05 12 26 Van Buren Street Parking Lot - Development Services Director Jason Earp
Extracted text (via ocr_local)
1403 characters
® Birdseye View Looking Southeast LH] P +] D} Harrington Planning + : x ES Stee | E | Ground Eye View Looking East FE VPN. | F ] Ground Eye View Looking North ieee (Oe Sil LEGEND KEY NOTES: @ Permeable Pavement, Color Pending 2) Central Walkway, Standard 4x8 Unit Pavers, Running Bond, Color - Match Existing, 2’ Ribbon Curb 3) Integral Colored Concrete, 14’ Wide, Solomon Colors Dry Integral Color “Peach” Paver Pattern, Match Existing Pattern, Colors - Plum & Terra Cotta, 2’ Concrete Header oe Screen Wall, Match Ex. Column Material, Steel Panel, Papel Picado Art Panels, fastened to Steel Panel Rain Garden Planter, 2’ Ribbon Curb, 6” Depth, 3-8” Rip Rap (7) Festoon Lighting, 13.5’ High, Attached to Steel Posts, to Match Van Buren Street Light Poles EV charging Station, GFI, 120/240V, 200A Pedestal Mounted Service yt (9) ROW Planter Revision, see Note #3 ® Proposed 4’ Pedestrian Gate Location, See Note #2 Notes: 1. See CP 3.1 for 3D Views of the preferred concept. 2. Please see CP 3.2 for Pedestrian Gate precedent imagery. 3. ROW Planters to be either: A. Pet-friendly synthetic turf with tree uplighting. B. DG with low-growing and colorful vegetation with tree uplighting. =) Permeable Pavement Paver Walkway, Running Integral Color Concrete Existing Paver Pattern Screen Wall Column Rain Garden Planter Festoon Lighting Event Charging Station Bond Pattern Material