Item Report

City of Tolleson — City Council (2025-08-26)

View PDF Meeting page

Extracted text (via pymupdf) 3544 characters
Tolleson Fire Department 
MONTHLY REPORT 
SEPTMEMBER 2025

PAGE 1 
Operations 
September Call Volume 
For September, Engine 161 responded to 185 calls (6.2 calls per day), and 
Ladder/LT161 responded to a combined 137 calls (4.6 calls per day). 
 
 
Operations 
• FTEs 
o Firefighters – 16 / 1 vacant 
o Engineers – 7 / 0 vacant 
o Captains – 6 / 0 vacant 
o Battalion Chiefs – 2 / 1 vacant 
 New wildland pants and boots have arrived for all members. This gear was 
approved in this year’s council-adopted budget and will enhance firefighter 
safety and comfort during wildland and brush fire responses.  
 Seven new recruits began the fire academy on September 8. Structure 
firefighting gear has arrived for each recruit to support their live fire 
training evolutions.   
0
1
2
3
4
5
6
7
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEPT
Chart Title
E161
L161

PAGE 2 
 Battalion Chief Matt Weaver returned safely from the Katy Creek Fire 
outside Colville, Washington. He served as a Task Force Leader during the 
two-week deployment, maintaining his certifications as a Task Force 
Leader, Strike Team Leader, and Engine Boss. 
 Deputy Chief Jack Garrison and Battalion Chief Matt Weaver were the lead 
instructors for the Incident Safety Officer (ISO) class at the Arizona State 
Fire School. In addition, four members: Firefighters Quintero and Nickens, 
and Engineer Ken Fennema, attended classes including ISO, Extrication and 
Patient Stabilization, and Smoke Reading. Fire Chief Young attended the 
New Chief Seminar, a 4-day course offered annually to help new fire chiefs 
navigate their first three years of leadership.  
 EMS continuing education was conducted at the station, focusing on 
cardiac emergencies and chart reviews. 
 The new SCBA order is in progress, and fit testing for all members is being 
conducted to ensure proper mask fit and safety compliance for new masks. 
 Department members participated in Tolleson Union High School’s 
Commitment Day event held at State Farm Stadium. This event served as a 
recruitment opportunity for the department’s upcoming Fire Cadet 
Program. 
 On-duty crews served lunch at the Senior Center for the city’s Fiestas 
Patrias lunch and celebration. 
 
 
Fire Prevention 
 Inspections: 13 
 
 Fire and Special Hazard Investigations  
o 83rd Ave Buckeye fuel spill  
o 297 N 107th Ave Circle K Co2 leak 2 times (System shut down 
until repaired) 
o 350 N. 96th Ave Sunrise Preschool several false fire alarm 
(Firewatch) 
o 130S 83rd Ave DHL Fire Pump (Firewatch) 
o 8313 W. Roosevelt St. fire pump (Firewatch) 
o 8314 W. Rosevelt Inland Kenworth Water flow (Firewatch) 
o 8701 W. Van Buren St. apartment fire (food on the stove) 
o 651 S 91st Ave JBS full system failure (long term Firewatch)

PAGE 3 
o 1207 91st Ave QT fire alarm down (Firewatch) 
 
 
 Plans reviews, new builds & Hydrant Flow Tests  
o Villas on Van Buren 
o Amazon Drone Battery Storage Expansion 
o Ceaser Pizza final 
o LivAway Suites 
o TUHSD Operations facility build 
 
 Records request 11 
 
 Special Hazards  
o 500 N 99th Ave (Kroger Ammonia Project) 
o Taylor Farms’ new Ammonia system  
 
 Training   
o State Fire School  
o University of Miami FLAR research Study  
o Community Planning for Disaster Recovery (AWR-356) 
o Unlocking the Power of AI: What You Need to Know 
 
 Special Project 
o Injury Prevention Advisory Council meeting  
o (GIS) special hazards preplan project. 
o Safety messages  
o 1st Submit AZDEQ Grant 
 
Community Programs 
 Volunteer hours 16 
 
 Car seat checks 2