April 22, 2025  
 
 
 
 
 
Mr. Chris Hamilton P.E. 
City of Tolleson 
City Engineer 
9555 W. Van Buren Street 
Tolleson, AZ 85353 
 
City of Tolleson  
Tolleson Aquatic Center 
Construction Administration Services 
 
This letter formulates Adaptive Architects Inc. (Adaptive) understanding of the scope and compensation for the 
work on the above referenced project.  This letter may serve as an exhibit to the contract between the City of 
Tolleson and Adaptive Architects Inc. or as agreed/amended. 
 
General Description 
 
The site is approximately 7.5 acres on Van Buren Street and west of 83rd avenue. The Adaptive Architects’ team 
have completed construction documents for the new City of Tolleson Aquatic facility. The scope of work is for 
construction administration services during construction of the new facility. The approximate construction duration 
is 16 months. Adaptive will retain the original design team to perform the following services: 
 
• 
Shop drawing review and processing per discipline. 
• 
Request for Information (RFI) responses with limited drawing/document changes related to RFI’s. 
• 
Three project site visits during construction as expended for Civil, Landscape Architect, MPE Engineers and 
structural engineers. 
• 
Special Structural Inspectiions by the engineer of record. 
• 
Pool designers will provide specific site visits as it relates to the pool shell. 
• 
Punch list creation and follow up review for each discipline. 
• 
Architect will attend all virtual Owner/Architect/Contractor (OAC) meetings and up to two site visits per 
month (averaged over the construction duration). 
 
Compensation 
 
 
J2 Engineering and Environmental Design 
 
 
 
$24,958 
 
Aquatic Design International 
 
 
 
 
 
$16,500 
 
Arizona Pinnacle Engineering 
 
 
 
 
 
$26,770 
 
Caruso Turley Scott 
 
 
 
 
 
 
$11,725 
 
Caruso Turley Scott Special Structural Engineering  
 
 
$18,095 
 
Adaptive Architects  
 
 
 
 
 
 
$84,250 
 
 
 
 
 
 
 
Total 
 
            $182,298 
See attached back-up for additional information.

Schedule 
 
Coincides with construction contract as determined. 
 
Excluded Services 
 
1. Creation of OAC Meeting Minutes. 
2. Material testing services. 
3. As built or record drawings. 
4. Geotechnical reports or Geotech services during construction. 
  
 
Sincerely, 
Vincent P. Di Bella AIA, CSI 
Vincent P. Di Bella 
Adaptive      Architects Inc. 
Principal               Architect

Tolleson  Aquatic Consultant Fee Summary Construction Administration
Total
Consultant
CTS
$29,820
J2
$24,958
ADI
$16,500
AZPE
$26,770
Adaptive
$84,250
Total
$182,298

Tolleson Aquatic Adaptive Fee Summary Construction Administration
Phase
Shop
RFI
OAC
ASI
Total
Rate
Hrs per phase
$180
$0
$145
50
60
100
40
$36,250
$135
$0
$120
140
100
100
60
$48,000
$120
$0
$100
$0
Total
$84,250
Total Hrs
0
190
160
200
100
650
Adaptive Hourly Rates
Principal
$180
Project Architect 
$145
Project Manager 1
$135
Project Manager 2
$120
BIM Specialist 1
$120
BIM Specialist 2
$100

CARUSO 
TURLEY 
SCOTT 
structural 
engineers 
STRUCTURAL 
SOLUTIONS 
 
PARTNERS 
Sandra Herd, SE, PE, LEED AP 
Thomas Morris, SE, PE, LEED AP 
Richard Dahlmann, SE, PE 
Troy Turley, SE, PE, LEED AP 
Brady Notbohm, SE, PE 
Craig Porter, SE, PE 
Ron Kuklish, SE, PE 
PROFESSIONAL 
REGISTRATION 
 
All 50 States 
Washington D.C. 
Puerto Rico 
1215 W. Rio Salado Pkwy. 
Suite 200 
Tempe, AZ 85281 
480.774.1700 
www.ctsaz.com 
April 10, 2025 
 
Mr. Vincent Di Bella 
ADAPTIVE ARCHITECTS 
160 W. University Drive, Suite #2 
Mesa, AZ 85201 
480.655.0633 
vince@adaptivearchitectsinc.com 
 
RE: 
Tolleson Aquatic Center – Construction Administration 
 
8400 W. Van Buren St. 
 
Tolleson, AZ 
 
CTS Job No: 23-0039-93 
 
Dear Mr. Di Bella: 
 
This will confirm our fee to provide structural engineering and drafting services as required for the following Construction 
Administration scope for the above-referenced project: 
 
1. Shop drawing review and processing. 
2. 
RFI responses and a limited amount of document changes related to RFIs. 
3. 
Punch list creation and follow up as required. 
4. 
Special structural inspections are included in this fee.  See below. 
5. 
3 engineering site visits during construction are included in this fee. 
6. 
An allowance for Owner changes that require document changes during construction is included in this fee. 
 
Our Basic Services for the base scope of work will be billed Hourly-Not-To-Exceed as follows: 
 
STRUCTURAL ENGINEERING AND DRAFTING FEES: 
Phase: 
Partner 
$200/hr. 
Project Engineer 
$140/hr. 
Project Drafter 
$105/hr. 
Special Structural 
Inspector  
$105/hr. 
Total 
Construction 
Administration: 
5 hrs. = 
$1,000.00 
46 hrs. = 
$6,440.00 
15 hrs. = 
$1,575.00 
N/A 
$9,015.00 
Allowance for 
limited CA 
Changes: 
2 hrs. =  
$400.00 
12 hrs. =  
$1,680.00 
6 hrs. =  
$630.00 
N/A 
$2,710.00 
Special 
Structural 
Inspections: 
N/A 
10 hrs. =  
$1,400.00 
N/A 
159 hrs. = 
$16,695.00 
$18,095.00 
Fee Total: 
$29,820.00 
 
Basic Services will be limited to the construction administration above scope. Redesign and field repair engineering 
would be considered outside the scope of basic services.  
 
Special Structural Inspection Services will be invoiced hourly based on time expended against an anticipated budget 
estimate of Eighteen Thousand Ninety-Five Dollars ($18,095.00). A maximum of 39 site visits and 159 hours is 
anticipated but is contingent upon the contractor's scheduling, phasing, weather, and construction methods. This budget 
estimate is provided as a courtesy to the Owner for budgeting purposes, however the final cost of Structural Inspections 
will be based on the actual hours expended. Charges are for actual services provided; therefore, if fewer trips or hours 
are required, or more than one type of inspection can be combined during a single trip, charges will be adjusted up or 
down accordingly. Notification will be provided if it appears that the anticipated inspection amount is to be exceeded. 
The inspection budget estimate shall also be adjusted for phased or interrupted construction or for a change in building 
construction type. After the design phase, the inspection budget estimate will be reviewed to verify the original scope 
assumptions and the budget will be adjusted accordingly if necessary. Saturday, Sunday, and Holiday inspections will 
be billed at our regular hourly rates x 1.5. Inspection fees exclude mileage which will be billed at the current Federal 
business per mile allowance rate. The anticipated inspection budget is based on the number of site visits and hours 
noted above. The anticipated inspection budget excludes additional services for re-inspection of incomplete work, time 
spent inspecting repair type conditions (epoxy grouting for example), time spent waiting for late concrete and grout 
and/or time spent going to an inspection, which was cancelled without timely notification to this office. In the event of an 
unexpected rise in fuel costs, Caruso Turley Scott reserves the right to include a fuel surcharge. 
 
In rendering professional services Caruso Turley Scott (CTS) shall apply the skill and care ordinarily exercised by 
structural engineers at the time and place the services are rendered. Schedules and timely available information from 
CLIENT INFORMATION: 
 
 
 
CLIENT PROJECT NO. 
 
 
 
PROJECT MANAGER 
 
 
 
OTHER

CARUSO 
TURLEY 
SCOTT 
STRUCTURAL SOLUTIONS SINCE 1963 
April 10, 2025 
Tolleson Aquatic Center – Construction Administration 
Tolleson, AZ 
Page 2 
 
 
the architect, owner and other design consultants contribute to the completeness of the structural drawings. As such, all 
projects should carry a contingency for potential coordination and value-added items. It is recommended that final bids 
not be taken until city review comments and coordination comments have been incorporated. If documents are bid prior 
to city and coordination comments, the owner assumes the risk for associated additional costs. Client agrees that the 
liability of CTS, its agents, and employees, in connection with services hereunder to the Client and to all persons having 
contractual relationships with them, resulting from any negligent acts, errors, and/or omissions of CTS, its agents, and/or 
employees is limited to the total fees actually paid by the Client to CTS for services rendered by CTS hereunder. CTS 
maintains a current professional liability insurance policy. As a consultant we shall neither have control over or charge 
of, nor be responsible for, the construction means, methods, techniques, sequences, or procedures, or for safety 
precautions and programs in connection with the work, since these are solely the Contractor’s rights and responsibilities. 
 
Payments for Services as described above shall be made upon the presentation of the Engineer’s invoice based on time 
expended. 
 
This proposal is valid for 120 days from the date of issuance. After 120 days, please contact our office for updated fees. 
If this contract meets with your approval, please sign, date and e-mail (MMcClinton@ctsaz.com) back to our 
office for authorization to proceed. 
 
Respectfully Submitted: 
 
Accepted By: 
CARUSO TURLEY SCOTT INC. 
 
ADAPTIVE ARCHITECTS 
 
 
 
Kelly Robertson, SE, PE 
Senior Project Manager 
480.774.1748 Direct 
KRobertson@ctsaz.com 
 
Name: 
 
 
Title: 
 
 
Date:

J2 Engineering and Environmental Design, LLC
4649 E. Cotton Gin Loop Suite B2
Phoenix, Arizona 85040
ph. 602.438.2221
April 21, 2025
Vincent Di Bella, AIA, CSI
Architect Principal
Adaptive Architects
160 W. University Drive, Suite #2
Mesa, AZ 85201
Re:  Tolleson Aquatic Center Post Design
Dear Mr. Di Bella, 
J2 Engineering and Environmental Design LLC (J2 Design) is pleased to submit this post design proposal for the Tolleson 
Aquatic Center Improvements.    
Thank you for including the J2 Team on this important project;  we are excited to begin the post design phase of the 
project and to continue our outstanding working relationship with Adaptive Architects and the City of Tolleson.  Please 
do not hesitate to call with any questions that you may have.
Sincerely,
Jeffrey Velasquez, PLA, ASLA
Principal
J2 Engineering and Environmental Design, LLC
jvelasquez@j2design.us  
Page 1 of 5

J2 Engineering and Environmental Design, LLC
4649 E. Cotton Gin Loop Suite B2
Phoenix, Arizona 85040
ph. 602.438.2221
City of Tolleson  |  Tolleson Aquatic Center 
J2 Scope of Services 
Post Design Phase 
 
Task 100 – Post Design Support
J2’s staff will review shop drawings; review, respond, and coordinate requests for information (RFI); and prepare 
architect’s supplemental information (ASI) on an as-needed basis.  We are anticipating at a minimum the following 
submittals to be reviewed: 
•
Decomposed granite materials and associated items
•
Concrete mix designs and associated civil elements 
•
Site furnishings (benches, perforated metal screen fencing, trash receptacles)
•
Irrigation components
•
Stamped, Colored Asphalt submittal and mock-up
•
Artificial Turf submittal and inspection
It is assumed that each submittal/shop drawing will have no more than two (2) reviews for each submittal package.  
This equates to an initial review of the submittal/shop drawing and a second review after any requested corrections 
or updates have been made.  
J2 staff will attend three (3) site visits each for civil, landscape, and irrigation elements.  Time will include travel to and 
from the site, and a summary of items. 
Pre-Final and Final Walk Through 
J2 will attend one (1) pre-final walk-through with the City and the contractor and develop a punch list of items relative 
to the site construction.  J2 will compile into an overall list punch list items from the City and our sub-consultants.  J2 
will attend one (1) final walk-through where the punch list previously developed will be reviewed and determined, 
what if anything, is left to complete before final acceptance of the projects.
Post Design General Understanding
Limited post design services shall be performed by J2 Engineering and Environmental Design, LLC.
Construction administration and observations will be provided by J2 under the limits described above with the intent 
of rendering a professional opinion regarding the quality of the completed construction strictly limited to the parking 
lot, curb and gutter, ADA ramps, landscape, irrigation, and colored stamped asphalt aspects of the project.  This task 
should not be construed to warrant the work of any contractor.
Each discipline will review and approve applicable shop drawings. 
In accordance with generally accepted construction practice, Contractor shall be solely responsible for all job site 
conditions and safety of persons or property.
Page 2 of 5

J2 Engineering and Environmental Design, LLC
4649 E. Cotton Gin Loop Suite B2
Phoenix, Arizona 85040
ph. 602.438.2221
Any observations of the work completed are subject to the following: The observations will be directly related to the 
quality of the work performed that such work is in accordance with the requirements of the construction documents.  
The issuance of a punch list shall not be a representation that J2 has:
(1)
Made exhaustive or continuous on-site observations to check the quality or quantity of the Work
(2) Reviewed construction means, methods, techniques, sequences for the Contractor’s own Work or procedures 
(3) Reviewed copies of requisitions received from Subcontractors and material suppliers and other data 
requested by the owner to substantiate the Contractor’s right to payment or
(4) Ascertained, how or for what purpose, the Contractor has used money previously paid on account of the 
Contract Sum.
J2 shall not have control over, or charge of, and shall not be responsible for construction means, methods, 
techniques, sequences or procedures, or for safety precautions and programs in connection with the Work of each of 
the Contractors, since these are solely the Contractor’s responsibility under the Contract for Construction.  J2 shall not 
be responsible for a Contractor’s failure to carry out the Work in accordance with the respective Contract Documents. 
 J2 shall not have control over, or charge of, acts or omissions of the Contractors, Subcontractors, or their agents or 
employees, or any other persons performing portions of the Work not directly employed by J2.
The Construction Administration and Observations portion of this Agreement is based upon the following 
assumptions, which are assumed to be reasonable:
Maximum contract time of 310 calendar days for construction (Approximately 10 ½ Months).
If this general understanding is not correct, or if the City feels additional field time is needed beyond this Scope of 
Work; such services can be provided on an additional time and materials basis at the rates provided. 
Design Allowances
The following allowances may only be utilized if authorized in advance by the city. These allowances will not be 
authorized until a full modified scope is known and may need to be increased if the required scope exceeds the 
established allowance amount. 
Owner Changes for landscape and irrigation revisions Allowance – an allowance has been established to revise 
owner-initiated design elements should it be required for site features outside of the current scope of work.  
General Understanding
The City of Tolleson the (Owner) shall designate a person for the project to act as the Client’s representative with 
respect to the services to be performed or furnished by the Project Team under this agreement. Such person, 
department, or committee shall have complete authority to transmit instructions, receive information, interpret, and 
define the Client's policies and decisions with respect to the Project Team's services for the Project. The Owner shall 
also provide key team personnel to be available in coordination meetings including operations and plan review 
representatives.
Page 3 of 5

J2 Engineering and Environmental Design, LLC
4649 E. Cotton Gin Loop Suite B2
Phoenix, Arizona 85040
ph. 602.438.2221
The Owner shall make available to the Project Team existing available data and records relevant to the site that the 
Owner has available.
The Owner shall approve in a timely manner all criteria and information as to Client's requirements for the Project 
including planning objectives and constraints, performance requirements, any budgetary limitations, and the 
submittal by the Project Team at the various phases of the projects.
The Owner shall furnish to the Project Team, upon the request of Project Team for performing the services, any existing 
pertinent data prepared by others, including electronic base maps, drawings of physical conditions in or relating to 
existing surface or subsurface utilities or structures within the planning area, hydrographic surveys, environmental or 
cultural assessments, impact statements, and other relevant environmental or cultural studies pertaining to the 
project as the Owner has available.
The Owner shall give prompt notice to Project Team whenever Client observes or otherwise becomes aware of any 
development that affects the scope of services or the time schedule of the Project Team.
The Owner warrants and represents that members of the Project Team have the right to enter upon the real property 
involved herein, and extends this right to J2. The Project Team agrees to exercise due care in the performance of all 
services pursuant hereto and acknowledges that it is at our own risk. 
The Project Team has provided no biological, cultural, or environmental investigations on this site/project, has no 
knowledge of any adverse biological, cultural, or environmental conditions on the site/project, and is not responsible 
for and has no liability for any such condition should one be found. It is the responsibility of the Owner to investigate 
and make these determinations based on the best knowledge and information available at the time of this project. 
Clearance to begin work shall be given prior to directing or ordering the preparation of any documents.
Design Assumptions and Exclusions
The following tasks are not included in this scope of services:
1.
The J2 team is not providing construction management or meeting minutes services.
2.
The J2 team is not providing materials testing. 
3.
The J2 team is not providing as-built or record drawing services.  This will be the responsibility of the 
Contractor 
We would expect to start our services promptly after Notice to Proceed and complete our services in a timely manner. 
 This exhibit represents the entire understanding of the Scope of Services as set out herein and may only be modified 
in writing signed by both parties. 
Page 4 of 5

Tolleson Aquatic Center | City of Tolleson
Post Design  - Construction Administration  
J2 Engineering and Environmental Design, LLC
4/21/2025
Design 
Manager
Project 
Engineer Sr.
Project 
Engineer
Engineer
Landscape 
Architect Sr.
Landscape 
Architect
Designer Sr.
Designer
215.27
$            
192.47
$            
132.32
$            
111.77
$              
199.23
$                 
136.76
$            
120.93
$            
88.69
$             
Task #
Hours Total
100
101
Respond to Contractor RFI's (Request For Information)  
2
2
6
4
6
20
102
Submittal / Shop Drawings Review
2
4
4
6
12
12
40
103
Develop
ASI's
(Architectural
Supplemental
Information) for necesarry field revisions
1
4
2
8
15
104
Three site visits each for civil, landscape and irrigation
with written summary
12
12
12
36
105
Pre-Final Walk Through and Punch List (1 Field Meeting) 
4
6
4
4
18
106
Final Walk Through and Punch list (1 Field Meeting) 
2
4
4
4
14
0
3
18
8
4
38
38
34
143
-
$               
577.41
$           
2,381.76
$        
894.16
$          
796.92
$              
5,196.88
$       
4,595.34
$      
3,015.46
$       
17,457.93
$               
Subconsultants:
Fee Amount
None
-
$               
24,958.00
$          
Total Subconsultants:
-
$               
Allowances:
Fee Amount
Owner Changes for landscape or irrigation revisions
$7,500.00
 Total Allowances: 
$7,500.00
Date
   
Labor Category:
Rate:
Task Description:
Post Design Support
April 21, 2025
Jeffrey Velasquez, PLA, ASLA  |  Principal 
J2 Hours per Labor Category:
J2 Fee per Labor Category:
Total Fee J2, Subconsultants, and Allowances:
J2 Engineering and Environmental Design, LLC
TAC - Post Design 
2025.04.21 - Fee  - TAC J2 post design.xls
Page 5 of 5

7536 N. La Cholla Blvd., Tucson, Arizona 85741      Phone: 520-219-8929      Fax: 520-219-9438      aquadesign.net 
 
 
 
11 April 25 
Adaptive Architects 
160 W. University Drive, Suite #2 
Mesa, AZ 85201 
 
RE:  
Tolleson Aquatic Center Construction Administration Quote  
ATTN: 
Vince DiBella vince@adaptivearchitectsinc.com 480-655-0633 
 
Dear Vince, 
 
Pursuant to your request of 8 Apr 25, we offer the following proposal for the Construction Administration (CA) 
phase of the aforementioned project and is limited to only this phase with the activities detailed below and the 
language germane to allowances for any VE changes requested or required throughout the CA’s.   
 
 
1) Shop Drawing Review and Processing. 
2) RFI Responses and Limited Amount of Document Changes Related to RFI’s. 
3) Punch List Creation and Follow-Up.  
4) Site Visits During Construction at Layout/Forming, Pre-Shotcrete, Punch One, Final Punch. Four Total 
Site Visits.  
 
Allowance for Owner changes: We are agreeable to make small changes to the plan set after the Construction 
Documents have been completed. Should the Owner choose to make significant changes to the project after the 
Construction Documents have been completed, all parties understand that the threshold for changes requiring an 
Additional Service could described as those triggered by changes to the structure of the pool(s) necessitating a 
revision to the existing permit or a resubmission into MECSD to issue a new permit as well as changes 
requiring our design team to remove and replace one or more of the three critical pieces of mechanical filtration 
system (pump, filter, heater). 
 
FEE:   
 
 
 
 
 
$16,500 
 
HOURLY RATES  
 
- 
Principal 
 
 
 
$190/hr 
 
- 
Project Manager 
 
 
$140/hr 
 
- 
CAD Tech 
 
 
 
$125/hr 
 
- 
Spec Writer 
 
 
 
$90/hr 
 
- 
Clerical 
 
 
 
$65/hr 
 
CHANGES TO SEALED PLAN SETS- If Client requests changes to any Aqua Design’s plan set or drawings 
that have been signed and sealed by a professional engineer, provided that the changes were not the result of an 
error or omission on the part of Aqua Design International, Inc., Client will pay Aqua Design International, Inc. 
a change fee established by the Registrant to review and re-seal the plan set at a cost that will be billed as a 
pass-through reimbursable (not marked-up).

7536 N. La Cholla Blvd., Tucson, Arizona 85741      Phone: 520-219-8929      Fax: 520-219-9438      aquadesign.net 
TRAVEL- Time for Travel for four (4) site visits are included in the base fee. If additional travel is required, 
we charge for travel/meeting time; door to door, at $1,600 per day for Principal, $800 per day for the Project 
Manager. We will also bill for reasonable trip expenses for transportation, lodging and meals as a pass-through 
reimbursable.  
 
PAYMENT- All of us at Aqua Design International will work hard to meet your expectations. We expect to get 
paid on time for our efforts. Aqua Design International will not accept payment terms tied to any pay-when-paid 
clause.  Payments are due within 30 days of receipt of invoice. Payments past due will be charged a service fee 
of 1.5% per month, compounded.  Late payments (60-90 days or more) may also result in a stoppage of work 
until all invoices are paid in full. 
 
Sincerely, 
  
 
 
 
Aden Acklin   
 
 
 
David Acklin  
Managing Principal/Owner 
 
 
Founding Principal/Brand Ambassador

2222 West Pinnacle Peak Road, Suite 290     •     Phoenix, AZ 85027     •     Phone: (623) 594-9049     •     www.az-pe.com 
 
 
 
 
 
 
ARIZONA PINNACLE ENGINEERING, LLC 
Mechanical and Electrical Consulting Engineers 
Raymond B. Lanford, P.E.              •            
 
 
 
         Eudjen Savu, P.E. 
 
 
 
April 18 2025 
 
 
Adaptive Architects, Inc. 
160 W University Drive, Suite 2 
Mesa, Arizona 85201 
 
Attn: Mr. Vince Di Bella 
 
Re: 
 Tolleson Aquatics Center 
AZPE Job No. 24044 
 
Sub: 
Addendum No. 1 to Mechanical and Electrical Engineering Services Agreement 
 
Dear Mr. Di Bella: 
 
We are pleased to submit Addendum No. 1 to the Mechanical and Electrical Engineering 
Services Agreement for the new Tolleson Aquatics Center that will include a diving/competition 
pool, a lazy river, spectator bleachers, bathhouse, entry, operations office, storage areas, 
classrooms, equipment rooms and vending areas per the description provided by you. 
 
1. 
This Addendum includes the Construction Administration additions to our scope of work. 
The hours are estimated, not to exceed, the actual hours spent will be billed monthly. 
 
a. 
Shop drawing review and processing (48 hours)…………………………..$7,200 
b. 
RFI responses and limited document changes related to RFI’s (44 hours)...$6,180 
c. 
Punch list creation and follow up (22 hours)…...…………………………...$2,960 
d. 
Three (3) site visits during construction per discipline (31.5 hours)…....….$4,410 
e. 
Allowance for Owner changes (44 hours)………………………………….$6,020 
 
2. 
All other items in our Proposal for Mechanical and Electrical Engineering Services dated 
March 14, 2024, shall remain unchanged as a result of this Addendum. 
 
Fee: 
 
Our proposed basic fee for this Addendum is $26,770 
 
If this Addendum meets with your approval, please sign in the space provided and return one 
copy to us for our files. 
 
We continue to appreciate the opportunity of working with you on this project and know it will 
be mutually beneficial.

Adaptive Architects, Inc. 
Re:  Addendum No. 1 to Mechanical and Electrical Engineering Services Agreement 
April 18, 2025 
Page 2 
 
 
Sincerely, 
ARIZONA PINNACLE ENGINEERING, LLC 
 
 
 
Eudjen Savu, P.E. 
Managing Member 
 
 
ACCEPTED AND APPROVED THIS___________ DAY OF_______________ , 20___ 
 
BY:____________________________________  FOR:______________________________ 
 
TITLE: ___________________________________________________________________

Tolleson Aquatics Center
Mechanical and Electrical CA Fee Summary Sheet
Line Task
M
E
M
E
M
E
M
E
M
E
1
Shop Drawing Review
6
6
18
18
2
RFI's
4
4
8
8
10
10
3
Punch List
7
7
4
4
4
Visits during Construction
10.5
21
5
Owner changes allaowance
2
2
10
10
10
10
6
7
8
9
10
11
12
13
14
15
16
17
18
Total Hours
12
12
53.5
64
24
24
19
20
Hourly Labor Rate
$195.00
$195.00
$180.00
$180.00
$140.00
$140.00
$125.00
$125.00
$90.00
$90.00
21
22
Total Labor and Profit
$2,160.00
$2,160.00
$7,490.00
$8,960.00
$3,000.00
$3,000.00
Total CA Fee
$26,770.00
April 18, 2025
Senior
Senior
Manager
Engineer
Designer
Designer
Clerical
ARIZONA PINNACLE ENGINEERING, LLC
Mechanical and Electrical Consulting Engineers
Raymond B. Lanford, P.E.                                                              Eudjen Savu, P.E.