Felix Construction Company Bid
Extracted text (via ocr_local)
28521 characters
Copy L Project Name: SWWTP Intensification Project Project No.: Bid 24-03 BID FORM FOR: TOWN OF WICKENBURG 155 Tegner, Suite A Wickenburg, Arizona 85390 Bid of Felix Construction Company CONTRACTOR'S License No, _970935-A A corporation organized and existing under the laws of the State of Arizona or a partnership consisting of , partners; or an individual conducting business as hereinafter called the BIDDER. TO: THE HONORABLE MAYOR AND COUNCIL TOWN of Wickenburg 155 N. Tegner, Suite A Wickenburg, Arizona 85390 The undersigned acknowledges that he has received and familiarized himself with the following: CONTRACT DOCUMENTS PROJECT MANUAL AND DETAILS DRAWINGS ADDENDA No.1 __ dated 12/3/24 ;No.4 dated 92/06/25 No. 2 dated 12/17/24 No. dated No. 3 dated 91/21/25; No. dated The undersigned further acknowledges that he has visited the site and has familiarized himself with local conditions affecting the cost of the WORK at the place where the WORK is to be done. The undersigned further acknowledges that if his bid is accepted, he shall be bound by the terms of the CONTRACT DOCUMENTS. In submitting this Bid, the undersigned agrees: 1. To furnish al! material, labor, tools, expendable and construction equipment, and all utility and transportation services necessary to furnish and install, in a workmanlike manner, all WORK at the PROJECT listed herein in strict conformity with the Construction Documents prepared by GHD Inc. for the consideration hereinafter set forth. 2. To hold his Bid open for not less than one hundred ninety days (90) DAYS after the receipt of Bids and to accept the provisions of the instructions to BIDDERS regarding disposition of BID SECURITY. 3. To enter into and execute a CONTRACT if awarded on the basis of this Bid within ten (10) days after AWARD of the Bid, and to furnish a PERFORMANCE BOND, a Labor & Material PAYMENT BOND and certificates of insurance in accord with the General Conditions and Genera! Requirements of this CONTRACT and to deliver executed Bonds and Construction Contract without CM A-l Form No. 11.03 Revised November 24, 2013 Project Name: SWWTP Intensification Project Project No.: Bid 24-03 Insurance Certificates to TOWN'S representative within ten (10) DAYS following the issuance of the NOTICE OF AWARD. 4. To utilize the subcontractors and suppliers attached to this Bid Form unless authorized by the Town to substitute another subcontractor or supplier. 5. To achieve final completion within the time period stated in the CONTRACT DOCUMENTS taken from the date of NOTICE TO PROCEED or the date otherwise established for the commencement of WORK. 6. The undersigned agrees that time is of the essence and TOWN will suffer financial damages due to CONTRACTOR'S failure to complete the WORK within the CONTRACT TIME. The liquidated damages shail be as follows for each calendar day beyond the CONTRACT TIME for which CONTRACTOR shall fail to complete the WORK: Final completion - $500.00 per calendar day 7. The undersigned has attached the required BID SECURITY and other items required in the Instructions to BIDDERS. The BID SECURITY shall become the property of TOWN of Wickenburg, Arizona, as liquidated damages for the delay and additional WORK caused thereby in the event the CONTRACT and Bonds are not executed within the time set forth above. Construction Contract without CM A-2 Form No. 11.03 Revised November 24, 2013 Felix Construction Company NAME OF BIDDER: TOWN OF WICKENBURG BID SCHEDULE 1. Project Management and Coordination $260,191.00 2. Initial Site Work - Preparation $104,955.00 A. Site Clearing $1,165.00 B. Subgrade Preparation $15,849.00 C._ Trenching and Backfilling $13,068.00 D. Excavation and Fill $65,141.00 E. Compaction $9,732.00 3. Biological Treatment Upgrades Fegard, 3/4. 0% | A. Pipes and Fittings $81,952.00 B. Rotary Screens $691,609.00 C. Concrete Slab $24,662.00 D. Anoxic Mixer $73,285.00 E. WAS Pump Station $209,195.00 F. Blower $14,030.00 G. Shade Structure $19,476.00 H. Valve Vaults Deleted |. Pipe Supports $1,222.00 J. Valves, Couplings and Fianged Connections $136,404.00 K._Installation $104,573.00 L. Electrical 8726, 06. CO 4. Quality Control and Testing $20,000.00 5. Construction Startup, Programming, Demonstration and Commissioning] $35,572.00 6. Mobilization and Demobilization $154,319.00 7. Construction Survey $6,000.00 8. Construction Startup, Programming, Demonstration and Commissioning} Included BI#5 9. As Builts $500.00 10. O&M Manuals $500.00 11. Record Drawings $500.00 12. Contractor Startup and Commissioning $7,040.00 13. Record Documents $500.00 44, Subtotal 7 F2G?Y EU Oa 15. Subtotal non-taxable $503,179.00 16. Subtotal taxable W171, 712.00 17. Estimated tax for taxable components $114,270.00 18. Allowance for all additional required work to successfully $1 14.000.00 construct and commission the project To ADD SRT Deleted ’ . per Add #4 19. TOTAL BID PRICE LUMP SUM (Items 1-18 Inclusive) is Total in Numbers 4 «7? 9032 /6/,00 Y 2 G03 Jer wiZ Cne Fherdred TY One and Zelg@ POWAS QUANTITIES. Each Bidder will determine their own quantities. This bid will result in a lump sum contract. PRICING. This is a lump sum contract and the contract price will remain in effect until the contract is complete. Unit prices are used for pricing change orders only. The Contractor shall specify the length of time through which unit prices will remain in effect. If the contract is not issued prior to the unit price expiration date, the Owner shall have the option of: [Total in Words 1) negotiating a unit price time extension; 2) negotiating revised unit prices based upon verifiable suppliers’ increases or decreases; 3) re-bidding the work. Once the contract has been issued, the unit prices will remain in effect until the contract is complete. In submitting this Bid, it is understood that the right to reject any and all Bids and to waive irregularities in the Bidding has been reserved by TOWN. The undersigned hereby certifies that the information submitted herewith, including any attachment, is true to the best of his knowledge and belief. 6 March 2025 Dated this day of Felix Construction Company Name of BIDDER (Company) 13. Record Documents $500.00 | 14. Subtotal 7 $2,295,317.00 15. Subtotal non-taxable $503,179.00 16. Subtotal taxable $1,792,138.00 17. Estimated tax for taxable components $114,270.00 18. Allowance for all additional required work to successfully $1 14,000.00 construct and commission the project To ADD SRT Deleted , . per Add #4 19. TOTAL BID PRICE LUMP SUM (Items 1-18 Inclusive) is Total in Numbers [Total in Words QUANTITIES. Each Bidder will determine their own quantities. This bid will result in a lump sum contract. PRICING. This is a lump sum contract and the contract price will remain in effect until the contract is complete. Unit prices are used for pricing change orders only. The Contractor shall specify the length of time through which unit prices will remain in effect. If the contract is not issued prior to the unit price expiration date, the Owner shall have the option of: 1) negotiating a unit price time extension; 2) negotiating revised unit prices based upon verifiable suppliers' increases or decreases; 3) re-bidding the work. Once the contract has been issued, the unit prices will remain in effect until the contract is complete. In submitting this Bid, it is understood that the right to reject any and all Bids and to waive irregularities in the Bidding has been reserved by TOWN. The undersigned hereby certifies that the information submitted herewith, including any attachment, is true to the best of his knowledge and belief. Dated this 6 day of March : 2025 Felix Construction Company Name of BIDDER (Company) 2530 S 52nd Ave Address of BIDDER Phoenix, AZ 85043 City, State, Zip Code (480) 464-0011 Area Code/Telephone Number Matt Phillips/Pyif¢ipal Ahi AL Authofized Officer Signature () (We), the undersigned (Corporate Secretary) (Partners), hereby certify that the above-named Officer is hereby authorized to execute all documents relative to this bid and the administration of this bid for and on behalf of L pany, fed above. or Gprporate Secretar¥ | (signature) Partner Signature Partner Signature Project Name: SWWTP intensification Project Project No.: Bid 24-03 BID BOND (Surety Bond) KNOW ALL MEN BY THESE PRESENTS: That we, Felix Construction Company : , (hereinafter "Principal"), and the Travelers Casualty and Surety Company of America , a corporation duly organized under the laws of the State of _Connecticut , duly licensed in and holding a certificate of authority to transact surety business in the State of Arizona issued by the Director of the Department of Insurance pursuant to Title 20, Chapter 2, Article 1, (hereinafter "Surety"), as Surety, are held and firmly bound unto TOWN of Wickenburg, a municipal corporation as Obligee, in the sum of ten percent (10%) of the amount of the bid included in the proposal, submitted by the Principal to the Mayor and Council of TOWN of Wickenburg, for the WORK described below, for the payment of which sum, well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, and administrators, successors and assigns, jointly and severally, firmly by these presents, and in conformance with A.R.S. § 34-201. WHEREAS, the Principal is herewith submitting its Bid for South WWTP Intensification Project NOW, THEREFORE, if TOWN of Wickenburg shail accept the Proposal of the Principal and the Principal shall enter into a CONTRACT with TOWN of Wickenburg, in accordance with the terms of such proposal and give the Bonds and Certificates of Insurance as specified in the SPECIFICATIONS with good and sufficient surety for the faithful performance of the CONTRACT and for the prompt payment of labor and material furnished in the prosecution of the CONTRACT, or in the event of the failure of the Principal to enter into the CONTRACT and give the Bonds and Certificates of Insurance, if the Principal pays to TOWN of Wickenburg the difference not to exceed the penalty of the bond between the amount specified in the Proposal and such larger amount for which TOWN of Wickenburg may in good faith CONTRACT with another party to perform the WORK covered by the Proposal, then this obligation is void. Otherwise it remains in full force and effect provided, however, that this Bond is executed pursuant to the provisions of Section 34-201, Arizona Revised Statutes, and all liabilities on this Bond shall be determined in accordance with the provisions of the Section to the extent as if it were copied at length herein. This Surety Bond shall not be executed by an individual surety or sureties, even if the requirements of A.R.S. § 7-101 are satisfied. Construction Contract without CM Form No. 11.03 Revised November 24, 2013 Project Name: SWWTP Intensification Project Project No.: Bid 24-03 Signed and sealed this 23rd_day of, January ,20_ 28. th Company Prixfcipal Franses eal Title Witness: Fr Travelers Casualty and Surety Company of America a mA, WY as he ike Witness: Title — Gregory P. Griffith, Attorney-in-Fact Address of Surety: Stephanie L. Bucholz One Tower Square Hartford, CT 06183 * Attach Power of Attorney Construction Contract without CM Form No. 11.03 Revised November 24, 2013 a TRAVELERS J SURETY BOND ELECTRONIC SIGNATURE & SEAL ADDENDUM TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA Travelers Casualty and Surety Company of America (“Travelers”) has authorized its Attorneys-in-Fact to utilize an electronic, facsimile, or digital signature (each an “Electronic Signature”) to execute bonds on behalf of Travelers and has further authorized its Attorneys-in-Fact to attach this Addendum to any such bonds. Travelers hereby acknowledges and agrees that the attached bond executed by the Attorney-in-Fact on behalf of Travelers with an Electronic Signature shall have the same force and effect as if executed by the Attorney-in-Fact with a wet ink signature. Travelers also hereby agrees that the seal below shall be deemed affixed to the attached bond to the same extent as if Travelers’ raised corporate seal was physically affixed to the face of the bond. Dated this 1st day of April, 2023. Travelers Casualty and Surety Company of America By: Robert L. Raney, SeniorVice President Travelers Casualty and Surety Company of America - Travelers Casualty and Surety Company TRAVELE R S St. Paul Fire and Marine Insurance Company POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and St. Paul Fire and Marine Insurance Company are corporations duly organized under the laws of the State of Connecticut (herein collectively called the “Companies"), and that the Companies do hereby make, constitute and appoint Gregory P. Griffith ofMesa Arizona , their true and lawful Attorney-in-Fact to sign, execute, seal and acknowledge any and all bonds, recognizances, conditional undertakings and other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. IN WITNESS WHEREOF, the Companies have caused this instrument to be signed, and their corporate seats to be hereto affixed, this 3rd day of February, 2017. State of Connecticut By: 7 City of Hartford ss. Robert L. Raney, Seffior Vice President On this the 3rd day of February, 2017, before me personally appeared Robert L. Raney, who acknowledged himself to be the Senior Vice President of Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and St. Paul Fire and Marine Insurance Company, and that he, as such, being authorized so to do, executed the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer. In Witness Whereof, | hereunto set my hand and official seal. My Commission expires the 30th day of June, 2021 Mane ¢ Aoreoutrd Marie C. Tetreault, Notary Public This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and St. Paul Fire and Marine Insurance Company, which sesolutions are now in full force and effect, reading as follows: RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint Attorneys-in-Fact and Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the Company's seal bonds, recognizances, contracts of indemnity, and other writings obligatory in the nature of a bond, recognizance, or conditional undertaking, and any of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her; and it is FURTHER RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company, provided that each such delegation is In writing and a copy thereof is filed in the office of the Secretary; and it is FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance, or conditional undertaking shall be valid and binding upon the Company when (a) signed by the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary and duly attested and sealed with the Company's sea! by a Secretary or Assistant Secretary; or (b) duly executed (under seal, if required) by one or more Attorneys-in-Fact and Agents pursuant fo the power prescribed in his or her certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority; and it is FURTHER RESOLVED, that the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President, any Vice President, any Assistant Vice President, any Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to any Power of Attorney or to any certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attorneys-in-Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, and any such Power of Attomey or certificate bearing such facsimile signature or facsimile seal shall be vatid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or understanding to which it is attached. |, Kevin E. Hughes, the undersigned, Assistant Secretary of Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and St. Paul Fire and Marine Insurance Company, do hereby certify that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies, which remains in full force and effect. Dated this 23rd day of January , 2025 @ Kevin E. Hughes, Assistant Secretary To verity the authenticity of this Power of Attorney, please call us at 1-800-421-3880. Please refer to the above-named Attorney-in-Fact and the detaits of the bond to which the power is attached. Project Name: SWWTP Intensification Project Project No.: Bid 24-03 AFFIDAVIT BY CONTRACTOR CERTIFYING THAT THERE WAS NO COLLUSION IN BIDDING FOR CONTRACT STATE OF ARIZONA ) ) ss. TOWN of Wickenburg ) Matt Phillips (Name of Individual) BEING DULY SWORN, DEPOSES AND SAYS: That she/he is Principal of Felix Construction Company (Title) (Name of Business) That pursuant to Section 34-253 of the Arizona Revised Statutes, he certifies as follows: That neither he nor anyone associated with the said Felix Construction Company (Name of Business) Has directly, or indirectly entered into any agreement, participated in any coJktSign or otherwise employee in connection with the award of this Contract. (Signature) Principal (Title) Felix Construction Company (Name of Business) ye SUBSCRIBED AND SWORN TO BEFORE ME this ©" day of Mntett 2025. My commission expires: otlod (zor Construction Contract without CM Form No.1 1.03 Revised November 24, 2013 Project Name: SWWTP Intensification Project Project No.: Bid 24-03 BIDDERS’ QUESTIONAIRE [To Be Submitted With Bid} BIDDER’S RESPONSIBILITY SUPPLEMENTAL EVALUATION CRITERIA Organizational Information BIDDER: Felix Construction Company (Bidder’s name) Submitted by: Name of Organization: Felix Construction Company Name of Individual: Title: _ _ _ Address: 2530S. 52nd Avenue, Phoenix AZ 85043 Telephone: ( 480 ) 464.0011 Bidder’s General Business Information Check If: [x] Corporation [] Partnership [] Joint Venture [] Sole Proprietorship If Corporation: a. Date and State of Incorporation: February 1987 - Arizona b. List of Executive Officers: Name Title David Giannetto - Principal & CEO “Matt Phillips - Principal | a Joel Felix - Principal Kevin Felix - Principal Construction Contract without CM. D-1 Form No. 11.03 Revised November 24, 2013 Project Name: SWWTP Intensification Project Project No.: Bid 24-03 If Partnership: a. Date and State of Organization: b. List of Current General Partners: Name Title c. Type of Partnership: [] General [] Publicly Traded [] Limited [ ] Other (describe): _ — = If Joint Venture: a. Date and State of Organization: b. Name and Address of Owner or Owners: Js your organization a member of a controlled group of corporations as defined in IRC Sec. 1563? [] Yes []No Construction Contract without CM D-2 Form No. 11.03 Revised November 24, 2013 Project Name: SWWTP Intensification Project Project No.: Bid 24-03 If yes, show names and addresses of affiliated companies: Furnish the following information with respect to an accredited banking institution familiar with your organization: Name of Bank: Bank of America Address: 14636 N Scottsdale Rd Ste #250 Scottsdale, AZ 85254 Patricia Ruiz Account Manager: Telephone Number: (480) 624-0648 Construction Contract without CM D-3 Form No. 11.03 . Revised November 24, 2013 Project Name: SWWTP Intensification Project Project No.. Bid 24-03 Similar Projects (Use Separate Sheets as needed) Provide information for at least TWO (2) similar projects successfully completed within the last FIVE (5) years. (See Section 1.1.2.) BIDDER: Felix Construction Company (idder’s name) a. Name of Similar Project #1: Kingman JOC - Stair Screen Install b. Contracting Party (Owner): Name: City of Kingman - Burely Hambrick Address: 310 N. Fourth Street, Kingman, Telephone Number: (928 ) 565.1424 c. If Joint Venture, names of each participant: N/A d. Contract Price: $335,336 e. Description of Similar Project #1:_ Removal and Install of Owner Supplied Stair Screens (Briefly describe here, and attach a copy of the description in the Contract. Technical specifications may be requested by TOWN.) f. Construction Manager(s) during the Similar Project #1: Name: Mike Bejarano ee Address: 2530 S. 52nd Avenue, Phoenix AZ 85043 | Telephone Number: (_ 480 _) 392.3133 g. Start date (notice to proceed issued): 8/5/2024 h. Completion date provided for in the Contract: 9/2024 i. Substantial completion date (approved by Owner):_ 9/2024 j. Reasons why work was completed early, or why delays occurred: Work completed.on time Construction Contract without CM D-4 Form No. 11.03 Revised November 24, 2013 Project Name: SWWTP Intensification Project Project No.: Bid 24-03 k. Final price paid by Owner for the Similar Project #1: I. If final price was 10% less or more than the original Contract Price, describe why: m. Describe any large cost over-runs (claims in excess of $ ) disputed or contested by the Owner, the reasons for dispute, and ultimate resolution of the dispute: n. Did Owner file a lawsuit against Bidder concerning performance? Yes No X_ Ifso, what was the result? 0. Following final payment on the Similar Project, has Bidder voluntarily or otherwise provided any additional work or repairs, or made any payments to the Owner to cure defects or fulfill warranties made to the Owner concerning the quality of the performance/or the work involved in the Similar Project? Describe: No_ _ — — p- Has your company undergone a major change in ownership, management, size, or expertise since the time of this Similar Project? Yes =~ No X Describe: All answers should be complete and informative. Attach additional sheets if needed to give a full answer. TOWN may, at its discretion, request Bidder to provide additional information concerning this Similar Project as part of its evaluation of the responsibility of the Bidder prior to award of the Contract. Construction Contract without CM Dp-5 Form No 11.03 3 Revised November 24, 2013 Project Name: SWWTP Intensification Project Project No.: Bid 24-03 Similar Projects (Use Separate Sheets as needed) Similar Project #2 BIDDER: Felix Construction Company (Bidder’s name) a. Name of Similar Project #2: Goodyear Rainbow Valley WR Centrifuge Replacement b. Contracting Party (Owner): Name: City of Goodyear - Barb Chappell_ Address: 1900 N. Civic Square, Goodyear, / AZ85 85395 Telephone Number: (623 _) 923.3910 c. If Joint Venture, names of each participant: N/A d. Contract Price: $154,849 e. Description of Similar Project #2: Disconnection of Existing Rental Centrifuge @ RVWRF, Buried conduit installation from existing panel to to new centrifuge, Startup Assistance and testing (Briefly describe here, and attach a copy of the description in the Contract. Technical specifications may be requested by TOWN.) f. Construction Manager(s) during the Similar Project #2: Name: Zach Foster - General Manager Address: 2530 S. 52nd Avenue, Phoenix, AZ 85043 Telephone Number: ( ) g. Start date (notice to proceed issued): 6/1/2020 h. Completion date provided for in the Contract: 8/17/2020 i. Substantial completion date (approved by Owner): 8/17/2020 j. Reasons why work was completed early, or why delays occurred: Work completed on time. k. Final price paid by Owner for the Similar Project #2: $154,849 Construction Contract without CM D-6 Form No. 11.03 Revised November 24, 2013 Project Name: SWWTP Intensification Project Project No.: Bid 24-03 l, If final price was 10% less or more than the original Contract Price, describe why: N/A m. Describe any large cost over-runs (claims in excess of $ ) disputed or contested by the Owner, the reasons for dispute, and ultimate resolution of the dispute: N/A n. Did Owner file a lawsuit against Bidder concerning performance? Yes No X If so, what was the result? o. Following final payment on the Similar Project, has Bidder voluntarily or otherwise provided any additional work or repairs, or made any payments to the Owner to cure defects or fulfill warranties made to the Owner concerning the quality of the performance/or the work involved in the Similar Project? Describe: No_ = — -_ a p. Has your company undergone a major change in ownership, management, size, or expertise since the time of this Similar Project? Yes_____No_X Describe: All answers should be complete and informative. Attach additional sheets if needed to give a full answer. TOWN may, at its discretion, request Bidder to provide additional information concerning this Similar Project as part of its evaluation of the responsibility of the Bidder prior to award of the Contract Construction Contract without CM D-7 Form No. 11.03 Revised November 24, 2013 Project Name: SWWTP Intensification Project Project No.: Bid 24-03 Personnel/Subcontractor Qualifications BIDDER: Felix Construction Company __ (Bidder’s name) a. List details of the construction experience of the Key Personnel (as defined in Paragraph 1.1.2 of the Contract Documents) directly involved in construction activities: TBD b. Does Bidder have an adequate workforce to complete the Work if awarded the Contract? Describe, including general types of work performed with your own work force: Yes, Civil, Concrete, Mechanical, Electrical | c. What additional personnel may need to be hired by Bidder as employees, if awarded the Contract? d. What other major projects is Bidder currently under contract to perform? (Describe the projects, completion dates) List will be provided if selected e. Are subcontractors proposed by Bidder ready, willing, and able to perform the work? Yes X No _. (Town may request additional information concerning subcontractors’ past performance, personnel, equipment, licenses, and other pending projects) f. If proposed subcontractors are not available, how does Bidder propose to replace the subcontractors? = = — B- If Bidder requires additional or replacement personnel and/or subcontractors to complete the Work, and there is a labor shortage due to high volume of construction occurring in Construction Contract without CM D-8 Form No. 11.03 Revised November 24, 2013 Project Name: SWWTP Intensification Project Project No.: Bid 24-03 the Phoenix metropolitan area, is Bidder able to complete the Work on time, as required by the Contract Documents? Yes * No__. Please describe. (TOWN does not consider mere labor shortage to qualify as force majeure.) h. Has any corporate officer, partner, joint venture participant or proprietor ever failed to complete a construction contract awarded to him or her in their own name or when acting as a principal of another organization? Yes_ No X __. Ifyes, describe circumstances: _ Construction Contract without CM p-9 Form No. 11.03 Revised November 24, 2013