Extracted text (via pymupdf)
56775 characters
Run Date:
05/21/2026
U.S. DEPARTMENT OF TRANSPORTATION
Report: FMISD05A
Run Time:
10:11:44
FEDERAL HIGHWAY ADMINISTRATION
Page 1 of 2
FEDERAL-AID PROJECT AGREEMENT
RECIPIENT:
4-Arizona
FEDERAL PROJECT NO:
MMA0302
UEI (SAM):
MSVMLAKEYJC5
RECIPIENT PROJ. NO(S):
T071301C,T071301D
1. The State through its department of transportation, or other recipient, has complied, or hereby agrees to comply, with the applicable terms and conditions
set forth in (a) Title 23, U.S. Code, highways;
(b) The regulations issued pursuant thereto, and the policies and procedures promulgated by the
Federal Highway Administration; and
(c) All other applicable federal laws and regulations.2. The State, or other recipient, stipulates that as a
condition to payment of the Federal funds obligated, it accepts and will comply with the provisions set forth in 23 CFR 630.112. These provisions
incorporate by reference all other federal laws and regulations pertaining to the project or the activity for which the funds are obligated. Solely for the
purposes of emphasis, such applicable provisions include, but are not limited to, the requirements of Appendix A to 2 CFR Part 170—Award terms for
Reporting subaward and executive compensation information, and 2 CFR 200, including for those funds for which such amount will be subawarded to a
subrecipient, 2 CFR 200.331.3. Relative to the above designated project, the FHWA has authorized certain work to proceed as evidenced by the date entered
opposite the specific item of work. For such authorized work, the federal funds obligated or advance-construction authorized, are not to exceed the amount
shown herein. The balance of the estimated total project cost is an obligation of the State or other direct recipient.4. Such authorization of Federal funds
extends only to project costs incurred by the State, or other recipient, following Federal Highway Administration’s authorization to proceed with the project.
PROJECT TITLE:
Various Locations in Maricopa County
PROJECT DESCRIPTION:
L101 Intelligent Transportation Systems Upgrades
DUNS#:
SUBRECIPIENT PROJECT:
No
SUBRECIPIENT UEI (SAM):
SUBRECIPIENT NAME:
PROJECT END DATE:
06/30/2031
CLASSIFICATION OF PHASE OF WORK
TO BE PUT UNDER AGREEMENT
EFFECTIVE DATE OF
AUTHORIZATION
HIGHWAY PLANNING & RESEARCH
PRELIMINARY ENGINEERING
RIGHT-OF-WAY
CONSTRUCTION
05/20/2026
OTHER
PROGRAM
CODE
FAIN
URBAN/
WITH
TOTAL COST
FEDERAL
SHARE
FEDERAL FUNDS
UNDER
AGREEMENT
ADVANCED
CONST. FUNDS
Y400
693JJ22630000Y400AZMMA0302
$2,074,125.00
94.30%
$1,946,470.00
$0.00
TOTAL
$2,074,125.00
$1,946,470.00
$0.00
ESTIMATED TOTAL COST:
$2,074,125.00
TOTAL AUTHORIZED FOR PROJECT:
$1,946,470.00
DEPARTMENT OF TRANSPORTATION ARIZONA
AVAILABLE FUNDS CERTIFIED BY:
Ryan Loos
DATE:
05/14/2026
APPROVED AND REQUESTED BY:
Joshua Wilson
DATE:
05/14/2026
AGRMT/MODIFY REQUESTED BY:
Joshua Wilson
DATE:
05/14/2026
FEDERAL HIGHWAY ADMINISTRATION
PROJECT INFORMATION REVIEWED BY:
Roman Moreno
DATE:
05/14/2026
APPROVAL RECOMMENDED BY:
Kimberly Utley
DATE:
05/20/2026
APPROVED AND AUTHORIZED BY:
Jennifer Acuna
DATE:
05/21/2026
RECIPIENT REMARKS:
*CN: Establish CN Phase. The total project cost of $2,074,125 includes $10,000 of funds provided by MCDOT
previously used for PE and are not part of the requested construction cost in this authorization.
Project End Date: 6/30/2031
ALN: 20.268
FY26 ICAP Rate: 6.10% N/A for this project
FHWA REMARKS:
Project End Date:6/30/2031
ALN:20.268
Run Date:
05/21/2026
U.S. DEPARTMENT OF TRANSPORTATION
Report: FMISD05A
Run Time:
10:11:44
FEDERAL HIGHWAY ADMINISTRATION
Page 2 of 2
FEDERAL-AID PROJECT AGREEMENT
FY26 ICAP Rate:6.10% N/A for this project
The total project cost of $2,074,125 includes $10,000 of funds provided by MCDOT previously used for PE and
are not part of the requested construction cost in this authorization.
Const authorized on 5/20/26 by KUtley.
UEI (SAM): MSVMLAKEYJC5
SUFFIX
D
GENERAL LOCATION
GENERAL DESCRIPTION OF WORK
Y400
20.268
Project End Date:
6/30/2031
ALN:
20.268
FY26 ICAP Rate:
6.10%
N/A for this project
C & S Engineer
email
contact #
by
for Division Administrator
Ryan Loos
rloos@azdot.gov
(602) 712-4326
Authorized by
Date
by
for Division Administrator
Title
Form AZPR2X (03/2012) - Approved by FHWA for use by ADOT
MMA-0(302)
Maricopa
T071301C
Various Locations in Maricopa County
DATE AUTHORIZATION EFFECTIVE
FMIS DATE
YOU ARE AUTHORIZED TO PROCEED WITH THE WORK CHECKED BELOW:
FEDERAL FUNDS($)
APPN CODE
RATIO(%)
PREVIOUS
AUTHORIZATIONS:
PHASE I: PRELIMINARY ENGINEERING - SCOPING, LOCATION STUDIES, ENVIRONMENTAL
STUDIES AND PRELIMINARY DESIGN
PHASE II: PRELIMINARY ENGINEERING - FINAL DESIGN/PREPARATION OF CONTRACT PLANS
ACQUISITION OF RIGHT-OF-WAY
FUNDING
FEDERAL PARTICIPATION AMOUNT($)
TOTAL ESTIMATED PROJECT COST($)
Resource Administration
FEDERAL HIGHWAY ADMINISTRATION - ARIZONA DIVISION OFFICE
LETTER OF AUTHORIZATION AND PROJECT AGREEMENT
ARIZONA DEPARTMENT OF TRANSPORTATION
Authorization
Modified Project Agreement
"The FHWA and ADOT Stewardship and Oversight Agreement for Arizona (July 2024)"
Project Agreement
Grant Agreement
The state agrees that as a condition to payment of the Federal funds obligated, it accepts and will comply with the agreement
provisions set forth in 23 CFR 630.112; and its signature constitutes the making of the certificates.
FEDERAL AID PROJECT NO.
PROGRAM / PHASE (ADOT)
COUNTY
ALN
L101 Intelligent Transportation Systems Upgrades
Authorization
Agreement
Dana Cherry
dcherry@azdot.gov
(602) 712-7030
Project Manager
email
contact #
Prepared by
email
contact #
date
F
H
W
A
THIS AUTHORIZATION
$2,064,125.00
A
D
O
T
$2,074,125.00
OTHER (SPECIFY)
PROJECT TOTALS
Establish CN Phase.
The total project cost of $2,074,125 includes $10,000 of funds provided by MCDOT previously used for PE and are not part of the requested
construction cost in this authorization.
$2,064,125.00
$1,946,470.00
$2,064,125.00
CONSTRUCTION - ADVERTISE FOR RECEIPT OF BIDS
CONSTRUCTION - PROCEED ON AN AGREED PRICE AND/OR FORCE ACCOUNT BASIS
Other:
94.30%
$1,946,470.00
05/14/2026
Begin:
Ending:
STIP/TIP #:
STIP Year:
2026
Enviro Doc
Date:
County
Name:
U
1
33.33%
4
33.33%
8
33.33%
Toll Road?
Safety
100%:
Temp
Matching?
Indian
Resv?
FTA?
Construction?
FHWA Area:
GREYED OUT SECTIONS TO BE COMPLETED BY PROGRAM FINANCE:
LINE ITEM
IMPROVEMENT
TYPE
PROG
CODE
OTHER SRC
1
44
Y400
Local
2
44
Y400
Local
3
44
Y400
Local
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
AZFMIS4 FMIS4FORM
GRAND TOTAL:
$1,946,470
$117,655
$2,064,125
$959,503
$57,997
$1,017,500
$143,925
$8,700
$152,625
FEDERAL AMT
OTHER AMT
TOTAL AMT
NBI #
$843,042
$50,958
$894,000
System Code:
3
(1-Interstate, 2-NHS Non-Interstate, 3-Other Federal-Aid Highway, 4- Not on any
Federal-Aid System)
Congressional District(s) & %:
Contracts and Specifications Engineer:
Maricopa
Urbanized Area:
Urban/Rural:
Functional System:
7
(0- No Functional System, 1- Interstate, 2- PA Other Freeways and
Expressways, 3- PA Other, 4- Minor Arterial, 5- Major Collector, 6-
Minor Collector, 7- Local)
Mile Point Number:
N/A
N/A
Est Constr Date:
103937
Environmental Document:
N/A
Project Description &
Type of Work:
Standard Place Code:
Inventory Rte No.:
N/A
FHWA - ARIZONA DIVISION FMIS4 CODING FORM
Federal Aid Project No.:
MMA-0(302)
ADOT Project No.
T071301C
Project Type:
C
(Conventional, Emergency
Relief, Demo, STP, SIB)
Route/County/MP
Maricopa
Various Locations in Maricopa County
L101 Intelligent Transportation Systems Upgrades
T0713XXX.xlsx
1
4
Org Number:
2
5
Org Name:
3
6
Org Manager:
EMAIL
7
8
ADOT Project No.
9
10
Route/County/MP:
11
12 STIP Year:
14
15 Program Estimate:
13 STIP/TIP #:
16
($15,875)
/
-0.76%
17
18 Est. Constr. Date:
Project End Date:
19
/
/
Execution date or Status:
/
Execution date or Status:
20A
20B Advertised by:
21
22 Sub / Ph:
23 Item#
24 Sub Project Funds:
25 ICAP:
26 Total Costs:
01C
80401
$1,946,470
$0
$1,946,470
01C
60000
$117,655
$0
$117,655
27 Totals:
$2,064,125
$0
$2,064,125
28
THIS SECTION RESERVED FOR PROGRAM FINANCE USE ONLY:
Fed Fund Source/OFS
Amount:
Federal:
94.30%
Y400
$1,946,470
Local IN-KIND:
5.70%
MCDOT
$117,655
FY26 ICAP:
6.10% N/A for this project
Total:
$2,064,125
Funds Available From: (listed in order of Activity):
Item #
Program Yr:
80401
/
2026
/
60000
/
2026
/
/
/
/
/
/
/
5/14/2026
/
/
Date
/
/
/
/
Totals:
Finance Remarks:
Approving Official:
Signature
Date
$2,064,125
Ryan Loos
RESOURCE ADMIN
Funding Type
Amount
$1,946,470
$117,655
Responsible Manager:
Bharat Kandel
5/14/2026
Name
Date
Activity:
Local Agency Construction
Local Agency Construction
Utility:
N/A
Other (identify):
N/A
Additional Informa
Required Agreement Numbers
JPA:
N/A
Execution date or Status:
2026
ADOT Estimate:
$2,064,125
$2,080,000
103937
Estimate Cost Variance by $ and %:
Local Matching Funds Received? (Yes No N/A):
N/A
6/30/2031
Location:
Maricopa
Description of Work:
Project Manager:
Dana Cherry
PMG
Project Manager Phone #:
(602) 712-7030
Bharat Kandel
dcherry@azdot.gov
Federal Aid Project No.:
MMA-0(302)
T071301C
Various Locations in Maricopa County
L101 Intelligent Transportation Systems Upgrades
FEDERAL AID REQUEST FOR AUTHORIZATION
ADOT OFFICE OF RESOURCE ADMINISTRATION
Date:
May 14, 2026
4983
Add Rows
05/14/2026
PROJECT NUMBER
T071301C
CREATED:
05/11/26
FEDERAL AID NUMBER
MMA-0(302)
REVISED:
LOCATION
Various Locations in Maricopa County
ENGINEER: Antonia Middleton
FHWA
ESTIMATED
FEDERAL
FEDERAL
LOCAL
LOCAL
LENGTH
DESCRIPTION
CODE
COST
PARTICIPATION
FUNDS
FUNDS
FUNDS
IN MI
94.30%
5.70%
100.00%
Other: Costs of Construction Software Design & Development
44
894,000
894,000
843,042
50,958
0.000
and Procurement of Equipment
44
1,017,500
1,017,500
959,503
57,997
Loop 101 ICM Readiness
SUBTOTAL
1,911,500
1,911,500
1,802,545
108,955
CONTINGENCY
Fixed
44
152,625
152,625
143,925
8,700
PROJECT TOTAL:
2,064,125
2,064,125
1,946,470
117,655
0.000
NOTE:
TOTAL FEDERAL FUNDS (94.3%):
$1,946,470.00
TOTAL LOCAL FUNDS (5.7%):
$117,655.00
TOTAL LOCAL FUNDS (100%):
$0.00
TOTAL LOCAL FUNDS:
$117,655.00
TOTAL CONSTRUCTION COST:
$2,064,125.00
DETAILED ESTIMATE
RECAPITULATION
Our True North: Safely Home
Rev. 2/23
ARIZONA DEPARTMENT OF TRANSPORTATION
1 | P a g e
1801 W. Jefferson St., Suite 120, MD 102M | Phoenix, AZ 85007 | azdot.gov
Infrastructure Delivery and Operations
Katie Hobbs, Governor
Jennifer Toth, Director
Audra Merrick, Deputy Director for Transportation/State Engineer
Matt Moul, Division Director
ŶƚŚŽŶLJE͘ ^ĂƌŚĂŶ
ĐƚŝŶŐDivision Administrator
Federal Highway Administration
4000 N. Central Ave., Suite 1500
Phoenix, Arizona 85012-1906
RE:
ADOT PROJECT NO.:
FEDERAL PROJECT NO.:
PROJECT TERMINI:
PROJECT LOCATION:
CONTRACT TIME:
( WORKING DAYS or CALENDAR DAYS), or
FIXED DATE:
ESTIMATED CONTRACT COST: $
Dear Mƌ͘ ^ĂƌŚĂŶ
The Arizona Department of Transportation (ADOT) is ready to request authorization for the above mentioned
Certification Acceptance Agency project.
The final set of Plans, Specification and Estimate (PS&E) for this project was approved on:
by: and verified by ADOT on:
The Proposed Work is:
Pavement Preservation:
Pavement Preservation – Surface treatments up to two-inches.
Pavement Rehabilitation (3R) – Mill and Fill greater than two-inches.
Other (Indicate Type of Work):
Procurement:
Materials only procurement – Installation will be completed by Local Agency forces without any Federal
participation or reimbursement for installation. Cost of installation is included as non-participating.
Materials only procurement – Installation will be completed by Contractor without any Federal participation
or reimbursement for installation. Cost of installation is included as non-participating.
Procurement of materials and installation completed by Contractor using Federal funds.
Procurement of materials and resources for the Safe Routes to School (SRTS) Support Program.
Docusign Envelope ID: CD398809-02D2-4A4D-AF93-A19365D71D86
N/A
Manojkumar Pavithran
X
L101, Maricopa County, AZ
700
N/A
12/16/2025
ITS Upgrades
MMA-0(302)D
X
T071301C
X
2,064,125.00
05/14/2026
Rev. 2/23
ARIZONA DEPARTMENT OF TRANSPORTATION
2 | P a g e
1801 W. Jefferson St., Suite 120, MD 102M | Phoenix, AZ 85007 | azdot.gov
The Project Description is:
Has the project been approved for Increased Federal Share for Innovative Technology Deployment?
No.
Yes, a 5% increase in Federal Aid participation for Innovative Technology Deployment (ITD) is included in this
request. ITD funds will be used for:
Project Funding:
The project is included in the approved 5-Year program.
The project is included in STIP Number
approved by FHWA on:
The STIP amendment number if applicable was approved by FHWA on:
The project is included in TIP Number
Is this project using HSIP funding? No. Yes, eligibility approved on:
by:
Is there a Local / 3rd Party contribution of funds above the required match?
No.
Yes, all work is eligible. The Local / 3rd Party is committed to funding $
of the project. Should the bids
come in low, no local funding will be deobligated.
Yes, the total Local / 3rd Party contribution above the required match is $
Of this amount:
$
is eligible for Federal reimbursement, including if bids are low or major changes occur.
$
is not eligible for Federal reimbursement; should bids be low or any major changes occur, this
portion cannot be replaced with Federal Aid. The reason for the overmatch is:
Design Exceptions:
Were not required for this project.
Were approved for this project on:
by:
System Engineering:
Was not required on this project.
Was approved for this project on:
by:
Is a Utility Clearance Letter required for this project?
No.
Yes.
If Yes, the Utility Clearance Letter for this project was issued on:
Docusign Envelope ID: CD398809-02D2-4A4D-AF93-A19365D71D86
02/10/2026
103937
06/15/2023
X
X
X
26-06
X
X
X
X
36693
X
03/02/2026
Procuring CCTV cameras, detection systems, field switches, and signal controllers to support real-time operations and
integrated corridor management at signalized intersections. The equipment will be provided to partner agencies, who
will be responsible for installation. The upgraded signals will be integrated into the AZTech ATSPM system which will be
upgraded to provide off-line analytics. The project also includes connected vehicle data integration, system support,
and training for ARIS and ATSPM ti ensure effective use and performance monitoring.
X
Susan Anderson
03/04/2026
Rev. 2/23
ARIZONA DEPARTMENT OF TRANSPORTATION
3 | P a g e
1801 W. Jefferson St., Suite 120, MD 102M | Phoenix, AZ 85007 | azdot.gov
Choose the appropriate statement:
Type 1 – All utilities have been cleared and relocated prior to construction.
Type 2 – Conditional Clearance – Utilities will be cleared or relocated prior to bid opening.
Type 3 – Conditional Clearance – Project can be authorized but will not be advertised prior to completion of
utility relocation.
Type 4 – Conditional Clearance – All utilities are mitigated. Contractor and/or Utility will coordinate final
relocation during construction. See the Special Provisions for additional information.
Choose the appropriate statement:
There is no railroad within ½ mile of the project limits.
There is a railroad within ½ mile of the project limits. There is no railroad work on this project. The railroad
was notified.
There is a railroad within the project limits. Railroad work was completed prior to the advertisement of this
project.
There is a railroad within the project limits. Railroad work will be completed by the railroad and/or the
contractor during this project. See attached special provisions for required coordination and impacts to this
project.
Is a Right of Way Clearance Letter required for this project?
No.
Yes.
If yes, the Right of Way Clearance Letter for this project was issued on:
The Conditional Clearance, if applicable was approved by FHWA on:
Choose the appropriate clearance type:
Type 1 – In accordance with 23 CFR 635.309(c)(1) – All property rights including legal and physical possession
have been obtained to construct the project and all relocation has been completed.
Type 2 – is considered a Conditional Clearance: In accordance with 23 CFR 635.309(c)(2) – All property rights
have not been fully acquired, but the right to occupy and to use all rights of way required for the proper
execution of the project has been acquired. Trial or appeal of some parcels may be pending in court and on
other parcels full legal possession has not been obtained but the right of entry has been obtained.
Type 3 – is considered a Conditional Clearance: In accordance with 23 CFR 635.309(c)(3)-All property rights
have not been obtained, but appropriate notification will be provided in the request for bids, identifying all
locations where right of occupancy and use has not been obtained. FHWA has received appropriate
notification identifying all locations where right of occupancy and use has not been obtained. Prior to the
ADOT/LPA issuing a notice to proceed with construction to the contractor, the ADOT/LPA shall provide an
updated notification to FHWA identifying all locations where right of occupancy and use has not been
obtained along with a realistic date when physical occupancy and use is anticipated.
Business Engagement and Compliance (BECO) has established a DBE participation rate of
% for this phase of
the project.
Department Furnished Materials: Are not required for this project.
This project contains Department Furnished Materials. Specify the following:
Manufactured Material (Use by the contractor must be Mandatory and PIF was approved on:
Local Natural Materials –
Use by the contractor is Mandatory, PIF was approved on:
Use by the contractor is Optional, no PIF is required
Docusign Envelope ID: CD398809-02D2-4A4D-AF93-A19365D71D86
0.00
X
X
X
02/26/2026
X
X
Rev. 2/23
ARIZONA DEPARTMENT OF TRANSPORTATION
4 | P a g e
1801 W. Jefferson St., Suite 120, MD 102M | Phoenix, AZ 85007 | azdot.gov
A VE Study: Was not conducted on this project.
Was conducted on this project on:
The NEPA Approval for this project was issued on:
A formal Re-Evaluation (CE, EA, EIS), if applicable, was issued on:
326 MOU
327 MOU
ADOT certifies that NEPA requirements consistent with the scope of work of the project have been met and the
project incorporates all environmental commitments per 23 CFR 771.109(d).
Project Environmental Clearance information provided by Environmental Planner:
______________________________
___________________
Signature of Environmental Planner
Date
____________________________
Printed Name
The Department respectfully requests authorization to proceed with advertisement of bids for construction work on
this project.
Sincerely,
_____________________________
___________________
Signature of Project Manager
Date
____________________________
Printed Name
O N/A
Docusign Envelope ID: CD398809-02D2-4A4D-AF93-A19365D71D86
X
Paul O'Brien
X
05/14/2026
02/04/2026
Dana Cherry
05/14/2026
P: 602.506.8600
F: 602.506.4750
Strategic Communications & Outreach Division
Intergovernmental Relations Branch
2901 W. Durango Street
Phoenix, Arizona 85009
May 11, 2026
Dana Cherry
Transportation Engineer Specialist
Arizona Department of Transportation
205 S. 17th Avenue, MD 614E
Phoenix, AZ 85007
Subject: Loop 101 Readiness
Federal-aid Project # MMA-0(302)D
ADOT Project # T0713 01C
MAG TIP # MMA25-260C/ MMA25-260C1
MCDOT Project # TE083
Maricopa County Department of Transportation
Request for Obligation Authority of $1,946,470
Dear Ms. Cherry:
On behalf of the Maricopa County Department of Transportation (MCDOT), I am
respectfully requesting obligation authority in the amount of $1,946,470 in Congestion
Mitigation and Air Quality (CMAQ) funding for the project referenced.
The total estimated construction cost of the project at this time per the Engineer’s Sealed
Construction Estimate is $2,064,125. Please see additional Information (on the next page)
for further details.
This MCDOT project will support the implementation of the Loop 101 Mobility Concept and
Integrated Corridor Management (ICM) corridors applications required during freeway incidents
with installation taking place in Maricopa County. The project will include support for ITS
infrastructure through the procurement of ITS equipment for partner agencies and will also
enhance various features within ARIS to improve traffic management with a focus on ICM support.
Enclosed is a highlighted excerpt of the MAG TIP amendment, which reflects this project’s still-
current programmed construction funds.
Clearances:
Environmental:
Approval was granted by the Arizona Department of Transportation (ADOT)
on February 04, 2026. A copy of the clearance will be submitted separately
and in the enclosed Bid Package.
Utilities:
The County issued a comprehensive utility clearance on February 10, 2026.
This document will be submitted separately. Individual utility clearance
response letters can be provided upon request. There are no railroad
facilities within ½ mile of the project limits.
P: 602.506.8600
F: 602.506.4750
Strategic Communications & Outreach Division
Intergovernmental Relations Branch
2901 W. Durango Street
Phoenix, Arizona 85009
Right of Way:
Right of way clearance was executed on February 26th, 2026, and will be
submitted separately.
Additional Information Included with this Submittal:
•
The County will not use proprietary products on this project.
•
The County has no exceptions on this project
•
Engineer-stamped, detailed cost estimate
•
Detailed Estimate Recapitulation
•
Project Location Map
•
Complete copy of the full bid package
•
DBE Goal Assessment Response
•
SE Checklist has been included
The County is prepared to work towards soliciting bids promptly upon approval by ADOT and the
Federal Highway Administration and notice of the federal fund’s obligation.
We greatly appreciate your review and subsequent approval of the obligation package.
If you need additional information, please contact me at (602) 506-0074 or at
Antonia.Middleton@maricopa.gov. Thank you for your prompt attention to this matter.
Sincerely,
Antonia Middleton
(interim) Federal Coordinator
Enclosures
Cc: Mary Ann Roder-MCDOT; Christopher Bradley – MCDOT; Alexander Lemka – MCDOT; Joe
Cottrell - MCDOT
Arizona Department of Transportation
Categorical Exclusion (CE) Checklist
for Actions Approved Under
23 CFR 771.117(c) & (d)
CE and NEPA Assignment – 11/19/2025
1
2A - (c) Listed
2B - (d) Listed
2C - (d) Unlisted
Project Information:
Project Name: L101 ITS Upgrades, Various Locations
ADOT Project Number: 0000 MMA T0713 01X
Federal-Aid Number: MMA-0(302)D
Estimated Project Construction Cost: $1,928,500
Planning Requirements:
STIP/Line Item
ADOT Sub-program
CE Start Date: 2/4/2026
Construction Project Administration
ADOT
CA Agency
Categorical Exclusion Approval for FMIS
Re-evaluation:
This project has been re-evaluated pursuant to 23 CFR 771.129 due to a change in the project scope, location, or
termini or because of the need to evaluate new impacts not previously considered, or because significant time has
passed since the date of the CE Approval. The information on this form reflects all updates to the project information.
Location and Limits:
This project will support the implementation of the Loop 101 Mobility Concept and Integrated Corridor Management (ICM)
corridors applications required during freeway incidents, with installation taking place in Maricopa County.
Purpose and Description (scope of work):
The purpose of this project is to support the implementation of the Loop 101 Mobility Concept and Integrated Corridor
Management (ICM) corridors applications required during freeway incidents. The equipment will be provided to partner
agencies, who will be responsible for installation. The upgraded signals will be integrated into the AZTech ATSPM system
which will be upgraded to provide offline analytics.
The scope of work includes:
•
Procure CCTV cameras, detection systems, field switches, and signal controllers to support real-time operations and
ICM at signalized intersections,
•
Expand ARIS to include a real-time analytics module to validate RADS data and identify data issues in real-time.
•
Develop system support, and training for ARIS and ATSPM to ensure effective use and performance monitoring,
No construction will occur; no right-of-way will be required, and no ground disturbance is anticipated.
Docusign Envelope ID: 87A6305F-57C8-4CE7-A08F-A8EAC661FAF0
2
CE and NEPA Assignment – 11/19/2025
Type of CE - Choose one from (c) or (d) or Appendix A drop-down lists:
(c) - list: (c)(1) Activities which do not involve or lead
directly to construction, such as planning and research
activities; grants for training; engineering to define the
elements of a proposed action or alternatives.
(d) - list:
Note: If the project qualifies for a (c)(1) or a (c)(9) emergency repair CE then no technical review is required and the CE is
complete. Proceed to NEPA Certification and Determination and Categorical Exclusion Approval.
Environmental Review Section
Each category below will be reviewed and a determination from a drop-down menu will be selected for each. The checkbox
will indicate review has been completed and the appropriate documentation placed in the Project File as applicable.
Air Quality – Clean Air Act
Select a determination from the drop-down menu
Noise – 23 CFR 772
Select a determination from the drop-down menu
Biological Resources – Endangered Species Act
Select a determination from the drop-down menu
Cultural Resources – Section 106
Select a determination from the drop-down menu
Section 4(f)
Select a determination from the drop-down menu
Individual Section 4(f) Approved
Section 404 – Clean Water Act
Select a determination from the drop-down menu
Section 401 – Clean Water Act
Select a determination from the drop-down menu
Docusign Envelope ID: 87A6305F-57C8-4CE7-A08F-A8EAC661FAF0
3
CE and NEPA Assignment – 11/19/2025
Hazardous Materials
Select a determination from the drop-down menu
Public Involvement
Select a determination from the drop-down menu
Other Considerations
Other potential environmental impacts such as Prime and Unique Farmlands, Sole Source Aquifers, Section 6(f)
property, visual resources, etc. have been considered for this project and additional documentation as applicable is
contained in the Project File.
Briefly cite if there are other applicable considerations and reference the appropriate file documentation. If no
other considerations “n/a” applies.
n/a
Complete this section only for CEs determined under 23 CFR 771.117(c)(26), (c)(27) and (c)(28) for
evaluation of the constraints under 23 CFR 771.117(e):
If the answer to all questions 1 through 11 below is No then the project can be approved as a (c)(26), (c)(27) or (c)(28) CE.
If the answer to any question 1through 11 for a project listed under (c)(26), (c)(27) or (c)(28) is Yes then the project
exceeds the constraints listed under 23 CFR 771.117(e) and must be processed under (d)(13). Additional information
regarding any constraint exceeded is included below.
Constraints:
Yes
No
1. Does the project involve the permanent acquisition of more than a minor amount of right-of-
way?
2. Does the project involve any residential or non-residential displacements?
3. Does the project require a bridge permit from the U.S. Coast Guard?
4. Does the project require an Individual Permit under Section 404 of the Clean Water Act or
Section 10 of the Rivers and Harbors Act?
5. Does the project have a finding of “Adverse Effect” on historic properties protected by Section
106 of the NHPA by FHWA?
6. Does the project involve the use of a resource protected under Section 4(f) except for actions
resulting in de minimis impacts?
7. Does the project have a finding of “may affect, likely to adversely affect” threatened or
endangered species or critical habitat under the Endangered Species Act?
8. Does the project involve construction of temporary access, or the closure of an existing road,
bridge, or ramp, that would result in major traffic disruptions?
9. Does the project involve a change in access control on a controlled access highway?
Docusign Envelope ID: 87A6305F-57C8-4CE7-A08F-A8EAC661FAF0
4
CE and NEPA Assignment – 11/19/2025
Complete this section only for CEs determined under 23 CFR 771.117(c)(26), (c)(27) and (c)(28) for
evaluation of the constraints under 23 CFR 771.117(e):
If the answer to all questions 1 through 11 below is No then the project can be approved as a (c)(26), (c)(27) or (c)(28) CE.
If the answer to any question 1through 11 for a project listed under (c)(26), (c)(27) or (c)(28) is Yes then the project
exceeds the constraints listed under 23 CFR 771.117(e) and must be processed under (d)(13). Additional information
regarding any constraint exceeded is included below.
Constraints:
Yes
No
10. Does the project involve a floodplain encroachment for other than functionally dependent uses
(e.g. bridges, wetlands) or actions facilitating open space use (e.g. recreational trails, bicycle and
pedestrian paths)?
11. Does the project involve construction activities in, across, or adjacent to a river component
designated or proposed for inclusion in the National System of Wild and Scenic Rivers?
23 CFR 771.117(e) – Constraints Exceeded (If any “Yes” on Checklist)
Certification and Determination by ADOT
The State has determined that this project has no significant impact(s) on the environment and that there are no
unusual circumstances as described in 23 CFR 771.117(b). As such, the project is categorically excluded from the
requirements to prepare an environmental assessment or environmental impact statement under NEPA. The action
complies with NEPA requirements relating to connected actions and segmentation [23 CFR 771.111(f)]. The State
has been assigned, and hereby certifies that it has carried out, the responsibility to make this determination
pursuant to 23 U.S.C. 326 and a Memorandum of Understanding dated December 20, 2023, executed between
FHWA and the State.
The State has determined that this project has no significant impact(s) on the environment and that there are no
unusual circumstances as described in 23 CFR 771.117(b). As such, the project is categorically excluded from the
requirements to prepare an environmental assessment or environmental impact statement under NEPA. The action
complies with NEPA requirements relating to connected actions and segmentation [23 CFR 771.111(f)]. The
environmental review, consultation, and other actions required by applicable Federal environmental laws for this
project are being, or have been, carried out by ADOT pursuant to 23 U.S.C. 327 and a Memorandum of
Understanding dated June 25, 2024 and executed by FHWA and ADOT.
Environmental Commitments
Environmental commitments are included with this project and will be incorporated into the project plans,
specifications and estimates as required.
Environmental Permits Issues and Commitments (EPIC) sheet to be included.
Docusign Envelope ID: 87A6305F-57C8-4CE7-A08F-A8EAC661FAF0
5
CE and NEPA Assignment – 11/19/2025
Categorical Exclusion Approval
Prepared By: Date:
Katie Rodriguez
Environmental Planner
Approved By: Date:
Paul O'Brien, PE
Administrator, Environmental Planning
Docusign Envelope ID: 87A6305F-57C8-4CE7-A08F-A8EAC661FAF0
2/4/2026
2/4/2026
Engineering Division
2901 W. Durango Street
Phoenix, Arizona 85009
P: 602.506.4889
UTILITIES & RAILROAD COORDINATION SECTION
UTILITY & RAILROAD CLEARANCE LETTER
Date:
February 10, 2026
To:
Alexander Lemka, Data Systems Engineer
Joe Cottrell, Traffic Technology Branch Manager
Mary Ann Roder, Finance Division Manager
From:
Shawn Coleman, PE, Utility Coordination Branch Manager
Transportation Engineering Division
Subject:
Project Name: Loop 101 Readiness
Federal ID No.: MMA-0(302)D
COG/MPO TIP No.: MMA25-260C/MMA25-260C1
ADOT Project No.: T0713 (sub-phases 01D/01C/01X)
MCDOT Project No.: TE083
This is a software development and procurement project only. There are no known utility conflicts
within the project limits.
Project No. TE083 activities will not result in construction work within one-half mile of a railroad track.
Please be aware that service drops and utility crossings are not always identified by Blue Stake services
or on as-built drawings and will be dealt with on a case by case basis if they are discovered during in
investigation activities.
2/10/2026
Utility Coordination Branch Manager
Date
cc:
File
Docusign Envelope ID: BED5F260-87F8-49F5-B193-B25F0BC9B143
Rev. 12/17
Memo of R/W Clearance:
Local Public Agency: County of Maricopa
Federal Project Number & ADOT TRAC:
MMA-0(302)D
ADOT Project Number:
0000 MMA T0713 01X
Road, Street and/or Alleyway:
Detection devices installed in various locations
Name of Project:
TE083 – L101 ICM Readiness
I, Nanci Chavez, have reviewed the Real Property Interest for the above
referenced project and completed the Real Property Interest Certification form. I
certify that all was done in accordance with all Federal and State rules &
regulations including ARS 12-1122, subsection C, 49 CFR 24, 23 CFR parts 450
and 771, (23 USC 128; Federal Aid Policy Guide 710-777 & (23 CFR 635.309 (c)
and the ADOT LPA manual.
This memo serves as notice that no Real Property Interests have been acquired
because they will not be impacted by Project Design, and that Right of Way is
hereby cleared.
Printed Name: Nanci Chavez
Title: Right of Way Agent
Signature: __________________________
Date: __
Note: Only an authorized official of the LPA can sign this form
ADOT LPA Coordinator Concurrence:
_______________________________________ Date: ________________
Matt Tolman
2/25/2026
Docusign Envelope ID: EC0BA355-FCF4-4E33-BA2D-26E24FB74BD6
2/26/2026
L101 ITS Upgrades, Var Locs
1
Version Date: March 26, 2025
14-461
Systems Engineering Checklist
41-2000
Prior to design, complete or update a Systems Engineering and Architecture Compliance Checklist or report (depending on
the complexity of the project) for projects containing any Intelligent Transportation Systems (ITS) elements. Submit the
checklist or report to the Arizona Department of Transportation (ADOT) Systems Technology Group manager for review
and approval. If federally funded, submit the approved checklist or report to the Federal Highway Administration (FHWA)
as part of the federal authorization paperwork.
Section 1 – Project Information
1.1a ADOT Project Manager and Contact Information:
1.1b Consultant Project Manager and Contact Information: N/A
1.1c Local Public Agency Project Manager and Contact Information: N/A
1.2
Project Location:
1.3
ADOT Project Number (also known as TRACS):
Federal-Aid: YES NO
Federal-Aid Project Number: N/A
1.4
Project Description, Title, and Type of Work:
1.5
Funding and Source of Each (Including State and Federal):
Fiscal Year:
Other (Please Specify):
1.6
Nature of Work (select all appropriate boxes):
Software/Integration
Planning
Construction
Equipment Upgrades
Operations
Preliminary Engineering
Evaluations
Other (Please Specify):
Dana Cherry, dcherry@azdot.gov, 602-712-7030
Alexander Lemka Alexander.lemka@Maricopa.gov 602.506.8288
RADS servers located at MCDOT TMC, various signal locations
T0713 (sub-phases 01D/01C/01X)
MMA-0(302)D
This project consists of procuring CCTV cameras, detection systems, field switches, and signal controllers to support real-time
operations and integrated corridor management at signalized intersections. The upgraded signals will be integrated into the ATSPM
system, and the project also includes connected vehicle data integration/support, system support, and training for ARIS and ATSPM.
Materials $860,488 Total: $912,500
Closeout Funds (Materials): $257,910 Total: $273,500
Construction $843,042 Total: $894,000
2027
Docusign Envelope ID: 313E760E-0561-441D-A621-49CF4F1706B9
2
Version Date: March 26, 2025
14-461
Systems Engineering Checklist
41-2000
Section 2 – ITS Architecture Conformance
National, Arizona, MAG, and PAG all have ITS Architectures available online.
If the project is located on a local jurisdiction facility within MAG, search MAG 2013 Architecture.
If the project is located on a local jurisdiction facility within PAG, search PAG 2004 Architecture.
All others, search Arizona 2024 Architecture.
2.1
Service Packages identified in MAG Architecture
http://azmag.gov/Programs/Transportation/Road-Safety-and-Technology/MAG-Regional-ITS-Architecture/MAG-ITS-
Architecture
Service (formerly “market”) Packages identified in PAG Architecture
http://www.pagnet.org/documents/its/2004-ITS-SDP.pdf
Service Packages identified in Arizona 2024 Architecture
https://apps.azdot.gov/files/its-architecture/services.htm
Search the online architectures to identify the service packages in the project.
List the service packages in the space provided:
2.2
Identify which ITS elements are not already included in the relevant architecture and list them here so they can be
identified in future Architecture updates:
Section 3 – Participating Agencies and Their Roles
3.1
Lead Agency:
3.2
Participating Agencies:
3.3
Is an Intergovernmental Agreement (IGA/JPA) Needed for This Project?
Existed
To Be Developed
IGA #
No
Please describe operational and budgetary relationships:
DM01, DM02, TM01, TM02, TM03, TM04, TM07, TM08, MC05, MC07
N/A
Maricopa Department of Transportation (MCDOT)
ADOT, Glendale, Tempe, Phoenix, Peoria, and other AZTech partner agencies
The partner agencies will be responsible for installing procured equipment and reimbursing MCDOT for the local match (5.7%) of
equipment they receive as well as $2,000 for the review fee for each agency (ADOT, Glendale, Tempe, Phoenix, Peoria).
Docusign Envelope ID: 313E760E-0561-441D-A621-49CF4F1706B9
3
Version Date: March 26, 2025
14-461
Systems Engineering Checklist
41-2000
Section 4 – Requirements Definitions and Alternatives Analysis
4.1
Project Purpose and Need Summary:
Is there a project scoping document defining the issue?
If “No,” please provide information:
Yes
No
Is there a project scoping document defining proposed alternatives?
If “No,” please provide information:
Yes
No
(Tip: List what types of planning documents have been or will be completed.)
4.2
Project Documentation
List the name and date of the existing document or what
is to be developed in the space below:
Feasibility Study with alternatives
and cost benefits
(Tip: List what types of planning
documents have been or will be
completed.)
Existing
Existing to Be Modified
To Be Developed
Concept of Operations
(ConOPS)
Existing
Existing to Be Modified
To Be Developed
Requirements
Existing
Existing to Be Modified
To Be Developed
Design / Post-Design
Existing
Existing to Be Modified
To Be Developed
Systems Engineering
Management Plan (SEMP)
(Required for Complex
ITS Projects)
Existing
Existing to Be Modified
To Be Developed
The Design Concept Report (DCR) presents alternatives to
building/enhancing the system.
Will be developed during the project
Specific system requirements will be defined during the project
through a design document
The DCR will provide high-level design. a Systems Design
Document will be created during the project
A Management Plan will be created during the project
Docusign Envelope ID: 313E760E-0561-441D-A621-49CF4F1706B9
4
Version Date: March 26, 2025
14-461
Systems Engineering Checklist
41-2000
Section 5 – Procurement
5.1
Procurement Methods:
Construction Contract
Procurement Contract
Request for Proposal
Other (Please Specify):
Invitation to Bid
5.2
Equipment to Be Purchased:
5.3
Procurement Contract Numbers to Be Used: app.az.gov (if using existing contract)
Section 6 – ITS Standards
6.1
Which specific National ITS Standards will be used in this project such as NTCIP and IEEE?
These standards are online: https://www.standards.its.dot.gov/DevelopmentActivities/PublishedStandards. Identify
the project specific ones:
If no National ITS Standards can be identified please explain why not:
Section 7 – Systems Testing
7.1
Systems Testing Documentation
List the name of the existing document or what is to be
developed in the space below:
System Test Plan
Existing
Existing to Be Modified
To Be Developed
System Validation
Existing
Existing to Be Modified
To Be Developed
37 Signal Controllers, 21 Switches, 31 CCTV Cameras, 24 Detection Systems, 8 Advanced Detection Systems
Not using existing contract
NTCIP, ITE, TMDD, IEE-1512
Systems Acceptance Test Plan will be developed as part of the
project
The SAT and Requirements testing will be used for System
Validation
Docusign Envelope ID: 313E760E-0561-441D-A621-49CF4F1706B9
5
Version Date: March 26, 2025
14-461
Systems Engineering Checklist
41-2000
Section 8 – Operational Resources
8.1
Procedures and Resources Needed for the Operation and Maintenance:
(Tip: If the operation is expanding, how will existing agreements, staff, processes, or networks manage the additional
equipment? If the operation is new, what agreements, staff, processes, or networks will ensure success?)
8.2
Operation/Maintenance Staff Contact Information:
(Tip: Once the construction is completed who will operate/maintain the equipment?)
Section 9 – Schedule
9.1
Expected Design Completion Date and Construction Completion Date:
9.2
Relationship to Other Federal, State, County, and Local Projects and Phases (within TIP and/or Five-Year Program):
(Tip: Does this project depend on another project to operate successfully? Is the project one of a series or projects for a
phased approach?)
Section 10 – Strategic Plans for System Update
10.1 Plans for Systems Upgrade and Lifecycle
List the name and date of the existing document or what
is to be developed in the space below:
System Update Plan
Existing
Existing to Be Modified
To Be Developed
Section 11 – Completed and Approved
11.1 Name of person completing the form, contact information, date when submitting:
11.2 ADOT Systems Technology Group Manager Signature and Date:
Signature
Date
The MCDOT ITS staff will use existing network and data management strategies updated for new processes developed in the project.
The partner agencies will deploy and maintain Traffic Equipment procured.
The MCDOT TMC staff will maintain the RADS within the MCDOT TMC facility. Any MCDOT ITS staff member should be able
to assist with identifying correct avenues for addressing specific problems. (Joe Cottrell Joe.Cottrell@maricopa.gov)
Implementation 3rd Qtr FY 27
RADS integrates data from various sensors and other ITS devices implemented through various TIP and ITS projects.
RADS Action Plan.
Alexander Lemka
Alexander.Lemka@Maricopa.gov
602.506.8288
Docusign Envelope ID: 313E760E-0561-441D-A621-49CF4F1706B9
3/4/2026
Transportation Systems Management &
Operations Division
2901 W. Durango Street
Phoenix, Arizona 85009
P: 602.506.8676
F: 602.506.8758
January 15, 2026
Susan Anderson
Systems Technology Group Manager
ADOT Transportation Systems Management & Operations (TSM&O) Division
1615 W. Jackson Street, MD 065R
Phoenix, AZ 85007
Re: Certification Request for Proprietary Materials for RADS Enhancements for L101 Readiness Project
MCDOT #TE083
Dear Mrs. Anderson:
The undersigned agencies respectfully request approval from the Arizona Department of Transportation
(ADOT) to procure specific brands and models of traffic management equipment for the L101 Readiness
Projects. This request seeks approval for agency-specific equipment necessary to maintain compatibility
with existing traffic management infrastructure, software platforms, and operational standards across
participating jurisdictions.
The requested procurement includes traffic signal controllers, Ethernet switches, CCTV cameras, detection
systems, and advanced detection devices. Due to the integrated and operationally critical nature of these
systems, equivalent substitutions are not feasible without introducing substantial risk, cost, and
operational disruption.
PUBLIC INTEREST JUSTIFICATION
A. Compatibility with Existing Systems
Each participating agency operates mature traffic management systems built upon standardized
equipment platforms. The requested devices are required to ensure full compatibility, continuity of
operations, and reliable system performance.
Arizona Department of Transportation (ADOT) – Transportation Technology
•
Econolite Cobalt TS2 Controllers (8 units)
•
EtherWan 73934X Ethernet Switches (8 units)
•
Bosch MIC IP 7000i CCTV Cameras (8 units)
Justification: ADOT has standardized on Econolite controllers and Bosch CCTV equipment across its
statewide network. These devices integrate directly with ADOT’s traffic management software,
communications backbone, and video management systems. Staff are fully trained, and maintenance
procedures are established.
Docusign Envelope ID: DA8AF0EB-59C8-4B22-B395-FEDDBFB23652
Docusign Envelope ID: 3402205C-C312-4B67-80A9-2EB9B716F4F0
Transportation Systems
Management & Operations Division
2901 W. Durango Street
Phoenix, Arizona 85009
P: 602.506.8676
F: 602.506.8758
Susan Anderson
Systems Technology Group Manager
ADOT Transportation Systems Management & Operations (TSM&O) Division
1615 W. Jackson Street, MD 065R
Phoenix, AZ 85007
Page 2
City of Glendale
•
Econolite Cobalt TS2 Controllers (11 units)
•
Econolite Vision Detection Systems (8 units)
•
Wavetronix Advanced Detection Devices (8 units)
Justification: Glendale has standardized on Econolite traffic control equipment and currently deploys
Econolite Vision and Wavetronix detection technologies. These systems are fully integrated into Glendale’s
traffic network, and staff are experienced in their operation and maintenance.
City of Peoria
•
McCain Traffic Signal Controllers (18 units)
•
EtherWan 73934X Ethernet Switches (13 units)
•
AXIS Q6075E PTZ CCTV Cameras (15 units)
Justification: Peoria utilizes McCain controllers as its standard platform, which integrates directly with the
City’s traffic management center software and communications infrastructure. AXIS cameras are Peoria’s
established CCTV standard and are fully supported by existing video management systems.
City of Phoenix
•
NoTraffic Video Detection Systems (16 units)
Justification: Phoenix currently deploys and operates NoTraffic video detection systems. These devices
are compatible with Phoenix’s signal infrastructure and central management systems, and staff are trained
with established maintenance and support procedures.
City of Tempe
•
AXIS Q6075E PTZ CCTV Cameras (8 units)
Justification: Tempe has standardized on AXIS CCTV equipment throughout its traffic network. The
Q6075E model is consistent with existing deployments and integrates seamlessly with Tempe’s video and
traffic monitoring platforms.
B. Operational Efficiency and Public Safety
Procuring equipment that matches existing systems directly serves the public interest by:
1. Ensuring System Reliability: Proven compatibility eliminates integration risks that could
compromise traffic operations and public safety.
2. Minimizing Downtime: Staff familiarity enables faster installation, troubleshooting, and repairs.
3. Maintaining Service Continuity: Compatible equipment prevents disruptions during deployment
and cutover.
4. Immediate Operational Readiness: Equipment can be placed into service without extended learning
curves or configuration delays.
C. Cost Effectiveness and Fiscal Responsibility
Specifying compatible equipment protects the federal investment by:
1. Eliminating integration and middleware costs
Docusign Envelope ID: DA8AF0EB-59C8-4B22-B395-FEDDBFB23652
Docusign Envelope ID: 3402205C-C312-4B67-80A9-2EB9B716F4F0
Transportation Systems
Management & Operations Division
2901 W. Durango Street
Phoenix, Arizona 85009
P: 602.506.8676
F: 602.506.8758
Susan Anderson
Systems Technology Group Manager
ADOT Transportation Systems Management & Operations (TSM&O) Division
1615 W. Jackson Street, MD 065R
Phoenix, AZ 85007
Page 3
2. Reducing or eliminating additional training expenses
3. Streamlining maintenance and spare parts inventories
4. Leveraging existing vendor support contracts
5. Avoiding long-term costs associated with maintaining mixed or incompatible systems
This approach ensures the most efficient use of federal funds over the life cycle of the equipment.
D. Proven Performance and Risk Mitigation
All requested equipment is currently deployed and operational within the respective agencies, providing:
•
Field-tested reliability in local environmental conditions
•
Verified compatibility with existing systems
•
Documented performance metrics
•
Reduced risk of implementation delays, system failures, or cost overruns
E. Interagency Coordination Benefits
While each agency requires equipment tailored to its own standards, this procurement approach supports
regional traffic management by:
•
Preserving agency-specific operational standards
•
Enabling seamless multi-jurisdictional coordination
•
Supporting effective incident response across agency boundaries
•
Ensuring consistent performance within the regional traffic network
RISKS OF ALTERNATIVE PROCUREMENT APPROACHES
Requiring the use of non-compatible or substitute equipment would:
1. Increase the risk of system integration failures
2. Compromise public safety during critical traffic events
3. Require additional federal funding for training and system modifications
4. Extend project timelines due to integration challenges
5. Create long-term operational and maintenance liabilities
CONCLUSION AND RECOMMENDATION
The requesting agencies respectfully submit that procuring the specified equipment is in the public interest
and represents the most responsible and effective use of federal funds. Approval of this Public Interest
Finding will:
•
Ensure system compatibility and operational continuity
•
Minimize risk, cost, and implementation delays
•
Maximize long-term operational efficiency
•
Protect public safety
•
Support regional traffic management objectives
The agencies request ADOT approval to proceed with procurement of the specified equipment for this
federally funded project.
Docusign Envelope ID: DA8AF0EB-59C8-4B22-B395-FEDDBFB23652
Docusign Envelope ID: 3402205C-C312-4B67-80A9-2EB9B716F4F0
Transportation Systems
Management & Operations Division
2901 W. Durango Street
Phoenix, Arizona 85009
P: 602.506.8676
F: 602.506.8758
Susan Anderson
Systems Technology Group Manager
ADOT Transportation Systems Management & Operations (TSM&O) Division
1615 W. Jackson Street, MD 065R
Phoenix, AZ 85007
Page 4
If you have any questions, please contact me at 480-640-7474.
Sincerely,
_______________________________
Date: _____________________
Joe Cottrell
Traffic Technology Branch Manager
Maricopa County Department of Transportation
Approved: _____________________
Denied: __________________
_______________________________
Date: _____________________
Susan E. Anderson, P.E., PTOE
Systems Technology Group Manager
Docusign Envelope ID: DA8AF0EB-59C8-4B22-B395-FEDDBFB23652
1/16/2026
Docusign Envelope ID: 3402205C-C312-4B67-80A9-2EB9B716F4F0
2/5/2026
X
MCDOT Project No.: TE083 ADOT Project No.: T0713 01C
Project Name: Loop 101 Integrated Corridor Management (ICM) Readiness
MAG TIP No.: MMA25-260C & MMA25-260C1
Locations Vicinity Map
Agency
Section
MAG ID
Location
Federal Functional Classification
MAG Mode
Estimated Date for
Completion/Open to
Traffic
AQ Area
In Program
Miles
Lanes
Before
Lanes
After
PM1 -
Safety
PM2T -
Transit
Asset
Condition
PM2N -
Pavement
Condition
PM2B -
Bridge
Condition
PM3F -
Travel
Reliability
PM3S - Non
SOV Travel
PM3E -
CMAQ
Emissions
On NHS
TIP ID
Local ID
STIP ID
Federal ID / Grant ID
TRACS / ALI
Work
Work Year
Funding
Apportionment
Year
Federal
Regional
Local
Total Note
Maricopa
County
Highway
36693
Various Locations - Maricopa County
ITS
OCT-DEC 2027
Maricopa
SM+O
0
0
0
No
No
No
No
Yes
No
Yes
No
MMA25-260C
TE083
103937
-----
-----
L101 ICM Readiness (Procurement)
2026
CMAQ
2026
860,488
0
52,012
912,500
Maricopa
County
Highway
36693
Various Locations - Maricopa County
ITS
OCT-DEC 2027
Maricopa
SM+O
0
0
0
No
No
No
No
Yes
No
Yes
No
MMA25-260C-CL
103937
-----
-----
L101 ICM Readiness (Procurement)
2026
CMAQ
2026
257,910
0
15,590
273,500
Maricopa
County
Highway
36693
Various Locations - Maricopa County
ITS
OCT-DEC 2027
Maricopa
SM+O
0
0
0
No
No
No
No
Yes
No
Yes
No
MMA25-260C1
TE083
103937
-----
-----
L101 ICM Readiness (Construction)
2026
CMAQ
2026
843,042
0
50,958
894,000
!"#
$ %
&'
()*
+,,-
.'/0
"#
-,1,/
23$"43 5657$7
" 6585 9:57 5"*;
<3=>""*?@!?A
$
4=585 92""*?@!?A
B
4B56 92""*?@!?A
$
4$ 92""*?@!?A
B
4*BC<B56 :5D5EF559
3$":57 54=585 9!
""*?@!?A
$!$
+GHI/0
"#$ %
.JKLMJ
"*;
&H.LN
OG,-,
P/I,/,/I
,-,
$
./
BB QA
?!@!
A?
RSTUV
WXYZ\]X^_V
R^`]^
Wabcbd
Wabcbe
Wabcbf
Wabcbg
Wabchc
WXiX^V
j]iTk
3"=
$"*l
!
m 2A 2nn
!
!
!
!
!
m 2A 2nn
3"=
o;D
m ??2
m p2@A
!
!
!
!
!
m?n
2@A
qM
m ??2
m?2
p
2
!
!
!
!
!
m?2?
?2
rstuvxyszyu{{|}
~bbccc ~bcfcccc
~bbcbccc
"#(55 "Q57
V^U`]Y`Ui]^'/MJH11qH11qHH11qHH11q?!
p*85 785 ?
?!?
?
n)?A)?
? @) )?
?A) @)?()*?n!
*7# ?
?n!?
?p
A) A)?
? A) A)? ?) )? ?) )??n!
@*85 785 ?
?n!?
?p )?)?
?
)?)?
?n
)?@)?
?n
)?@)?
?n?@!
*7# ?
?@!?
?
A)? )?
?n
A)? )?
?n
A)? )?
?n
A)? )?
?n?@!
@ *85 785 ?
?@!?
?
)??)?
?@
)
n)?
?@
)
)?
?@
)
A)?
?@?@!
A*85 785 ?
?@!?
?
?)?
)?
?@
) )?
?@
) ?)?
?@
) ?)?
?@?A!
*7# ?
?A!?
A)?
)?
?@
A)?)?
?@
)
?)?
?@
)
?)?
?@?A!
@*85 785 ?
?A!?
?) @)?
?@
)
)?
?A
)? )?
?A
) )?
?A?A!
A*85 785 ?
?A!?
)?)?
?A
?) p)?
?A
)
?)?
?A
?)?A)?
?Ayy|tuz||us
$B)F(B3(;)$C=!*77275o552 65 752C557o5 65
75575oE
'/G,/I./I-
<o#5 5578m 2?p2@
m?2?
?2
¡¢£¤ ¦ £§¨
©ª«¬®¯°±«ª¯
²¯¯±³¦³¯´±µ¶·¸«¯µ¹«º»¸¼¯½±¼±¬¼¾´³¯µ¶³±¿À¯´±¼ºª³´«Á¢£Ãģűª«¬®¯¼´¸Â ÄÆ¡Æ£Çźª³´«ÁÂÈ