Item Report

City of Tolleson — City Council (2026-01-13)

View PDF Meeting page

Extracted text (via pymupdf) 3746 characters
TOLLESON FIRE 
DEPARTMENT 
MONTHLY REPORT
2026
FEBRUARY

OPERATIONS
For February, Engine 161 responded to 160 calls, averaging 5.7
calls per day. Ladder/LT161 responded to a combined total of
149 calls averaging 5.2 calls per day. Full stafffing was
achieved throughout the month of February and the LA Unit
was not staffed during the month of January.  
www.reallygreatsite.com 
February Call Volume
01

OPERATIONS
FTEs
Firefighters – 15 / 0 vacant 
1 Firefighter Recruit on track to graduate from the
academy in April 2026.
1 applicant in pre-hire, on track to start academy in
May 2026.
Engineers – 6 / 1 vacant
Captains – 6 / 0 vacant
Battalion Chiefs – 3 / 0 vacant
Personnel (as of 01/30/2026)
01
We completed the first round of firefighter candidate
interviews for our current hiring process. The Fire Combine
was also conducted. Eight candidates advanced to the
Fire Chief interview stage. Final Chief interviews are done,
and we've established an eligibility list.
We've completed N95 fit testing for all fire personnel. Police
and Field Operations testing is also complete. Plus, all fire
personnel completed fit testing for AV300 / C5 SCBA
masks to ensure we're meeting safety standards and
getting proper respiratory protection.
Our monthly Fire Cadet meeting kept the mentoring
momentum going with future firefighters.
Chief Young met with Chief Burner and the Banner EMS
Coordinator to discuss EMS system coordination and how
we can keep improving patient care and operational
efficiency.
Staff joined the ribbon cutting at Del Valle Jewelers as part
of our ongoing commitment to local businesses and
community events.

OPERATIONS
01
The department took part in a City Council proclamation
and crew award presentation recognizing American Heart
Month and the lifesaving work our firefighters do. 
We've scheduled EMS training for March with a focus on
resuscitation and cardiac care, strengthening our
response to critical medical emergencies.
All three shifts got hands-on ladder truck and heavy
extrication practice at a local junkyard.
All shifts completed electric bus training at the Phoenix Bus
Yard (79th Ave and Van Buren), focusing on the unique
hazards these vehicles present.
Firefighter Meza attended NFPA 1403 Fixed Facility Fire
Training at the Buckeye Training Academy. This'll help
enhance our live fire training capabilities. 
Probationary firefighter training continues across all shifts
as new personnel work toward completing their required
development and operational competencies.

FIRE
PREVENTION
01
Inspections: 11
Fire and Special Hazard Incidents 
8421 W McDowell Rd (Best Western) smoke alarm
activation from VAP
1250 N.91  Ave (McDonalds) Co2 Alarm shut down
soda machine 2.5 days 
st
Structure Fire 10601 W. Van Buren St. (Amazon
Warehouse) trash compactor
Grease Fire 600 N. 96  Ave (Desert Apartments) 
th
495 S. 99  Ave (Windland Food) Fire Alarm sprinkler
head hit
th
Plans reviews, new builds & Hydrant Flow Tests 
The Waverly 99th and Wolverine
Rally’s
Development Services
Community Safety meeting 
Qtr. Engineering Coordination meeting
Records request: 12
Special Hazards 
Sysco Ammonia Sensor Testing (system in test
mode)
SpudCo up and operational
500 N 99th Ave (Tolleson Dairy Project) Completed

FIRE
PREVENTION
01
Special Project
Safety Steering Committee
Industrial Commission Meeting, Addendum and
Inspection Packet
29 CFR 1910.1200 Hazard Communication Standard
course
Training and Drills
Emergency Services Sector Preparedness Awareness
West Side Fire Investigator training
Community Programs and Events
Car seat checks: 2
Volunteer hours: 12
MARCH
EVENTS
Pinning Ceremony
TUHSD College & Career Fair
Ribbon Cutting: Harvest Compassion Center
3  Fridays
rd
TWIL Coffee & Tea Reflection