share of Infrastructure Costs Allocated to Each Colocated ARIZONA@WORK Job Center Partner 
ARIZONA@WORK Job Center Location: Maricopa West 4425 West Olive Avenue Ste. 190 Glendale, AZ 85302 
 
Total Infrastructure Costs for This ARIZONA@WORK Job Center: $647,930 (See Attachment B3) 
Colocated 
ARIZONA@WORK 
Job Center 
Partner 
ARIZONA@WORK 
Job Center 
Partner’s Dedicated 
Space as a % of 
All Colocated 
ARIZONA@WORK 
Job Center 
Partners’ Space 
Proportionate Share 
(% of 
ARIZONA@WORK Job 
Center Partner Space X 
Total Infrastructure 
Cost 
=ARIZONA@WORK Job 
Center Partner Share) 
$ Share to Be 
Paid 
In Cash 
$ Share to Be Paid 
In Non-Cash 
WIOA Title I-B 
Adult/Dislocated Worker 
69.00% 
$454,292 
$454,292 
WIOA Title I-B Youth 
23.00% 
$151,431 
$151,431 
Wagner-Peyser 
Employment Services 
6.50% 
$34,309 
$34,309 
Veterans 
0.50% 
$2,639 
$2,639 
Vocational 
Rehabilitation 
0.50% 
$2,639 
$2,639 
NFJP/MSFW 
0.50% 
$2,620 
$2,620

ARIZONA@WORK Infrastructure Funding Agreement 
 
28 
 
Total Infrastructure Costs to Be Shared by ARIZONA@WORK Job 
Center Partners in Cash/Non-Cash 
(Must Equal the Total Infrastructure Costs for This 
ARIZONA@WORK Job Center 
$647,930

ARIZONA@WORK Infrastructure Funding Agreement 
 
29 
 
 
Attachment C: 
 
Signatures of Colocated and Itinerate ARIZONA@WORK Job Center Partners Agreeing to Share Infrastructure 
Costs  
 
By signing below, all parties agree to the terms prescribed in the Infrastructure Funding Agreement 
 
(Chief Elected Official) 
(Colocated Partner Entity) 
 
 
 
Printed Name and Title 
Printed Name and Title 
 
 
 
Signature and Date 
 
(LWDB Chairperson) 
Signature and Date 
 
(Itinerate Partner Entity)
 
 
 
Printed Name and Title 
Printed Name and Title
 
 
Signature and Date 
Signature and Date

ARIZONA@WORK Infrastructure Funding Agreement 
 
 
 
Attachment D: 
 
Signatures of Noncolocated and Itinerate ARIZONA@WORK One-Stop Partners Agreeing to Negotiate the 
Sharing of Infrastructure Costs as When Sufficient Data Are Available to Determine Relative Benefit and 
Proportionate Share 
 
By signing below, all parties agree that when data are available to determine the benefit of 
ARIZONA@WORK Job Centers to non-collocated ARIZONA@WORK Job Center partners, the infrastructure cost 
sharing agreement will be renegotiated to include their proportionate share of contributions. 
 
(Noncolocated Partner Entity)  
 
 
 
 
 
(Itinerate Partner Entity) 
 
 
 
 
 
 
 
 
 
 
 
 
 
_________________________________________ 
 
Printed Name and Title 
 
 
 
 
 
 
 
Printed Name and Title 
 
 
 
 
 
 
 
 
 
 
 
 
 
__________________________________________ 
Signature and Date  
 
 
 
 
 
 
 
Signature and Date 
 
 
(Noncolocated Partner Entity)  
 
 
 
 
 
(Itinerate Partner Entity) 
 
 
 
 
 
 
 
 
 
 
 
 
 
___________________________________________ 
Printed Name and Title 
 
 
 
 
 
 
 
Printed Name and Title 
 
 
 
 
 
 
 
 
 
 
 
 
 
___________________________________________ 
Signature and Date  
 
 
 
 
 
 
 
Signature and Date

ARIZONA@WORK Infrastructure Funding Agreement 
 
 
 
 
Attachment E1:  
Career Services Applicable to Each ARIZONA@WORK System Partner 
Basic Career Services 
T-I Adult 
T-I DW 
T-I Youth 
T-II AEL 
T-III WP 
T-IV VR 
TANF 
T-I Program Eligibility 
✓ 
✓ 
✓ 
 
✓ 
 
 
Outreach, Intake, 
Orient 
✓ 
✓ 
✓ 
✓ 
✓ 
✓ 
✓ 
Initial Assessment 
✓ 
✓ 
✓ 
✓ 
✓ 
✓ 
✓ 
Labor Exch/Job Search 
✓ 
✓ 
✓ 
 
✓ 
✓ 
✓ 
Referrals to Partners 
✓ 
✓ 
✓ 
✓ 
✓ 
✓ 
✓ 
LMI 
✓ 
✓ 
✓ 
 
✓ 
✓ 
 
Performance/Cost Info 
✓ 
✓ 
✓ 
 
 
 
 
Support Service Info 
✓ 
✓ 
✓ 
 
✓ 
✓ 
✓ 
UI Info/Assistance 
✓ 
✓ 
✓ 
 
✓ 
 
 
Financial Aid Info 
✓ 
✓ 
✓ 
✓ 
 
✓ 
✓ 
Basic Career Services 
Tech Ed 
SCSEP 
Job Corps 
Native 
American 
MSFW- 
NFJP 
YouthBuild 
TAA 
T-I Program Eligibility 
 
 
 
 
 
 
 
Outreach, Intake, 
Orient 
 
✓ 
 
 
✓ 
 
✓ 
Initial Assessment 
 
✓ 
 
 
✓ 
 
✓ 
Labor Exch/Job Search 
 
✓ 
 
 
✓ 
 
✓ 
Referrals to Partners 
 
✓ 
 
 
✓ 
 
✓ 
LMI 
 
✓ 
 
 
✓ 
 
✓ 
Performance/Cost Info

ARIZONA@WORK Infrastructure Funding Agreement 
 
 
 
Support Service Info 
 
✓ 
 
 
✓ 
 
✓ 
UI Info/Assistance 
 
✓ 
 
 
✓ 
 
✓ 
Financial Aid Info 
 
 
 
 
✓ 
 
✓ 
 
Basic Career Services 
Comm Act 
Housing 
UI 
Native 
American 
Other 
Partners
: JVSG 
Other 
Partners 
Other 
Partners 
T-I Program Eligibility 
 
 
 
 
 
 
 
Outreach, Intake, 
Orient 
 
 
 
 
✓ 
 
 
Initial Assessment 
 
 
 
 
✓ 
 
 
Labor Exch/Job Search 
 
 
 
 
✓ 
 
 
Referrals to Partners 
 
 
 
 
✓ 
 
 
LMI 
 
 
 
 
✓ 
 
 
Performance/Cost Info 
 
 
 
 
 
 
 
Support Service Info 
 
 
 
 
✓ 
 
 
UI Info/Assistance 
 
 
✓ 
 
 
 
 
Financial Aid Info 
 
 
 
 
 
 
 
 
Individualized Career 
Services 
T-I Adult 
T-I DW 
T-I Youth 
T-II AEL 
T-III WP 
T-IV VR 
TANF 
Comp Assessment 
✓ 
 
 
✓ 
 
✓ 
 
Employment Plan 
✓ 
 
 
 
 
✓ 
✓ 
Career Plan/Counsel 
✓ 
 
 
 
 
✓ 
✓

ARIZONA@WORK Infrastructure Funding Agreement 
 
 
 
Short-Term Prevoc 
✓ 
 
 
 
 
✓ 
 
Internships/Wk Exper 
✓ 
 
 
 
 
✓ 
 
Out-of-Area Job Search 
✓ 
 
 
 
 
 
 
Financial Literacy 
✓ 
 
 
✓ 
 
 
 
ELA/Integ Education 
✓ 
 
 
✓ 
 
 
 
Workforce Preparation 
✓ 
 
 
✓

ARIZONA@WORK Infrastructure Funding Agreement 
 
 
 
Individualized Career 
Services 
Tech Ed 
SCSEP 
Job Corps 
Native 
American 
MSFW- 
NFJP 
YouthBuild 
TAA 
Comp Assessment 
 
✓ 
 
 
✓ 
 
✓ 
Employment Plan 
 
✓ 
 
 
✓ 
 
✓ 
Career Plan/Counsel 
 
✓ 
 
 
✓ 
 
✓ 
Short-Term Prevoc 
 
 
 
 
✓ 
 
✓ 
Internships/Wk Exper 
 
✓ 
 
 
✓ 
 
 
Out-of-Area Job Search 
 
 
 
 
✓ 
 
✓ 
Financial Literacy 
 
 
 
 
 
 
✓ 
ELA/Integ Education 
 
 
 
 
 
 
✓ 
Workforce Preparation 
 
✓ 
 
 
✓ 
 
✓ 
Individualized Career 
Services 
Comm Act 
Housing 
UI 
Native 
American 
Other 
Partners
: JVSG 
Other 
Partners 
Other 
Partners 
Comp Assessment 
 
 
 
 
✓ 
 
 
IEP 
 
 
 
 
✓ 
 
 
Career Plan/Counsel 
 
 
 
 
✓ 
 
 
Short-Term Prevoc 
 
 
 
 
✓ 
 
 
Internships/Wk Exper 
 
 
 
 
✓ 
 
 
Out-of-Area Job Search 
 
 
 
 
✓ 
 
 
Financial Literacy 
 
 
 
 
 
 
 
ELA/Integ Education 
 
 
 
 
 
 
 
Workforce Preparation 
 
 
 
 
✓

ARIZONA@WORK Infrastructure Funding Agreement 
 
 
 
Attachment E2:  
Consolidated System Budget for the Delivery of Applicable Career Services 
The “Consolidated System Budget for the Delivery of Applicable Career Services” is the total actual or reasonably 
estimated amount of funds budgeted by the required ARIZONA@WORK Job Center partners for the delivery of the 
career services (that are applicable to their programs) and made available through the ARIZONA@WORK one-stop 
delivery system. This budget includes all costs, including personnel, related to the administration and delivery of these 
services. 
Applicable Career 
Services 
T-I Adult 
T-I DW 
T-I Youth 
T-II AEL 
T-III WP 
T-IV VR 
TANF 
Basic Career 
Services: 
T-I Eligib/Initial Assess 
Outreach, Intake, 
Orient 
Labor Exch/Job Search 
Referrals/LMI 
Support Service Info 
UI Info/Fin Aid Info 
 
 
 
 
 
 
$4,436,62
3 
 
 
 
 
 
 
$253,123 
 
 
 
 
 
 
$2,205,906 
$0 
$286,807 
$5,122,624 
$0 
Applicable Career 
Services 
Tech Ed 
T-V OAA 
Job Corps 
Native 
American 
MSFW-
NFJP 
YouthBuild 
TAA 
Basic Career 
Services: 
T-I Eligib/Initial Assess 
Outreach, Intake, 
Orient 
Labor Exch/Job Search 
Referrals/LMI 
Support Service Info 
UI Info/Fin Aid Info 
$0 
$0 
$0 
$0 
$79,000 
$0 
$0

ARIZONA@WORK Infrastructure Funding Agreement 
 
 
 
Applicable Career 
Services 
Comm Act 
Housing 
UI 
Native 
American 
Other 
Partners
: JVSG 
Other 
Partners
: 
Head 
Start 
Other 
Partners 
Basic Career 
Services: 
T-I Eligib/Initial Assess 
Outreach, Intake, 
Orient 
Labor Exch/Job Search 
Referrals/LMI 
Support Service Info 
UI Info/Fin Aid Info 
$0 
$0 
$63,563 
$0 
$199,262 
$0 
$0 
 
Applicable Career 
Services 
T-I Adult 
T-I DW 
T-I Youth 
T-II AEL 
T-III WP 
T-IV VR 
TANF 
Individualized Career 
Services: 
Comp Assessment/IEP 
Career Plan/Counsel 
Short-Term Prevoc 
Internship/Wk Exper 
Financial Literacy 
IET/ELA/WF Prep 
 
 
 
 
 
 
$1,883,62
0 
 
 
 
 
 
 
$200,000 
 
 
 
 
 
 
$1,224,854 
 
 
 
 
 
 
$130,853 
 
 
 
 
 
 
$219,622 
 
 
 
 
 
 
$6,884,884 
 
 
 
 
 
 
$0 
Applicable Career 
Services 
Tech Ed 
T-V OAA 
Job Corps 
Native 
American 
MSFW- 
NFJP 
YouthBuild 
TAA

ARIZONA@WORK Infrastructure Funding Agreement 
 
 
Individualized Career 
Services: 
Comp Assessment/IEP 
Career Plan/Counsel 
Short-Term Prevoc 
$0 
$0 
$0 
$0 
$109,000 
$0 
$78,165

ARIZONA@WORK Infrastructure Funding Agreement 
 
 
 
Internship/Wk Exper 
Financial Literacy 
IET/ELA/WF Prep 
 
 
 
 
 
 
 
Applicable Career 
Services 
Comm Act 
Housing 
UI 
Native 
American 
Other 
Partners
: 
JVSG 
Other 
Partners
: Head 
Start 
Other 
Partners 
Individualized Career 
Services: 
Comp Assessment/IEP 
Career Plan/Counsel 
Short-Term Prevoc 
Internship/Wk Exper 
Financial Literacy 
IET/ELA/WF Prep 
$0 
$0 
$0 
$0 
$199,262 
$0 
$0

ARIZONA@WORK Infrastructure Funding Agreement 
 
 
 
Attachment F1:  
Optional ARIZONA@WORK Job Center Partner Agreement to Share Other Costs and Services 
Type of Cost to be Shared: N/A 
Description of the Cost to Be Shared and What it Includes: N/A 
ARIZONA@WORK Job Center Partners Agreeing to Share This Cost 
The following ARIZONA@WORK Job Center partners have agreed to share these costs: N/A 
The ARIZONA@WORK Job Center partners that agreed to share these costs will benefit by: N/A

ARIZONA@WORK Infrastructure Funding Agreement 
 
 
 
Shared Cost Budget for 
(Identify the Type of Cost) 
Line Item 
Budget Detail 
Cost 
N/A 
N/A 
N/A 
Total Budget for This Shared Cost 
$N/A 
Agreed Upon Cost Allocation Methodology to Share This Cost 
N/A

ARIZONA@WORK Infrastructure Funding Agreement 
 
 
 
Proportionate Share for ARIZONA@WORK Job Center Partners Agreeing to Share These Costs 
(Identify the Type of Cost) 
Partners Agreeing 
Agreed 
Methodology 
Initial Partner Share 
Amount in Cash 
Amount in 
Non-Cash 
Partner 1: 
N/A 
 
 
 
Partner 2: 
N/A 
 
 
 
Partner 3: 
N/A 
 
 
 
Partner 4: 
N/A 
 
 
 
Total Budget for This Shared Cost

ARIZONA@WORK Infrastructure Funding Agreement 
 
 
 
 
 
Signature Page for Partners Agreeing to Share (Identify the Type of Cost) 
 
 
By signing below, these parties agree to the terms prescribed in the sharing of other costs. 
 
Partner 1: N/A 
 
 
 
Printed Name and Title 
 
 
Signature and Date 
 
 
 
 
Partner 2: N/A 
 
 
 
Printed Name and Title 
 
 
Signature and Date 
Attachment F2: Signature of ARIZONA@WORK One-Stop Partners Agreeing to Share Identified Operating 
Costs/Shared Services