Staff Report

Town of Fountain Hills — Town Council (2026-02-24)

View PDF Meeting page

Extracted text (via pymupdf) 2242 characters
ITEM 3.e. 
 
TOWN OF FOUNTAIN HILLS 
 
STAFF REPORT 
 
Meeting Date: 
2/24/2026 
Meeting Type: 
Town Council Work Session (Budget Retreat)   AMENDED 
Submitting Department: 
Community Services 
Prepared by: 
Kevin Snipes, Community Services Director 
Staff Contact Information: Phone: 480-816-5178 
Email: ksnipes@fountainhillsaz.gov 
 
Request to Town Council Regular Meeting (Agenda Language) 
PRESENTATION: Fountain Park Lake Liner Replacement Design 
 
Staff Summary (background) 
The Fountain Park Lake liner is a critical infrastructure component that maintains water 
retention for the fountain and irrigation for the park, protects underlying soils, and supports 
the overall functionality and appearance of the lake  The existing liner, when it reaches the 
end of its useful life, will require proactive planning to prevent potential water loss, structural 
concerns, and more costly emergency repairs in the future. 
This project will fund the professional design and engineering services required to prepare 
construction-ready documents for the replacement of the lake liner. The design phase will 
include site evaluation, material analysis, phasing recommendations, permitting review, cost 
estimating, and coordination with fountain operations to minimize service disruption. The 
consultant will also evaluate opportunities to improve durability, maintenance efficiency, and 
long-term performance. 
Completing the design now positions the Town to plan and budget appropriately for 
construction and schedule the work during an optimal seasonal window to reduce community 
impact. Advancing this project demonstrates proactive asset management and protects one of 
the Town’s most recognizable and heavily utilized community amenities. 
 
Related Ordinance, Policy or Guiding Principle 
N/A 
 
Risk Analysis 
Choosing not to move forward with this project increases the risk of needing to do emergency 
planning and could lead to underfunding the project for when it needs to be completed. 
 
Recommendation(s) by Board(s) or Commission(s) 
N/A 
 
Staff Recommendation(s) 
N/A 
 
Suggested Motion 
Consensus to move forward 
 
FISCAL IMPACT 
Fiscal Impact:

Budget Reference:  
Funding Source:  
 
ATTACHMENTS 
1. 
Lake liner