TOWN OF WICKENBURG
INTENSIFICATION PROJECT
Herschel Workman, Public Works Director
May 5, 2025

2
Intensification Project
• Influent flow has reached 80% of rated average daily
capacity.
• Peak flow conditions occur at 3 times the rated capacity.
• Total nitrogen levels are more than twice the design
concentration.
• Regulatory Requirements:
• Design for expansion must begin at 80% capacity
• Construction must begin at 90% capacity.
Background
and Need:

Short-Term Solution:
Implement an intensification
process to meet flow/treatment
demands over the next 5 years.
Goals:
• Increase throughput and
treatment capacity
• Maintain regulatory compliance
Intensification Project
3

Design Elements:
• Activated granular sludge process
• Dual center-fed drum screens
• One additional blower
• Recycle & waste pump improvements
• Instrumentation upgrades
• Hydraulic capacity increase to 1.2 MGD
Intensification Project
4

5
Intensification Project Bids
Felix Construction Co.
• $2,903,161.00
Fann Environmental LLC
• $3,680,533.00
ASR Construction Group
• $3,025,916.37
Original engineer’s estimate: $1,470,000.00

I move to approve the contract with Felix Construction Company for the
South WWTP Intensification Project in the amount of $2,903,161.00 per
Bid 24-03 and authorize $600,000 from Wastewater 1 Contingency and
the use of budgeted ARPA funding.
6
Motion

Questions?
7