FY27 Capital Projects
Discussion
2
E8506 - Downtown Streetscape Improvement Program
5-Year Program to install
streetscape improvements in the
Downtown area by improving
pedestrian access, aesthetics and
overall functionality.
Ashbrook Wash Slope Stabilization
Anticipated Grant Funding (Flood Control District)
3-Year Project (contingent on Flood
Control District Grant Funding)
FY27 – Design ($250k)
FY28 – Construction ($2.5M)
FY29 – Construction ($2.5M)
Total Cost - $5.25M
Anticipated Grants - $3.9M (75%)
Town Share - $1.3M (25%)
S6061 – Sidewalk Infill and Design
Multi-Year Program to design and construct ADA-
compliant sidewalks and curb ramps where gaps
currently exist.
Budget: $325k / Year
FY26 locations completed:
•
Golden Eagle Blvd and Brittlebush Lane
•
La Montana Dr and Cambria Dr
•
Hamilton Dr, North of La Montana Dr
•
La Montana Dr, between Hamilton Dr and
Saguaro Blvd
FY27 location planned: Saguaro Blvd between
Hawk Drive and Oasis Drive
S6058 – Shea Boulevard Widening
South Side Between Palisades Blvd & FHBLVD
State Funding (Prop 400)
Project Construction underway in FY26
FY27 - Anticipated remaining
Construction Cost - $1M
State Share - $700k (70%)
Town Share - $300k (30%)
Development Fee Eligible
S7002 – Pedestrian Marked Crosswalks – Town-wide
Multi-Year Program to design and install
pedestrian crosswalks within the Town.
Budget: $150k / Year
FY26 locations completed:
•
El Lago Mid-Block Crossing between Saguaro
Blvd & La Montana Dr
•
Golden Eagle Blvd & Brittlebush Dr
•
La Montana Dr & Cambria Dr
•
La Montana & Hamilton Dr
FY27 location planned: Avenue of the Fountains
and Keith McMahon Drive
F4046 – Town Hall Campus Buildings – Roof Rehabilitation
FY26 – Design currently in progress
Project will install:
•
A complete roof coating system
replacement for long-term
protection
•
Proper flashing at penetrations
•
Improved drainage solutions
FY27 – Construction ($500k)
D6068 – Dam Sediment Removal and Improvements
Multi-Year Program
•
Structural Repairs
•
Sediment Removal
Budget: $100k / Year
Library/Museum/Community Center Air Handler Upgrades
Project will replace and upgrade
existing air handling units serving
the facilities.
FY27 – Construction ($400k)
(Facilities Reserve Fund)
D6057 – Golden Eagle Impoundment Area Improvements – Phase II
Grant Funding (Flood Control District)
Designed in FY26
FY27 – Construction ($325k)
Grant - $243,750 (75%)
Town Share - $81,250 (25%)
D6069 - Library/Museum Drainage Improvements (FY28)
FY26: Design in progress
FY28: Construction
Project will construct drainage
improvements at the
Library/Museum facility to reduce
stormwater ponding and water
intrusion.
FY28 Budget: $300k
(Facilities Reserve Fund)
S6068 – Guardrail Replacement Town-wide
Multi-Year Program to upgrade
guardrail to comply with current
Federal Highway standards
Budget: $50k / Year
Palm Tree Lighting and Electrical Upgrades on the Avenue (FY28)
Project will upgrade electrical
infrastructure supporting palm tree
lighting on the Avenue of the
Fountains. The project will address:
•
Underground electrical conduits
•
Junction boxes
•
Lighting circuits
•
Installing energy-efficient fixtures
FY28 – Design ($10k)
– Construction ($70k)
Public Works