Bid No.:
Date:
25-348
10/30/2025
Street:
Job Name:
City, State & Zip Code:
Job Address:
Item
Unit
QTY
Unit $
1
L.F.
1,972
51.07
$
2
S.F.
4,268
13.98
$
3
L.S.
1
5,000.00
$
1. Unforeseen Conditions
2. Testing, Inspections and Survey.
3. Permits, Fees, Traffic Control, Barricading
4. Any item not specifically included on this proposal.
Submitted by:
Temcon Concrete
Acceptance of Proposal:
Authorized Signature:
Troy Colby
Authorized Signature:
This proposal may be withdrawn if not accepted within 30 days.
We propose hereby to furnish material and labor complete in accordance with above specifications, for the above specified amount. All material is guaranteed
to be as specified. All work to be complete in a workmanlike manner according to standard practices. Any alteration or deviation from above specification
involving extra costs will be executed only upon written orders and will become an extra charge over and above the estimate. All agreements contingent upon
strikes, accidents or delays beyond our control. Owner to carry fire, tornado and other necessary insurance. Our workers are fully covered by Worker's
Compensation Insurance.
Total
$165,376.68
Inclusions: Labor, Equipment and Materials
Note: Work will include all saw cutting, removal, haul-off, forming, pouring & finishing new TOFH detail wedge curb, patching asphalt,
landscape restoration and final clean-up. Temcon will notify residents via door hangers distributed at least one week prior to work being
performed. Temcon reserves the right to bill for any work performed not included on this proposal.
Exclusions:
Tax
Subtotal
$165,376.68
8989 South Hardy Drive
Tempe, AZ 85284
(480) 893-1789
Saw Cut, Remove & Replace Wedge Curb
$100,710.04
Proposal
Proposal Submitted to:
Town of Fountain Hills
Wedge Curb Removal & Replacement
Barricades
$5,000.00
Richwood - Golden Eagle to East End
Description
Amount
Saw Cut, Remove & Replace Asphalt Pavement
$59,666.64