Staff Report

Town of Fountain Hills — Town Council (2026-03-24)

View PDF Meeting page

Extracted text (via pymupdf) 3056 characters
ITEM 3.c. 
 
TOWN OF FOUNTAIN HILLS 
 
STAFF REPORT 
 
Meeting Date: 
3/24/2026 
Meeting Type: 
Town Council Work Session 
Submitting Department: 
Public Works 
Prepared by: 
Justin Weldy, Public Works Director 
Staff Contact Information: Phone: 480-816-5133 
Email: jweldy@fountainhillsaz.gov 
 
Request to Town Council Regular Meeting (Agenda Language) 
PRESENTATION: Public Works FY27 Proposed Capital Improvement Projects 
 
Staff Summary (background) 
Public Works Staff has identified several current and planned capital improvement projects 
focused on maintaining, improving, and expanding the Town’s infrastructure. These 
investments are critical to ensuring long-term system reliability, public safety, and quality of 
life. 
The proposed FY2027 Capital Improvement Plan includes continued investment in projects 
such as the Downtown Streetscape Improvement Program, sidewalk infill, and town-wide 
crosswalk enhancements, all of which will improve pedestrian connectivity, accessibility, and 
the overall experience for residents and visitors. Key roadway projects, including 
improvements to Shea Boulevard and guardrail replacements, will further enhance traffic 
flow and safety. 
The plan also prioritizes long-term asset preservation and environmental resilience. Projects 
such as Ashbrook Wash slope stabilization, dam sediment removal, and stormwater 
improvements at the Golden Eagle Impoundment Area will help mitigate erosion and 
flooding risks. In addition, facility upgrades, including roof and HVAC improvements, will 
extend the life of Town assets and ensure reliable, efficient public facilities. 
The proposed projects include: 
• Downtown Streetscape Improvement Program - Year 2 
• Ashbrook Wash Slope Stabilization 
• Sidewalk Infill and Design - Multi-Year Program 
• Shea Boulevard Widening (South Side between Palisades Blvd & Fountain Hills 
Blvd) - Carryover Budget to Complete Construction 
• Pedestrian Marked Crosswalks – Town-wide Multi-Year Program 
• Town Hall Campus Buildings – Roof Rehabilitation 
• Dam Sediment Removal and Improvements - Multi-Year Program 
• Library/Museum/Community Center Air Handler Upgrades 
• Golden Eagle Impoundment Area Improvements – Phase II  
• Guardrail Replacement – Town-wide Multi-Year Program 
• Library/Museum Drainage Improvements (FY28)

• Palm Tree Lighting and Electrical Upgrades on the Avenue (FY28) 
 
These Public Works infrastructure investments are essential to maintaining safe, efficient, and 
resilient systems throughout the community. Continued investment in infrastructure supports 
economic vitality, enhances public safety, and preserves the Town’s long-term sustainability 
and quality of life. 
 
Related Ordinance, Policy or Guiding Principle 
Public Works Mission Statement 
 
Risk Analysis 
N/A 
 
Recommendation(s) by Board(s) or Commission(s) 
N/A 
 
Staff Recommendation(s) 
N/A 
 
Suggested Motion 
N/A 
 
FISCAL IMPACT 
Fiscal Impact:  
Budget Reference:  
Funding Source:  
 
ATTACHMENTS 
1. 
2027 PW Capital Improvement Project Presentation