05 12 26 Van Buren Street Parking Lot - Development Services Director Jason Earp

City of Tolleson — City Council (2026-05-12)

View PDF Meeting page

Extracted text (via ocr_local) 1403 characters
® Birdseye View Looking Southeast

LH] P

+] D} Harrington Planning +

: x

ES
Stee

| E | Ground Eye View Looking East

FE VPN.

| F ] Ground Eye View Looking North

ieee (Oe Sil

LEGEND KEY NOTES:

@ Permeable Pavement, Color Pending

2) Central Walkway, Standard 4x8 Unit Pavers, Running
Bond, Color - Match Existing, 2’ Ribbon Curb

3) Integral Colored Concrete, 14’ Wide,
Solomon Colors Dry Integral Color “Peach”

Paver Pattern, Match Existing Pattern, Colors - Plum
& Terra Cotta, 2’ Concrete Header

oe Screen Wall, Match Ex. Column Material, Steel Panel,
Papel Picado Art Panels, fastened to Steel Panel

Rain Garden Planter, 2’ Ribbon Curb, 6” Depth,
3-8” Rip Rap

(7) Festoon Lighting, 13.5’ High, Attached to
Steel Posts, to Match Van Buren Street Light Poles

EV charging Station, GFI, 120/240V, 200A Pedestal
Mounted Service

yt

(9) ROW Planter Revision, see Note #3

® Proposed 4’ Pedestrian Gate Location, See Note #2

Notes:

1. See CP 3.1 for 3D Views of the preferred concept.
2. Please see CP 3.2 for Pedestrian Gate precedent imagery.
3. ROW Planters to be either:
A. Pet-friendly synthetic turf with tree uplighting.
B. DG with low-growing and colorful vegetation with
tree uplighting.

=)

Permeable Pavement Paver Walkway, Running Integral Color Concrete Existing Paver Pattern Screen Wall Column Rain Garden Planter Festoon Lighting Event Charging Station
Bond Pattern Material