RESOLUTION FCD2024R003- GRAND & 75TH AVE.DOCX

Maricopa County — Formal (2024-05-22)

View PDF Item 95 Meeting page

Extracted text (via pymupdf) 3151 characters
RESOLUTION FCD 2024R003
Page 1 of 3
When Recorded Return to:
Contracts Branch
Flood Control DISTRICT of Maricopa County
2801 West Durango Street
Phoenix, AZ 85009
RESOLUTION - FCD 2024R003
Grand Avenue, Olive Avenue, and 75th Avenue Regional Drainage 
Improvements 
Agenda: 
WHEREAS, The Flood Control District of Maricopa County (DISTRICT) was 
established in accordance with provisions of Arizona Revised Statutes Title 48, Chapter 21, 
which authorizes the Board of Directors of the Flood Control District of Maricopa County 
(BOARD) to acquire by eminent domain, purchase, donation, dedication, exchange or other 
lawful means rights-of-way to construct, operate and maintain flood control works and storm 
drainage facilities within or without the DISTRICT for the benefit of the DISTRICT, to contract 
and join with the State of Arizona, the United States or any other flood control district or 
floodplain board, municipality, political subdivision, governmental agency, irrigation or 
agricultural improvement district, association, corporation or individual in acquiring, 
constructing, maintaining and operating flood control works, and regulating floodplains; and,
WHEREAS, the proposed improvements as shown in Exhibit A are located within the 
City of Peoria; and,
WHEREAS, the area is subject to frequent flooding; and, 
WHEREAS, the area was the subject of the Glendale/Peoria Area Drainage Master 
Plan (GPADMP) prepared in November 2011; and, 
WHEREAS, the GPADMP was used as the basis for the Peoria Storm Drain Master 
Plan prepared in 2014 which took a closer look at the existing storm drain system and made 
improvement recommendations to mitigate the flood hazards in the southwest corner of the

RESOLUTION FCD 2024R003
Page 2 of 3
intersection of Grand Avenue, Olive Avenue, and 75th Avenue (the PROJECT), as depicted by 
Exhibit A; and,
WHEREAS, the final design may identify different and/or additional features that 
may become part of the PROJECT; and, 
WHEREAS, the City of Peoria intends to be the lead agency for the PROJECT.
NOW, THEREFORE, BE IT RESOLVED that the Chief Engineer and General Manager 
of the DISTRICT is authorized and directed to include funds for the PROJECT implementation 
in the DISTRICT’s current and future Five-Year Capital Improvement Programs, subject to the 
ratification and approval of this BOARD; and,
BE IT FURTHER RESOLVED that the Chief Engineer and General Manager of the 
DISTRICT is authorized and directed to negotiate and prepare intergovernmental agreements 
and/or agreements with identified cost-share partners, other municipalities, agencies and 
others, as appropriate, for cost-sharing, rights-of-way acquisition, utility relocations, design, 
construction, and construction management of the PROJECT, subject to the ratification and 
approval of this BOARD.  
Dated this 
 day of 
, 2024.
Chairman, Board of Directors
ATTEST:

RESOLUTION FCD 2024R003
Page 3 of 3
Clerk of the Board

RESOLUTION FCD 2024R003
Page 4 of 3
*Approximate Locations
RESOLUTION FCD 2024R003
EXHIBIT A
PROJECT LOCATION MAP*
Grand Avenue, Olive Avenue, and 75th Avenue Regional Drainage 
Improvements