TOWN OF WICKENBURG INTENSIFICATION PROJECT Herschel Workman, Public Works Director May 5, 2025 2 Intensification Project • Influent flow has reached 80% of rated average daily capacity. • Peak flow conditions occur at 3 times the rated capacity. • Total nitrogen levels are more than twice the design concentration. • Regulatory Requirements: • Design for expansion must begin at 80% capacity • Construction must begin at 90% capacity. Background and Need: Short-Term Solution: Implement an intensification process to meet flow/treatment demands over the next 5 years. Goals: • Increase throughput and treatment capacity • Maintain regulatory compliance Intensification Project 3 Design Elements: • Activated granular sludge process • Dual center-fed drum screens • One additional blower • Recycle & waste pump improvements • Instrumentation upgrades • Hydraulic capacity increase to 1.2 MGD Intensification Project 4 5 Intensification Project Bids Felix Construction Co. • $2,903,161.00 Fann Environmental LLC • $3,680,533.00 ASR Construction Group • $3,025,916.37 Original engineer’s estimate: $1,470,000.00 I move to approve the contract with Felix Construction Company for the South WWTP Intensification Project in the amount of $2,903,161.00 per Bid 24-03 and authorize $600,000 from Wastewater 1 Contingency and the use of budgeted ARPA funding. 6 Motion Questions? 7