AMENDMENT NO. 1 TO THE PROFESSIONAL SERVICES AGREEMENT 
BETWEEN 
THE CITY OF TOLLESON 
AND 
4LINE STUDIO LLC 
 
THIS AMENDMENT NO. 1 TO THE PROFESSIONAL SERVICES AGREEMENT (this 
“Amendment”) between the CITY OF TOLLESON, an Arizona municipal corporation (the “City”) 
and 4LINE STUDIO, LLC, an Arizona limited liability company, (the “Consultant”), (collectively, the 
“parties”), is hereby entered into and shall be effective on the last signature date set forth below.   
Note: Amendment changes are noted with additions in bold font and deletions in strikeout font. 
RECITALS 
A. 
The City and the Consultant entered into a Professional Services Agreement. 
effective on June 30, for Consultant to provide the City with On-Call Architectural Services, (the 
“Agreement”).  The terms of the Agreement and any amendments thereto, are incorporated 
herein by reference. 
 
B. 
The City is permitted, pursuant to Section 3-5-7 of the City Code, to make 
purchases under the Agreement, at its discretion and with the agreement of the awarded 
Consultant. 
 
C. 
The City and the Consultant desire to enter into this Agreement for the purpose 
of (i) acknowledging their contractual relationship under the Agreement and this Agreement, 
(ii) establishing the terms and conditions by which the Consultant may provide the City with 
Services, and (iii) setting the maximum aggregate amount to be expended pursuant to this 
Agreement related to the Services. 
AGREEMENT 
NOW, THEREFORE, in consideration of the foregoing introduction and recitals, which are 
incorporated herein by reference, the following mutual covenants and conditions, and other 
good and valuable considerations, the receipt and sufficiency of which are hereby acknowledged, 
the City and the Consultant hereby agree as follows: 
 
1. 
The parties agree to amend Paragraph 1 Term of the Agreement as follows: 
 
1.   Term of Agreement. This Agreement shall be effective as of the date 
first set forth above and shall remain in full force and effect until June 30, 
20262027.

2 
2. 
The parties agree to amend Paragraph 3 Compensation of the Agreement to 
include a new Exhibit C, Fee Proposal, which is attached hereto. 
 
3. 
The parties agree to amend Paragraph 14.14 Notices and Requests of the 
Agreement as follows:  
 
With copy to: Pierce Coleman PLLC 
7730 E. Greenway Road, Suite 105 
17851 N. 85TH STREET, SUITE 175 
Scottsdale, Arizona 8526085255.  
Attn: Justin Pierce, City Attorney 
4. 
Effect of Amendment. In all other respects, the Agreement is affirmed and ratified 
and, except as expressly modified herein, all terms and conditions of the Agreement shall remain 
in full force and effect. 
5. 
Non-Default. By executing this Amendment, the Contractor affirmatively asserts 
that (i) the City is not currently in default, nor has it been in default at any time prior to this First 
Amendment, under any of the terms or conditions of the Agreement and (ii) any and all claims, 
known and unknown, relating to the Agreement and existing on or before the date of this  
Amendment are forever waived. 
6. 
Conflict of Interest. This Amendment and the Agreement may be canceled by the 
City pursuant to A.R.S. § 38-511. 
 
IN WITNESS WHEREOF, the parties hereto have executed this Amendment as of the last 
date and year set forth below. 
 
“City” 
 
CITY OF TOLLESON,  
an Arizona municipal corporation 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Reyes Medrano, Jr., City Manager 
 
 
 
Date 
 
ATTEST: 
 
 
 
 
 
 
 
 
 
Crystal Zamora, City Clerk

3 
APPROVED AS TO FORM: 
 
 
 
 
 
 
 
 
 
Justin S. Pierce, City Attorney 
 
 
“Contractor” 
 
4LINE STUDIO, LLC, an Arizona limited liability company 
 
 
By:  
 
 
 
 
 
 
 
 
 
 
 
 
Name:  
 
 
 
 
 
 
Date 
Its:

4 
AMENDED EXHIBIT C 
TO 
PROFESSIONAL SERVICES AGREEMENT 
BETWEEN 
THE CITY OF TOLLESON 
AND 
4LINE STUDIO, LLC 
 
(Fee Schedule + Fee Proposal) 
 
See following pages.

4Line Studio LLC 
 
6155 East Indian School Road #150 
Scottsdale, Arizona 85251 
 
 
www.4linestudio.com 
2 
P26004 – Tolleson Event Center 
 
 
02.19.2026 
 
 
 
Exhibit A – Scope Of Work 
 
Project Scope 
Our understanding of the project scope is as follows: 
The client is looking to develop the existing building located at 9258 West Van Buren Street 
Tolleson, Arizona 85353 to convert the existing structure into a new event space for the City 
of Tolleson. The existing building is +/- 5,500 sf and is roughly 80% completed through a 
construction project for a free standing office/medical building. The intent is to convert the 
existing structure into a new event space plus add +/- 3,500 sf to provide the following 
amenities: 
o 250 Occupant Ballroom Space 
o Small Meeting Room 
o Large Meeting Room 
o Restrooms 
o Bridal Room 
o Warming Kitchen 
o Misc. Business Spaces 
o Private Patio On North End Of Building 
o Vehicular Drop Off On South Side Of Building 
o New Parking Lot West Of Building On Adjacent Parcel That Will Be Part Of 
Larger City Owned Parcel

4Line Studio LLC 
 
6155 East Indian School Road #150 
Scottsdale, Arizona 85251 
 
 
www.4linestudio.com 
3 
P26004 – Tolleson Event Center 
 
 
02.19.2026 
 
 
Project Assumptions 
 
Construction will be not be phased and drawing packages will not be phased. 
 
Sufficient utilities (water, power, etc…) are available at existing property line and no 
off-site work is required 
 
All deliverables will be digital. Any physical printing/shipping will be billed as a 
reimbursable expense at the Client’s expense with a 10% markup 
 
All travel expenses are included in the fees above for the number of in person meetings 
listed in Exhibit A.  
 
It is assumed that retention will be underground. 
 
The existing building is not sprinkled, it is assumed the project will be sprinkled as part of 
this project’s scope, but design of the sprinkler system and fire riser is excluded from this 
project’s scope.

4Line Studio LLC 
 
6155 East Indian School Road #150 
Scottsdale, Arizona 85251 
 
 
www.4linestudio.com 
4 
P26004 – Tolleson Event Center 
 
 
02.19.2026 
 
 
Project Exclusions: 
 
Permit, Application, Design Review Fees 
 
Review and Evaluation of Value Engineering Proposed By Others  
 
Energy Modeling 
 
Estimation Of Construction Schedule 
 
Material Inspection, Sampling and Testing Services 
 
Environmental Assessments 
 
Asbestos, Lead, and Hazardous Material Abatement and Removal 
 
Delegated Design Items (Structural or Otherwise) 
 
Building Signage + Other Non-Code Required Signage  
 
Rezoning Submittals/Presentations 
 
Lot Split/Combination Submittals 
 
Special City Inspections 
 
Specifications and Analysis for Pre-Purchase of Equipment 
 
Multiple Permit Packages Or Bid Package 
 
Review of, and Response to, Design Review by Outside Consultants (except as noted) 
 
LEED/SITES/WELL Building Design 
 
Design of Grey Water Systems 
 
Bidding Negotiation 
 
3rd Party Utility Coordination (Except as Noted) 
 
Fire Alarm/Fire Sprinkler Design 
 
Lightning Protection Design 
 
Furniture Procurement 
 
Traffic Engineering or Studies 
 
Fire Flow Tests 
 
Utility Locating/Potholing 
 
IT/AV or Security Design 
 
Acoustical Analysis/Design 
 
Low Voltage Landscape Lighting Design 
 
Construction Staking 
 
NOI (Notice of Intent) Application By Contractor 
 
Irrigation Booster Pumping System 
 
Construction Administration Services 
 
Sub-Surface Exploration 
 
Design of Off-Site/Public Street, Sidewalk, Water, or Sewer Improvements 
 
Natural Gas/Propane Design

4Line Studio LLC 
 
6155 East Indian School Road #150 
Scottsdale, Arizona 85251 
 
 
www.4linestudio.com 
5 
P26004 – Tolleson Event Center 
 
 
02.19.2026 
 
 
Basic Services: 
 
Task 1.0 - Schematic Design 
 
Task 1.1 - Architectural Services – As part of this phase 4Line Studio LLC will work with 
the Client to develop a design that meets their objectives, making revisions as 
necessary to the exterior and interior design features of the core elements. During this 
phase all plans, elevations, exterior/interior finishes will be refined. Three-dimensional 
images will be provided. As part of this phase 4Line Studio will attend up to two (2) in 
person meetings with the client 
 
Task 1.2 – Mechanical And Plumbing Engineering Services – Refer to Exhibit A.1. No in 
person meetings by the sub-consultant are expected as part of this task 
 
Task 1.3 – Electrical Engineering Services – Refer to Exhibit A.2. No in person meetings 
by the sub-consultant are expected as part of this task 
 
Task 1.4 – Structural Engineering Services – Refer to Exhibit A.3. No in person 
meetings by the sub-consultant are expected as part of this task 
 
Task 1.5 – Civil Engineering Services – Refer to Exhibit A.4. No in person meetings by 
the sub-consultant are expected as part of this task 
 
Task 1.6 – Landscape Architectural Services – Refer to Exhibit A.5. No in person 
meetings by the sub-consultant are expected as part of this task 
 
Task 1.7 – Cost Estimation Services – Refer to Exhibit A.6. No in person meetings by 
the sub-consultant are expected as part of this task 
 
Task 1.8 – Food Service Design Services – Refer to Exhibit A.7. No in person meetings 
by the sub-consultant are expected as part of this task 
 
Task 1.9 – Geotechnical Engineering Services – Refer to Exhibit A.8. No in person 
meetings by the sub-consultant are expected as part of this task

4Line Studio LLC 
 
6155 East Indian School Road #150 
Scottsdale, Arizona 85251 
 
 
www.4linestudio.com 
6 
P26004 – Tolleson Event Center 
 
 
02.19.2026 
 
 
Task 2.0 - Design Development 
 
Task 2.1 - Architectural Services –Based on the approved SD package, 4Line Studio 
LLC will develop the design in further detail as needed, including: 
 
Development of the exterior building envelope, including wall materials, window 
fenestration, and other design elements 
Prepare wall sections for major wall assemblies and building components 
 
Interior elevations of core spaces showing proposed millwork, interior glass openings, 
and proposed interior finishes 
 
Reflected ceiling plans showing ceiling height and materials, and location of light 
fixtures 
 
Progress deliverables during this phase will be informal and submitted as needed to 
move the project forward 
 
Final deliverable for this phase includes a design development package in PDF form 
including drawings identified above. 
 
Task 2.2 – Mechanical And Plumbing Engineering Services – Refer to Exhibit A.1. No in 
person meetings by the sub-consultant are expected as part of this task 
 
Task 2.3 – Electrical Engineering Services – Refer to Exhibit A.2. No in person meetings 
by the sub-consultant are expected as part of this task 
 
Task 2.4 – Structural Engineering Services – Refer to Exhibit A.3. No in person 
meetings by the sub-consultant are expected as part of this task 
 
Task 2.5 – Civil Engineering Services – Refer to Exhibit A.4. No in person meetings by 
the sub-consultant are expected as part of this task 
 
Task 2.6 – Landscape Architectural Services – Refer to Exhibit A.5. No in person 
meetings by the sub-consultant are expected as part of this task 
 
Task 2.7 – Cost Estimation Services – Refer to Exhibit A.6. No in person meetings by 
the sub-consultant are expected as part of this task 
 
Task 2.8 – Food Service Design Services – Refer to Exhibit A.7. No in person meetings 
by the sub-consultant are expected as part of this task

4Line Studio LLC 
 
6155 East Indian School Road #150 
Scottsdale, Arizona 85251 
 
 
www.4linestudio.com 
7 
P26004 – Tolleson Event Center 
 
 
02.19.2026 
 
 
Task 3.0 - Construction Documents 
 
Task 3.1 - Architectural Services –Based on the approved DD package, 4Line Studio 
LLC will continue to develop the design and drawings to furnish a complete set of 
documents suitable for plan review, Contractor bidding, and construction. As part of 
this phase 4Line Studio LLC will coordinate the drawings and specifications and 
incorporate into the final CD package/Contract Documents. Progress deliverables 
during this phase will be informal and submitted as needed to move the project 
forward. As part of this phase 4Line Studio will attend up to two (2) in person meetings 
with the client 
 
4Line Studio LLC will develop architectural drawings for the use in permitting and 
construction for the Core and Shell scope, including: 
 
Code and Egress Study and Plans 
Floor Plans with Dimensions and Keynotes 
Interior Design and all finish selections 
Reflected Ceiling Plans. 
Light fixture selections 
All Necessary Details Interior and Exterior 
Sheet Specifications 
 
Task 3.2 – Mechanical And Plumbing Engineering Services – Refer to Exhibit A.1. No in 
person meetings by the sub-consultant are expected as part of this task 
 
Task 3.3 – Electrical Engineering Services – Refer to Exhibit A.2. No in person 
meetings by the sub-consultant are expected as part of this task 
 
Task 3.4 – Structural Engineering Services – Refer to Exhibit A.3. No in person 
meetings by the sub-consultant are expected as part of this task 
 
Task 3.5 – Civil Engineering Services – Refer to Exhibit A.4. No in person meetings by 
the sub-consultant are expected as part of this task 
 
Task 3.6 – Landscape Architectural Services – Refer to Exhibit A.5. No in person 
meetings by the sub-consultant are expected as part of this task 
 
Task 3.7 – Cost Estimation Services – Refer to Exhibit A.6. No in person meetings by 
the sub-consultant are expected as part of this task 
 
Task 3.8 – Food Service Design Services – Refer to Exhibit A.7. No in person meetings 
by the sub-consultant are expected as part of this task

4Line Studio LLC 
 
6155 East Indian School Road #150 
Scottsdale, Arizona 85251 
 
 
www.4linestudio.com 
8 
P26004 – Tolleson Event Center 
 
 
02.19.2026 
 
 
Exhibit -B Fees 
 
Task 1.0 – Schematic Design 
  
 
 
                          
    $48,319.00 
 
Task 1.1 – Architectural Services               
 
                       
 
        $15,000.00  
 
Task 1.2 – Mechanical and Plumbing Engineering Services                 
         
          $2,035.00  
Task 1.3 – Electrical Engineering Services                 
         
          
 
           $1,584.00 
 
Task 1.4 – Structural Engineering Services                 
                       
 
          $2,530.00  
 
Task 1.5 – Civil Engineering Services                 
                       
 
                   $14,300.00  
 
Task 1.6 – Landscape Architectural Services                 
                       
 
          $3,850.00  
 
Task 1.7 – Cost Estimation Services                
                       
 
          
          $1,980.00  
 
Task 1.8 – Food Service Design Services                                       
          
           $1,320.00 
Task 1.9 – Geotechnical Engineering Services                                
          
          $5,720.00  
 
Task 2.0 – Design Development   
 
 
                          
   $56,745.00 
 
Task 2.1 – Architectural Services               
 
                       
 
        $15,000.00  
 
Task 2.2 – Mechanical and Plumbing Engineering Services                 
         
          $9,130.00  
Task 2.3 – Electrical Engineering Services                 
         
          
 
          $3,168.00  
 
Task 2.4 – Structural Engineering Services                 
                       
 
          $2,420.00  
 
Task 2.5 – Civil Engineering Services                                   
                                  $14,025.00 
 
Task 2.6 – Landscape Architectural Services                                        
 
          $8,250.00  
 
Task 2.7 – Cost Estimation Services                 
                       
 
          
           $2,772.00 
 
Task 2.8 – Food Service Design Services                                       
          
          $1,980.00  
 
Task 3.0 – Construction Documents 
  
 
 
                          $66,321.00 
 
Task 3.1 – Architectural Services               
 
                       
 
       $20,000.00  
 
Task 3.2 – Mechanical and Plumbing Engineering Services                 
         
         $8,800.00  
Task 3.3 – Electrical Engineering Services                 
         
          
 
          $3,168.00  
 
Task 3.4 – Structural Engineering Services                 
                       
 
          $4,180.00  
 
Task 3.5 – Civil Engineering Services                                        
 
                    $18,425.00 
 
Task 3.6 – Landscape Architectural Services                                        
 
          $5,500.00 
 
Task 3.7 – Cost Estimation Services                 
                       
 
          
          $3,168.00  
 
Task 3.8 – Food Service Design Services                                       
          
          $3,080.00 
 
Basic Services Total: 
 
 
 
                       $171,385.00 
 
4Line Studio LLC Additional Services Hourly Rates  
 
 
 
Principal / Project Manager   
 
      
 
             
     $195.00/hr 
 
Project Architect    
 
 
      
 
              
 
     $155.00/hr 
 
Project Designer   
 
 
      
 
              
 
     $135.00/hr 
 
 
 
 
 
 
 
A 10% markup of all consultant fees will be applied to the total proposal costs that are provided to 
4Line Studio. This same 10% markup will be applied to any additional services required by any 
consultants to 4Line Studio LLC.